Loading...
HomeMy WebLinkAboutNCC192699_NOI Application_20191112Action History (UTC-05:00) Eastern Time (US & Canada) Subrrit by Anonymous User 11/7/2019 9:11:51 AM (NCG01 NOI Submission) Approve by Clark, Paul 11/7/2019 11:08:23 AM (Review- Construction NOI 18211) • The task was assigned to Clark, Paul by round robin distribution 11/7/2019 9:12 AM The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: November 11, 2019 5:00 PM 11/7/2019 9:12 AM Submit by McCoy, Suzanne 11/12/2019 7:59:07 AM (Payment Verification for NCC192699) * Kevin S Kerr • McCoy, Suzanne assigned the task to McCoy, Suzanne 11/12/2019 7:58 AM The task was assigned to DEMLR NCG01 Payment Team. The due date is: December 19, 2019 5:00 PM 11/7/2019 11:08 AM .• SThF� '; 1 NORTH CAROLINA EnrlronmertW quallly A. Project Information Part A. Project Location and Waterbody Information 1. Project Name * Rowhouse Development 2. County* Buncombe 3. Highway or Street Broadway Street Address * Street narre only is acceptable if no address nunber assigned yet 4. City or Township* Asheville 5. State * NC 6. Zip Code * 28801 7. Latitude * Enter the latitude in decirral degrees 35.6018 8. Longitude* Enter the longitude in decirral degrees (M. ST be negative) -82.5563 If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of North Carolina. Look for the coordinates in the bottom left corner. 9. Date to Begin* 11/18/2019 Estimated Construction Project Start Date 10. Date to End* 03/22/2021 Estimated Construction Project End Cute 11. SIC (Primary) * Residential, Single Family Houses (SFE) (1521) Standard Industrial aassification for Developrrent 12. Acres to be 2.10 disturbed* (including off -site borrow and waste areas) 13. Total site area 1.51 (acres) * 14. Post- 0.70 construction (Estimated) impervious area (acres)* NCC Project NCC-BUNCO-2019-Rowhouse Development Tracking ID Assignedautorratically Below you must enter waterbody information for surface waters affected by this project. Please consult DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. Please enter only immediate receiving waterbodies - not waters downstream of those unless the project extends there. You may enter up to 3 waterbodies if needed. 15a. Receiving Reed Creek Wate rbody* fine of waterbody into which storrrwater runoff will discharge 15b. Waterbody 6-80 Index No. * NCWaterbody Index Minter Stormwater V No discharges will flow r Yes to additional wate rs * 16a. Is this project r Yes subject to the NC r No, not subject to NC SPCA Sediment Pollution Control Act?* B. Permittee Information Part B. ^ Fternittee Inforrration - Legally Fbsponsible Entity and Individual Important: The person who signs the NOI Certification Form and signs the Certification in Section E of this application form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same organization. That person must be a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. 1. Organization Boulevard Development Group, LLC Name * 2. First Name* Kevin IF Corporation, enter Fbgistered Agent First Barre 3. Last Name* Kerr IF Corporation, enter Faegistered Agent Last %rre 3b. Title Manager 4. Permitee E-mail kevinskerr@gmail.com Address * 5. Permittee 828-242-5437 Telephone No.* 6. Permittee Mailing Street Address Address* PO Box2239 Address Line 2 city Asheville Fbstal / Zip Code 28802 Check box if the street address the same as mailing address 7. Permittee Street Address* r Yes Street Address 190 Broadway Street #201 Address Line 2 Cty Asheville Fbstal / Zip Code 28801 State / Frovince / Faegion NC Country Buncombe State / Frovince / Plegion NC Country Buncombe C. Site Contact Information Part C. Roject Site Contact Inforrration .................................................................................................................................................................................................... 1. Type of Non -Government Ownership * 2. Primary Site Mike Contact - First Name * 3. Primary Site Anderson Contact - Last Name * 4. Title PE 5. Site Contact E- manderson@aceasheville.com mail Address* 6. Site Contact 828-582-8970 Telephone No.* 7.Organization ACE Name 8. Site Contact Street Address Mailing Address* 50 S French Broad Ave STE 152 Address Line 2 City Asheville Fbstal / Zip Code 28801 9. Consultant Name (Optional) First and Last narre 10. Consultant E- This person will be copied on all correspondence. mail 11. Consultant Telephone No. State / Rovince / Fbgion North Carolina Country United States D. E&SC Plan Part D. ^ Erosion & Sediment Control (E&SC) Ran Approval Information ...................................................................................................................................................................................................................................................................................................................................... 1. Date E&SC Plan 11/04/2019 Approved * 2. E&SC Plan Project 18-08382PZ Number/ID * Assigned by agency or local program 3. E&SC Plan f State DEQ Office Approved by* r Local Program 4. Local Program* City of Asheville Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a complete application. 5. E&SC Plan City of Asheville Formal Grading Letter of Approval 200.8KB Approval_11-4-2019. pdf letter/documentation Mist be R7Ffon-rat 6. NOI Certification 1775 NCG01-eNO1-Certification-Form-Signed.pdf 783.16KB Form Mist be R7Ffon-rat This is an Express F No Review Project* r Yes E. Certification North Carolina General Statute 143-215.66 (1) provides that: Any person who knowingly makes anyfalse statement, representation, or certification in any application, record, report, plan, or other document filed or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Artcle; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Artcle shall be guilty ofa Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000). Under penalty of law, I certify that: 17 I am the person responsible for the construction activities of this project, for satisfying the requirements of this permit, and for any civil or criminal penalties incurred due to violations of this permit. rJ The information submitted in this NOI is, to the best of my knowledge and belief, true, accurate, and complete based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information. * 17 I will abide by all conditions of the NCG010000 General Permit and the approved Erosion and Sediment Control Plan. * rJ If the Erosion and Sediment Control Plan approved by the delegated program is not compliant with Part II (Stormwater Pollution Prevention Plan) of the NCG010000 General Permit. I will nonetheless ensure that all conditions of Part II of the permit are met on the project at all times. * 17 I hereby request coverage under the NCG010000 General Permit and understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. Specify if you are:* r The Responsible Person named on this Notice of Intent f Authorized Responsible Person* Important: The person who electronically signs this Certification above must be the same person who signs the NOI Certification Form. If that person is signing on behalf of the Permittee, that individual must be an authorized responsible person within the same organization as the Permittee. *An authorized individual is a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature Type Name* Kevin Kerr Title Manager Organization Boulevard Development Group, LLC Date * 11 /07/2019 F. Tracking and COC Info NOI Tracking No. 18211 NC Reference No. NCG01-2019-2699 Uses 'count number' variable (incremrented by SP) Certificate of NCC192699 Coverage (COC) Uses 'count number' variable (incremented by SP) No.* Count Number 2699 Sequential number for submittal that is incremented by Stored Frocedure COC Year 2019 Year of date reviewed (used to assign YY digits after "NOC' in COCno.)