Loading...
HomeMy WebLinkAboutNCG150024_Inspection Report_20191112ROY COOPER Governor MICHAEL S. REGAN Secretary S. DANIEL SMITH Director Avery County Airport Authority Attention: Sam Calvert 202 Little Cow Camp Road Newland, North Carolina 28657 NORTH CAROLINA Environmental Quality November 12, 2019 Subject: Compliance Evaluation Inspection Permit: NCG150000 Certificate of Coverage: NCG150024 Avery County, North Carolina Dear Mr. Calvert: Enclosed please find a copy of the Compliance Evaluation Inspection Report for the inspection I conducted at the subject facility on October 24, 2019. The report should be self-explanatory; however, should you have any questions concerning this report, please do not hesitate to contact me at (828) 296-4500 or by email at Isaiah.reed@ncdenr.gov. Sincer Isaiah Reed, WQ, CEPSCI, MS4CECI Environmental Specialist Land Quality Section Enclosure: Inspection Report D_E\ Qr�� North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Asheville Regional Office 12090 U.S. Highway 70 I Swannanoa, North Carolina 28778 828.296.4500 Permit: NCG150024 SOC: County: Avery Region: Asheville Contact Person: Sam Calvert Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Compliance Inspection Report Effective: 01/29/18 Expiration: 08/31/22 Owner: Avery County Airport Authority Effective: Expiration: Facility: Avery County Airport 400 Brushy Creek Rd Inspection Date: 10/2412019 Primary Inspector: Isaiah L Reed Secondary Inspector(s): Title: EntryTime: 10:OOAM Certification: Spruce Pine NC 28777 Phone: 828-260-1701 Phone: Exit Time: 10:00AM Phone: 828-296-4614 Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Air Transportation Stormwater Discharge CDC Facility Status: ❑ Compliant 0 Not Compliant Question Areas: 0 Storm Water (See attachment summary) Page 1 of 3 Permit: NCG150024 Owner -Facility: Avery County Airport Authority Inspection Date: 10124/2019 Inspection Type : Compliance Evaluation Reason for Visit: Routine Inspection Summary: On October 24, 2019 this facility was inspected for compliance. i met with Sam Calvert on site. During the inspection, the following was noted: The Stormwater Pollution Prevention Plan on site was a copy of the SWPPP for the Fayetteville Regional Airport SWPPP. The permittee is directed to create a SWPPP specific to this facility, and meeting all requirements outlined in the NCG150000 General Permit. Please give the above item your immediate attention. This facility will be re -inspected on or after December 10, 2019, if the above items are not addressed, further action will be taken. If you have any questions, please contact this office at (828) 296-4614 Page 2 of 3 Permit: NCG150024 Owner• Facility: Avery County Airport Authority Inspection Date: 10/24/2019 Inspection Type : Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ❑ 0 ❑ ❑ # Does the Plan include a General Location (USGS) map? ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? ❑ 0 ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? ❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? ❑ N ❑ ❑ # Does the Plan include a BMP summary? ❑ 0 ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? - ❑ 0 ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ❑ E ❑ ❑ # Does the facility provide and document Employee Training? ❑ 0 ❑ ❑ # Does the Plan include a list of Responsible Party(s)? ❑ 0 ❑ ❑ # Is the Plan reviewed and updated annually? ❑ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? ❑ 0 ❑ ❑ Comment: SWPPP was on site, but was the SWPPP for the Fayettville Regional Airport. Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? 0 ❑ ❑ ❑ Comment: Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? 0 ❑ ❑ ❑ # Were all oulfalls observed during the inspection? 0 ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ 0 ❑ # Has the facility evaluated all illicit (non stormwater) discharges? ❑ 0 ❑ ❑ Comment: Page 3 of 3