HomeMy WebLinkAboutNCC192674_ESC Approval Submitted_20191108ROY COOPER
Governor
MIC14AEL S. REGAN
se--lary
S. DANIEL ShM
Director
NORTH CAROLINA
Dmlrv� Quallry
October 3, 2019
LETTER OF APPROVAL WITH MODIFICATIONS
Eastwood Construction, LLC - Charlotte
Attention: Marc Battiste, Vice President Construction
2851 Westport Road
Charlotte, North Carolina 28208
RE: Project Name: Heritage Subdivision Lots 259-263 & 271-279 [Express Review]
Acres Approved: 2.74
Project ID: UNION-2020-028
County: Union, City: Indian Trail
Address: Wesley Chapel Road
River Basin: Catawba
Stream Classification: Other
Submitted By: Eastwood Construction, LLC - Charlotte
Date Received by LQS: October 1, 2019
Plan Type: New
Dear Mr. Battiste:
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be
acceptable with modifications and hereby issue this letter of Approval with Modifications. The
Modifications Required for Approval are listed on the attached page.. This plan approval shall expire three
(3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required
by Title 15A NCAC 4B .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice
of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCG01.0000 Construction
Stormwater General Permit. This form MUST be submitted prior to the commencement of any land
disturbing activity on the above named project. The NOI form may be accessed at deq.nc.govINCG01.
Please direct questions about the NOI form to Annette Lucas at Annette.lucas@ncdenr.gov or Paul Clark
at Paul.clark@ncdenr.gov. After you submit a complete and correct NOI Form, a COC will'. be emailed to
you within three business days. Initially, DEMLR will not charge a fee for coverage under the NCGO 1
permit. However, on or after May 1, 2019, a $100 fee will be charged annually. This fee is to be sent to the
DEMLR Stormwater Central Office staff in Raleigh.
Title 15A NCAC 4B .O l 18(a) and the NCGO1 permit require that the following documentation be kept on
file at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCGO1 permit and the COC, once it is received.
North Caronna Department of En*mnmtW qza&ry I �Mision of DwW, MVKn E and Land Resources
D ✓:may � Mooresv& Regional office_I_61a East Center Avenue, Scribe 301 I Mooresv&, North Carolina 28115
+► 704.663.1699 -- --
Letter of Approval with Modifications
Eastwood Construction, LLC - Charlotte
October 3, 2019
Page 2 of 4
Records of inspections made during the previous 30 days.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure
compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of
existing natural resources and adjoining properties. If; following the commencement of this project, the
erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation
Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require
revisions to the plan and implementation of the revisions to insure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water
quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to
this land -disturbing activity. This approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the Financial
Responsibility Form; which you provided. You are requested to file an amended form if there is any change
in the information included on the form. In addition, it would be helpful if you notify this office of the
proposed starting date for this project. Please notify us if you plan to have a preconstruction conference.
Your cooperation is appreciated.
Sincerely,
3--is➢ S.. 91'..1
Zahid S. Khan, CPK CPESC, CPSWQ
Regional Engineer
Land Quality Section
Enclosures: Certificate of Approval
Modifications Required for Approval
NCGO1 Fact Sheet
CC., Adam Brown, EI Pabst Design Group, PA, 404-B Glenwood Avenue, Raleigh, NC 27603
Inspection Department
Letter of Approval with Modifications
Eastwood Construction, LLC - Charlotte
October 3, 2019
Page 3 of 4
MODIFICATIONS REQUIRED FOR APPROVAL
Project Name: Heritage Subdivision Lots 259-263 & 271-279
Project ID: UNION-2020-028
County: Union
The new NCGO1 Construction stormwater permit requires Ground Stabilization and
Materials Handling and Self -Inspection, Recordkeeping and Reporting requirements on
your plans. The NCGO1 compliance plan sheets for these can be found at
https:Hdeq.nc.c,ov/about/divisions/energy-mineral-land-resources,/energy-mineral-land-
permits/stormwater-permits/construction-sw. 0., 3 kp—� It
2. If contiguous lots are graded such that one acre or more is disturbed, individual lot controls
will be insufficient, and surface dewatering is required in order to maintain compliance with
the NPDES general construction permit. This site is limited to individual lot disturbance.
If contiguous lot grading for lots totaling 1 acre or more is to take place, an approved plan
is required before grading takes place, with specific locations for surface dewatering,
specifications and calculations for surface dewatering. [N.C.G.S. 143-215.1]
Any off -site borrow and waste required for this project must come from a site with an
approved erosion control plan, a site regulated under the Mining Act of 1971, or a landfill
regulated by the Division of Solid Waste Management. Trash/debris from demolition
activities or generated by any activities on site must be disposed of at a facility regulated by
the Division of Solid Waste Management or per Division of Solid Waste Management or
Division of Water Resources rules and regulations. [15A NCAC 4B .0110]
4. The site, or portions of the site as applicable, are required to be stabilized after any period
of inactivity. Slopes steeper than 3:1, perimeter dikes, swales, and ditches must be stabilized
within 7 days. All other areas must be stabilized within 14 days. [N.C.G.S. 143-215.1]
5. Silt fence may not be placed such that portions of the lot are exposed to erosion. [15A NCAC
4B .0105]
6. All access to the lots must be through the construction entrances. Construction entrances
must be in place prior to lot disturbance. [15A NCAC 4B .01051 Lei��{ �] B� Se
7. All inlets collecting drainage or that might potentially be affected by the lot construction
shall have inlet protection. Inlet protection must be maintained until all areas draining to
the inlet are fully stabilized. [15A NCAC 4B .0105]
8. All measures, including stone drive, will be inspected after rain and at least weekly for
adequacy and needed maintenance. [N.C.G.S. 143-215.1]
9. All disturbed areas not built upon will be provided with permanent groundcover. [N.C.G.S.
113A-57(2)]
Letter of Approval with Modifications
Eastwood Construction, LLC - Charlotte
October 3, 2019
Page 4 of 4
10, Effective October 1, 2010, persons responsible for land disturbing activities must inspect
the sediment and erosion control measures on a project after each phase of the project to
make sure that the approved erosion and sedimentation control plan is being followed. Self -
inspection reports are required. A sample self -inspection report, as well as details of the
self -inspection program, can be found on the Land Quality web site:
http://portal,ncdenr.otoveb/wq/ws/su/construction
Not every project will have all the possible phases, but a list of phases may include:
• Installation of perimeter erosion and sediment control measures.
• Clearing and grubbing of existing ground cover.
• Completion of any phase of grading that requires provision of stabilization.
• Installation of measures during any phase of the project.
+ Completion of construction or development.
• Quarterly inspections until the establishment of permanent ground cover is fully
established.
Please note these inspection requirements are in addition to NPDES inspection requirements.
[N.C.G. S. 113A-54.1(e)]
it. Additional measures may be necessary during the course of this project. [15A NCAC
4B .0115]