HomeMy WebLinkAboutNCC192674_NOI Application_20191108Action History (UTC-05:00) Eastern Time (US & Canada)
Submit by Anonymous User 11/4/2019 4:50:14 PM (NCG01 NOI Submission)
Approve by Clark, Paul 11/6/2019 9:19:12 AM (Review- Construction NOI 18070)
• The task was assigned to Clark, Paul by round robin distribution 11/4/2019 4:50 PM
The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: November 6, 2019 5:00
PM 11 /4/2019 4:50 PM
Submit by Garcia, Lauren V 11/8/2019 8:55:42 AM (Payment Verification for NCC192674)
* Eastwood Construction
• Garcia, Lauren V assigned the task to Garcia, Lauren V 11/8/2019 8:55 AM
• The task was assigned to DEMLR NCG01 Payment Team. The due date is: December 18, 2019 5:00
PM 11 /6/2019 9:19 AM
STME
NORTH CAROLINA
Ernvlronmentol qualily
A. Project Information
Part A.
Project Location and Waterbody Inforrration
1. Project Name * Heritage subdivision lots 259-263 & 271-279
2. County* Union
3. Highway or Street Wesley Chapel Road
Address * Street name only is acceptable if no address nurrtrer assigned yet
4. City or Township * Indian Trail
5. State * NC
1r-G)a�T7G)MraIif_T1IIa10141
6. Zip Code* 28110
7. Latitude * Enter the latitude in decirral degrees
35.0244
8. Longitude * Enter the longitude in decirral degrees (MIST be negative)
-80.6659
If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of
North Carolina. Look for the coordinates in the bottom left corner.
9. Date to Begin*
10/18/2019
Estimated Construction Project Start Date
10. Date to End*
12/16/2021
Estimated Construction Project End Date
11. SIC (Primary)*
Residential, Single
Family Houses (SFE)
(1521)
Standard Industrial aassification for Development
12. Acres to be
2.74
disturbed*
(including off -site borrow and waste areas)
13. Total site area 2.74
(acres)*
14. Post- 1.00
construction (Estimated)
impervious area
(acres) *
NCC Project NCC-UNION-2019-Heritage subdivision lots 259-263 & 271-279
Tracking ID Assigned automatically
Below you must enter waterbody information for surface waters affected by this project. Please consult
DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. Please
enter only immediate receiving waterbodies - not waters downstream of those unless the project extends there. You
may enter up to 3 waterbodies if needed.
15a. Receiving Prince Mill Creek
Waterbody* Nbn-e of waterbody into which stormwater runoff will discharge
15b. Waterbody 11-138-2-2
Index No. * NCWaterbody Index Number
Stormwater r No
discharges will flow pr Yes
to additional
wate rs *
15c. Additional East Fork Twelve Mile Creek
Receiving Waterbody narre
Waterbody
15d. Waterbody 11-138-2
Index No. NCWaterbody Index Number
15e. Additional Waterbody narre
Receiving
Waterbody
15f. Waterbody NCWaterbody Index Number
Index No.
16a. Is this project F Yes
subject to the NC r No, not subject to NC SPCA
Sediment Pollution
Control Act?*
B. Permittee Information
Part B.
Perrrittee Information - Legally Responsible Entity and Individual
.....................................................................................................................................................................
h
Important: The person who signs the NOI Certification Form and signs the Certification in Section E of this application
form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same
organization. That person must be a responsible corporate officer who owns or operates the construction activity, such
as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV,
Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part
IV, Section B, Item (6) of that permit.
1. Organization Eastwood Construction
Name *
2. First Name* Marc
ff Corporation, enter Registered Agent First l\b e
3. Last Name * Battiste
ff Corporation, enter Registered Agent Last Barre
3b. Title VP of Construction
4. Permitee E-mail mbattiste@eastwoodhomes.com
Address*
5. Permittee 7045077033
Telephone No.*
6. Permittee Mailing Street Address
Address* 2857 Westport Road
Address Line 2
City
Charlotte
Postal / Zip Code
28208-3647
Check box if the
street address the
same as mailing
address
7. Permittee Street
Address*
fJ Yes
Street Address
2857 Westport Road
Address Line 2
City
Charlotte
Fbstal / Zip Code
28208-3647
State / Province / Region
NC
Country
us
State / Province / Region
NC
Country
us
C. Site Contact Information
Part C.
Proiect Site Contact hforrration
1. Type of Non -Government
Ownership*
2. Primary Site Patrick
Contact - First
Name *
3. Primary Site Lee
Contact - Last
Name *
4. Title
5. Site Contact E-
plee@eastwoodhomes.com
mail Address*
6. Site Contact
7043613178
Telephone No.*
7. Organization
Eastwood Construction
Name
8. Site Contact
Street Address
Mailing Address*
2857 Westport Road
Address Line 2
aty
Charlotte
Fbstal / Zip Code
28208
9. Consultant Name (optional)
Patrick Lee
First and Last nacre
10. Consultant E- This person will be copied on all correspondence.
mail
11. Consultant
Telephone No.
State / Province / Region
NC
Country
us
D. E&SC Plan
Part D.
Erosion & Sediment Control (E&SC) Ran Approval Information
.......................................................................................................................................................................................................................................
1. Date E&SC Plan 10/03/2019
Approved *
2. E&SC Plan Project UNION-2020-028
Number/ID* Assigned by agency or local program
3. E&SC Plan f• State DEQ Office
Approved by r Local Program
4. State DEQ Office * Mooresville (MRO)
Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a
complete application.
5. E&SC Plan Heritage Lot Grading Letter of Approval 14 Lots.pdf 440.44KB
Approval Mist be FDFfornat
letter/documentation
6. NOI Certification Heritage New Lots NOI.pdf 899.63KB
Form Mist be FI Fforrrat
This is an Express f• No
Review Project* r Yes
E. Certification
North Carolina General Statute 143-215.613 (1) provides that:
Anyperson who knowinglymakes any false statement, representation, or certification in anyapplication, record, report, plan, or other
documentfiled or required to be maintained under this Article or a rule implementing this Article; or who knowinglymakes a false statement
of a material fact in a rulemaking proceeding or contested case under this Article; or who falsifies, tampers with, or knowingly renders
inaccurate any recording or monitoring deice or method required to be operated or maintained under this Article or rules of the
Commission implementing this Article shall be guiltyofa Class 2 misdemeanor which mayinclude a fine not to exceed ten thousand
dollars ($10,000).
Under penalty of law, I certify that:
rJ I am the person responsible for the construction activities of this project, for
satisfying the requirements of this permit, and for any civil or criminal penalties
incurred due to violations of this permit.
* rJ The information submitted in this NOI is, to the best of my knowledge and belief,
true, accurate, and complete based on my inquiry of the person or persons who
manage the system, or those persons directly responsible for gathering the
information.
* I7 I will abide by all conditions of the NCG010000 General Permit and the
approved Erosion and Sediment Control Plan.
* rJ I hereby request coverage under the NCG010000 General Permit and
understand that coverage under this permit will constitute the permit
requirements for the discharge(s) and is enforceable in the same manner as an
individual permit.
Specify if you are:* r The Responsible Person named on this Notice of Intent
r Authorized Responsible Person*
Important: The person who electronically signs this Certification above must be the same person who signs the NOI
Certification Form. If that person is signing on behalf of the Permittee, that individual must be an authorized responsible
person within the same organization as the Permittee. *An authorized individual is a responsible corporate officer who
owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager
that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more
information on signatory requirements, see Part IV, Section B, Item (6) of that permit.
Signature
Type Name *
Patrick Lee
Title
Home Building Manager
Organization
Eastwood Construction
Date *
11 /04/2019
F. Tracking and COC Info
NOI Tracking No. 18070
NC Reference No. NCG01-2019-2674
Uses 'count number variable (incremrented by SP)
Certificate of NCC192674
Coverage (COC) Uses'count_nunber'variable (incremented by SF)
No. *
Count Number 2674
Sequential nunber for subrrittal that is incremented by Stored Procedure
COC Year 2019
Year of date reviewed (used to assign YY digits after "NGC' in OOCno.)