Loading...
HomeMy WebLinkAboutNCG030685_Inspection Report_20191108ROY COOPER Governor MICHAEL S. REGAN Secretary S. DANIEL SMITH Director NORTH CAROLINA Environmental Quality November 8, 2019 Unison Engine Components Inc. Attention: Lucy Crocker, Lead EHS Specialist 502 Sweeten Creek Industrial Park Road Asheville, North Carolina 28803 Subject: Compliance Evaluation Inspection Permit: NCG030000 Certificate of Coverage: NCG030685 Buncombe County, North Carolina Dear Mrs. Crocker: Enclosed please find a copy of the Compliance Evaluation Inspection Report for the inspection I conducted at the subject facility on November 5, 2019. The report should be self-explanatory; however, should you have any questions concerning this report, please do not hesitate to contact me at (828) 296-4500 or by email at Isaiah.reed@ncdenr.gov. Sinc Isaiah Reed, CPS Q, CEPSCI, MS4CECI Environmental Specialist Land Quality Section Enclosure: Inspection Report D_E Q�� North Carolina Department of Environmental Quality Division of Energy, Mineral and Land Resources Asheville Regional Office 12090 U.S. Highway 70 1 Swannanoa, North Carolina 28778 xanvcu�cuw. 828296.4500 Compliance Inspection Report Permit: NCG030685 Effective: 11/01/18 Expiration: 05/31/21 Owner: Unison Engine Components Inc SOC: Effective: Expiration: Facility: Unison Engine Components County: Buncombe 502 Sweeten Creek Industrial Park Rd Region: Asheville Asheville NC 28803 Contact Person: Michelle Hedrich Title: Phone: 829-232-8455 Directions to Facility: from 1-40 take 25 Alt south for 1/2 mile to Sweeten Creek Industrial Park Road, 502 is at the end of Sweeten Creek Industrial Park Road. System Classifications: Primary ORC: Certification: Phone: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 11/05/2019 Entry Time: 02:OOPM Exit Time: 04:OOPM Primary Inspector: Isaiah L Reed Phone: 828-296-4614 Secondary Inspector(s): Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Metal Fabrication Stomwater Discharge COC Facility Status: Compliant Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 3 Permit: NCG030685 Owner -Facility: Unison Engine Components Inc Inspection Date: 11/05/2019 Inspection Type : Compliance Evaluation Reason for Visit: Routine Inspection Summary On November 5, 2019 this facility was inspected for compliance. I met with Lucy Crocker on site. No major issues were noted during the inspection. It was discussed on site that, during construction activities at the facility, the sampling point will temporarily be located at the manhole adjacent to the parking lot at shipping and receiving. The relocation of the monitoring point is acknowledged Please inform this office of any future changes to the process and when the construction on site will be finished. Thank you. If you have any questions, please contact this office at (828) 296-4614 Page 2 of 3 Permit: NCG030685 Owner - Facility: Unison Engine Components Inc Inspection Date: 11/05/2019 Inspection Type : Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? 0 ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? _ ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices'? 0 ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? ❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? ❑ ❑ ❑ # Does the Plan include a BMP summary? M ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? 0 ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? 0 ❑ ❑ ❑ # Does the facility provide and document Employee Training? 0 ❑ ❑ ❑ # Does the Plan include a list of Responsible Party(s)? 0 ❑ ❑ ❑ # Is the Plan reviewed and updated annually? 0 ❑ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? M ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? 0 ❑ ❑ ❑ Comment Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? 0 ❑ ❑ ❑ Comment: Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? 0 ❑ ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ M ❑ Comment: Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? 0 ❑ ❑ ❑ # Were all outfalls observed during the inspection? 0 ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? 0 ❑ ❑ ❑ # Has the facility evaluated all illicit (non stormwaler) discharges? 0 ❑ ❑ ❑ Comment Page 3 of 3