HomeMy WebLinkAbout20140090 Ver 7_U-2579B Meeting Tuesday Morning_20191106
Wanucha, Dave
From:Dagnino, Carla S
Sent:Tuesday, November 5, 2019 9:27 AM
To:Braspennickx, Nicholle M CIV USARMY CESAW (US); Wanucha, Dave; Chambers, Marla
J
Cc:Turchy, Michael A; Cheely, Erin K
Subject:RE: \[External\] RE: U-2579B Meeting Tuesday Morning
Thanks Nicholle,
I sent your list to folks at the meeting today. The Corps number is on me, so I will make that change also.
Thanks.
Carla
-----Original Message-----
From: Braspennickx, Nicholle M CIV USARMY CESAW (US) <Nicholle.M.Braspennickx@usace.army.mil>
Sent: Tuesday, November 5, 2019 8:28 AM
To: Dagnino, Carla S <cdagnino@ncdot.gov>; Wanucha, Dave <dave.wanucha@ncdenr.gov>; Chambers, Marla J
<marla.chambers@ncwildlife.org>
Cc: Turchy, Michael A <maturchy@ncdot.gov>; Cheely, Erin K <ekcheely@ncdot.gov>
Subject: \[External\] RE: U-2579B Meeting Tuesday Morning
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an
attachment to report.spam@nc.gov<mailto:report.spam@nc.gov>
OK - time to dig up my notes... stand by...
I should note - the Corps SAW No. for U 2579B is 2008-03183... not 2009 -- that's a little typo at the top of the 2
modification requests the Corps' received on the project in recent months.
Yes, I need the functional assessment of Smith Creek's existing conditions before the proposed project.
I need to figure out who the public notice goes to.. just the 2 property owners that are not in the ROW? Agencies and
Tribes.. that is what I'm thinking currently - and for duration - I was thinking 21 days.. but I will coordinate w/ Monte.
I will need to figure out compensatory mitigation needs once I get all the information on the natural stream design
stream relocation... like what you ask?
From my notes on the Corps' white paper regarding stream relocation using natural channel design and compensatory
mitigation (2016) --- Larger Streams - stability analysis - Baseline conditions and subsequent monitoring \[to\]
demonstrate relocated channel is providing aquatic functions at or above level \[of Smith Creek\] at pre-construction. If
required uplift is not achieved, work not in compliance - more maintenance and compensatory mitigation can be
required. Corps includes permit condition(s) to explain this.
I asked Amy E. to put her brains to this in terms of constructability and feasibility.. w/ her experience and the experience
of the comp. mit team. DWR and WRC - the Corps can vet the project for some assurances of meeting a natural channel
design and channel stability.. But Amy has only been back for 1 day... so she's not promising today is the day she has for
this modification request.. she will be meeting w/ Carla D. soon on things.
1
Stream relocation is not held to the same standards as compensatory mitigation - however, if the proposal has risks (and
I think this one does - that is what we are discussing today - maybe) -- the Corps can require some monitoring and
maintenance and/or more compensatory mitigation.. I'm repeating the above..
I think that is it for now - I did go through my notes... I've not refreshed my memory on the plans - will do so here shortly
-- I spent 2 hours w/ them last week - but that was last week.
Sincerely,
Nicholle B.
704-510-0162
-----Original Message-----
From: Dagnino, Carla S \[mailto:cdagnino@ncdot.gov\]
Sent: Monday, November 4, 2019 5:04 PM
To: Braspennickx, Nicholle M CIV USARMY CESAW (US) <Nicholle.M.Braspennickx@usace.army.mil>; Wanucha, Dave
<dave.wanucha@ncdenr.gov>; Chambers, Marla J <marla.chambers@ncwildlife.org>
Subject: \[Non-DoD Source\] U-2579B Meeting Tuesday Morning
Hi Nicholle, Marla, and Dave -
For the meeting tomorrow, do you have any specifics on what you would like covered?
I originally thought that this would just be a discussion about the relocation of Smith Creek - but so that we are
prepared, will you let me know if there is anything you would like to have certain information about?
Nicolle, I know that you also wanted to have some information about the functional assessment and we will be looking
into that as well.
Thanks.
Carla
Carla Dagnino
Environmental Coordination and Permitting Group Leader
Environmental Analysis Unit
2
NC Department of Transportation
919 707 6110 office
cdagnino@ncdot.gov <mailto:cdagnino@ncdot.gov>
1598 Mail Service Center
Raleigh, NC 27699 -1598
1020 Birch Ridge Drive
Raleigh, NC 27610
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
________________________________
Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third
parties.
3