Compliance Evaluation Response - Permit # NCO074446
Date: 10/24/2019
It was very nice to meet Zach Thomas and Josh Brigham in person at the WWTP to look over the
work that we have done to the plant. We understand there are still some issues that need to be
taken care of. Here is our projected time line on getting these items resolved.
#4 - We plan to have the alarms fixed by January 31st, 2020.
#8 a - We plan to have the ground erosion fixed by January 31st, 2020.
#8 b - Going forward we will contact the State and Local Governments before doing anything with
regards to vegetation and trees.
#8 c - The flow meter is scheduled to be calibrated the week of November 4th - 8th.
Thank you,
James Radford
Managing Member
Radford Development of Virginia, LLC
ROY COOPER
Ccurrnor
MICHAEL S. REGAN
Sr r rerary
LINDA CULPEPPER
Director
James Radford, Managing Member
Radford Development of Virginia, LLC
P.O. Box 5529
Cary, NC 27512-5529
Dear Mr. Radford,
NC Dept of Environmental Quality
NOV - 5 2019
NORTH CAROLINA
Environmental Quality
Italeigh Regional Office
October 9, 2019
Subject: Notice of Deficiency — NOD-2019-PC-0224
Compliance Evaluation Inspection (Follow-up)
Hilltop Mobile Home Park WWTP
NPDES Permit Number NCO074446
Orange County
On Thursday, October 3, 2019, Zach Thomas and Josh Brigham of the Raleigh Regional Office with
Division of Water Resources conducted a follow-up compliance evaluation inspection of the
treatment facilities located at the Hilltop Mobile Home Park. The purpose of this inspection was to
ensure compliance with the subject NPDES permit and evaluate if the requested repairs from the
12-7-2018 inspection had been completed. During the inspection, the presence and cooperation of
Mr. Paul Smith (ORC), Mr. Derek Hinds and yourself was helpful and appreciated.
This NPDES 0moliance evaluationf n co-nsistgd of the followinp.;
Review of the NPDES permit;
Review of the owner/facility information;
On -site inspection of the wastewater treatment units
FindingS during he in5pection werpas follow
1. The ORC is completing log sheets for the facility and keeping additional information for site
visits in a binder for review.
2. A new bar screen has been fabricated and installed. At the time of inspection, everything
appeared to be in good working order with all flow passing through the treatment unit.
3. McFarland is contracted to pump and dispose of all sludge from the facility. Sludge is received
by the North Durham WRF located at 1900 East Club BIvd, Durham. The ORC stated that
McFarland recently visited on 10-1-2019 to collect sludge waste.
4. The previous inspection report stated, "At the time of inspection, neither of the two sets of audible
or visual alarms were operational. Please return these alarms to operational status and provide a
date when these were repaired". As of the 01-07-2019 response to DWR, staff at the WWTP had
Q ;� North Carohna Departtncrrt of Environmental Quality I Mdslon of Water [Zesouwces
Rale'91iRe9ionil Oftice 330O Barrett Drive I Raleigh. Nortli Cat Nina 2,609
h
n —ron i�o.a\ 1_ell 419701.4200
been working with Pete Duty and Associates to repair the alarms with no success. As of the 10-
3-2019 follow-up inspection, neither of the alarms had been repaired.
5. Both clarifiers appeared to have more sufficient settling throughout the column now that new
blowers have been added.
6. Notification to DWR of the operational status of the tertiary filters was required by 1-7-2019.
An email dated 12-26-2018 notified the RRO that the filters were placed online 12-17-2018.
Filters were in use at the time of the inspection. When the filters began to backwash, one of the
pumps was leaking. DWR staff asked that the part be evaluated and repaired promptly to avoid
any treatment issues.
7. A new generator was purchased and installed since the last inspection. The power was
switched off to the treatment facility and the generator operated properly under load.
8. In addition to evaluating the requested repairs, the Following items were noted during the
inspection:
a) Multiple locations of ground erosion around the treatment unit were observed. Please
ensure that these areas are addressed so that damage does not occur to the treatment
facility components.
b) Multiple trees have been limbed or cut to alleviate problems caused by leaf accumulation
within the treatment units. Please ensure that all State and Local government rules
regarding vegetation removal are followed if any work will occur in the future.
c) The flow meter was examined at the time of inspection and is past due for calibration as of
6-30-2019. Please ensure that the meter is calibrated and kept free from any debris that
will impede proper function.
Please respond in writing to items 4 and 8 within 30 days of receipt of this letter. If you have
questions or comments about the inspection, this report or the requirements to take corrective
action, please contact:
Zach Thomas at 919-791-4247 or via email at zachary.thomas(dincdenr.gov_.
Sincerely,
Ric olich, LG
Assistant Water Quality Regional Supervisor
Raleigh Regional Office
Attachments: EPA Water Compliance Inspection Report
Cc: RRO Files
Laserfiche
Orange County Health Department
Derek Hinds, Great Communities Inc (via email: info@greatcommunitiesinc.com)