Loading...
HomeMy WebLinkAboutNC0074446_NOD-2019-PC-0224 Response_20191024NUV - 5 2019 Radford Development of Virginia, LLC Raleigh Regional Office Hilltop Mobile Home Park PO BOX 1493, Christiansburg, VA 24068 Phone:888-437-4808 Fax:540-739-7398 Email: info@greatcommunitiesinc.com Website: www.greatcommunitiesinc.com Compliance Evaluation Response - Permit # NCO074446 Date: 10/24/2019 It was very nice to meet Zach Thomas and Josh Brigham in person at the WWTP to look over the work that we have done to the plant. We understand there are still some issues that need to be taken care of. Here is our projected time line on getting these items resolved. #4 - We plan to have the alarms fixed by January 31st, 2020. #8 a - We plan to have the ground erosion fixed by January 31st, 2020. #8 b - Going forward we will contact the State and Local Governments before doing anything with regards to vegetation and trees. #8 c - The flow meter is scheduled to be calibrated the week of November 4th - 8th. Thank you, James Radford Managing Member Radford Development of Virginia, LLC ROY COOPER Ccurrnor MICHAEL S. REGAN Sr r rerary LINDA CULPEPPER Director James Radford, Managing Member Radford Development of Virginia, LLC P.O. Box 5529 Cary, NC 27512-5529 Dear Mr. Radford, NC Dept of Environmental Quality NOV - 5 2019 NORTH CAROLINA Environmental Quality Italeigh Regional Office October 9, 2019 Subject: Notice of Deficiency — NOD-2019-PC-0224 Compliance Evaluation Inspection (Follow-up) Hilltop Mobile Home Park WWTP NPDES Permit Number NCO074446 Orange County On Thursday, October 3, 2019, Zach Thomas and Josh Brigham of the Raleigh Regional Office with Division of Water Resources conducted a follow-up compliance evaluation inspection of the treatment facilities located at the Hilltop Mobile Home Park. The purpose of this inspection was to ensure compliance with the subject NPDES permit and evaluate if the requested repairs from the 12-7-2018 inspection had been completed. During the inspection, the presence and cooperation of Mr. Paul Smith (ORC), Mr. Derek Hinds and yourself was helpful and appreciated. This NPDES 0moliance evaluationf n co-nsistgd of the followinp.; Review of the NPDES permit; Review of the owner/facility information; On -site inspection of the wastewater treatment units FindingS during he in5pection werpas follow 1. The ORC is completing log sheets for the facility and keeping additional information for site visits in a binder for review. 2. A new bar screen has been fabricated and installed. At the time of inspection, everything appeared to be in good working order with all flow passing through the treatment unit. 3. McFarland is contracted to pump and dispose of all sludge from the facility. Sludge is received by the North Durham WRF located at 1900 East Club BIvd, Durham. The ORC stated that McFarland recently visited on 10-1-2019 to collect sludge waste. 4. The previous inspection report stated, "At the time of inspection, neither of the two sets of audible or visual alarms were operational. Please return these alarms to operational status and provide a date when these were repaired". As of the 01-07-2019 response to DWR, staff at the WWTP had Q ;� North Carohna Departtncrrt of Environmental Quality I Mdslon of Water [Zesouwces Rale'91iRe9ionil Oftice 330O Barrett Drive I Raleigh. Nortli Cat Nina 2,609 h n —ron i�o.a\ 1_ell 419701.4200 been working with Pete Duty and Associates to repair the alarms with no success. As of the 10- 3-2019 follow-up inspection, neither of the alarms had been repaired. 5. Both clarifiers appeared to have more sufficient settling throughout the column now that new blowers have been added. 6. Notification to DWR of the operational status of the tertiary filters was required by 1-7-2019. An email dated 12-26-2018 notified the RRO that the filters were placed online 12-17-2018. Filters were in use at the time of the inspection. When the filters began to backwash, one of the pumps was leaking. DWR staff asked that the part be evaluated and repaired promptly to avoid any treatment issues. 7. A new generator was purchased and installed since the last inspection. The power was switched off to the treatment facility and the generator operated properly under load. 8. In addition to evaluating the requested repairs, the Following items were noted during the inspection: a) Multiple locations of ground erosion around the treatment unit were observed. Please ensure that these areas are addressed so that damage does not occur to the treatment facility components. b) Multiple trees have been limbed or cut to alleviate problems caused by leaf accumulation within the treatment units. Please ensure that all State and Local government rules regarding vegetation removal are followed if any work will occur in the future. c) The flow meter was examined at the time of inspection and is past due for calibration as of 6-30-2019. Please ensure that the meter is calibrated and kept free from any debris that will impede proper function. Please respond in writing to items 4 and 8 within 30 days of receipt of this letter. If you have questions or comments about the inspection, this report or the requirements to take corrective action, please contact: Zach Thomas at 919-791-4247 or via email at zachary.thomas(dincdenr.gov_. Sincerely, Ric olich, LG Assistant Water Quality Regional Supervisor Raleigh Regional Office Attachments: EPA Water Compliance Inspection Report Cc: RRO Files Laserfiche Orange County Health Department Derek Hinds, Great Communities Inc (via email: info@greatcommunitiesinc.com)