HomeMy WebLinkAbout20181640 Ver 3_Email approving measures to satisfy Condition #20_20191105From:
Scarbraugh, Anthony
To:
Shearin Dramby
Cc:
Thompson, Emily B CIV USARMY CESAW (US)
Subject:
RE: [External] Line 439 Wetland Fueling for HDDs
Date:
Tuesday, November 5, 2019 9:20:00 AM
Attachments:
imaae003.ona
Shearin,
The Division of Water Resources has reviewed the information and finds the measures adequate to
satisfy Condition #20 of the 401 Water Quality General Certification with additional conditions
issued by this Office on October 28, 2019 under DWR Project No. 18-1640 V3. If you have any
additional questions or concerns, please feel free to contact me.
Regards,
Anthony Scarbraugh
0
0-D
: Q5
Anthony Scarbraugh
Environmental Specialist 71 M2ter Resomrces
North arolm' Department of Environmental Quality
.52-948392.4 (Office)
Anthony_ S carbraugh- cdenr_gov
Ernar ccrresWz erce to and kc m Yn adavt w is 9 4ed W file ftflh Qwoira9 Pubk Piec uw Law a�
be dsolctwd ro 1W parum
From: Shearin Dramby [mailto:sdramby@drambyenv.com]
Sent: Monday, November 4, 2019 5:17 PM
To: Thompson, Emily B CIV USARMY CESAW (US) <Emily.B.Thompson@usace.army.mil>; Scarbraugh,
Anthony <anthony.scarbraugh@ncdenr.gov>
Cc: Shearin Dramby <sdramby@drambyenv.com>
Subject: [External] Line 439 Wetland Fueling for HDDs
Importance: High
• of click links or open attachmen ou verify. Send all suspi
hment to report.spamPnc.gov
Good afternoon Anthony/Emily,
As discussed last week, due to the geometry of the pipeline alignment, refueling of HDD drill rigs at 3
of our 7 HDDs are required to occur within wetlands:
1. HDD #1— Sta. 147+81
2. HDD #2 — Sta. 287+12
3. HDD #4 — Sta. 504+92
I have attached the 3 HDD drawing sheets for reference. Also attached is a fueling procedure that
will be used during all wetland fueling. During wetland fueling, both the equipment being fueled and
the fuel truck will be placed inside containment and a pre -job brief will occur prior to every instance
of refueling. With that said, Duke Energy requests approval to perform refueling in wetlands at these
locations according to the attached fueling procedures. Note, it is anticipated that each of the 3
drills would take approximately 1 week or less to complete.
Please let me know if you have any questions regarding this request.
Thank you,
Shearin Dramby
President/Sr. Regulatory Specialist
Dramby Environmental Consulting, Inc.
www.drambyenv.com
Cell: (757) 894-1673
FJ�_ c�-
DRAMS
lk�
Dramby Environmental Consulting is a certified small, woman -owned business!