Loading...
HomeMy WebLinkAbout19980816 Ver 1_COMPLETE FILE_19980818State of North Carolina Department of Environment and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor Wayne McDevitt, Secretary A. Preston Howard, Jr., P.E., Director A14 NCDENR DIVISION OF WATER QUALITY February 5, 1999 Mr. Bob Yelverton Weeks Corporation 1800 Perimeter Park Drive, Suite 200 Morrisville, NC 27560 Subject Stormwater Ponds Paramount Center Wake County, NC DWQ# 980816 Dear Mr. Yelverton: This Office is in receipt of the plans dated January 22, 1999, for the stormwater management ponds at the subject facility prepared on your behalf by DS Atlantic and submitted to the Division on January 25, 1999. Staff from the Wetlands Unit reviewed the plans and found them acceptable. If you have any questions regarding this matter, please contact Mr. Todd St. John at (919) 733-1786 ext. 260. e 1 , John R. Dorney Wet nds Unit Supervisor cc: Mr. Todd St. John, Wetlands Unit Raleigh Regional Office 4401 Reedy Creek Road, Raleigh, NC 27607 Telephone 919-733-1896 FAX 919-733-9959 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post-consumer paper ern NCDENR DIVISION OF WATER QUALITY February 5, 1999 Memorandum To: John Dorney From: Todd St. Joh Subject: Paramount Ce ter DWQ No. 980816 Wake County I have reviewed the stormwater management plans for the subject project. The applicant has reduced his parking lot size by 100 spaces to accommodate the stormwater management structures. In addition to the required 85% TSS removal the applicant is required to meet NBR requirements including sheet flow through the buffer. The applicant converted one of the dry ponds into a wet pond (wet pond #2). The subsequent wet pond will discharge into zone 2 (which is why a wet pond is necessary), parallel to the stream. This configuration will spread the flow more than a perpendicular sheet flow. Also, the discharge of the ten year storm will be reduced from 9.7 cfs to 1.5 cfs, greatly reducing the velocity. The surface area of this pond is 36% larger (surface area) than required; however, a forebay could not be added to the plan. Also, the inlet is located at the center of the pond instead of the end located furthest from the outlet. The discharge is directed away from the outlet towards the far end of the pond. This configuration is necessary to accommodate the collection system. Nevertheless, I recommend that this pond design be approved because the inlet is directed toward the far end of the pond and the pond is oversized. Wet pond #1 also discharges to zone 2. The outlet will be directed parallel to the stream and will have a discharge of 2.71 cfs in a ten year storm. This outlet had been proposed directly into the stream at the road crossing. The pond design does not include a forebay. However, because of its small size, the pond can easily be accessed for sediment removal. Both wet ponds encroach into zone 2. These ponds were originally to be dry ponds but were converted to wet ponds because sheet flow could not be achieved through the entire 50 foot buffer. However, stormwater structures can be permitted in the zone 2 if there is not practical alternative. The engineer has indicated that parking has already been reduced below the minimum number of spaces desired by the developer to accommodate stormwater management structures. Therefore, I propose that no practical ul ?a " n,Aa YY" \; r alternative exists and that the use of zone 2 for stormwater management structures be allowed in this instance. Dry pond #1 will discharge through a 25 foot wide flow-spreading device before it reaches zone 2. The discharge will be 2.87 cfs in a 10 year storm. The pond is 22% larger than required (volume). Dry pond #2 will also discharge through a 25 foot wide flow spreading device; however, the device and part of the dam are located in zone 2. The discharge will be 2.4 cfs in a 10 year storm. The pond is also 45% larger than required (volume). There do not appear to be any practical alternatives to the proposed configuration. The existence of the dry pond will help reduce the peak flow and limit the erosive potential of the stormwater discharge. The stormwater management plan, proposed for this project, does not meet all of the requirements of the Stormwater BMP Manual. However, the ponds are oversized, according to my calculations, and should provide better protection for the stream and surfaces waters than would have been provided by simply providing diffuse flow through the buffer. The ponds should provide nutrient and TSS removal as well as a reduction in peak flows. I recommend that the stormwater management plan be approved. DSAtlantl'ec February 3, 1999 Mr. Todd St. John NCDENR Division of Water Quality Post Office Box 29535 Raleigh, North Carolina, 27626-0535 SUBJECT: LOT 8 - PARAMOUNT CENTER MORRISVILLE, NORTH CAROLINA DSAtlantic PROJECT NO. LIC037.000 Dear Todd: On behalf of Weeks Corporation, we are transmitting herewith the signed and notarized Pond Maintenance Agreement for the above referenced project. If you have any questions concerning this submittal, please contact me at your first convenience. We look forward to the approval of our project and appreciate your efforts to help us through the review process. Sincerely, lr P---J4 Andrew R. Padiak, El Project Manager ARP Attachments: As noted above cc: Mr. Robert G. Yelverton - Weeks Corporation, w/ atts Mr. Claude Medlin -- Weeks Corporation, w/ atts Mr. Alan M. Maness, PE - DSAtIanlic Corporation, w/o atts File w/o atts 801 Jones Franklin Road Suite 300 Raleigh, NC 27606 (919) 851-6866 Fax: (919) 851-7024 www.dsatiantic.com i 11 ?I'-!i?. ? ¦ i??ii ?.?I;I ¦ ,? ¦ -i i'.?i I¦ I' ??i?.l? ¦ I; ii 11 `.1??.;r ?¦ ?, ir'?. AII',l. ?:t POND MAINTENANCE REQUIREMENTS Project Name: Lot 8 - Paramount Center - Dry Ponds # 1 & #2 and Wet Ponds # 1 & #2 Responsible Party: Weeks Corporation Address: c/o Bob Yelverton 1800 Perimeter Park Drive, Suite 200 Morrisville, North Carolina 27560 Phone Number: (919) 469-1300 Project Number: LIC037.000 1. Monthly (or after every runoff producing rainfall event if more frequent) A. Remove debris from the trash rack. B. Check and clear the orifice of any obstructions C. Check the pond side slopes; remove trash, repair eroded areas before the next rainfall event. D. Check the vegetative filter for sediment accumulation, erosion and proper operation of the flow spreader mechanism. Repair as necessary. II. Quarterly A. Inspect the collection system (i.e., catch basins, piping, grassed swales) for proper functioning. Clear accumulated trash from basin grates, and basin bottoms, and check piping for obstructions. B. Pond inlet pipes will be checked for undercutting, riprap will be replaced, and broken pipes will be repaired. C. Grassed swales, including the vegetative filter, will be reseeded twice a year as necessary. Eroded areas will be repaired immediately. III. Biannually A. Remove accumulated sediment from the bottom of the outlet structure. B. Check the pond bottom elevation at various points in the pond. If bottom elevation is at or above 1.0 foot of the original design elevation, sediment will be removed to re-establish the original design elevation. IV. General A. Cattails, and other indigenous wetland plants, are encouraged along the pond perimeter, however, they must be removed when they cover the entire surface area of the pond. B. The orifice is designed to draw down the pond in two to five days. If drawdown is not accomplished in that time, the system may be clogged. The source of the clogging must be found and eliminated. Wet Pond #2 must be drained with a submersible pump. C. All components of the detention pond will be kept in good working order. POND MAINTENANCE REQUIREMENTS (CONTINUED) I, Bob Yelverton , hereby acknowledge that I am an authorized representative of the financially responsibly party for maintenance of this detention pond. I will ensure the performance of maintenance as outlined above, as part of the Certification of Compliance with Stormwater a ulations received for this project. Signature: ^-? Date: "eta Z ??999 lrl2tf I, f , a N to Public for the State of County of , do hereby certify that &he ti personally appeared before me this day of (llI, and acknowledge the due execution of the foregoing instrument. Witness my hand and seal (Notary Public) (Seal) My Commission Expires ?/j/99 NM A POND MAINTENANCE REQUIREMENTS Project Name: Lot 8 - Paramount Center - Dry Ponds # I & #2 and Wet Ponds # 1 & #2 Responsible Party: Weeks Corporation Address: c/o Bob Yelverton 1800 Perimeter Park Drive. Suite 200 Morrisville, North Carolina 27560 Phone Number: (919) 469-1300 Project Number: LIC037.000 1. Monthly (or after every runoff producing rainfall event if more frequent) A. Remove debris from the trash rack. B. Check and clear the orifice of any obstructions C. Check the pond side slopes; remove trash, repair eroded areas before the next rainfall event. D. Check the vegetative filter for sediment accumulation, erosion and proper operation of the flow spreader mechanism. Repair as necessary. II. Quarterly A. Inspect the collection system (i.e., catch basins, piping, grassed swales) for proper functioning. Clear accumulated trash from basin grates, and basin bottoms, and check piping for obstructions. B. Pond inlet pipes will be checked for undercutting, riprap will be replaced, and broken pipes will be repaired. C. Grassed swales, including the vegetative filter, will be reseeded twice a year as necessary. Eroded areas will be repaired immediately. III. Biannually A. Remove accumulated sediment from the bottom of the outlet structure. B. Check the pond bottom elevation at various points in the pond. If bottom elevation is at or above 1.0 foot of the original design elevation, sediment will be removed to re-establish the original design elevation. IV. General A. Cattails, and other indigenous wetland plants, are encouraged along the pond perimeter, however, they must be removed when they cover the entire surface area of the pond. B. The orifice is designed to draw down the pond in two to five days. If drawdown is not accomplished in that time, the system may be clogged. The source of the clogging must be found and eliminated. Wet Pond #2 must be drained with a submersible pump. C. All components of the detention pond will be kept in good working order. POND MAINTENANCE REQUIREMENTS (CONTINUED) I, Bob Yelverton , hereby acknowledge that I am an authorized representative of the financially responsibly party for maintenance of this detention pond. I will ensure the performance of maintenance as outlined above, as part of the Certification of Compliance with Stormwater a ulations received for this project. Signature: Date: 4e-13 Z ?qq9 I, l' , a N to Public for the State of County of I' A7, , do hereby certify that personally appeared before me this ZC/-- day of 1 19 , and acknowledge the due execution of the foregoing instrument. Witness my hand and seal. (Notary Public) (Seal) My Commission ExpiresN M R POND MAINTENANCE REQUIREMENTS Project Name: Lot 8 - Paramount Center - Dry Ponds #1, #2, & #3 and Wet Pond Responsible Party: Weeks Corporation Address: c/o Bob Yelverton 1800 Perimeter Park Drive, Suite 200 Morrisville. North Carolina 27560 Phone Number: (919) 469-1300 1. Monthly (or after every runoff producing rainfall event if more frequent) A. Remove debris from the trash rack. B. Check and clear the orifice of any obstructions LIC037.000 C. Check the pond side slopes; remove trash, repair eroded areas before the next rainfall event. D. Check the vegetative filter for sediment accumulation, erosion and proper operation of the flow spreader mechanism. Repair as necessary. II. Quarterly A. Inspect the collection system (i.e., catch basins, piping, grassed swales) for proper functioning. Clear accumulated trash from basin grates, and basin bottoms, and check piping for obstructions. B. Pond inlet pipes will be checked for undercutting, riprap will be replaced, and broken pipes will be repaired. C. Grassed swales, including the vegetative filter, will be reseeded twice a year as necessary. Eroded areas will be repaired immediately. III. Biannually A. Remove accumulated sediment from the bottom of the outlet structure. B. Check the pond bottom elevation at various points in the pond. If bottom elevation is at or above 1.0 foot of the original design elevation, sediment will be removed to re-establish the original design elevation. IV. General A. Cattails, and other indigenous wetland plants, are encouraged along the pond perimeter, however, they must be removed when they cover the entire surface area of the pond. B. The orifice is designed to draw down the pond in two to five days. If drawdown is not accomplished in that time, the system may be clogged. The source of the clogging must be found and eliminated. Project Number: C. All components of the detention pond will be kept in good working order. POND MAINTENANCE REQUIREMENTS (CONTINUED) I, Bob Yelverton , hereby acknowledge that I am an authorized representative of the financially responsibly party for maintenance of this detention pond. I will ensure the performance of maintenance as outlined above, as part of the Certification of Compliance with Stormwater Regulations received for this project. Signature: I, Date: a Notary Public for the State of County of , do hereby certify that personally appeared before me this day of 19 and acknowledge the due execution of the foregoing instrument. Witness my hand and seal. (Notary Public) (Seal) My Commission Expires f DSAtlantl*c January 25, 1999 Mr. Todd St. John NCDENR Division of Water Quality Post Office Box 29535 Raleigh, North Carolina, 27626-0535 SUBJECT: LOT 8 - PARAMOUNT CENTER MORRISVILLE, NORTH CAROLINA DSAtlantic PROJECT NO. LIC037.000 Dear Todd: AN 2 5 IM On behalf of Weeks Corporation and pursuant to our meeting on January 20, 1999, we are transmitting herewith the comments and responses for the first review of the above referenced project. Also, please find the attached one full-sized set and one half-scaled set of revised plans. REVIEW COMMENTS: 1. Comment: Dry Pond #3 - Convert to a wet pond to obtain 85% TSS Removal. Increase the storage volume in the pond and demonstrate that the volume and velocity of the water exiting the outlet barrel is non-erosive. Response: We have converted the dry pond to a wet pond. We reduced the volume of water exiting the outlet barrel during a 10 year storm from 9.74 cfs to only 1.54 cfs. We were not able to increase the size of the outlet protection due to space constraints. Also, the small volume of water that passes through the outlet barrel during the 10 year storm would quickly be dissipated by the outlet protection shown. 2 3 Comment: Dry Pond #1 - Spread the flow exiting the outlet barrel to create more of a sheet flow situation. Response: We increased the size of the outlet protection to be nearly twice the size as shown on the previous submittal. Also, we labeled the outlet protection pad to have a 0% slope on detail #1 on the pond sheets. This should allow the water to be dispersed into more of a sheet flow condition. Comment: Dry Pond 42 - Spread the flow exiting the outlet barrel to create more of a sheet flow situation. Response: As we did for Dry Pond #1, we increased the size of the outlet protection to the 30 foot buffer. 801 Jones Franklin Road Suite 300 Raleigh, NC 27606 (919) 851-6866 Fax: (919) 851-7024 www.dsatiantic.com r Mr. Todd St. John NCDENR January 25, 1999 Page 2 4. Comment: Wet Pond - Pond configuration is adequate, however, relocate the riser to the northeast corner of the pond and extend the barrel along the toe of slope of the parking lot instead of through the headwall for Culvert #2. Response: The riser/barrel was relocated to the northeast corner of the pond as shown on sheet C6.2. 5. Comment: Specify vegetation for the dry ponds. Response: We have specified vegetation for the dry ponds as shown on the cross-sectional detail on sheet C6.1. We trust these items will be to your satisfaction. Upon completion of your review, please transmit any comments you may have. If you have any questions concerning this submittal, please contact me at your first convenience. Sincerely, ?'j4d r. U?k Andrew R. Padiak, El Project Manager ARP Attachments: As noted above cc: Mr. Robert G. Yelverton - Weeks Corporation, w/ atts Mr. Claude Medlin - Weeks Corporation, w/ atts Mr. Alan M. Maness, PE - DSAtlantic Corporation, w/o atts File w/o atts DSAdantic WET POND #2 DESIGN Lot 8 - Paramount Center Morrisville, North Carolina Project No.: LIC037.000 Watershed Data Hydrograph Formulation Stage-Storage Function Pond Volume Calculation Chainsaw Routing for the 10-year storm Drawdown Calculation Graphed Data for the 10-year storm Chainsaw Routing for the 100-year storm Graphed Data for the 100-year storm Outlet Protection WET-POND-2. xls 1/22/99 WATERSHED DATA Lot 8 - Paramount Center - Wet Pond #2 WATERSHED No. DRAINAGE AR Measure No.I Measure No.2 (ACRES) (ACRES) EA Measure No.3 Average (ACRES) (ACRES) 1 9.02 8.95 8.98 8.98 WATERSHED No. HYDRAULIC LENGTH (FT) VERTICAL RELIEF (FT) 1 877 24 WATERSHED No. ESTIMATION OF IMPE Watershed Area Pavement Area RVIOUSNESS Building Area % Imperv. 1 8.98 ac 4.86 ac 0.92 ac * 64.34% WET-POND-2. xis 1/22/99 BACKGROUND: REFERENCES: SOLUTION - Qp: INPUT OUTPUT L= 877 ft H= 24 ft Tc = 5.8 minutes 9= 195 (10 year h= 22 storm) 1= 7.02 in/hr A= 8.98 acres C= 0.66 QP10 = 42 cfs g = 290 (100 year h = 25 storm) SOLUTION - Tp: I = 9.43 in/hr QP1oo = 56 cfs INPUT OUTPUT Pn6 = 3.90 in (10 Year Storm) S= 4.71 in CN = 68 Q* = 1.14 in TP,o = 10.7 minutes Pn6 = 5.80 in (100 Year Storm) Q* = 2.47 in TP100 = 17.3 minutes TERMINOLOGY HYDROGRAPH FORMULATION Lot 8 - Paramount Center - Wet Pond #2 Use the Rational Method (Malcom, 1991; Wanielista, 1990) Use the Kirpich Equation & the Rational Method L = Hydraulic Length, (ft) H = Vertical Relief, (ft) g = Statistical Variable h = Statistical Variable A = Watershed Area, (acres) C = Composite Runoff Coefficient Pn6 = Precipitation from 6 hr storm (in) CN = Curve Number Tc = Time of Concentration, (minutes) I = Rainfall Intensity, (in/hr) Qp = Peak Discharge, (cfs) S = Ultimate Soil Storage, (in) Q' = Runoff Depth, (in) Tp = Time to Peak, (minutes) WET-POND-2. xls 1/22/99 STAGE-STORAGE FUNCTION Lot 8 - Paramount Center - Wet Pond #2 1 2 3 4 5 6 7 8 Y X CONTOUR CONTOUR INCR ACCUM Z In S In Z Z est AREA VOLUME VOLUME STAGE sq ft cu ft cu ft ft ft 334 5523 0 0 336 9599 15122 15122 2 9.6239 0.6931 2.03 338 14001 23600 38722 4 10.5642 1.3863 3.89 340 18903 32904 71626 6 11.1792 1.7918 5.93 342 23802 42705 114331 8 11.6469 2.0794 8.19 STAGE-STORAGE FUNCTION: S=KS*Zb where: b = 1.45 and KS = 5392 Stage-Storage Function 18 16 14 12 10 N C 8 6 4 2 0 < , t s r (r1''' A ? rt{ r k ? h i ??, T r Y I s: r r r ` r T 0.5 0.8 1.0 1.3 1.5 1.8 2.0 2.3 2.5 In Z WET-POND-2. xls 1/22/99 POND VOLUME CALCULATIONS Lot 8 - Paramount Center - Wet Pond #2 CALCULATE IMPERVIOUS AREA: Drainage area = 8.98 ac. Impervious area = 5.78 ac. Percent Impervious = 64.34% FIND SA/DA FOR PERMANENT POOL SIZING: Assume 85% Pollutant Removal Efficiency and 6 foot permanent pool depth Use Table 5. L.1 in Stormwater Management Guidance Manual and interpolate. SA/DA = 2.75% For Depth of Pool= 3 ft FIND REQUIRED SURFACE AREA: Surface Area = SA/DA x Drainage Area Surface Area = 0.25 ac. or 10761 sf. FIND VOLUME TO BE CONTROLLED FROM 1" STORM Rv = 0.63 DA = 8.98 ac Volume = Rv x 1" x Drainage Area = 0.47 ac.-ft. or 20506 cf. TERMINOLOGY: P = Precipitation Depth, (in) S = Ultimate Soil Storage, (in) CN = Curve Number Q' = Runoff Depth, (in) CHA/NSAW ROUTING FOR 10-YEAR STORM (REF: Malcom, 1991) COMPUTED RESULTS Normal Surface Area = 0.30 ac Peak Stage = 339.40 ft Maximum Surface Area = 0.39 ac Rise = 2.40 ft Peak Outflow = 1.54 cfs INPUT Hydrograph Results: Riser: Nr = 1 Top of Dam: 342.00 ft Qp = 42 cfs Lr = 3 ft Barrel: Tp = 10.7 min Wr = 3 ft Nb = 1 dT = 1 min Cwr = 3.00 Db = 15 in Stage-Storage Results: Cdr = 0.60 Cdb = 0.60 Ks = 5392 Zcr = 339.25 ft Zinv = 336.50 ft b = 1.45 Drawdown Pipe: Emergency Spillway: Zo = 334.0 ft (inv) Cdr = 0.60 L = 0 ft Initial Water Level: D = 2.00 in Zcr = 0.00 ft Z; = 337.00 ft Zcr = 337.00 ft Cw = 0.00 OUTPUT 1 2 3 4 5 6 7 8 9 Time T Inflow I Storage S Stage Z Outflow O Riser (weir) Riser (orifice) Barrel Emergency Spillway min cfs cu-ft ft cfs cfs cfs cfs cfs u u 401v". !J JJ/.VV U 0.0 0,0 O.U U.U 1 1 26594.13 337.00 0 0.0 0.0 0.0 0.0 2 3 26647.36 337.00 0 0.0 0.0 0.0 0.0 3 8 26855.73 337.02 0 0.0 0.0 0.0 0.0 4 13 27307.96 337.06 0 0.0 0.0 0.0 0.0 5 19 28071.95 337.11 0 0.0 0.0 0.0 0.0 6 25 29189.07 337.20 0 0.0 0.0 0.0 0.0 7 30 30670.58 337.31 0 0.0 0.0 0.0 0.0 8 35 32496.71 337.44 0 0.0 0.0 0.0 0.0 9 39 34618.31 337.60 0 0.0 0.0 0.0 0.0 10 41 36961.05 337.76 0 0.0 0.0 0.0 0.0 11 42 39431.77 337.93 0 0.0 0.0 0.0 0.0 12 40 41926.40 338.10 0 0.0 0.0 0.0 0.0 13 37 44338.83 338.27 0 0.0 0.0 0.0 0.0 14 33 46569.97 338.41 0 0.0 0.0 0.0 0.0 15 29 48556.75 338.54 0 0.0 0.0 0.0 0.0 16 26 50316.71 338.65 0 0.0 0.0 0.0 0.0 17 23 51875.75 338.75 0 0.0 0.0 0.0 0.0 18 20 53256.81 338.84 0 0.0 0.0 0.0 0.0 19 18 54480.19 338.92 0 0.0 0.0 0.0 0.0 20 16 55563.91 338.98 0 0.0 0.0 0.0 0.0 21 14 56523.91 339.04 0 0.0 0.0 0.0 0.0 22 13 57374.31 339.09 0 0.0 0.0 0.0 0.0 23 11 58127.62 339.14 0 0.0 0.0 0.0 0.0 24 10 58794.93 339.18 0 0.0 0.0 0.0 0.0 25 9 59386.06 339.22 0 0.0 0.0 0.0 0.0 26 8 59909.70 339.25 0 0.0 0.0 0.0 0.0 27 7 60373.57 339.28 0 0.1 6.9 8.7 0.0 28 6 60777.89 339.30 0 0.3 97 8.7 0.0 29 5 61123.91 339.32 1 0.5 11.5 8.7 0.0 30 5 61416.02 339.34 1 0.7 12.9 8.8 0.0 31 4 61659.35 339.35 1 0.9 13.9 8.8 0.0 32 4 61859.17 339.36 1 1.0 14.7 8.8 0.0 33 3 62020.55 339.37 1 1.2 15.3 8.8 0.0 34 3 62148.25 339.38 1 1.3 15.7 8.9 0.0 35 3 62246.67 339.39 1 1.4 16.1 8.9 0.0 36 2 62319.78 339.39 1 1.4 16.3 8.9 0.0 37 2 62371.15 339.40 1 1.5 16.5 8.9 0.0 38 2 62403.94 339.40 2 1.5 16.6 8.9 0.0 39 2 62420.97 339.40 2 1.5 16.7 8.9 0.0 40 1 62424.68 339.40 2 1.5 16.7 8.9 0.0 WET-POND-2.xls 1/22/99 DRAWDOWN CALCULATIONS Lot 8 - Paramount Center - Wet Pond Storage Pool Drawdown Pond must detain the first 1" of runoff and release it in 2 to 5 days INPUT Number of Drains = 1 Starting Water Elevation = 339.25 ft Diameter of Drains = 2.0 in Ending Water Elevation = 337.00 ft Orifice Coefficient = 0.60 ft Average Head = 1.13 ft Elevation of Drains = 337.00 ft OUTPUT By the Orifice Equation: Average Flow = 0.11 cfs Vol of Storage Required = 20506 cf Volume of Storage = 21467 cf OK Length of Drawdown = 192647 sec or 2.23 days OK Permanent Pool Drawdown Bottom drain must completely drain pond In less than 24 hours INPUT Number of Drains = 1 Starting Water Elevation = 337.00 ft Diameter of Drains = 8.0 in Ending Water Elevation = 334.00 ft Orifice Coefficient = 0.60 ft Average Head = 1.50 ft Elevation of Drains = 334.00 ft OUTPUT By the Orifice Equation: Average Flow = 2.06 cfs Volume of Storage = 1970 cf Length of Drawdown = 957 sec or 0.27 hours OK 50 40 30 m m r u T) 20 D 10 0 0 341.00 340.00 339.00 338.00 Q 337.00 336.00 335.00 10 20 30 40 Time (min) STAGE-DISCHARGE FUNCTION 50 0.0 0.5 1.0 1.5 DISCHARGE (cfs) WET-POND-2. xls 2.0 1/22/99 GRAPHED DATA FOR 10 YEAR STORM Hydrographs CHAINSAW ROUTING FOR 100-YEAR STORM (REF: Malcom, 1991) COMPUTED RESULTS Normal Surface Area = 0.30 ac Peak Stage = 340.33 Maximum Surface Area = 0.41 ac Rise = 3.33 ft Peak Outflow = 10.57 cfs INPUT Hydrograph Results: Riser: Nr = 1 Top of Dam: 342.00 ft Qp = 56 cfs Lr = 3 ft Barrel: Tp = 17.3 min Wr = 3 ft Nb = 1 dT = 1 min Cwr = 3.00 Db = 15 in Stage-Storage Results: Cdr = 0.60 Cdb = 0.60 Ks = 5392 Zcr = 339.25 ft Zinv = 336.50 ft b = 1.45 Drawdown Pipe: Emergency Spillway: Zo = 334.0 ft (inv) Cdr = 0.60 L = 0 ft Initial Water Level: D = 2.00 in Zcr = 0.00 ft Z; = 337.00 ft Zcr = 337.00 ft Cw = 0.00 OUTPUT 1 2 3 4 5 6 7 8 9 Time T Inflow I Storage S Stage Z Outflow O Riser (weir) Riser (orifice) Barrel Emergency Spillway min cfs cu-ft ft cfs cfs cfs cfs cfs V V coong.Ia ooi.UU U U.U U.U U.U U.U 1 0 26594.13 337.00 0 0.0 0.0 0.0 0.0 2 2 26621.81 337.00 0 0.0 0.0 0.0 0.0 3 4 26731.61 337.01 0 0.0 0.0 0.0 0.0 4 7 26975.27 337.03 0 0.0 0.0 0.0 0.0 5 11 27400.10 337.06 0 0.0 0.0 0.0 0.0 6 15 28047.43 337.11 0 0.0 0.0 0.0 0.0 7 20 28951.25 337.18 0 0.0 0.0 0.0 0.0 8 25 30137.08 337.27 0 0.0 0.0 0.0 0.0 9 30 31621.13 337.38 0 0.0 0.0 0.0 0.0 10 35 33409.76 337.51 0 0.0 0.0 0.0 0.0 11 40 35499.28 337.66 0 0.0 0.0 0.0 0.0 12 44 37876.07 337.83 0 0.0 0.0 0.0 0.0 13 48 40517.02 338.01 0 0.0 0.0 0.0 0.0 14 51 43390.30 338.20 0 0.0 0.0 0.0 0.0 15 54 46456.40 338.40 0 0.0 0.0 0.0 0.0 16 55 49669.47 338.61 0 0.0 0.0 0.0 0.0 17 56 52978.79 338.82 0 0.0 0.0 0.0 0.0 18 56 56330.45 339.03 0 0.0 0.0 0.0 0.0 19 55 59669.18 339.23 0 0.0 0.0 0.0 0.0 20 53 62940.10 339.43 2 2.0 18.3 9.0 0.0 21 50 65968.05 339.61 6 5.8 25.9 9.3 0.0 22 34 68603.40 339.76 10 9.9 31.0 9.6 0.0 23 32 70098.15 339.85 10 12.4 33.5 9.7 0.0 24 30 71433.50 339.92 10 14.9 35.6 9.9 0.0 25 28 72621.51 339 99 10 17.2 37.3 10.0 0.0 26 26 73673.29 340.05 10 19.3 38.8 10.1 0.0 27 24 74599.14 340.10 10 21.3 40.0 10.2 0.0 28 22 75408.55 340.15 10 23.0 41.1 10.3 0.0 29 20 76110.30 340.19 10 24.5 42.0 10.3 0.0 30 19 76712.53 340.22 10 25.8 42.7 10.4 0.0 31 18 77222.76 340.25 10 27.0 43.3 10.4 0.0 32 16 77647.96 340.27 10 28.0 43.8 10.5 0.0 33 15 77994.58 340.29 10 28.7 44.2 10.5 0.0 34 14 78268.59 340.31 11 29.4 44.6 10.5 0.0 35 13 78475.52 340.32 11 29.9 44.8 10.5 0.0 36 12 78620.51 340.33 11 30.2 45.0 10.6 0.0 37 11 78708.30 340.33 11 30.4 45.1 10.6 0.0 38 10 78743.31 340.33 11 30.5 45.1 10.6 0.0 39 10 78729.61 340.33 11 30.4 45.1 10.6 0.0 40 9 78670.99 340.33 11 30.3 45.0 10.6 0.0 41 8 78570.96 340.32 11 30.1 44.9 10.6 0.0 42 8 78432.77 340.32 11 29.8 44.8 10.5 0.0 70 60 50 w 40 m a m H 30 'o 20 10 0 GRAPHED DATA FOR 100 YEAR STORM Hydrographs STAGE-DISCHARGE FUNCTION 342.00 I i 341.00 340.00 339.00 w D a v~i 338.00 337.00 336.00 335.00 0 1 2 3 4 5 6 7 8 9 10 11 12 13 DISCHARGE (cfs) WET-POND-2. xls 1/22/99 Project No. DWQ 980816 Project Name: Paramount Center SUBMITTED DESIGN: REQUIRED DESIGN: elevations status Bottom of Basin (ft) 334 Permanent Pool (ft) 337 3 ft. depth ok Temporary Pool (ft) 339.25 2.25 ft. depth ok areas Permanent Pool SA (sq ft) 13068 9594 sq. ft. ok Drainage Area (ac) 5.98 Impervious Area (ac) 5.78 96.7 % - volumes Permanent Pool (cu ft) 92864 Temporary Pool (cu ft) 21467 19969 cu. ft. ok Forebay (cu ft) 0 0.0% check forebay other parameters SAIDA 2.03 3.68 Orifice Diameter (in) 2 0.11 efs drawdown Design Rainfall (in) 1 2.2 day drawdown ok Linear Interpolation of Correct SA/DA*** 0/0 Impervious Next Lowest 70 Project Impervious 96.7 Next Highest 100 3 ft. Permanent Pool Depth SAIDA from Table 2.75 3.68 3.8 NOTES: *This spreadsheet is designed to perform a quick preliminary check of design requirements and should not be considered a complete evaluation of any project. Use 'tab' instead of 'enter' to automatically advance to the next data entry window. **This spreadsheet is designed to roughly calculate the draw-down time using the average temporary pool depth and the orifice equation to estimate the change in driving head over time. ***Calculation of the required design parameters requires the SAIDA be computed in the linear interpolation table provided. If the project % impervious is an even value that can be found directly in the table then enter this as either the next higher or lower value and complete the table. pu,,L6? I Project No. DWQ 980816 Project Name: Paramount Center SUBMITTED DESIGN: REQUIRED DESIGN: elevations status Bottom of Basin (ft) 326 Permanent Pool (ft) 329 3 ft. depth ok Temporary Pool (ft) 330.25 1.25 ft. depth ok areas Permanent Pool SA (sq ft) 3920.4 2322 sq. ft. ok Drainage Area (ac) q36 Impervious Area (ac) 171.6 % volumes Permanent Pool (cu ft) 17246 Temporary Pool (cu ft) 5452 4788 cu. ft. ok Forebay (cu ft) 0 0.0% check forebay other parameters SAIDA 2.03 2.81 - Orifice Diameter (in) 1 0.02 cfs drawdown Design Rainfall (in) 1 3.0 day drawdown ok Linear Interpolation of Correct SAIDA*** 010 Impervious Next Lowest 70 Project Impervious 71.6 Next Highest 80 3 ft. Permanent Pool Depth SAIDA from Table 2.75 2.81 3.1 NOTES: *This spreadsheet is designed to perform a quick preliminary check of design requirements and should not be considered a complete evaluation of any project. Use 'tab' instead of 'enter' to automatically advance to the next data entry window. **This spreadsheet is designed to roughly calculate the draw-down time using the average temporary pool depth and the orifice equation to estimate the change in driving head over time. ***Calculation of the required design parameters requires the SAIDA be computed in the linear interpolation table provided. If the project % impervious is an even value that can be found directly in the table then enter this as either the next higher or lower value and complete the table. Project No. DWQ (to be provided by DWQ) DIVISION OF WATER QUALITY 401 EXTENDED DRY DETENTION BASIN WORKSHEET DWQ Stormwater Management Plan Review: A complete stormwater management plan submittal includes a dry detention basin worksheet for each basin, design calculations, plans and specifications showing all basin and outlet structure details, and a fully executed operation and maintenance agreement. An incomplete submittal package will result in a request for additional information and will substantially delay final review and approval of the project. 1. PROJECT INFORMATION (please complete the following information): Project Name : Contact Person: Phone Number: For projects with multiple basins, specify which basin this worksheet applies to: Drainage Area: acres Percent Impervious Area:_ II. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices Manual (N.C. Department of Environment, Health and Natural Resources, November 1995) and Administrative Code Section: 15 A NCAC 2H .1008. Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If a requirement has not been met, attach an explanation of why. Applicants Initials Either capture runoff from 1 yr., 24 hour storm and release over a 48 hour period, or capture runoff from 1 inch storm and draw down over a period of 2 to 5 days. The basin length to width ratio is greater than 3:1. The basin side slopes are no steeper than 3:1. A small permanent pool at outlet orifice is provided to reduce clogging. An emergency drain to completely empty the basin is provided. Vegetation plan prepared by a licensed professional is specified. Basin to be stabilized within 14 days of construction is specified. Sediment storage (20% of detention volume) in addition to detention volume is provided. Inlet and outlet erosion control measures to prevent scour are provided. Additional treatment to meet the 85% TSS removal efficiency is provided. Access for clean-out and maintenance is provided. Inlet plunge pool or other energy dissipation is provided. Forebay is provided to capture sediment and minimize clean-out problems. Uncompacted natural soils are utilized to promote vegetation and reduce sedimentation. Seasonal high water table is at least 1 foot below bottom of basin. If used as a temporary basin, plans indicate clean-out prior to final operation. A site specific operation and maintenance plan with the following provisions is provided. - Mow grass at least twice annually - Remove trash and debris upon accumulation and at least twice annually - Inspect for proper operation at least twice annually including: - outlet clogging or too rapid a release - erosion on banks t)-sAtlanti'*C January 11, 1999 Mr. Todd St. John NCDENR Division of Water Quality Post Office Box 29535 Raleigh, North Carolina, 27626-0535 SUBJECT: LOT 8 - PARAMOUNT CENTER MORRISVILLE, NORTH CAROLINA DSAtlantic PROJECT NO. LIC037.000 Dear Todd: On behalf of Weeks Corporation and pursuant to your 401 Water Quality Certification dated November 4, 1998, we are transmitting herewith the stormwater plan for the above referenced project. We have designed three dry detention ponds and one wet detention pond in combination with stream buffers to serve this site. This submittal includes the following items: 1. Three (3) sets of plans 2. Three (3) sets of design calculations 3. One (1) copy of the Pond Maintenance Agreement We trust all these items will be to your satisfaction. If you have any questions concerning this transmittal please contact me at your first convenience. Si erely, lan M. Ma es, P.E. Vice President Site/Municipal Engineering Group AMM/kj Attachments: As noted above cc: Mr. Robert G. Yelverton - Weeks Corporation w/ atts Mr. Andrew R. Padiak, EI, DSAtlantic Corporation w/o atts File w/o atts 801 Jones Franklin Road Suite 300 Raleigh, NC 27606 (919) 851-6866 Fax: (919) 851-7024 www.dsatlantic.com ¦ ¦ ¦ ¦ ¦ ¦ 0 WE A No DSAdantic DRY POND #1 DESIGN Lot 8 - Paramount Center Morrisville, North Carolina Project No.: LIC037.000 Watershed Data Hydrograph Formulation Stage-Storage Function Pond Volume Calculation Chainsaw Routing for the 10-year storm Drawdown Calculation Graphed Data for the 10-year storm Chainsaw Routing for the 100-year storm Graphed Data for the 100-year storm Outlet Protection ?•A ;.? SE L (122J`IN a o ("6- 09?_.p J %0 G114 M. M DRY-POND-1. xls 1/5/99 WATERSHED DATA Lot 8 - Paramount Center - Pond #1 WATERSHED No. DRAINAGE AR Measure No.I Measure No.2 (ACRES) (ACRES) EA Measure No.3 Average (ACRES) (ACRES) 1 6.88 6.80 6.85 6.84 WATERSHED No. HYDRAULIC LENGTH (FT) VERTICAL RELIEF (FT) 1 433 19 WATERSHED No. ESTIMATION OF IMPE Watershed Area Pavement Area RVIOUSNESS Building Area % Imperv. 1 6.84 ac 3.77 ac 1.11 ac * 71.31% DRY-POND-1. xls 1/4/99 BACKGROUND: REFERENCES: SOLUTION - Qp HYDROGRAPH FORMULATION Lot 8 - Paramount Center - Pond #1 Use the Rational Method (Malcom, 1991; Wanielista, 1990) Use the Kirpich Equation & the Rational Method INPUT OUTPUT L= 433 ft H= 19 ft Tc = 5.0 minutes 9 = 195 (10 year h= 22 storm) 11= 7.22 in/hr A= 6.84 acres C= 0.62 Q010 = 31 cfs g = 290 (100 year h = 25 storm) 1= 9.67 in/hr = 41 cfs SOLUTION - Tp: Pn6 = 3.90 in (10 Year Storm) CN = 66 S = 5.15 in Q* = 1.03 in T,10 = 10.0 minutes Q* = 2.29 in Tp1oo = 16.7 minutes TERMINOLOGY L = Hydraulic Length, (ft) H = Vertical Relief, (ft) g = Statistical Variable h = Statistical Variable A = Watershed Area, (acres) C = Composite Runoff Coefficient Pn6 = Precipitation from 6 hr storm (in) CN = Curve Number Pn6 = 5.80 in (100 Year Storm) Tc = Time of Concentration, (minutes) I = Rainfall Intensity, (in/hr) Qp = Peak Discharge, (cfs) S = Ultimate Soil Storage, (in) Q* = Runoff Depth, (in) Tp = Time to Peak, (minutes) DRY-POND-1.xls 1/4/99 STAGE-STORAGE FUNCTION Lot 8 - Paramount Center - Pond #1 1 2 3 4 5 6 7 8 Y X CONTOUR CONTOUR INCR ACCUM Z In S In Z Z est AREA VOLUME VOLUME STAGE sq ft cu ft cu ft ft ft 335.5 1684 0 0 336 4642 1582 1581.5 0.5 7.3661 -0.6931 0.51 338 8689 13331 14912.5 2.5 9.6100 0.9163 2.34 340 14398 23087 37999.5 4.5 10.5453 1.5041 4.41 342 21145 35543 73542.5 6.5 11.2056 1.8718 6.89 STAGE-STORAGE FUNCTION: S=Ks*Zb where: b = 1.48 and Stage-Storage Function 18 16 14 12 10 c 8 6 4 2 0 KS = 4235 0.5 1.0 1.5 2.0 2.5 In Z DRY-POND-1.xls 1/5/99 CHAINSAW ROUTING FOR 10-YEAR STORM (REF: Malcom, 1991) COMPUTED RESULTS Normal Surface Area = 0.07 ac Peak Stage = 338.72 ft Maximum Surface Area = 0.25 ac Rise = 2.97 ft Peak Outflow = 2.87 cfs INPUT Hydrograph Results: Riser: Nr = 1 Top of Dam: 342.00 ft Qp = 31 cfs Lr = 3 ft Barrel: Tp = 10.0 min Wr = 3 ft Nb = 1 dT = 2 min Cwr = 3.00 Db = 15 in Stage-Storage Results: Cdr = 0.60 Cdb = 0.60 Ks = 4235 Zcr = 338.50 ft Zinv = 335.50 ft b = 1.48 Drawdown Pipe: Emergency Spillway: Zo = 335.5 ft (inv) Cdr = 0.60 L = 0 ft Initial Water Level: D = 1.50 in Zcr = 0.00 ft Z; = 335.75 ft Zcr = 335.75 ft Cw = 0.00 OUTPUT 1 2 3 4 5 6 7 8 9 Time T Inflow I Storage S Stage Z Outflow O Riser (weir) Riser (orifice) Barrel Emergency Spillway min cfs cu-ft ft cfs cfs cfs cfs cfs -U-4 o .iU v 0.0 0.0 0.0 U.U 2 3 545.02 335.75 0 0.0 0.0 0.0 0.0 4 11 897.55 335.85 0 0.0 0.0 0.0 0.0 6 20 2172.48 336.14 0 0.0 0.0 0.0 0.0 8 28 4585.96 336.56 0 0.0 0.0 0.0 0.0 10 31 7917.53 337.03 0 0.0 0.0 0.0 0.0 12 28 11594.64 337.48 0 0.0 0.0 0.0 0.0 14 21 14912.26 337.84 0 0.0 0.0 0.0 0.0 16 17 17488.36 338.11 0 0.0 0.0 0.0 0.0 18 13 19473.62 338.31 0 0.0 0.0 0.0 0.0 20 10 21003.53 338.45 0 0.0 0.0 0.0 0.0 22 8 22182.55 338.56 0 0.4 11.0 9.2 0.0 24 6 23038.72 338.64 1 1.5 16.4 9.4 0.0 26 4 23562.90 338.69 2 2.3 19.0 9.5 0.0 28 3 23830.72 338.72 3 2.7 20.1 9.5 0.0 30 3 23921.06 338.72 3 2.9 20.5 9.5 0.0 32 2 23897.23 338.72 3 2.8 20.4 9.5 0.0 34 2 23804.89 338.71 3 2.7 20.0 9.5 0.0 36 1 23675.02 338.70 2 2.4 19.5 9.5 0.0 38 1 23527.78 338.69 2 2.2 18.8 9.4 0.0 40 1 23375.84 338.67 2 2.0 18.1 9.4 0.0 42 1 23226.83 338.66 2 1.7 17.4 9.4 0.0 44 0 23085.09 338.65 2 1.5 16.7 9.4 0.0 46 0 22952.87 338.64 1 1.3 16.0 9.3 0.0 48 0 22831.10 338.62 1 1.2 15,3 9.3 0.0 50 0 22719.90 338.61 1 1.0 14.6 9.3 0.0 52 0 22618.92 338.60 1 0.9 14.0 9.3 0.0 54 0 22527.56 338.60 1 0.8 13.4 9.3 0.0 56 0 22445.08 338.59 1 07 12.9 9.3 0.0 58 0 22370.69 338.58 1 0.6 12.4 9.2 0.0 60 0 22303.63 338.58 1 0.6 11.9 9.2 0.0 62 0 22243.16 338.57 0 0.5 11.4 9.2 0.0 64 0 22188.58 338.56 0 0.4 11.0 9.2 0.0 66 0 22139.29 338.56 0 0.4 10.6 9.2 0.0 68 0 22094.70 338.56 0 0.4 10.2 9.2 0.0 70 0 22054.30 338.55 0 0.3 9.9 9.2 0.0 72 0 22017.65 338.55 0 0.3 9.5 9.2 0.0 74 0 21984.34 338.55 0 0.3 9.2 9.2 0.0 76 0 21954.00 338.54 0 0.2 8.9 9.2 0.0 78 0 21926.32 338.54 0 0.2 8.7 9.2 0.0 80 0 21901.02 338.54 0 0.2 8.4 9.2 0.0 DRY-POND-1. xls 116199 DRAWDOWN CALCULATIONS Lot 8 - Paramount Center - Pond #1 Storage Pool Drawdown Pond must detain the first 1" of runoff and release it in 2 to 5 days INPUT Number of Drains = 1 Starting Water Elevation = 338.50 ft Diameter of Drains = 1.5 in Ending Water Elevation = 335.75 ft Orifice Coefficient = 0.60 ft Average Head = 1.38 ft Elevation of Drains = 335.75 ft OUTPUT By the Orifice Equation: Average Flow = 0.07 cfs Vol of Storage Required = 17178 cf Volume of Storage = 20956 cf OK Length of Drawdown = 302420 sec or 3.50 days OK 40 30 u m 20 ?o r u N_ 10 0 0 341.00 340.00 339.00 338.00 Q 337.00 336.00 335.00 GRAPHED DATA FOR 10 YEAR STORM Hydrographs 10 20 30 Time (min) STAGE-DISCHARGE FUNCTION 40 50 ICI 0 DRY-POND-l.xls 1 2 DISCHARGE (cfs) 3 4 115199 CHAINSAW ROUTING FOR 100-YEAR STORM (REF: Malcom, 1991) COMPUTED RESULTS Normal Surface Area = 0.07 ac Peak Stage = 339.62 ft Maximum Surface Area = 0.28 ac Rise = 3.87 ft Peak Outflow = 11.03 cfs INPUT Hydrograph Results: Riser: Nr = 1 Top of Dam: 342.00 ft Qp = 41 cfs Lr = 3 ft Barrel: Tp = 16.7 min Wr = 3 ft Nb = 1 dT = 2 min Cwr = 3.00 Db = 15 in Stage-Storage Results: Cdr = 0.60 Cdb = 0.60 Ks = 4235 Zcr = 338.50 ft Zinv = 335.50 ft b = 1.48 Drawdown Pipe: Emergency Spillway: Zo = 335.5 ft (inv) Cdr = 0.60 L = 0 ft Initial Water Level: D = 1.50 in Zcr = 0.00 ft Z; = 335.75 ft Zcr = 335.75 ft Cw = 0.00 OUTPUT 1 2 3 4 5 6 7 8 9 Time T Inflow I Storage S Stage Z Outflow O Riser (weir) Riser (orifice) Barrel Emergency Spillway min cfs cu-ft It cfs cfs cfs cfs cfs V V J9J.UL JJJ./D U V.U U.U U.U U.U 2 1 545.02 335.75 0 0.0 0.0 0.0 0.0 4 6 718.11 335.80 0 0.0 0.0 0.0 0.0 6 12 1386.13 335.97 0 0.0 0.0 0.0 0.0 8 19 2801.30 336.26 0 0.0 0.0 0.0 0.0 10 27 5110.71 336.64 0 0.0 0.0 0.0 0.0 12 34 8335.68 337.08 0 0.0 0.0 0.0 0.0 14 38 12368.71 337.56 0 0.0 0.0 0.0 0.0 16 41 16988.63 338.06 0 0.0 0.0 0.0 0.0 18 40 21891.71 338.54 0 0.2 8.3 9.2 0.0 20 37 26711.57 338.97 9 8.8 29.8 10.0 0.0 22 24 30101.10 339.27 10 18.1 37.9 10.5 0.0 24 20 31711.42 339.40 11 23.1 41.1 10.7 0.0 26 17 32880.89 339.50 11 26.9 43.3 10.8 0.0 28 15 33677.30 339.56 11 29.6 44.7 10.9 0.0 30 13 34158.14 339.60 11 31.3 45.5 11.0 0.0 32 11 34372.26 339.62 11 32.0 45.9 11.0 0.0 34 9 34361.30 339.62 11 32.0 45.8 11.0 0.0 36 8 34160.78 339.60 11 31.3 45.5 11.0 0.0 38 7 33801.05 339.57 11 30.0 44.9 11.0 0.0 40 6 33308.05 339.53 11 28.4 44.0 10.9 0.0 42 5 32703.97 339.48 11 26.3 43.0 10.8 0.0 44 4 32007.84 339.43 11 24.1 41.7 10.7 0.0 46 4 31235.95 339.36 11 21.6 40.2 10.6 0.0 48 3 30402.29 339.29 10 19.0 38.6 10.5 0.0 50 3 29518.88 339.22 10 16.4 36.7 10.4 0.0 52 2 28596.03 339.14 10 13.8 34.6 10.2 0.0 54 2 27642.64 339.06 10 11.2 32.3 10.1 0.0 56 2 26666.37 338.97 9 8.7 29.7 10.0 0.0 58 1 25823.54 338.90 7 6.7 27.3 9.8 0.0 60 1 25189.86 338.84 5 5.3 25.2 9.7 0.0 62 1 24697.82 338.79 4 4.3 23.5 9.6 0.0 64 1 24305.47 338.76 4 3.6 22.1 9.6 0.0 66 1 23985.62 338.73 3 3.0 20.8 9.5 0.0 68 1 23720.05 338.71 3 2.5 19.7 9.5 0.0 70 1 23496.10 338.69 2 2.2 18.7 9.4 0.0 72 0 23304.81 338.67 2 1.9 17.8 9.4 0.0 74 0 23139.62 338.65 2 1.6 16.9 9.4 0.0 76 0 22995.66 338.64 1 1.4 16.2 9.4 0.0 78 0 22869.20 338.63 1 1.2 15.5 9.3 0.0 80 0 22757.39 338.62 1 1.1 14.9 9.3 0.0 82 0 22657.95 338.61 1 1.0 14.3 9.3 0.0 84 0 22569.09 338.60 1 0.9 13.7 9.3 0.0 50 40 42 30 m E, ?o L u V 20 o 10 0 0 10 20 30 40 Time (min) STAGE-DISCHARGE FUNCTION 50 60 342.00 341.00 340.00 339.00 y? 338.00 x 337.00 Q 336.00 335.00 334.00 333.00 332.00 0 1 2 3 4 5 6 7 8 9 10 11 12 DISCHARGE (cfs) GRAPHED DATA FOR 100 YEAR STORM Hydrographs Riprap Velocity Dissipator Pad DRYPOND #1 LOT 8 - PARAMOUNT CENTER Morrisville, North Carolina Design Storm: 10-year BACKGROUND: Use the E&S Control Planning & Design Manual, Section 8.06. REFERENCE: (NCOEHVR, 1993) Step 1. Minimum Tailwater Condition Step 2. D-o = 15 in. D-o = 1.25 ft. Q-10 = 2.87 cfs (from Chainsaw Routing Sheet) V= 2.3 fps d-50 = 0.5 ft. Figure 8.06 a L-a = 8 ft. Figure 8.06 a Step 3. 3*D-o = 3.75 ft. Use: 4 ft W = 9.25 ft. Use: 10 ft Step 4. d-max 0.75 ft. Maximum Stone Diameter (1.5*d-50) d-max 9 in. Class "B" Rip-Rap Step 5. Thickness = 1.1 ft. Apron Thickness With Filter Fabric (1.5*d-50) Thickness = 14 in. Use: 18 in TERMINOLOGY: Q10 = 10-Year Design Storm, Peak Discharge, (cfs) D-o = Pipe Diameter, (in. & ft.) d-50 = Mean Stone Diameter of Rip-Rap, (ft.) L-a = Length of Rip-Rap Apron, (ft.) 3*D-o = Width of Rip-Rap Apron @ Pipe Outlet, (ft.) W = Width of Rip-Rap Apron @ End of Apron, (ft.) d-max = Maximum Stone Diameter of Rip-Rap, (ft. & in.) Thickness = Thickness of Rip-Rap Apron With Filter Fabric, (ft. &in.) v DSAdantic DRY POND #1 DESIGN Lot 8 - Paramount Center Morrisville, North Carolina Project No.: LIC037.000 Watershed Data Hydrograph Formulation Stage-Storage Function Pond Volume Calculation Chainsaw Routing for the 10-year storm Drawdown Calculation Graphed Data for the 10-year storm Chainsaw Routing for the 100-year storm Graphed Data for the 100-year storm Outlet Protection CARP Q i \\ m^mi,13tI n ?FESS/G??' ?`- SEAL 022092 p'. w u ??q! FNGINE?? ''?, N M. MPS .. DRY-POND-1.xls 1/5/99 WATERSHED DATA Lot 8 - Paramount Center - Pond #1 WATERSHED No. DRAINAGE AR Measure No.l Measure No.2 (ACRES) (ACRES) EA Measure No.3 Average (ACRES) (ACRES) 1 6.88 6.80 6.85 6.84 WATERSHED No. HYDRAULIC LENGTH (FT) VERTICAL RELIEF (FT) 1 433 19 WATERSHED No. ESTIMATION OF IMPE Watershed Area Pavement Area RVIOUSNESS Building Area % Imperv. 1 6.84 ac 3.77 ac 1.11 ac * 71.31% DRY-POND-1.As 1/4/99 HYDROGRAPH FORMULATION Lot 8 - Paramount Center - Pond #1 BACKGROUND: Use the Rational Method REFERENCES: (Malcom, 1991; Wanielista, 1990) SOLUTION - Qp: Use the Kirpich Equation & the Rational Method INPUT OUTPUT L= 433 ft H= 19 ft Tc = 5.0 minutes 9= 195 (10 year h= 22 storm) I= 7.22 in/hr A= 6.84 acres C= 0.62 QP10 = 31 cfs g = 290 (100 year h = 25 storm) I = 9.67 in/hr QP1oo = 41 cfs SOLUTION - To: Pn6 = 3.90 in (10 Year Storm) CN = 66 Pn6 = 5.80 in (100 Year Storm) S = 5.15 in Q* = 1.03 in TP10 = 10.0 minutes Q* = 2.29 in TP,oo = 16.7 minutes TERMINOLOGY L = Hydraulic Length, (ft) H = Vertical Relief, (ft) g = Statistical Variable h = Statistical Variable A = Watershed Area, (acres) C = Composite Runoff Coefficient Pr6 = Precipitation from 6 hr storm (in) CN = Curve Number DRY-POND-1.xls Tc = Time of Concentration, (minutes) I = Rainfall Intensity, (in/hr) Qp = Peak Discharge, (cfs) S = Ultimate Soil Storage, (in) Q* = Runoff Depth, (in) Tp = Time to Peak, (minutes) 1/4/99 STAGE-STORAGE FUNCTION Lot 8 - Paramount Center - Pond #1 1 2 3 4 5 6 7 8 Y X CONTOUR CONTOUR INCR ACCUM Z In S In Z Z est AREA VOLUME VOLUME STAGE sq ft cu ft cu ft ft ft 335.5 1684 0 0 336 4642 1582 1581.5 0.5 7.3661 -0.6931 0.51 338 8689 13331 14912.5 2.5 9.6100 0.9163 2.34 340 14398 23087 37999.5 4.5 10.5453 1.5041 4.41 342 21145 35543 73542.5 6.5 11.2056 1.8718 6.89 STAGE-STORAGE FUNCTION: S=Ks*Zb where-. b = 1.48 and KS = 4235 Stage-Storage Function 18 16 14 12 10 c 8 6 4 2 0 0.5 1.0 1.5 2.0 2.5 In Z DRY-POND-1.xls 1/5/99 CHAINSAW ROUTING FOR 10-YEAR STORM (REF: Malcom, 1991) COMPUTED RESULTS Normal Surface Area = 0.07 ac Peak Stage = 338.72 ft Maximum Surface Area = 0.25 ac Rise = 2.97 ft Peak Outflow = 2.87 cfs INPUT Hydrograph Results: Riser: Nr = 1 Top of Dam: 342.00 ft Qp = 31 cfs Lr = 3 ft Barrel: Tp = 10.0 min Wr = 3 ft Nb = 1 dT = 2 min Cwr = 3.00 Db = 15 in Stage-Storage Results: Cdr = 0.60 Cdb = 0.60 Ks = 4235 Zcr = 338.50 ft Zinv = 335.50 It b = 1.48 Drawdown Pipe: Emergency Spillway: Zo = 335.5 ft (inv) Cdr = 0.60 L = 0 ft Initial Water Level: D = 1.50 in Zcr = 0.00 ft Z; = 335.75 ft Zcr = 335.75 ft Cw = 0.00 OUTPUT 1 2 3 4 5 6 7 8 9 Time T Inflow I Storage S Stage Z Outflow O Riser (weir) Riser (orifice) Barrel Emergency Spillway min cfs cu-ft It cfs cfs cfs cfs cfs v u 545.02 335.75 u 0.0 0.0 0.0 0.0 2 3 545.02 335.75 0 0.0 0.0 0.0 0.0 4 11 897.55 335.85 0 0.0 0.0 0.0 0.0 6 20 2172.48 336.14 0 0.0 0.0 0.0 0.0 8 28 4585.96 336.56 0 0.0 0.0 0.0 0.0 10 31 7917.53 337.03 0 0.0 0.0 0.0 0.0 12 28 11594.64 337.48 0 0.0 0.0 0.0 0.0 14 21 14912.26 337.84 0 0.0 0.0 0.0 0.0 16 17 17488.36 338.11 0 0.0 0.0 0.0 0.0 18 13 19473.62 338.31 0 0.0 0.0 0.0 0.0 20 10 21003.53 338.45 0 0.0 0.0 0.0 0.0 22 8 22182.55 338.56 0 0.4 11.0 9.2 0.0 24 6 23038.72 338.64 1 1.5 16.4 9.4 0.0 26 4 23562.90 338.69 2 2.3 19.0 9.5 0.0 28 3 23830.72 338.72 3 2.7 20.1 9.5 0.0 30 3 23921.06 338.72 3 2.9 20.5 9.5 0.0 32 2 23897.23 338.72 3 2.8 20.4 9.5 0.0 34 2 23804.89 338.71 3 2.7 20.0 9.5 0.0 36 1 23675.02 338.70 2 2.4 19.5 9.5 0.0 38 1 23527.78 338.69 2 2.2 18.8 9.4 0.0 40 1 23375.84 338.67 2 2.0 18.1 9.4 0.0 42 1 23226.83 338.66 2 1.7 17.4 9.4 0.0 44 0 23085.09 338.65 2 1.5 16.7 9.4 0.0 46 0 22952.87 338.64 1 1.3 16.0 9.3 0.0 48 0 22831.10 338.62 1 1.2 15.3 9.3 0.0 50 0 22719.90 338.61 1 1.0 14.6 9.3 0.0 52 0 22618.92 338.60 1 0.9 14.0 9.3 0.0 54 0 22527.56 338.60 1 0.8 13.4 9.3 0.0 56 0 22445.08 338.59 1 0.7 12.9 9.3 0.0 58 0 22370.69 338.58 1 0.6 12.4 9.2 0.0 60 0 22303.63 338.58 1 0.6 11.9 9.2 0.0 62 0 22243.16 338.57 0 0.5 11.4 9.2 0.0 64 0 22188.58 338.56 0 0.4 11.0 9.2 0.0 66 0 22139.29 338 56 0 0.4 10.6 9.2 0.0 68 0 22094.70 338.56 0 0.4 10.2 9.2 0.0 70 0 22054.30 338 55 0 0.3 9.9 9.2 0.0 72 0 22017.65 338.55 0 0.3 9.5 9.2 0.0 74 0 21984.34 338.55 0 0.3 9.2 9.2 0.0 76 0 21954.00 338.54 0 0.2 8.9 9.2 0.0 78 0 21926.32 338.54 0 0.2 8.7 9.2 0.0 80 0 21901.02 338.54 0 0.2 8.4 9.2 0.0 DRY-POND-1. xls 1/6/99 DRAWDOWN CALCULATIONS Lot 8 - Paramount Center - Pond #1 Storage Pool Drawdown Pond must detain the first 1" of runoff and release it in 2 to 5 days INPUT Number of Drains = 1 Starting Water Elevation = 338.50 ft Diameter of Drains = 1.5 in Ending Water Elevation = 335.75 ft Orifice Coefficient = 0.60 ft Average Head = 1.38 ft Elevation of Drains = 335.75 ft OUTPUT By the Orifice Equation: Average Flow = 0.07 cfs Vol of Storage Required = 17178 cf Volume of Storage = 20956 cf OK Length of Drawdown = 302420 sec or 3.50 days OK 40 30 v m O7 20 a L V N O 10 0 0 341.00 340.00 339.00 Lq 338.00 I- 337.00 336.00 335.00 10 20 30 40 Time (min) STAGE-DISCHARGE FUNCTION 50 0 1 2 3 4 DISCHARGE (cfs) DRY-POND-1. xis 115199 GRAPHED DATA FOR 10 YEAR STORM Hydrographs CHAINSAW ROUTING FOR 100-YEAR STORM (REF: Malcom, 1991) COMPUTED RESULTS Normal Surface Area = 0.07 ac Peak Stage = 339.62 ft Maximum Surface Area = 0.28 ac Rise = 3.87 ft Peak Outflow = 11.03 cfs INPUT Hydrograph Results: Riser. Nr = 1 Top of Dam: 342.00 ft Qp = 41 cfs Lr = 3 ft Barrel: Tp = 16.7 min Wr = 3 ft Nb = 1 dT = 2 min Cwr = 3.00 Db = 15 in Stage-Storage Results: Cdr = 0.60 Cdb = 0.60 Ks = 4235 Zcr = 338.50 ft Zinv = 335.50 ft b = 1.48 Drawdown Pipe: Emergency Spillway: Zo = 335.5 It (inv) Cdr = 0.60 L = 0 ft Initial Water Level: D = 1.50 in Zcr = 0.00 ft Z; = 335.75 ft Zcr = 335.75 ft Cw = 0.00 OUTPUT 1 2 3 4 5 6 7 8 9 Time T Inflow I Storage S Stage Z Outflow O Riser (weir) Riser (orifice) Barrel Emergency Spillway min cfs cu-ft ft cfs cfs cfs cfs cfs v v 040.UZ a150.iZ) v O.u U.U 0.0 0.0 2 1 545.02 335.75 0 0.0 0.0 0.0 0.0 4 6 718.11 335.80 0 0.0 0.0 0.0 0.0 6 12 1386.13 335.97 0 0.0 0.0 0.0 0.0 8 19 2801.30 336.26 0 0.0 0.0 0.0 0.0 10 27 5110.71 336.64 0 0.0 0.0 0.0 0.0 12 34 8335.68 337.08 0 0.0 0.0 0.0 0.0 14 38 12368.71 337.56 0 0.0 0.0 0.0 0.0 16 41 16988.63 338.06 0 0.0 0.0 0.0 0.0 18 40 21891.71 338.54 0 0.2 8.3 9.2 0.0 20 37 26711.57 338.97 9 8.8 29.8 10.0 0.0 22 24 30101.10 339.27 10 18.1 37.9 10.5 0.0 24 20 31711.42 339.40 11 23.1 41.1 10.7 0.0 26 17 32880.89 339.50 11 26.9 43.3 10.8 0.0 28 15 33677.30 339.56 11 29.6 44.7 10.9 0.0 30 13 34158.14 339.60 11 31.3 45.5 11.0 0.0 32 11 34372.26 339.62 11 32.0 45.9 11.0 0.0 34 9 34361.30 339.62 11 32.0 45.8 11.0 0.0 36 8 34160.78 339.60 11 31.3 45.5 11.0 0.0 38 7 33801.05 339.57 11 30.0 44.9 11.0 0.0 40 6 33308.05 339.53 11 28.4 44.0 10.9 0.0 42 5 32703.97 339.48 11 26.3 43.0 10.8 0.0 44 4 32007.84 339.43 11 24.1 41.7 10.7 0.0 46 4 31235.95 339.36 11 21.6 40.2 10.6 0.0 48 3 30402.29 339.29 10 19.0 38.6 10.5 0.0 50 3 29518.88 339.22 10 16.4 36.7 10.4 0.0 52 2 28596.03 339.14 10 13.8 34.6 10.2 0.0 54 2 27642.64 339.06 10 11.2 32.3 10.1 0.0 56 2 26666.37 338.97 9 8.7 29.7 10.0 0.0 58 1 25823.54 338.90 7 6.7 27.3 9.8 0.0 60 1 25189.86 338.84 5 5.3 25.2 9.7 0.0 62 1 24697.82 338.79 4 4.3 23.5 9.6 0.0 64 1 24305.47 338.76 4 3.6 22.1 9.6 0.0 66 1 23985.62 338.73 3 3.0 20.8 9.5 0.0 68 1 23720.05 338.71 3 2.5 19.7 9.5 0.0 70 1 23496.10 338.69 2 2.2 18.7 9.4 0.0 72 0 23304.81 338.67 2 1.9 17.8 9.4 0.0 74 0 23139.62 338.65 2 1.6 16.9 9.4 0.0 76 0 22995.66 338.64 1 1.4 16.2 9.4 0.0 78 0 22869.20 338.63 1 1.2 15.5 9.3 0.0 80 0 22757.39 338.62 1 1.1 14.9 9.3 0.0 82 0 22657.95 338.61 1 1.0 14.3 9.3 0.0 84 0 22569.09 338.60 1 0.9 13.7 9.3 0.0 50 ,-- 40 J2 30 m m I L V N 20 10 0 GRAPHED DATA FOR 100 YEAR STORM Hydrographs 0 10 20 30 40 50 60 Time (min) STAGE-DISCHARGE FUNCTION 342.00 341.00 340.00 339.00 338.00 x 337.00 336.00 335.00 334.00 333.00 332.00 0 1 2 3 4 5 6 7 8 9 10 11 12 DISCHARGE (cfs) Riprap Velocity Dissipator Pad DRY POND W LOT 8 - PARAMOUNT CENTER Morrisville, North Carolina Design Storm: 10-year BACKGROUND: Use the E&S Control Planning & Design Manual, Section 8.06. REFERENCE: (,1'CDEHNR, 1993) Step 1. Minimum Tailwater Condition Step 2. D-o = 15 in. D-o = 1.25 ft. Q-10 = 2.87 cfs (from Chainsaw Routing Sheet) V= 2.3 fps d-50 = 0.5 ft. Figure 8.06 a L-a = 8 ft. Figure 8.06 a Step 3. 3*D-o = 3.75 ft. W = 9.25 ft. Step 4. d-max 0.75 ft. d-max 9 in. Step 5. Thickness = 1.1 ft. Thickness = 14 in. TERMINOLOGY: Q10 D-o d-50 L-a 3*D-o W d-max Thickness Use: 4 ft Use: 10 ft Maximum Stone Diameter (1.5*d-50) Class "B" Rip-Rap Apron Thickness With Filter Fabric (1.5*d-50) Use: 18 in 10-Year Design Storm, Peak Discharge, (cfs) Pipe Diameter, (in. & ft.) Mean Stone Diameter of Rip-Rap, (ft.) Length of Rip-Rap Apron, (ft.) Width of Rip-Rap Apron @ Pipe Outlet, (ft.) Width of Rip-Rap Apron @ End of Apron, (ft.) Maximum Stone Diameter of Rip-Rap, (ft. & in.) Thickness of Rip-Rap Apron With Filter Fabric, (ft. &in.) DSAflantic DRY POND #1 DESIGN Lot 8 - Paramount Center Morrisville, North Carolina Project No.: LIC037.000 Watershed Data Hydrograph Formulation Stage-Storage Function Pond Volume Calculation Chainsaw Routing for the 10-year storm Drawdown Calculation Graphed Data for the 10-year storm Chainsaw Routing for the 100-year storm Graphed Data for the 100-year storm Outlet Protection .r•?? N CARO d% a 9FE8Si®% w w SEAL 022092 ,?q1? NGINE????a. M. M P? DRY-POND-1. xls 1/5/99 WATERSHED DATA Lot 8 - Paramount Center - Pond #1 WATERSHED No. DRAINAGE AR Measure No.l Measure No.2 (ACRES) (ACRES) EA Measure No.3 Average (ACRES) (ACRES) 1 6.88 6.80 6.85 6.84 WATERSHED No. HYDRAULIC LENGTH (FT) VERTICAL RELIEF (FT) 1 433 19 WATERSHED No. ESTIMATION OF IMPE Watershed Area Pavement Area RVIOUSNESS Building Area % Imperv. 1 6.84 ac 3.77 ac 1.11 ac * 71.31% DRY-POND-1.xls 1/4/99 BACKGROUND: REFERENCES: SOLUTION - Qp: HYDROGRAPH FORMULATION Lot 8 - Paramount Center - Pond #1 Use the Rational Method (Malcom, 1991; Wanielista, 1990) Use the Kirpich Equation & the Rational Method T SOLUTION - Tp: L = 433 ft H= 19 ft g = 195 (10 year h = 22 storm) A = 6.84 acres C = 0.62 Tc = 5.0 minutes I = 7.22 in/hr QP,o = 31 cfs I = 9.67 in/hr QP1oo = 41 cfs INPUT OUTPUT Pn6 = 3.90 in (10 Year Storm) S= 5.15 in CN = 66 Q* = 1.03 in TP,o = 10.0 minutes Pn6 = 5.80 in (100 Year Storm) Q* = 2.29 in TP100 = 16.7 minutes TERMINOLOGY.- g = 290 (100 year h = 25 storm) L = Hydraulic Length, (ft) H = Vertical Relief, (ft) g = Statistical Variable h = Statistical Variable A = Watershed Area, (acres) C = Composite Runoff Coefficient Pn6 = Precipitation from 6 hr storm (in) CN = Curve Number Tc = Time of Concentration, (minutes) I = Rainfall Intensity, (in/hr) Qp = Peak Discharge, (cfs) S = Ultimate Soil Storage, (in) Q* = Runoff Depth, (in) Tp = Time to Peak, (minutes) DRY-POND-1. xls 1/4/99 STAGE-STORAGE FUNCTION Lot 8 -Paramount Center - Pond #1 1 2 3 4 5 6 7 8 Y X CONTOUR CONTOUR INCR ACCUM Z In S In Z Z est AREA VOLUME VOLUME STAGE sq ft cu ft cu k ft ft 335.5 1684 0 0 336 4642 1582 1581.5 0.5 7.3661 -0.6931 0.51 338 8689 13331 14912.5 2.5 9.6100 0.9163 2.34 340 14398 23087 37999.5 4.5 10.5453 1.5041 4.41 342 21145 35543 73542.5 6.5 11.2056 1.8718 6.89 STAGE-STORAGE FUNCTION: S = Ks * Zb where: b = 1.48 and KS = 4235 Stage-Storage Function 18 16 14 12 10 c 6 4 2 0 0.5 1.0 1.5 2.0 2.5 In Z DRY-POND-1.xls 1/5/99 CHAINSAW ROUTING FOR 10-YEAR STORM (REF: Malcom, 1991) COMPUTED RESULTS Normal Surface Area = 0.07 ac Peak Stage = 338.72 ft Maximum Surface Area = 0.25 ac Rise = 2.97 ft Peak Outflow = 2.87 cfs INPUT Hydrograph Results: Riser. Nr = 1 Top of Dam: 342.00 ft Qp = 31 cfs Lr = 3 ft Barrel: Tp = 10.0 min Wr = 3 ft Nb = 1 dT = 2 min Cwr = 3.00 Db = 15 in Stage-Storage Results: Cdr = 0.60 Cdb = 0.60 Ks = 4235 Zcr = 338.50 ft Zinv = 335.50 ft b = 1.48 Drawdown Pipe: Emergency Spillway: Zo = 335.5 ft (inv) Cdr = 0.60 L = 0 ft Initial Water Level: D = 1.50 in Zcr = 0.00 ft Z; = 335.75 ft Zcr = 335.75 ft Cw = 0.00 OUTPUT 1 2 3 4 5 6 7 8 9 Time T Inflow I Storage S Stage Z Outflow O Riser (weir) Riser (orifice) Barrel Emergency Spillway min cfs cu-ft It cfs cfs cfs cfs cfs / -1-4 JJJ.IJ V V.V 0.0 0.U U.U 2 3 545.02 335.75 0 0.0 0.0 0.0 0.0 4 11 897.55 335.85 0 0.0 0.0 0.0 0.0 6 20 2172.48 336.14 0 0.0 0.0 0.0 0.0 8 28 4585.96 336.56 0 0.0 0.0 0.0 0.0 10 31 7917.53 337.03 0 0.0 0.0 0.0 0.0 12 28 11594.64 337.48 0 0.0 0.0 0.0 0.0 14 21 14912.26 337.84 0 0.0 0.0 0.0 0.0 16 17 17488.36 338.11 0 0.0 0.0 0.0 0.0 18 13 19473.62 338.31 0 0.0 0.0 0.0 0.0 20 10 21003.53 338.45 0 0.0 0.0 0.0 0.0 22 8 22182.55 338.56 0 0.4 11.0 9.2 0.0 24 6 23038.72 338.64 1 1.5 16.4 9.4 0.0 26 4 23562.90 338.69 2 2.3 19.0 9.5 0.0 28 3 23830.72 338.72 3 2.7 20.1 9.5 0.0 30 3 23921.06 338.72 3 2.9 20.5 9.5 0.0 32 2 23897.23 338.72 3 2.8 20.4 9.5 0.0 34 2 23804.89 338.71 3 2.7 20.0 9.5 0.0 36 1 23675.02 338.70 2 2.4 19.5 9.5 0.0 38 1 23527.78 338.69 2 2.2 18.8 9.4 0.0 40 1 23375.84 338.67 2 2.0 18.1 9.4 0.0 42 1 23226.83 338.66 2 1.7 17.4 9.4 0.0 44 0 23085.09 338.65 2 1.5 16.7 9.4 0.0 46 0 22952.87 338.64 1 1.3 16.0 9.3 0.0 48 0 22831.10 338.62 1 1.2 15.3 9.3 0.0 50 0 22719.90 338.61 1 1.0 14.6 9.3 0.0 52 0 22618.92 338.60 1 0.9 14.0 9.3 0.0 54 0 22527.56 338.60 1 0.8 13.4 9.3 0.0 56 0 22445.08 338.59 1 0.7 12.9 9.3 0.0 58 0 22370.69 338.58 1 0.6 12.4 9.2 0.0 60 0 22303.63 338.58 1 0.6 11.9 9.2 0.0 62 0 22243.16 338.57 0 0.5 11.4 9.2 0.0 64 0 22188.58 338.56 0 0.4 11.0 9.2 0.0 66 0 22139.29 338.56 0 0.4 10.6 9.2 0.0 68 0 22094.70 338.56 0 0.4 10.2 9.2 0.0 70 0 22054.30 338.55 0 0.3 9.9 9.2 0.0 72 0 22017.65 338.55 0 0.3 9.5 9.2 0.0 74 0 21984.34 338.55 0 0.3 9.2 9.2 0.0 76 0 21954.00 338.54 0 0.2 8.9 9.2 0.0 78 0 21926.32 338.54 0 0.2 8.7 9.2 0.0 80 0 21901.02 338.54 0 0.2 8.4 9.2 0.0 DRY-POND-i.xls 116199 DRAWDOWN CALCULATIONS Lot 8 -Paramount Center - Pond #1 Storage Pool Drawdown Pond must detain the first 1" of runoff and release it in 2 to 5 days INPUT Number of Drains = 1 Starting Water Elevation = 338.50 ft Diameter of Drains = 1.5 in Ending Water Elevation = 335.75 ft Orifice Coefficient = 0.60 ft Average Head = 1.38 ft Elevation of Drains = 335.75 ft OUTPUT By the Orifice Equation: Average Flow = 0.07 cfs Vol of Storage Required = 17178 cf Volume of Storage = 20956 cf OK Length of Drawdown = 302420 sec or 3.50 days OK GRAPHED DATA FOR 10 YEAR STORM Hydrographs 40 30 v m °.' 20 m r L) N_ 10 0 0 341.00 340.00 339.00 x 338.00 337.00 336.00 335.00 STAGE-DISCHARGE FUNCTION I 50 0 1 2 3 4 DISCHARGE (cfs) DRY-POND-1. xls 11599 10 20 30 40 Time (min) CHAINSAW ROUTING FOR 100-YEAR STORM (REF: Malcom, 1991) COMPUTED RESULTS Normal Surface Area = 0.07 ac Peak Stage = 339.62 ft Maximum Surface Area = 0.28 ac Rise = 3.87 ft Peak Outflow = 11.03 cfs INPUT Hydrograph Results: Riser: Nr = 1 Top of Dam: 342.00 ft Qp = 41 cfs Lr = 3 ft Barrel: Tp = 16.7 min Wr = 3 ft Nb = 1 dT = 2 min Cwr = 3.00 Db = 15 in Stage-Storage Results: Cdr = 0.60 Cdb = 0.60 Ks = 4235 Zcr = 338.50 ft Zinv = 335.50 ft b = 1.48 Drawdown Pipe: Emergency Spillway: Zo = 335.5 ft (inv) Cdr = 0.60 L = 0 ft Initial Water Level: D = 1.50 in Zcr = 0.00 ft Z; = 335.75 ft Zcr = 335.75 ft Cw = 0.00 OUTPUT 1 2 3 4 5 6 7 8 9 Time T Inflow I Storage S Stage Z Outflow O Riser (weir) Riser (orifice) Barrel Emergency Spillway min cfs cu-ft ft CIS cfs cfs cfs cfs v V -.VL JJ'./, V U.U U.U U.U U.U 2 1 545.02 335.75 0 0.0 0.0 0.0 0.0 4 6 718.11 335.80 0 0.0 0.0 0.0 0.0 6 12 1386.13 335.97 0 0.0 0.0 0.0 0.0 8 19 2801.30 336.26 0 0.0 0.0 0.0 0.0 10 27 5110.71 336.64 0 0.0 0.0 0.0 0.0 12 34 8335.68 337.08 0 0.0 0.0 0.0 0.0 14 38 12368.71 337.56 0 0.0 0.0 0.0 0.0 16 41 16988.63 338.06 0 0.0 0.0 0.0 0.0 18 40 21891.71 338.54 0 0.2 8.3 9.2 0.0 20 37 26711.57 338.97 9 8.8 29.8 10.0 0.0 22 24 30101.10 339.27 10 18.1 37.9 10.5 0.0 24 20 31711.42 339.40 11 211 41.1 10.7 0.0 26 17 32880.89 339.50 11 26.9 43.3 10.8 0.0 28 15 33677.30 339.56 11 29.6 44.7 10.9 0.0 30 13 34158.14 339.60 11 31.3 45.5 11.0 0.0 32 11 34372.26 339.62 11 32.0 45.9 11.0 0.0 34 9 34361.30 339.62 11 32.0 45.8 11.0 0.0 36 8 34160.78 339.60 11 31.3 45.5 11.0 0.0 38 7 33801.05 339.57 11 30.0 44.9 11.0 0.0 40 6 33308.05 339.53 11 28.4 44.0 10.9 0.0 42 5 32703.97 339.48 11 26.3 43.0 10.8 0.0 44 4 32007.84 339.43 11 24.1 41.7 10.7 0.0 46 4 31235.95 339.36 11 21.6 40.2 10.6 0.0 48 3 30402.29 339.29 10 19.0 38.6 10.5 0.0 50 3 29518.88 339.22 10 16.4 36.7 10.4 0.0 52 2 28596.03 339.14 10 13.8 34.6 10.2 0.0 54 2 27642.64 339.06 10 11.2 32.3 10.1 0.0 56 2 26666.37 338.97 9 8.7 29.7 10.0 0.0 58 1 25823.54 338.90 7 6.7 27.3 9.8 0.0 60 1 25189.86 338.84 5 5.3 25.2 97 0.0 62 1 24697.82 338.79 4 4.3 23.5 9.6 0.0 64 1 24305.47 338.76 4 3.6 22.1 9.6 0.0 66 1 23985.62 338.73 3 3.0 20.8 9.5 0.0 68 1 23720.05 338.71 3 2.5 19.7 9.5 0.0 70 1 23496.10 338.69 2 2.2 18.7 9.4 0.0 72 0 23304.81 338.67 2 1.9 17.8 9.4 0.0 74 0 23139.62 338.65 2 1.6 16.9 9.4 0.0 76 0 22995.66 338.64 1 1.4 16.2 9.4 0.0 78 0 22869.20 338.63 1 1.2 15.5 9.3 0.0 80 0 22757.39 338.62 1 1.1 14.9 9.3 0.0 82 0 22657.95 338.61 1 1.0 14.3 9.3 0.0 84 0 22569.09 338.60 1 0.9 13.7 9.3 0.0 GRAPHED DATA FOR 100 YEAR STORM Hydrographs 50 40 Z 30 m ?o z u 20 0 10 0 0 STAGE-DISCHARGE FUNCTION 342.00 341 00 340.00 339.00 338.00 4 x 337.00 M 1 ?r, 336.00 335.00 334.00 333.00 332.00 0 1 2 3 4 5 6 7 8 9 10 11 12 DISCHARGE (cfs) 10 20 30 40 50 60 Time (min) Riprap Velocity Dissipator Pad DRYPOND #1 LOT 8 - PARAMOUNT CENTER Morrisville, North Carolina Design Storm: 10-year BACKGROUND: Use the E&S Control Planning & Design Manual. Section 8.06. REFERENCE: (NCDEHNR, 1993) Step 1. Minimum Tailwater Condition Step 2. D-o = 15 in. D-o = 1.25 ft. Q-10 = 2.87 cfs (from Chainsaw Routing Sheet) V= 2.3 fps d-50 = 0.5 ft. Figure 8.06 a L-a = 8 ft. Fi-ure 8.06 a Step 3. 3*D-o = 3.75 ft. W = 9.25 ft. Step 4. d-max 0.75 ft. d-max 9 in. Step 5. Thickness = 1.1 ft. Thickness = 14 in. 5 Use: 4 ft Use: 10 ft Maximum Stone Diameter (1.5*d-50) Class "B" Rip-Rap Apron Thickness With Filter Fabric (1.5*d-50) Use: 18 in TERMINOLOGY: Q10 = 10-Year Design Storm, Peak Discharge, (cfs) D-o = Pipe Diameter, (in. & ft.) d-50 = Mean Stone Diameter of Rip-Rap, (ft.) L-a = Length of Rip-Rap Apron, (ft.) 3*D-o = Width of Rip-Rap Apron @ Pipe Outlet, (ft.) W = Width of Rip-Rap Apron @ End of Apron, (ft.) d-max = Maximum Stone Diameter of Rip-Rap, (ft. & in.) Thickness = Thickness of Rip-Rap Apron With Filter Fabric, (ft. &in.) DSAdanfic DRY POND #2 DESIGN Lot 8 - Paramount Center Morrisville, North Carolina Project No.: LIC037.000 Watershed Data Hydrograph Formulation Stage-Storage Function Pond Volume Calculation Chainsaw Routing for the 10-year storm Drawdown Calculation Graphed Data for the 10-year storm Chainsaw Routing for the 100-year storm Graphed Data for the 100-year storm Outlet Protection *??? ESS%pa /4? Q49F ?9 SEAL g Oak M. MP\?` DRY-POND-2.xls 1/5/99 WATERSHED DATA Lot 8 - Paramount Center - Pond #2 WATERSHED No. DRAINAGE AR Measure No.1 Measure No.2 (ACRES) (ACRES) EA Measure No.3 Average (ACRES) (ACRES) 1 5.79 5.78 5.81 5.79 WATERSHED No. HYDRAULIC LENGTH (FT) VERTICAL RELIEF (FT) 1 598 34 WATERSHED No. ESTIMATION OF IMPE Watershed Area Pavement Area RVIOUSNESS Building Area % Imperv. 1 5.79 ac 3.54 ac 0.54 ac * 70.43% DRY-POND-2. xls 1/5/99 BACKGROUND: REFERENCES: SOLUTION - Qp: INPUT OUTPUT L= 598 ft H= 34 ft Tc = 5.0 minutes 9 = 195 (10 year h= 22 storm) I= 7.22 in/hr A= 5.79 acres C= 0.66 Qu1u = 28 cfs 9 = 290 (100 year h = 25 storm) SOLUTION - To: I = 9.67 in/hr QP1oo = 37 cfs INPUT OUTPUT Pn6 = 3.90 in (10 Year Storm) S= 4.71 in CN = 68 Q* = 1.14 in TP,o = 10.4 minutes Pn6 = 5.80 in (100 Year Storm) Q* = 2.47 in TP100 = 16.8 minutes TERMINOLOGY HYDROGRAPH FORMULATION Lot 8 - Paramount Center - Pond #2 Use the Rational Method (Malcom, 1991; Wanielista, 1990) Use the Kirpich Equation & the Rational Method L = Hydraulic Length, (ft) H = Vertical Relief, (ft) g = Statistical Variable h = Statistical Variable A = Watershed Area, (acres) C = Composite Runoff Coefficient Pn6 = Precipitation from 6 hr storm (in) CN = Curve Number Tc = Time of Concentration, (minutes) I = Rainfall Intensity, (in/hr) Qp = Peak Discharge, (cfs) S = Ultimate Soil Storage, (in) Q* = Runoff Depth, (in) Tp = Time to Peak, (minutes) DRY-POND-2. xis 1/5/99 STAGE-STORAGE FUNCTION Lot 8 - Paramount Center - Pond #2 1 2 3 4 5 6 7 8 Y X CONTOUR CONTOUR INCR ACCUM Z In S In Z Z est AREA VOLUME VOLUME STAGE sq ft cu ft cu k ft ft 316 373 0 0 318 1818 2191 2191 2 7.6921 0.6931 2.05 320 4155 5973 8164 4 9.0075 1.3863 3.84 322 7788 11943 20107 6 9.9088 1.7918 5.89 324 13223 21011 41118 8 10.6242 2.0794 8.29 STAGE-STORAGE FUNCTION: S=Ks*Zb where: b = 2.10 and KS = 486 Stage-Storage Function 18 16 14 12 10 8 6 4 2 0 0.5 DRY-POND-2.xls 1.0 1.5 In Z 2.0 2.5 1/5/99 POND VOLUME CALCULATIONS Lot 8 - Paramount Center - Pond #2 CALCULATE IMPERVIOUS AREA: Drainage area = 5.79 ac. Impervious area = 4.08 ac. Percent Impervious = 70.43% FIND VOLUME TO BE CONTROLLED FROM 1" STORM Rv = 0.68 DA = 5.79 ac Volume = Rv x 1" x Drainage Area = 0.33 ac.-ft. or 14375 cf. TERMINOLOGY: P = Precipitation Depth, (in) S = Ultimate Soil Storage, (in) CN = Curve Number Q' = Runoff Depth, (in) CHAINSAW ROUTING FOR 10-YEAR STORM (REF: Malcom, 1991) COMPUTED RESULTS Normal Surface Area = 0.01 ac Peak Stage = 322.20 ft Maximum Surface Area = 0.17 ac Rise = 5.95 ft Peak Outflow = 2.40 cfs INPUT Hydrograph Results: Riser.- Nr = 1 Top of Dam: 324.00 ft Qp = 28 cfs Lr = 3 ft Barrel: Tp = 10.4 min Wr = 3 ft Nb = 1 dT = 2 min Cwr = 3.00 Db = 15 in Stage-Storage Results: Cdr = 0.60 Cdb = 0.60 Ks = 486 Zcr = 322.00 It Zinv = 316.00 ft b = 2.10 Drawdown Pipe: Emergency Spillway: Zo = 316.0 ft (inv) Cdr = 0.60 L = 0 ft Initial Water Level: D = 1.50 in Zcr = 0.00 ft Z; = 316.25 ft Zcr = 316.25 ft Cw = 0.00 OUTPUT 1 2 3 4 5 6 7 8 9 Time T Inflow I Storage S Stage Z Outflow O Riser (weir) Riser (orifice) Barrel Emergency Spillway min A cfs A cu-ft ft cfs cfs cfs cfs cfs .. .. ??.?.+ viv.w v V.V v.v 0.0 0.0 2 2 26.45 316.25 0 0.0 0.0 0.0 0.0 4 9 318.13 316.82 0 0.0 0.0 0.0 0.0 6 17 1382.17 317.65 0 0.0 0.0 0.0 0.0 8 24 3427.30 318.54 0 0.0 0.0 0.0 0.0 10 27 6316.83 319.39 0 0.0 0.0 0.0 0.0 12 26 9616.76 320.15 0 0.0 0.0 0.0 0.0 14 21 12748.61 32074 0 0.0 0.0 0.0 0.0 16 16 15260.25 321.17 0 0.0 0.0 0.0 0.0 18 13 17217.70 321.47 0 0.0 0.0 0.0 0.0 20 10 18743.25 321.70 0 0.0 0.0 0.0 0.0 22 8 19932.20 321.87 0 0.0 0.0 0.0 0.0 24 6 20858.81 322.00 0 0.0 0.0 0.0 0.0 26 5 21580.96 322.10 1 0.8 13.4 13.8 0.0 28 4 22048.54 322.16 2 1.7 17.2 13.9 0.0 30 3 22284.07 322.19 2 2.2 18.8 13.9 0.0 32 2 22359.60 322.20 2 2.4 19.3 13.9 0.0 34 2 22338.32 322.20 2 2.3 19.2 13.9 0.0 36 1 22264.33 322.19 2 2.2 18.7 13.9 0.0 38 1 22165.33 322.17 2 1.9 18.0 13.9 0.0 40 1 22057.66 322.16 2 1.7 17.3 13.9 0.0 42 1 21950.51 322.14 1 1.5 16.5 13.9 0.0 44 0 21848.69 322.13 1 1.3 15.7 13.8 0.0 46 0 21754.51 322.12 1 1.1 14.9 13.8 0.0 48 0 21668.79 322.11 1 0.9 14.2 13.8 0.0 50 0 21591.58 322.10 1 0.8 13.5 13.8 0.0 52 0 21522.45 322.09 1 0.7 12.8 13.8 0.0 54 0 21460.81 322.08 1 0.6 12.2 13.8 0.0 56 0 21405.96 322.07 1 0.5 11.6 13.8 0.0 58 0 21357.20 322.07 0 0.4 11.1 13.8 0.0 60 0 21313.87 322.06 0 0.4 10.5 13.8 0.0 62 0 21275.34 322.05 0 0.3 101 13.7 0.0 64 0 21241.05 322.05 0 0.3 9.6 13.7 0.0 66 0 21210.50 322.05 0 0.3 9.2 13.7 0.0 68 0 21183.24 322.04 0 0.2 8.8 13.7 0.0 70 0 21158.88 322.04 0 0.2 8.5 13.7 0.0 72 0 21137.06 322.04 0 0.2 8.1 13.7 0.0 74 0 21117.49 322.03 0 0.2 7.8 13.7 0.0 76 0 21099.90 322.03 0 0.1 7.5 13.7 0.0 78 0 21084.06 322.03 0 0.1 7.2 13.7 0.0 80 0 21069.76 322.03 0 0.1 7.0 13.7 0.0 DRY-POND-2. xls 116199 DRAWDOWN CALCULATIONS Lot 8 - Paramount Center - Pond #2 Storage Pool Drawdown Pond must detain the first 1" of runoff and release it in 2 to 5 days INPUT Number of Drains = 1 Starting Water Elevation = 322.00 ft Diameter of Drains = 1.5 in Ending Water Elevation = 316.25 ft Orifice Coefficient = 0.60 ft Average Head = 2.88 ft Elevation of Drains = 316.25 ft OUTPUT By the Orifice Equation: Average Flow = 0.10 cfs Vol of Storage Required = 14375 cf Volume of Storage = 20853 cf OK Length of Drawdown = 208112 sec or 2.41 days OK 40 30 w 0 m 2 20 M r u N 10 0 GRAPHED DATA FOR 10 YEAR STORM Hydrographs s, 0 325.00 324.00 323.00 322.00 321.00 x 320.00 Q I- 319.00 318.00 317.00 316.00 315.00 10 20 30 40 50 Time (min) STAGE-DISCHARGE FUNCTION 0 1 2 3 DISCHARGE (cfs) DRY-POND-2.xls 115199 CHAINSAW ROUTING FOR 100-YEAR STORM (REF: Malcom, 1991) COMPUTED RESULTS Normal Surface Area = 0.01 ac Peak Stage = 322.94 ft Maximum Surface Area = 0.20 ac Rise = 6.69 ft Peak Outflow = 14.83 cfs INPUT Hydrograph Results: Riser: Nr = 1 Top of Dam: 324.00 ft Qp = 37 cfs Lr = 3 ft Barrel: Tp = 16.8 min Wr = 3 ft Nb = 1 dT = 2 min Cwr = 3.00 Db = 15 in Stage-Storage Results: Cdr = 0.60 Cdb = 0.60 Ks = 486 Zcr = 322.00 ft Zinv = 316.00 ft b = 2.10 Drawdown Pipe: Emergency Spillway: Za = 316.0 ft (inv) Cdr = 0.60 L = 0 ft Initial Water Level: D = 1.50 in Zcr = 0.00 ft Z; = 316.25 ft Zcr = 316.25 ft Cw = 0.00 OUTPUT 1 2 3 4 5 6 7 8 9 Time T Inflow I Storage S Stage Z Outflow O Riser (weir) Riser (orifice) Barrel Emergency Spillway min cfs cu-ft It cfs cfs cfs cfs cfs V V LV.YU aIO.LV U V.U U.U U.U U.U 2 1 26.45 316.25 0 0.0 0.0 0.0 0.0 4 5 179.05 316.62 0 0.0 0.0 0.0 0.0 6 10 768.47 317.24 0 0.0 0.0 0.0 0.0 8 17 2018.78 317.97 0 0.0 0.0 0.0 0.0 10 24 4063.12 318.75 0 0.0 0.0 0.0 0.0 12 30 6925.35 319.55 0 0.0 0.0 0.0 0.0 14 34 10516.77 320.33 0 0.0 0.0 0.0 0.0 16 37 14648.31 321.07 0 0.0 0.0 0.0 0.0 18 37 19056.58 321.74 0 0.0 0.0 0.0 0.0 20 34 23440.12 322.34 5 5.4 25.3 14.1 0.0 22 22 26858.56 322.76 15 18.1 37.9 14.6 0.0 24 19 27735.75 322.87 15 21.9 40.4 14.7 0.0 26 16 28221.62 322.93 15 24.1 41.7 14.8 0.0 28 14 28376.80 322.94 15 24.8 42.1 14.8 0.0 30 12 28252.97 322.93 15 24.2 41.8 14.8 0.0 32 10 27894.28 322.89 15 22.6 40.8 14.8 0.0 34 9 27338.50 322.82 15 20.1 39.3 14.7 0.0 36 7 26618.09 322.74 15 17.0 37.2 14.6 0.0 38 6 25760.90 322.63 14 116 34.4 14.5 0.0 40 5 24899.57 322.53 10 10.3 31.4 14.3 0.0 42 5 24322.51 322.45 8 8.2 29.2 14.2 0.0 44 4 23897.88 322.40 7 6.8 27.4 14.2 0.0 46 3 23563.77 322.36 6 5.7 25.9 14.1 0.0 48 3 23288.44 322.32 5 4.9 24.5 14.1 0.0 50 3 23054.37 322.29 4 4.2 23.3 14.0 0.0 52 2 22851.17 322.26 4 3.7 22.2 14.0 0.0 54 2 22672.32 322.24 3 3.2 21.2 14.0 0.0 56 2 22513.39 322.22 3 2.8 20.3 14.0 0.0 58 1 22371.27 322.20 2 2.4 19.4 13.9 0.0 60 1 22243.58 322.18 2 2.1 18.6 13.9 0.0 62 1 22128.49 322.17 2 1.9 17.8 13.9 0.0 64 1 22024.49 322.15 2 1.6 17.0 13.9 0.0 66 1 21930.33 322.14 1 1.4 16.3 13.9 0.0 68 1 21844.95 322.13 1 1.3 15.7 13.8 0.0 70 1 21767.43 322.12 1 1.1 15.0 13.8 0.0 72 0 21696.97 322.11 1 1.0 14.4 13.8 0.0 74 0 21632.86 322.10 1 0.9 13.9 13.8 0.0 76 0 21574.47 322.09 1 0.8 13.3 13.8 0.0 78 0 21521.24 322.09 1 0.7 12.8 13.8 0.0 80 0 21472.69 322.08 1 0.6 12.3 13.8 0.0 82 0 21428.36 322.07 1 0.6 11.8 13.8 0.0 84 0 21387.86 322.07 0 0.5 11.4 13.8 0.0 50 40 30 m rn m r u 0 20 0 10 0 GRAPHED DATA FOR 100 YEAR STORM Hydrographs 0 10 20 30 40 50 60 Time (min) STAGE-DISCHARGE FUNCTION 325.00 324.00 323.00 322.00 321.00 320.00 Q H 319.00 318.00 317.00 316.00 315.00 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 DISCHARGE (cfs) DRY-POND-2.xls 1/5/99 Riprap Velocity Dissipator Pad DRY POND #2 LOT 8 - PARAMOUNT CENTER Morrisville, North Carolina Design Storm: 10-year BACKGROUND: Use the E&S Control Planning & Design Manual, Section 8.06. REFERENCE: (NCDEHNR, 1993) Step 1. Minimum Tailwater Condition Step 2. D-o = 15 in. D-o = 1.25 ft. Q-10 = 2.4 cfs (from Chainsaw Routing Sheet) V= 2.0 fps d-50 = 0.5 ft. Figure 8.06 a L-a = 8 ft. Figure 8.06 a Step 3. 3*D-o = 3.75 ft. W = 9.25 ft. Step 4. d-max 0.75 ft. d-max 9 in. Step 5. Thickness = 1.1 ft. Thickness = 14 in. Use: 4 ft Use: 10 ft Maximum Stone Diameter (1.5*d-50) Class "B" Rip-Rap Apron Thickness With Filter Fabric (1.5*d-50) Use: 18 in TERMINOLOGY: Q10 = 10-Year Design Storm, Peak Discharge, (cfs) D-o = Pipe Diameter, (in. & ft.) d-50 = Mean Stone Diameter of Rip-Rap, (ft.) L-a = Length of Rip-Rap Apron, (ft.) 3*D-o = Width of Rip-Rap Apron @ Pipe Outlet, (ft.) W = Width of Rip-Rap Apron @ End of Apron, (ft.) d-max = Maximum Stone Diameter of Rip-Rap, (ft. & in.) Thickness = Thickness of Rip-Rap Apron With Filter Fabric, (ft. &in.) 1 DSAdantic DRY POND #2 DESIGN Lot 8 - Paramount Center Morrisville, North Carolina Project No.: LIC037.000 Watershed Data Hydrograph Formulation Stage-Storage Function Pond Volume Calculation Chainsaw Routing for the 10-year storm Drawdown Calculation Graphed Data for the 10-year storm Chainsaw Routing for the 100-year storm Graphed Data for the 100-year storm Outlet Protection H CAR04 4?EsS SEAL 071092 s w GIN& k M. Mpa.??> DRY-POND-2.xls 1/5/99 WATERSHED DATA Lot 8 - Paramount Center - Pond #2 WATERSHED No. DRAINAGE AR Measure No.I Measure No.2 (ACRES) (ACRES) EA Measure No.3 Average (ACRES) (ACRES) 1 5.79 5.78 5.81 5.79 WATERSHED No. HYDRAULIC LENGTH (FT) VERTICAL RELIEF (FT) 1 598 34 WATERSHED No. ESTIMATION OF IMPE Watershed Area Pavement Area RVIOUSNESS Building Area % Imperv. 1 5.79 ac 3.54 ac 0.54 ac * 70.43% DRY-POND-2. xls 1/5/99 BACKGROUND: REFERENCES: SOLUTION - Qp: HYDROGRAPH FORMULATION Lot 8 - Paramount Center - Pond #2 Use the Rational Method (Malcom, 1991; Wanielista, 1990) Use the Kirpich Equation & the Rational Method OUTPUT SOLUTION - Tp: L = 598 ft H = 34 ft 9 = 195 (10 year h = 22 storm) A = 5.79 acres C = 0.66 Tc = 5.0 minutes I = 7.22 in/hr 0 = 28 cfs I = 9.67 in/hr QP100 = 37 cfs INPUT OUTPUT Pn6 = 3.90 in (10 Year Storm) S= 4.71 in CN = 68 Q* = 1.14 in TP10 = 10.4 minutes Pn6 = 5.80 in (100 Year Storm) Q* = 2.47 in TP100 = 16.8 minutes TERMINOLOGY: 9 = 290 (100 year h = 25 storm) L = Hydraulic Length, (ft) H = Vertical Relief, (ft) g = Statistical Variable h = Statistical Variable A = Watershed Area, (acres) C = Composite Runoff Coefficient Pn6 = Precipitation from 6 hr storm (in) CN = Curve Number Tc = Time of Concentration, (minutes) I = Rainfall Intensity, (in/hr) Qp = Peak Discharge, (cfs) S = Ultimate Soil Storage, (in) Q* = Runoff Depth, (in) Tp = Time to Peak, (minutes) DRY-POND-2.xls 1/5/99 STAGE-STORAGE FUNCTION Lot 8 - Paramount Center - Pond #2 1 2 3 4 5 6 7 8 Y X CONTOUR CONTOUR INCR ACCUM Z In S In Z Z est AREA VOLUME VOLUME STAGE sq k cu ft cu k ft ft 316 373 0 0 318 1818 2191 2191 2 7.6921 0.6931 2.05 320 4155 5973 8164 4 9.0075 1.3863 3.84 322 7788 11943 20107 6 9.9088 1.7918 5.89 324 13223 21011 41118 8 10.6242 2.0794 8.29 STAGE-STORAGE FUNCTION: S = Ks zb where: b = 2.10 and KS = 486 Stage-Storage Function 18 16 14 12 10 C 8 6 4 2 0 t1! 0.5 DRY-POND-2.xls 1.0 1.5 2.0 In Z 2.5 1/5/99 POND VOLUME CALCULATIONS Lot 8 - Paramount Center - Pond #2 CALCULATE IMPERVIOUS AREA: Drainage area = 5.79 ac. Impervious area = 4.08 ac. Percent Impervious = 70.43% FIND VOLUME TO BE CONTROLLED FROM 1" STORM Rv = 0.68 DA = 5.79 ac Volume = Rv x 1" x Drainage Area = 0.33 ac.-ft. or 14375 cf. TERMINOLOGY: P = Precipitation Depth, (in) S = Ultimate Soil Storage, (in) CN = Curve Number Q" = Runoff Depth, (in) CHAINSAW ROUTING FOR 10-YEAR STORM (REF: Malcom, 1991) COMPUTED RESULTS Normal Surface Area = 0.01 ac Peak Stage = 322.20 ft Maximum Surface Area = 0.17 ac Rise = 5.95 ft Peak Outflow = 2.40 cfs INPUT Hydrograph Results: Riser: Nr = 1 Top of Dam: 324.00 ft Qp = 28 cfs Lr = 3 ft Barrel: Tp = 10.4 min Wr = 3 ft Nb = 1 dT = 2 min Cwr = 3.00 Db = 15 in Stage-Storage Results: Cdr = 0.60 Cdb = 0.60 Ks = 486 Zcr = 322.00 ft Zinv = 316.00 ft b = 2.10 Drawdown Pipe: Emergency Spillway: Za = 316.0 ft (inv) Cdr = 0.60 L = 0 ft Initial Water Level: D = 1.50 in Zcr = 0.00 ft Z; = 316.25 ft Zcr = 316.25 ft Cw = 0.00 OUTPUT 1 2 3 4 5 6 7 8 9 Time T Inflow I Storage S Stage Z Outflow O Riser (weir) Riser (orifice) Barrel Emergency Spillway min cfs cu-ft ft cfs cfs cfs cfs cfs w v Lv.Yu a I0.40 0 0.0 U,U 0.0 U.U 2 2 26.45 316.25 0 0.0 0.0 0.0 0.0 4 9 318.13 316.82 0 0.0 0.0 0.0 0.0 6 17 1382.17 317.65 0 0.0 0.0 0.0 0.0 8 24 3427.30 318.54 0 0.0 0.0 0.0 0.0 10 27 6316.83 319.39 0 0.0 0.0 0.0 0.0 12 26 9616.76 320.15 0 0.0 0.0 0.0 0.0 14 21 12748.61 320.74 0 0.0 0.0 0.0 0.0 16 16 15260.25 321.17 0 0.0 0.0 0.0 0.0 18 13 17217.70 321.47 0 0.0 0.0 0.0 0.0 20 10 18743.25 321.70 0 0.0 0.0 0.0 0.0 22 8 19932.20 321.87 0 0.0 0.0 0.0 0.0 24 6 20858.81 322.00 0 0.0 0.0 0.0 0.0 26 5 21580.96 32210 1 0.8 13.4 13.8 0.0 28 4 22048.54 322.16 2 1.7 17.2 13.9 0.0 30 3 22284.07 32219 2 2.2 18.8 13.9 0.0 32 2 22359.60 322.20 2 2.4 19.3 13.9 0.0 34 2 22338.32 322.20 2 2.3 19.2 13.9 0.0 36 1 22264.33 322.19 2 2.2 18.7 13.9 0.0 38 1 22165.33 322.17 2 1.9 18.0 119 0.0 40 1 22057.66 322.16 2 1.7 17.3 13.9 0.0 42 1 21950.51 32214 1 1.5 16.5 13.9 0.0 44 0 21848.69 322.13 1 1.3 15.7 13.8 0.0 46 0 21754.51 322.12 1 1.1 14.9 13.8 0.0 48 0 21668.79 322.11 1 0.9 14.2 13.8 0.0 50 0 21591.58 322.10 1 0.8 13.5 13.8 0.0 52 0 21522.45 322.09 1 0.7 12.8 13.8 0.0 54 0 21460.81 322.08 1 0.6 12.2 13.8 0.0 56 0 21405.96 322.07 1 0.5 11.6 13.8 0.0 58 0 21357.20 322.07 0 0.4 11.1 13.8 0.0 60 0 21313.87 322.06 0 0.4 10.5 13.8 0.0 62 0 21275.34 322.05 0 0.3 10.1 13.7 0.0 64 0 21241.05 322.05 0 0.3 9.6 13.7 0.0 66 0 21210.50 322.05 0 0.3 91 13.7 0.0 68 0 21183.24 322.04 0 0.2 8.8 117 0.0 70 0 21158.88 322.04 0 0.2 8.5 133 0.0 72 0 21137.06 322.04 0 0.2 8.1 13.7 0.0 74 0 21117.49 322.03 0 0.2 7.8 13.7 0.0 76 0 21099.90 322.03 0 0.1 7.5 13.7 0.0 78 0 21084.06 322.03 0 0.1 7.2 13.7 0.0 80 0 21069.76 322.03 0 0.1 7.0 137 0.0 DRY-POND-2. xls 1/6/99 DRAWDOWN CALCULATIONS Lot 8 - Paramount Center - Pond #2 Storage Pool Drawdown Pond must detain the first 1" of runoff and release it in 2 to 5 days INPUT Number of Drains = 1 Starting Water Elevation = 322.00 ft Diameter of Drains = 1.5 in Ending Water Elevation = 316.25 ft Orifice Coefficient = 0.60 ft Average Head = 2.88 ft Elevation of Drains = 316.25 ft OUTPUT By the Orifice Equation: Average Flow = 0.10 cfs Vol of Storage Required = 14375 cf Volume of Storage = 20853 cf OK Length of Drawdown = 208112 sec or 2.41 days OK 40 30 v m 20 i° t N_ 0 10 0 GRAPHED DATA FOR 10 YEAR STORM Hydrographs 0 325 00 324.00 323 00 322.00 321.00 x 320.00 Q 319 00 318 00 317.00 316.00 315 00 10 20 30 Time (min) STAGE-DISCHARGE FUNCTION 40 50 1 I 0 1 2 3 DISCHARGE (cfs) DRY-POND-2. xls 1/5/99 CHAINSAW ROUTING FOR 100-YEAR STORM (REF: Malcom, 1991) COMPUTED RESULTS Normal Surface Area = 0.01 ac Peak Stage = 322.94 ft Maximum Surface Area = 0.20 ac Rise = 6.69 ft Peak Outflow = 14.83 cfs INPUT Hydrograph Results: Riser Nr = 1 Top of Dam: 324.00 ft op = 37 cfs Lr = 3 ft Barrel: Tp = 16.8 min Wr = 3 ft Nb = 1 dT = 2 min Cwr = 3.00 Db = 15 in Stage-Storage Results: Cdr = 0.60 Cdb = 0.60 Ks = 486 Zcr = 322.00 ft Zinv = 316.00 ft b = 2.10 Drawdown Pipe: Emergency Spillway: Zo = 316.0 ft (inv) Cdr = 0.60 L = 0 ft Initial Water Level: D = 1.50 in Zcr = 0.00 ft Z; = 316.25 ft Zcr = 316.25 ft Cw = 0.00 OUTPUT 1 2 3 4 5 6 7 8 9 Time T Inflow I Storage S Stage Z Outflow O Riser (weir) Riser (orifice) Barrel Emergency Spillway min cfs cu-ft ft cfs cfs cfs cfs cfs V U 40.40 Jl0.LJ U Vu U.0 0.0 0.0 2 1 26.45 316.25 0 0.0 0.0 0.0 0.0 4 5 179.05 316.62 0 0.0 0.0 0.0 0.0 6 10 768.47 317.24 0 0.0 0.0 0.0 0.0 8 17 2018.78 317.97 0 0.0 0.0 0.0 0.0 10 24 4063.12 318.75 0 0.0 0.0 0.0 0.0 12 30 6925.35 319.55 0 0.0 0.0 0.0 0.0 14 34 10516.77 320.33 0 0.0 0.0 0.0 0.0 16 37 14648.31 321.07 0 0.0 0.0 0.0 0.0 18 37 19056.58 321.74 0 0.0 0.0 0.0 0.0 20 34 23440.12 322.34 5 5.4 25.3 14.1 0.0 22 22 26858.56 322.76 15 18.1 37.9 14.6 0.0 24 19 27735.75 322.87 15 21.9 40.4 14.7 0.0 26 16 28221.62 322.93 15 24.1 41.7 14.8 0.0 28 14 28376.80 322.94 15 248 42.1 14.8 0.0 30 12 28252.97 322.93 15 24.2 41.8 14.8 0.0 32 10 27894.28 322.89 15 22.6 40.8 14.8 0.0 34 9 27338.50 322.82 15 20.1 39.3 14.7 0.0 36 7 26618.09 322.74 15 17.0 37.2 14.6 0.0 38 6 25760.90 322.63 14 13.6 34.4 14.5 0.0 40 5 24899.57 322.53 10 10.3 31.4 14.3 0.0 42 5 24322.51 322.45 8 8.2 29.2 14.2 0.0 44 4 23897.88 322.40 7 6.8 27.4 14.2 0.0 46 3 23563.77 322.36 6 5.7 25.9 14.1 0.0 48 3 23288.44 322.32 5 4.9 24.5 14.1 0.0 50 3 23054.37 322.29 4 4.2 23.3 14.0 0.0 52 2 22851.17 322.26 4 3.7 22.2 14.0 0.0 54 2 22672.32 322.24 3 3.2 21.2 14.0 0.0 56 2 22513.39 322.22 3 2.8 20.3 14.0 0.0 58 1 22371.27 322.20 2 2.4 19.4 13.9 0.0 60 1 22243.58 322.18 2 2.1 18.6 13.9 0.0 62 1 22128.49 322.17 2 1.9 17.8 119 0.0 64 1 22024.49 322.15 2 1.6 17.0 13.9 0.0 66 1 21930.33 322.14 1 1.4 16.3 13.9 0.0 68 1 21844.95 322.13 1 1.3 15.7 13.8 0.0 70 1 21767.43 322.12 1 1.1 15.0 13.8 0.0 72 0 21696.97 322.11 1 1.0 14.4 13.8 0.0 74 0 21632.86 322.10 1 0.9 13.9 13.8 0.0 76 0 21574.47 322.09 1 0.8 13.3 13.8 0.0 78 0 21521.24 322.09 1 0.7 12.8 118 0.0 80 0 21472.69 322.08 1 0.6 12.3 118 0.0 82 0 21428.36 322.07 1 0.6 11.8 13.8 0.0 84 0 21387.86 322.07 0 0.5 11.4 13.8 0.0 50 40 30 m ?a u u y 20 0 10 0 GRAPHED DATA FOR 100 YEAR STORM Hydrographs 0 10 20 30 40 50 60 Time (min) STAGE-DISCHARGE FUNCTION 325.00 324.00 323.00 322.00 321.00 x ? 320.00 F I 319.00 318.00 317.00 316.00 315.00 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 DISCHARGE (cfs) DRY-POND-2. xls 1/5/99 Riprap Velocity Dissipator Pad DRYPOND #2 LOT 8 - PARAMOUNT CENTER Morrisville, North Carolina Design Storm: 10-year BACKGROUND: Use the E&S Control Planning & Design Manual, Section 8.06. REFERENCE: (NCDEHNR, 1993) Step 1. Minimum Tailwater Condition Step 2. D-o = 15 in. D-o = 1.25 ft. Q-10 = 2.4 cfs (from Chainsaw Routing Sheet) V= 2.0 fps d-50 = 0.5 ft. Figure 8.06 a L-a = 8 ft. Figure 8.06 a Step 3. 3*D-o = 3.75 ft. W = 9.25 ft. Step 4. d-max 0.75 ft. d-max 9 in. Step 5. Thickness = 1.1 ft. Thickness = 14 in. TERMINOLOGY: Q10 D-o d-50 L-a 3*D-o W d-max Thickness Use: 4 ft Use: 10 ft Maximum Stone Diameter (1.5*d-50) Class "B" Rip-Rap Apron Thickness With Filter Fabric (1.5*d-50) Use: 18 in 10-Year Design Storm, Peak Discharge, (cfs) Pipe Diameter, (in. & ft.) Mean Stone Diameter of Rip-Rap, (ft.) Length of Rip-Rap Apron, (ft.) Width of Rip-Rap Apron @ Pipe Outlet, (ft.) Width of Rip-Rap Apron @ End of Apron, (ft.) Maximum Stone Diameter of Rip-Rap, (ft. & in.) Thickness of Rip-Rap Apron With Filter Fabric, (ft. &in.) 1 DSAtlantic DRY POND #2 DESIGN Lot 8 - Paramount Center Morrisville, North Carolina Project No.: LIC037.000 Watershed Data Hydrograph Formulation Stage-Storage Function Pond Volume Calculation Chainsaw Routing for the 10-year storm Drawdown Calculation Graphed Data for the 10-year storm Chainsaw Routing for the 100-year storm Graphed Data for the 100-year storm Outlet Protection N CAR a 44FESS ? SEAL -« 022(392 '"•'?V M. M DRY-POND-2.xls 1/5/99 WATERSHED DATA Lot 8 - Paramount Center - Pond #2 WATERSHED No. DRAINAGE AR Measure NoA Measure No.2 (ACRES) (ACRES) EA Measure No.3 Average (ACRES) (ACRES) 1 5.79 5.78 5.81 5.79 WATERSHED No. HYDRAULIC LENGTH (FT) VERTICAL RELIEF (FT) 1 598 34 WATERSHED No. ESTIMATION OF IMPE Watershed Area Pavement Area RVIOUSNESS Building Area % Imperv. 1 5.79 ac 3.54 ac 0.54 ac * 70.43% DRY-POND-2.xis 1/5/99 BACKGROUND: REFERENCES: SOLUTION - Qp INPUT OUTPUT L= 598 ft H= 34 ft Tc = 5.0 minutes 9= 195 (10 year h= 22 storm) 1= 7.22 in/hr A= 5.79 acres C= 0.66 QP10 = 28 cfs 9 = 290 (100 year h = 25 storm) SOLUTION - Tp: I = 9.67 in/hr QP1oo = 37 cfs INPUT OUTPUT Pns = 3.90 in (10 Year Storm) S= 4.71 in CN = 68 Q* = 1.14 in TPto = 10.4 minutes Pns = 5.80 in (100 Year Storm) Q* = 2.47 in TP100 = 16.8 minutes TERMINOLOGY HYDROGRAPH FORMULATION Lot 8 - Paramount Center - Pond #2 Use the Rational Method (Malcom, 1991; Wanielista, 1990) Use the Kirpich Equation & the Rational Method L = Hydraulic Length, (ft) H = Vertical Relief, (ft) g = Statistical Variable h = Statistical Variable A = Watershed Area, (acres) C = Composite Runoff Coefficient Pn6 = Precipitation from 6 hr storm (in) CN = Curve Number Tc = Time of Concentration, (minutes) I = Rainfall Intensity, (in/hr) Qp = Peak Discharge, (cfs) S = Ultimate Soil Storage, (in) Q* = Runoff Depth, (in) Tp = Time to Peak, (minutes) DRY-POND-2. xls 1/5/99 STAGE-STORAGE FUNCTION Lot 8 - Paramount Center - Pond #2 1 2 3 4 5 6 7 8 Y X CONTOUR CONTOUR INCR ACCUM Z In S In Z Z est AREA VOLUME VOLUME STAGE sq ft cu k Cu ft ft ft 316 373 0 0 318 1818 2191 2191 2 7.6921 0.6931 2.05 320 4155 5973 8164 4 9.0075 1.3863 3.84 322 7788 11943 20107 6 9.9088 1.7918 5.89 324 13223 21011 41118 8 10.6242 2.0794 8.29 STAGE-STORAGE FUNCTION. S=Ks - Zb where: b = 2.10 and KS = 486 Stage-Storage Function 18 16 14 12 10 c 8 6 4 2 0 0.5 1.0 1.5 2.0 2.5 In Z DRY-POND-2.xls 1/5/99 POND VOLUME CALCULATIONS Lot 8 - Paramount Center - Pond #2 CALCULATE IMPERVIOUS AREA: Drainage area = 5.79 ac. Impervious area = 4.08 ac. Percent Impervious = 70.43% FIND VOLUME TO BE CONTROLLED FROM 1" STORM Rv = 0.68 DA = 5.79 ac Volume = Rv x 1" x Drainage Area = 0.33 ac.-ft. or 14375 cf. TERMINOLOGY: P = Precipitation Depth, (in) S = Ultimate Soil Storage, (in) CN = Curve Number Q" = Runoff Depth, (in) CHAINSAW ROUTING FOR 10-YEAR STORM (REF: Malcom, 1991) COMPUTED RESULTS Normal Surface Area = 0.01 ac Peak Stage = 322.20 ft Maximum Surface Area = 0.17 ac Rise = 5.95 ft Peak Outflow = 2.40 cfs INPUT Hydrograph Results: Riser: Nr = 1 Top of Dam: 324.00 ft Qp = 28 cfs Lr = 3 ft Barrel: Tp = 10.4 min Wr = 3 ft Nb = 1 dT = 2 min Cwr = 3.00 Db = 15 in Stage-Storage Results: Cdr = 0.60 Cdb = 0.60 Ks = 486 Zcr = 322.00 ft Zinv = 316.00 ft b = 2.10 Drawdown Pipe: Emergency Spillway: Zo = 316.0 ft (inv) Cdr = 0.60 L = 0 ft Initial Water Level: D = 1.50 in Zcr = 0.00 ft Z; = 316.25 ft Zcr = 316.25 ft Cw = 0.00 OUTPUT 1 2 3 4 5 6 7 8 9 Time T Inflow I Storage S Stage Z Outflow O Riser (weir) Riser (orifice) Barrel Emergency Spillway min A cfs A cu-ft It cfs cfs cfs cfs cfs .. .. cv. .? 0iv.4 ? v V.V 0.0 0.0 0.U 2 2 26.45 316.25 0 0.0 0.0 0.0 0.0 4 9 318.13 316.82 0 0.0 0.0 0.0 0.0 6 17 1382.17 317.65 0 0.0 0.0 0.0 0.0 8 24 3427.30 318.54 0 0.0 0.0 0.0 0.0 10 27 6316.83 319.39 0 0.0 0.0 0.0 0.0 12 26 9616.76 320.15 0 0.0 0.0 0.0 0.0 14 21 12748.61 320.74 0 0.0 0.0 0.0 0.0 16 16 15260.25 321.17 0 0.0 0.0 0.0 0.0 18 13 17217.70 321.47 0 0.0 0.0 0.0 0.0 20 10 18743.25 321.70 0 0.0 0.0 0.0 0.0 22 8 19932.20 321.87 0 0.0 0.0 0.0 0.0 24 6 20858.81 322.00 0 0.0 0.0 0.0 0.0 26 5 21580.96 322.10 1 0.8 13.4 13.8 0.0 28 4 22048.54 322.16 2 1.7 17.2 13.9 0.0 30 3 22284.07 322.19 2 2.2 18.8 13.9 0.0 32 2 22359.60 322.20 2 2.4 19.3 13.9 0.0 34 2 22338.32 322.20 2 2.3 19.2 13.9 0.0 36 1 22264.33 322.19 2 2.2 187 13.9 0.0 38 1 22165.33 322.17 2 1.9 18.0 13.9 0.0 40 1 22057.66 322.16 2 1.7 17.3 13.9 0.0 42 1 21950.51 322.14 1 1.5 16.5 13.9 0.0 44 0 21848.69 322.13 1 1.3 15.7 13.8 0.0 46 0 21754.51 322.12 1 1.1 14.9 13.8 0.0 48 0 21668.79 322.11 1 0.9 14.2 13.8 0.0 50 0 21591.58 322.10 1 0.8 13.5 13.8 0.0 52 0 21522.45 322.09 1 0.7 12.8 13.8 0.0 54 0 21460.81 322.08 1 0.6 12.2 13.8 0.0 56 0 21405.96 322.07 1 0.5 11.6 13.8 0.0 58 0 21357.20 322.07 0 0.4 11.1 13.8 0.0 60 0 21313.87 322.06 0 0.4 10.5 13.8 0.0 62 0 21275.34 322.05 0 0.3 10.1 13.7 0.0 64 0 21241.05 322.05 0 0.3 9.6 13.7 0.0 66 0 21210.50 322.05 0 0.3 9.2 13.7 0.0 68 0 21183.24 322.04 0 0.2 8.8 13.7 0.0 70 0 21158.88 322.04 0 0.2 8.5 13.7 0.0 72 0 21137.06 322.04 0 0.2 8.1 13.7 0.0 74 0 21117.49 322.03 0 0.2 7.8 13.7 0.0 76 0 21099.90 322.03 0 0.1 7.5 13.7 0.0 78 0 21084.06 322.03 0 0.1 7.2 13.7 0.0 80 0 21069.76 322.03 0 0.1 7.0 13.7 0.0 DRY-POND-2.xls 1/&99 DRAWDOWN CALCULATIONS Lot 8 - Paramount Center - Pond #2 Storage Pool Drawdown Pond must detain the first 1" of runoff and release it in 2 to 5 days INPUT Number of Drains = 1 Starting Water Elevation = 322.00 ft Diameter of Drains = 1.5 in Ending Water Elevation = 316.25 ft Orifice Coefficient = 0.60 ft Average Head = 2.88 ft Elevation of Drains = 316.25 ft OUTPUT By the Orifice Equation: Average Flow = 0.10 cfs Vol of Storage Required = 14375 cf Volume of Storage = 20853 cf OK Length of Drawdown = 208112 sec or 2.41 days OK 40 30 m 20 L V _N 10 0 III 0 325.00 324.00 323.00 322.00 321.00 x Lq 320.00 N 319.00 318.00 317.00 316.00 315.00 10 20 30 Time (min) STAGE-DISCHARGE FUNCTION 40 i it li I 50 0 DRY-POND-2.xls 1 2 3 DISCHARGE (cfs) 115199 GRAPHED DATA FOR 10 YEAR STORM Hydrographs CHAINSAW ROUTING FOR 100-YEAR STORM (REF: Malcom, 1991) COMPUTED RESULTS Normal Surface Area = 0.01 ac Peak Stage = 322.94 ft Maximum Surface Area = 0.20 ac Rise = 6.69 ft Peak Outflow = 14.83 cfs INPUT Hydrograph Results: Riser Nr = 1 Top of Dam: 324.00 ft Qp = 37 cfs Lr = 3 ft Barrel: Tp = 16.8 min Wr = 3 ft Nb = 1 dT = 2 min Cwr = 3.00 Db = 15 in Stage-Storage Results: Cdr = 0.60 Cdb = 0.60 Ks = 486 Zcr = 322.00 ft Zinv = 316.00 ft b = 2.10 Drawdown Pipe: Emergency Spillway: Zo = 316.0 ft (inv) Cdr = 0.60 L = 0 ft Initial Water Level: D = 1.50 in Zcr = 0.00 ft Z; = 316.25 ft Zcr = 316.25 ft Cw = 0.00 OUTPUT 1 2 3 4 5 6 7 8 9 Time T Inflow I Storage S Stage Z Outflow O Riser (weir) Riser (orifice) Barrel Emergency Spillway min cfs cu-ft It cfs cfs cfs cfs cfs V V L0.9U aio.G.7 V U.U U.U U.0 0.0 2 1 26.45 316.25 0 0.0 0.0 0.0 0.0 4 5 179.05 316.62 0 0.0 0.0 0.0 0.0 6 10 768.47 317.24 0 0.0 0.0 0.0 0.0 8 17 2018.78 317.97 0 0.0 0.0 0.0 0.0 10 24 4063.12 318.75 0 0.0 0.0 0.0 0.0 12 30 6925.35 319.55 0 0.0 0.0 0.0 0.0 14 34 10516.77 320.33 0 0.0 0.0 0.0 0.0 16 37 14648.31 321.07 0 0.0 0.0 0.0 0.0 18 37 19056.58 321.74 0 0.0 0.0 0.0 0.0 20 34 23440.12 322.34 5 5.4 25.3 14.1 0.0 22 22 26858.56 322.76 15 18.1 37.9 14.6 0.0 24 19 27735.75 322.87 15 21.9 40.4 14.7 0.0 26 16 28221.62 322.93 15 24.1 41.7 14.8 0.0 28 14 28376.80 322.94 15 24.8 42.1 14.8 0.0 30 12 28252.97 322.93 15 24.2 41.8 14.8 0.0 32 10 27894.28 322.89 15 22.6 40.8 14.8 0.0 34 9 27338.50 322.82 15 20.1 39.3 14.7 0.0 36 7 26618.09 322.74 15 17.0 37.2 14.6 0.0 38 6 25760.90 322.63 14 13.6 34.4 14.5 0.0 40 5 24899.57 322.53 10 10.3 31.4 14.3 0.0 42 5 24322.51 322.45 8 8.2 29.2 14.2 0.0 44 4 23897.88 322.40 7 6.8 27.4 14.2 0.0 46 3 23563.77 322.36 6 5.7 25.9 14.1 0.0 48 3 23288.44 322.32 5 4.9 24.5 14.1 0.0 50 3 23054.37 322.29 4 4.2 23.3 14.0 0.0 52 2 22851.17 322.26 4 3.7 22.2 14.0 0.0 54 2 22672.32 322.24 3 3.2 21.2 14.0 0.0 56 2 22513.39 322.22 3 2.8 20.3 14.0 0.0 58 1 22371.27 322.20 2 2.4 19.4 13.9 0.0 60 1 22243.58 322.18 2 2.1 18.6 13.9 0.0 62 1 22128.49 322.17 2 1.9 17.8 13.9 0.0 64 1 22024.49 322.15 2 1.6 17.0 13.9 0.0 66 1 21930.33 322.14 1 1.4 16.3 13.9 0.0 68 1 21844.95 322.13 1 1.3 15.7 13.8 0.0 70 1 21767.43 322.12 1 1.1 15.0 13.8 0.0 72 0 21696.97 322.11 1 1.0 14.4 13.8 0.0 74 0 21632.86 322.10 1 0.9 13.9 13.8 0.0 76 0 21574.47 322.09 1 0.8 13.3 13.8 0.0 78 0 21521.24 322.09 1 0.7 12.8 13.8 0.0 80 0 21472.69 322.08 1 0.6 12.3 13.8 0.0 82 0 21428.36 322.07 1 0.6 11.8 13.8 0.0 84 0 21387.86 322.07 0 0.5 11.4 13.8 0.0 GRAPHED DATA FOR 100 YEAR STORM Hydrographs 50 40 30 m rn m r u 20 0 10 0 0 i i 10 20 30 40 50 60 Time (min) STAGE-DISCHARGE FUNCTION 325.00 324.00 323.00 322.00 321.00 320.00 Q 319.00 318.00 317.00 316.00 315.00 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 DISCHARGE (cfs) DRY-POND-2.xls 1/5/99 Riprap Velocity Dissipator Pad DRY POND #2 LOT 8 - PARAMOUNT CENTER Morrisville, North Carolina Design Storm: 10-year BACKGROUND: Use the E&S Control Planning & Design Manual, Section 8.06. REFERENCE: (NCDEHNR. 1993) Step 1. Minimum Tailwater Condition Step 2. D-o = 15 in. D-o = 1.25 ft. Q-10 = 2.4 cfs (from Chainsaw Routing Sheet) V= 2.0 fps d-50 = 0.5 ft. L-a = 8 ft. Step 3. 3*D-o = 3.75 ft. W = 9.25 ft. Step 4. d-max 0.75 ft. d-max 9 in. Step 5. Thickness = 1.1 ft. Thickness = 14 in. Figure 8.06 a Figure 8.06 a Use: 4 ft Use: 10 ft Maximum Stone Diameter (1.5*d-50) Class "B" Rip-Rap Apron Thickness With Filter Fabric (1.5*d-50) Use: 18 in TERMINOLOGY: Q10 = 10-Year Design Storm, Peak Discharge, (cfs) D-o = Pipe Diameter, (in. & ft.) d-50 = Mean Stone Diameter of Rip-Rap, (ft.) L-a = Length of Rip-Rap Apron, (ft.) 3*D-o = Width of Rip-Rap Apron @ Pipe Outlet, (ft.) W = Width of Rip-Rap Apron @ End of Apron, (ft.) d-max = Maximum Stone Diameter of Rip-Rap, (ft. & in.) Thickness = Thickness of Rip-Rap Apron With Filter Fabric, (ft. &in.) DSAdantic DRY POND #3 DESIGN Lot 8 - Paramount Center Morrisville, North Carolina Project No.: LIC037.000 Watershed Data Hydrograph Formulation Stage-Storage Function Pond Volume Calculation Chainsaw Routing for the 10-year storm Drawdown Calculation Graphed Data for the 10-year storm Chainsaw Routing for the 100-year storm Graphed Data for the 100-year storm Outlet Protection N Co a SEAL = 022092 DRY-POND-3.xls 1/5/99 WATERSHED DATA Lot 8 - Paramount Center - Pond #3 WATERSHED No. DRAINAGE AR Measure No.I Measure No.2 (ACRES) (ACRES) EA Measure No.3 Average (ACRES) (ACRES) 1 9.02 8.95 8.98 8.98 WATERSHED No. HYDRAULIC LENGTH (FT) VERTICAL RELIEF (FT) 1 877 24 WATERSHED No. ESTIMATION OF IMPE Watershed Area Pavement Area RVIOUSNESS Building Area % Imperv. 1 8.98 ac 4.86 ac 0.92 ac * 64.34% DRY-POND-3. xls 1/5/99 BACKGROUND: REFERENCES: SOLUTION - Qp: HYDROGRAPH FORMULATION Lot 8 - Paramount Center - Pond #3 Use the Rational Method (Malcom, 1991; Wanielista, 1990) Use the Kirpich Equation & the Rational Method INPUT OUTPUT L= 877 ft H= 24 ft Tc = 5.8 minutes g = 195 (10 year h= 22 storm) I= 7.02 in/hr A= 8.98 acres C= 0.66 QP10 = 42 cfs g = 290 (100 year h = 25 storm) SOLUTION - To: I = 9.43 in/hr QP100 = 56 cfs Pn6 = 3.90 in (10 Year Storm) CN = 68 S = 4.71 in Q* = 1.14 in TP,o = 10.7 minutes Q* = 2.47 in TP100 = 17.3 minutes TERMINOLOGY L = Hydraulic Length, (ft) H = Vertical Relief, (ft) g = Statistical Variable h = Statistical Variable A = Watershed Area, (acres) C = Composite Runoff Coefficient Pn6 = Precipitation from 6 hr storm (in) CN = Curve Number Pn6 = 5.80 in (100 Year Storm) Tc = Time of Concentration, (minutes) I = Rainfall Intensity, (in/hr) Qp = Peak Discharge, (cfs) S = Ultimate Soil Storage, (in) Q* = Runoff Depth, (in) Tp = Time to Peak, (minutes) DRY-POND-3.xls 1/5/99 STAGE-STORAGE FUNCTION Lot 8 - Paramount Center - Pond #3 1 2 3 4 5 6 7 8 Y X CONTOUR CONTOUR INCR ACCUM Z In S In Z Z est AREA VOLUME VOLUME STAGE sq ft cu ft cu ft ft h 336.5 5159 0 0 338 8345 10128 10128 1.5 9.2231 0.4055 1.51 340 12202 20547 30675 3.5 10.3312 1.2528 3.43 342 16270 28472 59147 5.5 10.9878 1.7047 5.57 STAGE-STORAGE FUNCTION: S=Ks*Zb where: b = 1.35 and KS = 5799 Stage-Storage Function 18 16 14 12 10 c 8 6 4 2 0 0.0 0.5 1.0 1.5 2.0 In Z DRY-POND-3. xls 1/5/99 POND VOLUME CALCULATIONS Lot 8 - Paramount Center - Pond #3 CALCULATE IMPERVIOUS AREA: Drainage area = 8.98 ac. Impervious area = 5.78 ac. Percent Impervious = 64.34% FIND VOLUME TO BE CONTROLLED FROM 1" STORM Rv = 0.63 DA = 8.98 ac Volume = Rv x 1" x Drainage Area = 0.47 ac.-ft. or 20506 cf. TERMINOLOGY: P = Precipitation Depth, (in) S = Ultimate Soil Storage, (in) CN = Curve Number Q' = Runoff Depth, (in) CHAINSAW ROUTING FOR 10-YEAR STORM (REF: Malcom, 1991) COMPUTED RESULTS Normal Surface Area = 0.11 ac Peak Stage = 339.85 ft Maximum Surface Area = 0.28 ac Rise = 3.10 ft Peak Outflow = 9.74 cfs INPUT Hydrograph Results: Riser: Nr = 1 Top of Dam: 342.25 ft Qp = 42 cfs Lr = 3 ft Barrel: Tp = 10.7 min Wr = 3 ft Nb = 1 dT = 2 min Cwr = 3.00 Db = 15 in Stage-Storage Results: Cdr = 0.60 Cdb = 0.60 Ks = 5799 Zcr = 339.25 ft Zinv = 336.50 ft b = 1.35 Drawdown Pipe: Emergency Spillway: Zo = 336.5 ft (inv) Cdr = 0.60 L = 0 ft Initial Water Level: D = 2.00 in Zcr = 0.00 ft Z; = 336.75 ft Zcr = 336.75 ft Cw = 0.00 OUTPUT 1 2 3 4 5 6 7 8 9 Time T Inflow I Storage S Stage Z Outflow O Riser (weir) Riser (orifice) Barrel Emergency Spillway min cfs cu-ft ft cfs cfs cfs cfs cfs ovv. io JJO.io 0 0.0 0.0 u.u 0.0 2 3 890.18 336.75 0 0.0 0.0 0.0 0.0 4 13 1306.93 336.83 0 0.0 0.0 0.0 0.0 6 25 2834.91 337.09 0 0.0 0.0 0.0 0.0 8 35 5797.94 337.50 0 0.0 0.0 0.0 0.0 10 41 10041.13 338.00 0 0.0 0.0 0.0 0.0 12 40 14982.57 338.52 0 0.0 0.0 0.0 0.0 14 33 19807.44 338.98 0 0.0 0.0 0.0 0.0 16 26 23781.01 339.34 1 0.7 13.0 8.8 0.0 18 20 26810.68 339.60 6 5.7 25.8 9.3 0.0 20 16 28574.64 339.75 10 9.7 30.8 9.6 0.0 22 13 29346.77 339.82 10 11.6 32.7 9.7 0.0 24 10 29691.48 339.85 10 12.5 33.5 9.7 0.0 26 8 29705.62 339 85 10 12.5 33.5 9.7 0.0 28 6 29464.97 339.83 10 11.9 33.0 9.7 0.0 30 5 29028.91 339.79 10 10.8 31.9 9.6 0.0 32 4 28444.00 339.74 9 9.3 30.4 9.5 0.0 34 3 27770.89 339.69 8 7.8 28.6 9.4 0.0 36 2 27189.88 339.64 6 6.5 26.9 9.3 0.0 38 2 26687.22 339.59 5 5.4 25.4 9.3 0.0 40 1 26251.38 339.56 5 4.6 24.0 9.2 0.0 42 1 25872.64 339.52 4 3.9 22.7 9.1 0.0 44 1 25542.78 339.49 3 3.3 21.4 9.1 0.0 46 1 25254.87 339.47 3 2.8 20.3 9.0 0.0 48 1 25003.01 339 45 2 2.4 19.3 9.0 0.0 50 0 24782.19 339.43 2 2.0 18.3 9.0 0.0 52 0 24588.16 339.41 2 1.8 17.4 8.9 0.0 54 0 24417.27 339.40 2 1.5 16.6 8.9 0.0 56 0 24266.43 339.38 1 1.3 15.8 8.9 0.0 58 0 24132.97 339.37 1 1.1 15.1 8.8 0.0 60 0 24014.63 339.36 1 1.0 14.5 8.8 0.0 62 0 23909.45 339.35 1 0.9 13.8 8.8 0.0 64 0 23815.75 339.34 1 0.8 113 8.8 0.0 66 0 23732.08 339.34 1 0.7 12.7 8.8 0.0 68 0 23657.20 339.33 1 0.6 12.2 8.8 0.0 70 0 23590.02 339.32 1 0.5 11.8 8.7 0.0 72 0 23529.62 339.32 0 0.5 11.3 8.7 0.0 74 0 23475.19 339.31 0 0.4 10.9 8.7 0.0 76 0 23426.02 339.31 0 0.4 10.5 8.7 0.0 78 0 23381.51 339.31 0 0.4 10.2 8.7 0.0 80 0 23341.13 339.30 0 0.3 9.9 8.7 0.0 DRY-POND-3. xls 1/&99 DRAWDOWN CALCULATIONS Lot 8 - Paramount Center - Pond #3 Storage Pool Drawdown Pond must detain the first 1" of runoff and release it in 2 to 5 days INPUT Number of Drains = 1 Starting Water Elevation = 339.25 ft Diameter of Drains = 2.0 in Ending Water Elevation = 336.75 ft Orifice Coefficient = 0.60 ft Average Head = 1.25 ft Elevation of Drains = 336.75 ft OUTPUT By the Orifice Equation: Average Flow = 0.12 cfs Vol of Storage Required = 20506 cf Volume of Storage = 21871 cf OK Length of Drawdown = 186204 sec or 2.16 days OK GRAPHED DATA FOR 10 YEAR STORM Hydrographs 50 40 4 30 m m r v M 20 o 10 I 0 0 i STAGE-DISCHARGE FUNCTION J4G.UV 341.00 340.00 { 339.00 w O a , N 338.00 337.00 336.00 d 335.00 0 1 2 3 4 5 6 7 8 9 10 DISCHARGE (cfs) DRY-POND-3. xis 115199 10 20 30 40 50 Time (min) CHAINSAW ROUTING FOR 100-YEAR STORM (REF: Malcom, 1991) COMPUTED RESULTS Normal Surface Area = 0.11 ac Peak Stage = 341.35 ft Maximum Surface Area = 0.31 ac Rise = 4.60 ft Peak Outflow = 12.12 cfs INPUT Hydrograph Results: Riser: Nr = 1 Top of Dam: 342.25 ft Qp = 56 cfs Lr = 3 ft Barrel: Tp = 17.3 min Wr = 3 ft Nb = 1 dT = 2 min Cwr = 3.00 Db = 15 in Stage-Storage Results: Cdr = 0.60 Cdb = 0.60 Ks = 5799 Zcr = 339.25 ft Zinv = 336.50 ft b = 1.35 Drawdown Pipe: Emergency Spillway: Zo = 336.5 ft (inv) Cdr = 0.60 L = 0 ft Initial Water Level: D = 2.00 in Zcr = 0.00 ft Z; = 336.75 ft Zcr = 336.75 ft Cw = 0.00 OUTPUT 1 2 3 4 5 6 7 8 9 Time T Inflow 1 Storage S Stage Z Outflow O Riser (weir) Riser (orifice) Barrel Emergency Spillway min cfs cu-ft It cfs cfs cfs cfs cfs u u oau. 10 aao. i o u u.u 0.0 0.0 0.0 2 2 890.18 336.75 0 0.0 0.0 0.0 0.0 4 7 1109.78 336.79 0 0.0 0.0 0.0 0.0 6 15 1959.44 336.95 0 0.0 0.0 0.0 0.0 8 25 3767.08 337.23 0 0.0 0.0 0.0 0.0 10 35 6735.18 337.62 0 0.0 0.0 0.0 0.0 12 44 10914.22 338.10 0 0.0 0.0 0.0 0.0 14 51 16196.12 338.64 0 0.0 0.0 0.0 0.0 16 55 22328.33 339.21 0 0.0 0.0 0.0 0.0 18 56 28946.96 339.79 10 10.6 31.7 9.6 0.0 20 53 34469.74 340.24 10 26.5 431 10.4 0.0 22 34 39521.58 340.64 11 44.1 51.0 11.1 0.0 24 30 42333.82 340.85 11 54.8 54.9 11.4 0.0 26 26 44527.34 341.02 12 63.5 57.6 11.6 0.0 28 22 46193.11 341.14 12 70.3 59.6 11.8 0.0 30 19 47408.62 341.23 12 75.4 61.0 12.0 0.0 32 16 48240.03 341.29 12 78.9 61.9 12.0 0.0 34 14 48744.00 341.33 12 81.0 62.5 12.1 0.0 36 12 48969.06 341.35 12 82.0 62.8 12.1 0.0 38 10 48956.86 341.35 12 81.9 62.7 12.1 0.0 40 9 48743.18 341.33 12 81.0 62.5 12.1 0.0 42 8 48358.74 341.30 12 79.4 62.1 12.1 0.0 44 7 47829.98 341.26 12 77.1 61.5 12.0 0.0 46 6 47179.61 341.22 12 74.4 60.8 11.9 0.0 48 5 46427.22 341.16 12 71.3 59.9 11.8 0.0 50 4 45589.64 34110 12 67.8 58.9 11.8 0.0 52 4 44681.39 341.03 12 641 57.8 11.7 0.0 54 3 43714.99 340.96 12 60.2 56.6 11.5 0.0 56 3 42701.21 340.88 11 56.2 55.3 11.4 0.0 58 2 41649.37 340.80 11 52.1 53.9 11.3 0.0 60 2 40567.50 340.72 11 48.0 52.5 11.2 0.0 62 2 39462.55 340.63 11 43.9 50.9 11.0 0.0 64 1 38340.52 340.54 11 39.8 49.3 10.9 0.0 66 1 37206.61 340.46 11 35.7 47.6 10.8 0.0 68 1 36065.33 340.37 11 31.8 45.8 10.6 0.0 70 1 34920.58 340.27 10 28.0 43.9 10.5 0.0 72 1 33775.75 340.18 10 24.3 41.8 10.3 0.0 74 1 32633.81 340.09 10 20.8 39.7 10.2 0.0 76 1 31497.33 340.00 10 17.4 37.5 10.0 0.0 78 1 30368.56 339.90 10 14.3 35.0 9.8 0.0 80 0 29249.49 339.81 10 11.3 32.4 9.7 0.0 82 0 28141.85 339.72 9 8.6 29.6 9.5 0.0 84 0 27151.60 339.63 6 6.4 26.8 9.3 0.0 GRAPHED DATA FOR 100 YEAR STORM Hydrographs 70 60 50 N w 40 m W u 30 O 20 10 0 0 I STAGE-DISCHARGE FUNCTION JYL. V V 341.00 340.00 339.00 w Q V) 338.00 337.00 336.00 335.00 0 1 2 3 4 5 6 7 8 9 10 11 12 13 DISCHARGE (cfs) DRY-POND-3. xls 1/5/99 10 20 30 40 50 60 Time (min) Riprap Velocity Dissipator Pad DRY POND #3 LOT 8 - PARAMOUNT CENTER Morrisville, North Carolina Design Storm: 10-year BACKGROUND: Use the E&S Control Planning & Design Manual, Section 8.06. REFERENCE: (NCDEHYVR, 1993) Step 1. Minimum Tailwater Condition Step 2. D-o = 15 in. D-o = 1.25 ft. Q-10 = 9.74 cfs (from Chainsaw Routing Sheet) V= 7.9 fps d-50 = 0.5 ft. Figure 8.06 a L-a = 12 ft. Figure 8.06 a Step 3. 3*D-o = 3.75 ft. W = 13.25 ft. Step 4. d-max 0.75 ft. d-max 9 in. Step 5. Thickness = 1.1 ft. Thickness = 14 in. Use: 4 ft Use: 14 ft Maximum Stone Diameter (1.5*d-50) Class "B" Rip-Rap Apron Thickness With Filter Fabric (1.5*d-50) Use: 18 in TERMINOLOGY: Q10 = 10-Year Design Storm, Peak Discharge, (cfs) D-o = Pipe Diameter, (in. & ft.) d-50 = Mean Stone Diameter of Rip-Rap, (ft.) L-a = Length of Rip-Rap Apron, (ft.) 3*D-o = Width of Rip-Rap Apron @ Pipe Outlet, (ft.) W = Width of Rip-Rap Apron @ End of Apron, (ft.) d-max = Maximum Stone Diameter of Rip-Rap, (ft. & in.) Thickness = Thickness of Rip-Rap Apron With Filter Fabric, (ft. &in.) DSAdantic DRY POND #3 DESIGN Lot 8 - Paramount Center Morrisville, North Carolina Project No.: LIC037.000 Watershed Data Hydrograph Formulation Stage-Storage Function Pond Volume Calculation Chainsaw Routing for the 10-year storm Drawdown Calculation Graphed Data for the 10-year storm Chainsaw Routing for the 100-year storm Graphed Data for the 100-year storm Outlet Protection ilrul4r? ?i ?ess?o 9 Q4 SEAL 022092 M. M 111111', rr IIIIP DRY-POND-3.xls 1/5/99 WATERSHED DATA Lot 8 - Paramount Center - Pond #3 WATERSHED No. DRAINAGE AR Measure No.l Measure No.2 (ACRES) (ACRES) EA Measure No.3 Average (ACRES) (ACRES) 1 9.02 8.95 8.98 8.98 WATERSHED No. HYDRAULIC LENGTH (FT) VERTICAL RELIEF (FT) 1 877 24 WATERSHED No. ESTIMATION OF IMPE Watershed Area Pavement Area RVIOUSNESS Building Area % Imperv. 1 8.98 ac 4.86 ac 0.92 ac * 64.34% DRY-POND-3.xls 1/5/99 BACKGROUND: REFERENCES: SOLUTION - Qp. INPUT OUTPUT L= 877 ft H= 24 ft Tc = 5.8 minutes g = 195 (10 year h= 22 storm) 1= 7.02 in/hr A= 8.98 acres C= 0.66 QP1O = 42 cfs g = 290 (100 year h = 25 storm) SOLUTION - Tp: I = 9.43 in/hr QP1oo = 56 cfs INPUT OUTPUT Pn6 = 3.90 in (10 Year Storm) S= 4.71 in CN = 68 Q* = 1.14 in TP10 = 10.7 minutes Pn6 = 5.80 in (100 Year Storm) Q* = 2.47 in TP100 = 17.3 minutes TERMINOLOGY HYDROGRAPH FORMULATION Lot 8 - Paramount Center - Pond #3 Use the Rational Method (Malcom, 1991; Wanielista, 1990) Use the Kirpich Equation & the Rational Method L = Hydraulic Length, (ft) H = Vertical Relief, (ft) g = Statistical Variable h = Statistical Variable A = Watershed Area, (acres) C = Composite Runoff Coefficient Pn6 = Precipitation from 6 hr storm (in) CN = Curve Number Tc = Time of Concentration, (minutes) I = Rainfall Intensity, (in/hr) Qp = Peak Discharge, (cfs) S = Ultimate Soil Storage, (in) Q* = Runoff Depth, (in) Tp = Time to Peak, (minutes) DRY-POND-3.xls 1/5/99 STAGE-STORAGE FUNCTION Lot 8 - Paramount Center - Pond #3 1 2 3 4 5 6 7 8 Y X CONTOUR CONTOUR INCR ACCUM Z In S In Z Z est AREA VOLUME VOLUME STAGE sq ft cu ft cu ft ft ft 336.5 5159 0 0 338 8345 10128 10128 1.5 9.2231 0.4055 1.51 340 12202 20547 30675 3.5 10.3312 1.2528 3.43 342 16270 28472 59147 5.5 10.9878 1.7047 5.57 STAGE-STORAGE FUNCTION: S=Ks*Zb where: b = 1.35 and Stage-Storage Function 18 16 14 12 10 c 8 6 4 2 0 KS = 5799 0.0 0.5 1.0 1.5 2.0 In Z DRY-POND-3.xls 1/5/99 POND VOLUME CALCULATIONS Lot 8 - Paramount Center - Pond #3 CALCULATE IMPERVIOUS AREA: Drainage area = 8.98 ac. Impervious area = 5.78 ac. Percent Impervious = 64.34% FIND VOLUME TO BE CONTROLLED FROM 1" STORM Rv = 0.63 DA = 8.98 ac Volume = Rv x 1" x Drainage Area = 0.47 ac.-ft. or 20506 cf. TERMINOLOGY: P = Precipitation Depth, (in) S = Ultimate Soil Storage, (in) CN = Curve Number Q" = Runoff Depth, (in) CHAINSAW ROUTING FOR 10-YEAR STORM (REF: Malcom, 1991) COMPUTED RESULTS Normal Surface Area = 0.11 ac Peak Stage = 339.85 ft Maximum Surface Area = 0.28 ac Rise = 3.10 ft Peak Outflow = 9.74 cfs INPUT Hydrograph Results: Riser: Nr = 1 Top of Dam: 342.25 ft Qp = 42 cfs Lr = 3 ft Barrel: Tp = 10.7 min Wr = 3 ft Nb = 1 dT = 2 min Cwr = 3.00 Db = 15 in Stage-Storage Results: Cdr = 0.60 Cdb = 0.60 Ks = 5799 Zcr = 339.25 ft Zinv = 336.50 ft b = 1.35 Drawdown Pipe: Emergency Spillway: Zo = 336.5 ft (inv) Cdr = 0.60 L = 0 ft Initial Water Level: D = 2.00 in Zcr = 0.00 ft Z; = 336.75 ft Zcr = 336.75 ft Cw = 0.00 OUTPUT 1 2 3 4 5 6 7 8 9 Time T Inflow I Storage S Stage Z Outflow O Riser (weir) Riser (orifice) Barrel Emergency Spillway min cfs cu-ft It cfs cfs cfs cfs cfs ovu.ja ooo.io 0 0.0 0.0 0.0 0.0 2 3 890.18 336.75 0 0.0 0.0 0.0 0.0 4 13 1306.93 336.83 0 0.0 0.0 0.0 0.0 6 25 2834.91 337.09 0 0.0 0.0 0.0 0.0 8 35 5797.94 337.50 0 0.0 0.0 0.0 0.0 10 41 10041.13 338.00 0 0.0 0.0 0.0 0.0 12 40 14982.57 338.52 0 0.0 0.0 0.0 0.0 14 33 19807.44 338.98 0 0.0 0.0 0.0 0.0 16 26 23781.01 339.34 1 0.7 13.0 8.8 0.0 18 20 26810.68 339.60 6 5.7 25.8 9.3 0.0 20 16 28574.64 339.75 10 9.7 30.8 9.6 0.0 22 13 29346.77 339.82 10 11.6 32.7 9.7 0.0 24 10 29691.48 339.85 10 12.5 33.5 9.7 0.0 26 8 29705.62 339.85 10 12.5 33.5 9.7 0.0 28 6 29464.97 339.83 10 11.9 33.0 9.7 0.0 30 5 29028.91 339.79 10 10.8 31.9 9.6 0.0 32 4 28444.00 339.74 9 9.3 30.4 9.5 0.0 34 3 27770.89 339.69 8 7.8 28.6 9.4 0.0 36 2 27189.88 339.64 6 6.5 26.9 9.3 0.0 38 2 26687.22 339.59 5 5.4 25.4 9.3 0.0 40 1 26251.38 339.56 5 4.6 24.0 9.2 0.0 42 1 25872.64 339.52 4 3.9 22.7 9.1 0.0 44 1 25542.78 339.49 3 3.3 21.4 9.1 0.0 46 1 25254.87 339.47 3 2.8 20.3 9.0 0.0 48 1 25003.01 339.45 2 2.4 19.3 9.0 0.0 50 0 24782.19 339.43 2 2.0 18.3 9.0 0.0 52 0 24588.16 339.41 2 1.8 17.4 8.9 0.0 54 0 24417.27 339.40 2 1.5 16.6 8.9 0.0 56 0 24266.43 339.38 1 1.3 15.8 8.9 0.0 58 0 24132.97 33937 1 1.1 15.1 8.8 0.0 60 0 24014.63 339.36 1 1.0 14.5 8.8 0.0 62 0 23909.45 339.35 1 0.9 13.8 8.8 0.0 64 0 23815.75 339.34 1 0.8 13.3 8.8 0.0 66 0 23732.08 339.34 1 0.7 12.7 8.8 0.0 68 0 23657.20 339.33 1 0.6 12.2 8.8 0.0 70 0 23590.02 339.32 1 0.5 11.8 8.7 0.0 72 0 23529.62 339.32 0 0.5 11.3 8.7 0.0 74 0 23475.19 339.31 0 0.4 10.9 8.7 0.0 76 0 23426.02 339.31 0 0.4 10.5 8.7 0.0 78 0 23381.51 339.31 0 0.4 10.2 8.7 0.0 80 0 23341.13 339.30 0 0.3 9.9 8.7 0.0 DRY-POND-3. xls 116199 DRAWDOWN CALCULATIONS Lot 8 - Paramount Center - Pond #3 Storage Pool Drawdown Pond must detain the first 1" of runoff and release it in 2 to 5 days INPUT Number of Drains = 1 Starting Water Elevation = 339.25 ft Diameter of Drains = 2.0 in Ending Water Elevation = 336.75 ft Orifice Coefficient = 0.60 ft Average Head = 1.25 ft Elevation of Drains = 336.75 ft OUTPUT By the Orifice Equation: Average Flow = 0.12 cfs Vol of Storage Required = 20506 cf Volume of Storage = 21871 cf OK Length of Drawdown = 186204 sec or 2.16 days OK 50 40 30 m a `m L V T 20 O 10 0 GRAPHED DATA FOR 10 YEAR STORM Hydrographs A" w ?a 'r ?trr >i 0 10 20 30 40 50 Time (min) STAGE-DISCHARGE FUNCTION 342.00 i 341.00 340.00 339.00 w Q Y) 338.00 337.00 336.00 L 335.00 0 1 2 3 4 5 6 7 8 9 10 DISCHARGE (cfs) DRY-POND-3. xls 1/5/99 CHAINSAW ROUTING FOR 100-YEAR STORM (REF. Malcom, 1991) COMPUTED RESULTS Normal Surface Area = 0.11 ac Peak Stage = 341.35 ft Maximum Surface Area = 0.31 ac Rise = 4.60 ft Peak Outflow = 12.12 cfs INPUT I-lydrograph Results: Riser: Nr = 1 Top of Dam: 342.25 ft Qp = 56 cfs Lr = 3 ft Barrel: Tp = 17.3 min Wr = 3 ft Nb = 1 dT = 2 min Cwr = 3.00 Db = 15 in Stage-Storage Results: Cdr = 0.60 Cdb = 0.60 Ks = 5799 Zcr = 339.25 ft Zinv = 336.50 ft b = 1.35 Drawdown Pipe: Emergency Spillway. Zo = 336.5 ft (inv) Cdr = 0.60 L = 0 ft Initial Water Level: D = 2.00 in Zcr = 0.00 ft Z; = 336.75 ft Zcr = 336.75 ft Cw = 0.00 OUTPUT 1 2 3 4 5 6 7 8 9 Time T Inflow I Storage S Stage Z Outflow O Riser (weir) Riser (orifice) Barrel Emergency Spillway min cfs cu-ft It cfs cfs cfs cfs cfs v .... 1. -.I J U V.U U.U U.U U.U 2 2 890.18 336.75 0 0.0 0.0 0.0 0.0 4 7 1109.78 336.79 0 0.0 0.0 0.0 0.0 6 15 1959.44 336.95 0 0.0 0.0 0.0 0.0 8 25 3767.08 337.23 0 0.0 0.0 0.0 0.0 10 35 6735.18 337.62 0 0.0 0.0 0.0 0.0 12 44 10914.22 338.10 0 0.0 0.0 0.0 0.0 14 51 16196.12 338.64 0 0.0 0.0 0.0 0.0 16 55 22328.33 339.21 0 0.0 0.0 0.0 0.0 18 56 28946.96 339.79 10 10.6 31.7 9.6 0.0 20 53 34469.74 340.24 10 26.5 43.1 10.4 0.0 22 34 39521.58 340.64 11 44.1 51.0 11.1 0.0 24 30 42333.82 340.85 11 54.8 54.9 11.4 0.0 26 26 44527.34 341.02 12 63.5 57.6 11.6 0.0 28 22 46193.11 341.14 12 70.3 59.6 11.8 0,0 30 19 47408.62 341.23 12 75.4 61.0 12.0 0.0 32 16 48240.03 341.29 12 78.9 61.9 12.0 0.0 34 14 48744.00 341.33 12 81.0 62.5 12.1 0.0 36 12 48969.06 341.35 12 82.0 62.8 12.1 0.0 38 10 48956.86 341.35 12 81.9 62.7 12.1 0.0 40 9 48743.18 341.33 12 81.0 62.5 12.1 0.0 42 8 48358.74 341.30 12 79.4 62.1 12.1 0.0 44 7 47829.98 341.26 12 77.1 61.5 12.0 0.0 46 6 47179.61 341.22 12 74.4 60.8 11.9 0.0 48 5 46427.22 341.16 12 71.3 59.9 11.8 0.0 50 4 45589.64 341.10 12 67.8 58.9 11.8 0.0 52 4 44681.39 341.03 12 64.1 57.8 11.7 0.0 54 3 43714.99 340.96 12 60.2 56.6 11.5 0.0 56 3 42701.21 340.88 11 56.2 55.3 11,4 0.0 58 2 41649.37 340.80 11 52.1 53.9 11.3 0.0 60 2 40567.50 340.72 11 48.0 52.5 11.2 0.0 62 2 39462.55 340.63 11 43.9 50.9 11.0 0.0 64 1 38340.52 340.54 11 39.8 49.3 10.9 0.0 66 1 37206.61 340.46 11 35.7 47.6 10.8 0.0 68 1 36065.33 340.37 11 31.8 45.8 10.6 0.0 70 1 34920.58 340.27 10 28.0 43.9 10.5 0.0 72 1 33775.75 340.18 10 24.3 41.8 10.3 0.0 74 1 32633.81 340.09 10 20.8 39.7 10.2 0.0 76 1 31497.33 340.00 10 17.4 37.5 10.0 0.0 78 1 30368.56 339.90 10 14.3 35.0 9.8 0.0 80 0 29249.49 339.81 10 11.3 32.4 9.7 0.0 82 0 28141.85 339.72 9 8.6 29.6 9.5 0.0 84 0 27151.60 339.63 6 6.4 26.8 9.3 0.0 70 60 50 H w 40 m w ?o a 30 20 10 0 GRAPHED DATA FOR 100 YEAR STORM Hydrographs 0 10 20 30 40 50 60 Time (min) STAGE-DISCHARGE FUNCTION i 342.00 341.00 340.00 339.00 w Q y H 338.00 337.00 336.00 335.00 0 1 2 3 4 5 6 7 8 9 10 11 12 13 DISCHARGE (cfs) DRY-POND-3.xls 1/5/99 Riprap Velocity Dissipator Pad DRY POND #3 LOT 8 - PARAMOUNT CENTER Morrisville, North Carolina Design Storm: 10-year BACKGROUND: Use the E&S Control Planning & Design Manual, Section 8.06. REFERENCE: (VCDEHNR, 1993) Step 1. Minimum Tailwater Condition Step 2. D-o = 15 in. D-o = 1.25 ft. Q-10 = 9.74 cfs (from Chainsaw Routing Sheet) V= 7.9 fps d-50 = 0.5 ft. Figure 8.06 a L-a = 12 ft. Figure 8.06 a Step 3. 3*D-o = 3.75 ft. Use: 4 ft W = 13.25 ft. Use: 14 ft Step 4. d-max 0.75 ft. Maximum Stone Diameter (1.5*d-50) d-max 9 in. Class "B" Rip-Rap Step 5. Thickness = 1.1 ft. Apron Thickness With Filter Fabric (1.5*d-50) Thickness = 14 in. Use: 18 in TERMINOLOGY: Q10 = 10-Year Design Storm, Peak Discharge, (cfs) D-o = Pipe Diameter, (in. & ft.) d-50 = Mean Stone Diameter of Rip-Rap, (ft.) L-a = Length of Rip-Rap Apron, (ft.) 3*D-o = Width of Rip-Rap Apron @ Pipe Outlet, (ft.) W = Width of Rip-Rap Apron @ End of Apron, (ft.) d-max = Maximum Stone Diameter of Rip-Rap, (ft. & in.) Thickness = Thickness of Rip-Rap Apron With Filter Fabric, (ft. &in.) ME M WEE DSAdanfic DRY POND #3 DESIGN Lot 8 - Paramount Center Morrisville, North Carolina Project No.: LIC037.000 Watershed Data Hydrograph Formulation Stage-Storage Function Pond Volume Calculation Chainsaw Routing for the 10-year storm Drawdown Calculation Graphed Data for the 10-year storm Chainsaw Routing for the 100-year storm Graphed Data for the 100-year storm Outlet Protection CJq'q 4?FfcSSy _= 9 m " SEAL 022092 r FHcINct*o M. M ?PPPP7!M111,? DRY-POND-3.xls 1/5/99 WATERSHED DATA Lot 8 - Paramount Center - Pond #3 WATERSHED No. DRAINAGE AREA Measure No.1 Measure No.2 Measure No.3 Average (ACRES) (ACRES) (ACRES) (ACRES) 1 9.02 8.95 8.98 8.98 WATERSHED No. HYDRAULIC LENGTH (FT) VERTICAL RELIEF (FT) 1 877 24 WATERSHED No. ESTIMATION OF IMPE Watershed Area Pavement Area RVIOUSNESS Building Area % Imperv. 1 8.98 ac 4.86 ac 0.92 ac * 64.34% DRY-POND-3. xls 1/5/99 BACKGROUND. REFERENCES: SOLUTION - Qp INPUT OUTPUT L= 877 ft H= 24 ft Tc = 5.8 minutes 9 = 195 (10 year h= 22 storm) I= 7.02 in/hr A= 8.98 acres C= 0.66 QD1O = 42 cfs g = 290 (100 year h = 25 storm) I = 9.43 in/hr QP1oo = 56 cfs SOLUTION - Tp: INPUT OUTPUT Pn6 = 3.90 in (10 Year Storm) S= 4.71 in CN = 68 Q* = 1.14 in TD10 = 10.7 minutes Pn6 = 5.80 in (100 Year Storm) Q* = 2.47 in TP100 = 17.3 minutes TERMINOLOGY HYDROGRAPH FORMULATION Lot 8 - Paramount Center - Pond #3 Use the Rational Method (Malcom, 1991; Wanielista, 1990) Use the Kirpich Equation & the Rational Method L = Hydraulic Length, (ft) H = Vertical Relief, (ft) g = Statistical Variable h = Statistical Variable A = Watershed Area, (acres) C = Composite Runoff Coefficient Pn6 = Precipitation from 6 hr storm (in) CN = Curve Number Tc = Time of Concentration, (minutes) I = Rainfall Intensity, (in/hr) Qp = Peak Discharge, (cfs) S = Ultimate Soil Storage, (in) Q* = Runoff Depth, (in) Tp = Time to Peak, (minutes) DRY-POND-3.xls 1/5/99 STAGE-STORAGE FUNCTION Lot 8 - Paramount Center - Pond #3 1 2 3 4 5 6 7 8 Y X CONTOUR CONTOUR INCR ACCUM Z In S In Z Z est AREA VOLUME VOLUME STAGE sq ft cu ft cu ft ft ft 336.5 5159 0 0 338 8345 10128 10128 1.5 9.2231 0.4055 1.51 340 12202 20547 30675 3.5 10.3312 1.2528 3.43 342 16270 28472 59147 5.5 10.9878 1.7047 5.57 STAGE-STORAGE FUNCTION: S=Ks*Zb where-. b = 1.35 and Stage-Storage Function 18 16 14 12 10 c 8 6 4 2 0 Ks = 5799 0.0 0.5 1.0 In Z 1.5 2.0 DRY-POND-3.xls 1/5/99 POND VOLUME CALCULATIONS Lot 8 - Paramount Center - Pond #3 CALCULATE IMPERVIOUS AREA: Drainage area = 8.98 ac. Impervious area = 5.78 ac. Percent Impervious = 64.34% FIND VOLUME TO BE CONTROLLED FROM 1" STORM Rv = 0.63 DA = 8.98 ac Volume = Rv x 1" x Drainage Area = 0.47 ac.-ft. or 20506 cf. TERMINOLOGY: P = Precipitation Depth, (in) S = Ultimate Soil Storage, (in) CN = Curve Number Q* = Runoff Depth, (in) CHAINSAW ROUTING FOR 10-YEAR STORM (REF: Malcom, 1991) COMPUTED RESULTS Normal Surface Area = 0.11 ac Peak Stage = 339.85 ft Maximum Surface Area = 0.28 ac Rise = 3.10 ft Peak Outflow = 9.74 cfs INPUT Hydrograph Results: Riser- Nr = 1 Top of Dam: 342.25 ft Qp = 42 cfs Lr = 3 ft Barrel: Tp = 10.7 min Wr = 3 ft Nb = 1 dT = 2 min Cwr = 3.00 Db = 15 in Stage-Storage Results: Cdr = 0.60 Cdb = 0.60 Ks = 5799 Zcr = 339.25 ft Zinv = 336.50 ft b = 1.35 Drawdown Pipe: Emergency Spillway: Zo = 336.5 ft (inv) Cdr = 0.60 L = 0 ft Initial Water Level: D = 2.00 in Zcr = 0.00 ft Z; = 336.75 ft Zcr = 336.75 ft Cw = 0.00 OUTPUT 1 2 3 4 5 6 7 8 9 Time T Inflow I Storage S Stage Z Outflow O Riser (weir) Riser (orifice) Barrel Emergency Spillway min cfs cu-ft It cfs cfs cfs cfs cfs .. v oau. i o oou. I o v 0.0 0.0 0.0 0.0 2 3 890.18 336.75 0 0.0 0.0 0.0 0.0 4 13 1306.93 336.83 0 0.0 0.0 0.0 0.0 6 25 2834.91 337.09 0 0.0 0.0 0.0 0.0 8 35 5797.94 337.50 0 0.0 0.0 0.0 0.0 10 41 10041.13 338.00 0 0.0 0.0 0.0 0.0 12 40 14982.57 338.52 0 0.0 0.0 0.0 0.0 14 33 19807.44 338.98 0 0.0 0.0 0.0 0.0 16 26 23781.01 339.34 1 0.7 13.0 8.8 0.0 18 20 26810.68 339.60 6 5.7 25.8 9.3 0.0 20 16 28574.64 339.75 10 9.7 30.8 9.6 0.0 22 13 29346.77 339.82 10 11.6 32.7 9.7 0.0 24 10 29691.48 339.85 10 12.5 33.5 9.7 0.0 26 8 29705.62 339.85 10 12.5 33.5 9.7 0.0 28 6 29464.97 339.83 10 11.9 33.0 9.7 0.0 30 5 29028.91 339.79 10 10.8 31.9 9.6 0.0 32 4 28444.00 339 74 9 9.3 30.4 9.5 0.0 34 3 27770.89 339.69 8 7.8 28.6 9.4 0.0 36 2 27189.88 339.64 6 6.5 26.9 9.3 0.0 38 2 26687.22 339.59 5 5.4 25.4 9.3 0.0 40 1 26251.38 339.56 5 4.6 24.0 9.2 0.0 42 1 25872.64 339.52 4 3.9 22.7 9.1 0.0 44 1 25542.78 339.49 3 3.3 21.4 9.1 0,0 46 1 25254.87 339.47 3 2.8 20.3 9.0 0.0 48 1 25003.01 339.45 2 2.4 19.3 9.0 00 50 0 24782.19 339.43 2 2.0 18.3 9.0 0.0 52 0 24588.16 339.41 2 1.8 17.4 8.9 0.0 54 0 24417.27 339.40 2 1.5 16.6 8.9 0.0 56 0 24266.43 339.38 1 1.3 15.8 8.9 0.0 58 0 24132.97 339.37 1 1.1 15.1 8.8 0.0 60 0 24014.63 339.36 1 1.0 14.5 8.8 0.0 62 0 23909.45 339.35 1 0.9 13.8 8.8 0.0 64 0 23815.75 339.34 1 0.8 13.3 8.8 00 66 0 23732.08 339.34 1 0.7 12.7 8.8 0.0 68 0 23657.20 339.33 1 0.6 12.2 8.8 0.0 70 0 23590.02 339.32 1 0.5 11.8 8.7 0.0 72 0 23529.62 339.32 0 0.5 11.3 8.7 0.0 74 0 23475.19 339.31 0 0.4 10.9 8.7 0.0 76 0 23426.02 339.31 0 0.4 10.5 8.7 0.0 78 0 23381.51 339.31 0 0.4 10.2 8.7 0.0 80 0 23341.13 339.30 0 0.3 9.9 8.7 0.0 DRY-POND-3.xls 1/6/99 DRAWDOWN CALCULATIONS Lot 8 - Paramount Center - Pond #3 Storage Pool Drawdown Pond must detain the first 1" of runoff and release it in 2 to 5 days INPUT Number of Drains = 1 Starting Water Elevation = 339.25 ft Diameter of Drains = 2.0 in Ending Water Elevation = 336.75 ft Orifice Coefficient = 0.60 ft Average Head = 1.25 It Elevation of Drains = 336.75 ft OUTPUT By the Orifice Equation: Average Flow = 0.12 cfs Vol of Storage Required = 20506 cf Volume of Storage = 21871 cf OK Length of Drawdown = 186204 sec or 2.16 days OK 50 40 30 m ?o uu N 20 0 10 0 111 0 GRAPHED DATA FOR 10 YEAR STORM Hydrographs STAGE-DISCHARGE FUNCTION 342.00 341.00 340.00 339.00 w Q Y) 338.00 337.00 336.00. 335.00 0 1 2 3 4 5 6 7 8 9 10 DISCHARGE (cfs) DRY-POND-3. xls 115199 10 20 30 40 50 Time (min) CHAINSAW ROUTING FOR 100-YEAR STORM (REF: Malcom, 1991) COMPUTED RESULTS Normal Surface Area = 0.11 ac Peak Stage = 341.35 ft Maximum Surface Area = 0.31 ac Rise = 4.60 ft Peak Outflow = 12.12 cfs INPUT Hydrograph Results: Riser: Nr = 1 Top of Dam: 342.25 ft Qp = 56 cfs Lr = 3 ft Barrel: Tp = 17.3 min Wr = 3 n Nb = 1 dT = 2 min Cwr = 3.00 Db = 15 in Stage-Storage Results: Cdr = 0.60 Cdb = 0.60 Ks = 5799 Zcr = 339.25 ft Zinv = 336.50 ft b = 1.35 Drawdown Pipe: Emergency Spillway: Zo = 336.5 ft (inv) Cdr = 0.60 L = 0 ft Initial Water Level: D = 2.00 in Zcr = 0.00 ft Z; = 336.75 ft Zcr = 336.75 ft Cw = 0.00 OUTPUT 1 2 3 4 5 6 7 8 9 Time T Inflow I Storage S Stage Z Outflow O Riser (weir) Riser (orifice) Barrel Emergency Spillway min cfs cu-ft It cfs cfs cfs cfs cfs v v ovu.lo JJO./o U U.U u.u OA U.0 2 2 890.18 336.75 0 0.0 0.0 0.0 0.0 4 7 1109.78 336.79 0 0.0 0.0 0.0 0.0 6 15 1959.44 336.95 0 0.0 0.0 0.0 0.0 8 25 3767.08 337.23 0 0.0 0.0 0.0 0.0 10 35 6735.18 337.62 0 0.0 0.0 0.0 0.0 12 44 10914.22 338.10 0 0.0 0.0 0.0 0.0 14 51 16196.12 338.64 0 0.0 0.0 0.0 0.0 16 55 22328.33 339.21 0 0.0 0.0 0.0 0.0 18 56 28946.96 339.79 10 10.6 31.7 9.6 0.0 20 53 34469.74 340.24 10 26.5 43.1 10.4 0.0 22 34 39521.58 340.64 11 44.1 51.0 11.1 0.0 24 30 42333.82 340.85 11 54.8 54.9 11.4 0.0 26 26 44527.34 341.02 12 63.5 57.6 11.6 0.0 28 22 46193.11 341.14 12 70.3 59.6 11.8 0.0 30 19 47408.62 341.23 12 75.4 61.0 12.0 0.0 32 16 48240.03 341.29 12 78.9 61.9 12.0 0.0 34 14 48744.00 341.33 12 81.0 62.5 12.1 0.0 36 12 48969.06 341.35 12 82.0 62.8 12.1 0.0 38 10 48956.86 341.35 12 81.9 62.7 12.1 0.0 40 9 48743.18 341.33 12 81.0 62.5 12.1 0.0 42 8 48358.74 341.30 12 79.4 62.1 12.1 0.0 44 7 47829.98 341.26 12 77.1 61.5 12.0 0.0 46 6 47179.61 341.22 12 74.4 60.8 11.9 0.0 48 5 46427.22 341.16 12 71.3 59.9 11.8 0.0 50 4 45589.64 341.10 12 67.8 58.9 11.8 0.0 52 4 44681.39 341,03 12 64.1 57.8 11.7 0,0 54 3 43714.99 340.96 12 60.2 56.6 11.5 0.0 56 3 42701.21 340.88 11 56.2 55.3 11.4 0.0 58 2 41649.37 340.80 11 52.1 53.9 11.3 0.0 60 2 40567.50 340.72 11 48.0 52.5 11.2 0.0 62 2 39462.55 340.63 11 43.9 50.9 11.0 0.0 64 1 38340.52 340.54 11 39.8 49.3 10.9 0.0 66 1 37206.61 340.46 11 35.7 47.6 10.8 0.0 68 1 36065.33 340.37 11 31.8 45.8 10.6 0.0 70 1 34920.58 340.27 10 28.0 43.9 10.5 0.0 72 1 33775.75 340.18 10 24.3 41.8 10.3 0.0 74 1 32633.81 340.09 10 20.8 39.7 10.2 0.0 76 1 31497.33 340.00 10 17.4 37.5 10.0 0.0 78 1 30368.56 339.90 10 14.3 35.0 9.8 0.0 80 0 29249.49 339.81 10 11.3 32.4 9.7 0.0 82 0 28141.85 339.72 9 8.6 29.6 9.5 0.0 84 0 27151.60 339.63 6 6.4 26.8 9.3 0.0 70 60 50 40 m w ?a w 30 0 20 10 0 GRAPHED DATA FOR 100 YEAR STORM Hydrographs 0 10 20 30 40 50 60 Time (min) STAGE-DISCHARGE FUNCTION 342.00 341.00 340.00 F 339.00 w c7 a v~) 338.00 337.00 336.00 335.00 0 1 2 3 4 5 6 7 8 9 10 11 12 13 DISCHARGE (cfs) DRY-POND-3. xis 1/5/99 Riprap Velocity Dissipator Pad DRYPOND #3 LOT 8 - PARAMOUNT CENTER Morrisville, North Carolina Design Storm: 10-year BACKGROUND: Use the E&S Control Planning & Design Manual, Section 8.06. REFERENCE: (NCDEHNR, 1993) Step 1. Minimum Tailwater Condition Step 2. D-o = 15 in. D-o = 1.25 ft. Q-10 = 9.74 cfs (from Chainsaw Routing Sheet) V= 7.9 fps d-50 = 0.5 ft. Figure 8.06 a L-a = 12 ft. Figure 8.06 a Step 3. 3*D-o = 3.75 ft. Use: 4 ft W = 13.25 ft. Use: 14 ft Step 4. d-max 0.75 ft. Maximum Stone Diameter (1.5*d-50) d-max 9 in. Class "B" Rip-Rap Step 5. Thickness = 1.1 ft. Apron Thickness With Filter Fabric (1.5*d-50) Thickness = 14 in. Use: 18 in TERMINOLOGY: Q10 = 10-Year Design Storm, Peak Discharge, (cfs) D-o = Pipe Diameter, (in. & ft.) d-50 = Mean Stone Diameter of Rip-Rap, (ft.) L-a = Length of Rip-Rap Apron, (ft.) 3*D-o = Width of Rip-Rap Apron @ Pipe Outlet, (ft.) W = Width of Rip-Rap Apron @ End of Apron, (ft.) d-max = Maximum Stone Diameter of Rip-Rap, (ft. & in.) Thickness = Thickness of Rip-Rap Apron With Filter Fabric, (ft. &in.) DSAtlantic WET POND DESIGN Lot 8 - Paramount Center Morrisville, North Carolina Project No.: LIC037.000 Watershed Data Hydrograph Formulation Stage-Storage Function Pond Volume Calculation Chainsaw Routing for the 10-year storm Drawdown Calculation Graphed Data for the 10-year storm Chainsaw Routing for the 100-year storm Graphed Data for the 100-year storm Outlet Protection CARpI?' ,? ?° ?ESSi tiq Q4 0? SEAL = 072092 IGI fill; WET-POND.xfs 1/5/99 WATERSHED DATA Lot 8 - Paramount Center - Wet Pond WATERSHED No. DRAINAGE AR Measure No.I Measure No.2 (ACRES) (ACRES) EA Measure No.3 Average (ACRES) (ACRES) 1 1.92 1.88 1.90 1.90 WATERSHED No. HYDRAULIC LENGTH (FT) VERTICAL RELIEF (FT) 1 445 24 WATERSHED No. 1 ESTIMATION OF IMPE 1 Watershed Area Pavement Area RVIOUSNESS Building Area % Imperv. 1 1.90 ac 1.36 ac 0.00 ac * 71.58% WET-POND.xis 1/5/99 BACKGROUND: REFERENCES: SOLUTION - Qp: HYDROGRAPH FORMULATION Lot 8 - Paramount Center - Wet Pond Use the Rational Method (Malcom, 1991; Wanielista, 1990) Use the Kirpich Equation & the Rational Method L = 445 ft H = 24 ft g = 195 (10 year h = 22 storm) A = 1.90 acres C = 0.68 SOLUTION - Tp: Tc = 5.0 minutes I = 7.22 in/hr QP,o = 9 cfs I = 9.67 in/hr QP1oo = 12 cfs INPUT OUTPUT Pn6 = 3.90 in (10 Year Storm) S= 4.49 in CN = 69 Q* = 1.20 in TP10 = 10.7 minutes Pn6 = 5.80 in (100 Year Storm) Q* = 2.56 in TP100 = 16.9 minutes TERMINOLOGY g = 290 (100 year h = 25 storm) L = Hydraulic Length, (ft) H = Vertical Relief, (ft) g = Statistical Variable h = Statistical Variable A = Watershed Area, (acres) C = Composite Runoff Coefficient Pn6 = Precipitation from 6 hr storm (in) CN = Curve Number Tc = Time of Concentration, (minutes) I = Rainfall Intensity, (in/hr) Qp = Peak Discharge, (cfs) S = Ultimate Soil Storage, (in) Q* = Runoff Depth, (in) Tp = Time to Peak, (minutes) WET-POND.xls 1/5/99 STAGE-STORAGE FUNCTION Lot 8 - Paramount Center - Wet Pond 1 2 3 4 5 6 7 8 Y X CONTOUR CONTOUR INCR ACCUM Z In S In Z Z est AREA VOLUME VOLUME STAGE sq ft cu ft cu ft ft ft 326 1334 0 0 328 2818 4152 4152 2 8.3313 0.6931 2.01 330 4687 7505 11657 4 9.3637 1.3863 3.93 332 6354 11041 22698 6 10.0300 1.7918 6.06 STAGE-STORAGE FUNCTION. S=Ks*Zb where: b = 1.54 and KS = 1414 Stage-Storage Function 18 16 14 12 10 U) C _ 8 6 4 2 0 0.5 WET-POND.xIs 1.0 1.5 In Z 2.0 1/5/99 POND VOLUME CALCULATIONS Woodlake Center - Lot 4: Project No. LI0004.010 CALCULATE IMPERVIOUS AREA: Drainage area = 1.90 ac. Impervious area = 1.36 ac. Percent Impervious = 71.58% FIND SA/DA FOR PERMANENT POOL SIZING: Assume 85% Pollutant Removal Efficiency and 6 foot permanent pool depth Use Table 51.1 in Stormwater Management Guidance Manual and interpolate. SA/DA = 2.75% For Depth of Pool= 3 ft FIND REQUIRED SURFACE AREA: Surface Area = SA/DA x Drainage Area Surface Area = 0.05 ac. or 2276 sf. FIND VOLUME TO BE CONTROLLED FROM 1" STORM Rv = 0.69 DA = 1.90 ac Volume = Rv x 1" x Drainage Area = 0.11 ac.-ft. or 4786 cf. TERMINOLOGY: P = Precipitation Depth, (in) S = Ultimate Soil Storage, (in) CN = Curve Number Q" = Runoff Depth, (in) CHAINSAW ROUTING FOR 10-YEAR STORM (REF: Malcom, 1991) COMPUTED RESULTS Normal Surface Area = 0.09 ac Peak Stage = 330.47 ft Maximum Surface Area = 0.11 ac Rise = 1.47 ft Peak Outflow = 2.71 cfs INPUT Hydrograph Results: Riser.- Nr = 1 Top of Dam: 332.00 ft Qp = 9 cfs Lr = 3 ft Barrel: Tp = 10.7 min Wr = 3 ft Nb = 1 dT = 2 min Cwr = 3.00 Db = 15 in Stage-Storage Results: Cdr = 0.60 Cdb = 0.60 Ks = 1414 Zcr = 330.25 ft Zinv = 326.00 ft b = 1.54 Drawdown Pipe: Emergency Spillway: Zo = 326.0 ft (inv) Cdr = 0.60 L = 0 ft Initial Water Level: D = 1.00 in Zcr = 0.00 ft Z; = 329.00 ft Zcr = 329.00 It Cw = 0.00 OUTPUT 1 2 3 4 5 6 7 8 9 Time T Inflow I Storage S Stage Z Outflow O Riser (weir) Riser (orifice) Barrel Emergency Spillway min cfs cu-ft It cfs cfs cfs cfs cfs i of v.jv Jcy.UU U 0.0 U.U 0.0 u.U 2 1 7679.50 329.00 0 0.0 0.0 0.0 0.0 4 3 7774.08 329.02 0 0.0 0.0 0.0 0.0 6 6 8120.44 329.11 0 0.0 0.0 0.0 0.0 8 8 8790.72 329.28 0 0.0 0.0 0.0 0.0 10 9 9747.61 329.50 0 0.0 0.0 0.0 0.0 12 9 10856.98 329.76 0 0.0 0.0 0.0 0.0 14 7 11933.16 329.99 0 0.0 0.0 0.0 0.0 16 6 12813.57 330.18 0 0.0 0.0 0.0 0.0 18 5 13503.32 330.33 1 0.6 12.1 11.4 0.0 20 4 13973.32 330.43 2 2.0 18.1 11.5 0.0 22 3 14159.32 330.46 3 2.7 20.0 11.6 0.0 24 2 14171.96 330.47 3 2.7 20.1 11.6 0.0 26 2 14106.96 330.45 2 2.5 19.5 11.5 0.0 28 1 14015.26 330.43 2 2.1 18.6 11.5 0.0 30 1 13919.66 330.41 2 1.8 17.6 11.5 0.0 32 1 13829.35 330.40 1 1.5 16.5 11.5 0.0 34 1 13747.57 330.38 1 1.2 15.5 11.4 0.0 36 1 13674.97 330.36 1 1.0 14.6 11.4 0.0 38 0 13611.17 330.35 1 0.9 13.7 11.4 0.0 40 0 13555.37 330.34 1 0.7 12.9 11.4 0.0 42 0 13506.68 330.33 1 0.6 12.1 11.4 0.0 44 0 13464.24 330.32 0 0.5 11.4 11.3 0.0 46 0 13427.23 330.31 0 0.4 10.8 11.3 0.0 48 0 13394.93 330.31 0 0.4 10.2 11.3 0.0 50 0 13366.73 330.30 0 0.3 9.6 11.3 0.0 52 0 13342.06 330.29 0 0.3 9.1 11.3 0.0 54 0 13320.45 330.29 0 0.2 8.6 11.3 0.0 56 0 13301.49 330.29 0 0.2 8.2 11.3 0.0 58 0 13284.83 330.28 0 0.2 7.8 11.3 0.0 60 0 13270.16 330.28 0 0.1 7.4 11.3 0.0 62 0 13257.21 330.28 0 0.1 7.1 11.3 0.0 64 0 13245.77 330.27 0 0.1 6.7 11.3 0.0 66 0 13235.63 330.27 0 0.1 6.4 11.3 0.0 68 0 13226.64 330.27 0 0.1 6.1 11.3 0.0 70 0 13218.64 330.27 0 0.1 5.9 11.3 0.0 72 0 13211.50 330.27 0 0.1 5.6 11.3 0.0 74 0 13205.13 330.27 0 0.1 5.4 11.3 0.0 76 0 13199.42 330.26 0 0.0 5.2 11.3 0.0 78 0 13194.30 330.26 0 0.0 5.0 11.3 0.0 80 0 13189.69 330.26 0 0.0 4.8 11.3 0.0 WET-POND. x/s 1/&99 DRAWDOWN CALCULATIONS Lot 8 - Paramount Center - Wet Pond Storage Pool Drawdown Pond must detain the first 1" of runoff and release it in 2 to 5 days INPUT Number of Drains = 1 Starting Water Elevation = 330.25 ft Diameter of Drains = 1.0 in Ending Water Elevation = 329.00 ft Orifice Coefficient = 0.60 ft Average Head = 0.63 ft Elevation of Drains = 329.00 ft OUTPUT By the Orifice Equation: Average Flow = 0.02 cfs Vol of Storage Required = 4786 cf Volume of Storage = 5452 cf OK Length of Drawdown = 262550 sec or 3.04 days OK Permanent Pool Drawdown Bottom drain must completely drain pond in less than 24 hours INPUT Number of Drains = 1 Starting Water Elevation = 329.00 ft Diameter of Drains = 8.0 in Ending Water Elevation = 326.00 ft Orifice Coefficient = 0.60 ft Average Head = 1.50 ft Elevation of Drains = 326.00 ft OUTPUT By the Orifice Equation: Average Flow = 2.06 cfs Volume of Storage = 7680 cf Length of Drawdown = 3730 sec or 1.04 hours OK 12 10 8 m O7 6 m L u N_ 4 2 0 0 F 3? s _ r o 332.00 GRAPHED DATA FOR 10 YEAR STORM Hydrographs 10 20 30 40 50 Time (min) STAGE-DISCHARGE FUNCTION 331.00 330.00 H 329.00 328.00 L- 0.0 WET-POND. xls 0.5 1.0 1.5 2.0 DISCHARGE (cfs) 2.5 3.0 115199 CHAINSAW ROUTING FOR 100-YEAR STORM (REF: Malcom, 1991) COMPUTED RESULTS Normal Surface Area = 0.09 ac Peak Stage = 330.78 ft Maximum Surface Area = 0.12 ac Rise = 1.78 ft Peak Outflow = 10.30 cfs INPUT Hydrograph Results: Riser: Nr = 1 Top of Dam: 332.00 ft Qp = 12 cfs Lr = 3 ft Barrel: Tp = 16.9 min Wr = 3 ft Nb = 1 dT = 2 min Cwr = 3.00 Db = 15 in Stage-Storage Results: Cdr = 0.60 Cdb = 0.60 Ks = 1414 Zcr = 330.25 ft Zinv = 326.00 ft b = 1.54 Drawdown Pipe: Emergency Spillway: Za = 326.0 ft (inv) Cdr = 0.60 L = 0 ft Initial Water Level: D = 1.00 in Zcr = 0.00 ft Z; = 329.00 ft Zcr = 329.00 ft Cw = 0.00 OUTPUT 1 2 3 4 5 6 7 8 9 Time T Inflow I Storage S Stage Z Outflow O Riser (weir) Riser (orifice) Barrel Emergency Spillway min cfs cu-ft ft cfs cfs cfs cfs cfs - - ?,. N.V V.V u.u u.u 2 0 7679.50 329.00 0 0.0 0.0 0.0 0.0 4 2 7730.50 329.01 0 0.0 0.0 0.0 0.0 6 3 7927.55 329.06 0 0.0 0.0 0.0 0.0 8 6 8345.82 329.17 0 0.0 0.0 0.0 0.0 10 8 9030.37 329.33 0 0.0 0.0 0.0 0.0 12 10 9990.04 329.56 0 0.0 0.0 0.0 0.0 14 12 11196.19 329.83 0 0.0 0.0 0.0 0.0 16 12 12586.65 330.13 0 0.0 0.0 0.0 0.0 18 12 14074.16 330.45 2 2.3 19.2 11.5 0.0 20 12 15277.56 330.69 8 7.9 28.7 11.9 0.0 22 7 15715.65 330.78 10 10.3 31.4 12.0 0.0 24 6 15377.51 330.71 8 8.4 29.4 11.9 0.0 26 6 15139.99 330.66 7 7.1 27.8 11.9 0.0 28 5 14944.72 330.62 6 6.1 26.4 11.8 0.0 30 4 14774.51 330.59 5 5.3 25.2 11.7 0.0 32 3 14622.93 330.56 5 4.6 24.0 11.7 0.0 34 3 14486.77 330.53 4 4.0 22.9 11.7 0.0 36 3 14364.01 330.51 3 3.5 21.9 11.6 0.0 38 2 14253.15 330.48 3 3.0 20.9 11.6 0.0 40 2 14152.91 330.46 3 2.6 19.9 11.6 0.0 42 2 14062.20 330.44 2 2.3 191 11.5 0.0 44 1 13980.08 330.43 2 2.0 18.2 11.5 0.0 46 1 13905.69 330.41 2 1.7 17.4 11.5 0.0 48 1 13838.26 330.40 2 1.5 16.6 11.5 0.0 50 1 13777.12 330.38 1 1.3 15.9 11.4 0.0 52 1 13721.65 330.37 1 1.2 15.2 11.4 0.0 54 1 13671.31 330.36 1 1.0 14.6 11.4 0.0 56 1 13625.60 330.35 1 0.9 13.9 11.4 0.0 58 0 13584.07 330.34 1 0.8 13.3 11.4 0.0 60 0 13546.33 330.34 1 0.7 12.8 11.4 0.0 62 0 13512.01 330.33 1 0.6 12.2 11.4 0.0 64 0 13480.78 330.32 1 0.5 11.7 11.3 0.0 66 0 13452.37 330.32 0 0.5 11.2 11.3 0.0 68 0 13426.49 330.31 0 0.4 10.8 11.3 0.0 70 0 13402.91 330.31 0 0.4 10.3 11.3 0.0 72 0 13381.42 330.30 0 0.3 9.9 11.3 0.0 74 0 13361.82 330.30 0 0.3 9.5 11.3 0.0 76 0 13343.94 330.29 0 0.3 9.2 11.3 0.0 78 0 13327.61 330.29 0 0.2 8.8 11.3 0.0 80 0 13312.69 330.29 0 0.2 8.5 11.3 0.0 82 0 13299.06 330.29 0 0.2 8.1 11.3 0.0 84 0 13286.60 330.28 0 0.2 7.8 11.3 0.0 GRAPHED DATA FOR 100 YEAR STORM Hydrographs 14 12 10 10 20 30 40 Time (min) STAGE-DISCHARGE FUNCTION 50 w u 8 t u a 6 0 4 2 0 0 332.00 331.00 E 330.00 Q H y 329.00 328.00 60 0 1 2 3 4 5 6 7 8 9 10 11 DISCHARGE (cfs) WET-POND.xls 1/5/99 Riprap Velocity Dissipator Pad WET POND LOT 8 - PARAMOUNT CENTER Morrisville, North Carolina Design Storm: 10-year BACKGROUND: Use the E&S Control Planning & Design Manual, Section 8.06. REFERENCE: (NCDENNR, 1993) Step 1. Minimum Tailwater Condition Step 2. D-o = 15 in. D-o = 1.25 ft. Q-10 = 2.71 cfs (from Chainsaw Routing Sheet) V= 2.2 fps d-50 = 0.5 ft. L-a = 8 ft. Step 3. 3*D-o = 3.75 ft. W = 9.25 ft. Step 4. d-max 0.75 ft. d-max 9 in. Step 5. Thickness = 1.1 ft. Thickness = 14 in. TERMINOLOGY: Q10 D-o d-50 L-a 3 * D-o W d-max Thickness Figure 8.06 a Figure 8.06 a Use: 4 ft Use: 10 ft Maximum Stone Diameter (1.5*d-50) Class "B" Rip-Rap Apron Thickness With Filter Fabric (1.5*d-50) Use: 18 in = 10-Year Design Storm, Peak Discharge, (cfs) = Pipe Diameter, (in. & ft.) = Mean Stone Diameter of Rip-Rap, (ft.) = Length of Rip-Rap Apron, (ft.) = Width of Rip-Rap Apron @ Pipe Outlet, (ft.) = Width of Rip-Rap Apron @ End of Apron, (ft.) = Maximum Stone Diameter of Rip-Rap, (ft. & in.) = Thickness of Rip-Rap Apron With Filter Fabric, (ft. &in.) I DSAdantic WET POND DESIGN Lot 8 - Paramount Center Morrisville, North Carolina Project No.: LIC037.000 Watershed Data Hydrograph Formulation Stage-Storage Function Pond Volume Calculation Chainsaw Routing for the 10-year storm Drawdown Calculation Graphed Data for the 10-year storm Chainsaw Routing for the 100-year storm Graphed Data for the 100-year storm Outlet Protection `,11111111 1/DP?F// CARO ? ?QFESS/p?'9 Q SEAL - 022092 ?/?llllrtYAlyP WET-POND.As 1/5/99 WATERSHED DATA Lot 8 - Paramount Center - Wet Pond WATERSHED No. DRAINAGE AR Measure No.I Measure No.2 (ACRES) (ACRES) EA Measure No.3 Average (ACRES) (ACRES) 1 1.92 1.88 1.90 1.90 WATERSHED No. HYDRAULIC LENGTH (FT) VERTICAL RELIEF (FT) 1 445 24 WATERSHED No. ESTIMATION OF IMPE Watershed Area Pavement Area RVIOUSNESS Building Area % Imperv. 1 1.90 ac 1.36 ac 0.00 ac * 71.58% WET-PON D. As 1/5/99 BACKGROUND: REFERENCES: SOLUTION - Qp: INPUT OUTPUT L= 445 ft H= 24 ft Tc = 5.0 minutes g = 195 (10 year h= 22 storm) I= 7.22 in/hr A= 1.90 acres C= 0.68 QP10 = 9 cfs g = 290 (100 year h = 25 storm) SOLUTION - To: 1= 9.67 in/hr QP,oo = 12 cfs INPUT OUTPUT Pn6 = 3.90 in (10 Year Storm) S= 4.49 in CN = 69 Q* = 1.20 in TP10 = 10.7 minutes Pn6 = 5.80 in (100 Year Storm) Q* = 2.56 in TP100 = 16.9 minutes TERMINOLOGY HYDROGRAPH FORMULATION Lot 8 - Paramount Center - Wet Pond Use the Rational Method (Malcom, 1991; Wanielista, 1990) Use the Kirpich Equation & the Rational Method L = Hydraulic Length, (ft) H = Vertical Relief, (ft) g = Statistical Variable h = Statistical Variable A = Watershed Area, (acres) C = Composite Runoff Coefficient Pn6 = Precipitation from 6 hr storm (in) CN = Curve Number Tc = Time of Concentration, (minutes) I = Rainfall Intensity, (in/hr) Qp = Peak Discharge, (cfs) S = Ultimate Soil Storage, (in) Q* = Runoff Depth, (in) Tp = Time to Peak, (minutes) WET-POND.xls 1/5/99 STAGE-STORAGE FUNCTION Lot 8 - Paramount Center - Wet Pond 1 2 3 4 5 6 7 8 Y X CONTOUR CONTOUR INCR ACCUM Z In S In Z Z est AREA VOLUME VOLUME STAGE sq ft Cu k cu ft ft ft 326 1334 0 0 328 2818 4152 4152 2 8.3313 0.6931 2.01 330 4687 7505 11657 4 9.3637 1.3863 3.93 332 6354 11041 22698 6 10.0300 1.7918 6.06 STAGE-STORAGE FUNCTION: S=Ks*Zb where: b = 1.54 and KS = 1414 Stage-Storage Function 18 16 14 12 10 c 8 6 4 2 0 0.5 1.0 1.5 In Z 2.0 WET-POND.xis 1/5/99 POND VOLUME CALCULATIONS Woodlake Center - Lot 4: Project No. LI0004.010 CALCULATE IMPERVIOUS AREA: Drainage area = 1.90 ac. Impervious area = 1.36 ac. Percent Impervious = 71.58% FIND SA/DA FOR PERMANENT POOL SIZING: Assume 85% Pollutant Removal Efficiency and 6 foot permanent pool depth Use Table 51.1 in Stormwater Management Guidance Manual and interpolate. SA/DA = 2.75% For Depth of Pool= 3 ft FIND REQUIRED SURFACE AREA: Surface Area = SA/DA x Drainage Area Surface Area = 0.05 ac. or 2276 sf. FIND VOLUME TO BE CONTROLLED FROM 1" STORM Rv = 0.69 DA = 1.90 ac Volume = Rv x 1" x Drainage Area = 0.11 ac.-ft. or 4786 cf. TERMINOLOGY: P = Precipitation Depth, (in) S = Ultimate Soil Storage, (in) CN = Curve Number Q' = Runoff Depth, (in) CHAINSAW ROUTING FOR 10-YEAR STORM (REF: Malcom, 1991) COMPUTED RESULTS Normal Surface Area = 0.09 ac Peak Stage = 330.47 ft Maximum Surface Area = 0.11 ac Rise = 1.47 ft Peak Outflow = 2.71 cfs INPUT Hydrograph Results: Riser: Nr = 1 Top of Dam: 332.00 ft Qp = 9 cfs Lr = 3 ft Barrel: Tp = 10.7 min Wr = 3 ft Nb = 1 dT = 2 min Cwr = 3.00 Db = 15 in Stage-Storage Results: Cdr = 0.60 Cdb = 0.60 Ks = 1414 Zcr = 330.25 ft Zinv = 326.00 It b = 1.54 Drawdown Pipe: Emergency Spillway: Za = 326.0 ft (inv) Cdr = 0.60 L = 0 ft Initial Water Level: D = 1.00 in Zcr = 0.00 ft Z; = 329.00 ft Zcr = 329.00 it Cw = 0.00 OUTPUT 1 2 3 4 5 6 7 8 9 Time T Inflow I Storage S Stage Z Outflow O Riser (weir) Riser (orifice) Barrel Emergency Spillway min cfs cu-ft It cfs cfs CIS cfs cfs 0 0 7679.00 329.0u 0 u.u 0.0 0.0 0.0 2 1 7679.50 329.00 0 0.0 0.0 0.0 0.0 4 3 7774.08 329.02 0 0.0 0.0 0.0 0.0 6 6 8120.44 329.11 0 0.0 0.0 0.0 0.0 8 8 8790.72 329.28 0 0.0 0.0 0.0 0.0 10 9 9747.61 329.50 0 0.0 0.0 0.0 0.0 12 9 10856.98 329.76 0 0.0 0.0 0.0 0.0 14 7 11933.16 329.99 0 0.0 0.0 0.0 0.0 16 6 12813.57 330.18 0 0.0 0.0 0.0 0.0 18 5 13503.32 330.33 1 0.6 12.1 11.4 0.0 20 4 13973.32 330.43 2 2.0 18.1 11.5 0.0 22 3 14159.32 330.46 3 2.7 20.0 11.6 0.0 24 2 14171.96 330.47 3 2.7 20.1 11.6 0.0 26 2 14106.96 330.45 2 2.5 19.5 11.5 0.0 28 1 14015.26 330.43 2 2.1 18.6 11.5 0.0 30 1 13919.66 330.41 2 1.8 17.6 11.5 0.0 32 1 13829.35 330.40 1 1.5 16.5 11.5 0.0 34 1 13747.57 330.38 1 1.2 15.5 11.4 0.0 36 1 13674.97 330.36 1 1.0 14.6 11.4 0.0 38 0 13611.17 330.35 1 0.9 13.7 11.4 0.0 40 0 13555.37 330.34 1 0.7 12.9 11.4 0.0 42 0 13506.68 330.33 1 0.6 12.1 11.4 0.0 44 0 13464.24 330.32 0 0.5 11.4 11.3 0.0 46 0 13427.23 330.31 0 0.4 10.8 11.3 0.0 48 0 13394.93 330.31 0 0.4 10.2 11.3 0.0 50 0 13366.73 330.30 0 0.3 9.6 11.3 0.0 52 0 13342.06 330.29 0 0.3 9.1 11.3 0.0 54 0 13320.45 330.29 0 0.2 8.6 11.3 0.0 56 0 13301.49 330.29 0 0.2 8.2 11.3 0.0 58 0 13284.83 330.28 0 0.2 7.8 11.3 0.0 60 0 13270.16 330.28 0 0.1 7.4 11.3 0.0 62 0 13257.21 330.28 0 0.1 7.1 11.3 0.0 64 0 13245.77 330.27 0 01 6.7 11.3 0.0 66 0 13235.63 330.27 0 0.1 6.4 11.3 0.0 68 0 13226.64 330.27 0 0.1 61 11.3 0.0 70 0 13218.64 330.27 0 0.1 5.9 11.3 0.0 72 0 13211.50 330.27 0 0.1 5.6 11.3 0.0 74 0 13205.13 330.27 0 0.1 5.4 11.3 0.0 76 0 13199.42 330.26 0 0.0 5.2 11.3 0.0 78 0 13194.30 330.26 0 0.0 5.0 11.3 0.0 80 0 13189.69 330.26 0 0.0 4.8 11.3 0.0 WET-POND.x/s 115199 DRAWDOWN CALCULATIONS Lot 8 - Paramount Center - Wet Pond Storage Pool Drawdown Pond must detain the first 1" of runoff and release it in 2 to 5 days INPUT Number of Drains = 1 Starting Water Elevation = 330.25 ft Diameter of Drains = 1.0 in Ending Water Elevation = 329.00 ft Orifice Coefficient = 0.60 ft Average Head = 0.63 ft Elevation of Drains = 329.00 ft OUTPUT By the Orifice Equation: Average Flow = 0.02 cfs Vol of Storage Required = 4786 cf Volume of Storage = 5452 cf OK Length of Drawdown = 262550 sec or 3.04 days OK Permanent Pool Drawdown Bottom drain must completely drain pond in less than 24 hours INPUT Number of Drains = 1, Starting Water Elevation = 329.00 ft Diameter of Drains = 8.0 in Ending Water Elevation = 326.00 ft Orifice Coefficient = 0.60 ft Average Head = 1.50 ft Elevation of Drains = 326.00 ft OUTPUT By the Orifice Equation: Average Flow = 2.06 cfs Volume of Storage = 7680 cf Length of Drawdown = 3730 sec or 1.04 hours OK 12 10 8 m 6 M .c u N_ O 4 2 0 III 0 x P ?y?y b f 332.00 331.00 GRAPHED DATA FOR 10 YEAR STORM Hydrographs 10 20 30 40 Time (min) STAGE-DISCHARGE FUNCTION 50 330.00 a N 329.00 328.00 L- 0.0 WET-POND. xls 0.5 1.0 1.5 2.0 2.5 DISCHARGE (cfs) 3.0 1/5/99 CHAINSAW ROUTING FOR 100-YEAR STORM (REF: Malcom, 1991) COMPUTED RESULTS Normal Surface Area = 0.09 ac Peak Stage = 330.78 ft Maximum Surface Area = 0.12 ac Rise = 1.78 ft Peak Outflow = 10.30 cfs INPUT Hydrograph Results: Riser: Nr = 1 Top of Dam: 332.00 ft Qp = 12 cfs Lr = 3 ft Barrel: Tp = 16.9 min Wr = 3 ft Nb = 1 dT = 2 min Cwr = 3.00 Db = 15 in Stage-Storage Results: Cdr = 0.60 Cdb = 0.60 Ks = 1414 Zcr = 330.25 ft Zinv = 326.00 ft b = 1.54 Drawdown Pipe: Emergency Spillway: Zo = 326.0 ft (inv) Cdr = 0.60 L = 0 ft Initial Water Level: D = 1.00 in Zcr = 0.00 ft 4 = 329.00 ft Zcr = 329.00 ft Cw = 0.00 OUTPUT 1 2 3 4 5 6 7 8 9 Time T Inflow I Storage S Stage Z Outflow O Riser (weir) Riser (orifice) Barrel Emergency Spillway min cfs cu-ft It cfs cfs cfs cfs cfs - - „ V.V V.V u.u u.0 2 0 7679.50 329.00 0 0.0 0.0 0.0 0.0 4 2 7730.50 329.01 0 0.0 0.0 0.0 0.0 6 3 7927.55 329.06 0 0.0 0.0 0.0 0.0 8 6 8345.82 329.17 0 0.0 0.0 0.0 0.0 10 8 9030.37 329.33 0 0.0 0.0 0.0 0.0 12 10 9990.04 329.56 0 0.0 0.0 0.0 0.0 14 12 11196.19 329.83 0 0.0 0.0 0.0 0.0 16 12 12586.65 330.13 0 0.0 0.0 0.0 0.0 18 12 14074.16 330.45 2 2.3 19.2 11.5 0.0 20 12 15277.56 330.69 8 7.9 28.7 11.9 0.0 22 7 15715.65 330.78 10 10.3 31.4 12.0 0.0 24 6 15377.51 330.71 8 8.4 29.4 11.9 0.0 26 6 15139.99 330.66 7 7.1 27.8 11.9 0.0 28 5 14944.72 330.62 6 6.1 26.4 11.8 0.0 30 4 14774.51 330.59 5 5.3 25.2 11.7 0.0 32 3 14622.93 330.56 5 4.6 24.0 11.7 0.0 34 3 14486.77 330.53 4 4.0 22.9 11.7 0.0 36 3 14364.01 330.51 3 3.5 21.9 11.6 0.0 38 2 14253.15 330.48 3 3.0 20.9 11.6 0.0 40 2 14152.91 330.46 3 2.6 19.9 11.6 0.0 42 2 14062.20 330.44 2 2.3 19.1 11.5 0.0 44 1 13980.08 330.43 2 2.0 18.2 11.5 0.0 46 1 13905.69 330.41 2 1.7 17.4 11.5 0.0 48 1 13838.26 330.40 2 1.5 16.6 11.5 0.0 50 1 13777.12 330.38 1 1.3 15.9 11.4 0.0 52 1 13721.65 330 37 1 1.2 15.2 11.4 0.0 54 1 13671.31 330.36 1 1.0 14.6 11.4 0.0 56 1 13625.60 330.35 1 0.9 13.9 11.4 0.0 58 0 13584.07 330.34 1 0.8 13.3 11.4 0.0 60 0 13546.33 330.34 1 0.7 12.8 11.4 0.0 62 0 13512.01 330.33 1 0.6 12.2 11.4 0.0 64 0 13480.78 330.32 1 0.5 11.7 11.3 0.0 66 0 13452.37 330.32 0 0.5 11.2 11.3 0.0 68 0 13426.49 330.31 0 0.4 10.8 11.3 0.0 70 0 13402.91 330.31 0 0.4 10.3 11.3 0.0 72 0 13381.42 330.30 0 0.3 9.9 11.3 0.0 74 0 13361.82 330.30 0 0.3 9.5 11.3 0.0 76 0 13343.94 330.29 0 0.3 9.2 11.3 0.0 78 0 13327.61 330.29 0 0.2 8.8 11.3 0.0 80 0 13312.69 330.29 0 0.2 8.5 11.3 0.0 82 0 13299.06 330.29 0 0.2 8.1 11.3 0.0 84 0 13286.60 330.28 0 0.2 7.8 11.3 0.0 14 12 10 v 8 .o t u _N 6 O 4 2 0 0 10 20 30 40 50 Time (min) 60 STAGE-DISCHARGE FUNCTION 332.00 331 00 E 330.00 329.00 328.00 ' i 0 1 2 3 4 5 6 7 8 9 10 11 DISCHARGE (cfs) WET-PO N D. xls 1/5/99 GRAPHED DATA FOR 100 YEAR STORM Hydrographs Riprap Velocity Dissipator Pad WET POND LOT 8 - PARAMOUNT CENTER Morrisville, North Carolina Design Storm: 10-year BACKGROUND: Use the E&S Control Planning & Design Manual, Section 8.06. REFERENCE: (NCDEHNR, 1993) Step 1. Minimum Tailwater Condition Step 2. D-o = 15 in. D-o = 1.25 ft. Q-10 = 2.71 cfs (from Chainsaw Routing Sheet) V= 2.2 fps d-50 = 0.5 ft. Figure 8.06 a L-a = 8 ft. Figure 8.06 a Step 3. 3*D-o = 3.75 ft. W = 9.25 ft. Step 4. d-max 0.75 ft. d-max 9 in. Step 5. Thickness = 1.1 ft. Thickness = 14 in. b Use: 4 ft Use: 10 ft Maximum Stone Diameter (1.5*d-50) Class "B" Rip-Rap Apron Thickness With Filter Fabric (1.5*d-50) Use: 18 in TERMINOLOGY: Q10 = 10-Year Design Storm, Peak Discharge, (cfs) D-o = Pipe Diameter, (in. & ft.) d-50 = Mean Stone Diameter of Rip-Rap, (ft.) L-a = Length of Rip-Rap Apron, (ft.) 3*D-o = Width of Rip-Rap Apron @ Pipe Outlet, (ft.) W = Width of Rip-Rap Apron @ End of Apron, (ft.) d-max = Maximum Stone Diameter of Rip-Rap, (ft. & in.) Thickness = Thickness of Rip-Rap Apron With Filter Fabric, (ft. &in.) DSAdantic WET POND DESIGN Lot 8 - Paramount Center Morrisville, North Carolina Project No.: LIC037.000 Watershed Data Hydrograph Formulation Stage-Storage Function Pond Volume Calculation Chainsaw Routing for the 10-year storm Drawdown Calculation Graphed Data for the 10-year storm Chainsaw Routing for the 100-year storm Graphed Data for the 100-year storm Outlet Protection N CARD essi 0 SEAL n/0 22092 M. M P? .. 10,- r,r WET-POND.As 1/5/99 WATERSHED DATA Lot 8 - Paramount Center - Wet Pond WATERSHED No. DRAINAGE AR Measure No.I Measure No.2 (ACRES) (ACRES) EA Measure No.3 Average (ACRES) (ACRES) 1 1.92 1.88 1.90 1.90 WATERSHED No. HYDRAULIC LENGTH (FT) VERTICAL RELIEF (FT) 1 445 24 WATERSHED No. ESTIMATION OF IMPE Watershed Area Pavement Area RVIOUSNESS Building Area % Imperv. 1 1.90 ac 1.36 ac 0.00 ac * 71.58% WET-PON D.xls 1/5/99 BACKGROUND: REFERENCES: SOLUTION - Qp. HYDROGRAPH FORMULATION Lot 8 - Paramount Center - Wet Pond Use the Rational Method (Malcom, 1991; Wanielista, 1990) Use the Kirpich Equation & the Rational Method OUTPUT SOLUTION - To: L = 445 ft H = 24 ft g = 195 (10 year h = 22 storm) A = 1.90 acres C = 0.68 Tc = 5.0 minutes I = 7.22 in/hr o = 9 cfs I = 9.67 in/hr QP1oo = 12 cfs INPUT OUTPUT Pn6 = 3.90 in (10 Year Storm) S= 4.49 in CN = 69 Q* = 1.20 in TP10 = 10.7 minutes Pn6 = 5.80 in (100 Year Storm) Q* = 2.56 in TP,oo = 16.9 minutes TERMINOLOGY g = 290 (100 year h = 25 storm) L = Hydraulic Length, (ft) H = Vertical Relief, (ft) g = Statistical Variable h = Statistical Variable A = Watershed Area, (acres) C = Composite Runoff Coefficient Pri6 = Precipitation from 6 hr storm (in) CN = Curve Number Tc = Time of Concentration, (minutes) I = Rainfall Intensity, (in/hr) Qp = Peak Discharge, (cfs) S = Ultimate Soil Storage, (in) Q* = Runoff Depth, (in) Tp = Time to Peak, (minutes) WET-POND.xIs 1/5/99 STAGE-STORAGE FUNCTION Lot 8 - Paramount Center - Wet Pond 1 2 3 4 5 6 7 8 Y X CONTOUR CONTOUR INCR ACCUM Z In S In Z Z est AREA VOLUME VOLUME STAGE sq ft cu ft cu ft ft ft 326 1334 0 0 328 2818 4152 4152 2 8.3313 0.6931 2.01 330 4687 7505 11657 4 9.3637 1.3863 3.93 332 6354 11041 22698 6 10.0300 1.7918 6.06 STAGE-STORAGE FUNCTION: S=Ks*Zb where: b = 1.54 and Stage-Storage Function 18 16 14 12 10 c 8 6 4 2 0 KS = 1414 0.5 1.0 1.5 In Z L.V WET-POND.xls 1/5/99 POND VOLUME CALCULATIONS Woodlake Center - Lot 4: Project No. LI0004.010 CALCULATE IMPERVIOUS AREA: Drainage area = 1.90 ac. Impervious area = 1.36 ac. Percent Impervious = 71.58% FIND SA/DA FOR PERMANENT POOL SIZING: Assume 85% Pollutant Removal Efficiency and 6 foot permanent pool depth Use Table 51.1 in Stormwater Management Guidance Manual and interpolate. SA/DA = 2.75% For Depth of Pool= 3 ft FIND REQUIRED SURFACE AREA: Surface Area = SA/DA x Drainage Area Surface Area = 0.05 ac. or 2276 sf. FIND VOLUME TO BE CONTROLLED FROM 1" STORM Rv = 0.69 DA = 1.90 ac Volume = Rv x 1" x Drainage Area = 0.11 ac.-ft. or 4786 cf. TERMINOLOGY: P = Precipitation Depth, (in) S = Ultimate Soil Storage, (in) CN = Curve Number Q* = Runoff Depth, (in) CHAINSAW ROUTING FOR 10-YEAR STORM (REF: Malcom, 1991) COMPUTED RESULTS Normal Surface Area = 0.09 ac Peak Stage = 330.47 ft Maximum Surface Area = 0.11 ac Rise = 1.47 ft Peak Outflow = 2.71 cfs INPUT Hydrograph Results: Riser: Nr = 1 Top of Dam: 332.00 ft Qp = 9 cfs Lr = 3 ft Barrel: Tp = 10.7 min Wr = 3 ft Nb = 1 dT = 2 min Cwr = 3.00 Db = 15 in Stage-Storage Results: Cdr = 0.60 Cdb = 0.60 Ks = 1414 Zcr = 330.25 ft Zinv = 326.00 ft b = 1.54 Drawdown Pipe: Emergency Spillway: Zo = 326.0 ft (inv) Cdr = 0.60 L = 0 ft Initial Water Level: D = 1.00 in Zcr = 0.00 ft Z; = 329.00 ft Zcr = 329.00 ft Cw = 0.00 OUTPUT 1 2 3 4 5 6 7 8 9 Time T Inflow I Storage S Stage Z Outflow O Riser (weir) Riser (orifice) Barrel Emergency Spillway min cfs cu-ft ft cfs cfs cfs cfs cfs V W IQIV.ov JZV.UU U U.U U.u U.U U.U 2 1 7679.50 329.00 0 0.0 0.0 0.0 0.0 4 3 7774.08 329.02 0 0.0 0.0 0.0 0.0 6 6 8120.44 329.11 0 0.0 0.0 0.0 0.0 8 8 8790.72 329.28 0 0.0 0.0 0.0 0.0 10 9 9747.61 329.50 0 0.0 0.0 0.0 0.0 12 9 10856.98 329.76 0 0.0 0.0 0.0 0.0 14 7 11933.16 329.99 0 0.0 0.0 0.0 0.0 16 6 12813.57 330.18 0 0.0 0.0 0.0 0.0 18 5 13503.32 330.33 1 0.6 12.1 11.4 0.0 20 4 13973.32 330.43 2 2.0 18.1 11.5 0.0 22 3 14159.32 330.46 3 2.7 20.0 11.6 0.0 24 2 14171.96 330.47 3 2.7 20.1 11.6 0.0 26 2 14106.96 330.45 2 2.5 19.5 11.5 0.0 28 1 14015.26 330.43 2 21 18.6 11.5 0,0 30 1 13919.66 330.41 2 1.8 17.6 11.5 0.0 32 1 13829.35 330.40 1 1.5 16.5 11.5 0.0 34 1 13747.57 330.38 1 1.2 15.5 11.4 0.0 36 1 13674.97 330.36 1 1.0 14.6 11.4 0.0 38 0 13611.17 330.35 1 0.9 13.7 11.4 0.0 40 0 13555.37 330.34 1 0.7 12.9 11.4 0.0 42 0 13506.68 330.33 1 0.6 12.1 11.4 0.0 44 0 13464.24 330.32 0 0.5 11.4 11.3 0.0 46 0 13427.23 330.31 0 0.4 10.8 11.3 0.0 48 0 13394.93 330.31 0 0.4 10.2 11.3 0.0 50 0 13366.73 330.30 0 0.3 9.6 11.3 0.0 52 0 13342.06 330.29 0 0.3 9.1 11.3 0.0 54 0 13320.45 330.29 0 0.2 8.6 11.3 0.0 56 0 13301.49 330.29 0 0.2 8.2 11.3 0.0 58 0 13284.83 330.28 0 0.2 7.8 11.3 0.0 60 0 13270.16 330.28 0 0.1 7.4 11.3 0.0 62 0 13257.21 330.28 0 0.1 7.1 11.3 0.0 64 0 13245.77 330.27 0 0.1 6.7 11.3 0.0 66 0 13235.63 330.27 0 0.1 6.4 11.3 0.0 68 0 13226.64 330.27 0 0.1 6.1 11.3 0.0 70 0 13218.64 330.27 0 0.1 5.9 11.3 0.0 72 0 13211.50 330.27 0 0.1 5.6 11.3 0.0 74 0 13205.13 330.27 0 0.1 5.4 11.3 0.0 76 0 13199.42 330.26 0 0.0 5.2 11.3 0.0 78 0 13194.30 330.26 0 0.0 5.0 11.3 0.0 80 0 13189.69 330.26 0 0.0 4.8 11.3 0.0 WET-POND.xIs 115,99 DRAWDOWN CALCULATIONS Lot 8 - Paramount Center - Wet Pond Storage Pool Drawdown Pond must detain the first 1" of runoff and release it in 2 to 5 days INPUT Number of Drains = 1 Starting Water Elevation = 330.25 ft Diameter of Drains = 1.0 in Ending Water Elevation = 329.00 ft Orifice Coefficient = 0.60 ft Average Head = 0.63 ft Elevation of Drains = 329.00 ft OUTPUT By the Orifice Equation: Average Flow = 0.02 cfs Vol of Storage Required = 4786 cf Volume of Storage = 5452 cf OK Length of Drawdown = 262550 sec or 3.04 days OK Permanent Pool Drawdown Bottom drain must completely drain pond in less than 24 hours INPUT Number of Drains = 1 Starting Water Elevation = 329.00 ft Diameter of Drains = 8.0 in Ending Water Elevation = 326.00 ft Orifice Coefficient = 0.60 ft Average Head = 1.50 ft Elevation of Drains = 326.00 ft OUTPUT By the Orifice Equation: Average Flow = 2.06 cfs Volume of Storage = 7680 cf Length of Drawdown = 3730 sec or 1.04 hours OK 12 10 ? 8 m T 6 A t u a 0 4 2 0 0 V ?c F 7a` s t 332.00 331.00 GRAPHED DATA FOR 10 YEAR STORM Hydrographs 10 20 30 40 Time (min) STAGE-DISCHARGE FUNCTION bU 330.00 329.00 328.00 L- 0.0 WET-POND. xls 0.5 1.0 1.5 2.0 DISCHARGE (cfs) 2.5 3.0 1/5/99 CHA/NSAW ROUTING FOR 100-YEAR STORM (REF: Malcom, 1991) COMPUTED RESULTS Normal Surface Area = 0.09 ac Peak Stage = 330.78 ft Maximum Surface Area = 0.12 ac Rise = 1.78 ft Peak Outflow = 10.30 cfs INPUT Hydrograph Results: Riser. Nr = 1 Top of Dam: 332.00 ft Qp = 12 cfs Lr = 3 ft Barrel: Tp = 16.9 min Wr = 3 ft Nb = 1 dT = 2 min Cwr = 3.00 Db = 15 in Stage-Storage Results: Cdr = 0.60 Cdb = 0.60 Ks = 1414 Zcr = 330.25 ft Zinv = 326.00 ft b = 1.54 Drawdown Pipe: Emergency Spillway: Za = 326.0 ft (inv) Cdr = 0.60 L = 0 ft Initial Water Level: D = 1.00 in Zcr = 0.00 ft Z; = 329.00 ft Zcr = 329.00 ft Cw = 0.00 OUTPUT 1 2 3 4 5 6 7 8 9 Time T Inflow I Storage S Stage Z Outflow O Riser (weir) Riser (orifice) Barrel Emergency Spillway min cfs cu-ft ft cfs cfs cfs cfs cfs - - ,,.,, V.V U.U u.u 2 0 7679.50 329.00 0 0.0 0.0 0.0 0.0 4 2 7730.50 329.01 0 0.0 0.0 0.0 0.0 6 3 7927.55 329.06 0 0.0 0.0 0.0 0.0 8 6 8345.82 329.17 0 0.0 0.0 0.0 0.0 10 8 9030.37 329.33 0 0.0 0.0 0.0 0.0 12 10 9990.04 329.56 0 0.0 0.0 0.0 0.0 14 12 11196.19 329.83 0 0.0 0.0 0.0 0.0 16 12 12586.65 330.13 0 0.0 0.0 0.0 0.0 18 12 14074.16 330.45 2 2.3 19.2 11.5 0.0 20 12 15277.56 330.69 8 7.9 28.7 11.9 0.0 22 7 15715.65 330.78 10 10.3 31.4 12.0 0.0 24 6 15377.51 330.71 8 8.4 29.4 11.9 0.0 26 6 15139.99 330.66 7 7.1 27.8 11.9 0.0 28 5 14944.72 330.62 6 6.1 26.4 11.8 0.0 30 4 14774.51 330.59 5 5.3 25.2 11.7 0.0 32 3 14622.93 330.56 5 4.6 24.0 11.7 0.0 34 3 14486.77 330.53 4 4.0 22.9 11.7 0.0 36 3 14364.01 330.51 3 3.5 21.9 11.6 0.0 38 2 14253.15 330.48 3 3.0 20.9 11.6 0.0 40 2 14152.91 330.46 3 2.6 19.9 11.6 0.0 42 2 14062.20 330.44 2 2.3 19.1 11.5 0.0 44 1 13980.08 330.43 2 2.0 18.2 11.5 0.0 46 1 13905.69 330.41 2 1.7 17.4 11.5 0.0 48 1 13838.26 330.40 2 1.5 16.6 11.5 0.0 50 1 13777.12 330.38 1 1.3 15.9 11.4 0.0 52 1 13721.65 330.37 1 1.2 15.2 11.4 0.0 54 1 13671.31 330.36 1 1.0 14.6 11.4 0.0 56 1 13625.60 330.35 1 0.9 13.9 11.4 0.0 58 0 13584.07 330.34 1 0.8 13.3 11.4 0.0 60 0 13546.33 330.34 1 0.7 12.8 11.4 0.0 62 0 13512.01 330.33 1 0.6 12.2 11.4 0.0 64 0 13480.78 330.32 1 0.5 11.7 11.3 0.0 66 0 13452.37 330.32 0 0.5 11.2 11.3 0.0 68 0 13426.49 330.31 0 0.4 10.8 11.3 0.0 70 0 13402.91 330.31 0 0.4 10.3 11.3 0.0 72 0 13381.42 330.30 0 0.3 9.9 11.3 0,0 74 0 13361.82 330.30 0 0.3 9.5 11.3 0.0 76 0 13343.94 330.29 0 0.3 9.2 11.3 0.0 78 0 13327.61 330.29 0 0.2 8.8 11.3 0.0 80 0 13312.69 330.29 0 0.2 8.5 11.3 0.0 82 0 13299.06 330.29 0 0.2 8.1 11.3 0.0 84 0 13266.60 330.28 0 0.2 7.8 11.3 0.0 GRAPHED DATA FOR 100 YEAR STORM Hydrographs 12 10 N u a 8 L R r a 6 0 4 2 0 ;lad a: s 337.5 i 0 332.00 F 331.00 330.00 Q WET-POND.xls 329.00 328.00 10 20 30 40 50 Time (min) STAGE-DISCHARGE FUNCTION 60 0 1 2 3 4 5 6 7 8 9 10 11 DISCHARGE (cfs) 1/5/99 Riprap Velocity Dissipator Pad WET POND LOT 8 - PARAMOUNT CENTER Morrisville, North Carolina Design Storm: 10-year BACKGROUND: Use the E&S Control Planning & Design Manual, Section 8.06. REFERENCE: (NCDEHNR, 1993) Step 1. Minimum Tailwater Condition Step 2. D-o = 15 in. D-o = 1.25 ft. Q-10 = 2.71 cfs (from Chainsaw Routing Sheet) V= 2.2 fps d-50 = 0.5 ft. Figure 8.06 a L-a = 8 ft. Figure 8.06 a Step 3. 3*D-o = 3.75 ft. Use: 4 ft W = 9.25 ft. Use: 10 ft Step 4. d-max 0.75 ft. Maximum Stone Diameter (1.5*d-50) d-max 9 in. Class "B" Rip-Rap Step 5. Thickness = 1.1 ft. Apron Thickness With Filter Fabric (1.5*d-50) Thickness = 14 in. Use: 18 in TERMINOLOGY: Q10 = 10-Year Design Storm, Peak Discharge, (cfs) D-o = Pipe Diameter, (in. & ft.) d-50 = Mean Stone Diameter of Rip-Rap, (ft.) L-a = Length of Rip-Rap Apron, (ft.) 3*D-o = Width of Rip-Rap Apron @ Pipe Outlet, (ft.) W = Width of Rip-Rap Apron @ End of Apron, (ft.) d-max = Maximum Stone Diameter of Rip-Rap, (ft. & in.) Thickness = Thickness of Rip-Rap Apron With Filter Fabric, (ft. &in.) V D A D in. 69.57143 0.01 0.14 0.12 13.91429 0.05 0.7 0.6 6.957143 0.1 1.4 1.2 3.478571 0.2 2.8 2.4 2.319048 0.3 4.2 3.6 1.739286 0.4 5.6 4.8 1.391429 0.5 7 6 1.159524 0.6 8.4 7.2 _ ??/ ass fe *; k /?? ?o 4 4 3 (Of vr"Cp ? U-1c; qovaf,c-,, *f"cj- j n ?? l ?F 5 s? l55 y?(x? ? 1? g,? y l??ouyGc s /l rrar? bE ou.??ei? NA( ca is s;? 2? ?-?s w?c}cccC atik?''u.?c ... tiDI'cw??- • ?/a ?,ru,Lai (1iw sn?1 SGtuk'? 4AL 'q I^4" State of North Carolina Department of Environment and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor Wayne McDevitt, Secretary A. Preston Howard, Jr., P.E., Director NC ENR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES November 4, 1998 Wake County DWQProject # 980816 APPROVAL of 401 Water Quality Certification and ADDITIONAL CONDITIONS and Neuse River Buffer Rules Weeks Kichtin 1800 Perimeter Park Drive; Suite 200 Morrisville, NC 27560 Dear Sirs: You have our approval, in accordance with the attached conditions and those listed below, to place fill material in 0.37 acres of wetlands or waters for the purpose of constructing a commercial development at Paramount Center, as you described in your application dated August 14, 1998. After reviewing your application, we have decided that this fill is covered by General Water Quality Certification Numbers 3101, 3103 and 3108. These certifications allow you to use Nationwide Permit Numbers 12, 14 and 26 when the Corps of Engineers issues them. This approval is also valid for the Neuse River buffer rules (15A NCAC 2B .033). In addition, you should get any other federal, state or local permits before you go ahead with your project including (but not limited to) Sediment and Erosion Control, Coastal Stormwater, Non-Discharge and Water Supply Watershed regulations. This approval will expire when the accompanying 404 or CAMA permit expires unless otherwise specified in the General Certification. This approval is only valid for the purpose and design that you described in your application except as modified below. If you change your project, you must notify us and you may be required to send us a new application.. If the property is sold, the new owner must be given a copy of this Certification and approval letter and is thereby responsible for complying with all conditions. If total wetland fills for this project (now or in the future) exceed one acre, compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h) (6) and (7). For this approval to be valid, you must follow the conditions listed in the attached certification and any additional conditions listed below. 1. Deed notifications or similar mechanisms shall be placed on all lots with remaining jurisdictional wetlands and waters or areas within 50 feet of all streams and ponds to notify the state in order to assure compliance for future wetland and/or water impact. These mechanisms shall be put in place within 30 days of the date of this letter or the issuance of the 404 Permit (whichever is later). 2. An additional condition is that a final, written stormwater plan including a dry detention basins and stream buffers which meet the 85% TSS removal standard must be approved by DWQ before wetland (or stream) impacts occur. If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition, which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, P.O. Box 27447, Raleigh, N.C. 27611- 7447. This certification and its conditions are final and binding unless you ask for a hearing. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please telephone John Domey at 919-733-1786. pirton oward, Jr. P.E. Attachment cc: Wilmington District Corps of Engineers Corps of Engineers Raleigh Field Office Raleigh DWQ Regional Office John Domey Central Files Alan Maness; DS Atlantic 980816.1tr Division of Water (duality • Non-Discharge Branch 4401 Reedy Creek Rd., Raleigh, NC 27607 Telephone 919-733-1786 FAX # 733-9959 An Equal Opportunity Affirmative Action Employer • 50% recycled/10% post consumer paper 10/15/98 13:57 DSRTLRNTIC ? 7339959 N0.012 D01 FACSIMILE DSAdantic TRANSMITTAL COVER SHEET TO John Domoy COMPANY NCDENR FROM Andy Padiak DATE 10/15/98 TIME TELEPHONE FAX PHONE 733-9959 PROJECT Lot 8 Paramount Center PROJECT NO. RE: TOTAL PAGES INCLUDING COVER SHEET 2 ORIGINAL TO BE SENT REMARKS: Please see the attached sheet. Thank you. The rn ormetion contained in this faceimile meeeage (unless otherwise indicated) is privileged and confidential Information intemood for the use or the Individual or ontity nomad above. If tho reader of thle moooage Is not the Intanded roolplant, you are hereby notified that any dissemin2tion, distribution or copying of this communication is strlotiy prohibited. If you received this oommunication In error, please notify us by telephone and return the original massage to use the address shown below via the U.S. Postal service at our ex ense. IF YOU DO NOT RECEIVE ALL THE PACES, PLEASE Cr1LL AS SOON AS POSSIBLE. 801 Jones Franklin Road, Suite 300 Raleigh, NC 27606 919-851-6866. fax 919-851.7024 10/15/98 13:57 DSATLANTIC 4 7339959 N0.012 902 We are in receipt of your letter of October 5, 1988 regarding our Water Quality Certification for tho above referenced project. There seems to have been some confusion on the pert of DWa staff as to our application of August 14, 1998. Denny Smith of your Regional Office attempted to contact SWE regarding his questions about this project, not DSAtlantic. S&ME performed wetland delineation for this project but was not involved in the permitting process. After several days of confusion between Denny and SWE I did eventually most with Danny Smith on October 6, one day after your letter. I would ask that you pleas@ speak with Danny regarding our meeting, as we reviewed each proposed crossing In the field that day, in your letter you also requested a stormwater plan to demonstrate 85% TSS removal. After speaking with Eric Galemb of your office I understand this to mean a detention pond will be required, I would like to emphasize again come of the history of this site and some of the issues we feel make a detention pond impossible. The wetlands on this property consist of three intermittent streams running east to west through the site and three isolated wetland pockets in the western portion of the site. The Impacts proposed are for roadway and utility crossings only. No general site fill Is necessary for the propaeed building alto. The intermittent streams must be crossed by roadways and utilities in order to connect with the existing infrastructure of the Town of Morrisville. In addition to these impacts we are asking permission to fill the Isolated wetlands In the western portion of the property. These isolated wetlands are unregulated by the Corps of Engineers and require no permit from that agency. Wetland Impacts have been minimized to the extent possible. Crossings for roads and utilities have been kept close to perpendicular. The roadway sections used are the minimum standards of the Town of Morrisville for their designation, Both Paramount Parkway and Road 'N have been adopted to the Town of Morrisville Master Thoroughfare Plan_ We Initially met with DWQ staff to discuss this project In the fall of 1997. At that time we were informed that "water quality features" would be required. From our experience, we understand that the device of choice has been a wet detention pond. With this In mind, we designed a wet detention pond to serve not only the first building site, but approximately two-thirds of the subdivision. As logic would dictate, the pond was designed to be "online" of one of the Intermittent streams flowing through the site. With the enactment of the Neuse River Nutrient Sensitive Waters Management Strategy In December of 1997, the possibility of the pond we designed was eliminated. The buffers placed on this stream by the Neuse River Rules do not allow for this pond's construction. We explored the potential of building smeller ponds up-slope of the buffers, but feel this option Is not viable due to topographical and geotechnical constraints. The site is steeply drained and has rock at shallow depths (T-8) for most of its area. With this Information in mind, we developed a new water quality strategy which did not include a wet detention pond. The site was redesigned to provide the required 50 ft. buffers and in most cases provide even more buffer than required. To the extent possible the site was graded to "sheet draln" to the wetlands. Along the 0 i V'\$ northern side of the site, curb cuts have been utilized at several points to allow water to flow through the buffers Jc;- and food the wetlands. Piped drainage has been limited to the extent possible. There are other circumstances that we feel should eliminate the need for a pond on this property. There is an existing pond In the northwest portion of the site that we intend to sustai )ha lso, the subject property Iles directly above the Sorrell% Grove Regional Detention Pond owned by WCounty. The combination of these factors and the natural vegetated buffers should be adequate to perfarm required water quality functions. down and discuss this John, we appreciate your time and interest in this project. We would be py to sit project Mtn you at your convenience. Please respond as soon as you cAlan M. Maness, P.E. i CivillSite Group Leader c? DSAtlantic Corp. (919) 851-6888 amanses satlantic.com Regiona l Contact WQ Supervisor " Vi6noh Date: ;TAPE REPORT AND RECOMMENDATIONS ?- ? "",tom a #'?7 F •? ,; /DF.> - County Wake, Win. .. >«} L .. 1, County2 a ?±»totyt? ' s Region Raleigh r - 8 Recvd By Region t e[al . ficetes Stream Class Acres Feet Wetland Wetland Stream Score Index Prim. Supp. Basin Req. Req. impact ?.? -H1NF y L ON 27-33-4-2 C NSW 030402 0.37 ; 12'1 ? ' Eta#f?.N"' ? ? r y Mitigation Wetland k ? r+t;;e+t.,? JA C' Acres Feet J Is Mitigation required? O Y O N Did you request more info? Q Y O N Is Wetland Rating Sheet Attached? Q Y O N Have Project Changes/Conditions Been Discussed With Applicant? Q Y O N Recommendation: Q Issue O Issue/Cond O Deny Comments: d. cc: Regional Office Central Office Page Number, Paramount Center Wake County -Stream Crossing labeled #3 did not warrant mitigation. While significant Triassic Basin streams are located at crossings labeled #1 and #2 these stream are also intermittent and do not have "adequate aquatic function" per DWQ's policy to re ui es stream mitigation. Accordingly, the RRO recommends that stream mitigation not be required for the subject project. However, storm water management plan should be required. This issue was briefly discussed with Mr. Alan Maness with DS Atlantic. He; however, was not receptive to the idea. That is, he was interested in using the forest vegetation which is maintained due to NBRs for storm water management, but explained that he could not build a storm water pond. (Shallow to bed rock) (He also noted the downstream storm water control lake was providing that function.) The RRO disagrees with DS Atlantic's approach. The storm water that will be generated from the subject development should be managed on site. They should be required to revisit the storm water issue with the caveat that a pond is not the only solution (while using the buffer is a good idea it may not be adequate). Also, the RRO's refute to reliance on the nearby storm water control lake is that the control lake is designed to address peak flow, thereby reduce downstream flooding. It is inappropriate to not ? consider the affects to water quality to streams above the control structure. jaded jewnsuoo lsod %01/paloAoej %09 . jeAoidw3 uoll3d anllewjlllV Allunpoddo lenb3 uV 6966-£EL # Xd3 99L 1-EEL-616 euogdalel L09LE ON '0191% "PH N99J0 APaad 10bb gouej8 aBjegoslQ-uoN . AI!lenp jaleM Io uolslnla PIT918086 wuJ201d uopu3 1310 Aliluno 1al M X;)Wo(j •21 u Of laou ugo f '3S PPol oiluullf/ SG :ssauuW uuId Sopjju11ua0 ,Cau1o(I uqo f slaauloug 3o sd1oD oogjo Plai3 g2lol d siaauTBug 3o sd1oD 30 131.11114 u012uiwllM 03!330 luu0120N OMQ g8ialu2l :33 luawg3ulltl '((b)ML090' HZ DVDN V90 uolluu pi alaldwoom of onp 8uissooold 1no 1oj ploq uo poould oq Ipm laafold oql `osld •ploq uo loafold sigl could mouiBug 3o sd1oD oql lugl (lalpol sigl 3o Xdoo Xq) 3sonbal Ipm I `pania3al sl uolluwlo3ui sigl Iilurl •suoilsonb Xuu anuq noA 3i 98LI-££L-6I6 lu Pag3ual oq uuo I •olqunolddu si loafold sigl laglogm oppop of sn 1oj nplo ui OMQ Xq popoou si uolluuuo3ui situ 'lunowal SS.L 0/098 apinold Ipm salnsuauz 1alumuuols pauuuld 1noA lugl molts of suopulnoluo apinold of paau Ip m noX osld •8uissolo mjnoipuadlad alow u oq of poluoolal oq uuo S 8uisson lu peol oql laglogm (Z) puu sluawalinbal uoilu8piw wualls (l) lnoqu suoilsonb 8uiulaouoo rioX gouol of olquun uaaq sug aoij3o Ieuoi2o-d 1no 3o gliwS XuuuCl •1W orris olaldwoo lou sum uouuoilddu 1noA -XlunoD a3luM u! uoisinipgns laluoD lunowulud 10J lunolddu olni 1aj3nq 1ani2l OsnoN puu liuuad IOt,/tot, u 1o3 tulliwgns 1noX POMOIA01 sug Aliiuno 1aluM Jo uoisinlQ agZ 918086 # aMQ AiunoO a3luM uolslnipgns laluaD lunowund :0-d slis 1uaQ 099LZ DN `aliinsLUOW OOZ alinS ani1Q Nnd lalawuad 0081 upg3i?I/s?laaM 8661 `S lagoloo s3o8nos38 -lvun1VN dNV 1N3WNOMIAN3 30 1N3HIMVd3Q VN11MJV:D H180N IIN3 :)N maw a0109aia '.3.d '.ar`PJUM0H uolsaad -V iJeJBJ09S ':4in9doW 9UA18M aouaanoE) --jr 'junH -e sewer Alileno jejuM jo uoisinia saoanosoU leant'eN PUB Iuauluoainu3 jo luewliedaa au110aEO PON 10 OMIS s la ntic ? pvG ? Au{ , 1'998 Mr. John Dorney v r" NC Department of Environment and Natural Resources Q, Division of Water Quality, Wetlands Group O! 4401 Reedy Creek Rd. Raleigh, NC 27607 SUBJECT: PRE-CONSTRUCTION NOTIFICATION APPLICATION PARAMOUNT CENTER SUBDIVISION MORRISVILLE, NORTH CAROLINA DSAtlantic PROJECT NO.: LIC037.000 Dear Mr. Dorney: On behalf of Weeks/Lichtin, we are pleased to submit the Pre-Construction Notification for Nationwide Permits 12, 14 and 26 to fill some portion of the wetlands on the subject property. Please find attached the following items: 1. Seven (7) copies of the Pre-Construction Notification Application 2. Seven (7) copies of the Vicinity Map 3. Seven (7) copies of the overall Site Layout Plan 4. Seven (7) copies of one (1) plan view and two (2) cross-section views of each proposed roadway crossing 5. Seven (7) copies of the Wetland Delineation by S&ME, Inc. 6. One (1) set of grading plans. The wetlands on this property consist of three intermittent streams running east to west through the site and three isolated wetland pockets in the western portion of the site. The impacts proposed are for roadway and utility crossings only. No general site fill is necessary for the proposed building site. The intermittent streams must be crossed by roadways and utilities in order to connect with the existing infrastructure of the Town of Morrisville. In addition to these impacts we are asking permission to fill the isolated wetlands in the western portion of the property. These isolated wetlands are unregulated by the Corps of Engineers and require no permit from that agency. Wetland impacts have been minimized to the extent possible. Crossings for roads and utilities have been kept close to perpendicular. The roadway sections used are the minimum standards of the Town of Morrisville for their designation. Both Paramount Parkway and Road `A' have been adopted to the Town of Morrisville Master Thoroughfare Plan. We initially met with DWQ staff to discuss this project in the fall of 1997. At that time we were informed that "water quality features" would be required. From our experience, we understand that the device of choice has been a wet detention pond. With this in mind, we designed a wet detention pond to serve not only the first building site, but approximately two-thirds of the subdivision. 801 Jones Franklin Road Suite 300 Raleigh, NC 27606 (919) 851-6866 Fax: (919) 851-7024 www.dsatlantic.com As logic would dictate, the pond was designed to be "online" of one of the intermittent streams flowing through the site. With the enactment of the Neuse River Nutrient Sensitive Waters Management Strategy in December of 1997, the possibility of the pond we designed was eliminated. The buffers placed on this stream by the Neuse River Rules do not allow for this pond's construction. We explored the potential of building smaller ponds up-slope of the buffers, but feel this option is not viable due to topographical and geotechnical constraints. The site is steeply drained and has rock at shallow depths (3'-8') for most of its area. With this information in mind, we developed a new water quality strategy which did not include a wet detention pond. The site was redesigned to provide the required 50 ft. buffers and in most cases provide even more buffer than required. To the extent possible the site was graded to "sheet drain" to the wetlands. Along the northern side of the site, curb cuts have been utilized at several points to allow water to flow through the buffers and feed the wetlands. Piped drainage has been limited to the extent possible. There are other circumstances that we feel should eliminate the need for a pond on this property. There is an existing pond in the northwest portion of the site that we intend to sustain. Also, the subject property lies directly above the Sorrell's Grove Regional Detention Pond owned by Wake County. The combination of these factors and the natural vegetated buffers should be adequate to perform the required water quality functions. We trust all these items will be to your satisfaction. If you have any questions concerning this transmittal please contact me at your first convenience. Si rely, an M. aness, E. Civil Project Manager AMM Attachments: As noted above cc: Mr. Robert G. Yelverton - Weeks/Lichtin w/atts Mr. Keith Brown - S&ME, Inc. w/o atts Mr. Lester V. Lowe, III, P.E., - DSAtlantic w/o atts Mr. Andrew R. Padiak, E.I.T., - DSAtlantic w/o alts File w/atts WETLAND DELINEATION PARAMOUNT CENTER MORRISVILLE, NORTH CAROLINA S&ME, INC. PROJECT NO. 1051-97-103 Prepared for: Weeks/Lichtin Properties 1800 Perimeter Park Drive Morrisville, NC 27560 Prepared By: S&ME Inc. 3109 Spring Forest Road (27616) Post Office Box 58069 Raleigh North Carolina 27658-8069 May, 1997 *S&ME September 30, 1997 Weeks Lichtin Properties, Inc. 1800 Perimeter Park Drive Morrisville, North Carolina 27560 Attention: Mr. Bob Yelverton Vice-President - Construction Reference: Wetland Delineation Paramount Center Morrisville, North Carolina S&ME, Inc. Project No. 1051-97-103 Dear Mr. Yelverton: Enclosed is the report of findings on the completed wetland delineation at the above referenced site. The flagged wetland/upland boundary should be surveyed as quickly as possible in order to alleviate possible problems with tom or deteriorated flags, and in order for us to accurately determine proposed impacts for any authorization procedures. Please contact us should you need further assistance in completing this project. We may be reached at (919) 872-2660. Sincerely, S&ME, INC. :??-erg 1?,kc?? Joel Hard `ry Y Consulting Ecologist Abne* s, Jr., P.E. Senior Project Engineer Attachments SBME, Inc. 3100 Spring Forest Rood, Raleigh, North Carolina 27616, (919) 872-2660, Fox (919) 790-9827 Moiling address: P.O. Box 58069, Raleigh, North Carolina 27658-8069 INTRODUCTION This report presents the findings of the wetland assessment recently performed on a site approximately 113 acres in size located adjacent to Hwy. 54, approximately 4,000 feet west of Airport Blvd. In Morrisville, North Carolina. The opinions included. herein are based on information obtained during the study and our professional experience. The report is based on the observations made on the dates noted and using the procedures described herein. If additional information becomes available, we request the opportunity to review the information, reassess the potential environmental concerns, and if appropriate, modify our conclusions and recommendations. SITE DESCRIPTION The site consists of approximately 113 acres of undeveloped property. The property is currently sparsely wooded and rolling and the majority of the property has recently been timbered. The remaining timber consists of a hard wood/pine mix. The majority of swales at the site appear to contain groundwater seepage areas depositing into the perennial and intermittent streams onsite. The site is bordered on the north, south and east by other undeveloped lands, and is bordered by residential properties adjacent to Hwy. 54 to the west. Access is gained through an easement off of Hwy. 54. A large pond borders the property to the north and outfalls into a smaller pond onsite. Drainage from these ponds eventually outfalls into a perennial stream that bisects the property. Three other perennial or intermittent streams bisect the site. Each of these streams appears to be fed by groundwater seepage both on and offsite, and by runoff. In addition, a semi-permanently flooded wetland exists along the western boundary of the site. SCOPE OF SERVICES On April 26-27, 1997, Weeks/Lichtin Properties, Inc. authorized S&ME, Inc. (S&ME) to perform a wetland delineation and assessment of the subject site. The scope of services included the following: 1. Field delineation of all areas of waters of the United States located at the site. 2. Completion of documentation for justification and verification of the wetland/upland boundary. WETLAND ASSESSMENT An on-site reconnaissance of the site was completed on April 26-27, 1997, by Mr. Joel Hardy, Consulting Ecologist for S&ME. During the site visit, all areas which would be considered as waters of the United States were identified and the wetland/upland boundary was marked with individual, sequentially numbered flags. The areas of jurisdiction were identified using the currently accepted interim methods of wetland determination described in the 1987 Corps of Engineers Manual for Identifying and Delineating Wetland Areas, and detailed as follows: The present methodology for determining the specific location of the wetland jurisdiction line pursuant to the above definition is present in the Federal Manual for Identifying and Delineation Wetlands, Reed, 1988 and Hvdric Soils of the United States Soil Conservation Service 1987. This methodology was adopted by the federal agencies including the Environmental Protection Agency (EPA), U.S. Fish and Wildlife Service (FWS), and the U.S. Department of Agriculture, Soil Conversation Service (SCS) to provide a concurrent definition of wetlands. This definition states that under normal circumstances (no site alteration by drainage, clearing, etc.) an area must compromise three components to be declared jurisdictional - vegetation, hydrology and soils. 2 Vegetation: The list of hydrophytic (wetland) plants is very broad and includes perhaps 90 percent of all species occurring in the southeastern United States (National List of Plant Species That Occur in Wetlands: Reed, 1988). The 1987 manual states that if greater than 51 percent of the dominant vegetation within the community is FAC, FACW or OBL, the vegetation community is considered hydrophytic. Hvdrologv: Traditionally, wetlands are thought to require standing water or at least very moist soil conditions at the surface. The hydrologic criteria includes evidence of floods such as water lines on trees, drift lines, buttressed bases on trees, crayfish burrows, etc., but this criteria can also be met by a high groundwater table. Generally, the determining factor of minimal hydrologic conditions are met by groundwater and not surface water with this federal wetland definition. Soils: The third requirement for a determination of jurisdiction is hydric soils. Clearly, hydrology and soils are tied together. Prolonged standing water obviously implies that the underlying soils are hydric (wet). High water tables can cause the soils to be hydric within the requirement for standing water; however, the presence of hydric soil component does not necessarily demonstrate the presence of the hydrology component. Positive indicators of hydrology must be visible and confirmed before the hydrology component can be confirmed. DELINEATION SURVEY RESULTS Results of the field delineation of wetlands may be seen on Figure 1 with the estimated wetland/upland boundary marked on it. In general however, the jurisdictional areas were restricted to the channels of the streams onsite, and to the waterline of the pond. Several narrow linear wetland areas resulting from seepage areas exist within the natural drainage swales at the site and deposit into the streams at the sites. One small depressional 3 palustrine wetland exists along the western boundary of the site. Data substantiating the jurisdictional determination is attached. CONCLUSIONS Federal Regulatory Authority under Section 404 CWA The Corps of Engineers (COE) generally issues two types of permits, Nationwide Permits and Individual Permits. Nationwide Permit 33 CFR Part 330.6 (13)(26) or NWP 26 allows the filling or adverse impact of up to 0.33 acre of headwater [has an average annual flow of less than 5 cubic feet per second (cfs)] and/or isolated wetlands, and may allow the filling or adverse impact of between 0.33 and 3 acres of these types of wetlands provided the applicant notify the District Engineer in accordance with 33 CFR Part 330.6 (C), also termed a "Pre-discharge Notification." The wetlands at the site associated with the intermittent streams would be classified as headwater wetlands and therefore would come under the purview of NWP 26. The stream located at the extreme northeast portion of the site would be classified as a below head water stream and would not come under the purview of NWP26. 4 0 7, 17 ' c ' % ?,?? SITE 300 OIL 3-061 )Y4 10 341 ? 4?\ '`\\?. L' ,? ? ••. ? (/ G ?``? ?s.? `' _ ? X3015 `, > l J SCALE 1:24 000 1 1 z 0 1 MILE 1000 0 1000 2000 3000 4000 5000 6000 7000 FEET 1 5 0 1 KILOMETER CONTOUR INTERVAL 10 FEET N. C ¦ UAGA TOPOGRAPHIC MAP 'WY. N.C. OUADRANGLE )ATED 1973 PHOTORENISED 1987 OIIAORANOLE LOCATION I' 2.000' PCHECKED Y' CNN tAlAW ' TRP ,A ' UAV IQQ7 ENVIIIMMENUI SERVICES ff.,..luffmmku. - .r....•., PARAMOUNT CENTER MORRISVILLE, NORTH CAROLINA InAl_Q7_In-4 -/ Mw•pt FORMERLY RAY MLSDELL / p/IAaT 0{RAr ,^y m / u DD t s LG= 7.30 nG NOW on-Fop*A a.Y ? iA KIIIII \ '\ -400 YcMR Hoot D - 5.61 *4. LDLC `- 10 51 \ Mllj? ` 1\? R R./F m . tIRpqD4v '! '/ ' ?/ • -? "-\ ? ? : ' a \ ?;'\ .? (•; ?/ e• urrr+,a.aeT i? / ? . / ?? GR?ffir noR p1 ? ROOM A JESS M E n I ? p R ? 7.0 \ \ + \ LQLnm ?? N \\ \ ?Za"``CV?aow oR fOaiMER'r ? ? •+e >.RR - "- w rG , / /,'>. ?c / T - " ? `,. . r• 'T • VOYSTRK•oWIAT: ? ' J It?? ? ? + -- 4?l wqr . ? ., :---- 3 / ? ew -- -.co, "OR TORMEEILY \ K E'vEiE'T PROPERTIES. LP x •DANOOS?GO.fJILAr .oi•uaR4 vsRUr _ SITE l / ` ??\/ ? ?--- - --' - , ,? ,,. - ? ` •J , • All _ / , f ' __ !gW OR FORMERLY , V _ R.l MOM \ . .oMOtnneK o..RU+ :Y-wtw.MK j r _ -- nwa\vne' ^x r,cMrr v cw.T_ NOW OR FORMI PERIMETER I SO r. , tCS Di-? LCL 12 12.12 c 41M US[: I1 Ep zcwha I v An sa.cilur u. Ew D w .Gi?yLNRL o \ o' LQUI.BG oK.,,. ra D WOO ' " LEGEND _ .? S Un E , - 1 - - - - = 7:= AREA OF JURISDICTION , I" ft 600' WCKW BY., CNN TR P '" MAY 1997 WO NSMIS • TERM AD DATA POINT LOCATIOD nom No PARAMOUNT CENTER MORRISVILLE, NORTH CAROLINA 2 mm "o" 1051-97-103 DATA FORM ROUTINE WETLAND DETERMINATION (1987 COE Wetlands Delineation Manual) Project/Site: -Paramount Center Date: 4/26/96 County: Applicant/Owner: Weeks/Lichtin Properties. Inc. Wake State: NC_ Investigator: $&ME - Joel Hardy Do Normal Circumstances exist on the Site? YesX No Community ID: Is the site significantly disturbed (A typical Situation) Yes_ No_ Transect ID: Plot Is the area a potential problem area? Yes_ No_, ID: AW (If needed, explain on reverse) VEGETATIONS 1. Acer rubrum _T FAC 9. 2.11auidacubar sty. T FAC 10. 3. Juncus eHusus H OBL 11. 4. Rhynchospora sp. _H OBL 12. 5. 13. 6. 14. 7. 15. 8. 16. Percent of Dominant Species that are OBL, FACW or FAC (excluding FAC)- 100 Remarks: > 51 % of dominant vegetation FAC, FACW or OBL HvnRrn nny _ Recorded Data (Describe in Remarks): Wetland Hydrology Indicators: -Stream, Lake, Or Tide Gauge Primary Indicators: -Aerial Photographs -Other X Inundated X Saturated in Upper 12 inches X No Recorded Data Available _ Water Marks _ Drift Lines _ Sediment Deposits _ Drainage Patterns in Wetlands Secondary Indicators (2 or more required): Oxidized Root Channels in Upper 12 inches X Water-stained Leaves _ Local Soil Survey Data _ FAC Neutral Test _ Other (Explain in Remarks) Field Observations: Depth of Surface Water: 4-10 (in.) Depth to Free Water in Pit: Surf (in.) Depth to Saturated Soil: Surf (in.) Remarks: Area is a depressional groundwater discharge area. Area inundated and saturated at time of inspection. DATA FORM ROUTINE WETLAND DETERMINATION (1987 COE Wetlands Delineation Manual) (Continued) AW SOILS Map Unit Name Drainage Class: (Series and Phase): N/A Field Observations Taxonomy (Subgroup): Confirm Mapped Type? Yes_ No Profile Descriotion: Depth Matrix Color Mottle Colors Mottle Texture, Concretions, finchesi Horizon (Munsell Moist) iMunsell Moistl Abundance/Contrast Structures, etc. 0-3 _A 3.18 10YR 3/1 10YR 412 Sandy Clay Muck 10YR 51 F _a_ -1830 B_ JOYR 4/1 0 ew Sandy Clav 10YR / Few Sandy Ciav Hydric Soil Indicators: _ Histosol _ Concretions _ Histic Epipedon _ High Organic Content _ Sulfidio Odor _ Organic Streaking in Sandy Soils X Aquio Moisture Regime _ Listed on Local Hydric Soils List Reducing Conditions _ Listed on National Hydric Soils List TL Gleyed or Low-Chroma Colors Other (Explain in Remarks Remarks: Munsell reading in hydriz (chroma < 2 w/mottles) in a saturatedfinundated environment WETLAND DETERMINATION I Hydrophytic Vegetation? YesX No_ I II Wetland Hydrology Present Yeses No_ Is this Sampling Hydric Soils Present? Yeses No_ Point within a Wetland? YesX No_ Remarks: All parameters present DATA FORM ROUTINE WETLAND DETERMINATION (1887 COE Wetlands Delineation Manual) Project/Site: Paramount Center Date: 4/28/87 Applicant/Owner: Weeks/Lichtin Properties. Inc. County: Wake Investigator: Joel Hardy, Sd,ME. Inc. State: NC Do Normal Circumstances exist on the Site? Yes,L No_ Community ID: Is the site significantly disturbed (A typical Situation) Yes_ Nom Transect ID: Plot Is the area a potential problem area? Yes_ Nom ID: BW (If needed, explain on reverse) VEGETATIONS 1. Acer rubrum T FAC 9. 2. Liauidacubar sfv. T FAC 10. 3. O. More T FAC 11. 4. Juncus effusus H OBL 12. 5. Rhynchosoroa so. H OBL 19. 8. Cavex so. _ H OBL 14. 7. 15. 8. 18. Percent of Dominant Species that are OBL, FACW or FAC (excluding FAC)- 1 t10 Remarks: > 51% of dominant vegetation FAC, FACW or OBL HYDROLOGY _ Recorded Data (Describe In Remarks): Wetland Hydrology Indicators: -Stream, Lake, Or Tide Gauge Primary Indicators: -Aerial Photographs -Other X Inundated _ Saturated in Upper 12 inches X No Recorded Data Available _ Water Marks _ Drift Lines _ Sediment Deposits _)?_ Drainage Patterns in Wetlands Secondary Indicators (2 or more required): _ Oxidized Root Channels in Upper 12 inches X Water-stained Leaves _ Local Soil Survey Data _ FAC Neutral Test _ Other (Explain in Remarks) Field Observations: Depth of Surface Water: 0-3 (in.) Depth to Free Water in Pit: Surf. (in.) Depth to Saturated Soil: Surf. (in.) Remarks: Area is a groundwater seepage area depositing into a natural drainage swale leading to a stream DATA FORM ROUTINE WETLAND DETERMINATION (1987 COE Wetlands Delineation Manual) (Continued) BW SOILS Map Unit Name Drainage Class: (Series and Phase): N/A Field Observations Taxonomy (Subgroup): Confirm Mapped Type? Yes_ No Profile Description: Depth Matrix Color Mottle Colors Mottle Texture, Concretions, (Inches) Horizon 04 A (Munsell Molstl JQ / R (Munsell Moist) Abundance/Contrast Structures. etc. - 4_16 _B 1_ Y 3 411 Sandy Clay 10YR 5/8 Few Sandy Clay 16-30 _.@_ 10YR 4/1 Sandy Clay Hydric Soil Indicators: _ Histosol _ Concretions _ Histic Epipedon _ High Organic Content _ Sulfidio Odor _ Organic Streaking in Sandy Solis X Aquio Moisture Regime _ Listed on Local Hydric Soils List X Reducing Conditions _ Listed on National Hydric Soils List X Gleyed or Low-Chroma Colors Other (Explain in Remarks Remarks: Munsell reading in hydriz (chrome < 2 w/mottles) in a saturated/inundated groundwater seepage area. VVCiLANU Hydrophytic Vegetation? Yes X No Wetland Hydrology Present YesX No_ Is this Sampling Hydric Soils Present? Yes- No_ Point within a Wetland? YesX No_ Remarks: All parameters met. DATA FORM ROUTINE WETLAND DETERMINATION (1987 COE Wetlands Delineation Manual) Project/Site: Paramount Center Date: 4126/96 Applicant/Owner: Weeks/Uchtin Properties. Inc. County: Wake Investigator: Joel Hardy - SAME. Inc. State: NC Do Normal Circumstances exist on the Site? YesX No_ Community ID: Is the site significantly disturbed (A typical Situation) Yes_ Nom Transect ID: Plot Is the area a potential problem area? Yes_ No X ID: CW (If needed. explain on reverse) VEGETATIONS 1. Acer rubrum T FAC 9. 2. Lipuidacubar sfy. T FAC 10. 3. O. Mora T FAC 11. 4. Juncus effusus F OR[ 12. 5. Cavex so. H_ OBL 13. 6. Sohaanum so. H OBL 14. 7. 15. 8. 16. Percent of Dominant Species that are OBL, FACW or FAC (excluding FAC)- 100 Remarks: > 51 % of dominant vegetation FAC, FACW or OBL HVnRm r]r;Y _ Recorded Data (Describe in Remarks): Wetland Hydrology Indicators: -Stream, Lake, Or Tide Gauge Primary Indicators: -Aerial Photographs -Other X Inundated X Saturated in Upper 12 inches X No Recorded Data Available _ Water Marks _ Drift Lines X Sediment Deposits X Drainage Patters in Wetlands Secondary Indicators (2 or more required): _ Oxidized Root Channels in Upper 12 inches _ Water-stained Leaves _ Local Soil Survey Data _ FAC Neutral Test _ Other (Explain in Remarks) Field Observations: Depth of Surface Water: 0-3 (in.) Depth to Free Water in Pit: Surf. (in.) Depth to Saturated Soil: Surf. (in.) Remarks: Area is a groundwater seepage area depositing in a natural drainage swale. DATA FORM ROUTINE WETLAND DETERMINATION (1987 COE Wetlands Delineation Manual) (Continued) CW SOILS Map Unit Name Drainage Class: (Series and Phase): NIA Field Observations Taxonomy (Subgroup): Confirm Mapped Type? Yes_ No Profile Description: Depth Matrix Color Mottle Colors Mottle Texture. Concretions. (Inches) Horizon MMunsell Moist) (Munsell Moist) Abundance/Contrast Structures, etc. 04 A 10YR 312 Sandy Clay Muck 4-20 _@_ 10YR 9/1 Sandy Clay 20-30 B_ 10YR 411 Sandy Clay Hydric Soil Indicators: _ Histosol _ Concretions _ Histic Epipedon _ High Organic Content _ Sulfidio Odor _ Organic Streaking in Sandy Soils _j_ Aquio Moisture Regime _ Listed on Local Hydric Soils List X Reducing Conditions _ Listed on National Hydric Soils List Gleyed or Low-Chroma Colors Other (Explain in Remarks Remarks: Munsell reading is hydriz (chroma < 2 w/o mottles) in a saturated groundwater seepage area WETLAND DETERMINATION Hydrophytic Vegetation? YesX No Wetland Hydrology Present Yes X No Is this Sampling Hydric Soils Present? Yes X_ No_ Point within a Wetland? YesX No_ Remarks: All parameters met DATA FORM ROUTINE WETLAND DETERMINATION (1987 COE Wetlands Delineation Manual) Project/Site: Paramount Center Date: 4/28/97 Applicant/Owner:Weeks/Lichtin Properties. Inc. County: Wake Investigator: Joel Hardy - S&ME. Inc. State: NC Do Normal Circumstances exist on the Site? YesJL No Community ID: Is the site significantly disturbed (A typical Situation) Yes_ No_x Transect ID: Plot is the area a potential problem area? Yes_ No-X,_ ID:DW (If needed, explain on reverse) VEGETATIONS 1. Acer rubrum T FAC 9. 2. Llauidacubar sfv. _T FAC 10. 3. Betula Mars _L _QM_ 11. 4._Platanus occ. T FAC 12. 5. O Mara T FAC 13. 6. 14. 7. 15. 8. 16. Percent of Dominant Species that are OBL, FACW or FAC (excluding FAC)- 100 Remarks: > 51 % of dominant vegetation FAC, FACW or OBL Nvnpninrv _ Recorded Data (Describe in Remarks): Wetland Hydrology Indicators: -Stream, Lake, Or Tide Gauge Primary Indicators: -Aerial Photographs -Other Inundated Saturated in Upper 12 inches CX No Recorded Data Available _ Water Marks _ Drift Lines _ Sediment Deposits _ Drainage Patterns in Wetlands Secondary Indicators (2 or more required): _ Oxidized Root Channels in Upper 12 inches _ Water-stained Leaves _ Local Soil Survey Data _ FAC Neutral Test Other (Explain in Remarks) _ Field Observations: Depth of Surface Water: 0-10 (in.) Depth to Free Water in Pit: Surf (in.) Depth to Saturated Soil: Surf (in.) Remarks: Area is a bank to bank perennial stream DATA FORM ROUTINE WETLAND DETERMINATION (1887 COE Wetlands Delineation Manual) (Continued) DW SOILS Map Unit Name Drainage Class: (Series and Phase): N/A Field Observations Taxonomy (Subgroup): Confirm Mapped Type? Yes_ No Profile Description: Depth Matrix Color Mottle Colors Mottle Texture, Concretions, (Inches) Horizon fMunsell Moist) 0_ Refusal (Munsell Moist) Abundance/Contrast Structures. etc. Alluvium Rock Hydric Soil Indicators: _ Histosol _ Concretions _ Histic Epipedon _ High Organic Content _ Sulfidio Odor _ Organic Streaking in Sandy Soils _ Aquio Moisture Regime _ Listed on Local Hydric Soils List _ Reducing Conditions _ Listed on National Hydric Soils List Gleyed or Low-Chroma Colors Other (Explain in Remarks Remarks: No practical soil profile - Area is an unconsolidated rock bottom for a perennial stream WtILANU Hydrophytic Vegetation? YesX No_ Wetland Hydrology Present YesX No_ Is this Sampling Hydric Soils Present? Yeses No_ Point within a Wetland? YesX No_ Remarks: All parameters met. DATA FORM ROUTINE WETLAND DETERMINATION (1987 COE Wetlands Delineation Manual) ProjecVSite: Paramount Center Date: 4126197 Applicant/Owner:_Weeks/Lichtin Progerties. Inc. County: Wake Investigator: Hardy - S&ME. Inc. State:- NC Do Normal Circumstances exist on the Site? YesX No Community ID: Is the site significantly disturbed (A typical Situation) Yes_ No X Transect ID: Plot Is the area a potential problem area? Yes_ No X ID: AD (if needed, explain on reverse) VEGETATIONS 1. Acer rubrum T FAC 9. 2.0. rubrum _T FAC 10. 3. Comus Florida T FACU it. 4. Cercis canadensis T FACU 12. 5. Vbamum so, h FAC 13. 6. 14. 7. 15. 6• I a. Percent of Dominant Species that are OBL, FACW or FAC (excluding FAC)- 60 Remarks: > 51 % of dominant vegetation FAC, FACW or OBL Nvnpr)i nr_v _ Recorded Data (Describe in Remarks): Wetland Hydrology Indicators: -Stream, Lake, Or Tide Gauge Primary Indicators: -Aerial Photographs -Other _ Inundated _ Saturated in Upper 12 inches X No Recorded Data Available _ Water Marks _ Drift Lines _ Sediment Deposits _ Drainage Patterns in Wetlands Secondary Indicators (2 or more required): _ Oxidized Root Channels in Upper 12 inches _ Water-stained Leaves _ Local Soil Survey Data _ FAC Neutral Test _ Other (Explain in Remarks) Field Observations: Depth of Surface Water: N/A (in.) Depth to Free Water in Pit: N/A (in.) Depth to Saturated Soil: 18 (in.) Remarks: No inundation/saturation within root zone w/o secondary or primary indicators of hydrology DATA FORM ROUTINE WETLAND DETERMINATION (1987 COE Wetlands Delineation Manual) Project/Site:_ Paramount Center Date: 4126197 Applicant/Owner. Weeks/Lichtin Properties. Inc. County: Wake Investigator: Joel Hardy -S&ME. Inc. State: NC Do Normal Circumstances exist on the Site? YesX No Community ID: Is the site significantly disturbed (A typical Situation) Yes_ No X Transact ID: Plot Is the area a potential problem area? Yes_ No X ID: EW (If needed, explain on reverse) VEGETATIONS Dominant Plant S ecies Serum Indicator 1. Acer rubrum T FAC Dominant Plant Species ;mum Indicator 9. 2.Llquidacubarsty. _T FAC 10. 3.0 niara T FAC 11 4. Betula niara T OBL 12. 5. 13. 6. 14. 7. 15. 6. 16. Percent of Dominant Species that are OBL, FACW or FAC (excluding FAC)- 100 Remarks: > 51 % of dominant vegetation FAC, FACW or OBL HYDRnI f)rY _ Recorded Data (Describe in Remarks): Wetland Hydrology Indicators: -Stream, Lake, Or Tide Gauge Primary Indicators: -Aerial Photographs -Other X Inundated X Saturated in Upper 12 inches X No Recorded Data Available _ Water Marks _ Drift Lines _ Sediment Deposits _ Drainage Patterns in Wetlands Secondary Indicators (2 or more required): _ Oxidized Root Channels in Upper 12 inches _ Water-stained Leaves _ Local Soil Survey Data _ FAC Neutral Test Other (Explain in Remarks) _ Field Observations: Depth of Surface Water: 0-6 (in.) Depth to Free Water in Pit: Surf. (in.) Depth to Saturated Soil: Surf. (in.) Remarks: Area is a bank to bank intermittent stream system DATA FORM ROUTINE WETLAND DETERMINATION (1987 COE Wetlands Delineation Manual) (Continued) EW SOILS Map Unit Name Drainage Class: (Series and Phase): N/A Field Observations Taxonomy (Subgroup): Confirm Mapped Type? Yes_ No Profile Description: Depth Matrix Color Mottle Colors Mottle Texture, Concretions, (inches) Horizon IMunsell Moist) (Munsell Moist) Abundance/Contrast Structures. etc. -04 --A 10YR 3/1 4-10 B_ 10YR 4/1 Refusal Sandy clay Sandy clay Rock Hydric Soil Indicators: _ Histosol Concretions _ Histic Epipedon _ _ High Organic Content _ Sulfidio Odor _ Organic Streaking in Sandy Solis XAquio Moisture Regime _ Listed on Local Hydric Soils List _ Reducing Conditions _ Listed on National Hydric Soils List X Gleyed or Low-Chroma Colors Other (Explain in Remarks Remarks: Munsell reading is hydric (chroma < 2 w/o mottles) within the bed of an intermittent stream system WETLAND DETERMINATION Hydrophytic Vegetation? YesX No_ Wetland Hydrology Present Yes X No_ Is this Sampling Hydric Soils Present? Yeses No Point within a Wetland? YesX No_ Remarks: All parameters met DATA FORM ROUTINE WETLAND DETERMINATION (1987 COE Wetlands Delineation Manual) SOILS (Continued) AD Map Unit Name Drainage Class: (Series and Phase): Taxonomy (Subgroup): Field Observations Confirm Mapped Type? Yes_ No_ Profile Description: Depth MatHx Color (Inchesi Horizon IMunsell Moist) Mottle Colors Mottle Texture, Concretions, (M ll M i .0--8 _ A 10YR 312 unse o st) Abundance/Contrast Structures, etc. Sandy Clay 8-17 B_ 10YR 4/3 17-30 B_ 10YR 4/4 Sandy Clay Sandy Clay Hydric Soil Indicators: - Histosol Concretions - Histic Epipedon _ _ High Organic Content - SulBdio Odor _ Organic Streaking in Sandy Soils _ Aquio Moisture Regime _ Listed on Local Hydric Soils List - Reducing Conditions _ Listed on National Hydric Soils List - Gleyed or Low-Chrome Colors Other (Explain in Remarks Remarks: Munsell reading is non-hydric (chroma > 2 w/o mottles) . WETLAND DETERMINATION Hydrophytic Vegetation? Yes_. No Wetland Hydrology Present Yes_ No X Is this Sampling Hydric Soils Present? Yes_ No X Point within a Wetland? Yes No _.& Remarks: Hydric soils and wetland hydrology absent DATA FORM ROUTINE WETLAND DETERMINATION (1987 COE Wetlands Delineation Manual) Project/Site: _ Paramount Center Date: 4/28/97 Applicant/Owner: Weeks/Lichtin Properties, inc. County: Wake Investigator: Joel Hardy-S&ME.Inc. State: NC Do Normal Circumstances exist on the Site? YesjL No_ Community ID: Is the site significantly disturbed (A typical Situation) Yes_ No X Transect ID: Plot Is the area a potential problem area? Yes_ No _)L ID•_ BD (If needed, explain on reverse) VEGETATIONS 1. Acer rubrum _ T FAC 9. 2. Liguidacubar sfv. T FAC 10. 3. Q. niara T FAC 11. 4. Viburnum sp. Sh FAC 12. 5. 13. 6. 14. 7. 15. 8. 16. Percent of Dominant Species that are OBL, FACW or FAC (excluding FAC)- 100 Remarks: > 51 % of dominant vegetation FAC, FACW or OBL NvnRni nr_v _ Recorded Data (Describe in Remarks): Wetland Hydrology Indicators: -Stream, Lake, Or Tide Gauge Primary Indicators: -Aerial Photographs -Other _ Inundated _ Saturated in Upper 12 inches X No Recorded Data Available _ Water Marks _ Drift Lines _ Sediment Deposits _ Drainage Patterns in Wetlands Secondary Indicators (2 or more required): _ Oxidized Root Channels in Upper 12 inches _ Water-stained Leaves _ Local Soil Survey Data _ FAC Neutral Test Other (Explain in Remarks) _ Field Observations: Depth of Surface Water: N/A (in.) Depth to Free Water in Pit: N/A (in.) Depth to Saturated Soil: 8 (in.) Remarks: No primary or secondary indicators present DATA FORM ROUTINE WETLAND DETERMINATION (1987 COE Wetlands Delineation Manual) (Continued) BD SOILS Map Unit Name Drainage Class (Series and Phase): NIA Field Observations Taxonomy (Subgroup): Confirm Mapped Type? Yes_ No_ Profile Description: Depth Matrix Color Mottle Colors Mottle Texture, Concretions, !(Inches) Horizon (Munsell Moist) (Munsell Moist! Abundance/Contrast Structures. etc. 0-3 A 3-17 a 10YR 2/1 10YR 4/2 _ 17-30 B 10YR 4/2 10YR 5/6 Hydric Soil Indicators: - Histosol Concretions _ Histic Epipedon _ - High Organic Content _ Sulfidio Odor _ Organic Streaking in Sandy Soils - Aquio Moisture Regime _ Listed on Local Hydric Soils List - Reducing Conditions _ Listed on National Hydric Soils List _ Gleyed or Low-Chrome Colors Other (Explain in Remarks Remarks: Munsell reading is non-hydric (chroma 2 2 w/o mottles) in an area w/o primary/secondary indicators of hydrology. Ut I tKMI HydrophyUc Vegetation? YesX No_ Wetland Hydrology Present Yes_ Nom Is this Sampling Hydric Soils Present? Yes_ No_, Point within a Wetland? Yes_ NoX Remarks: Hydric soils and wetland hydrology absent DATA FORM ROUTINE WETLAND DETERMINATION (1987 COE Wetlands Delineation Manual) ProjecVSite: Paramount Center Date: 4/26197 Applicant/Owner: Weeks/Lichtin Properties.Inc. County:- Wake Investigator: Joel Hardav . S&ME. Inc. State: NC Do Normal Circumstances exist on the Site? YesX No_ Community ID: Is the site significantly disturbed (A typical Situation) Yes_ No X Transect ID: Plot is the area a potential problem area? Yes_ No X ID: CD (It needed, explain on reverse) VEGETATIONS 1. Acer rubrum _ T FAC 9. 2. 0. niyra T FAC 10. 3._0. rubrum T FACU 11. 4. Comus Florida T FACU 12. 5. Cercis canadensis T FACU 13. 6. Vibamum sp. Sh FAC 14. 7. 15. 6. 16. Percent of Dominant Species that are OBL, FACW or FAC (excluding FAC)- 50 Remarks: > 51 % of dominant vegetation FAC, FACW or OBL Nvnani nr_v _ Recorded Data (Describe in Remarks): Wetland Hydrology Indicators: -Stream, Lake, Or Tide Gauge Primary Indicators: -Aerial Photographs -Other _ Inundated _ Saturated in Upper 12 inches X No Recorded Data Available _ Water Marks _ Drift Lines _ Sediment Deposits _ Drainage Patterns in Wetlands Secondary Indicators (2 or more required): _ Oxidized Root Channels in Upper 12 inches _ Water-stained Leaves _ Local Soil Survey Data _ FAC Neutral Test Other (Explain in Remarks) Field Observations: Depth of Surface Water: N/A (in.) Depth to Free Water in Pit: N/A (in.) Depth to Saturated Soil: 22 (in.) Remarks: No primary/ secondary indicators of hydrology DATA FORM ROUTINE WETLAND DETERMINATION (1987 COE Wetlands Delineation Manual) SOILS (Continued) CD Map Unit Name Drainage Class: (Series and Phase): N/A Taxonomy (Subgroup): Field Observations Confirm Mapped Type? Yes_ No Profile Descriotion: _ Depth Matrix Color (inches) H i Mottle Colors Mottle Texture, Concretions, or zon IMunsell Moist) A 0 10YR 3/2 (Munsell Moisti Abundance/Contrast Structures, etc. _ _ 5-19 _$_. 10YR 412 Silty Clay Silty Clay 18-30 10YR 414 Silty Clay Hydric Soil Indicators: _ Histosol Concretions _ Histic Epipedon _ _ High Organic Content _ Sul idio Odor _ Organic Streaking in Sandy Soils _ Aqulo Moisture Regime _ Listed on Local Hydric Soils List _ Reducing Conditions _ Listed on National Hydric Soils List _ Gleyed or Low-Chrome Colors Other (Explain In Remarks Remarks: Munsell reading is non-hydric (chroma > 2 w/o mottles) DD Hydrophytic Vegetation? YesX No_ Wetland Hydrology Present Yes_ No X Is this Sampling Hydric Soils Present? Yes_ NoA Point within a Wetland? Yes_ No_& Remarks: Hydric soils and wetland hydrology absent DATA FORM ROUTINE WETLAND DETERMINATION (1987 COE Wetlands Delineation Manual) Project/Site: Paramount Center Date: 4/28/97 Applicant/Owner: Weeks/Lichtin Properties. Inc. County: Wake Investigator: Joel Hardy - SbME. Inc. State: NC Do Normal Circumstances exist on the Site? YesX No Community ID: Is the site significantly disturbed (A typical Situation) Yes_ Nom Transect ID: Plot Is the area a potential problem area? Yes_ No X ID: DD (If needed, explain on reverse) Dominant Plant Species Stratum jndicat I 1. 0. niora T FAC Dominant Plant S ecies Stratum Indicat4L 9. 2. 0. rubra T FACU 10. _ 3. Comus Florida T FACU _ it. 4. Cercis canadensis _T FACU 12. 5. Ulmus americana _T FAC 13. 6. 14. 7. 15. _ 8. 16. Percent of Dominant Species that are OBL, FACW or FAC (excluding FAC)_ 40 Remarks: < 51 % of dominant vegetation FAC, FACW or OBL HYDROI Or,Y _ Recorded Data (Describe in Remarks): Wetland Hydrology Indicators: -Stream, Lake, Or Tide Gauge Primary Indicators: -Aerial Photographs -Other _ Inundated _ Saturated in Upper 12 inches No Recorded Data Available _ Water Marks _ Drift Lines _ Sediment Deposits _ Drainage Patterns in Wetlands Secondary Indicators (2 or more required): _ Oxidized Root Channels in Upper 12 inches _ Water-stained Leaves _ Local Soil Survey Data _ FAC Neutral Test Other (Explain in Remarks) Field Observations: Depth of Surface Water: N/A (in.) Depth to Free Water in Pit: N/A (in.) Depth to Saturated Soil: N/A (in.) Remarks: No primary/ secondary indicators of hydrology present DATA FORM ROUTINE WETLAND DETERMINATION (1987 COE Wetlands Delineation Manual) (Continued) DD SOILS Map Unit Name Drainage Class: (Series and Phase): N/A Field Observations Taxonomy (Subgroup): Confirm Mapped Type? Yes_ No- Profile Description: Depth h (i ) Matrix Color Mottle Colors Mottle Texture, Concretions, nc es Horizon (Munsell Moist) lMunsell Moisti Abundance/Contrast Structures, etc, 0-3 A -JOYR 312 Sandy Clay -15 -B -10YR 413 Sandy Clay 15-30 10YR 4/4 Sandy Clay Hydric Soil Indicators: _ Histosol Concretions _ Histic Epipedon _ - High Organic Content _ Sulfidio Odor _ Organic Streaking in Sandy Soils _ Aquio Moisture Regime _ Listed on Local Hydric Soils List _ Reducing Conditions _ Listed on National Hydric Soils List Gleyed or Low-Chroma Colors Other (Explain in Remarks Remarks: Munsell reading is non-hydric (chromah > 2 w/o mottles) in an area w/o hydrologic indicators RMINATION Hydrophytic Vegetation? Yes_ NoX Wetland Hydrology Present Yes_ Nom Is this Sampling Hydric Soils Present? Yes_ NoA Point within a Wetland? Yes_ NoA Remarks: Hydric soils, hydrophytiz vegetation and wetland hydrology absent DATA FORM ROUTINE WETLAND DETERMINATION (1987 COE Wetlands Delineation Manual) Project/Slte: Paramount Center Date: 4128197 Applicant/Owner: Weeks/Lichtin Properties Inc County: Wake Investigator. Joel Hardy - S&ME. Inc. State: NC Do Normal Circumstances exist on the Site? YesjL No Community ID: Is the site significantly disturbed (A typical Situation) Yes_ No X Transect ID: Plot Is the area a potential problem area? Yes_ Nom ID: ED (If needed, explain on reverse) Dominant Plant Species Stratum Ipsleato 1. Acer rubrum T FAC Dominant Plant S ecies Stratum Indicato 9 2._Liauidacubar sfv. T FAC 10 3. O. nigra T FAC 11. 4. Viburnum so. Sh FAC 12 5. 13. 6. 14. 7. 15. a. 16. Percent of Dominant Species that are OBL, FACW or FAC (excluding FAC)- 100 Remarks: > 51 % of dominant vegetation FAC, FACW or OBL HYnRnl r1r;Y _ Recorded Data (Describe In Remarks): Wetland Hydrology Indicators: -Stream, Lake, Or Tide Gauge Primary Indicators: -Aerial Photographs -Other _ Inundated _ Saturated in Upper 12 inches No Recorded Data Available _ Water Marks _ Drift Lines _ Sediment Deposits _ Drainage Patterns in Wetlands Secondary Indicators (2 or more required): _ Oxidized Root Channels in Upper 12 inches _ Water-stained Leaves _ Local Soil Survey Data _ FAC Neutral Test Other (Explain in Remarks) _ Field Observations: Depth of Surface Water: N/A (in.) Depth to Free Water in Pit: N/A (in.) Depth to Saturated Soil: 18 (in.) Remarks: No surficiai indicators of hydrology present DATA FORM ROUTINE WETLAND DETERMINATION (1987 COE Wetlands Delineation Manual) (Continued) ED SOILS Map Unit Name Drainage Class: (Series and Phase): NIA Field Observations Taxonomy (Subgroup): Confirm Mapped Type? Yes_ No Profile Description: Depth Matrix Color (i h Mottle Colors Mottle Texture, Concretions, nc es) Hodi4II (Munsell Moist) 0-5 A 10YR 3/1 (Munsell Moistl Abundance/Contrast Structures. etc. 5-13 _B_ 10YR 412 Sandy Clay Sandy Clay 13.3_ _B 10YR 413 Sandy Clay Hydric Soil Indicators: _ Histosol _ Concretions _ Histic Epipedon _ High Organic Content _ Sulfidlo Odor _ Organic Streaking in Sandy Soils _ Aquio Moisture Regime _ Listed on Local Hydric Soils List _ Reducing Conditions _ Listed on National Hydric Soils List Gleyed or Low-Chroma Colors Other (Explain in Remarks Remarks: Munsell reading is non-hydric (chromah > 2 w/o mottles) Hydrophytic Vegetation? Yeses No_ Wetland Hydrology Present Yes_ NoX Is this Sampling Hydric Soils Present? Yes_ No_& Point within a Wetland? Yes_ No_& Remarks: Wetland hydrology and hydric soils absent • I, NU INI:FRS ¦A]kL'I1111:CTS ¦sUlkvI%YOKg ¦PLANNEIIS August 14, 1998 *'3 v U i 18 U..STodd J. Tr o 4 (? (? `6 1.15. Army Corps s of Engineers `6 Regulatory Field Office 6508 Falls of the Neuse Road ' q. q g rj f( q,, Suite 120 FAleigh, NC 27615 IJ {J . ? ? ?a SUBJECT: PRE, -CONSTRUCTION NOTIFICATION APPLICATION PARAMOUNT CENTER SUBDIVISION MORRTSVILLE, NORTH CAROLINA, I)SAIJantlo PROJECT NO.: L IC037.000 Dear Mr. Tugwe 11: On behalf of Weeks/Lichtin, we are pleased to submit the Pre-ConsUruction Notification for Nationwide Permits 12, 14 and 26 to fill some portion of the wetlands on the subject property. Please find attached the following items; 1. One (1) copy of the Pre-Consttuction Notification Application 2. One (1) copy of the Vicinity Map 3. Ono (1) copy of the overall Site Layout Plan 4. Ono (1) plan view and two (2) cross-section views of each proposed roadway crossing 5. One (1) copy oftho Wotland Delineation by S&ME, Iuc. The wetlands on this property consist of three intermittent streams running east to west through the site and three isolated wetland pockets in the western portion of the site. The impacts proposed are for roadway and utility crossings only. No general site fill Is necessary for the proposed building site. The intermittent streams must be crossed by roadways And utilities in order to connect with the existing infrastructure of the Town of Morrisville. We trust all these items wil.1 be to your satisfaction. If you have any questions conerming this transmittal please contact me at your first convenience. Si rely, an M. ane s, .E. Civil.Project Manor AMM Attachments: As noted above cc: Mr. Robert G. Yelverton - Weeks/Lichtin what* Mr. Wes Lowder - S&ME, Inc. w/o atts Mr. Lester V. Lowe, III, P.E.; - DSAtlantic w/o att's Mr. Andrew R. Padiak, E.I.T,, - DSAt(ande w/o atts File w/acts 801 Jones Franklin. Road Suite 300 Ralcigh, NC 27606 (919) 851-6866 Fax: (919) 851-7024 wwwdsatlatitio.com C: It ARL01":'H, NC N CULUM131A, SC N N1 A1 ON I' A ¦ NA C1;V?I 1 TN' ¦ 1) Al rio Z0'd SZ:91 8661'1Z'80 Adoiuin93d HSI31Ud I4ONJ RECEIUD AUG 18 1999 DWQ.ID: CORPS ACTION ID: ? q r f?-,;? / o,,.?,-t_ NATIONWIDE PERMIT REQUESTED (PROVIDX NATIONWIDE PERMIT #),12,14,26 PRE-CONSTRUCTION NOTIFICATION APPLICATION FOR NATIONWIDE PERMITS THAT REQUIRE: 1. NOTIFICATION TO THE CORPS OF ENGINEERS 2. APPLICATION FOR SECTION 401 CERTIFCATION 3. COORDINATION WITH THE NC DIVISION OF COASTAL MANAGEMENT SEND TIME ORIGINAL AND (1) COPY OF THIS COMPLETED FORM TO THE APPROPRIATE FIELD OFFICE OF THE CORPS 01: ENGINEERS (SEE AGENCY ADDRESSES SHEET). SEVEN COPIES MUST BE SENT TO THE NC DIVISION OF WATER, QUALITY, ATTN: JOHN DOI2NEV9, 4401 REEDY CREEK ROAD, RALEIGH, NC 27607. PLEASE PRINT OR 'T'YPE. 1. OWNER'S NAME.- Weeks/Lichtin 2. MAILING ADDRESS: 1800 perimeter Park Drive, Suite 200 CITY: Morrisville STATE: NC ZIP CODE: 27560 PROJECT LOCATION ADDRESS, INCLUDING SUBDIVISION NAME (fF DIFFERFNT FROM MAILING ADDRESS ABOVEParamount Center Subdivision Morrisvile, NC 3. TPLFPI40NEhUMBER: (HOME) SUBDIVISION NAME: Perimeter Park Page I of 6 (WORT() (919) 469-1300 E0'd 9Z:91 866T'TZ'80 AdGlbin93N HS131UN W021d 4. IF APPLICABLE: AGVNT'S NAME OR RESPON SIDLE CORPORATE OFFICIAL, ADDRESS, -PHONE NUMBER: Robert G. Yelverton 1800 Perimeter Park Drive, Suite 200, Morrisville, NQ 27560 5. LOCATION OF WORK (PROVIDt A MAP, PREFERABLY A COPY OF USGS TOPOGRAPHIC MAP OX AURAL PHO'IL)GRAPHY WITI4 SCALE): COUNTY: Wake NEAREST TOWN: Morrisville SPECIFIC LOCATION (INCLUDE ROAD NUMBERS, LANDMARKS, ETC.) The site entrance is located on NC Hwy 54 a roximately 3700 lineal feet north of the intersection of NC' Hvvy 54 and _Airport Blvd (SR 3016). The site is located to the east of NO Hwy 54 as Shown on the attached vicinity map. 6. IMPACTED OR NEAREST STRUANURIVER: Stirrup Iron Creek RIYER BASEN: Neuse A 7a. IS PROJECT LOCATED NEAR WATER CLASSIFIED AS 'T'ROUT, TIDAL SALTWATER, (SA), HIGH QUALITY WATERS (IIQW), OUTSTANDINQ RESOURSE WATERS (OTtW), WATER SUPPLY (WS?I OR WS41)? YES © NO ® IF YES, EXPLAIN: 7b. IS THE PROJECT LOCATED WITHIN A NORTH CAROLINA DIVISION O COASTAL MANAGEMENT AREA OF E,NVIROMENTAL CONCERN (AEC)? YES F] NO 2 7c. IF THE PROJECT IS LOCATED WITHIN A COASTAL COUNTY (SEE PAGE 7 FOR LIST OF COASTAL COUNTIES), WHAT IS THE LAND USE PLAN (LUP) DESIGNATION? NIA Page 2 of 6 b0'd 9L:ST 8661'TZ'80 %d0ib1A63N HS131U8 W0dJ 8a. HAVE ANY SECTION 404 PERMITS BEEN PREVIOUSLY REQUESTED FOR USE ON THIS PROJECT? YES 0 NO ® IF YES, PROVIDE ACTION J.D. NUMBER OF PREVIOUS PERMIT AND ANY ADDITIONAL INFORMATION (INCLUDE P140TOCOPY OF 401 CERTIFICATION): 8b, ARL ADDITIONAL PERMIT REQUESTS EXPECTI?D FOR 1'H IS PROPERTY IN TH ; FUTURE? YES L] NO ® IF YES, DESCRI13E ANTICIPATED WORK: 9a, ESTIMATED TOTAL NUMBERS OF ACRES IN TRACT OF LAND: 157.46 acres 9b. ESTIMATED TOTAL NUMBER OF ACRES OF WETLANDS LOCATED ON PROJECT SITE: 5.49 acres 10a. NUMBER OF ACRES OF WETLANDS IMPACTED BY THE PROPOSED PROJECT $Y: FILLING: Nwd. 14 - 0.13 ac./Nwd. 26 - 0.30 ac. EXCAVATION: N/A FLOODING: N/A OTHER : Nwd. 12 - 0.01 ac. sanity sewer crossin DRAINAGE: N/A TOTAL ACRES TO BE IMPACTED: 0.37 acres 10b. (1) STREAM CHANNEL TO BE IMPACTED BY THE PROPOSED ]PROJECT (IF RELOCATED, PROVIDE DISTANCE BOTH BEFORE AND ALTER RELOCATION: LENGTH BEFORE: Nwd. 14 - 4151Nwd. 26 - 410 FT. AFTER. FT. WIDTH BEFORE (based on normal high water contours): A 10, B 15, C 16 FT. Page 3 of 6 AVERAGE DEPTH BEFORE: 3 I;T. AFTER: FT. S0'd 9Z:Si 8661'1Z'80 h8oiuinUa H0131UN W08J (2) STREAM CHANNEL IMPACTS WILL RESULT ]FROM: (CNF;CK ALL T14A.T APPLY) OPEN CHANNEL RELOCATION; CHANNEL EXCAVATION; E7 OTHER: F] PLACEMENT OF PIPE IN CHANNEL- CONSTRUCTION OP A. DAM/FLOODING: 0 11. IF CONSTRUCTION OF A POND IS PROPOSED, WHAT IS THE SIZE OF THE WATERSHED DRAINING TO THE POND? NIA WHAT IS THE EXPECTED POND SURFACE AREA-1 12. DESCIUPTION OF PROPOSED WORK INCLUDING DISCUSSION OF TYP) OF MECHANICAL EQUIPMENT TO BE USED? (ATTACH PLANS; 81/2 BY 11 DRAWINGS ONLY) The work will involve placement of reinforced concrete culvert pipe in the channels covered by earth backfill to allow four rondwa crossings (A, B, C & D). Nationwide Permit 14 Is requested to cover Impact Areas 'A' and 'B', Nationwide Permit 2 is re uested to cover Impact Areas 'C' and V. In addition Nationwide Permit 12 is requested for a gravity sanitary sewer crossing in Impact Area 'E'. PURPOSE OF PROPOSED WORK: The roadway crossings are to serve an office subdivision and the general population of Morrisville. Both roadways have been adopted to the Town of Morrisville Master Thoroughfare Plan. A new gravity sewer stream crossing is also, required to serve the office park. _ 14. STATE REASONS WHY IT IS BELIEVED THAT THIS ACTIVITY MUST 13E CARRIED OUT IN WETLANDS (INCLUDE ANY MEASURES TAKEN TO MINIMIZE WETLAND IMPACTS) The Is bisected by two streams and a third stream separates the parcel from the remainder of Page 4 of 6 90'd 9z:91 8661'IZ'80 hdoltlu@38 He131U8 W08J the Town of Morrisvdle's infrastructure. The crossings have been planned to be perpendicular to the streams and slopes have been designed as steep me possible to limit 1e th of stream Impact. IS. YOU ARE REQUIRED TO CONTACT THF, US FISH AND WILDLIFE SERVICE ,AND/OR NATIONAL MARINE FISHERILS SERIVE REGARDING THE PRESENCE OF ANY FEDERALY LISTED OR PROPOSED FOR LISTING ENDANGERED OR THILCATENED SPECIES OR CRITICAL HABITAT IN THE PERMITAREA THAT MAY BE AFFECTED BY TRI- PROPOSED PROJECT, DATE CONTACTED; N/A 16. YOU ARE REQUIRED TO CONTACT 1'HE STATE HISTORIC PRESERVATION OFFICER (SHPO) REGARDING THE PRESENCE OF HISTORIC PROPERTIES IN THE PERMIT AREA WHICH MAY BE AFFECTED BY THE PROPOSED PROJECT. DATE CONTACTED NIA 17. DOES THE PROJECT INVOLVE AN EXPENDITURE OF PUBLIC FUNDS OT THE USE OF PUBLIC (STATE) LAND? YES E] NO ® (IF NO, GO TO 16) a_ IF YES, DOES THF. PROJECT REQUIRE PREPE RATION OF AN ENVIRONMENTAL DOCUMENT PURUANT TO 1'HF REQUIREM13XTS OF THE NORT11 CAROLINA ENVIRONMENTAL POLICY ACT? YES © NQ 0 b. IF YES, HAS THE DOCUMENT BEEN REFIEWED THROUGH T14E NORT14 CAROLINA DEPARTMENT OF ADMINISTRATION STATE CLEARINGIOUSE YES Fl NO IF ANSWER 17b IS YES, THEN SUBMIT APPROPRIATE DOCUMENTATION FROM THE- STA1-L CLEARINGHOUSE WITH THE NORTH CAROLINA ENVIRONMENTAL POLICY ACT. QUESTIONS REGARDING THE STATE CLEARINGHOUSE REVIEW PROCESS SHOULD 13E DIRECTED TO MS. CHRYS BAGGETI', DIRECTOR STATE CLEARINGHOUSE, NORTH CAROLINA DEPARTMENT OF ADMINISTRATION, 116 WEST JONES STRF.,ET, RALF-IG1I, NORTH CAROLINA 27603-8003, TELEPHONE (919) 733-6369, I8. THE FOLLOWING ITEMS SHOULD BE INCLUDED WITH THIS APPLICATION IF PROPOSED ACTIVITY INVOLVES THE DISCHA,ROE OF EXCAVATED OF FILL MATERIAL INTO WETLANDS; a. WETLAND DELINEATION MAP SHOWING ALL WETLANDS, STREAMS, LAKES, AND PONDS ON THE PROPERTY (FOR NATIONWIDE PERMIT NUMBERS 14, 18, 21, 26, 29, ANb 38). ALL STREAM (INTERMITTENT AND PERMANENT) ON THE PROPERTY MUST 13E SHOWN ON THE MAP, MAP SCALES SHOULD BE 1 INCH EQUALS 50 FEET OF I INCII EQUALS 100 FEET OF THEIR EQUIVALENT. b, IF AVAILABLE, REPRESENTATIVE PHOTOGRAPH OF WETLANDS TO BE IMPACTED BY PRODUCT. c. IF DELINEATION WAS PERFORMED BY A CONSULTANT, INCLUDE ALL DATA SHEETS Page 5 of 6 L0'd ZZ:91 866T'IZ'80 ndoiuine38 HE131UN W021d RELEVANT TO THE PLACEMENT OF THE DELINEATION LINE. d. ATTACH A COPY OF THE STORMWATL•'R MANAGEMENT PLAN IF REQUIRED. o. WHAT IS LAND USE ON SURROUNDING PROPOERTY? vacant f. IF APPLICABLE, WHAT IS PROPOSED METHOD OF SE WAGE DISPOSAL? A sewage lift station will Pump sewage back down paramount Parkway to an existing Town of Morrisville grravity outfall g- SIGNED AND DATED AGENT AUTHORIZATION LETTER, IF APPLICABLE. NOTE: WETLANDS OR WATERS OFTHE U.S. MAY NOT BE IMPACTED PRIOR TO: I. ISSUANCE OF A SECTION 404 CORPS ON ENGINEERS PERMIT, 3. OWNER'S/, 2. EITHER THE ISSUANCE OR WAIVER OF A 401 DIVISION OF WATER QUALITY CERTIFICATION, AND (IN THE TWENTY COASTAL COUNTIES ONLY), A LETTER FROM TIlt NORTH CAROLINA DIVISION OF COASTAL MANAGEMENT STATING THE PROPOSED ACTIVITY IS CONSISTLNT WITH THE NORTH CAROLINA COASTAL MANAGEMENT PROGRAM, (AGENT'S S1GNA 3 DATE ONLY IF AUTHORIZATION Page 6 of '6 801d LZ:SI 8661'TZ'80 nNciui 638 HSI31U8 W08J Ln, TTER FROM THE OWNER IS PRO VIDED)_ VICINITY MAP SCALE: 1" = 2000' 60'd ZZ:91 8661'TZ'80 (%doiuinS3N H9I31U8 W021d OVERALL PLAN PARAMOUNT CENTER WEEKS/ LICHTIN WEEKS REALTY, LP 1800 PERIMM PARK DRIVE, surm 200 ,6..., #.4., MORRISME, NORTH CAROLINA 0T'd LUST 866T'TZ'80 D"'SAtlantic CHARI&M. NC • COLMIA, AC • MLCON, CA • I<AMMUZ, yx RAMOH, NC • RWM§dOND, VA r Wft; ON-@W+1, NC PROJECT No. LIC037.000 DATE 17AUCI"B smrw gun, FVM Aaoiuin638 HS131tla woad IMPACT AREA w PARAMOUNT CENTER WEEKS/ LICHTIN WEEKS REALTY, LP 1000 PERIMETER PARK DRIVE, SURE 200 MORRISVILLE, NORTH CAROLINA ZI'd 8L:SS 866I'TZ'80 I"J""SAtlantic CNHIG4'pE. MC 0 COLUMAIA, SC I MACON, CA • NARMLLR, TN HAWCH. NC • H[CH{IDND. VA r Ngo"N-BMAI, NC PROJECT NO. UC037M DATE 1TAUCT"b SKF rl4 MCl• rv, A8ciuinS38 HS131bb WOad IMPACT AREA PARAMOUNT CENTER WEEKS/ LICHTIN %"EKS REALTY, LP 1800 PERIMETER PARK DRIVE, SUITE 100 +?.e¦.? MORR MLLE, NORTH WOUNA Zt'd 8Z:SS 866T*TZ'80 T-%SAtlantic CHAMM- HC ¦ coyPN814 N • MACCH, GA 0 NAMMLL8, TM HUZU. NC • RI[NYOND, TA • Mmmu-"N. Nc PROJECT 140: UCD37A00 DA's 17AU01"O qrF rw tun, h8ciuinS38 HSI31d l WOdJ , i ' IMPACT E .... C AREA "N370.0 ' CROSS i ..............._._..i,... SECTION GRAPHIC SCALE 0 50 100 700 ' I I I I ' I 1 ( IN FEET ) i ! 1 inch = 100 ! i j I i.. VERTICAL 7" . y0• ft. 360.00....... _ ..... i...__!.._....... i ..... ........ I i ? I I ' i ! i i I ' I I I ' ; i l l ? I E I i?( I i I I i j I ? ? I I I i ! ( I ? I 340.00...., I +, . I I .. i _i.. i i j . i ' f ? ? i I I I ? i i i •I ? I ' E ! I I ? ' I I I I j 1 ? E I I i I I ! 1 i I I ! j i ! ? ? i ' ' I I I i I ! ' i I i E 0.00 20.00 40.00 60.00 00.00 100.00 12Q.00 140.00 160.00 180.00 200.00 220.00 IMPACT AREA 'A' PARAMOUNT CENTER WEEKS/ LICHTIN WEEKS REALTY, LP 1800 PERIMETER PARK C7wL SUITE 20o MORRISVILLk NORTH CAROUTA £1'd 81:S1 866T'IZ'80 SAtlantic c1u?MBM NC . COMA A, He . XWON, GA . )VARMua, 7N BAWCH. NO • JUCHWOND. va . jMyMN-aujgl. Na PROJECT No- UC037.000 DATE 17AUC1990 SKFTC'N N(1• Me A Aaoiuin63d HOI31U8 W08A IMPACT AREA ,B, PARAMOUNT CENTER WEEKSI LICHTI N WEEKS REALTY, LP 1800 PFX MMR PARK DRIVE, SUITE 200 MORRISNiI & NORTH CAROUNA bi'd 6Z:ST 866I'TZ'80 il"J"' S Atlantic ma nzom Plc . coulw" ac . WON, Cry . 14M" W. Trr numGH. MC . YA7MM, VA r WrWMM-AAfW NO PROJECT NQ UC037A00 DAT'E_ 'DAU(,' S SKFrna NO- rue haoiuin@38 HSI31U6 WOSzf IMPACT AREA 'B' PARAMOUNT CENTER WEEKS/ LICHTIN WEEKS Rmly, LP IWO PERIMETER PARK DRIVE, SUITE 200 MORRISVILLI, NORTH CAROLINA SSA tla?z tic A1TS NC • ccWlpL, sc . r?sa?, ce • x?vtus, roc PRo1ECT NO., UC0NDW DATE VAUC t"S SKF rrM N[)' eve ST'd 6Z:ST 866T'TZ'80 6N0lHlnS3N HB131bb WONJ IMPACT AREA 'B' CROSS SECTION GRAPHIC SCALE 0 50 100 200 ( IN FEET ) 1 inch = 100 ft VERTICAL Y =10" DATUM ELE1 300. Op OROUP B SECTION i IMPACT AREA 'B' 91 'd PARAMOUNT CENTER WEEKS/ LICHTIN WEEKS REALTY, LP 10M MW MR f ARX ORK SURE 200 MORRI5MLLE, NORTH CAROLNMA 6L:ST 866T'TZ'80 if It .1"", ;& S A da n tie c I'll-11r, aoal"k w • ??con, a • K,?aicvtw?, ,iv X"C". Nc . ;UMMO a. vw r +mlBrotl-aµ?K, Nc PROACf NO: LIC037.000 DATE 17AUG1"8 SK -TrU Mn, -M 6doiuinS38 H@I31U8 W0dJ U, VV LO.OD ?O.DD 60.00 80.00 100.00 120.00 140.00 160.00 JAO.OD 200.00 220,00 240.00 IMPACT AREA ,C, PARAMOUNT CENTER WEEKS/ LICHTIN WEEKS REALTY, LP =0 PERIMETER PARK DRIVE, 5UITE 200 464spK"q MORRISVlI.LE„ NORTH CAROLINA LI'd 6Z:9I 866I'IZ'80 13SAtlantic OWUO I NQ • WLwsu, 8C • WON, CA 0 XA"Uj, rx RAtil4a, No • 21=0NO, 1A • •R19TON4un, Nc PROJECT NO. LIC037,000 DATE VAUC1998 CVCTru him (,NOIU InO3b H9I3lUd WONJ IMPACT AREA ,C, PARAMOUNT CENTER WEEKS/ LICHTIN WEEKS REALTY, LF 1800 PERWIETER PARK DRIVE, SUITE 200 MORRISMLLE; NORTH CAROLINA 8T'd 02:91 8661'TZ'80 l.j Atlanti CNARLCI4'R, " • W6U1&1A- !C * MACOn, CA • NA MLIC, TN KAM= NC ? 7UCHY0Nn, VA + 11II""m-,, wN, NC PROJECT NO. 00037,000 DA'Z'E 11AUC1995 SKF rl4 Nn- ..... Aaoiuin93N H9I31Ud woad CROSS i i SECTION i i GRAPHIC; SCATHE` 50 tao 200: ? i i I I I 1 1 t 1 j i I i f - - ------ ------ i 1 I , f i ! I 1 1 ? I j I i i I I i i i 1 1 ? i I 40.00 60.00 80.00 100.00 120.00 140.00 160.00 180.00 200.00220-00 240-00 260.00280.001300, IMPACT AREA /C. PARAMOUNT CENTER WEEKS/ LICHTIN WEEKS REALTY, LP 1800 PERIMETER PARK DRIVE, SUITE 200 MORRISVILLE, NORTH CAROUNA 61'd OZ:r.T 8661"TZ'80 ?o DSAtlantic R"011, toe . >deYKum, VA . WwrMN-Lum. NG PROJECT NO: UC037.000 DAM 1DAUCI"8 na01tlin63N H0I31U8 WONA IMPACT AREA `D' AREA = 0.202 AC WIDTH = 98' LENGTH = 150' GRAPHIC SCALE 0 5a Iq0 700 ( IN FEET ) 1 inch 100 > t. ` i WEEKS REALTY. LP LOT X14 PARAMOUNT CENTER ZONINQ F I 00, AIRPORT OVERT AY 1 USE: VACAN7 1 • f ? 0.91 AC -?l. R LOT #4 ,., D&la? ?., `''•' °`.? IMPACT AREA Ity .'w?? :? ? ??? ; ??"fit,., -MM IMPACT AREA 'D' PARAMOUNT CENTER WEEKS/ LICHTIN WEEKS REALTY, LP 1800 PERIMETER PARK DRIVE, SUITE 200 10h,,,01i,q MORRISVILU. NORTH CAROLINA 0Z'd 0£:9T 8661'TZ'80 i..,6Atlantic CIURIOM. NC • =MBn, Sr, • a=, oA • KAIPI[f ". %W R"rR. NC . 21011Youm, VA • wmmm-bAlAw. t1C PROJECT' NO: IJC03T.000 We 17AUC19" ;Mru AIn. r%8oiNinU38 H9I31UN W02 IMPACT AREA 'D' PROPOSED ROAD PROFILE GRAPHIC SCALE 0 30 100 200 ( IN FEET ) 1 inch - 1p0 ft. VIRTICAL 1" = 10' 7 3 i IMPACT AREA V LWeam d" TZ'd ijSAtlantic CNARMQU NC & CIUMM Id • KWON, CA ¦ NAMI" TN RAl MR. No • NCmmn. VA • IIMM14-MEM, NC rRoitCT No. UC037MO DAM 17AUC19% cvrrrn l h l^ A80lUln93d HS131Ub WMA PARAMOUNT CENTER WEEKS/ LICHTIN WEEKS REALTY, LP 1900 PERIMETER PARK DRIVE, SUITE 200 MORRISVILLk NORTH CAROLINA TEST 866T'TZ'80 IMPACT AREA 'D' CROSS SECTION GRAPHIC SCALE 0 54 100 200 ( IN FEET ) 1 Inch = loo ft. VERTICAL 1' = 10' VA TUN ELE; 330.00 CROUP D SECTION 1 IMPACT AREA .U, PARAMOUNT CENTER WEEKS/ LICHTIN WEEKS REALTY, LP 1800 PERIMETER PARK DRIVE, SUfIE 200 MOMWILLF, NORTH CAROUNA ZZ'd 12:91 8661'TZ'80 SSA tlantl C C"lof'[I, HC CpWYBIA, 8C ¦ YAM. CA • NAIRY02J, 81 RAUIGK WC • 1UMOMD, VA • WD10"ll-GAM, NC PROJECT No., LIC037.000 DATE 17AUCI"b SKF7f14 kn. .,..? ha01Hln93N HS131dN woad 0,00 20.00 40.00 60,00 80,00 100.00 120,00 140,00 160,00 180,00 IMPACT AREA 'El AREA = 0.006 AC WIDTH : 13.5' LENGTH = 20' 7 C "I x 1 I AMPACT AREA I I 1 I / GRAPHIC SCALE 0 50 100 200 ( IN FEET 1 inch = 100 It, 6 U [V NOW OR FORMERLY JESSE MARCOM 20NiND: AOMRPQRT OVERLAY USE. RC51DENTIAL IMPACT AREA .E, PARAMOUNT CENTER WEEKS/ LICHTIN WEEKS REALTY, LP 1800 PERIMETER PARK DRIVE SUITE 200 MORRISVILL? NORTH CAROLINA TzIST 8661'TZ'80 NOW OR FORMERLY J.A. FERRELL IONINQ AD/ARPORT OVERLAY U$41 VACANT Atlantic OUAR14w?M?w.. Nq • COW"a. 8C • MUM, CA • NAM M" TN PA MON, NC . RiCHHOPM. VA A 1RNOTON-SA=. NO PROJECT No. LIC037A00 DATE VAUG1995 9lfrT'f u un. AdOlNln93N H9I31bb w08z IMPACT AREA 'E' PROPOSED PROFILE GRAPHIC SCALE 0 50 too 200 ( IN FEET ) 1 inch = 100 It. VERTICAL 1' = 10' I 310.QQ .........:.........y....._.:....,,...{............... p....._j.........i DATUM ELEV .300.00 GROUP R SECTION 1 IMPACT AREA 'E' UZ'd PARAMOUNT CENTER WEEKS/ LICHTI N WEEKS REALTY, LP 1800 PERWIE7ER PARK DRK sum 200 MORRISALE, NORTH CAROLINA Z2:9I 8661'1Z'80 Atlana C1IAmmR. NC • cal u"m ac .0 MACON, ".0 l'fACl1"" rN /WEIGH, NC • Rte o". V? IIO181'ON-OA{it?l, NC PROJECT NO. UC037A00 DATE VAUCIM ,gvrY'L ktr%. wry A80iUlnSEIN HS131UN woad VICINITY MAP SCALE: 1 " = 2000' I I II ` \ I I I \ ISOLATED (( I WETLANDS I jr," I II blry'^Ir*? y. IMPACT, r \ ISOLATED r+;<' AREA \ ,q.,, ETLANDS ` \ \ I \ I i d 9 A `? a o 4 ; 4 4 i ? ccV ?°= 9 ao.oooDo GRAPHIC SCALE 0 250 500 1000 ( IN FEET ) 1 inch = 500 ft. ?I \ 1 \ ;i i I rr • ` \ v c O T # O J ` ! \c? \\\ i 6 0 0 D } \??? ? IMPACT , 6 0 ARl1? IMPACT - 'x 0 0 y 0 D 0 \\ . ?\ .. , AREA i I i i Wetland Length Width Area Area (ft) (ft) (AC) I A 200.0 10.0 0.0487 0 D 8 215.0 12.0 0.0783 C. C 260.0 16.0 0.0946 D 150.0 98.0 0.2017 Q! a E 20.0 13.5 0.0060 -, Summary 839 156 0.4292 OVERALL PLAN DJSAtlantic PARAMOUNT CENTER CHARIAITE, NC • COLUMBIA, 8C • YACON, CA • NAHIMLLE, TN WEEKS/ LICHTIN RAIZIGH, NC • RICHMOND, VA a WINSTON-SALEM. NC WEEKS REALTY, LP PROJECT NO_ LIC037.000 1800 PERIMETER PARK DRIVE, SUITE 200 DATE 17AUC1998 MORRISVILLE, NORTH CAROLINA SKETCH NO. E)(1 +ac@MoLao IMPACT AREA 'A' AREA = 0.049 AC WIDTH = 10' LENGTH = 200' GRAPHIC SCALE 0 50 100 200 ( IN FEET ) 1 inch = 100 ft. IMPACT AREA 'A' i ,??iAtlantic PARAMOUNT CENTER -. WEEKS/ LICHTIN CNAR1A17E, NC • COLUMBIA, 8C • YACON, CA 0 NABHYILLB, TN R=ICH, NC • RICHMOND. VA • MBTON_SALBY, NC WEEKS REALTY, LP PROJECT NO: LIC037.000 1800 PERIMETER PARK DRIVE, SUITE 200 DATE 17AUC1"8 aeswneL#" MORRISVILLE, NORTH CAROLINA SKETCH NO_ w IMPACT AREA 'A' PROPOSED ROAD PROFILE GRAPHIC SCALE 0 50 100 200 ( IN FEET ) 1 inch = 100 ft. VERTICAL 1" = 10' ---- ..------C-..-... ---- -------- 0 z z a -------- 3 ---------------- ----------------------------- ------------- ------ ---------------- ------------------ of 0 + o z D W w ? o z O N ? -......_...... .._---.....-._ ..1.._..- ..._-... _...._.. N -- --------' w -- ! j --------- ---- 49'4 ---------- ------- L£ ?A313 ' lVL9+0 Z :V1S lAi o o a..? .. I ................; ? o Iv + N7 _ ?? / Q J L C: n P U . Y J ? ---- -- S i 5; ( S a a ---------- 5b'6L£ A31 3 64'LQ+6L NISI OAd i - - ------ ? n - -------- ----------------' I r of N o I N gl N o I H O I O N of N o I 0 IMPACT AREA 'IN TIN Atlantic PARAMOUNT CENTER CHARlD17'6, NC • COLUMBIA, 8C • YACON, CA • NAHHYILLB, TN WEEKS/ LICHTIN RAUION, NC • RICHMOND. VA • WMSTON-SAMN. NC WEEKS REALTY, LP PROJECT NO: LIC037.000 1800 PERIMETER PARK DRIVE, SUITE 200 DATE 17AUC1998 ,e.e•e•L#" MORRISVILLE, NORTH CAROLINA SKETCH NO. EX3 i I IMPACT AREA "A370.00 .......... ._.< ............. '. .. .... ............ ....... ....... CROSS SECTION GRAPHIC SCALE: 350. 340.OC IMPACT AREA 'IN 1' ,;SAtlantic PARAMOUNT CENTER -. WEEKS/ LICHTIN CHARIAl'f6, NC • CDLUYBU, 8C • YACON, CA • NASHVILLE. TN RALEIGH, NC' RICHMOND, VA • WINBrON-8ALSM, NC WEEKS REALTY, LP PROJECT NO: LIC037.000 1800 PERIMETER PARK DRIVE, SUITE 200 DATE 17AUG1998 4pp.hbLd , MORRISVILLE, NORTH CAROLINA SKETCH NO: D(4 0.00 20.00 40.00 60.00 80.00 100.00 120.00 140.00 160.00 180.00 200.00 220.00 IMPACT AREA 'B' AREA = 0.078 AC WIDTH = 12' LENGTH = 215' \ 1 WEEKS REALTY, LP LOT X111 PARAMOUNT CENTER ZONING: I Odd, AIRPORT OVERLAY USE: VACANT 5.00 AC I WEEKS REALTY, LP LOT #10 PARAMOUtfr CENTER ZONING: P1 Odd, AIRPORT 0 RLAY USE: VACANT ••'"`'• 5.10 AC I / I \ I? l? Ja , r C GRAPHIC SCALE 0 50 100 200 ( IN FEET ) 1 inch = 100 ft. a ? a o en 0 LOT #8 IMPACT AREA 'B' PARAMOUNT CENTER Atlantic CHABLO'PIE. NC • COLUMBM SC • MACON. GA • HABtV=. TN WEEKS/ LICHTIN RALEIGH. NC • RICHMOND, VA • 111N6rON-9ALSM, NC WEEKS REALTY, LP PROJECT NO_ LIC037.000 1800 PERIMETER PARK DRIVE, SUITE 200 DATE VAUC1998 01d" MORRISVILLE, NORTH CAROLINA SKETCH NO. EX5 IMPACT AREA 'B' PROPOSED ROAD PROFILE GRAPHIC SCALE 0 50 100 zoo ( IN FEET ) 1 inch = 100 ft. VERTICAL 1" = 10' 0 , CnN +. o M a o N .......... .. x-1-11-- ??---I?--?. W F J N;v) W Q Y a °ia 5 ---------------- o I s I o I ---------- + --------------- L° -- E............ °- > ------------ ...°-.... . + i A 8 /i 00 ----------------- ------------°-- ;.....-------------;-...--- --------:----- ------------ ........; ..._...... --------- ----------- ZZ174£ ':A313 09+94 :VIS iAd ............. .................. ----...-.--_-.-.i--...----------- / -- .............................. $ n IMPACT AREA 'B' SAtlantic PARAMOUNT CENTER CHARIATI'E, NC • COLUMBIA. 8C • YACON, CA a NASITYILI.E. TN WEEKS/ LICHTIN 8A,8I6H. NC . RICHMOND, VA • wlNvrON-9AISY. NC WEEKS REALTY, LP PROJECT NO_ UC037.000 1800 PERIMETER PARK DRIVE, SUITE 200 DATE 17AUC1998 ...n.,.t,., MORRISVILLE, NORTH CAROLINA SKETCH NO: EX6 IMPACT AREA 'B' CROSS SECTION GRAPHIC SCALE 0 50 100 200 ( IN FEET) 3so.on_.__. 1 inch = 100 ft. VERTICAL 1" = 10' DATUM ELE 320.00 GROUP 8 SECTION 1 IMPACT AREA 'B' Atlantic PARAMOUNT CENTER WEEKS/ LICHTIN CHART M. NC . COWUMA, SC . AUCON. 6A . NAMMIX. TN RAMGH, NC . RICHMOND, VA . WINSPON-SAUK, NO WEEKS REALTY, LP PROJECT NO: LIC037.000 1800 PERIMETER PARK DRIVE, SUITE 200 DATE 17AUC1998 46490 t.d" MORRISVILLE, NORTH CAROUNA SKETCH NO. EX7 0.00 20.00 40.00 60.00 80.00 100.00 120.00 140.00 160.00 180.00 200.00 220.00 240.00 IMPACT AREA 'C' AREA = 0.095 AC WIDTH = 16' LENGTH = 260' GRAPHIC SCALE 0 50 100 200 ( IN FEET ) 1 inch = 100 Pt. Ih IMPACT AREA 'C' PARAMOUNT CENTER WEEKS/ LICHTIN WEEKS REALTY, LP 1800 PERIMETER PARK DRIVE, SUITE 200 MORRISVILLE, NORTH CAROLINA D S Atlantic CHABL&M NC • COLUMBIA, 8C • MACON, CA • NASHVILLE, TN RALEIGH. NC • RICHMOND. VA • RINSTON-SALEM. NC PROJECT NO: LIC037.000 DATE 17AUC1998 SKETCH NO. EX8 IMPACT AREA 'C' PROPOSED ROAD PROFILE GRAPHIC SCALE 0 50 100 200 ( IN FEET ) 1 inch = 100 ft. VERTICAL 1" = 10' of o I 0 S I 0 0 0 M O, n C, n: N II II II i II '0 II .................. ............_...!,.....?.-C;51 1.. ,.JI -------------- -------° ......... -- - ---------------<------- Z ---- -- -° - wNN,W ------------- - + n O a II a S j Of J a a J (n X W + .................. L------------................... ---- ------- '/-------------- ............. --------'------i---- --------- --- ' - ---------- - n n n n n IMPACT AREA /Cl D"'SAtlantic PARAMOUNT CENTER WEEKS/ LICHTI N N °""? RAIM. T?MBU, . MA CON. O . AM, NC RAI.RICH. NC • RICHMONDD, , VA • RDi31'ON-9AI811 NC WEEKS REALTY, LP PROJECT NO: 00037000 1800 PERIMETER PARK DRIVE, SUITE 200 DATE: 17AUG1998 N« MORRISVILLE, NORTH CAROLINA SKETCH NO: EX9 IMPACT34A9?E} ...?C? ........... ...........................-...............,...-...:...-.-.......:_.........--....... ...... ...... ...... ....... ...... ...... .. .. . CROSS SECTION IMPACT AREA. D...SAtlantic PARAMOUNT CENTER CHARIATTE, NC • COLUMBIA, 9C • YACON, CA • NASHVILLE, 7N WEEKS/ LICHTIN RALBIOB, NC • RICHMOND. VA • WINMN-BAIBY, NC WEEKS REALTY, LP PROJECT NO: 00037.000 1800 PERIMETER PARK DRIVE, SUITE 200 DATE 17AUG1998 ??? MORRISVILLE, NORTH CAROLINA SKETCH NO: EK10 IMPACT AREA 'D' AREA = 0.202 AC WIDTH = 98' LENGTH = 150' I )) I J LOT #8 I I C? I IMPACT AREA 'fY \I IMPACT AREA 'D' Atlantic PARAMOUNT CENTER WEEKS/ LICHTIN CHARlATP6 NC • COLumom 8C • YACON. CA • NAM"= TN RAL916. NC . RICHMOND, VA • ODVBTON-SALEM, NC WEEKS REALTY, LP PROJECT NO: LIC037.000 1800 PERIMETER PARK DRIVE, SUITE 200 DATE: 17AUC1998 -44a bbd" MORRISVILLE, NORTH CAROLINA SKETCH NO-- D01 GRAPHIC SCALE 0 50 100 200 ( IN FEET ) 1 inch = 100 ft. ? I nl j ' , I IMPACT AREA 'D' PROPOSED ROAD PROFILE GRAPHIC SCALE 0 50 100 200 ( IN FEET ) 1 inch = 100 ft. VERTICAL 1" = 10' .. ....... >-- H... w?a> . W y F J p a4a. a J ,ywa ...H......-. > J . .............. 1y iop .. ................ ... ............: / N Z D I c? z LL'ZS£ :A313 ' N ..............+--- -- - 05+9C :V1S OAdi . ,..._ ..... .-I----r----- ------------:, Q c -- - --- -r - - ?...a° . N ................ .. ................. ...... ............ h ? I LL'65£ ?313 a 05+L£ 1S lAd I - - : ................. -...../ 0 - ------------ -----------.... ------ ..... ..- - i ............ o 0 D ' N n n I ? I o i a o n M n + 0 v r M 1 4 .t o - - - - .. - • N, ....... . . j tr.. ?.. > II II II tD ........................ ------------ --------------- II , < W I? II a i W 1 > yV)w'?Y? -------- -- -----?- II S i=---H a-.-a a -------- ---------- --------- ----------------- i I' i -- ...... --. ....... ...... 05'L£+Z4 :V1S :)Ad \ -............... -- - +; o - ._. .-------------------- ------------- j 0 , I " LL 'Z S£ -A313 ------------------ : \ 05+ 1 4 :V1S lAd r .. ----- ... .... - --°° - --- -- - - ?-- -- ---------. 4------------------ .......------ --- ---------- .... - ------------------------------- °° . on + 0 II 9 II II v n g I e °o I o I r °o I r o I S I n 00 I n O I n IMPACT AREA Atlantic PARAMOUNT CENTER CHARLOTTE. NC • COLUMBIA, SC • MACON. OA • NASHVLLIL TN WEEKS/ LICHTIN RA181TH. NC IT RICHMOND. VA • RINSTON-SAUM. NC WEEKS REALTY, LP PROJECT NO_ LIC037.000 1800 PERIMETER PARK DRIVE, SUITE 200 DATE 17AUG1998 MORRISVILLE, NORTH CAROLINA SKETCH NO. EX12 IMPACT AREA 'D' CROSS SECTION GRAPHIC SCALE 0 50 100 200 ( IN FEET ) 1 inch = 100 ft. VERTICAL 1" = 10' 360.OQ.............. --°- DATUM ELEV 330.00 GROUP D SECTION 1 IMPACT AREA 'D' I* )"S Atlantic PARAMOUNT CENTER WEEKS/ LICHTIN C""R'"?G NC . LUMBIA, D, . YAC IN, CA • NASHVILLE TN RALEIGH, NC • RICHM CHMOND, VA • IID9S7'ON-9A1.B11, NC WEEKS REALTY, LP PROJECT NO-- UC03ZOOO 1600 PERIMETER PARK DRIVE, SUITE 200 DATE 17AUC1998 404Csh6L#" MORRISVILLE, NORTH CAROLINA SKETCH NO. EX13 0.00 20.00 40.00 60.00 80.00 100.00 120.00 140.00 160.00 180.00 IMPACT AREA 'E' AREA = 0.006 AC WIDTH = 13.5' LENGTH = 20' N 2 G) ?1 s C T C O 4PACT AREA 'E' -- ,-- GRAPHIC SCALE 0 50 100 200 ( IN FEET ) 1 inch = 100 ft. 0 0 6 0 0 ? 0 Q ------------ NOW OR FORMERLY 1 JESSE MARCOM NOW OR FORMERLY \ ZONING: J.A. F ERRELL AD/AIRPORT OVERLAY G: ZONIN NG: USE: AO/AIRPORT OVERLAY RESIDENTIAL USE: VACANT IMPACT AREA • 'E' I TIN PARAMOUNT CENTER i.-,,;SAtlantic CHARl0rM NC • COLUMBIA. SC • YACON, CA • NASMUS, rN WEEKS/ LICHTIN RALEIGH. NC . RICHMOND, YA . WINgrON-SALEM, NC WEEKS REALTY, LP PROJECT NO. 00037.000 1800 PERIMETER PARK DRIVE, SUITE 200 DATE 17AUC1"8 4640aMbLO" MORRISVILLE, NORTH CAROLINA SKETCH NO: EX14 NCWRC,HCP,FALLS LAKE TEL:919-528-987j9 FAX COVER Sep 01'98 1542 No.005 P.01 NC Wildlife Resources Commission Habitat Conservation Program 91421-85 Service Road IMPACT AREA 'E' TDNSAdantic PARAMOUNT CENTER CHARL0ITE, NC • WWYBIA, 8C • YACON, CA • NAHIML.E, TN WEEKS/ LICHTIN NAUI°N• NC • ECmroND, YA • WINrMN_SAMM, NC WEEKS REALTY, LP PROJECT NO: LIC037.000 1800 PERIMETER PARK DRIVE, SUITE 200 DATE 17AUC1998 .$4c@pMbL#p MORRISVILLE, NORTH CAROLINA SKETCH NO: W5 NCWRC,HCP,FALLS LAKE TF1_:919-528-98:9 -),Pp 01'98 15:42 Nn.005 P.02 ol.ina ?WAcIfe Resources Commission ? - _ ? Noah Car _ -?- S12 N. Salisbury Strc Raleigh, gh, North Carolina 27604.1188, 919-733-3391 Charles R. Fullwood, Executive Director MEMO[tAN ill 1 M TO: Todd Tugwell US Army Corps c Engineer '?g1 a1?eig? ?tw dnt"Re ion Coordinator 8 FROM: Owen F. Anderson in I labitat Conservation Program DATE: Auguet 27, 1998 Pre-Uischar c Notification for Weekaiehtin, Paramount Ccntcr, Morrisville, Wake SUBJECT: 8 County, Stirrup Iron Creole, Nauss River Basin, 199821022/1998212f)41199821205 the wea, Our comments are provided t Staff biologists witlgt ohn vWv'Idlifeeand ReSOUrc fishery resources application to assess impau in accordance with provisions Stait C401, ns 16RII amended-, lb 1917 S 03361-6.7.)66 et seq.), and the Fish an Wildlife Coordination Act udes feet stre The applicant is requcyt al devoldac 0,43 ?e e $ attnfal olf 5.49 acres of wetlands on t,efor road construction for a commercial development, approximately 157-acre site. Three tributaries of Stirrup Iron Creek traverse the site. We have the following comments and recommendations on this application. 1, Maintain the with the Neuor s ivc Rule vegetated buffers along streams on the property in accordance 2. Require storntwater best inanagerrtent practiom, including wet detention ponds, to treat stormwater pollutants from parking lots and highly manicured lawn nreac and to reduce scouring of streams by high energy stormwater. 3. Require that the remaining wetlandr, on the site be protected from impacts by current or future owners of the property. 4. Require that sufficient stortnwater be routed to remaining wetlands to maintain wetland hydrology- 5. Require compensatory mitigation within the upper Neuse River basin for the unavoidable stream impacts. We appreciate the opportunity to provide comment on this application. if our oftlce can provide further assistance, please contact our office at (919) 528-9886. cc: John Dorney, Wetland Scientist, I)ivislOn of Water Quslity