Loading...
HomeMy WebLinkAboutNCC192550_ESC Approval Submitted_20191029ROY COOPER Governor MICHAEL S. REGAN Secretary S. DANIEL SMITH Director NORTH CAROLINA Environmental Quality October 21, 2019 LETTER OF APPROVAL WITH MODIFICATIONS Duke Energy Carolinas, LLC ATTN: Mr. Jonathan R. Wise 5788 Powerhouse Road Morganton, NC 28655 RE: Project Name: Linville Dam ESSI Project - Borrow Area 4 Acres Approved: 17.33 (add'13.71 acres from previously approved 13.62) Project ID: BURKE-2013-002 County: Burke City: Morganton Address: Powerhouse Road River Basin: Catawba Stream Classification: Catawba River - WS-V;B Submitted By: Mr. Chris Martell, PE Date Received by LQS: August 27, 2012 Date Revision Received by LQS: January 30, 2017 Date Revision Received by LQS: October 16, 2019 Plan Type: Other Dear Mr. Wise: This office has reviewed the subject revised erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this Letter of Approval with Modifications. The Modifications Required for Approval are listed on the attached page. This plan approval shall expire three (3) years following the date of approval, if no land - disturbing activity has been undertaken, as is required by Title 15A NCAC 413.0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction Stormwater General Permit. This form MUST be submitted and COC issued prior to the commencement of any land disturbing activity on the above -named project. The NOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the NOI form to Annette Lucas at Annette.lucas@ncdenr.gov or Paul Clark at Paul.clark@ncdenr.gov. After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. Initially, DEMLR will not charge a fee for EQ,A North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Asheville Regional Office 1 2090 U.S. Highway 70 1 Swannanoa, North Carolina 28778 NORTHCAROURA �� " --- - — — 828.296.4500 Letter of Approval with Modifications Duke Energy Carolinas, LLC October 21, 2019 Page 2 of 3 coverage under the NCG01 permit. However, a $100 fee will soon be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. Title 15A NCAC 413.0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Program is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. This permit allows for a land - disturbance, as called for on the application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. 6Since Blit Assi�Lantion Enclosures: Modifications Required for Approval NPDES NCG01 Fact Sheet cc: Mr. Chris Martell cmartell@vaughnmelton.com Letter of Approval with Modifications Duke Energy Carolinas, LLC October 21, 2019 Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: Linville Dam ESSI Project - Borrow Area 4 Project ID: BURKE-2013-002 County: Burke 1. Prior to any disturbance in this revised limits of disturbance, the Certificate of Coverage for NCG01 Construction Stormwater General Permit must have been received. {NCG01 Construction Stormwater General Permit} 2. All surface waters must be protected from sediment -laden runoff with adequate erosion sediment control devices and an adequate buffer. {G.S.113A-57}{15A NCAC 04B .0106}{15A NCAC 04B .0109}{15A NCAC 04B .0125}