Loading...
HomeMy WebLinkAbout20191453 Ver 1_Permit_Drawings_2019-10-21_20191021See Sheet 1A For Index of Sheets See Sheet 1 B For Conventional Symbols See Sheet RW02C- t For Survey Control Sheet 1103 Maul'sI'arnli Pt Rd eek eo Rill, r7 o Meuth o war ak 11 Cr Rd. urea Ware Creek er w School 1100 � 1100 C SChumht. Francls & Fl l .1O Swa Rd. s yo 11 4 1104 `P� 1932 H PROJECT El -bet Pell R.fer 1956 Durham n n Rd s 11 the LOCATION Nevil CRd k . Flat Creek d Cr ford �i m p R Coxes ssroads c O Durhu g 5 ciaacei c 1954 d n erton Srr a cnuren st""a \P 1.952 Ch—h StNey en I J nn To R do ren atidn 33 NO,pe- o`KS P'St Ph... hapel R e e ry ., UrHFR ey 93 1936 Triumph cnur h qyA� \ urh onnerton Cre h-1Rd. Church � C urrk Chch � S. Flat Swamp Rd X r pe 10 VICINITY MAP OFFSITE DETOUR BEGI —L— F STATE E OF NORTH C I" OLIN . DIVISIONOF HIGHWAYS BEAUFORT COUNTY LOCATION: REPLACE BRIDGE NO.14 ON SR 1971 OVER BRANCH OF DURHAM CREEK TYPE OF WORK: GRADING, DRAINAGE, STRUCTURE AND PAVING PERMIT DRAWINGS BEGIN BRIDGE END BRIDGE —L— STA. 16+33.81 �—L— STA. 17+26.19 SR 1971 (DURHAM CREEK ROAD) TQK . --- -- --- -1--•----�-- SR 1957 WHITLEY FARM RD. T Nq� 8 \011 4 END STATE PROJECT 17BP.2.R.95 —L— POC STA. 19 + 50.00 : -- t— t i-- ,4 19,36 SB ,ANvaot4 RO' STATE STATE PROIP.CT REPERENC6 NO. BREET NO. TOTAL SI@ETS 17BP.2.R.95 a'L+ PROl.N0. .A.PROl. OL+9CRIP]TON 17BP.2.R.95 NA PE 17BP.2.R.95 NA W, UTIL 17BP.2.R.95 NA CONST. PERMIT DRAWING SHEET 1 OF 8 DOCMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED GRAPHIC SCALES DESIGN DATA PROJECT LENGTH Prepared For: HYDRAULICS ENGINEER DIVISION OF HIGHWAYS 50 25 0 50 100 ADT 2016 = 170 1000 Birch Ridge Dr., Raleigh NC, 27610 ADT 2040 = 280 V = 60 MPH LENGTH ROADWAY STATE PROJECT 17BP.2.R.95 = 0.100 mile BY, `1[`GS TGS ENGINEERS PX (919) 733-8887 ae XrLLsaoe2#0 sz. sUTIE zoo CORP. LICENSE NO.: C-0275 �� �y o PLANS 50 25 0 50 100 T = 6 % LENGTH STRUCTURES STATE PROJECT 17BP.2.R.95 = 0.017 mile RALEIGX, NC 2. P.E. SIGNATURE: a g 2018 STANDARD SPECIFICATIONS TOTAL LENGTH STATE PROJECT 17BP.2.R.95 = 0.117 mile ROADWAY DESIGN RIGHT OF WAY DATE: JUNE 27, 2019 V. MARCUS LOWERY, PE ENGINEER 1 Q PROFILE (HORIZONTAL) PROJECT ENGINEER CLASS = ®� 8w���� 10 5 0 10 20 LOCAL RURAL SUB —REGIONAL TIER LETTING DATE: FEBRUARY 12, 2020 MICHFUNCT L AMAN, PE PE SIGNATURE: NCDOT D CDOT II ISION 2 CONTACT PROFILE (VERTICAL) w� MMM � ffmfl i"RiliffAimili-i %' -SU M� M � ffmfl WETLAND AND SURACE WATER IMPACTS SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Site No. Station (From/To) Structure Size / Type Permanent Fill In Wetlands (ac) Temp. Fill In Wetlands (ac) Excavation in Wetlands (ac) Mechanized Clearing in Wetlands (ac) Hand Clearing in Wetlands (ac) Permanent SW impacts (ac) Temp. SW impacts (ac) Existing Channel Impacts Permanent (ft) Existing Channel Impacts Temp. (ft) Natural Stream Design (ft) -L- 15+61 to 15+95 RT Permeant Utility Easement < 0.01 -L- 17+45 to 18+51 RT Permeant Utility Easement 0.02 TOTALS*: 0.02 *Rounded totals are sum of actual impacts NOTES: Revised 2018 Feb RIPARIAN BUFFER IMPACTS SUMMARY IMPACTS BUFFER TYPE ALLOWABLE MITIGABLE REPLACEMENT Site Station Structure ROAD PARALLEL No. (From/To) Size / Type BRIDGE ZONE 1 ZONE 2 TOTAL ZONE 1 ZONE 2 TOTAL ZONE 1 ZONE 2 CROSSING IMPACT (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft) -L- Sta. 16+32 - 16+48 LT 1 @40', 1 @50', 21 " CSU Bridge x 15 5 20 -L- Sta. 15+45 - 16+52 RT 1 @40', 1 @50', 21 " CSU Bridge x 1410 770 2180 -L- Sta. 17+04 - 17+64 RT 1 @40', 1 @50', 21" CSU Bridge x 880 530 1410 TOTALS: 2305 1305 3610 NOTES: Total Buffer Impacts = 0.08 Ac sed 2018 Feb WETLANDS IN BUFFER IMPACTS SUMMARY WETLANDS IN SITE STATION BUFFERS NO. (FROM/TO) ZONE 1 ZONE 2 (ft2) (ft2) -L- 17+45 to 17+64 RT 0 40 TOTAL: 0 40 NOTES: NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS 9/5/2019 BEAUFORT COUNTY 17BP.2.R.95 Revised 2018 Feb I SHEET 8 OF 8 Hi North Carolina Department of Transportation Highway Stormwater Program STORMWATER MANAGEMENT PLAN dk (Version 2.04; Released November 2015) FOR NCDOT PROJECTS WBS Element: 17BP.2.R.95 TIP No.: County(ies): Beaufort Page 1 of 2 General Project Information WBS Element: 17BP.2.R.95 TIP Number: Project Type: Bridge Re lacement Date: 9/27/2018 NCDOT Contact: William Galen G. Cail, PE Contractor / Desi ner: ITGS Engineers Ben Hene ar, PE Address: 1020 Birch Ridge Road Raleigh, 27610 I Address: 706 Hillsborough Street Suite 200 Raleigh, NC 27603 Phone: 919-707-6711 Phone: 919-773-8887 ext. 123 Email: gcail@ncdot.gov Email: bhene ar t sen ineers.com City/Town: Bonnerton Count ies : Beaufort River Basin(s): Tar -Pamlico I CAMA County? Yes Wetlands within Project Limits? Yes Project Descri lion Project Length lin. miles or feet): 0.12 SurroundingLand Use: Rural Coastal Plain AllilliM Proposed Project Existing Site Project Built -Upon Area ac. 0.4 ac. 0.3 ac. Typical Cross Section Description: Two 10' paved travel lanes with 2' paved shoulder. Two 9' paved travel lanes with 3' grassed shoulder. Annual Avg Daily Traffic (veh/hr/day): Design/Future: Year: Existing: Year: General Project Narrative: (Description of Minimization of Water Quality Impacts) Replacement of Bridge No. 060014 on SR 1971 (Durham Creek Rd) over Branch of Durham Creek in Beaufort County in Bonnerton, NC. The proposed 90' long by 30' wide two -span bridge would replace the existing 61' long by 30' wide two -span bridge. The proposed grade will be about 1.5' above existing grade. Bridge No. 060014 is within the Tar -Pamlico River Basin and shall adhere to the Tar -Pamlico Buffer Rules. The proposed bridge will have no direct discharge into Branch of Durham Creek. Stormwater runoff from the south approach of the proposed bridge flows to two traffic bearing grated inlets on both sides of the roadway where it will be diffused with a rip -rap pad at the outlet of the proposed pipe. The proposed deck runoff will outlet outside of buffers, treated by a grass swale before discharging into the stream as diffuse flow. Waterbody Information Surface Water Body 1 : Branch of Durham Creek NCDWR Stream Index No.: 29-21-3 NCDWR Surface Water Classification for Water Body Primary Classification: Class C Supplemental Classification: Nutrient Sensitive Waters (NSW) Other Stream Classification: None Impairments: None Aquatic T&E Species? No Comments: NRTR Stream ID: 29-21-3 Buffer Rules in Effect: Tar -Pamlico Project Includes Bridge Spanning Water Body? Yes Deck Drains Discharge Over Buffer? INo Dissipator Pads Provided in Buffer? N/A Deck Drains Discharge Over Water Body? No (If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the General Project Narrative) (If yes, provide justification in the General Project Narrative) Hig hwa North Carolina Department of Transportation gStormwatcr Highway Stormwater Program STORMWATER MANAGEMENT PLAN A (Version 2.04; Released November 2015) FOR NCDOT PROJECTS WBS Element: 17BP.2.R.95 TIP No.: County(ies): Beaufort Page 2 of 2 Swales Sheet No. Station & Coordinates (Road and Non Road Projects) Surface Water Body Base Width (ft) Front Slope (1-1:1) Back Slope (H:1) Drainage Area (ac) Recommended Treatm't Length (ft) Actual Length (ft) Longitudinal Slope N Q2 (cfs) V2 (fps) Q10 (Cfs) V10 (fps) Rock Checks Used BMP Associated w/ Buffer Rules? 4 -L- 17+13 RT (1)Branch of Durham 0.0 3.0 3.0 0.1 10 15 0.80 % 0.5 1.1 0.6 1.1 No Yes 35.36308 /-76.86976 Additional Comments