Loading...
HomeMy WebLinkAbout20191411 Ver 1_Shoreline Stabilization_20191014State of North Carolina C' zz L] ) 1 Department of Environment and Natural Resources Division of Water. Resources Water Resources 15A NCAC 02H .0500 — Water Quality Certification, Shoreline Stabilization ENVIRONMENTAL QUALITY FORM: SSGP 02-2017 Shoreline Stabilization Application Form Three copies of the application (including attachments) and the application fee should be sent to: If sending via US Postal Service If sending via delivery service (UPS, Fed Ex, etc.) Karen Higgins Karen Higgins DWR — 401 & Buffer Permitting Branch DWR — 401 & Buffer Permitting Branch 1617 Mail Service Center 512 N. Salisbury Street Raleigh, NC 27699-1617 Raleigh, NC 27604 A. Applicant Information [15A NCAC 02H .0502(a)] 1. Owner Information 1 Name: / homa6 M 6,ell, Mailing Address: f73ZE3Wind Telephone Number: E-mail Address: 2. Agent/ Contact Person Information W,t®r pasources p rrnitwg sect A signed and dated copy of the Agent Authorization letter must be attached it the Agent has signed this application form. (A form can be downloaded here: httD://www.saw.usace.armv.mil/Portals/59/do(;1regulatory/regdocs/Permits/SAMPLE AGENT AUTHORIZ ATION FORM.Ddf) Company Affiliation: I pulcn r C(shm DC.h1 y i R Mailing Address: 15& e-rfh Rd Rou+mar)' IVC. 61 toto Telephone Number: al -iD2�l�g(O Fax Number: _3 d E-mail Address: bf na. k0.nCa5+e_rdor_K:5 (5-0 CA ala'► I B. Project Information [15A NCAC 02H .0502(a) & (b)] 1. Attach a vicinity map (i.e. street map) clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. 2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing, buildings, retaining walls, docks, impervious surfaces, rip rap, excavation or dredging below Full Pond/ Normal Water Level elevations, and construction access corridors. You may use the diagram provided at the end of this application form. FORM: SSGP 02-2017 Page 1 of 3 3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of some sort- a yard stick, shovel handle, etc.) 4. Location of the property (where work is to be conducted) County: \Jkn co' n Nearest Town: Denver - Lake/ river/ ocean adjacent to property: Norman an Property size (acres): • 13 QCre5 Subdivision name or site address (include phase/lot number): L.o f IFJeon 35 er�SCPr��' 7328 W:e7dy Pine C;rde, _/)enyer. NC 28037 Directions to site - please include road names and numbers, landmarks, etc.: 5rorKA)U4251f5 r,c.ie, PY-0 per+y "*I-& o titude (in decimal degrees) Longitude (decimal degrees)-(50.ClQ(aj29 ) 5. Describe the existing land use or condition of the site at the time of this application (residential, undeveloped, etc.): Ret:idewhal 6. Describe proposed work (include discussion as to how hardening of shoreline has been avoided, or whyitis necessary): Ehp*'ek lVie" r e-Ere-6VA w►+)l C.1455 B Y_t'� i� TY'G�nr 5"n0ire.li✓1e -hCA31 17AAinY1 � ey'DStbyl CUY%+_6i 7. Will work be conducted from land? a, From water? 8. Total amount of impacts below the normal pool lake level / Normal Water Level Permanent impacts (including all excavation, backfill, rip rap, retaining walls, etc.) in square feet: Temporary impacts in square feet: 9. Total amount of impacts above the normal pool lake level / Normal Water Level and 50 feet land -ward Permanent impacts (including back fill4,excavation, rip rap, retaining walls, etc.) in square feet: Temp,oprary impacts (tempgq�rary clearing, construction corridor) in square feet: 1'('n•^r;Aor_ 10. Please describe the vegetation above the normal pool lake level/ N7TO I Water Level and 50 feet landward to be impacted (number of trees, for instance): /7co 11. :2X� %�—•T '/! Owner/Agent's Signature* [15A NCAC 02H .0502(f)) Date *Agent's signature is valid only if an authorization letter from the owner is provided. FORM: SSGP 02-2017 Page 2 of 4 12. Please approximately sketch the following information on this plan and provide dimensions for each item: a. All proposed vegetation clearing b. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation c. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation d. Location of any proposed structures such as buildings, retaining walls, docks, etc. e. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation Pull Pond/ Normal Water L Shoreline Plan View FORM: SSGP 02-2017 Lake (At Full Pond/ Normal Water Level) ��i�'►sl(��m.►(v'a1.�l.asjwa ,. L-..r�..w>Aii+=�R�r �n'..i!%�.s.�!?}„a.�a - � .w.=�p �'� Lake (At Full Pond/ Normal MW Levey ' Existing: Dock 30ftx7ft 3ftx 150ft ae[=full .pond/ NWL Full Pond/ Normal Water Level a� m ® 4ftx 150ft °®'rho rei ne Ri pra p Above full pond/ NWL 2 ft.x 150 fL addidonal clearing if necessary EX,AMPLE Plan View Page 3 of 4 Lake (At Full PonO/ Normal Water Le el) c Side View CL FORM: SSGP 02-2017 Page 4 of 4 CATAWBA RIPARIAN BUFFER N0TIFICATI0N FORM Project Owner: Contractor/agent.. L'>7i^D�n The approval is for the purpose and design described in your application. Impacts not indicated in the application is a violation of the Buffer Rule. Site specific work should be provided in the application. [15A NCAC 02H .0506 and 15A NCAC 02B .0243(8)] Trees are not allowed to be removed from Zone 1 of the Buffer (within 30 ft of the full pond elevation), unless approved. Exception, those trees that are severely undermined along the immediate shoreline can be removed. Minimal shaping and sloping along the Immediate shoreline Is allowed. [15A NCAC 026.0243(6)] Benching, grading in the buffer is not allowed. Excessive disturbance of ground cover. 115A NCAC 028 .0243 (6)] Beaches, impervious patios, impervious walkways, etc. are not allowed in the buffer unless specifically approved by the Division. There are limitation on size for decks. [15A NCAC 02B .0243(4) and (6)] Work to be conducted from land must indicate an access and indicate any trees that are to be removed. The work corridor should be described. The approved access corridor shall be restored. Staging, spoil, construction material must be outside the buffer. [15A NCAC 02H .0502 and 15A NCAC 02B .0243 (4), (6), (8)] Stormwater cannot be piped or channeled for direct discharge to the lake. All constructed stormwater discharges must be at the natural elevation and discharged prior to entering the buffer directed as diffuse or sheet flow at non -erosive velocities to the lake. [15A NCAC 02B .0243(5), (6)] Acknowledgement of Notification 1, pn1 ��'I A rel hereby state that I have been informed of the Catawba Riparian Buffer Rule. Any work conducted in the buffer, not specifically stated in the application and approved by the Division of Water Resources (DWR), is a violation and subject to enforcement. Due diligence will be taken such that the construction will be built within substantial compliance and intent of the 401 Vyater Quality Certification and Buffer Rules, the approved plan(s) and specification(s), and other supporting materials. ` Signature (owner): Date; 0 r-� � THOMAS CHRISTIN W BURKS JENNIFER HORBELT JOHN L MI SPANGLER CLIFFORRD E 7309 BANKER CAROL J HAGER HAROLD DEAN ViEATHE.R1v1AN IvARTFIA H 25.8 73,46 UTARELLI THOMAS 19 7" 0 September 3, 2019 0 100 Esri- Inc., Lincoln County, NC I I 1 inch = 58 feet