Loading...
HomeMy WebLinkAbout20151033 Ver 2_Certification of Completion_20191024Environmental Quality North Carolina Division of Environmental Quality Division of Water Resources Roy Cooper Governor DWQ Project No.: 2015-1033 Ver. 2 County: Jackson Applicant: North Carolina Department of Transportation — Division 14 Project Name: Bridge 164 on SR 1462 (Woodfin Road) replacement. Date of Issuance of 401 Water Quality Certification: 10.25.2016 Certificate of Completion James H. Trogdon III Secretary of Transportation Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401 Transportation Planning Unit, North Carolina Division of Water Resources, 1617 Mail Service Center, Raleigh, NC, 27699-1617. This form may be returned to NCDWR by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certification I, Patrick J. Breedlove, Division 14 - Environmental Specialist II, hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. DocuSigned by: Ppaf�&— �,-10/22/2019 Signature: D� Date: A2DAC8979C7943D... Agent's Certification I, , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: Engineer's Certification Partial Final I, , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project, for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date Transportation and Permitting Unit 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N Salisbury St. Raleigh, North Carolina 27604 Phone: 919-807-63001 FAX: 919-733-1290 Internet: www.ncwaterguality.org Registration No. None rthCarolina Naturally An Equal Opportunity 1 Affirmative Action Employer