HomeMy WebLinkAboutNCC192458_NOI Application_20191023Action History (UTC-05:00) Eastern Time (US & Canada)
Submit by Anonymous User 10/21/2019 2:06:05 PM (NCG01 NOI Submission)
Approve by Garcia, Lauren V 10/21/2019 3:57:31 PM (Review- Construction NOI 17435)
• Georgoulias, Bethany reassigned the task to Garcia, Lauren V 10/21/2019 3:22 PM
* L - a couple of these express eNO/s came in since I left. If they are not actually express projects,
please feel free to reject them on those grounds.
• The task was assigned to Morman, Alaina by round robin distribution 10/21/2019 2:06 PM
The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: October 23, 2019 5:00
PM. The priority is: High 10/21/2019 2:06 PM
Submit by McCoy, Suzanne 10/23/2019 11:21:06 AM (Payment Verification for NCC192458)
* Emily Jo Anderson
• McCoy, Suzanne assigned the task to McCoy, Suzanne 10/23/2019 11:20 AM
• The task was assigned to DEMLR NCG01 Payment Team. The due date is: December 2, 2019 5:00 PM.
The priority is: High 10/21/2019 3:57 PM
1 r-i) iTII T:2,0)M 1-11 (-_TiI a 1010
NORTH CAROLINA
Ernvlronmentol qualily
A. Project Information
Part A.
Project Location and Waterbody Information
1. Project Name * Blewett Falls Lake Hydroelectric Station - Spillway Modifications
2. County* Anson
3. Highway or Street Power Plant Road
Address * Street name only is acceptable if no address number assigned yet
4. City or Township* Lilesville
5. State * NC
6. Zip Code* 28091
7. Latitude * Enter the latitude in decimal degrees
34.9840
8. Longitude * Enter the longitude in decimal degrees (WISTbe negative)
-79.8800
If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of
North Carolina. Look for the coordinates in the bottom left corner.
9. Date to Begin* 10/28/2019
Estimated Construction Project Start Date
10. Date to End* 04/01 /2020
Estimated Construction Project End Date
11. SIC (Primary)* Industrial (1541)
Standard Industrial aassification for Development
12. Acres to be 12.00
disturbed* (including off -site borrow and waste areas)
13. Total site area
12.00
(acres)*
14. Post-
0.00
construction
(Estimated)
impervious area
(acres) *
NCC Project
NCC-ANSON-2019-Blewett Falls Lake Hydroelectric Station -
Tracking ID
Spillway Modifications
Assigned automatically
Below you must enter waterbody information for surface waters affected by this project. Please consult
DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. Please
enter only immediate receiving waterbodies - not waters downstream of those unless the project extends there. You
may enter up to 3 waterbodies if needed.
15a. Receiving Pee Dee River
Waterbody* Nbrre of waterbody into which storrrwater runoff will discharge
15b. Waterbody 13-(26.5)
Index No. * NC Waterbody Index Narrber
Stormwater rJ No
discharges will flow r Yes
to additional
wate rs *
16a. Is this project r Yes
subject to the NC r No, not subject to NC SPCA
Sediment Pollution
Control Act?*
B. Permittee Information
Part B.
Perrrittee Information - Legally Responsible Entity and Individual
.....................................................................................................................................................................
h
Important: The person who signs the NOI Certification Form and signs the Certification in Section E of this application
form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same
organization. That person must be a responsible corporate officer who owns or operates the construction activity, such
as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV,
Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part
IV, Section B, Item (6) of that permit.
1. Organization Duke Energy Progress, Inc.
Name *
2. First Name* Emily
ff Corporation, enter Registered Agent First l\b e
3. Last Name * Anderson
ff Corporation, enter Registered Agent Last Barre
3b. Title Project Manager - Duke Energy
4. Permitee E-mail emily.anderson@duke-energy.com
Address*
5. Permittee 432-425-2672
Telephone No.*
6. Permittee Mailing Street Address
Address* 400 South Tryon Street
Address Line 2
City
Charlotte
Postal / Zip Code
28202
Check box if the
street address the
same as mailing
address
7. Permittee Street
Address*
fJ Yes
Street Address
400 South Tryon Street
Address Line 2
City
Charlotte
Fbstal / Zip Code
28202
State / Province / Region
NC
Country
us
State / Province / Region
NC
Country
us
C. Site Contact Information
Part C.
Roiect Site Contact Information
1. Type of Non -Government
Ownership*
2. Primary Site Yamil
Contact - First
Name *
3. Primary Site Correa -Rivera
Contact - Last
Name *
4. Title
5. Site Contact E- Yamil.Correa-Rivera@duke-energy.com
mail Address*
6. Site Contact 704-848-9209
Telephone No.*
7. Organization
Name
8. Site Contact Street Address
Mailing Address* 2593 Power Plant Rd
Address Line 2
City
Lilesville
Pbstal/ Zip Code
28091
9. Consultant Name (optional)
Matthew Kunkle
First and Last name
10. Consultant E- mkunkle@smeinc.com
mail This person will be copied on all correspondence.
11.Consultant 704-523-4726
Telephone No.
State / Province / Region
NC
Country
us
D. E&SC Plan
Part D.
Erosion & Sediment Control (E&SC) Ran Approval Information
.......................................................................................................................................................................................................................................
1. Date E&SC Plan 10/17/2019
Approved *
2. E&SC Plan Project ANSON-2020-002
Number/ID* Assigned by agency or local program
3. E&SC Plan f• State DEQ Office
Approved by r Local Program
4. State DEQ Office * Fayetteville (FRO)
Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a
complete application.
5. E&SC Plan ANSON-2020-002 Approval.pdf 69.59KB
Approval Mist be RDFforrrat
letter/documentation
6. NOI Certification NOI Certification Form_signed.pdf 58.34KB
Form Mist be RDFforrret
This is an Express f No
Review Project* r Yes
E. Certification
North Carolina General Statute 143-215.613 (1) provides that:
Anyperson who knowinglymakes any false statement, representation, or certification in anyapplication, record, report, plan, or other
documentfiled or required to be maintained under this Article or a rule implementing this Article; or who knowinglymakes a false statement
of a material fact in a rulemaking proceeding or contested case under this Article; or who falsifies, tampers with, or knowingly renders
inaccurate any recording or monitoring deice or method required to be operated or maintained under this Article or rules of the
Commission implementing this Article shall be guiltyofa Class 2 misdemeanor which mayinclude a fine not to exceed ten thousand
dollars ($10,000).
Under penalty of law, I certify that:
rJ I am the person responsible for the construction activities of this project, for
satisfying the requirements of this permit, and for any civil or criminal penalties
incurred due to violations of this permit.
* rJ The information submitted in this NOI is, to the best of my knowledge and belief,
true, accurate, and complete based on my inquiry of the person or persons who
manage the system, or those persons directly responsible for gathering the
information.
* I7 I will abide by all conditions of the NCG010000 General Permit and the
approved Erosion and Sediment Control Plan.
* rJ I hereby request coverage under the NCG010000 General Permit and
understand that coverage under this permit will constitute the permit
requirements for the discharge(s) and is enforceable in the same manner as an
individual permit.
Specify if you are:* r The Responsible Person named on this Notice of Intent
r Authorized Responsible Person*
Important: The person who electronically signs this Certification above must be the same person who signs the NOI
Certification Form. If that person is signing on behalf of the Permittee, that individual must be an authorized responsible
person within the same organization as the Permittee. *An authorized individual is a responsible corporate officer who
owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager
that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more
information on signatory requirements, see Part IV, Section B, Item (6) of that permit.
Signature
wa
Type Name *
Emily Anderson
Title
Project Manager
Organization
Duke Energy Progress, Inc.
Date *
10/21 /2019
F. Tracking and COC Info
NOI Tracking No. 17435
NC Reference No. NCG01-2019-2458
Uses 'count number variable (incremrented by SP)
Certificate of NCC192458
Coverage (COC) Uses'count_nunber'variable (incremrented by SF)
No. *
Count Number 2458
Sequential nunber for subrrittal that is incremented by Stored Procedure
COC Year 2019
Year of date reviewed (used to assign YY digits after "NGC' in OOCno.)