Loading...
HomeMy WebLinkAboutNCC192458_NOI Application_20191023Action History (UTC-05:00) Eastern Time (US & Canada) Submit by Anonymous User 10/21/2019 2:06:05 PM (NCG01 NOI Submission) Approve by Garcia, Lauren V 10/21/2019 3:57:31 PM (Review- Construction NOI 17435) • Georgoulias, Bethany reassigned the task to Garcia, Lauren V 10/21/2019 3:22 PM * L - a couple of these express eNO/s came in since I left. If they are not actually express projects, please feel free to reject them on those grounds. • The task was assigned to Morman, Alaina by round robin distribution 10/21/2019 2:06 PM The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: October 23, 2019 5:00 PM. The priority is: High 10/21/2019 2:06 PM Submit by McCoy, Suzanne 10/23/2019 11:21:06 AM (Payment Verification for NCC192458) * Emily Jo Anderson • McCoy, Suzanne assigned the task to McCoy, Suzanne 10/23/2019 11:20 AM • The task was assigned to DEMLR NCG01 Payment Team. The due date is: December 2, 2019 5:00 PM. The priority is: High 10/21/2019 3:57 PM 1 r-i) iTII T:2,0)M 1-11 (-_TiI a 1010 NORTH CAROLINA Ernvlronmentol qualily A. Project Information Part A. Project Location and Waterbody Information 1. Project Name * Blewett Falls Lake Hydroelectric Station - Spillway Modifications 2. County* Anson 3. Highway or Street Power Plant Road Address * Street name only is acceptable if no address number assigned yet 4. City or Township* Lilesville 5. State * NC 6. Zip Code* 28091 7. Latitude * Enter the latitude in decimal degrees 34.9840 8. Longitude * Enter the longitude in decimal degrees (WISTbe negative) -79.8800 If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of North Carolina. Look for the coordinates in the bottom left corner. 9. Date to Begin* 10/28/2019 Estimated Construction Project Start Date 10. Date to End* 04/01 /2020 Estimated Construction Project End Date 11. SIC (Primary)* Industrial (1541) Standard Industrial aassification for Development 12. Acres to be 12.00 disturbed* (including off -site borrow and waste areas) 13. Total site area 12.00 (acres)* 14. Post- 0.00 construction (Estimated) impervious area (acres) * NCC Project NCC-ANSON-2019-Blewett Falls Lake Hydroelectric Station - Tracking ID Spillway Modifications Assigned automatically Below you must enter waterbody information for surface waters affected by this project. Please consult DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. Please enter only immediate receiving waterbodies - not waters downstream of those unless the project extends there. You may enter up to 3 waterbodies if needed. 15a. Receiving Pee Dee River Waterbody* Nbrre of waterbody into which storrrwater runoff will discharge 15b. Waterbody 13-(26.5) Index No. * NC Waterbody Index Narrber Stormwater rJ No discharges will flow r Yes to additional wate rs * 16a. Is this project r Yes subject to the NC r No, not subject to NC SPCA Sediment Pollution Control Act?* B. Permittee Information Part B. Perrrittee Information - Legally Responsible Entity and Individual ..................................................................................................................................................................... h Important: The person who signs the NOI Certification Form and signs the Certification in Section E of this application form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same organization. That person must be a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. 1. Organization Duke Energy Progress, Inc. Name * 2. First Name* Emily ff Corporation, enter Registered Agent First l\b e 3. Last Name * Anderson ff Corporation, enter Registered Agent Last Barre 3b. Title Project Manager - Duke Energy 4. Permitee E-mail emily.anderson@duke-energy.com Address* 5. Permittee 432-425-2672 Telephone No.* 6. Permittee Mailing Street Address Address* 400 South Tryon Street Address Line 2 City Charlotte Postal / Zip Code 28202 Check box if the street address the same as mailing address 7. Permittee Street Address* fJ Yes Street Address 400 South Tryon Street Address Line 2 City Charlotte Fbstal / Zip Code 28202 State / Province / Region NC Country us State / Province / Region NC Country us C. Site Contact Information Part C. Roiect Site Contact Information 1. Type of Non -Government Ownership* 2. Primary Site Yamil Contact - First Name * 3. Primary Site Correa -Rivera Contact - Last Name * 4. Title 5. Site Contact E- Yamil.Correa-Rivera@duke-energy.com mail Address* 6. Site Contact 704-848-9209 Telephone No.* 7. Organization Name 8. Site Contact Street Address Mailing Address* 2593 Power Plant Rd Address Line 2 City Lilesville Pbstal/ Zip Code 28091 9. Consultant Name (optional) Matthew Kunkle First and Last name 10. Consultant E- mkunkle@smeinc.com mail This person will be copied on all correspondence. 11.Consultant 704-523-4726 Telephone No. State / Province / Region NC Country us D. E&SC Plan Part D. Erosion & Sediment Control (E&SC) Ran Approval Information ....................................................................................................................................................................................................................................... 1. Date E&SC Plan 10/17/2019 Approved * 2. E&SC Plan Project ANSON-2020-002 Number/ID* Assigned by agency or local program 3. E&SC Plan f• State DEQ Office Approved by r Local Program 4. State DEQ Office * Fayetteville (FRO) Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a complete application. 5. E&SC Plan ANSON-2020-002 Approval.pdf 69.59KB Approval Mist be RDFforrrat letter/documentation 6. NOI Certification NOI Certification Form_signed.pdf 58.34KB Form Mist be RDFforrret This is an Express f No Review Project* r Yes E. Certification North Carolina General Statute 143-215.613 (1) provides that: Anyperson who knowinglymakes any false statement, representation, or certification in anyapplication, record, report, plan, or other documentfiled or required to be maintained under this Article or a rule implementing this Article; or who knowinglymakes a false statement of a material fact in a rulemaking proceeding or contested case under this Article; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring deice or method required to be operated or maintained under this Article or rules of the Commission implementing this Article shall be guiltyofa Class 2 misdemeanor which mayinclude a fine not to exceed ten thousand dollars ($10,000). Under penalty of law, I certify that: rJ I am the person responsible for the construction activities of this project, for satisfying the requirements of this permit, and for any civil or criminal penalties incurred due to violations of this permit. * rJ The information submitted in this NOI is, to the best of my knowledge and belief, true, accurate, and complete based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information. * I7 I will abide by all conditions of the NCG010000 General Permit and the approved Erosion and Sediment Control Plan. * rJ I hereby request coverage under the NCG010000 General Permit and understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. Specify if you are:* r The Responsible Person named on this Notice of Intent r Authorized Responsible Person* Important: The person who electronically signs this Certification above must be the same person who signs the NOI Certification Form. If that person is signing on behalf of the Permittee, that individual must be an authorized responsible person within the same organization as the Permittee. *An authorized individual is a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature wa Type Name * Emily Anderson Title Project Manager Organization Duke Energy Progress, Inc. Date * 10/21 /2019 F. Tracking and COC Info NOI Tracking No. 17435 NC Reference No. NCG01-2019-2458 Uses 'count number variable (incremrented by SP) Certificate of NCC192458 Coverage (COC) Uses'count_nunber'variable (incremrented by SF) No. * Count Number 2458 Sequential nunber for subrrittal that is incremented by Stored Procedure COC Year 2019 Year of date reviewed (used to assign YY digits after "NGC' in OOCno.)