Loading...
HomeMy WebLinkAboutNCC192418_NOI Application_20191018Action History (UTC-05:00) Eastern Time (US & Canada) Submit by Anonymous User 10/17/2019 4:26:11 PM (NCG01 NOI Submission) Approve by Garcia, Lauren V 10/18/2019 7:39:10 AM (Review- Construction NOI 17318) • The task was assigned to Garcia, Lauren V by round robin distribution 10/17/2019 4:26 PM The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: October 21, 2019 5:00 PM. The priority is: High 10/17/2019 4:26 PM Submit by Lucas, Annette 10/18/2019 8:22:32 AM (Payment Verification for NCC192418) • Lucas, Annette assigned the task to Lucas, Annette 10/18/2019 8:11 AM The task was assigned to DEMLR NCG01 Payment Team. The due date is: November 29, 2019 5:00 PM. The priority is: High 10/18/2019 7:39 AM STME NORTH CAROLINA Ernvlronmentol qualily A. Project Information Part A. Project Location and Waterbody Inforrration 1. Project Name * Capital Subaru 2. County* Guilford 3. Highway or Street 811 E. Bessemer Ave. Address * Street name only is acceptable if no address nurrtrer assigned yet 4. City or Township* Greensboro 5. State * NC 1r-8)a�T7i1)MfiIi(-_TiIa10141 6. Zip Code* 27405 7. Latitude * Enter the latitude in decirral degrees 36.0857 8. Longitude * Enter the longitude in decirral degrees (MIST be negative) -79.7775 If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of North Carolina. Look for the coordinates in the bottom left corner. 9. Date to Begin* 10/21/2019 Estimated Construction Project Start Date 10. Date to End* 07/31 /2020 Estimated Construction Project End Date 11. SIC (Primary)* Commercial (1542) Standard Industrial aassification for Development 12. Acres to be 3.79 disturbed* (including off -site borrow and waste areas) 13. Total site area 4.54 (acres)* 14. Post- 4.36 construction (Estimated) impervious area (acres) * NCC Project NCC-GUILF-2019-Capital Subaru Tracking ID Assigned autorratically Below you must enter waterbody information for surface waters affected by this project. Please consult DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. Please enter only immediate receiving waterbodies - not waters downstream of those unless the project extends there. You may enter up to 3 waterbodies if needed. 15a. Receiving North Buffalo Creek Waterbody* Nbrre of waterbody into which storrrwater runoff will discharge 15b. Waterbody 16-11-14-1 Index No. * NCWaterbody Index Number Stormwater rJ No discharges will flow r Yes to additional wate rs * 16a. Is this project r Yes subject to the NC r No, not subject to NC SPCA Sediment Pollution Control Act?* B. Permittee Information Part B. Perrrittee Information - Legally Responsible Entity and Individual ..................................................................................................................................................................... h Important: The person who signs the NOI Certification Form and signs the Certification in Section E of this application form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same organization. That person must be a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. 1. Organization Fourth Elm Construction Name * 2. First Name* Blake ff Corporation, enter Registered Agent First l\b e 3. Last Name * Hayworth ff Corporation, enter Registered Agent Last Barre 3b. Title Senior Project Manager 4. Permitee E-mail bhayworth@fourthelm.com Address* 5. Permittee 336-575-7206 Telephone No.* 6. Permittee Mailing Street Address Address* 110-A Shields Park Drive Address Line 2 City Kernersville Fbstal / Zip Code 27284 Check box if the street address the same as mailing address 7. Permittee Street Address* fJ Yes Street Address 110-A Shields Park Drive Address Line 2 City Kernersville R bstal / Zip Code 27284 State / Province / Region NC Country United States State / Province / Region NC Country United States C. Site Contact Information Part C. Froiect Site Contact Information 1. Type of Non -Government Ownership* 2. Primary Site Wes Contact - First Name * 3. Primary Site Frazier Contact - Last Name * 4. Title Superintendent 5. Site Contact E- wfrazier@fourthelm.com mail Address* 6. Site Contact 336-455-2635 Telephone No.* 7. Organization Fourth Elm Construction Name 8. Site Contact Street Address Mailing Address* 110-A Shields Park Drive Address Line 2 aty Kernersville Fbstal / Zip Code 27284 9. Consultant Name (optional) First and Last nane 10. Consultant E- This person will be copied on all correspondence. mail 11. Consultant Telephone No. State / Province / P egion NC Country United States D. E&SC Plan Part D. Erosion & Sediment Control (E&SC) Ran Approval Information ....................................................................................................................................................................................................................................... 1. Date E&SC Plan 10/17/2019 Approved * 2. E&SC Plan Project 2964 Number/ID* Assigned by agency or local program 3. E&SC Plan f State DEQ Office Approved by r Local Program 4. Local Program* City of Greensboro Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a complete application. 5. E&SC Plan Approval Letter (2964).pdf Approval Mist be RDFfornat letter/documentation 6. NOI Certification 2019-10-17_NOI Form.pdf Form Mist be RDFfornat This is an Express r No Review Project* r Yes 375.14KB 869.48KB E. Certification North Carolina General Statute 143-215.6B (1) provides that: Anyperson who knowinglymakes any false statement, representation, or certification in anyapplication, record, report, plan, or other documentfiled or required to be maintained under this Article or a rule implementing this Article; or who knowinglymakes a false statement of a material fact in a rulemaking proceeding or contested case under this Article; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring deice or method required to be operated or maintained under this Article or rules of the Commission implementing this Article shall be guiltyofa Class 2 misdemeanor which mayinclude a fine not to exceed ten thousand dollars ($10,000). Under penalty of law, I certify that: rJ I am the person responsible for the construction activities of this project, for satisfying the requirements of this permit, and for any civil or criminal penalties incurred due to violations of this permit. * V The information submitted in this NOI is, to the best of my knowledge and belief, true, accurate, and complete based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information. * I7 I will abide by all conditions of the NCG010000 General Permit and the approved Erosion and Sediment Control Plan. * V If the Erosion and Sediment Control Plan approved by the delegated program is not compliant with Part II (Stormwater Pollution Prevention Plan) of the NCG010000 General Permit, I will nonetheless ensure that all conditions of Part II of the permit are met on the project at all times. * I7 I hereby request coverage under the NCG010000 General Permit and understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. Specify if you are:* r The Responsible Person named on this Notice of Intent r Authorized Responsible Person' Important: The person who electronically signs this Certification above must be the same person who signs the NOI Certification Form. If that person is signing on behalf of the Permittee, that individual must be an authorized responsible person within the same organization as the Permittee. *An authorized individual is a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature Type Name* Blake Hayworth Title Senior Project Manager Organization Fourth Elm Construction Date * 10/17/2019 F. Tracking and COC Info NOI Tracking No. 17318 NC Reference No. NCG01-2019-2418 Uses 'count number variable (incremrented by SP) Certificate of NCC192418 Coverage (COC) Uses'countnunber'variable (incremrented by SF) No. * Count Number 2418 Sequential nunber for subrrittal that is incremented by Stored Procedure COC Year 2019 Year of date reviewed (used to assign YY digits after "NGC' in OOCno.)