Loading...
HomeMy WebLinkAboutNCC191344_Modification Review_20191017Action History (UTC-05:00) Eastern Time (US & Canada) Submit by Anonymous User 10/17/2019 9:12:57 AM (ADD TO FILE Submittal) Approve by Georgoulias, Bethany 10/17/2019 11:44:43 AM (Construction COC ADD TO FILE Review - NCC191344) • The task was assigned to Georgoulias, Bethany. The due date is: October 22, 2019 5:00 PM 10/17/2019 9:13 AM �mw+� NORTH CAROUNA e'vorwMienfal Quanty Certificate of NCC191344 Coverage (COC) Enter the Certificate of Coverage Minter (Use capital letters) No. * Information associated with this permit Project Name Wallace 230kV Substation - Permanent Flood Mitigation Address 280 Mail Route Road, Wallace, NC County Duplin Latitude 34.7243 Longitude -77.9633 Permittee Listed Duke Energy Progress Legally Responsible Cooper Dwiggins Individual NC Reference No. NCG01-2019-1344 E&SC Plan ID DUPLI-2020-004 Original NOI 14753 Tracking No.* Date COC Issued* 08/14/2019 Prior Rescission This field will populate only if COChas already been rescinded. Date Modification Information: Reason for r Closed -Out Lots/Outparcels in E&SC Plan Modification* f Additional Lots/Outparcels Approved - E&SC Revised r Other Revision(s) to E&SC Plan f Multiple Reasons (List) Ad d io n al Ivbre information if necessary Explanation Increased LOD for construction of sheet pile wall. Additional measures added and approved. You must upload supporting documentation below. Do not upload E&SC Plans unless specific plan sheets are the only documentation with approval for revised acres of disturbance, etc. (only upload applicable sheets). Supporting Upload Supporting Wcurantation (Revised E&SCApproval, dose -Out Doc, etc.) Documentation DUPLI-2020-004 Approval Revised 10-10-19.pdf 286.38KB Mist be FCF format North Carolina General Statute 143-215.6113 (1) provides that: Any person who knowingly makes any false statement, representation, or certification in anyapplication, record, report, plan, or other documentfiled or required to be maintained underthis Article or a rule implementing this Article; or who knowinglymakes a false statement of a material fact in a rulemaking proceeding or contested case under this Article; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Article shall be guiltyofa Class 2 misdemeanor which mayinclude a fine not to exceed ten thousand dollars ($10,000). I7 I, as an authorized representative, hereby request modification to coverage under the NPDES Stormwater Permit for the subject project site. I am familiar with the information contained in this request and to the best of my knowledge and belief such information is true, complete and accurate. "This form must be signed by a responsible corporate officer that owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature Type Name* Tim Same Title * Manager Organization* Duke Energy Date * 10/17/2019 Email Address* Tim.Same@duke-energy.com Email for Confirmation Telephone Number* 919 546 7468 Contact Narber if we need to reach you Date Formatted 20191017