HomeMy WebLinkAbout20160689 Ver 3_Report of Geotechnical Services_20191011 REPORT OF GEOTECHNICAL SUBSURFACE EXPLORATION GRANTHAM SUBDIVISION - PHASES 3 AND 4 SEWER LINE ROBINSON CHURCH ROAD HARRISBURG, NORTH CAROLINA SUMMIT PROJECT NO. 4140.502 Prepared For: Mr. Shawn Santee Santee Land Group, Inc. 11535 Carmel Commons Boulevard, Suite 101 Charlotte, North Carolina 28226 Email: Shawn@santeelandgroup.com Prepared By: SUMMIT Engineering, Laboratory & Testing, P. C. (SUMMIT) 3575 Centre Circle Drive Fort Mill, South Carolina 29715 September 9, 2019 i September 9, 2019 Mr. Shawn Santee Santee Land Group, Inc. 11535 Carmel Commons Boulevard, Suite 101 Charlotte, North Carolina 28226 Email: Shawn@santeelandgroup.com Subject: Report of Geotechnical Subsurface Exploration Grantham Subdivision - Phases 3 and 4 Sewer Line Robinson Church Road Harrisburg, North Carolina SUMMIT Project No. 4140.502 Dear Mr. Santee: SUMMIT Engineering, Laboratory & Testing, P. C. (SUMMIT) has completed a geotechnical subsurface exploration for the Grantham Subdivision - Phases 3 and 4 Sewer Line located off of Robinson Church Road in Harrisburg, North Carolina. These geotechnical services were performed in general accordance with our Proposal No. P2019-752-G, dated June 26, 2019 and our correspondences. This report contains a brief description of the project information provided to us, general site and subsurface conditions revealed during our geotechnical subsurface exploration. SUMMIT appreciates the opportunity to be of service to you on this project. If you have any questions concerning the information presented herein or if we can be of further assistance, please feel free to call us at (704) 504-1717. Sincerely yours, SUMMIT Engineering, Laboratory & Testing, P. C. Todd A. Costner, E.I. Kerry C. Cooper, P.E. Senior Professional Geotechnical Department Manager 9/9/19 Report of Geotechnical Subsurface Exploration SUMMIT Project No. 4140.502 Grantham Subdivision - Phases 3 and 4 Sewer Line September 9, 2019 ii TABLE OF CONTENTS SECTION Page 1.0 INTRODUCTION .............................................................................................................. 3 1.1. Site and Project Description.................................................................................... 3 1.2. Purpose of Subsurface Exploration ......................................................................... 3 2.0 EXPLORATION PROCEDURES...................................................................................... 4 2.1. Field Exploration .................................................................................................... 4 3.0 AREA GEOLOGY AND SUBSURFACE CONDITIONS ............................................... 5 3.1. Physiography and Area Geology ............................................................................ 5 3.2. Generalized Subsurface Stratigraphy ...................................................................... 5 3.2.1. Surface Materials........................................................................................ 6 3.2.2. Auger Refusal ............................................................................................. 6 3.2.3. Groundwater Level Measurements ............................................................ 7 4.0 CONSTRUCTION CONSIDERATIONS .......................................................................... 8 4.1. Difficult Excavation ................................................................................................ 8 4.2. Temporary Excavation Stability ............................................................................. 9 4.3. Structural Fill .......................................................................................................... 9 4.4. Engineering Services During Construction .......................................................... 10 5.0 RELIANCE AND QUALIFICATIONS OF REPORT .................................................... 12 APPENDIX 1 - Figures Site Vicinity Map .................................................................................................................1 Boring Location Plan ...........................................................................................................2 APPENDIX 2 - Boring Logs Report of Geotechnical Subsurface Exploration SUMMIT Project No. 4140.502 Grantham Subdivision - Phases 3 and 4 Sewer Line September 9, 2019 3 1.0 INTRODUCTION 1.1. Site and Project Description The subject site is located off of Robinson Church Road in Harrisburg, North Carolina. A vicinity map showing the project’s general location is provided as Figure 1. At the time of our exploration, the subject site was undeveloped land with a creek. SUMMIT was provided a plan sheet titled “Sewer & Water Plan-Profile”, prepared by Latham- Walters Engineering, Inc. dated February 8, 2018 that indicated the configurations of the proposed construction planned for this project. 1.2. Purpose of Subsurface Exploration The purpose of this exploration was to obtain general geotechnical information regarding the subsurface conditions and to provide general preliminary recommendations regarding the geotechnical aspects of site preparation and foundation design. This report contains the following items: • General subsurface conditions, • Anticipated excavation difficulties during site grading and/or utility installation, • Remedial measures to correct unsatisfactory soil conditions during site development, as needed, • Construction considerations. Report of Geotechnical Subsurface Exploration SUMMIT Project No. 4140.502 Grantham Subdivision - Phases 3 and 4 Sewer Line September 9, 2019 4 2.0 EXPLORATION PROCEDURES 2.1. Field Exploration SUMMIT initially visited the site on August 5, 2019 and performed a geotechnical exploration that consisted of three (3) auger probe borings (identified as B-1 through B-3). SUMMIT returned to the site on August 22, 2019 and performed five (5) additional auger probe borings (identified as B-4, B-4A, B-4B, B-4C through B-5). The approximate locations of the borings are shown on the Figure 2 - “Boring Location Plan” provided in Appendix 1. The borings were located by professionals from our office using the provided plan, recreation-grade handheld GPS, existing topography, and aerial maps as reference. Since the boring locations were not surveyed, the location of the borings should be considered approximate. The auger probe borings were performed using an ATV-mounted CME 550X drill rig and extended to approximate depths of 3 to 19.5 feet below the existing ground surface. Hollow-stem, continuous flight auger drilling techniques were used to advance the borings into the ground. Water level measurements were attempted at the termination of drilling. The results of these tests are presented on the individual boring logs provided in Appendix 2 at the respective test depth. Report of Geotechnical Subsurface Exploration SUMMIT Project No. 4140.502 Grantham Subdivision - Phases 3 and 4 Sewer Line September 9, 2019 5 3.0 AREA GEOLOGY AND SUBSURFACE CONDITIONS 3.1. Physiography and Area Geology The subject property is located in Harrisburg, North Carolina, which is located in the south central Piedmont Physiographic Province. The Piedmont Province generally consists of well-rounded hills and ridges which are dissected by a well-developed system of draws and streams. The Piedmont Province is predominantly underlain by metamorphic rock (formed by heat, pressure and/or chemical action) and igneous rock (formed directly from molten material) which were initially formed during the Precambrian and Paleozoic eras. The volcanic and sedimentary rocks deposited in the Piedmont Province during the Precambrian era were the host of the metamorphism and were generally changed to gneiss and schist. The more recent Paleozoic era had periods of igneous emplacement, with episodes of regional metamorphism resulting in the majority of the rock types seen today. The topographic relief found throughout the Piedmont Province has developed from differential weathering of theses igneous and metamorphic rock formations. Ridges developed along the more easily weathered and erodible rock. Because of the continued chemical and physical weathering, the rocks in the Piedmont Province are generally covered with a mantle of soil that has weathered in-place from the parent bedrock below. These soils have variable thicknesses and are referred to as residual soils, as they are the result of in-place weathering. Residual soils are typically fine- grained and have a higher clay content near the ground surface because of the advanced weathering. Similarly, residual soils typically become more coarse-grained with increasing depth because of decreased weathering. As weathering decreases with depth, residual soils generally retain the overall appearance, texture, gradation and foliations of their parent rock. 3.2. Generalized Subsurface Stratigraphy General subsurface conditions observed during our geotechnical exploration are described herein. For more detailed soil descriptions and stratifications at a particular field test location, the respective “Boring Logs”, provided in Appendix 2 should be reviewed. The horizontal Report of Geotechnical Subsurface Exploration SUMMIT Project No. 4140.502 Grantham Subdivision - Phases 3 and 4 Sewer Line September 9, 2019 6 stratification lines designating the interface between various strata represent approximate boundaries. Transitions between different strata in the field may be gradual in both the horizontal and vertical directions. Therefore, subsurface stratigraphy between test locations may vary. 3.2.1. Surface Materials At the time of our exploration, the surficial organic (topsoil) soils had been stripped/ removed from the ground surface of the boring locations. 3.2.2. Auger Refusal Auger refusal conditions were encountered in Borings B-1, B-2, and B-4 through B-5 at approximate depths ranging from 3 to 19.5 feet. Boring B-3 did not encounter auger refusal. Auger refusal is defined as material that could not be penetrated by the drilling equipment used during our field exploration. Materials that might result in auger refusal include large boulders, rock ledges, lenses, seams or the top of parent bedrock. Core drilling techniques would be required to evaluate the character and continuity of the refusal material. However, rock coring was beyond the scope of this exploration and not performed. The following table summarizes the approximate depths of auger refusal conditions that were encountered in the borings. Summary Table of Auger Refusal Depths Boring No. Auger Refusal Approx. Depth, (feet)* Boring No. Auger Refusal Approx. Depth, (feet)* B-1 7.5 B-4A 3 B-2 19.5 B-4B 3 B-3 Not Encountered (>10’) B-4C 5.5 B-4 3 B-5 10 *Depths were measured from the ground surface existing at the time drilling was performed. Report of Geotechnical Subsurface Exploration SUMMIT Project No. 4140.502 Grantham Subdivision - Phases 3 and 4 Sewer Line September 9, 2019 7 3.2.3. Groundwater Level Measurements At the time of drilling, groundwater was not observed in the borings performed during this exploration. It should also be noted that groundwater levels tend to fluctuate with seasonal and climatic variations, as well as with some types of construction operations. Therefore, water may be encountered during construction at depths not indicated in the borings performed for this exploration. Report of Geotechnical Subsurface Exploration SUMMIT Project No. 4140.502 Grantham Subdivision - Phases 3 and 4 Sewer Line September 9, 2019 8 4.0 CONSTRUCTION CONSIDERATIONS 4.1. Difficult Excavation Based on the results of our borings, the contractor can anticipate encountering difficult excavation during the construction of the proposed utility line and the use of specialized equipment and procedures. Also, please note that the depth and thickness of partially weathered rock, boulders, and rock lenses or seams can vary dramatically in short distances and between the boring locations; therefore, soft/hard weathered rock, boulders or bedrock may be encountered during construction at locations or depths, between the boring locations, not encountered during this exploration. When blasting is utilized for trench excavation in rock, charges should be held above design grades. Actual grades for setting charges should be selected by the contractor and he should be responsible for any damage caused by the blasting. All loose rock should be carefully cleaned from the bottom of the excavation prior to backfill. Trench excavations in which the rock subgrade has been loosened due to blasting should be deepened to an acceptable bearing elevation. In our professional opinion, a clear and appropriate definition of rock should be included in the project specifications to reduce the potential for misunderstandings. A sample definition of rock for excavation specifications is provided below: Rock is defined as any material that cannot be dislodged by a Caterpillar D-8 tractor, or equivalent, equipped with a hydraulically operated power ripper (or by a Cat 325 hydraulic backhoe, or equivalent) without the use of drilling and blasting. Boulders or masses of rock exceeding ½ cubic yard in volume shall also be considered rock excavation. This classification does not include materials such as loose rock, concrete, or other materials that can be removed by means other than drilling and blasting, but which for any reason, such as economic reasons, the Contractor chooses to remove by drilling and blasting. Report of Geotechnical Subsurface Exploration SUMMIT Project No. 4140.502 Grantham Subdivision - Phases 3 and 4 Sewer Line September 9, 2019 9 4.2. Temporary Excavation Stability Localized areas of soft or unsuitable soils not detected by our borings, or in unexplored areas, may be encountered once grading operations begin. Vertical cuts in these soils may be unstable and may present a significant hazard because they can fail without warning. Therefore, temporary construction slopes greater than 5 feet in height should not be steeper than two horizontal to one vertical (2H:1V), and excavated material should not be placed within 10 feet of the crest of any excavated slope. In addition, runoff water should be diverted away from the crest of the excavated slopes to prevent erosion and sloughing. Should excavations extend below final grades, shoring and bracing or flattening (laying back) of the slopes may be required to obtain a safe working environment. Excavation should be sloped or shored in accordance with local, state and federal regulations, including OSHA (29 CFR Part 1926) excavation trench safety standards. 4.3. Structural Fill Soil to be used as structural fill should be free of organic matter, roots or other deleterious materials. Structural fill should have a plasticity index (PI) less than 25 and a liquid limit (LL) less than 50 or as approved by the Geotechnical Engineer-of-Record. Compacted structural fill should consist of materials classified as either CL, ML, SC, SM, SP, SW, GC, GM, GP, or GW per ASTM D-2487 or as approved by the Geotechnical Engineer-of-Record. Off-site borrow soil should also meet these same classification requirements. Non-organic, low-plasticity on-site soils are expected to meet this criterion. However, successful reuse of the excavated, on-site soils as compacted structural fill will depend on the moisture content of the soils encountered during excavation. We anticipate that scarifying and drying of portions of the on-site soils will be required before the recommended compaction can be achieved. Drying of these soils will likely result in some delay. All structural fill soils should be placed in thin (not greater than 8 inches) loose lifts and compacted to a minimum of 95 percent of the soil's Standard Proctor maximum dry density (ASTM D 698) Report of Geotechnical Subsurface Exploration SUMMIT Project No. 4140.502 Grantham Subdivision - Phases 3 and 4 Sewer Line September 9, 2019 10 at/or near optimum moisture content (±2%). The upper 2 feet of structural fill should be compacted to a minimum of 100 percent of the soil's Standard Proctor maximum dry density (ASTM D 698) at/or near optimum moisture content (±2%). Some manipulation of the moisture content (such as wetting, drying) may be required during the filling operation to obtain the required degree of compaction. The manipulation of the moisture content is highly dependent on weather conditions and site drainage conditions. Therefore, the grading contractor should be prepared to both dry and wet the fill materials to obtain the specified compaction during grading. Sufficient density tests should be performed to confirm the required compaction of the fill material. 4.4. Engineering Services During Construction As stated previously, the engineering recommendations provided in this report are based on the project information outlined above and the data obtained from field tests. However, unlike other engineering materials like steel and concrete, the extent and properties of geologic materials (soil) vary significantly. Regardless of the thoroughness of a geotechnical engineering exploration, there is always a possibility that conditions between borings will be different from those at the boring locations, that conditions are not as anticipated by the designers, or that the construction process has altered the subsurface conditions. This report does not reflect variations that may occur between the boring locations. Therefore, conditions on the site may vary between the discrete locations observed at the time of our subsurface exploration. The nature and extent of variations between the borings may not become evident until construction is underway. To account for this variability, professional observation, testing and monitoring of subsurface conditions during construction should be provided as an extension of our engineering services. These services will help in evaluating the Contractor's conformance with the plans and specifications. Because of our unique position to understand the intent of the geotechnical engineering recommendations, retaining us for these services will also allow us to provide consistent service through the project construction. Geotechnical engineering construction observations should be performed under the supervision of the Geotechnical Engineer-of-Record from our office who is familiar with the intent of the recommendations presented herein. This observation is recommended to evaluate whether the conditions anticipated in the design actually Report of Geotechnical Subsurface Exploration SUMMIT Project No. 4140.502 Grantham Subdivision - Phases 3 and 4 Sewer Line September 9, 2019 11 exist or whether the recommendations presented herein should be modified where necessary. Observation and testing of compacted structural fill/backfill should also be provided by our firm. Report of Geotechnical Subsurface Exploration SUMMIT Project No. 4140.502 Grantham Subdivision - Phases 3 and 4 Sewer Line September 9, 2019 12 5.0 RELIANCE AND QUALIFICATIONS OF REPORT This geotechnical subsurface exploration has been provided for the sole use of Santee Land Group, Inc. This geotechnical subsurface exploration should not be relied upon by other parties without the express written consent of SUMMIT and Santee Land Group, Inc. The analyses and recommendations submitted in this report were based, in part, on data obtained from this exploration. If the above-described project conditions are incorrect or changed after the issuing of this report, or subsurface conditions encountered during construction are different from those reported, SUMMIT should be notified and these recommendations should be re-evaluated based on the changed conditions to make appropriate revisions. We have prepared this report according to generally accepted geotechnical engineering practices. No warranty, express or implied, is made as to the professional advice included in this report. Report of Geotechnical Subsurface Exploration SUMMIT Project No. 4140.502 Grantham Subdivision - Phases 3 and 4 Sewer Line September 9, 2019 APPENDIX 1 – Figures larawaod Dr y �a u r cAc 6 �Q- i sto"'d tx c c� S m; �S �pG A �gcd'F �dQs OR HutttrmAOr 1 SITE -e VDavis Equestrian Center 9 N Q QD Z o, �Js � Nraq dr Ila :t Saddahorsa Ln S OL ® Bradfield Farms 9 ; Food Lion F Figure 1 Grantham Subdivision - Sewerline / /� Site Vicinity Map Phases 3 and4 CELEBRATING t5YE AR Robinson Church Road I AM_ Harrisburg, North Carolina SUMMIT ENGINEERING, LABORATORY B'IE87'R16. P.C. 3575 Centre Circle SCAIJIi ; NTS SUMMIT Pro ect No.: 4140.502 J Fort Mill, South Carolina 29715 (803) 504-1717 OS%OIIJ Figure 2 Boring Location Plan Approx. Soil Test Boring Location CL Z ti p W ¢ co U 2 (p m SOLI y a Z0 J B-1 L_ 1. Boring locations were not surveyed and should be considered approximate Grantham Subdivision - Sewerline Phases 3 and 4 'e1X11AT11G t5YEAR5 Robinson Church Road / AMENNIOL Harrisburg, North Carolina SUMMIT SCALE: NTS SUMMIT Project No.: 4140.502 Report of Geotechnical Subsurface Exploration SUMMIT Project No. 4140.502 Grantham Subdivision - Phases 3 and 4 Sewer Line September 9, 2019 APPENDIX 2 – Boring Logs PROJECT NUMBER 4140.502 PROJECT LOCATION Harrisburg, North Carolina PROJECT NAME Grantham Subdivision - Phases 3 and 4CLIENTSantee Land Group ABBREVIATIONS TV PID UC ppm - - - - TORVANE PHOTOIONIZATION DETECTOR UNCONFINED COMPRESSION PARTS PER MILLION LIQUID LIMIT (%) PLASTIC INDEX (%) MOISTURE CONTENT (%) DRY DENSITY (PCF) NON PLASTIC PERCENT PASSING NO. 200 SIEVE POCKET PENETROMETER (TSF) LL PI W DD NP -200 PP - - - - - - - SAMPLER SYMBOLSLITHOLOGIC SYMBOLS (Unified Soil Classification System) WELL CONSTRUCTION SYMBOLS KEY TO SYMBOLS Water Level at Time Drilling, or as Shown Water Level After 24 Hours, or as Shown Water Level at End of Drilling, or as Shown AUGER: Auger Probe BLANK SUMMIT Engineering, Laboratory & Testing, P.C. 3575 Centre Circle Fort Mill, South Carolina 29715 704.504.1717 summit-companies.com Auger Probed to an approx. depth of 7.5 feet bgs Difficult Drilling at approx. 4 feet bgs Bottom of Boring at 7.5 feet bgs, Auger Refusal NOTES Refer to Figure 2 "Boring Location Plan" for Approx. Boring Location GROUND ELEVATION 0 ft LOGGED BY J Parrish DRILLING METHOD Hollow Stem Auger DRILLING CONTRACTOR SUMMIT CHECKED BY T. Costner DATE STARTED 8/5/19 COMPLETED AT TIME OF DRILLING --- GW NE ATD AT END OF DRILLING --- HOLE SIZE 6 inches GROUND WATER/CAVE-IN: AFTER DRILLING ---RECOVERY %(RQD)20 40 60 800 100 PL LLMC FINES CONTENT (%) 20 40 60 800 100GRAPHICLOGELEVATION(ft.)0.0 -5.0 -10.0 -15.0 -20.0 5.0 10.0 15.0 20.0 25.0 SAMPLE TYPENUMBERMATERIAL DESCRIPTION BLOWCOUNTS(N VALUE) SPT N VALUE 20 40 60 800 100 PAGE 1 OF 1 BORING NUMBER B-1 PROJECT NUMBER 4140.502 PROJECT LOCATION Harrisburg, North Carolina PROJECT NAME Grantham Subdivision - Phases 3 and 4CLIENTSantee Land Group SUMMIT Engineering, Laboratory & Testing, P.C. 3575 Centre Circle Fort Mill, South Carolina 29715 704.504.1717 summit-companies.com 14ft Auger Probed to an approx. depth of 19.5 feet bgs Difficult Drilling at approx. 14 feet bgs Bottom of Boring at 19.5 feet bgs, Auger Refusal NOTES Refer to Figure 2 "Boring Location Plan" for Aprox. Boring GROUND ELEVATION 0 ft LOGGED BY J Parrish DRILLING METHOD Hollow Stem Auger DRILLING CONTRACTOR SUMMIT CHECKED BY T. Costner DATE STARTED 8/5/19 COMPLETED AT TIME OF DRILLING --- GW NE ATD / Cave-in Depth at 14' bgs AT END OF DRILLING --- HOLE SIZE 6 inches GROUND WATER/CAVE-IN: AFTER DRILLING ---RECOVERY %(RQD)20 40 60 800 100 PL LLMC FINES CONTENT (%) 20 40 60 800 100GRAPHICLOGELEVATION(ft.)0.0 -5.0 -10.0 -15.0 -20.0 5.0 10.0 15.0 20.0 25.0 SAMPLE TYPENUMBERMATERIAL DESCRIPTION BLOWCOUNTS(N VALUE) SPT N VALUE 20 40 60 800 100 PAGE 1 OF 1 BORING NUMBER B-2 PROJECT NUMBER 4140.502 PROJECT LOCATION Harrisburg, North Carolina PROJECT NAME Grantham Subdivision - Phases 3 and 4CLIENTSantee Land Group SUMMIT Engineering, Laboratory & Testing, P.C. 3575 Centre Circle Fort Mill, South Carolina 29715 704.504.1717 summit-companies.com 7.5ft Auger Probed to an approx. depth of 10 feet bgs Bottom of Boring at 10 feet bgs, Boring Terminated NOTES Refer to Figure 2 "Boring Location Plan" for Aprox. Boring GROUND ELEVATION 0 ft LOGGED BY J Parrish DRILLING METHOD Hollow Stem Auger DRILLING CONTRACTOR SUMMIT CHECKED BY T. Costner DATE STARTED 8/5/19 COMPLETED AT TIME OF DRILLING --- GW NE ATD / Cave-in Depth at 7.5' bgs AT END OF DRILLING --- HOLE SIZE 6 inches GROUND WATER/CAVE-IN: AFTER DRILLING ---RECOVERY %(RQD)20 40 60 800 100 PL LLMC FINES CONTENT (%) 20 40 60 800 100GRAPHICLOGELEVATION(ft.)0.0 -5.0 -10.0 -15.0 -20.0 5.0 10.0 15.0 20.0 25.0 SAMPLE TYPENUMBERMATERIAL DESCRIPTION BLOWCOUNTS(N VALUE) SPT N VALUE 20 40 60 800 100 PAGE 1 OF 1 BORING NUMBER B-3 PROJECT NUMBER 4140.502 PROJECT LOCATION Harrisburg, North Carolina PROJECT NAME Grantham Subdivision - Phases 3 and 4CLIENTSantee Land Group SUMMIT Engineering, Laboratory & Testing, P.C. 3575 Centre Circle Fort Mill, South Carolina 29715 704.504.1717 summit-companies.com Auger Probed to an approx. depth of 3 feet bgs Bottom of Boring at 3 feet bgs, Auger Refusal NOTES Refer to Figure 2 "Boring Location Plan" for Approx. Boring GROUND ELEVATION 0 ft LOGGED BY D. Robles DRILLING METHOD Hollow Stem Auger DRILLING CONTRACTOR SUMMIT CHECKED BY T. Costner DATE STARTED 8/22/19 COMPLETED AT TIME OF DRILLING --- AT END OF DRILLING --- HOLE SIZE 6 inches GROUND WATER/CAVE-IN: AFTER DRILLING ---RECOVERY %(RQD)20 40 60 800 100 PL LLMC FINES CONTENT (%) 20 40 60 800 100GRAPHICLOGELEVATION(ft.)0.0 -5.0 -10.0 -15.0 -20.0 5.0 10.0 15.0 20.0 25.0 SAMPLE TYPENUMBERMATERIAL DESCRIPTION BLOWCOUNTS(N VALUE) SPT N VALUE 20 40 60 800 100 PAGE 1 OF 1 BORING NUMBER B-4 PROJECT NUMBER 4140.502 PROJECT LOCATION Harrisburg, North Carolina PROJECT NAME Grantham Subdivision - Phases 3 and 4CLIENTSantee Land Group SUMMIT Engineering, Laboratory & Testing, P.C. 3575 Centre Circle Fort Mill, South Carolina 29715 704.504.1717 summit-companies.com Auger Probed to an approx. depth of 3 feet bgs Bottom of Boring at 3 feet bgs, Auger Refusal NOTES Boring Located Approx. 5' from AP-4 Towards Creek GROUND ELEVATION 0 ft LOGGED BY D. Robles DRILLING METHOD Hollow Stem Auger DRILLING CONTRACTOR SUMMIT CHECKED BY T. Costner DATE STARTED 8/22/19 COMPLETED AT TIME OF DRILLING --- AT END OF DRILLING --- HOLE SIZE 6 inches GROUND WATER/CAVE-IN: AFTER DRILLING ---RECOVERY %(RQD)20 40 60 800 100 PL LLMC FINES CONTENT (%) 20 40 60 800 100GRAPHICLOGELEVATION(ft.)0.0 -5.0 -10.0 -15.0 -20.0 5.0 10.0 15.0 20.0 25.0 SAMPLE TYPENUMBERMATERIAL DESCRIPTION BLOWCOUNTS(N VALUE) SPT N VALUE 20 40 60 800 100 PAGE 1 OF 1 BORING NUMBER B-4A PROJECT NUMBER 4140.502 PROJECT LOCATION Harrisburg, North Carolina PROJECT NAME Grantham Subdivision - Phases 3 and 4CLIENTSantee Land Group SUMMIT Engineering, Laboratory & Testing, P.C. 3575 Centre Circle Fort Mill, South Carolina 29715 704.504.1717 summit-companies.com Auger Probed to an approx. depth of 3 feet bgs Bottom of Boring at 3 feet bgs, Auger Refusal NOTES Boring Located Approx. 10' from AP-4 Towards Creek GROUND ELEVATION 0 ft LOGGED BY D. Robles DRILLING METHOD Hollow Stem Auger DRILLING CONTRACTOR SUMMIT CHECKED BY T. Costner DATE STARTED 8/22/19 COMPLETED AT TIME OF DRILLING --- AT END OF DRILLING --- HOLE SIZE 6 inches GROUND WATER/CAVE-IN: AFTER DRILLING ---RECOVERY %(RQD)20 40 60 800 100 PL LLMC FINES CONTENT (%) 20 40 60 800 100GRAPHICLOGELEVATION(ft.)0.0 -5.0 -10.0 -15.0 -20.0 5.0 10.0 15.0 20.0 25.0 SAMPLE TYPENUMBERMATERIAL DESCRIPTION BLOWCOUNTS(N VALUE) SPT N VALUE 20 40 60 800 100 PAGE 1 OF 1 BORING NUMBER B-4B PROJECT NUMBER 4140.502 PROJECT LOCATION Harrisburg, North Carolina PROJECT NAME Grantham Subdivision - Phases 3 and 4CLIENTSantee Land Group SUMMIT Engineering, Laboratory & Testing, P.C. 3575 Centre Circle Fort Mill, South Carolina 29715 704.504.1717 summit-companies.com Auger Probed to an approx. depth of 5.5 feet bgs Bottom of Boring at 5.5 feet bgs, Auger Refusal NOTES Boring Located Approx. 15' from AP-4 Towards Creek GROUND ELEVATION 0 ft LOGGED BY D. Robles DRILLING METHOD Hollow Stem Auger DRILLING CONTRACTOR SUMMIT CHECKED BY T. Costner DATE STARTED 8/22/19 COMPLETED AT TIME OF DRILLING --- AT END OF DRILLING --- HOLE SIZE 6 inches GROUND WATER/CAVE-IN: AFTER DRILLING ---RECOVERY %(RQD)20 40 60 800 100 PL LLMC FINES CONTENT (%) 20 40 60 800 100GRAPHICLOGELEVATION(ft.)0.0 -5.0 -10.0 -15.0 -20.0 5.0 10.0 15.0 20.0 25.0 SAMPLE TYPENUMBERMATERIAL DESCRIPTION BLOWCOUNTS(N VALUE) SPT N VALUE 20 40 60 800 100 PAGE 1 OF 1 BORING NUMBER B-4C PROJECT NUMBER 4140.502 PROJECT LOCATION Harrisburg, North Carolina PROJECT NAME Grantham Subdivision - Phases 3 and 4CLIENTSantee Land Group SUMMIT Engineering, Laboratory & Testing, P.C. 3575 Centre Circle Fort Mill, South Carolina 29715 704.504.1717 summit-companies.com Auger Probed to an approx. depth of 10 feet bgs Bottom of Boring at 10 feet bgs, Auger Refusal NOTES Refer to Figure 2 "Boring Location Plan" for Approx. Boring GROUND ELEVATION 0 ft LOGGED BY D. Robles DRILLING METHOD Hollow Stem Auger DRILLING CONTRACTOR SUMMIT CHECKED BY T. Costner DATE STARTED 8/22/19 COMPLETED AT TIME OF DRILLING --- AT END OF DRILLING --- HOLE SIZE 6 inches GROUND WATER/CAVE-IN: AFTER DRILLING ---RECOVERY %(RQD)20 40 60 800 100 PL LLMC FINES CONTENT (%) 20 40 60 800 100GRAPHICLOGELEVATION(ft.)0.0 -5.0 -10.0 -15.0 -20.0 5.0 10.0 15.0 20.0 25.0 SAMPLE TYPENUMBERMATERIAL DESCRIPTION BLOWCOUNTS(N VALUE) SPT N VALUE 20 40 60 800 100 PAGE 1 OF 1 BORING NUMBER B-5 PROJECT NUMBER 4140.502 PROJECT LOCATION Harrisburg, North Carolina PROJECT NAME Grantham Subdivision - Phases 3 and 4CLIENTSantee Land Group SUMMIT Engineering, Laboratory & Testing, P.C. 3575 Centre Circle Fort Mill, South Carolina 29715 704.504.1717 summit-companies.com