Loading...
HomeMy WebLinkAbout19980260 Ver 4_NPDES inspection Oct_20191015Wetland Inspection Report Project Num: 19980260 Version: 4 Project Name: NC DOT - Winston-Salem Northern Beltway Phase 2 County: Forsyth(R-2247/U-2579) Location: NC DOT - Winston-Salem Northern Beltway Phase 2 (R-2247/U-2579) Latitude: +36' 10' 49" SW Plan Location Site Owner Name NC DOT PDEA Inspection Date: 10/7/2019 Reason for Inspection Routine Inspection Type: Records/File Review (DOT) Inspection Contact Person: Title: On -Site Representative(s): Primary Inspector: Dave Wanucha Secondary Inspector(s): Facility Compliance Status: 0 Compliant ❑ Not Compliant Program Areas: NPDES SW - Roadway (DOT) Question Areas: SW Measures Operation and Maintenance Inspection Summary: Status: Issued Project Type: New Road/Highway Region: Winston-Salem Longitude: -80' 16' 23" Phone: Phone: 336-776-9703 page: 1 Site Number: 19980260 Owner: Thorpe, Gregory Inspection Date: 10/7/2019 Inspection Type: Records/File Review (DOT) Reason for Visit: Routine SW Measures Yes No NA NE Are the SW measures constructed as per the approved plans? 0 ❑ ❑ ❑ Are the inlets located per the approved plans? 0 ❑ ❑ ❑ Are the outlet structures located per the approved plans? 0 ❑ ❑ ❑ Comment: The plan was to be revised per Roadside to prevent further sediment losses. Contractor instructed to backfill culvert ASAP to bring elevation up to where basins will be more effective. Operation and Maintenance Yes No NA NE Are the SW measures being maintained and operated as per the permit requirements? 0 ❑ ❑ ❑ Are the inspection and maintenance records complete and available for review? 0 ❑ ❑ ❑ Comment: I reviewed the NPDES records the week of and following the storm event on Sept 27. Inspections were made and EC measures were in place prior to the storm and were under repair the week following. In fact work was still underway during our inspection of sediment removal. page: 2