Loading...
HomeMy WebLinkAbout19961179 Ver 1_COMPLETE FILE_19961223State of North Carolina Department of Environment, Health and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor Jonathan B. Howes, Secretary A. Preston Howard, Jr., P.E., Director APPROVAL of 401 Water Quality Certification Mr. R.R. Stansberry Plantation Pipe Line Co. P.O. Box 18616 Atlanta, GA 31126-0616 Dear Mr. Stansberry: C) EHNF1 January 15, 1997 Mecklenburg County DWQ Project # 961179 You have our approval to place fill material in acres of wetlands or waters for the purpose of constructing two petroleum product delivery lines in the Paw Creek area, as you described in your application dated 19 December 1996. After reviewing your application, we have decided that this fill is covered by General Water Quality Certification Number 3022. This certification allows you to use Nationwide Permit Number 12 when it is issued by the Corps of Engineers. This approval is only valid for the purpose and design that you described in your application. If you change your project, you must notify us and you may be required to send us a new application. If total wetland fills for this project (now or in the future) exceed one acre, compensatory mitigation may be required as described in 15A NCAC 2H.0506 (h) (6) and (7). For this approval to be valid, you must follow the conditions listed in the attached certification. In addition, you should get any other federal, state or local permits before you go ahead with your project. Also this approval will expire when the accompanying 404 or CAMA permit expires unless otherwise specified in the General Certification. If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, P.O. Box 27447, Raleigh, N.C. 27611-7447. This certification and its conditions are final and binding unless you ask for a hearing. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please telephone John Domey at 919-733-1786. Sincerely, qf n Hw r.E. Attachment cc: Wilmington District Corps of Engineers Corps of Engineers Asheville Field Office Mooresville DWQ Regional Office Central Files 961179.1tr Division of Water Quality • Environmental Sciences Branch Environmental Sciences Branch, 4401 Reedy Creek Rd., Raleigh, NC 27607 Telephone 919-733-1786 FAX # 733-9959 An Equal Opportunity Affirmative Action Employer • 50% recycled/10% post consumer paper PLANTATION PIPp DNE ComPAN'Y' SERVING THE SOUTHEAST SINCE 1940 R. R. STANSBERRY, P.E. Telephone: 404-364-5890 Environmental, Health and Safety Team Leader 17 Facsimile: 404-816-3045 1% I:3 0 1996 cFLFQ WETLANDS GROUP tiT ? , f'9rf VATER UALITY SECTIO 9 ?' 00, Mr. Greg Price NCDEHNR Division of Water Quality Environmental Sciences 4401 Reedy Creek Road Raleigh, NC 27607 Dear Mr. Price: December 19, 1996 File Ref. 5. 9. 7. 1 PPL to Southeast Terminals Delivery Line Project- Paw Creek, NC 409 ISSUED Plantation Pipe Line Company plans to begin construction of new, twelve-inch and ten-inch diameter petroleum product delivery lines in the Paw Creek vicinity in early January. These new lines will connect our terminal located at 6869 Freedom Drive with Southeast Terminals (BP/Dreyfus). Each line will be approximately 4,700 feet in length. In order to install these pipelines it will be necessary to cross a drainage ditch at the headwaters of an unnamed tributary of Paw Creek. The proposed crossing area is in the Mountain Island Lake Quadrangle at approximate UTM coordinates of 5 06 000 East and 39 03 400 North and is indicated by a red "X" on the enclosed USGS map. The drainage ditch normally has no flow. The pipeline crossing will be approximately eight feet in length and potentially disturb a linear distance of no more than 30 feet. The entire area of disturbance will be well below one-third acre. Mr. Steve Lund at the Army Corp of Engineers has determined that the crossing would be covered under Nationwide Permit 26. We ask your written concurrence that a Section 401 Water Quality Certification is not required and that submitting a permit application is not necessary. If you have any questions, please contact me at (404) 364-5890. Sincerely, R. R. St berry, P.E. Enclosure c: \user\word\hydro\nc\961219. doc P.O. BOX 18616, ATLANTA, GEORGIA 31126-0616 945 EAST PACES FERRY ROAD, ATLANTA, GEORGIA 30326-1125