Loading...
HomeMy WebLinkAboutNC0074446_NOD-2019-PC-0224_20191009ROY COOPER Got-crrror MICHAEL S. REGAN Sccr;.f;try LINDA CULPEPPER Drrerfor nq oil a TIM 13 ; f f James Radford, Managing Member Radford Development of Virginia, LLC P.O. Box 5529 Cary, NC 27512-5529 Dear Mr. Radford, NORTH CAROLINA Environmental Quality October 9, 2019 Subject: Notice of Deficiency -- NOD-2019-PC-0224 Compliance Evaluation Inspection (Follow-up) Hilltop Mobile Home Park WWTP NPDES Permit Number NCO074446 Orange County On Thursday, October 3, 2019, Zach Thomas and Josh Brigham of the Raleigh Regional Office with Division of Water Resources conducted a follow-up compliance evaluation inspection of the treatment facilities located at the Hilltop Mobile Home Park. The purpose of this inspection was to ensure compliance with the subject NPDES permit and evaluate if the requested repairs from the 12-7-2018 inspection had been completed. During the inspection, the presence and cooperation of Mr. Paul Smith (ORC), Mr. Derek Hinds and yourself was helpful and appreciated. This 'an 1 o follow-up inspection con i d of the f lI w' Review of the NPDES permit; Review of the owner/facility information; On -site inspection of the wastewater treatment units Findings during insj=tion were as follows: 1. The ORC is completing log sheets for the facility and keeping additional information for site visits in a binder for review. 2. A new bar screen has been fabricated and installed. At the time of inspection, everything appeared to be in good working order with all flow passing through the treatment unit. 3. McFarland is contracted to pump and dispose of all sludge from the facility. Sludge is received by the North Durham WRF located at 1900 East Club Blvd, Durham. The ORC stated that McFarland recently visited on 10-1-2019 to collect sludge waste. 4. The previous inspection report stated, "At the time of inspection, neither of the two sets of audible or visual alarms were operational. Please return these alarms to operational status and provide a date when these were repaired." As of the 01-07-2019 response to DWR, staff at the WWTP had J ^� ��, Itiarth i:ar;tlia� Ua���artmcnt ui E:nvironntrnta3 Puafitr ' Uiaisis,ro uF t'VarrrHeiuurres �� �it,Iciyio Rcyion �l Of itr :SBC)U i err etf [iri:�: RX.- oil. N"In II Coo u irar :i60 ) o-w��u..s+t l!•.nrtrrn:y;k.ui, �� c,19.i�tf.�10r7 been working with Pete Duty and Associates to repair the alarms with no success. As of the 10- 3-2019 follow-up inspection, neither of the alarms had been repaired. S. Both clarifiers appeared to have more sufficient settling throughout the column now that new blowers have been added. 6. Notification to DWR of the operational status of the tertiary filters was required by 1-7-2019. An email dated 12-26-2018 notified the RRO that the filters were placed online 12-17-2018. Filters were in use at the time of the inspection. When the Filters began to backwash, one of the pumps was leaking. DWR staff asked that the part be evaluated and repaired promptly to avoid any treatment issues. 7. A new generator was purchased and installed since the last inspection. The power was switched off to the treatment facility and the generator operated properly under load. 8. In addition to evaluating the requested repairs, the following items were noted during the inspection: a) Multiple locations of ground erosion around the treatment unit were observed. Please ensure that these areas are addressed so that damage does not occur to the treatment facility components. b) Multiple trees have been limbed or cut to alleviate problems caused by leaf accumulation within the treatment units. Please ensure that all State and Local government rules regarding vegetation removal are followed if any work will occur in the future. c) The flow meter was examined at the time of inspection and is past due for calibration as of 6-30-2019. Please ensure that the meter is calibrated and kept free from any debris that will impede proper function. Please respond in writing to items 4 and 8 within 30 days of receipt of this letter. If you have questions or comments about the inspection, this report or the requirements to take corrective action, please contact: Zach Thomas at 919-791-4247 or via email at zachary.th masOncdenr.gov. Sincerely, Ric olich, LG Assistant Water Quality Regional Supervisor Raleigh Regional Office Attachments: EPA Water Compliance Inspection Report Cc: RRO Files Laserfiche Orange County Health Department Derek Hinds, Great Communities Inc (via email: info@greatcommunitiesinc.com) United States Environmental ProlecLon Agency Form Approved EPA Washington. D C 2t146fl OMB No 20404057 Water Compliance Inspection Report Approval expires 8-31-98 Section A: National Data System Coding (i.e, PCS) Transaction Code NPDES yr.mo;day Inspection Type Inspector Fac Type 1 u 2 15 1 3 1 NCO074446 I11 121 1-3110:03 I17 18 I,• U I 19 II c I 20I 21 J J L6 Inspection Work Days Facility Self -Monitoring Evaluation Rating B1 CIA Reserved 67 70 � I 71 L I 72 I N I 73 I I 174 75 80 E� ty Section B: Facility Data h _I I f I Name and Location of Facility Inspected (For Industrial Users discharging to POTW also riclude Entry Time/Date Permit Effective Date POTW name and NPDES Permit Number) 10 00AM 19110/03 16/11/01 Hilltop Mobile Home Park WWTP 7105 NC Hwy 86 N Exit Time/Date Permit Expiration Date Chapel Hill NC 27514 11 30A&I 19/10/03 21/04/30 Name(s) of Onsite Representative(s)ITitles(s)1Phone and Fax Number(s) Other Facility Data 1N Paul Matthew Smith10RC1336-932-93471 Name, Address of Responsible Official/Title/Phone and Fax Number James Radford,PO Box 5529 Cary NC 2751255291l540-357-46761 Contacted No Section C: Areas Evaluated During Inspection (Check only those areas evaluated) Permit N Flow Measurement Operations & Maintenance E Records/Reports Self-Monitoring Program 0 Sludge Handling Disposal Facility Site Review 0 EffluentlReceiving Waters Laboratory Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) (See attachment summary) Name(s) and Signature(s) of Inspector(s) AgencylOfticelPhone and Fax Numbers Date Joshua S Brigham4�.:: DWR/RRO WO1919-791-4200r 10 -f 0 -20 Ici Zachary Thomas DWRIRRO W01919-7914200r Signature of Manag ment O A Reviewer AgencylOfficelPhone and Fax Numbers ate /6 �i EPA Form 60-3 (Rev 9-94) Previous editions are obsolete Page# NPDES yr.molday Inspection Type 3 NCO074446 11 12 19110/03 17 18 ICI Section D Summary of Find nglComments (Attach additional sheets of narrative and checklists as necessary) See attached summary. Page# Permit: NCO074446 Owner - Facility: H:Illop Mobile Home Park wwTP Inspection Date: 10/03/2019 Inspection Type: Compliance Fvaluaticn Operations & Maintenance Is the plant generally clean with acceptable housekeeping? Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable Solids, pH, DO, Sludge Judge, and other that are applicable? Comment: The previous issue regarding leaves appears to be solved. Permit (If the present permit expires in 6 months or less). Has the permittee submitted a new application? Is the facility as described in the permit? # Are there any special conditions for the permit? Is access to the plant site restricted to the general public? Is the inspector granted access to all areas for inspection? Yes No NA NE ■ ❑ ❑ ❑ ■ ❑ ❑ ❑ Yes No NA NE ❑❑■❑ Comment: Special Condition A3 required notification to DWR of the operational status of the tertiary filters was required by 1-7-2019. An email dated 12-26-2018 notified the RRO that the filters were placed online 12-17-2018 Bar Screens Yes No NA NE Type of bar screen a.Manual b.Mechanical ❑ Are the bars adequately screening debris? 0 ❑ ❑ ❑ Is the screen free of excessive debris? N ❑ ❑ ❑ Is disposal of screening in compliance? 0 ❑ ❑ ❑ Is the unit in good condition? 0 ❑ ❑ ❑ Comment: A new bar screen has been fabricated and installed. At the time of inspection everything appeared to be in good working order with all flow gassing through the treatment unit. Standby Power Yes No NA NE Is automatically activated standby power available? 0 ❑ 11 ❑ Is the generator tested by interrupting primary power source? 0 ❑ ❑ ❑ Is the generator tested under load? E ❑ ❑ ❑ Was generator tested & operational during the inspection? E [l ❑ ❑ Do the generator(s) have adequate capacity to operate the entire wastewater site? 0 ❑ [] [] Is there an emergency agreement with a fuel vendor for extended run on back-up power? ❑ ❑ ❑ Is the generator fuel level monitored? 0 ❑ ❑ ❑ Page# 3 Permit: NCO074446 Owner - Facllily: Hilltop Mobile Home Park WWTP Inspection Date: 10/03/2019 Inspection Type: Compliance Evaluation Standby Power Yes No NA NE Comment: Please ensure that the generator is tested on a regular basis to evaluate proper function. Flow Measurement - Effluent Yes No NA NE # Is flow meter used for reporting? M ❑ ❑ ❑ Is flow meter calibrated annually? ❑ 0 ❑ ❑ Is the flow meter operational? N ❑ ❑ ❑ (If units are separated) Does the chart recorder match the flow meter? ❑ ❑ s ❑ Comment: The flow meter was examined at the time of inspection and is past due for calibration as of 6-30-2019 Please ensure that the meter is calibrated and kept free from any debris that will impede proper function. Secondary Clarifier Yes No NA NE Is the clarifier free of black and odorous wastewater? 0 ❑ ❑ ❑ Is the site free of excessive buildup of solids in center well of circular clarifier? ❑ ❑ M ❑ Are weirs level? M ❑ ❑ ❑ Is the site free of weir blockage? M ❑ ❑ ❑ Is the site free of evidence of short-circuiting? ■ ❑ ❑ ❑ Is scum removal adequate? ❑ ❑ M ❑ Is the site free of excessive floating sludge? M ❑ ❑ ❑ Is the drive unit operational? ❑ ❑ N ❑ Is the return rate acceptable (low turbulence)? ■ ❑ ❑ ❑ Is the overflow clear of excessive solids/pin floc? 0 Cl ❑ ❑ Is the sludge blanket level acceptable? (Approximately % of the sidewall depth) M ❑ ❑ ❑ Comment: Both clarifiers appeared to have more sufficient settling throughout the column Equalization Basins Yes No NA NE Is the basin aerated? N ❑ ❑ ❑ Is the basin free of bypass lines or structures to the natural environment? M ❑ ❑ ❑ Is the basin free of excessive grease? 0 ❑ ❑ ❑ Are all pumps present? 0 ❑ ❑ ❑ Are all pumps operable? 0 ❑ ❑ ❑ Are float controls operable? ❑ ❑ ❑ N Are audible and visual alarms operable? ❑ 0 ❑ ❑ # Is basin sizelvolume adequate? M ❑ ❑ ❑ Page# 4 Permit: NCO074446 Owner - Facility Hilltop Mobile Home Park WWTP Inspection Date: 10103l2019 Inspection Type.• Compliance Evaluation Etc ualization Basins Yes No NA NE Comment: As of the 01-07-2019 response to DWR staff at the WWTP had been workinq with Pete Duty and Associates to repair the alarms with no success. As of the 10-3-2019 follow-up inspection, neither of the alarms had been repaired Sand Filters Low rate Yes No NA NE (If pumps are used) Is an audible and visible alarm Present and operational? 0 Is the distribution box level and watertight? 11. Is sand filter free of panding? ■ Is the sand filler effluent re -circulated at a valid ratio? 11 0 11E # Is the sand filter surface free of algae or excessive vegetation? 0❑ 0 ❑ # Is the sand filter effluent re -circulated at a valid ratio? (Approximately 3 to 1) 0 ❑ 0 0 Comment: Notification to DWR of the operational status of the tertiary filters was required by 1-7-2019. An email dated 12-26-2018 notified the RRO that the filters were placed online 12-17-2018. Filters were in use at the time of the inspection. When the Filters be an to backwash one of the Pumps was leakinci. DWR staff asked that the art be evaluated and repaired Promptly to avoid any treatment issues. Page# 5