Loading...
HomeMy WebLinkAbout19980260 Ver 4_NPDES 9-23-19_20191009INSPECTION RECORD FOR ACTIVITIES UNDER STORMWATER GENERAL PERMIT NCGO10000 SELF -INSPECTION RECORD FOR LAND DISTURBING ACTIVITIES PER § 113A-54.1 RESPONSE FOR EROSION CONTROL FORM 1675 PROJECT LOCATION WINSTON SALEM, NO TIP/"S# u 579D. LEVEL H SUPERVISOR Dillon Johnson COUNTY FOR--Li— CONTRACTOR FLATIRON - BLYTHE DEVELOPMENT, A JOINT VENTURE All erosion and sedimentation control measures and stormwater discharge outfalls must be inspected once per seven calendar days AND within 24 hours of a rainfall of 0.5 inch or greater per 24 hour period. Additional monitoring MAY be required at the discretion of DWR if the receiving stream is 303(d) listed for turbidity AND the project has had documented problems managing turbidity. Permittee must keep a record of inspections. Attach Multi Precipitation Estimator (MPE) rainfall data for weekly period. If using on site rain gage, complete daily rainfall measurement. See the most recent `Applicable Requirements' document for more information. (htti)://www.nedot.gov/doh/oi)erations/dpchief en /roadside/fieldo s/downloads/Files/NCG01GuidanceandFA s2015. d . Day Date Rain Amt(in) Notes 1 9l2312019 0 11 INSPECTION 9 19re4/2o19 �19/2512019 9 Th F 912612019 9/2112019 I O 0 II Sat 9/28/2019 .965 Sun sr2sr2o1s a Phase of Grading lace a check in the box of the current project phaso Installation of perimeter erosion and sediment control measures X Clearing and grubbing of existing ground cover X Cam letion of any phase of grading of slopes or fills Installation of storm drainage facilities X Completion of construction or development Establishment of permanent around cover sufficient to restrain erosion Has all land disturbing activity been completed? (Y/N) N Has the final permanent ground cover been completed and established? (Y/N) N By this signature, I certify (in accordance with Part H Section B, 10 of the NCG010000 permit) that this report is accurate and complete to the best of my knowledge: Cert. bevel 11 Sup k visor Cert. # NCDO"f Cer . evel II Representative Cert. 4 Exceptions to standard monitoring requirements Idle projects: Idle projects must be inspected once every 14 calendar days and after 0.5" of rain in a 24 hour period. Idle projects are projects that have not been completed but where no construction activity occurs for 21 calendar days or more AND the entire project has been adequately stabilized with temporary vegetation pursuant to DEMLR guidelines. See `Applicable Requirements' for exceptions. Completed projects: Completed projects are those projects where work has been completed and you're waiting for the permanent vegetation to establish (i.e. waiting for the grass to grow). Completed projects must be inspected once every 30 calendar days AND after 0.5" of rain in a 24 hour period. The reduced monitoring can begin once construction has been completed, and erodible slopes have been sufficiently stabilized to restrain erosion by application of permanent ground cover varieties and installation of temporary ground cover to include appropriate erosion control matting and/or other approved mulch materials. Form should not be signed until the week is complete and ALL corrective actions have been completed in the 24 hour and/or 5 day time periods. 04/2019 SP--FORM30 StOmwater'�>fscharg Clu>'aals {ID, Visible Sedimentation- -N Shee 2 ;; (I2equ>llred to last du117 4 eat ll-inspectiq>) u�f and S#ream Turbidity Inspection Date Station Number. Corrective Actions Takeu Priority* Date Corrected Other Pollutants*.: Sediment Deposited"* Stream Clarity.* 9/23/2019 BID 5.10B Installed N N N 9/23/2019 BID 5.11B Installed N N N 9/23/2019 BID 5.12CG Installed N N N 9/23/2019 BID 5.13CG Installed N N N 9/23/2019 BID 5.14CG Installed N N N 9123/2019 BID 5.15CG Installed N N N 9/23/2019 BID 5. I6CG Installed N N N 9/23/2019 BID 5.18CG Installed N N N 9/23/2019 BID 5.19CG Installed N N N 9/23/2019 BID 6.1B Installed N N N 9/23/2019 BID 6.313 Installed N N N 9/23/2019 BID 6.4CG Installed N N N 9/23/2019 BID 6513 Installed N \' N 9/23/2019 BID 7.1B Installed N N N 9/23/2019 BID 7.3CG Installed N N N 9/23/2019 BID 7.4CG Installed N N N 9/23i2019 BID 8.1CG Installed N N N 9/23/2019 BID 8.2CG installed N N N 9/23/2019 BID 9.1CG Installed N N N 9/23/2019 BID 9.2CG Installed N N N 9/2312019 BID 9.3CG Installed N N N 9/23/2019 BID 10.5E Installed N N N 9/23/2019 BID 10,6E Installed N N N 9/2312019 BID 10.8F Installed N N N 9/2312019 BID 10.9F Installed N N N 9/23/2019 BID IO.IOB Installed N N N 9/23/2019 BID 11.3B Installed N N N 9/23/2019 BID 11.5E Installed N N N 9/23/2019 BID 11.7CG Installed N N N 9/23/2019 BID 11,8E Installed N N N 9/23/2019 BID 26.1 B Installed N N N 9/23/2019 BID 26.213 Installed N N N 9/23/2019 BID 26.313 Installed N N N 9/23/2019 811) 26.4CG Installed N N N 9/23/2019 BID 28.5F Installed N N N 9/23/2019 BID 28.6F Installed N N N *R=Routine; needs attention within 5 days; U=Urgent, needs attention within 24 hrs. **Is there evidence of other pollutants discharging from site such as oil sheen, discoloration, cement wastes, sanitary waste, fertilizers, or fuel or storage leakage? (Y/N) **If Other Pollutants is marked Yes describe extent of discharge g and list the corrective actions taken. ***Is there "any visible sediment. deposited in a stream, wetland, buffer or:adjacent propertyT (YIN) *** Contact DWQ/DLR-LQ within 24 hours if visible sediment is deposited in surface waters or wetlands. ****Is there Any visible decrease in stream clarity. (increase turbidity - cloudy) because of discharge? (YIN) NOTE: Any erosion control device that is damaged that has the potential to lose sediment and/or pollution offsite and/or into surface waters should be treated as "URGENT" 04/2019 Sr^''FORM30 5tormwater Disehalrge Outfalls (SDO) Utsible sedilnentation (Required to list during each inspection) aztdStream Tu'rliidi. ty Inspection Date Station.NumberCorrective Actions Taken , > . Prioritty� hate Corrected' other Pollutants". Sediment . Deposited"** Stream Clarity*. �* ' 9/2312019 BID 28.7E Installed N N N 9/23/2019 BID 30.3E Installed N N N 9/23/2019 BID 30.417 Installed N N N 9/23/2019 BID 30.5F Installed N N N 9/23/2019 BID 30.6P Installed N N N 9/23/2019 BID 31.1 B Installed N N N 9/23/2019 BID 31.2B Installed N N N 9/23/2019 BID 31.3B Installed N N N 9/23/2019 STA - 67+65 Rt 192' Installed N N N 9/23/2019 STA - 67+95 Rt 80' Installed N N N 9/23/2019 STA - 68+30 Rt 37' Installed N N N 9123/2019 STA - 68+50 Lt 72' Installed N N N 9/23/2019 STA - 68+55 Lt 60' HWC - Installed N N N 9/23/2019 STA - 69+15 Lt 172' HWC - Installed N N N 9/23/2019 STA - 69+25 Lt 202' HWC - Installed N N N 9/23/2019 STA - 69+35 Lt 219' HWC - Installed N N N 9/23/2019 STA - 69+80 Lt 188' HWC - Installed N N 9/23/2019 STR 1026 Pipe outlet - Installed N N N 9/23/2019 STA - 356+30 Rt 17' HWC - Installed N N N 9/23/2019 STA - 356+35 Rt 26' HWC - Installed N N N 9/23/2019 STA - 405+75 Rt 240' Permanent Ditch - Installed N N N 9/23/2019 YI RPA 20+20 Rt 110' 1IWC - Installed N N N 9/23/2019 YI RPA 20+20 Rt 36' HWC - Installed N N N 9/23/2019 Yl RPA 20+50 Rt 91' HWC - InstaIled N N N 9/23/2019 Yl RPA 20+15 Lt 44' HWC - InstaIled N N N 9/23/2019 YI RPA 20+00 Lt 57' HWC - Installed N N N 9/23/2019 Yi LPD 5+05 Lt 77' HWC - Installed N N N 9/23/2019 Y1 LPD 4+85 Lt 17' HWC - Installed N N N 9/23/2019 YI LPD 5+50 Lt 5' HWC - Installed N N N 9/23/2019 Y I RPD 25+90 Rt 52' HWC - InstalIed N N N 9/23/2019 Y1 RPD 25+95 Lt 55' HWC - Installed N N N 9/23/2019 Yl RPD 26+00 Lt 117' HWC - Installed N N N 9/2312019 Yl RPD 26+10 Lt 1 17' HWC - Installed N N N N N N N N N N N N *R=Routine, needs attention within 5 days; U=Urgent, needs attention within 24 hrs. **ls there evidence of other pollutants discharging from site such as oil sheen, discoloration, cement wastes, sanitary waste; fertilizers, or fuel or storage leakage? (YIN) **If Other Pollutants is marked Yes, describe extent of discharge n and list the corrective actions taken. ' ***Is there any visible sediment deposited in a stream, wetland,:, buffer or adjacent property? (Y/N) . *x*.Contact DWQ/DI,R-LQ within 24 hours if visible sediment is in surface waters or=wetlands. ****Is there any visible decrease in stream,clarity (increase turb dity- cloudy) because of a discharge? (YIN) NOTE: Any erosion control device that is damaged that has the potential to lose sediment and/or pollution offsite and/or into surface waters should be treated as "URGENT" 04/2019 SPA'— ORM30 NOTE: Any erosion control device that is damaged that has the potential to lose sediment and/or pollution offsite and/or into surface waters should be treated as "URGENT" DOT Precip Res,", For Project Winston DEF https://climate.ncsu.edu/dot/p- ',ct_more_query.php Multi -Sensor Precipitation Estimates .�. (M PE) r 7 O OI,RAH�" �r MPE home Map My Projects My Alerts More MPE Data User Acct Status NC CRONOS State Climate Office Contact Project Precipitation Time Series for Winston DEF Date Range: 2019-09-23 thru 2019-09-29 Project: Winston DEF Observation University Pkwy (old DOT Yard) Germanton Rd Old Hollow Rd Baux Mtn Rd Davis Rd Dippen Rd L sta. 400 Date & Time 36.230926°N, 36.19847°N, 36.191274°N, 36.180289°N, 36.165017°N, 36.162432°N, 36.157971°N, (EST) -80.280589°E -80.253883°E -80.242678°E -80.222719°E -80.203091'E -80.194357°E -80.187804°E (inches) (inches) (inches) (inches) (inches) (inches) (inches) 2019-09-23 0 0 0 0 0 0 0 07:00:00 2019-09-24 0 0 0 0 0 0 0 07:00:00 2019-09-25 0 0 0 0 0 0 0 07:00.00 2019-09-26 0 0 0 0 0 0 D 07:00:00 2019-09-27 0 0 0 0 0 0 p 07:00:00 2019-09-28 07:00:00 0.965 0.866 0.866 Q.856 0.331 0.331 0,331 2019-09-29 0 0 0 0 0 0 0 07:00:00 TOTAL 0.965 0.866 0.866 0,866 0.331 0.331 0.331 1 of 1 10/2/2019, 3:55 PM PERMANENT SEEDING L-LINE 9/23/2019 126+00 LEFT 75 601.00 72.5 43572.50 1.00 131+00 70 43572.50 I 1.00 Y3RPB 9/25/2019 24+00 LEFT 55 467.00 57.5 26852.50 0.62 _ 28+00 60 26852.50 0.62 Y3RPB 9/25/2019 24+00 RIGHT 56 645.00 57 36765.00 0.84 30+00 58 36765.00 0.84 I L-LINE 9/25/2019 114+00 LEFT 50 1275.00 52.5 66937.50 1.54 126+00 55 66937.50 1.54 TEMPORARY SEEDING MATTING MATTING STATION LOCATION LENGTH WIDTH AVG. AREA [SF] AREA [SY] DATE MATTED WIDTH 126+00 ] 75 L-LT 601.00 72.5 43572.5 4841.39 131+00 70.,.: 115+90 41.:.. I I L-LT 860.00 44.5 38270 4252.22 124+501 48 1J I I I SUBTOTAL 81842.5 9093.61 I I SUBTOTAL 0 0.00 9/23/19 & 9/25/19 1 1 s�> RESPONSE FOR EROSION CONTROL — INSPECTOR'S DAILY REPORT I. _ O * w 27.00 511 n 9/26/2019 Temporary Sift Fence LF Matting for Erosion Control Sy 7,000.00 9/23/19 & 9/26/19 Perm. Seed and Mulch AC 4.00 9/23/19 & 9/26/19 Temp. Mulching AC 4.00 9/26/2019 Temp. Seed LB 200.00 9/26/2019 Temp. Fertilizer TN 0.80 9/26/2019 Response for Erosion Control EA 1.00 9/26/2019