Loading...
HomeMy WebLinkAbout19980260 Ver 4_Lifting ICA Status on U-2579 D_E_F W_S Beltway_ Forsyth Co_20191009 This email was generated by the NCDOT ErCon (Erosion Control Management) system. Wanucha, Dave From:Suggs, Phillip H Sent:Tuesday, October 8, 2019 12:26 PM To:Kiser, Marcus K; McLaughlin, Zachery R; Wyrick, Scott D; Latham, Tim; Wanucha, Dave; Eplin, Tamera Cc:Ivey, Stephen P; Archer Sr, Wright; Puckett, Lester L; Braquet, Stephanie; DeWit, Benjamin J; Harris, David B; Goodwin, Jeremy A; Smith, Thomas A; Marciniak, Katherine J; Davis, Vickie G; Coco, Julie Subject:Lifting ICA Status on U-2579 D,E,F W/S Beltway, Forsyth Co Attachments:InspectionReport_34839.3.GV7_10-01-2019.pdf Attached is the Inspection Report for the following Project: InspectionReport_34839.3.GV7_10-01-2019.pdf County: Forsyth Winston Salem Northern Beltway Project Location University to New Walkertown Rd, Description: Forsyth co Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. 1