Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
Search
My WebLink
About
(1) Site 16A FLYCA 29+00.jpg
(1) Site 19 FLYBD 84+00.jpg
(2) Site 16A FLYCA 29+00.jpg
(2) Site 19 FLYBD 84+00.jpg
(3) Site 16A FLYCA 29+00.jpg
19980260 Ver 7__External_ RE_ U-2579AB Modification_Public Notice_20210112
19980260 Ver 7_Approval Letter_20210125
19980260 Ver 7_Meeting Note_20210209
19980260 Ver 7_Modification Request Attachment_20201203
19980260 Ver 7_Modification Request_20201203
19980260 Ver 7_NCDOT Review Mod_20210209
19980260 Ver 7_Page 4 of 11 from U-2579AB Phased Modification December 2 2020_20210106
19980260 Ver 7_Pre-Filing Meeting Information_20201203
19980260 Ver 7_RE_ U-2579AB Mod_Site 16_DWR_20210106
19980260 Ver 7_RE_ U-2579AB Permit MOD_20210209
19980260 Ver 7_RESPONSE to DWR Comments_20201218
19980260 Ver 7_Revised Approval Letter_20210209
19980260 Ver 7_Staff Comments_20210212
19980260 Ver 7_Stormwater issue resolved_20201218
19980260 Ver 7_U-2579AA Wetland Tree Removal_20211006
19980260 Ver 7_U-2579AA wetland tree removal_20211014
19980260 Ver 7_U-2579AA Wetland Tree Removal_Corps_20211014
19980260 Ver 7_U-2579AA wetland tree removal_Final area measure_20211019
19980260 Ver 7_U-2579AA Wetland Tree Removal_Final_20211006
20230605_132336.jpg
20230605_132429.jpg
20230605_141006.jpg
20230605_141832.jpg
20230605_145214.jpg
20230605_145829.jpg
54 Pipe - Sediment.pdf
AB NPDES review_March
AB Site Inspection March
C204633 - 3-11-22 -Environmental Pre-Con
C204633_-_3-11-22_-Environmental_Pre-Con.pdf
DJI_0218.JPG
DWR_In-Field Mod U-2579AB Site 18
FW_ _External_ Re_ U-2579AB Additional reportable losses 5_29_23
FW_ R-2247EB Silt Loss Permit Site 14
FW_ U-2579AA_ Winston-Salem Northern Beltway
FW_ U-2579AB Sediment Loss
IMG_2460.jpg
IMG_2461.jpg
IMG_2462.jpg
IMG_2464.jpg
IMG_2466.jpg
IMG_2469.jpg
permit site 16a inlet side
Photo 2.jpg
R-2247EB
RE_ _External_ RE_ U-2579AA permit modification for additional temporary impacts
RE_ _External_ RE_ U-2579AA permit modification for additional temporary impacts (2)
RE_ _External_ RE_ U-2579AB plan revision_final
RE_ _External_ Re_ U-2579AB_March followup
RE_ 2579AB Reportable losses
RE_ 2579AB Sewer Breach from November 2022
Re_ 2579AB Sewer breach in permit site
RE_ 2579AB Sewer breach in permit site (2)
Re_ I-485 _ U2579AB Project
RE_ permit site 16a inlet side
RE_ U-2579AA permit modification for additional temporary impacts
RE_ U-2579AA_ Winston-Salem Northern Beltway_Part 2
RE_ U-2579AB Sediment Loss
RE_ U-2579AB sediment loss_second
Sediment Loss report AB Section
Silt Loss 2.jpg
Silt Loss.jpg
Site 09 -L- 793+00.jpg
site 16a U-2579AB picture.pdf
Site 2.jpg
Site 7, a.jpg
Site 7.jpg
Site 9.jpg
start of work U-2579AB
U-2579AA permit modification 3.24.2023 package (2).pdf
U-2579AA permit modification 3.24.2023 package.pdf
U-2579AA permit modification for additional temporary impacts
U-2579AA Sites 3B, 6, and 19 In-Field Mod_2023 05 01.pdf
U-2579AA_REV Permit Sheet 3 of 32 (2).pdf
U-2579AA_REV Permit Sheet 3 of 32 .pdf
U-2579AA_REV-Permit Sheets 11 & 12 of 32.pdf
U-2579AB and U-2579AA Cover Letter.pdf
U-2579AB Environmental Pre-Construction Meeting Minutes
U-2579AB sediment loss
U-2579AB sediment losses
U-2579AB Site 16a plan sheet.pdf
U-2579BA stream relocation