Loading...
HomeSearchMy WebLinkAbout(1) Site 16A FLYCA 29+00.jpg(1) Site 19 FLYBD 84+00.jpg(2) Site 16A FLYCA 29+00.jpg(2) Site 19 FLYBD 84+00.jpg(3) Site 16A FLYCA 29+00.jpg19980260 Ver 7__External_ RE_ U-2579AB Modification_Public Notice_2021011219980260 Ver 7_Approval Letter_2021012519980260 Ver 7_Meeting Note_2021020919980260 Ver 7_Modification Request Attachment_2020120319980260 Ver 7_Modification Request_2020120319980260 Ver 7_NCDOT Review Mod_2021020919980260 Ver 7_Page 4 of 11 from U-2579AB Phased Modification December 2 2020_2021010619980260 Ver 7_Pre-Filing Meeting Information_2020120319980260 Ver 7_RE_ U-2579AB Mod_Site 16_DWR_2021010619980260 Ver 7_RE_ U-2579AB Permit MOD_2021020919980260 Ver 7_RESPONSE to DWR Comments_2020121819980260 Ver 7_Revised Approval Letter_2021020919980260 Ver 7_Staff Comments_2021021219980260 Ver 7_Stormwater issue resolved_2020121819980260 Ver 7_U-2579AA Wetland Tree Removal_2021100619980260 Ver 7_U-2579AA wetland tree removal_2021101419980260 Ver 7_U-2579AA Wetland Tree Removal_Corps_2021101419980260 Ver 7_U-2579AA wetland tree removal_Final area measure_2021101919980260 Ver 7_U-2579AA Wetland Tree Removal_Final_2021100620230605_132336.jpg20230605_132429.jpg20230605_141006.jpg20230605_141832.jpg20230605_145214.jpg20230605_145829.jpg54 Pipe - Sediment.pdfAB NPDES review_MarchAB Site Inspection MarchC204633 - 3-11-22 -Environmental Pre-ConC204633_-_3-11-22_-Environmental_Pre-Con.pdfDJI_0218.JPGDWR_In-Field Mod U-2579AB Site 18FW_ _External_ Re_ U-2579AB Additional reportable losses 5_29_23FW_ R-2247EB Silt Loss Permit Site 14FW_ U-2579AA_ Winston-Salem Northern BeltwayFW_ U-2579AB Sediment LossIMG_2460.jpgIMG_2461.jpgIMG_2462.jpgIMG_2464.jpgIMG_2466.jpgIMG_2469.jpgpermit site 16a inlet sidePhoto 2.jpgR-2247EBRE_ _External_ RE_ U-2579AA permit modification for additional temporary impactsRE_ _External_ RE_ U-2579AA permit modification for additional temporary impacts (2)RE_ _External_ RE_ U-2579AB plan revision_finalRE_ _External_ Re_ U-2579AB_March followupRE_ 2579AB Reportable lossesRE_ 2579AB Sewer Breach from November 2022Re_ 2579AB Sewer breach in permit siteRE_ 2579AB Sewer breach in permit site (2)Re_ I-485 _ U2579AB ProjectRE_ permit site 16a inlet sideRE_ U-2579AA permit modification for additional temporary impactsRE_ U-2579AA_ Winston-Salem Northern Beltway_Part 2RE_ U-2579AB Sediment LossRE_ U-2579AB sediment loss_secondSediment Loss report AB SectionSilt Loss 2.jpgSilt Loss.jpgSite 09 -L- 793+00.jpgsite 16a U-2579AB picture.pdfSite 2.jpgSite 7, a.jpgSite 7.jpgSite 9.jpgstart of work U-2579ABU-2579AA permit modification 3.24.2023 package (2).pdfU-2579AA permit modification 3.24.2023 package.pdfU-2579AA permit modification for additional temporary impactsU-2579AA Sites 3B, 6, and 19 In-Field Mod_2023 05 01.pdfU-2579AA_REV Permit Sheet 3 of 32 (2).pdfU-2579AA_REV Permit Sheet 3 of 32 .pdfU-2579AA_REV-Permit Sheets 11 & 12 of 32.pdfU-2579AB and U-2579AA Cover Letter.pdfU-2579AB Environmental Pre-Construction Meeting MinutesU-2579AB sediment lossU-2579AB sediment lossesU-2579AB Site 16a plan sheet.pdfU-2579BA stream relocation