HomeMy WebLinkAboutSubtask2_3_LitReviewNeuseExpansion
Subtask 2.3: Neuse River Basin
Literature Review Expansion
North Carolina Flood Resiliency Blueprint
Prepared for the North Carolina Department of Environmental Quality by AECOM,
ESP Associates, and Insight
November 2023
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | i
Table of Contents
Definitions ....................................................................................................................... v
Acronyms ........................................................................................................................ vi
1 Introduction ............................................................................................................... 1
1.1 Purpose and Intended Uses of Neuse River Basin Literature Review Expansion ..................... 1
1.2 Neuse River Basin ........................................................................................................................ 1
1.3 Connections to Other North Carolina Flood Resiliency Blueprint Tasks .................................. 2
1.4 Inclusion Criteria ......................................................................................................................... 3
2 Index .......................................................................................................................... 4
2.1 Summary Table Overview ........................................................................................................... 4
2.2 Resource Inventory Summary .................................................................................................... 6
3 Review and Inventory ............................................................................................... 12
3.1 Plans and Strategies.................................................................................................................. 12
3.1.1 Hurricane Matthew Resilient Redevelopment Plans................................................ 12
3.1.2 Regional Resilience Portfolio Program ..................................................................... 16
3.1.3 Hazard Mitigation Plans ............................................................................................ 19
3.2 Technical Reports and Memos .................................................................................................. 24
3.2.1 Neuse River Basin Flood Analysis and Mitigation Strategies Study ........................ 24
3.2.2 Neuse River Basin Flood Risk Management, North Carolina Technical Report ...... 26
3.3 Research Projects and Studies ................................................................................................. 28
3.3.1 Flood Abatement Assessment for Neuse River Basin ............................................... 28
3.3.2 Improving North Carolina’s Resilience to Coastal Riverine Flooding ...................... 32
3.3.3 Financial Risk of Flood Events in Eastern North Carolina ........................................ 35
3.3.4 Supporting Environmental Justice in Connected Coastal Communities
Through a Regional Approach to Collaborative Community Science ..................... 37
3.4 Programs ................................................................................................................................... 38
3.4.1 North Carolina Floodplain Mapping Program .......................................................... 38
3.4.2 Natural Infrastructure Flood Mitigation Program .................................................... 41
3.4.3 Triangle J Council of Government Water Resources Program ................................ 42
3.4.4 Resilient Coastal Communities Program .................................................................. 44
3.5 Barriers to Implementation ...................................................................................................... 46
3.5.1 Capability Assessments: Regional Hazard Mitigation Plans .................................... 46
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | ii
4 Concluding Remarks ................................................................................................. 48
5 Appendix .................................................................................................................. 49
5.1 Adjacent Resources ................................................................................................................... 49
5.2 Barriers to Implementation ...................................................................................................... 54
5.2.1 Capability Assessments: Regional Hazard Mitigation Plans .................................... 54
5.3 Sources of Flooding ................................................................................................................... 57
5.3.1 Hurricane Matthew Resilient Redevelopment Plan ................................................. 57
5.3.2 Regional Hazard Mitigation Plans ............................................................................. 59
5.3.3 Neuse River Basin Flood Analysis and Mitigation Strategies Study ........................ 61
5.3.4 Improving North Carolina’s Resilience to Coastal Riverine Flooding ...................... 62
5.4 Existing and Proposed Investments ......................................................................................... 64
5.4.1 Hurricane Matthew Resilient Redevelopment Plans (2017) .................................... 64
5.4.2 Regional Resilience Portfolio Program (2022) ........................................................ 100
5.4.3 Regional Hazard Mitigation Plans ........................................................................... 105
5.4.4 Neuse River Basin Flood Analysis and Mitigation Strategies Study (2018) ........... 180
5.4.5 Flood Abatement Assessment for Neuse River Basin (2020).................................. 181
5.4.6 Improving North Carolina’s Resilience to Coastal Riverine Flooding (2021) ........ 182
5.5 Other Relevant Information .................................................................................................... 184
5.5.1 Financial Risk of Flood Events in Eastern North Carolina (2021) ........................... 184
Figures
Figure 1. Counties and HUC-8 Watersheds in the Neuse River Basin ......................................................... 2
Figure 2. NC Council of Government Regions (source: https://www.ncarcog.com/regional-
councils/) ................................................................................................................................ 16
Figure 3. Location of Peak Discharges Recorded During Hurricane Matthew (5.3.3.) ............................. 62
Tables
Table 1. Resource Summary (2.2) ................................................................................................................ 6
Table 2. Snapshot of Flood Resilience Investments (3.1.1.) ..................................................................... 14
Table 3. Snapshot of Flood Resilience Investments (3.1.2.) ..................................................................... 18
Table 4. Snapshot of Flood Resilience Investments (3.1.3.) ..................................................................... 21
Table 5. Snapshot of Flood Resilience Investments (3.2.1.) ..................................................................... 25
Table 6. Snapshot of Flood Resilience Investments (3.2.2.) ..................................................................... 27
Table 7. Strategies for Improving Floodplain Ordinances in the Neuse River Basin (3.3.1) .................... 30
Table 8. Snapshot of Flood Resilience Investments (3.3.1.) ..................................................................... 31
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | iii
Table 9. Snapshot of Flood Resilience Investments (3.3.2.) ..................................................................... 34
Table 10. Snapshot of Flood Resilience Investments (3.3.3) .................................................................... 36
Table 11. Flood Resilience Investments (3.4.1.) ........................................................................................ 40
Table 12. Flood Resilience Investments (3.4.2.) ........................................................................................ 41
Table 13. Flood Resilience Investments (3.4.3.) ........................................................................................ 43
Table 14. Flood Resilience Investments (3.4.4.) ........................................................................................ 45
Table 15. Regional and County Overall Capability (3.5.1) ........................................................................ 47
Table 16 Literature Review Adjacent Resources (5.1) ............................................................................... 49
Table 17. Overall Mitigation Capability Ratings for Cities and Towns in the Neuse River Basin
(5.2.1)....................................................................................................................................... 54
Table 18. Riverine Sources of Flooding: Hurricane Matthew Resilient Redevelopment Plan
(5.3.1.)...................................................................................................................................... 57
Table 19. Coastal Sources of Flooding: Hurricane Matthew Resilient Redevelopment Plan (5.3.1.) ...... 59
Table 20. Riverine Sources of Flooding: Regional Hazard Mitigation Plans (5.3.2.) ................................ 59
Table 21. Coastal Sources of Flooding: Pamlico Sound Regional Hazard Mitigation Plan (5.3.2.) ......... 61
Table 22. Peak Discharges Recorded During Hurricane Matthew (5.3.3.) ................................................ 61
Table 23. Observed and Modeled Peak Discharge and Runoff Volume (5.3.4) ........................................ 62
Table 24. HMRRP – Carteret County (5.4.1.) .............................................................................................. 64
Table 25. HMRRP – Craven County (5.4.1.) ................................................................................................ 66
Table 26. HMRRP – Franklin County (5.4.1.) .............................................................................................. 72
Table 27. HMRRP – Greene County (5.4.1.) ................................................................................................ 73
Table 28. HMRRP – Johnston County (5.4.1.) ............................................................................................ 76
Table 29. HMRRP – Jones County (5.4.1.) .................................................................................................. 79
Table 30. HMRRP – Lenoir County (5.4.1.) ................................................................................................. 82
Table 31. HMRRP – Nash County (5.4.1.) ................................................................................................... 85
Table 32. HMRRP – Pamlico County (5.4.1.) .............................................................................................. 86
Table 33. HMRRP – Pitt County (5.4.1.) ...................................................................................................... 92
Table 34. HMRRP – Wake County (5.4.1.) ................................................................................................... 94
Table 35. HMRRP – Wayne County (5.4.1.) ................................................................................................. 95
Table 36. HMRRP – Wilson County (5.4.1.) ................................................................................................. 99
Table 37. RRP – Eastern Carolina (5.4.2) .................................................................................................. 100
Table 38. RRP – Mid-East (5.4.2) ............................................................................................................... 101
Table 39. RRP – Upper Coastal Plain (5.4.2) ............................................................................................ 102
Table 40. RRP – Kerr-Tar (5.4.2) ............................................................................................................... 103
Table 41. RRP – Triangle J (5.4.2) ............................................................................................................. 104
Table 42. RHMP – Neuse Region (5.4.3) ................................................................................................... 105
Table 43. RHMP – Pamlico Sound Region (5.4.3) .................................................................................... 115
Table 44. RHMP – Eno-Haw Region (5.4.3) .............................................................................................. 122
Table 45. RHMP – Wake County (5.4.3) .................................................................................................... 128
Table 46. RHMP – N.E.W. Region (5.4.3) ................................................................................................... 146
Table 47. RHMP – Tar River (5.4.3) ........................................................................................................... 150
Table 48. RHMP – Cape Fear Region (5.4.3) ............................................................................................. 164
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | iv
Table 49. Neuse River Basin Flood Analysis and Mitigation Strategies Study (5.4.4.) ........................... 180
Table 50. Flood Abatement Assessment for Neuse River Basin (5.4.5) .................................................. 181
Table 51. Improving North Carolina’s Resilience to Coastal Riverine Flooding (5.4.6.) ........................ 182
Table 52. Hurricane Florence Risk Profiles in Counties Contained by the Neuse Watershed
(5.5.1.).................................................................................................................................... 184
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | v
Definitions
A comprehensive list of definitions applicable to multiple Flood Resiliency Blueprint documents is
provided in a separate document.
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | vi
Acronyms
ARC – American Red Cross
BCP – Beaver Control Program
BFE – Base Flood Elevation
CAD – Computer Aided Design
CDBG – Community Development Block Grant
CERT – Community Emergency Response
Team
COG – Council of Government
COOP – Continuity of Operation Plan
CPRC – Central Pines Regional Council
CRES – Coastal Region Evacuation and
Sheltering
CRS – Community Rating System
DFE – Design Flood Elevation
DFRIS – Digital Flood Risk Information System
DMS – Division of Mitigation Services
DOT – Department of Transportation
ECU – East Carolina University
EM – Emergency Management
EMS – Emergency Medical Services
EOC – Emergency Operations Center
EOP – Emergency Operations Plan
ES – Emergency Services
ETJ – Extra-Territorial Jurisdiction
FEMA – Federal Emergency Management
Agency
FIMAN – Flood Inundation Mapping and Alert
Network
FIRM – Flood Insurance Rate Map
GIS – Geographic Information System
GUC – Greenville Utilities Commission
H&H – Hydrologic and Hydraulic
HMA – Hazard Mitigation Assistance
HMGP – Hazard Mitigation Grant Program
HMP – Hazard Mitigation Plan
HMRRP – Hurricane Matthew Resilient
Redevelopment Plan
HUD – Department of Housing and Urban
Development
HVAC – Heat, Ventilation, and Air Conditioning
JLOW – Jordan Lake One Water
LiDAR – Light Detecting and Ranging
N/A – Not Available
NBS – Nature Based Solutions
NC – North Carolina
NCCNMS – North Carolina Coordinated Needs
Management Strategy
NCDCM – North Carolina Division of Coastal
Management
NCDACS – North Carolina Department of
Agriculture and Consumer Services
NCDEQ – North Carolina Department of
Environmental Quality
NCDMS – North Carolina Division of Mitigation
Services
NCDOT – North Carolina Department of
Transportation
NCDPS – North Carolina Department of Public
Safety
NCEM – North Carolina Emergency
Management
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | vii
NCFMP – North Carolina Floodplain Mapping
Program
NCOEMS – North Carolina Office of Emergency
Medical Services
NCORR – North Carolina Office of Recovery
and Resiliency
NCSU – North Carolina State University
N.E.W. – Nash, Edgecombe, Wilson
NFIP – National Flood Insurance Program
NI – Natural Infrastructure
NIFMP – Natural Infrastructure Flood
Mitigation Program
NRCS – Natural Resources Conservation
Service
NS – Non-Structural
NSF – National Science Foundation
ODS – Office of Dam Safety
P – Planning
RCCP – Resilient Coastal Communities
Program
RHMP – Regional Hazard Mitigation Plan
RRP – Regional Resilience Portfolio
RWP – Regional Watershed Plan
S – Structural
SFHA – Special Flood Hazard Area
SMNR – Special Medical Needs Registry
SWCD – Soil and Water Conservation District
TBC – To Be Continued
UDO – Unified Development Ordnance
UNC – University of North Carolina
US – United States
USACE – United States Army Corps of
Engineers
USGS – United States Geological Survey
WWTP – Water and Wastewater Treatment
Plant
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 1
1 Introduction
1.1 Purpose and Intended Uses of Neuse River Basin Literature
Review Expansion
This document is an expansion of Task 1.1, which provided the initial foundational literature review
and data collection inventory of existing data, planning efforts, research projects, studies, and
regional scale modeling to support development of the North Carolina Flood Resiliency Blueprint
(Blueprint). The purpose of the current document is to expand the previous literature review to
document the most current plans, reports, and documents that identify current flood resiliency efforts
and sources of flooding within the Neuse River Basin. This includes existing local/regional/state
resilience efforts, policy, and plans. Further documentation is provided to identify existing
investments in flood resilience: structural, non-structural, nature-based, and planning including
details such as age/condition, need for future maintenance, and current ownership/ management. For
plans, the report indicates if recommendations have been implemented and any barriers to
implementation. This includes current state, regional, or local resilience staffing levels and relative
levels and types of expertise.
Technical Advisory Group representatives are subject matter experts who provide advisory input and
feedback during the development of the Blueprint. Their expertise contributes to identifying key
components of existing work including this Neuse River Basin literature review.
This inventory will enable all those involved to build upon existing efforts to help meet the intent of
the North Carolina Flood Resiliency Blueprint. Phase I is a statewide effort to create a basis of
knowledge including an understanding of the vast amount of resiliency planning done throughout the
state. Stakeholders from each basin will have the opportunity to add local and regional planning
efforts to narrow the North Carolina Flood Resiliency Blueprint consideration for regional and local
needs.
1.2 Neuse River Basin
The Neuse River Basin is comprised of four eight-digit hydrologic unit codes (03020201 (Upper Neuse),
03020202 (Middle Neuse), 03020203 (Contentnea), and 03020204 (Lower Neuse)) and covers over 6,200
square miles of both land and open water. The Neuse River Basin covers all or part of 17 counties:
Carteret, Craven, Durham, Franklin, Granville, Greene, Johnston, Jones, Lenoir, Nash, Orange,
Pamlico, Person, Pitt, Wake, Wayne, and Wilson.
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 2
Figure 1. Counties and HUC-8 Watersheds in the Neuse River Basin
1.3 Connections to Other North Carolina Flood Resiliency Blueprint
Tasks
There are various interconnections between this Neuse River Basin literature review expansion
(Task 2.3) and other tasks in the Blueprint, listed below.
• Task 1.1 - presents the foundational literature review for state-wide existing data, planning efforts,
research projects, studies, and regional scale modeling.
• Task 1.7 - identifies specific recommendations from existing statewide planning efforts that
correspond with flood resilience strategies.
• Task 2.10 - identifies existing recommendations.
• Task 3.3 – provides recommendations for integrating and leveraging other state, federal, and
regional flood resiliency efforts
The following sections organize reviewed materials by the following purposes.
• Plans and Strategies
• Technical Reports and Memos
• Research Projects and Studies
• Programs
For each source, the report includes the components outlined in the above Purpose and Intended Use
section as well as overview tables of each source that catalog flood resilience investments described
in the source, identify the type of investment, and furnish other elements of interest.
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 3
1.4 Inclusion Criteria
Inclusion criteria for literature review resources are listed below. Resources identified that do not
meet the inclusion criteria but are valuable for awareness and reference are documented in Table 16
in the Appendix.
• Basin-wide or smaller geographic scope. The geographic scope for this Neuse River Basin literature
review expansion is Neuse River Basin-wide or a smaller scale within the basin.
• Credible and vetted. Resources have local, state or agency support and/or have been reviewed by
subject matter experts.
• Up-to-date, latest version. Generally, resources were published in 2017 or later, in response to
Governor Roy Cooper’s 2018 Executive Order 80. For resources updated annually, only the latest
version was reviewed although earlier versions may be mentioned or linked in the document.
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 4
2 Index
2.1 Summary Table Overview
Summary table fields are described below along with included options.
• Age and Update Cycle: narrative form that includes the year it was published or released along with
any known information on the update cycle.
• Relative Level of Detail: the level of detail points of interest for existing flood resilience efforts is
covered including sources of flooding, age/condition, need for future maintenance, current
ownership/management, barriers to and status of implementation.
o Low: somewhat detailed but key points covered generally; some topics missing or broad
o Medium: moderately detailed with some key points supported by Neuse relevant descriptions,
data, maps, and other visualizations; a few topics missing or broad
o High: highly detailed with most key points supported by Neuse and applicable geographic area
relevant information; most points of interest covered explicitly
• Sources of Flooding:
o Coastal: caused by water from the ocean coming on land either as tides, storm surge, or wave
action.
o Compound: occurs when multiple factors or processes like storm surge, high tides, heavy
rainfall, river discharge, and other factors converge, leading to more severe and widespread
flooding in a particular area than if these factors acted independently.
o Dam and Levee: flooding occurs when a dam or levee fails to contain floodwater. The failure
can result from floodwater overtopping the dam or levee as well as if the dam or levee
experience a structural failure, or breach, resulting in a release of floodwater.
o Flash: characterized by a rapid rise in water, high velocities, and a large amount of debris.
o Rain: occurs when a rainfall event creates a flood independent of an overflowing water body.
o Riverine: occurs when stream and rivers exceed the capacity of their natural or constructed
channels to accommodate water flow and thus water overflows the banks, spilling out into
adjacent low-lying, dry land.
o Urban and Stormwater: occurs when excess rainfall in an urban area is greater than can be
conveyed away from the developed area by the urban drainage system.
• Investments in Flood Resilience: references existing or proposed investments in flood resilience
and identifies the type of investment.
o Structural (S): direct actions used to prevent floodwaters from reaching properties. Structural
measures involve the construction of man-made structures that control and redirect water
flows. Structural mitigation generally includes:
▪ Reservoirs
▪ Levees/floodwalls/seawalls
▪ Channel modifications
▪ Enlarging culverts or bridge openings
▪ Diversions
▪ Storm sewers
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 5
▪ Beach nourishment
o Non-Structural (NS): physical and nonphysical measures, which when applied to structures
vulnerable to flooding, or those measures incorporated as programmatic floodplain
management actions, result in a reduction in life loss and property damage and/or an increase
in flood resiliency. These measures generally cause no adverse effects on flood stages,
velocities, flood duration or the environment in which the measures are implemented. Common
examples include…
▪ Acquisition, elevation, and/or relocation of at-risk structures and property
▪ Wet and dry floodproofing (i.e., retrofitting/modifying existing structures)
▪ Local level policies, regulations, and guidance concerning land uses, zoning, building
codes, etc.
▪ State level policies, regulations, and guidance
▪ Flood insurance
▪ Emergency services including early warning systems, evacuation routing, shelters and
critical facilities
▪ Public education and outreach
o Nature-Based Solutions (NBS): also referred to as "nature-based infrastructure,” “natural
infrastructure,” or “green infrastructure;” actions that protect, sustainably manage and/or
restore natural and modified ecosystems in ways that address flood related challenges
effectively and adaptively, providing benefits for both people and the environment. Examples of
NBS include:
▪ Wetland establishment, restoration, and preservation for flood storage
▪ Conservation of natural resources including reforestation, riparian buffer
restoration/protection, streambank and shoreline protection, etc.
▪ Adaptive forestry and agricultural practices
▪ Green stormwater infrastructure that mimics natural features to capture, treat, and
disperse rainwater such as green roofs, bioswales (vegetated low-lying areas and
specialized soil mixes), rain gardens, etc.
▪ Reconnection of rivers and streams to their floodplains
▪ Coastal marsh to reduce the impact of waves, storm surge, and coastal erosion.
o Planning (P): collaborative processes that identify, evaluate, and prioritize the sources and
impacts of flooding to people and property with the purpose of forming implementable
solutions for flood mitigation. Examples of (P) include:
▪ Emergency preparedness and response planning
▪ Stormwater and floodplain management planning
▪ Technical support and funding programs
▪ Data collection, modeling, and mapping
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 6
2.2 Resource Inventory Summary
This document contains a review of existing local/regional/state resilience efforts, investments, policy, and plans relevant to the Neuse River
Basin. All 35 plans, strategies, technical reports, memos, research projects, studies, and programs reviewed in this document are highlighted
in Table 1 below. The Resource Summary Table (Table 1) includes the title of the resource, a link to that resource as well as factors described
in the inclusion criteria (section 1.4) including the year it was published (for programs the year it was started), the update cycle of that
resource, the relative level of detail, sources of flooding identified, and categories of flood resiliency actions.
Table 1. Resource Summary (2.2)
Title and Link Year Update Cycle
Relative
Level of
Detail Sources of Flooding
Investments
S NS NBS P
Hurricane Matthew Redevelopment Plan: Carteret
County
https://files.nc.gov/rebuildnc/documents/matthew/rebuild
nc_carteret_plan_combined.pdf
2017 - Medium Coastal; Rain; Riverine ✓ ✓ ✓ ✓
Hurricane Matthew Redevelopment Plan: Craven County
https://files.nc.gov/rebuildnc/documents/matthew/rebuild
nc_craven_plan_combined.pdf
2017 - Medium Coastal; Rain; Riverine ✓ ✓ ✓ ✓
Hurricane Matthew Redevelopment Plan: Franklin
County
https://files.nc.gov/rebuildnc/documents/matthew/rebuild
nc_franklin_plan_combined.pdf
2017 - Medium Rain; Riverine ✓ ✓
Hurricane Matthew Redevelopment Plan: Greene County
https://files.nc.gov/rebuildnc/documents/matthew/rebuild
nc_greene_combined.pdf
2017 - Medium Rain; Riverine ✓ ✓ ✓ ✓
Hurricane Matthew Redevelopment Plan: Johnston
County
https://files.nc.gov/rebuildnc/documents/matthew/rebuild
nc_johnston_plan_combined.pdf
2017 - Medium Rain; Riverine ✓ ✓ ✓ ✓
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 7
Title and Link Year Update Cycle
Relative
Level of
Detail Sources of Flooding
Investments
S NS NBS P
Hurricane Matthew Redevelopment Plan: Jones County
https://files.nc.gov/rebuildnc/documents/matthew/rebuild
nc_jones_plan_combined.pdf
2017 - Medium Rain; Riverine ✓ ✓ ✓ ✓
Hurricane Matthew Redevelopment Plan: Lenoir County
https://files.nc.gov/rebuildnc/documents/matthew/rebuild
nc_lenoir_combined.pdf
2017 - Medium Rain; Riverine ✓ ✓ ✓ ✓
Hurricane Matthew Redevelopment Plan: Nash County
https://files.nc.gov/rebuildnc/documents/matthew/rebuild
nc_nash_plan_combined.pdf
2017 - Medium Rain; Riverine ✓ ✓ ✓ ✓
Hurricane Matthew Redevelopment Plan: Pamlico
County
https://files.nc.gov/rebuildnc/documents/matthew/rebuild
nc_pamlico_plan_combined.pdf
2017 - Medium Coastal; Rain; Riverine ✓ ✓ ✓
Hurricane Matthew Redevelopment Plan: Pitt County
https://files.nc.gov/rebuildnc/documents/matthew/rebuild
nc_pitt_plan_combined.pdf
2017 - Medium Rain; Riverine ✓ ✓ ✓
Hurricane Matthew Redevelopment Plan: Wake County
https://files.nc.gov/rebuildnc/documents/matthew/rebuild
nc_pitt_plan_combined.pdf
2017 - Medium Rain; Riverine ✓ ✓ ✓ ✓
Hurricane Matthew Redevelopment Plan: Wayne County
https://files.nc.gov/rebuildnc/documents/matthew/rebuild
nc_wayne_plan_combined.pdf
2017 - Medium Rain; Riverine ✓ ✓ ✓ ✓
Hurricane Matthew Redevelopment Plan: Wilson County
https://files.nc.gov/rebuildnc/documents/matthew/rebuild
nc_wilson_plan_combined.pdf
2017 - Medium Rain; Riverine ✓ ✓ ✓
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 8
Title and Link Year Update Cycle
Relative
Level of
Detail Sources of Flooding
Investments
S NS NBS P
Eastern Carolina Regional Resilience Portfolio
https://www.rebuild.nc.gov/resiliency/resilient-
communities/rise/eastern-carolina#Tab-
FundedProjectHighlight-3617
2022 - High Coastal; Flash; Rain;
Riverine; Urban &
Stormwater
✓ ✓ ✓
Mid-East Regional Resilience Portfolio
https://www.rebuild.nc.gov/resiliency/resilient-
communities/rise/mid-east
2022 - High Coastal; Flash; Rain;
Riverine; Urban &
Stormwater
✓ ✓ ✓ ✓
Upper-Coastal Plain Resilience Portfolio
https://www.rebuild.nc.gov/resiliency/resilient-
communities/rise/upper-coastal-plain
2022 - High Coastal; Flash; Rain;
Riverine; Urban &
Stormwater
✓ ✓ ✓
Triangle J Regional Resilience Portfolio
https://www.rebuild.nc.gov/resiliency/resilient-
communities/rise/triangle-j
2022 - High Flash; Rain; Riverine;
Urban & Stormwater
✓ ✓ ✓ ✓
Kerr-Tar Regional Resilience Portfolio
https://www.rebuild.nc.gov/resiliency/resilient-
communities/rise/kerr-tar
2022 - High Flash; Rain; Riverine;
Urban & Stormwater
✓ ✓ ✓ ✓
Cape Fear Regional Hazard Mitigation Plan
https://www.chathamcountync.gov/home/showpublishedd
ocument/56417/637679232925770000
2020 Quarterly review
and plan
maintenance;
formal update
every five years
Medium Dam (Levee not
included); Flash; Rain;
Riverine; Urban &
Stormwater
✓ ✓ ✓ ✓
Eno-Haw Regional Hazard Mitigation Plan
https://www.orangecountync.gov/DocumentCenter/View/1
9321/Eno-Haw-Final-Hazard-Mitigation-Plan-PDF
2020 Quarterly review
and plan
maintenance;
formal update
every five years
Medium Dam (Levee not
included); Flash; Rain;
Riverine; Urban &
Stormwater
✓ ✓ ✓ ✓
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 9
Title and Link Year Update Cycle
Relative
Level of
Detail Sources of Flooding
Investments
S NS NBS P
Pamlico Sound Regional Hazard Mitigation Plan
https://www.cravencountync.gov/DocumentCenter/View/8
70/Pamlico-Sound-Regional-Hazard-Mitigation-Plan-2020-
PDF
2020 Quarterly review
and plan
maintenance;
formal update
every five years
Medium Coastal; Dam & Levee;
Flash; Rain; Riverine;
Urban & Stormwater
✓ ✓ ✓ ✓
Tar River Regional Hazard Mitigation Plan
https://gis.aecomonline.net/irisk2/NCHMP.aspx?region=30
2021 Quarterly review
and plan
maintenance;
formal update
every five years
Medium Dam & Levee; Flash;
Rain; Riverine; Urban &
Stormwater
✓ ✓ ✓ ✓
Neuse River Regional Hazard Mitigation Plan
https://www.rebuild.nc.gov/documents/neuse-river-
regional-hazard-mitigation-plan/download?attachment
2020 Quarterly review
and plan
maintenance;
formal update
every five years
Medium Coastal; Dam (Levee
not included); Flash;
Rain; Riverine; Urban &
Stormwater
✓ ✓ ✓ ✓
N.E.W. Regional Hazard Mitigation Plan
https://www.nashcountync.gov/DocumentCenter/View/723
7/NEW-Regional-HMP-Final-Plan
2020 Quarterly review
and plan
maintenance;
formal update
every five years
Medium Dam & Levee; Flash;
Rain; Riverine; Urban &
Stormwater
✓ ✓ ✓ ✓
Wake County Multi-Jurisdictional Hazard Mitigation Plan
https://s3.us-west-1.amazonaws.com/wakegov.com.if-us-
west-1/s3fs-public/documents/2021-
06/2020%20MP%20Wake%20County%20Complete%20Revi
sed.pdf
2019 Quarterly review
and plan
maintenance;
formal update
every five years
Medium Dam (Levee not
included); Flash;
Riverine; Urban &
Stormwater
✓ ✓ ✓ ✓
Neuse River Basin Flood Analysis and Mitigation
Strategies Study
https://www.rebuild.nc.gov/documents/files/neuse-
mitigation-report/open
2018 - High Dam & Levee; Flash;
Rain; Riverine; Urban &
Stormwater
✓ ✓
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 10
Title and Link Year Update Cycle
Relative
Level of
Detail Sources of Flooding
Investments
S NS NBS P
Neuse River Basin Flood Risk Management Technical
Report
https://www.saw.usace.army.mil/Portals/59/siteimages/Flo
od%20risk%20management/NRB/FINAL_Neuse_River_Basi
n-Technical_Report-
02212023_508%20v1_1.pdf?ver=e6vLMewgY2OYkt6n871hrA
%3d%3d
2023 - High Rain; Riverine - - - -
Flood Abatement Assessment for Neuse River
https://connect.ncdot.gov/projects/research/RNAProjDocs/
Final%20Report%20RP2018-32.pdf
2020 - High Dams & Levee; Flash;
Rainfall; Riverine;
Urban & Stormwater
✓ ✓ ✓
Improving North Carolina’s Resilience to Coastal
Riverine Flooding
https://repository.library.noaa.gov/view/noaa/49651
2021 - High Rain; Riverine ✓ ✓ ✓ ✓
Financial Risk of Flood Events in Eastern North Carolina
https://collaboratory.unc.edu/wp-
content/uploads/sites/476/2021/05/financial-risk-of-flood-
events-in-eastern-north-carolina.pdf
2021 - High Coastal; Flash; Rain;
Riverine; Urban &
Stormwater
✓ ✓ ✓
Supporting Environmental Justice in Connected Coastal
Communities Through a Regional Approach to
Collaborative Community Science
https://www.nsf.gov/awardsearch/showAward?AWD_ID=20
52889&HistoricalAwards=false#:~:text=Our%20team%20of
%20academic%20researchers%20takes%20a%20transdisci
plinary,from%20diverse%20communities%20throughout%
20the%20region%20and%20beyond
2021 Ongoing –
scheduled to be
completed by
August, 2026
Low Coastal, rainfall, and
riverine flooding
✓ ✓
NC Floodplain Mapping Program
https://flood.nc.gov/ncflood/
2000 Ongoing High - ✓ ✓
Natural Infrastructure Flood Mitigation Program 2020 Ongoing Medium-Low - ✓ ✓
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 11
Title and Link Year Update Cycle
Relative
Level of
Detail Sources of Flooding
Investments
S NS NBS P
https://www.deq.nc.gov/about/divisions/mitigation-
services/natural-infrastructure-
program#:~:text=The%20pilot%20project%2C%20and%20t
he%20Natural%20Infrastructure%20Program,streams%20
which%20help%20store%20water%20and%20reduce%20fl
ooding
Central Pines Regional Council
https://www.centralpinesnc.gov/environment-
resilience/water-resource-management
- Ongoing Medium-Low Flash, Rainfall,
Riverine, Urban &
Stormwater
✓ ✓ ✓ ✓
NC Resilient Coastal Communities Program
https://www.deq.nc.gov/about/divisions/coastal-
management/coastal-adaptation-and-resiliency/nc-
resilient-coastal-communities-
program#Phase3Awards2022-2023-11442
2020 Ongoing Medium-High Coastal, Flash, Rainfall,
Riverine, Urban &
Stormwater
✓ ✓ ✓ ✓
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 12
3 Review and Inventory
The Neuse River Basin, with headwaters in the Piedmont that runs through the Coastal Plain until
reaching the Atlantic coast, has experienced frequent and severe flooding over the past two decades
with three major hurricanes resulting in loss of life and billions of dollars in damage and recovery
related costs. The historical and ongoing flood hazard challenges in the Neuse have resulted in
numerous resiliency efforts and investments. The review and inventory serve as a comprehensive
overview of up-to-date and credible flood resiliency efforts with resources covering Basin-wide or
smaller geographic scopes. Resources included in this review include plans and strategies, technical
reports and memos, research projects and studies, as well as programs.
Each resource covered includes a background section on the impetus for, the intended purpose and
geographic scope of the effort. The summary of flood resiliency efforts subsections describes the
development process including relevant participants, stakeholder and community engagement
activities, prioritization, and other key details. The sources of flooding subsections highlight how each
resource identifies flooding including the sources of flooding categories described in section 2.1 of
this document and any other relevant details. Investments in Flood Resilience subsections include a
summary and table with a snapshot outline of existing and proposed flood resiliency investments and
actions by the categories described in section 2.1 (i.e., structural, non-structural, nature-based
solutions, and planning). The full list of each resources investments and actions can be found in
section 5.4 of the Appendix. Lastly, relevant sources for each resource covered are provided.
3.1 Plans and Strategies
This section covers three primary plan and strategy types with Neuse River Basin relevant flood
resiliency efforts including Hurricane Matthew Resilient Redevelopment Plans, Regional Resilience
Portfolios, and Hazard Mitigation Plans. The several individual regional, county, and/or municipal
plans that fall under each plan type are summarized together as the overall development process,
document structures, and intent are similar. A comprehensive overview of each individual plan within
these plan types are detailed in Section 5.4 of the Appendix.
3.1.1 Hurricane Matthew Resilient Redevelopment Plans
3.1.1.1 Background
Following Hurricane Matthew in 2016, the Disaster Recovery Act of 2016 directed North Carolina
Emergency Management (NCEM) to lead efforts in a resilient redevelopment program for all fifty
counties included in the Presidential Disaster Declaration. The purpose of the program was to create a
path for impacted communities to rebuild and revitalize through the creation of Hurricane Matthew
Resilient Redevelopment Plans (HMRRPs). The comprehensive planning program also served as the
foundation of the state’s Recovery Action Plan, which the United States (US) Department of Housing
and Urban Development (HUD) required for the allocation of Community Development Block Grant
(CDBG)-Disaster Relief program funds. The locally driven plans identified redevelopment strategies,
reconstruction projects, and defined unmet funding needs. There are 13 counties that significantly
intersect the Neuse River Basin with HMRRPs having flood specific mitigation action
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 13
recommendations. These counties include Carteret, Craven, Franklin, Greene, Johnston, Jones,
Lenoir, Nash, Pamlico, Pitt, Wake, Wayne, and Wilson.
While each plan has uniquely tailored action recommendations for the participating counties, the
overall planning processes and plan structure follow a similar template. Due to these similarities, the
next section summarizes the HMRRPs planning processes while the accompanying tables compare
and highlight key actions and recommendations of individual plans.
3.1.1.2 Summary of Flood Resiliency Efforts
The Regional Resilience Portfolio (RRP) action strategies provide recommendations at both the
county and local scale. NCEM also led the development of four regional HMRRPs, based on the
prosperity zones defined by the North Carolina (NC) Department of Commerce, to provide a more
holistic picture of recovery and redevelopment needs. Three of the four regional HMRRPs provide
flood related recommendations relevant to the Neuse River Basin including the North Central,
Northeast, and Southeast regions. Stakeholder engagement and public participation served as the
backbone of the HMRRP planning process and action strategy development. Three to four public
meetings that included data discovery, analysis, collaboration, and interaction informed both county
and regional scale HMRRPs. Meetings had two parts with the first part being an in-depth workshop
where collaboration between county officials, subject matter experts, and local planners occurred.
The second part of the meetings was a public open house where residents had the opportunity to gain
experience and contribute to the planning process. The plans sort action strategy recommendations
into four resilient redevelopment pillars including housing, economic development, infrastructure,
and environment. Participating stakeholders ranked and approved proposed actions as high,
medium, and low priority groups during the final meeting of the HMRRP process. Each proposed
action in the plans include a priority group and rank, timeframe, location and accompanying map,
project summary and summary table. The summary tables provide a high level of detail through a
question and response format. Questions addressed in this section of the HMRRPs include:
• Articulate how this project addresses an unmet need that has been created by damage from
Hurricane Matthew.
• Is this project consistent with existing plans (describe points of intersection/departure)?
• Does this project comply with existing local and state authority (codes, plans, and ordinances)?
• Does this project meet the intents and goals for the Hurricane Matthew Recovery Act?
• Explain any benefits or impacts to the economy of the county from this project.
• How long this solution will be effective?
• How effective is the risk reduction (assessed by what flood frequency interval a proposed project is
designed for, i.e., 50-, 100-, 200-, 500-year events)?
• How many public facilities are involved in this project (buildings and infrastructure)?
• Is coordination with other communities /counties needed to complete this project?
• Is this project consistent with federal laws?
• To what degree does this project adversely impact local floodplain/coastal zone management?
• To what degree will it be possible to positively quantify the environmental benefits and the return
on investment of this project?
• What impact will this action have on the local economy/tax base?
• What impacts to the environment of the county will result from this project?
• What is the capability of the local government to administer this project?
• What is the financial range of this project?
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 14
• What is the level of public support for this project?
• What is the technical feasibility of this project?
• Who will administer this project?
3.1.1.3 Sources of Flooding Identified
Each HMRRP has a Storm Impact section that provides a local 48-hour observed rainfall depth map of
Hurricane Matthew as well as a riverine and coastal flooding summary. Plans outline sources of
riverine flooding using United States Geological Survey (USGS) gages, applicable county, river name
and location, drainage area, peak Matthew Elevation, and the previous/existing peak flood elevation
record. Plans similarly describe sources of coastal flooding using a map ID, applicable county, site
description, body of water, and estimated peak surge. Table 18 and Table 19, located in section 5.3.1
of the Appendix, contain riverine and coastal flooding sources identified in the 13-county scale
HMRRPs.
3.1.1.4 Investments in Flood Resilience
The HMRRPs culminated into an extensive set of resilient redevelopment recommendations with the
purpose of mitigating the impacts of flooding, covering structural, non-structural, nature based, and
planning action categories. Table 2 provides a snapshot of these recommendations while section
5.4.1. of the Appendix contains the full accounting of proposed actions for the 13 Neuse River Basin
specific HMRRPs.
Table 2. Snapshot of Flood Resilience Investments (3.1.1.)
Plan Investment
Type
Age Maintenance
Ownership/
Management
Status &
Barriers S NS NBS P
Carteret
County
Hurricane
Matthew
Resilient
Redevelop
ment Plan
(HMRRP)
Acquisitions: The Carteret
County Planning Dept. has
a list of repetitive loss
properties and potential
candidates for elevation.
✓ 2017 Green space
management
post buyout
County Planning
Department; NC
Office of Recovery
and Resiliency
(NCORR)
1-2 years
Pamlico
County
HMRRP
Kershaw Road Culverts:
Increase culvert capacity
and elevate roadway out of
500yr floodplain, or
alternatively reroute road
out of floodplain where
possible.
✓ 2017 - Pamlico County;
NC Department of
Transportation
(NCDOT)
1-2 years
Wake
County
HMRRP
Unmapped Stream
Studies: There is a need for
studies to map areas of
frequent and nuisance
flooding to better
understand risk for future
flood events.
Approximately 66 miles of
streams not currently
mapped as Federal
Emergency Management
✓ 2017 - Wake County Immediately
(2017)
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 15
Plan Investment
Type
Age Maintenance
Ownership/
Management
Status &
Barriers S NS NBS P
Agency (FEMA) Special
Flood Hazard Area (SFHA)
may have experienced
flooding during Hurricane
Matthew.
Greene
County
HMRRP
Implement riparian buffers:
This project would provide
funding for the county to
implement riparian buffers
along waterways.
✓ 2017 - Greene County 5-10 years
3.1.1.5 Resources
The following resources, hyperlinked as bullets below, include the 13 counties and three regional
HMRRPs that cover areas geographically relevant to the Neuse River Basin.
• Carteret County:
https://files.nc.gov/rebuild
nc/documents/matthew/re
buildnc_carteret_plan_co
mbined.pdf
• Craven County:
https://files.nc.gov/rebuild
nc/documents/matthew/re
buildnc_craven_plan_com
bined.pdf
• Franklin County:
https://files.nc.gov/rebuild
nc/documents/matthew/re
buildnc_franklin_plan_com
bined.pdf
• Green County:
https://files.nc.gov/rebuild
nc/documents/matthew/re
buildnc_greene_combined.
pdf
• Johnston County:
https://files.nc.gov/rebuild
nc/documents/matthew/re
buildnc_johnston_plan_co
mbined.pdf
• Jones County:
https://files.nc.gov/rebuild
nc/documents/matthew/re
buildnc_jones_plan_combi
ned.pdf
• Lenoir County:
https://files.nc.gov/rebuild
nc/documents/matthew/re
buildnc_lenoir_combined.
pdf
• Nash County:
https://files.nc.gov/rebuild
nc/documents/matthew/re
buildnc_nash_plan_combi
ned.pdf
• Pamlico County:
https://files.nc.gov/rebuild
nc/documents/matthew/re
buildnc_pamlico_plan_co
mbined.pdf
• Pitt County:
https://files.nc.gov/rebuild
nc/documents/matthew/re
buildnc_pitt_plan_combin
ed.pdf
• Wake County:
https://files.nc.gov/rebuild
nc/documents/matthew/re
buildnc_wake_plan_combi
ned.pdf
• Wayne County:
https://files.nc.gov/rebuildnc/
documents/matthew/rebuild
nc_wayne_plan_combined.p
df
• Wilson County:
https://files.nc.gov/rebuildnc/
documents/matthew/rebuild
nc_wilson_plan_combined.p
df
• Southeast Region:
https://files.nc.gov/rebuildnc/
documents/matthew/rebuild
nc_southeast_region_plan_d
raft.pdf
• North Central Region:
https://files.nc.gov/rebuildnc/
documents/matthew/rebuild
nc_north_central_region_pla
n_draft.pdf
• Northeast Region:
https://files.nc.gov/rebuildnc/
documents/matthew/rebuild
nc_northeast_region_plan_dr
aft.pdf
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 16
3.1.2 Regional Resilience Portfolio Program
3.1.2.1 Background
The NC Office of Recovery and Resiliency (NCORR) in partnership with the NC Rural Center, regional
councils of governments (COG), planning consultants, and local subject matter experts-initiated the
RRP Program in 2022 to assist North Carolina regions in expanding natural hazard related resilience
efforts. Nine regions, defined by COG geographies (see Figure 2) in Eastern North Carolina,
participated in the program that produced tailored climate change and natural hazards vulnerability
assessments and climate resilience project portfolios. Vulnerability assessments identified current
and future hazards in a region and evaluated the relative strengths and weaknesses of a region when
managing those hazards. Project portfolios, informed by the vulnerability assessment findings,
include shovel ready prioritized projects with detailed implementation pathways to reduce risk and
enhance regional resilience efforts. Five out of the nine regions that participated in the program have
areas that are within or significantly intersect the Neuse River Basin including the Eastern Carolina,
Mid-East, Upper Coastal Plain, Kerr-Tar, and Triangle J regions.
While each plan has uniquely tailored action recommendations for the participating regions, the
overall planning processes and plan structure follow a similar template. Due to these similarities, the
next section summarizes the RRPs planning processes while the accompanying tables compare and
highlight key actions and recommendations of individual plans.
Figure 2. NC Council of Government Regions (source: https://www.ncarcog.com/regional-councils/)
3.1.2.2 Summary of Flood Resiliency Efforts
The program provided vulnerability assessments and prioritized actions at a multi-county (regional)
scale to increase coordination among areas that face interrelated natural hazard impacts. The two-
part planning process began with the development of climate change and natural hazards
vulnerability assessments. Stakeholders developed vulnerability assessments through a five-step
process that included a literary review, geospatial analysis, stakeholder partnership meetings,
surveys, and two public workshops per region. The literary reviews identified existing plans, policies,
programs, and data sources to build a regional profile that covered physical setting, population
demographic, economic, housing, critical infrastructure, and community support service topics.
Stakeholders identified and prioritized natural hazards through meeting discussions and surveys.
Upper
Coastal
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 17
Assessments include high priority hazard profiles, informed by geospatial risk assessment analyses
and regional profiles, which include the following details…
• Description
• Location and extent
• Climate change impacts
• Impact on…
o Social vulnerability and equity, health, and safety
o Housing, critical infrastructure, and community support systems
o Economy
o Natural environmental systems
• Cascading impacts on other hazards
• Additional data needs
The stakeholder partnership used the regional vulnerability assessment findings to support the
development of climate resilience project portfolios. Stakeholders, community leaders, and residents
discussed potential projects over a series of meetings where participants voted for ten projects
believed to be most beneficial to the region. The partnership refined the list of ten projects to
incorporate feedback from the stakeholder and public workshops and further prioritized based on a
resilience scorecard rating. Projects received a score based on several categories including reduction
in risk, scale, cost, benefits, timeframe, feasibility, socioeconomic, climate justice and equity,
environmental impacts, and public and stakeholder support. The final portfolio includes five to seven
projects with the highest overall score. Each project outlined in the resilience portfolios has a high
level of detail with a focus on reducing barriers to implementation by providing a path to action.
Project sections include…
• Description - Hazards and Sectors Addressed, Local/Service Area
• Potential Impact and Populations Served
• Roles of Lead and Supporting Agencies
• Cost Estimate and Potential Funding/Match Sources
• Benefits Provided - Physical, Socioeconomic, Environmental, Equitable Outcomes
• Steps for Implementation and Timeframe
• Integration with Existing Plans, Programs, and Policies
• Challenges/Obstacles - Legislative Challenges, Permitting, Zoning Requirements
3.1.2.3 Sources of Flooding Identified
The vulnerability assessments and project portfolios do not directly identify sources of flooding. The
documents provide general flood type descriptions that impact the regions including riverine, flash,
stormwater/urban, coastal, and storm surge flooding. Assessments highlight climate change as a
current and future factor exacerbating flooding across all regions due to more frequent and severe
storms in conjunction with sea level rise. In place of flood source identification, the vulnerability
assessments focus on how flooding impacts key sectors by providing tables and maps that illustrate
how housing, infrastructure, economic development assets, public health, and historical and cultural
resources intersect the 1.0 and 0.2 percent annual chance floodplain.
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 18
3.1.2.4 Investments in Flood Resilience
The US Economic Development Administration, US HUD-CDBG – Mitigation fund, and in-kind support
from NCORR and NC Rural Center provided the funding for administrative and technical aspects of the
Regional Resilience Portfolio Program. Regional resilience project portfolios received $600,000 in
support of project implementation from the Duke Energy Foundation’s Accelerator Grant Program.
Each region received one to two awards of up to $65,000 to implement a prioritized project identified
in the project portfolios. Table 3 describes the projects, all of which have the purpose of mitigating the
impacts of flooding, awarded Accelerator grants for the Eastern Carolina, Mid-East, Kerr-Tar, and
Triangle J regions that cover structural, non-structural, nature based, and planning action categories.
Recommendations not funded through the Accelerator grants are in section 5.4.2. of the Appendix.
Table 3. Snapshot of Flood Resilience Investments (3.1.2.)
Plans Investment
Type
Age Maintenance
Ownership/
Management
Status &
Barriers S NS NBS P
Eastern
Carolina
Regional
Resilience
Portfolio
RRP
Beneficial Reuse of
Acquired Properties –
Goldsboro, NC
✓ ✓ 2022 - Community
Technical
Assistance, Inc
Green
development of
an acquired
parcel could
occur within a
matter of
months;
Establishing
consensus on
the ideal use of
each property
Mid-East
RRP
Upsizing Regional
Stormwater
Infrastructure
✓ 2022 - Local
stormwater
administrators
and engineering
staff
Project is
expected to be
completed over
the long term,
likely taking
several years to
complete;
challenges are
striking balance
between grey-
green
infrastructure
and high costs.
Upper
Coastal
Plain RRP
Comprehensive Plans
and Zoning
Ordinances Address
Climate Change
✓ ✓ Upper Coastal
Plain COG
5-15 years; large
undertaking for
locales that lack
staff capacity
and resources
Kerr-Tar
RRP
Environmentally
Friendly Farming
Practices to Improve
Soil Health
✓ ✓ 2022 Testing and
reporting of soil
conditions
Working
Landscapes, an
organization
based in Warren
County, NC
2 years; Barriers
may include
knowledge gaps
in cover crop
methods,
although the
implementers
will create
educational
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 19
3.1.2.5 Resources
The following resources, hyperlinked as bullets below, include the five RRPs that cover areas
geographically relevant to the Neuse River Basin.
• Eastern Carolina:
https://www.rebuild.nc.gov/regional-
resilience-project-portfolio-eastern-carolina-
region/open
• Mid-East:
https://www.rebuild.nc.gov/regional-
resilience-project-portfolio-mid-east-
region/open
• Triangle J:
https://www.rebuild.nc.gov/climate-
resilience-projects-triangle-j-region/open
• Kerr Tar:
https://www.rebuild.nc.gov/climate-
resilience-projects-kerr-tar-region/open
• Upper Coastal Plain:
https://www.rebuild.nc.gov/climate-
resilience-projects-upper-coastal-plain-
region/open
3.1.3 Hazard Mitigation Plans
3.1.3.1 Background
A combined effort between county, city, and town departments, NCEM, Federal Emergency
Management Agency (FEMA) Region IV, residents, and stakeholders create hazard mitigation plans
(HMPs) with the purpose of reducing the impacts natural and human-induced hazards have on people
and property. These plans identify, assess, and mitigate hazard risk and ensure participating
jurisdictions are eligible for disaster assistance from FEMA’s Hazard Mitigation Grant Program (HMGP),
Pre-Disaster Mitigation, and Flood Mitigation Assistance programs. In the Neuse River Basin, there are
five regional hazard mitigation plans (RHMPs) and one multi-jurisdictional Hazard Mitigation Plan
(HMP) that include flood related recommended actions for 17 counties and approximately 80 cities
and towns that significantly intersect the Basin. These plans include:
• Cape Fear RHMP (2020)
• Eno-Haw RHMP (2020)
• Tar River RHMP (2021)
• Neuse River RHMP (2020)
Plans Investment
Type
Age Maintenance
Ownership/
Management
Status &
Barriers S NS NBS P
materials for
participants
Triangle J
RRP
Develop a Privately
Owned Dam Inventory
and Dam Ownership
Guidebook
✓ ✓ 2022 - Deborah
McGuffin, Moore
County
Cooperative
Extension
Director.
May need
assistance
bringing in
technical
specialists.
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 20
• N.E.W. (Nash, Edgecombe, Wilson) RHMP (2020)
• Pamlico Sound RHMP (2020)
• Wake County Multi-Jurisdictional HMP (2020)
While each plan has uniquely tailored action recommendations for the participating jurisdictions, the
overall planning processes and plan structure follow a similar template. Due to these similarities, the
next section summarizes the RHMPs planning processes while the accompanying tables compare and
highlight key components of individual plans.
3.1.3.2 Summary of Flood Resiliency Efforts
As their title suggests, these plans are regional in scope meaning counties, incorporated
municipalities, and unincorporated areas work together to create a set of actions informed by one
another. At the county and local scale, RHMPs outline action plans for individual counties, cities, and
towns. Action plans address medium and high priority natural hazards, based on a priority risk index
score that assigns a degree of risk using probability, impact, spatial extent, warning time, and
duration categories. While each of the Neuse relevant HMPs cover anywhere from 9 to 15 medium or
high priority hazards, plans consistently rank flood related hazards as one of the highest priorities to
address.
Community and hazard profiles as well as vulnerability and capability assessments (see Section 3.5,
Barriers to Implementation) inform the recommended flood mitigation actions across the six plans.
Community and stakeholder engagement also played a role in selecting feasible and effective
recommendations with at least two public engagement meetings and four planning committee
meetings. NCEM staff, local government staff, community officials, and other stakeholders
participated in planning committee meetings (also open to the public) to facilitate discussion, gain
consensus, and begin data collection efforts. Further public outreach included public participation
surveys that had a combined 836 responses across the six plans.
The plans prioritize actions as low, medium, or high based on suitability, risk reduction, and cost
criteria. There are six mitigation categories that define proposed actions including prevention,
property protection, natural resource protection, emergency services (ES), structural projects, and
public information and outreach. Each proposed action has a specific local lead department or agency
for implementation as well as a timeline goal to ensure responsibility and assist in evaluating
implementation progress. Members of planning committees meet quarterly for regular reviews and
plan maintenance as well as after a significant hazard event. Participants formally update every five
years, with the Neuse relevant HMPs scheduled update being 2025-2026.
3.1.3.3 Sources of Flooding Identified
The plans identify three primary types of flooding hazards impacting the Neuse River Basin including
flash, riverine, and coastal floods. RHMPs describe sources of flooding for each flood type as well as
more specifically as detailed in Table 20 and Table 21, located in the Appendix. The plans detail
several factors that cause or exacerbate localized flood events (flash, riverine, or coastal). Inadequate
capacity of pipe systems, clogged inlets, blocked drainage outfalls, and improper grade of asphalt are
common infrastructure challenges and sources of all three types of flooding. Heavy/excessive
precipitation over an extended period is the primary source of riverine flooding in the RHMPs.
Impervious surfaces and intense rainfall over a brief period, commonly caused by slow-moving
thunderstorms, is the primary source of flash flooding. The plans indicated coastal flooding normally
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 21
occurs due to abnormally high tides or tidal waves as well as storm surge and heavy rains in
combination with high tides, tropic storms, and hurricanes.
3.1.3.4 Investments in Flood Resilience
The HMPs culminated into an extensive set of recommendations with the purpose of mitigating the
impacts of flooding, covering structural, non-structural, nature based, and planning action categories.
Table 4 provides a snapshot of these recommendations while section 5.4.3. of the Appendix contains
the full accounting of proposed actions.
Table 4. Snapshot of Flood Resilience Investments (3.1.3.)
Plan Investment
Type
Age Maintenance
Ownership/
Management
Status &
Barriers S NS NBS P
Cape Fear
RHMP
Johnston County
(Town of Smithfield)-
Complete the Spring
Branch Wetlands
Restoration Project to
improve the quality of
stormwater runoff before it
enters the Neuse River.
✓ 2020 - Director of
Public Works
• 2025: In
Progress
• Wetland
facility
restored in
2019.
• Applied to
grant for
additional
work.
• Received
grant
funding for a
constructed
wetland and
stream bank
restoration
project
along the
Spring
Branch to be
continued
(TBC) in
2022.
Eno-Haw
RHMP
Alamance County
(City of Mebane)- Expand
the County's geographic
information system (GIS)
Capabilities to Include
Maintaining Elevation
Certificates
✓ ✓ County
maintains GIS
but city
maintains
elevation
certificates
County and
City
2025
Neuse River
RHMP
Greene County- Consider
joining the Community
Rating System (CRS). The
county will assess the cost
benefit of joining this
program for county
residents and property
owners.
✓ ✓ 2020 - County
Admin.;
Municipal
Admins.
Not Started: 2-
to-3-year
N.E.W. (Nash,
Edgecombe,
Wilson County ✓ ✓ ✓ ✓ 2020 Engineering,
Stormwater,
2025: seeking
grant funding
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 22
Plan Investment
Type
Age Maintenance
Ownership/
Management
Status &
Barriers S NS NBS P
Wilson)
RHMP
(City of Wilson)-
Restoration Program:
Begin design and
development of Hominy
Creek Water Quality Park &
Greenway Plan
Planning &
Development
Services
Pamlico
Sound RHMP
Pamlico County- Continue
to monitor drainage
conditions issues
associated with drainage
ditches and agricultural
runoff canals. Once issues
are identified, the county
will work with municipal
jurisdictions and state
agencies to identify short-
and long-term solutions to
these issues
✓ ✓ 2020 - County
Admin.;
County
emergency
services (ES);
Municipal
Admins.
Ongoing: in
process
Tar River
RHMP
Franklin County
(Town of Youngsville)-
Provide local real estate
agents with handouts that
will advise potential buyers
to investigate the flood
hazard for the property
they are considering
purchasing.
✓ 2021 It is likely that
the
information
needs to be
updated
Town Clerk 2026 - In
progress: Some
handouts have
been
developed and
passed to real
estate agents,
but not every
agent has been
reached.
Wake County
Multi-
Jurisdictional
Hazard
Mitigation
Plan
Wake County- Partner with
other governmental units
and other interested
parties to jointly identify
and acquire 30,000 acres of
open space lands.
✓ ✓ 2019 - County
Community
Services
3-5 years
3.1.3.5 Resources
The following resources, hyperlinked as bullets below, include the seven-hazard mitigation plans that
cover areas geographically relevant to the Neuse River Basin.
• Pamlico Sound:
https://www.cravencountync.gov/DocumentCenter/
View/870/Pamlico-Sound-Regional-Hazard-
Mitigation-Plan-2020-PDF
• Nash, Edgecombe, and Wilson (N.E.W.):
https://www.nashcountync.gov/DocumentCenter/Vi
ew/7237/NEW-Regional-HMP-Final-Plan
• Cape Fear:
https://www.chathamcountync.gov/home/showpubl
isheddocument/56417/637679232925770000
• Eno Haw:
https://www.orangecountync.gov/Do
cumentCenter/View/19321/Eno-Haw-
Final-Hazard-Mitigation-Plan-PDF
• Tar River:
https://gis.aecomonline.net/irisk2/N
CHMP.aspx?region=30
• Wake County: https://s3.us-west-
1.amazonaws.com/wakegov.com.if-
us-west-1/s3fs-
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 23
• Neuse River:
https://www.rebuild.nc.gov/documents/neuse-river-
regional-hazard-mitigation-
plan/download?attachment
public/documents/2021-
06/2020%20MP%20Wake%20County
%20Complete%20Revised.pdf
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 24
3.2 Technical Reports and Memos
This section includes two technical reports including the Neuse River Basin Flood Analysis and
Mitigation Strategies Study and the Neuse River Basin Flood Risk Management, NC Technical Report.
The reports were produced by NC state government entities and identify and evaluate Basin-wide
flood mitigation strategies in the Neuse River Basin.
3.2.1 Neuse River Basin Flood Analysis and Mitigation Strategies Study
3.2.1.1 Background
In the wake of Hurricane Matthew in 2016, NCEM and the NC Department of Transportation (NCDOT)
conducted a study on the Lumber, Neuse, and Tar River basins with the purpose of identifying sources
of flooding and potential mitigation strategies to reduce future flood impacts. The Neuse River Basin
Flood Analysis and Mitigation Strategies Study identifies the primary causes and magnitude of
flooding, calculates the impacts of flooding on the built, living, and economic environments for
multiple flood frequencies, and assesses mitigation strategies as well as their short- and long-term
benefits to costs. The study primarily focuses on the main stem of the Neuse River including the Town
of Smithfield, the City of Goldsboro, the Town of Seven Springs, the City of Kinston, the Town of
Grifton, as well as unincorporated areas of Johnston, Wayne, Lenoir, and Craven Counties.
3.2.1.2 Summary of Flood Resiliency Efforts
The study has five primary components including a basin profile, flooding profile, engineering
analysis, flood risk analysis, and mitigation strategies. Three public meetings informed these
components where participants shared and discussed project details and progress. NCEM and NCDOT
incorporated feedback from meetings into the document that resulted in additional analysis. Each
component of the study has a high level of detail with the basin profile covering hydrologic,
demographic, and rainfall - streamflow aspects of the basin along with trend analyses. The flooding
profile covers significant historic flood events as well as a detailed review of Hurricane Matthew
related rainfall and flood measurements and related impacts.
The engineering analysis details the development process of a new hydrologic model that takes
volume and timing of floods into account. The analysis compares the new hydrologic model’s
calibration and results against observed and National Flood Insurance Program (NFIP) models. The
flood risk analysis uses the new hydrologic model to estimate the location of and damage to buildings
as well as the locations of roadway overtopping for varying flood recurrence intervals. NCEM
evaluated 12 mitigation strategies to reduce flood risk identified in the basin profile, engineering
analysis, and flood risk analysis. The strategies include the following:
1. New Detention (Dam) Structures
2. Retrofit of Existing Detention Structures
3. Offline Storage
4. Channel Modification
5. New Embankment Structures
6. Existing Levee Repair/Enhancement
7. Roadway Elevation/Clear Spanning
8. Large Scale Wet Flood-proofing
9. Acquisition/Elevation/Relocation
10. Land Use Strategies
11. River Corridor Greenspace
12. Wildlife Management
Planners created and modeled 16 mitigation scenarios using the strategies underlined in the list
above (strategies 1-5, 7, and 9). The strategies include nine dam mitigation scenarios, four
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 25
acquisition/elevation/relocation scenarios, and one scenario per channel modification, embankment
structure, and clear spanning strategy. The study includes maps of proposed scenario locations as
well as benefit/cost ratio tables with a 30- and 50-year time horizon for each of the modeled scenarios.
3.2.1.3 Sources of Flooding Identified
The study primarily focuses on flood events related to Hurricane Matthew in 2016, which produced
record rainfall totals in 17 Eastern North Carolina counties. The document’s flooding profile section
identifies sources of flooding in the Neuse by using peak stream flow data obtained from USGS stream
gauges during Hurricane Matthew to estimate the magnitude (return period) of flooding across the
study area (see Figure 3 in the Appendix). Wake County experienced the least amount of flooding by
far in comparison to the other observed counties with a highest recorded return period flood of 33
years while Johnston and Greene Counties had the most severe recorded floods at return periods
greater than 500 years (see Table 22 in the Appendix).
3.2.1.4 Investments in Flood Resilience
Table 5 provides a snapshot of proposed mitigation scenarios, covering structural and non-structural
action categories, which received the highest benefit cost scores and considered high priority actions
in the Neuse River Basin Flood Analysis and Mitigation Strategies Study. The document has not
received an update or follow up since 2018 when NCEM published it, so the implementation status of
the following “investments” is unknown. A comprehensive summary of high, medium, and low priority
actions is in section 5.4.4. of the Appendix.
Table 5. Snapshot of Flood Resilience Investments (3.2.1.)
Scenario Description
Type Ownership/
Management
Maintenance
(30-yr.)
Status & Barriers
Proposed (2018) S NS NBS P
Scenario 3 Dry Dam at Wilson’s
Mills, Wet Dams at
Beulahtown and
Swift Creek
✓ NC Emergency
Management
(NCEM) & NC
Department of
Transportation
(NCDOT)
$9.6M Demand for new municipal
water sources and existing
wastewater treatment plant
restraints may outweigh flood
storage needs; TMDL rules; rare
and endangered species
Scenario 9 Channel Dredging at
Kinston
✓ NCEM &
NCDOT
Dredging
would be
required
approx. every
four years
($12M)
Sedimentation and
downstream water surface
elevation concerns; public buy-
in
Scenario 10 New Levee at Seven
Springs
✓ NCEM &
NCDOT
$150K Risk associated with potential
failure of the structure, and if
overtopping occurs the
consequence would be
extreme flooding; public buy-in
Scenario 12b Elevate Structures
with Finished Floor
Elevation Less Than
Base Flood Elevation
and 50-Year
✓ NCEM &
NCDOT
- Elevation does not remove
structures from being at risk;
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 26
Scenario Description
Type Ownership/
Management
Maintenance
(30-yr.)
Status & Barriers
Proposed (2018) S NS NBS P
Scenario 12d Acquire or Relocate
Structures in
Floodplain with 50-
Year
✓ NCEM &
NCDOT
- There may be a gap between
funds for buyouts and the
money needed to acquire
comparable living space
outside of floodplain; stress to
infrastructure in new
communities
3.2.1.5 Resources
The following hyperlink, provided as a bullet below, includes the source of the resource covered in
this section, which is housed on NCORR’s website.
• Neuse River Basin Flood Analysis and Mitigation Strategies Study:
https://www.rebuild.nc.gov/documents/files/neuse-mitigation-report/open
3.2.2 Neuse River Basin Flood Risk Management, North Carolina Technical
Report
3.2.2.1 Background
The US Army Corps of Engineers (USACE) Wilmington District in partnership with the NC Department
of Environmental Quality (NCDEQ) conducted the Neuse River Flood Risk Management Study between
2020 and 2023. Funded by the Disaster Relief Act in 2019, the study identifies flood risk within the river
basin and evaluates potential alternative actions to reduce flood risk. The technical report covers
separate focus areas characterized as population centers with notable flood risk across the river
basin.
3.2.2.2 Summary of Flood Resiliency Efforts
The study’s general strategy was to identify flood risk in specific focus areas and create tailored flood
mitigation plans with both structural and nonstructural measures for each area. USACE then selected
and combined viable plans from focus areas to create a basin wide plan. The initial basin wide
recommended plan proposed the elevation or floodproofing of 768 structures located near Crabtree
Creek, Raleigh; Hominy Swamp Creek, Wilson; Big Ditch, Goldsboro; and the Neuse River between
Goldsboro and Smithfield, NC. However, USACE significantly reduced the scale and footprint of the
recommendation plan to only 12 structures in the Raleigh focus area after public, agency, technical
and policy reviews found many of the proposed actions neither implementable nor economically
viable due to a variety of factors. USACE further screen the reduced plan at increasing levels of detail
where it was then determined a recommended plan of “No Action” was the only option as the
floodproofing of structures in Raleigh conflicted with federal and local regulations.
Ten stakeholder gathering events held in the Neuse River Basin study area with town, city, county, and
state officials contributed to the study by providing existing information on past flood risk studies,
mapping, and other technical data. The study held three public involvement meetings individually
focused on discussing potential actions that the study could evaluate for flood risk reduction in either
the eastern, central, or western portions of the basin.
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 27
3.2.2.3 Sources of Flooding Identified
The report attributes thunderstorms, northeasters, and hurricanes as the primary causes of flooding.
Tropical hurricanes in the late summer and autumn season bring the heaviest and most prolonged
rainfalls in the Neuse River Basin, producing the largest floods. The spatial extent of hurricanes can
cause compound flooding where two or more floods occur in a given area at generally the same time.
The report indicates the upper portion of the river basin, which has comparatively more high-density
urban land use cover, experiences a higher risk of flash flooding due to poor infiltration from
impervious surfaces and streams typically characterized by steep gradients with high, narrow banks.
The middle and lower portions of the river basin are significantly more exposed to severe storm
occurrences and have a substantial percentage of their floodplain areas used for agriculture. Flooding
of major tributaries in these areas, caused by temporary debris and historically undersized bridge
spans or culvert openings, can constrict flows, lead to prolonged flood stages, and increase overall
damages. The lower portion of the river basin has the greatest risk of experiencing extreme storms
that can cause coastal flood hazards, exacerbated by climate change and sea level rise, in the form of
storm surge, waves, wind, rainfall, compound coastal-inland flooding, seiche, and extreme tides.
3.2.2.4 Investments in Flood Resilience
The technical report concludes with a recommendation of “No Action” as every proposed alternative
action was neither implementable or economically viable under federal, state, and local regulations,
policy and/or guidelines. The one recommendation in Table 6 below was the only economically
feasible alternative action, however, it did not meet planning screening acceptability criteria due to
conflicts with federal and local regulations. It is important to note that federal agencies use different
cost-benefit analyses when evaluating potential projects and the USACE used a specific cost-benefit
analysis method (2020-2021) that does not consider the full suite of ecosystem services some projects
offer (at this time).
Table 6. Snapshot of Flood Resilience Investments (3.2.2.)
Investment
Type
Age Maintenance
Ownership/
Management Status & Barriers S NS NBS P
Dry floodproofing of 12
structures, ten of which
are multi-family
residential apartment
buildings, located
adjacent to Crabtree
Creek in Raleigh, NC
✓ Proposed
(2023)
USACE
Wilmington
District
Conflicts with the Federal
Emergency Management Agency
National Flood Insurance
Program Technical Bulletin 3
dated January 2021
Requirements for the design and
certification of Dry
Floodproofing Non-Residential
and Mixed-Use Buildings
(Section 1.3) and City of Raleigh
Stormwater Design Manual,
dated 22 July 2022, (Chapter 7,
Section 7.7)
3.2.2.5 Resources
The following hyperlink, provided as a bullet below, includes the source of the Technical Report,
which is housed on USACE’s website.
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 28
• Neuse River Basin Flood Risk Management North Carolina Technical Report:
https://www.saw.usace.army.mil/Portals/59/siteimages/Flood%20risk%20management/NRB/FIN
AL_Neuse_River_Basin-Technical_Report-
02212023_508%20v1_1.pdf?ver=e6vLMewgY2OYkt6n871hrA%3d%3d
3.3 Research Projects and Studies
This section of the Review and Inventory includes four major flood resiliency research projects and
studies conducted in the Neuse River Basin covering a wide range of topics and geographical scales.
The resources provide recommendations and strategies for flood mitigation and resiliency across
several topics including transportation infrastructure, natural infrastructure implementation, the
distribution of flood hazard related financial risk, and strengthening coastal communities by support
environmental justice through a regional community collaborative science approach.
3.3.1 Flood Abatement Assessment for Neuse River Basin
3.3.1.1 Background
The NC Sea Grant and North Carolina State University (NCSU) Department of Biological and
Agricultural Engineering Department, in partnership with NCDOT, conducted the Flood Abatement
Assessment for Neuse River Basin in 2020. The study focuses on flooding in the Middle Neuse and
Upper Neuse portions the Neuse River Basin (specifically Goldsboro, Smithfield, and Kinston) as it
relates to transportation with the purpose of understanding the sources and nature of riverine
flooding, testing potential measures to mitigate flooding, improving early warning systems for
transportation-related infrastructure, evaluating future storm severity, and identifying potential
improvements to local floodplain ordinances. Researchers worked towards these goals by performing
hydrologic, hydraulic, and engineering analyses as well as coordinating technical and community
outreach meetings focused on flood mitigation.
3.3.1.2 Summary of Flood Resiliency Efforts
Community and stakeholder workshops served as the base of the study’s design. At the beginning of
the project in April of 2019, the research partnership held three workshops in Smithfield, Goldsboro,
and Kinston to accumulate information on community concerns, impacts, and perceived ideas about
flooding causes and solution to inform the study’s geographic and mitigation focus area. A fourth
meeting, held in August of 2019, with federal and state agencies, academic researchers and private
consulting firms informed the study’s approach to storm and disaster warning, flood modeling,
hydraulic infrastructure design, and transportation flood alert systems.
To improve methods of early warning for flood-related transportation impacts, researchers identified
spatial gaps in USGS gages that are the only the only available source of real time flood data for early
warning systems. The study found many of these gages were in the upper portion of the basin and
recommended the installation of two high, ten medium, and six low priority gages in the middle and
lower portions of the basin based on critical transportation infrastructure and historical and modeled
flood events.
During stakeholder workshops, participants shared concerns over the impact of bridge and road
crossing embankments restricting floodplain conveyance areas resulting in an increase in upstream
flooding. In response, researchers used hydraulic models to assess the impact ten crossing
modifications would have on water surface elevations over several flood return period events. The
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 29
models found that for a Hurricane Matthew scale event, increasing bridge spans or elevation
combined with a removal of existing floodplain embankments would only decrease river levels by less
than a foot, and often less than half a foot, for four of the seven bridges analyzed. Three modeled
bridge modifications in Smithfield had a more substantial rise level reduction impact of 1.4 to 2.0 feet.
Stakeholder workshops identified flash flooding in tributaries of the Neuse River that overtop roads
and bridges as a major challenge. The study incorporates these concerns though the hydraulic
modeling of 78 crossings (culverts and bridges) along eight tributaries of the Neuse River Basin.
Researchers found many of the modeled crossings were undersized and vulnerable to overtopping for
events much less than a 100-year flood, with 45 crossings overtopping during 10-year events and 17
overtopping during 25-year events. The high expense of replacing all vulnerable crossings led the
study to prioritize potential projects as low, medium, or high based on their condition, overtopping
vulnerability, road functional class, relative replacement cost, and critical transportation importance.
Researchers also used the modeling results to develop an initial framework for regional resilient
routes that identify roads with the least chance of flooding that would remain open during extreme
events, allowing transportation to critical access points.
University of North Carolina (UNC)-Chapel Hill Department of City and Regional Planning in
partnership with NCSU conducted a review of floodplain ordinances in Goldsboro, Smithfield, and
Kinston to better understand local impact in comparison to other ordinances in the state and country
and develop recommendations for improvement. The review resulted in 13 recommended strategies
for improving floodplain ordinances in the municipalities, comparing recommendations based on
municipal versus individual investment levels to account for local capacity restraints. These
recommendations included the following:
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 30
Table 7. Strategies for Improving Floodplain Ordinances in the Neuse River Basin (3.3.1)
Municipal Investment
Low Moderate High
In
d
i
v
i
d
u
a
l
I
n
v
e
s
t
m
e
n
t
Lo
w
• Improve municipality website design.
Flood maps and Flood Ordinances should
be easy to locate on a municipality’s
website so that residents can better
understand their own risk. Municipalities
can leverage state resources, such as the
FIMAN or FRIS webpages, and link to them
from their websites.
• Clean up ordinances
• Contact individuals in
floodplains
• Expand floodplain
• City water retention
strategies
• Develop buyout
strategy
Mo
d
e
r
a
t
e
• Increase freeboard (an additional amount
of height above the Base Flood Elevation
used as a factor of safety (e.g., 2 feet above
the Base Flood) in determining the level at
which a structure's lowest floor must be
elevated or floodproofed to be in
accordance with state or community
floodplain management regulations.)
• Require Dryland
Access
• Encourage greater
participation in the
National Flood
Insurance Program
• Establish base flood
elevation (BFE) for
all properties
Hi
g
h
• Implement a stormwater tax • Lot-level water
retention strategies
• Expand applicability
of sections
3.3.1.3 Sources of Flooding Identified
The study characterizes land use conditions in the Neuse River Basin to better understand existing
sources of flooding through data and geospatial analyses of spatial land use, subbasin, floodplain
development, precipitation, and discharge trends. During the stakeholder workshops, participants
voiced concerns over water released from the Falls Lake reservoir that exacerbates downstream
flooding. These concerns resulted in a detailed overview of historical flood events, downstream flood
stages, flood durations, and long-term annual peak discharges related to waters released from the
Falls Lake reservoir. The Neuse River Basin Flood Analysis and Mitigation Strategies Study, previously
covered in this report, informed this study by providing details on land use changes and analyses of
historical extreme events, precipitation, and discharge records in the Neuse River Basin between
2001-2011. The analysis of Falls Lake found, in contrast to stakeholder concerns, that discharge gage
data indicated that the reservoir reduces downstream flooding by retaining and slowly releasing
upstream runoff. The study references the NCEM study’s findings in the report while expanding on
them to include more recent 2016 land use data. The study found that in the portion of Neuse River
Basin that drains to Kinston the following occurs:
• Developed area increased from 13.6 percent to 16 percent and forest and agricultural land
decreased from 30.7 percent to 29.5 percent between 2001 and 2016
• The upper basin saw higher development growth rates, greater than 25 percent, while the middle
basin saw rates between 4-25 percent
• That 75 percent of all developed area in the Neuse River Basin was located upstream of Smithfield
with the largest changes in the Swift, Middle, and Crabtree Creek subbasins
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 31
• Goldsboro had the greatest increase in floodplain development between 2001-2016 from 22
percent to 25 percent, Kinston increased from 18 percent to 20 percent, and Smithfield only
increased from 4 percent to 5 percent
• Six stations in the basin showed no increasing precipitation trends from the early 1900s to 2016
while two stations in Kinston and Greenville showed an increase of approximately 0.05 inches per
year.
To better understand changes in future flood events, researchers recalibrated the HEC-HMS model,
developed by USACE, to create multiple scenarios for increased development in three southern Wake
County sub watersheds (Swift, Middle, and Black Creeks) and precipitation predictions related to
climate change scenarios to evaluate future peak flood elevations. The model assumed all currently
undeveloped land in the three sub watersheds would be developed and used precipitation
predictions from managed (low-carbon) and “business as usual” (high-carbon) climate change
scenarios. The scenario results show the following:
• Residential development of all previously undeveloped land in the Swift, Middle, and Black Creek
sub watersheds would result in a 6.2 percent increase in the peak discharge of the Neuse at
Goldsboro.
• The low/managed carbon scenario resulted in a peak discharge increase of 30-42 percent for a
storm event like Hurricane Matthew.
• The two high carbon scenarios resulted in a peak discharge increase of 58-102 percent for a storm
event like Hurricane Matthew.
• The two high carbon scenarios indicate that peak discharges for a 100-year storm may be similar to
the peak of the current 500-year with the peak discharges of both the 100- and 500-year peak flood
elevations increasing by more than 2 feet.
3.3.1.4 Investments in Flood Resilience
The assessment culminated with a set of transportation related flood mitigation recommendations
covering structural, non-structural, and planning action categories. Table 8 provides a snapshot of
these recommendations while section 5.4.5. of the Appendix contains the full accounting of proposed
actions.
Table 8. Snapshot of Flood Resilience Investments (3.3.1.)
Investment
Type
Age Maintenance
Ownership/
Management
Status &
Barriers S NS NBS P
Identify community level and
regional resilient
transportation routes using a
geospatial and
systems/network analysis
process considering existing
infrastructure flood
vulnerability; infrastructure
upgrade costs and the location
of industry, commerce,
communities, military bases,
and evacuation routes.
✓ 2020 - NC Department
of
Transportation
(NCDOT)
-
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 32
Investment
Type
Age Maintenance
Ownership/
Management
Status &
Barriers S NS NBS P
Identify, evaluate, and
compare costs of new design
standards for all roads,
bridges, and culverts along the
resilient route corridors.
✓ ✓ ✓ 2020 - NCDOT -
Work with NCEM and USGS to
install new flow, stage, and
rainfall gages in basin with a
focus on improving early
warning systems and
hydrology model validation.
✓ ✓ 2020 - NCDOT -
Develop a pilot project that
combines hydrologic modeling
with machine learning to
predict where road
overtopping and washout are
at risk of occurring based on
predicted rainfall and
resulting discharge and
flooding.
✓ 2020 - NCDOT -
3.3.1.5 Resources
The following resources, hyperlinked as bullets below, include the direct source of the Assessment
(housed on NCDOT’s website), as well as NC Sea Grant’s overview webpage for the effort.
• Flood Abatement Assessment for Neuse River Basin:
https://connect.ncdot.gov/projects/research/RNAProjDocs/Final%20Report%20RP2018-32.pdf
• Study Web Page: https://ncseagrant.ncsu.edu/program-areas/coastal-hazards/n-c-coastal-rivers-
flood-mitigation/
3.3.2 Improving North Carolina’s Resilience to Coastal Riverine Flooding
3.3.2.1 Background
A multidisciplinary team of university faculty, staff, and student researchers from NCSU and UNC-
Chapel Hill, in partnership with representatives from NC Sea Grant, NC Foundation for Soil and Water
Conservation, NC Association of Soil and Water Conservation Districts (SWCDs), US Geological Survey,
Environmental Defense Fund, and NC Farm Bureau Federation, conducted a 16-month study to
evaluate the potential for natural infrastructure (NI) to mitigate riverine flooding in eastern North
Carolina. The Middle Neuse River Basin from Johnston to Lenoir County, an area heavily impacted by
recent riverine flooding events from Hurricanes Floyd (1999), Matthew (2016), and Florence (2018),
was the focus area of the study. The research team prepared and presented the results and
recommendations of the Improving North Carolina’s Resilience to Coastal Riverine Flooding study to
the NC Policy Collaboratory, an organization established in 2016 by the North Carolina General
Assembly for the purpose of facilitating the dissemination of the policy and research expertise of the
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 33
UNC System and other institutions of higher learning cross the state for practical use by state and
local government.
3.3.2.2 Summary of Flood Resiliency Efforts
The study team used seven distinct methods of analysis to develop a comprehensive evaluation of
natural infrastructure’s potential to mitigation riverine flooding including:
• A literature review and exploration of 18 conservation, restoration, and land management
measures
o The study identifies several key NI measures with the greatest potential to mitigate flooding in
the study area including cover crops and no-till; hardpan breakup; agroforestry; wetland
restoration; natural stream channel restoration; dry dams and berms; and land drainage
controls.
• The resource uses geospatial mapping analyses in combination with hydrologic, hydraulic, and
water quality modeling to evaluate three sub watersheds (Little River, Bear Creek, and Nahunta
Swamp) and the larger Middle Neuse River Basin. These analyses found:
o The study assessed three NI measures for their potential implementation (area in acres) in the
Middle Neuse River Basin and found 5,157 acres of wetland restoration, 10,530 acres of water
farming (the practice of constructing a berm or terrace along the edge of a field with an outlet
structure designed to temporarily retain runoff water on a cropland field and slowly release it
during and following an extreme rainfall event), and 97,050 acres of reforestation potential.
Estimated peak flow, peak discharge, and river water level reductions as well as water quality
improvements along the Neuse River and several tributaries resulting from the implementation
of the three NI measures
o Estimated number of structures that would experience less flooding along the Neuse River with
a focus on the communities of Kinston and Goldsboro
• Landowner and community outreach focusing on:
o A focus group workshop of 20 innovative farmers, early program adopters, and landowners in
Wayne County to explore the feasibility of NI measures and processes necessary to implement a
conservation-based flood mitigation program
o A detailed survey of more than 50 landowners across six counties within the study area to
estimate the costs of leasing and buying land for NI practices
• Economic analyses for establishing identified NI measures including:
o Property leasing and purchase agreements
o Economic assessment for the costs of installing and maintaining NI measures, rate of return for
NI measures, the breakeven point for landowner’s expenses when offering annual payments at
a given discount rate, and a comparison of NI measures against landowner’s current business as
usual practices
o Costs and spending analysis of wetland and stream restoration
o The value of structural flooding damage reductions
o The direct costs (total upfront project costs) and cost per unit volume of water stored of
wetland restoration, water-farming, and reforestation measures
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 34
o The economic impact (measure of net changes in economic activity because of funding for
projects) of the wetland restoration, water farming, and reforestation construction and
monitoring-maintenance phases.
3.3.2.3 Sources of Flooding Identified
The study primarily focuses on riverine, rain, and urban & stormwater flooding within the middle of
the Neuse River Basin study area. The research team selected three sub watersheds (Little River, Bear
Creek, and Nahunta Swamp), which represent the two physiographic regions of the basin (Piedmont
and Coastal Plain) for detailed hydrologic modeling. The three sub watershed models estimate peak
discharge and total runoff volume for US Soil Conservation Service type two storms at 25-, 50-, 100-,
and 500-year return periods. A complete summary table of the modeling results is in Table 51 of the
Appendix.
3.3.2.4 Investments in Flood Resilience
The study’s detailed and comprehensive analyses culminated into a total estimate of
reforestation/agroforestry, water farming, and wetland restoration implementation potential in the
middle of the Neuse River Basin study area as well as ten recommendations to improve coastal
riverine flooding in eastern North Carolina covering structural, non-structural, nature based, and
planning action categories. Table 9 provides a snapshot of NI potential and overall recommendations
while a full accounting of the study’s recommendations is in section 5.4.6. of the Appendix.
Table 9. Snapshot of Flood Resilience Investments (3.3.2.)
Investment
Type
Age Maintenance
Ownership/
Management
Status &
Barriers S NS NBS P
Reforestation/Agroforestry Potential
• Neuse River Basin: 97,050 ac.
• Little River: 2,327 ac.
• Nahunta Swamp: 885 ac.
• Bear Creek (HUC10): 3,975 ac.
✓ 2021 - To Be Determined -
Water Farming Potential
• Neuse River Basin: 10,530 ac.
• Nahunta Swamp: 2,505 ac.
• Bear Creek: 1,995 ac.
✓ 2021 - To Be Determined -
Wetland Restoration Potential
• Neuse River Basin: 5,157 ac.
• Little River: 55 ac.
• Nahunta Swamp: 605 ac.
• Bear Creek: 798 ac.
✓ 2021 - To Be Determined -
Invest in research to develop and monitor a
pilot water farming project. The research
should focus on evaluating water
management systems, storage, and peak
flow reductions, impacts to soils and crops
and other agricultural management
processes, and associated economic
factors.
✓ ✓ 2021 - To Be Determined -
Develop a pilot flood mitigation program
for a targeted sub watershed with
✓ ✓ 2021 - To Be Determined -
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 35
Investment
Type
Age Maintenance
Ownership/
Management
Status &
Barriers S NS NBS P
documented flooding issues. The program
would allow the ecological restoration
industry to implement flood mitigation
projects.
3.3.2.5 Resources
The following hyperlink, provided as a bullet below, includes the source for the study, which is located
on NOAAs website where the full report and executive summary can be downloaded.
• Improving North Carolina's Resilience to Coastal Riverine Flooding:
https://repository.library.noaa.gov/view/noaa/49651
3.3.3 Financial Risk of Flood Events in Eastern North Carolina
3.3.3.1 Background
Researchers conducted the Financial Risk of Flood Events in Eastern North Carolina study in 2021 as a
part of the NC Flood Resilience Study administered by the NC Policy Collaboratory. The study
evaluates the distribution of flood related financial risk across the federal government (through the
NFIP), property owners (residential only), mortgage lenders, and local government (county and
municipal).
3.3.3.2 Summary of Resiliency Efforts
The study uses Hurricane Florence (2018) as a case study to examine environmental, financial, and
built environment systems in the 17 counties that lie within the Neuse River Basin. Researchers used
several unique and highly resolved datasets to model financial risk including:
• Financial: parcel level information on property sales, flood insurance policies and claims; census
tract level mortgage information.
• Built environment: first-flood elevation; square footage
• Environmental: soil characteristics, heigh above nearest drainage site, and other elements that
affect local flood wave routing
The risk modeling effort considered changes in property values, uninsured damages, and equity
(outstanding mortgage balances) when determining overall financial risk distribution for the four
study groups. The results of the risk modeling show property owners retain a majority of flood related
financial risk across the entire Neuse River Basin (in the context of a Hurricane Florence like event) at
43 percent with subsequent groups carrying the remainder including the federal government (25
percent), local governments (23 percent), and mortgage lenders (9 percent). The study also found that
Craven ($720.72 million) and Pamlico ($423.53 million) Counties have significantly more total flood
related financial risk in comparison to the other nine modeled counties, which have a combined risk
total of only $141.7 million . A complete summary of flood risk profiles for modeled counties and the
Neuse River Basin are in Table 52 of the Appendix.
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 36
3.3.3.3 Sources of Flooding Identified
The study does not directly identify sources of flooding in the Neuse River Basin. However, the
document does generally attribute flood related damages to coastal, flash, rain, riverine, and urban
and stormwater flooding.
3.3.3.4 Investments in Flood Resilience
Table 10 provides a summary of the study’s six primary flood mitigation and resilience
recommendations informed by highly resolved information on who holds financial risk. The
recommendations cover structural, non-structural, and planning action categories and include two
high priority, three medium priority, and one low priority action.
Table 10. Snapshot of Flood Resilience Investments (3.3.3)
Investment/Proposed Action
Type
Age Maintenance
Ownership/
Management
Status &
Barriers S NS NBS P
The state should target communities at risk
to encourage insurance uptake through
both education and provision of incentives,
such as funding to assist property owners in
paying National Flood Insurance Program
premiums to cover future damages.
✓ 2021 - - High
Priority: 1-
2 years
The state should renew efforts to develop
pre-disaster mitigation plans via a
“portfolio” approach that includes multiple
strategies, including infrastructure (e.g.,
flood control, property elevation), buyouts
of at-risk properties, zoning policy and
financial instruments (e.g., flood insurance,
disaster-based reinsurance).
✓ ✓ ✓ 2021 - - High
Priority: 1-
2 years
A rigorous and detailed assessment of
neighborhoods at highest risk of flood-
related mortgage default should be
conducted to identify which areas and
lenders are most threated, and to inform
actions designed to mitigate this risk (e.g.,
property buyouts, lines of credit to
vulnerable banks).
✓ ✓ 2021 - - Medium
Priority: 3-
5 Years
Planning efforts that reduce development
in areas most at risk of flooding (e.g., flood
plains), which decrease the financial risk of
these events, should be pursued at the
local, county, and state level.
✓ ✓ 2021 - - Medium
Priority: 3-
5 Years
The state should increase efforts to identify
areas and parties at greatest risk from
flooding and set up systems to collect and
rapidly disseminate post-flood damage
information to inform targeted resiliency
efforts.
✓ ✓ 2021 - - Medium
Priority: 3-
5 Years
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 37
Investment/Proposed Action
Type
Age Maintenance
Ownership/
Management
Status &
Barriers S NS NBS P
A comprehensive assessment of statewide
flood risk and the attendant financial risk,
especially in urban areas and communities
in some western parts of the state, would
give state agencies a better understanding
of risk and improved ability to assess the
feasibility of a range of risk management
actions. Additionally, greater specificity
with respect to who holds flood-related
financial risk should be identified to inform
preparation and mitigation strategies.
✓ 2021 - - Low
Priority: 5-
10 years
3.3.3.5 Resources
The following hyperlink, provided as a bullet below, includes the source for the study, which is housed
on the NC Collaboratory’s website.
• Financial Risk of Flood Events in Eastern North Carolina: https://collaboratory.unc.edu/wp-
content/uploads/sites/476/2021/05/financial-risk-of-flood-events-in-eastern-north-carolina.pdf
3.3.4 Supporting Environmental Justice in Connected Coastal Communities
Through a Regional Approach to Collaborative Community Science
3.3.4.1 Background
The Albemarle-Pamlico Estuary system, including portions of the Pasquotank, Chowan, Roanoke, Tar-
Pamlico, White Oak, and Neuse River basins, has been impacted by poor water quality that threatens
ecosystems and economic activities important to coastal communities. In 2021, the National Science
Foundation awarded a grant to East Carolina University (ECU) in partnership with NC Central
University, and other research institutions to conduct this project over five years with the purpose of
strengthening coastal resilience in communities along the Albemarle-Pamlico Estuary system of
coastal North Carolina.
3.3.4.2 Summary of Resiliency Efforts
The project partnership’s ongoing efforts include the creation of a research hub to investigate how the
co-production of scientific knowledge, between community members, regional stakeholders, and
academic researchers contributes to our understanding of socioenvironmental drivers that impact
coastal hazard resilience. A key goal of the project is to create a Hub that serves as the central
coordinating unit to catalyze connections within the community, coordinate internships (high school
and college students) embedded with partners and communicate with community stakeholders.
Relationships built through the Hub will help facilitate the integration a broad coalition of academic,
community, non-governmental organizations, and local/state government stakeholders to develop
mitigation strategies and understand tradeoffs in adaptation and management plans. This research
will inform the adoption of solutions to coastal hazard impacts, particularly for marginalized
populations that are disproportionately affected by poor water quality, hurricanes, floods, droughts,
and sea level rise.
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 38
3.3.4.3 Sources of Flooding Identified
While the projects efforts have not been directly published as of August 2023, the project’s abstract
indicates the regional effort will address coastal, rainfall, and riverine flooding sources including
hurricanes and sea level rise.
3.3.4.4 Investments in Flood Resilience
The five-year, collaborative, and transdisciplinary project includes four primary objectives to address
regional scale coastal resilience that fall into non-structural and planning action categories including:
• Mapping key natural, built, and socioeconomic resources and interdependencies that define the
regional socio-engineered- environmental system
• Understanding how coastal hazards enhance vulnerabilities in the region
• Identifying opportunities for locally appropriate adaptation and mitigation strategies to build
community and regional resilience
• Establishing a Coastal Environmental Justice Institute as a long-term mechanism to promote and
support collaboration among stakeholder groups from diverse communities throughout the region
and beyond
3.3.4.5 Resources
The following hyperlinks, provided as bullets below, include ECU’s project overview and an ECU news
article that includes interviews with project leads, as well as the project award page housed on the
National Science Foundation’s website. As the project is still ongoing, a full report on the progress and
results of the effort is not available.
• National Science Foundation -
https://www.nsf.gov/awardsearch/showAward?AWD_ID=2052889&HistoricalAwards=false#:~:text=
Our%20team%20of%20academic%20researchers%20takes%20a%20transdisciplinary,from%20di
verse%20communities%20throughout%20the%20region%20and%20beyond.
• Project Overview: https://scholars.ecu.edu/display/G236769962
• ECU News Article: https://news.ecu.edu/2021/10/13/building-resiliency/
3.4 Programs
3.4.1 North Carolina Floodplain Mapping Program
3.4.1.1 Background
Hurricane Floyd, which caused widespread damage across eastern North Carolina in 1999, highlighted
the need for accurate, up-to-date flood related data and mapping to better address the state’s
vulnerabilities. In response, FEMA designated North Carolina as a Cooperating Technical State in
conjunction with the federal flood map modernization program in 2000. The state government
created the North Carolina Floodplain Mapping Program (NCFMP) to fulfill its’ responsibility as a
Cooperating Technical State. Administered by NCEM, NCFMP updates North Carolina's flood hazard
data and creates studies and maps to identify areas of the state at risk of flooding.
3.4.1.2 Summary of Flood Resiliency Efforts
The NCFMP provides services to the entirety of North Carolina including a wealth of Neuse River Basin
specific information. The program administers five key programs including the…
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 39
• Flood Inundation Mapping and Alert Network (FIMAN)
o FIMAN provides rain and stage gage data on stream elevation, rainfall, and weather parameters
from over 550 gages across the state that provide real-time alerts to support risk-based
decisions regarding flooding. The website also provides flood inundation and risk maps for
selected sites and across entire river basins with impacts to buildings, roads, and infrastructure
identified by water depth in each building and estimated damage costs.
• NC Flood Inundation Mapping and Alert Network for Transportation (FIMAN-T)
o Like FIMAN, FIMAN-T provides real time and forecasted, where available, flooding impacts to
roads, bridges and other NCDOT assets in support of risk-based decision-making during flood
events. FIMAN-T uses real-time, 3D inundation mapping coupled with LiDAR derived roadway
elevation layers to estimate flooding depths over roadways for current, modeled, and
forecasted conditions. The tool also includes stream elevation, an interactive stage hydrograph,
forecasted peak flow, summary tables of impacted roads, bridge hydraulic performance, and
bridge freeboard status.
• NC Digital Flood Risk Information System (DFRIS)
o A web-based mapping and data portal that provides digital flood insurance rate maps that are
composites of base data, topographic data, and flood layers that can be viewed in combination
with local parcel information or other data to more easily determine if a house or other
property is, or will be, located in a Special Flood Hazard Area (SFHA) or floodway. Information
accessible through this resource includes geospatial base map data, imagery, light detecting
and ranging (LiDAR) data, along with hydraulic and hydrologic models that is available for
download and use.
• NC Coordinated Needs Management Strategy (NCCNMS)
o The NCCNMS allows communities to see areas the State is currently studying and will study in
the future as well as base level engineering analyses that are outside of the regulatory flood
hazard area and are no longer considered unmapped by FEMA’s Coordinated Needs
Management Strategy protocols. The tool allows communities to make future flood study
update requests or needs as a point or area through the website and access an inventory of
stream centerlines and associated verification status.
• Advisory Flood Program
o NCFMP’s Advisory Flood Data Website provides flood mapping visualizations and flood risk
analyses in non-regulated Advisory Flood areas where these products were previously
unavailable. The web viewer offers flood hazard information, risk assessments, and mitigation
strategies as a tool to help create more resilient communities and reduce future losses due to
flooding. In addition, the program identifies and communicates areas of mitigation interests’
data as a part of a study wide “hot spot” grid to pinpoint areas of concentrated Advisory Flood
risk and potential locations for future mitigation actions.
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 40
3.4.1.3 Sources of Flooding Identified
As a comprehensive database and webtool for the entire State of North Carolina, NCFMP identifies
and evaluates all flood source categories considered in this report. Neuse specific sources of flooding
are accessible through the program links listed in Section 3.4.1.5, Resources below.
3.4.1.4 Investments in Flood Resilience
Table 11 covers the five primary services NCFMP provides to the State of North Carolina, covering non-
structural and planning related action categories.
Table 11. Flood Resilience Investments (3.4.1.)
Investment
Type
Age Maintenance
Ownership/
Management
Status &
Barriers S NS NBS P
Flood Inundation Mapping and
Alert Network (FIMAN)
✓ ✓ FIMAN v1.0 – 2003
FIMAN v2.0 - 2016
Ongoing NC Floodplain
Mapping
Program
(NCFMP)
Ongoing
NC Flood Inundation Mapping
and Alert Network for
Transportation (FIMAN-T)
✓ ✓ 2020 Ongoing NC
Department of
Transportation
(NCDOT);
NCFMP
Ongoing
NC Digital Flood Risk
Information System (DFRIS)
✓ ✓ 2012 Ongoing NCFMP Ongoing
NC Coordinated Needs
Management Strategy
(NCCNMS)
✓ ✓ 1994 Ongoing NCFMP Ongoing
Advisory Flood Program ✓ ✓ - Ongoing NCFMP Ongoing
3.4.1.5 Resources
The following hyperlinks, provided as bullets below, include the NCFMP’s main webpage as well as
individual links to each of the program’s individual products and efforts covered in this section.
• NC Floodplain Mapping Program (Main Webpage): https://flood.nc.gov/ncflood/
• FIMAN: https://fiman.nc.gov/
• FIMAN-T:
https://fimant.nc.gov/About.aspx#:~:text=In%202020%2C%20NCDOT%20and%20NCEM%20partn
ered%20to%20develop,in%20support%20of%20risk-based%20decision-
making%20during%20flooding%20events.
• DFRIS: https://fris.nc.gov/fris/Home.aspx?ST=NC
• NCCNMS: https://flood.nc.gov/nccnms/
• Advisory Flood Program: https://flood.nc.gov/AdvisoryFlood/Home/Index
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 41
3.4.2 Natural Infrastructure Flood Mitigation Program
3.4.2.1 Background
In 2020, the NC General Assembly created the Natural Infrastructure Flood Mitigation Program (NIFMP)
within the NC Division of Mitigation Services (NCDMS), incorporating flood storage capacity
enhancement projects into the division's activities. The 2021 Appropriations Act further supported
this mission by setting aside $3.5 million to create pilot projects addressing chronic flooding in the
Stoney Creek watershed. NCDMS also received funding through the NC Office of Recovery and
Resilience from HUD’s CDBG for program development.
3.4.2.2 Summary of Flood Resiliency Efforts
The Stoney Creek pilot project will target flooding which impacts businesses, roadways, and access to
emergency services in Wayne County and Goldsboro. The pilot project, and the Natural Infrastructure
Program at large, seek to mitigate flooding using natural infrastructure, constructed systems which
mimic natural processes. These systems can include strategies like building wetlands and restoring
streams which help store water and reduce flooding. The Stoney Creek pilot program will also serve as
the basis for expanding natural infrastructure flood mitigation projects to additional watersheds.
Lessons learned through the Stoney Creek pilot project will help develop scaling solutions to enhance
community flood resilience across North Carolina.
3.4.2.3 Sources of Flooding Identified
The NIFMP pilot project addresses chronic flash, rain, riverine, and urban and stormwater related
flooding within the Stoney Creek watershed, a sub watershed of the Neuse River Basin, encompassing
a significant portion of the City of Goldsboro in Wayne County, NC.
3.4.2.4 Investments in Flood Resilience
Table 12 includes the NIFMP’s pilot project that is currently underway. The pilot project covers
structural and nature-based action categories.
Table 12. Flood Resilience Investments (3.4.2.)
Investment
Type
Age Maintenance
Ownership/
Management Status & Barriers S NS NBS P
Stoney Creek Pilot Project: will
target flooding which impacts
businesses, roadways, and access
to emergency services in Wayne
County and Goldsboro. These
systems can include strategies like
building wetlands and restoring
streams and floodplains which
help store water and attenuate
flooding.
✓ ✓ 2023 - NC Division of
Mitigation
Services
(NCDMS)
December 2022 - NCDMS
executes a contract,
awarded to Ecosystem
Planning & Restoration,
LLC for project. Work is
ongoing.
3.4.2.5 Resources
The following hyperlinks, provided as bullets below, include NCDMS’s main webpage for the NIFMP,
the award announcement from the private contractor working with NCDMS on the Stoney Creek Pilot
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 42
Project, and an overview article of Stoney Creek published the NC Coastal Federation’s that provides
context to the selection of the pilot project.
• NCDMS Natural Infrastructure Flood Mitigation Program:
https://www.deq.nc.gov/about/divisions/mitigation-services/natural-infrastructure-
program#:~:text=In%202020%2C%20the%20NC%20General%20Assembly%20created%20the,stor
age%20capacity%20enhancement%20projects%20into%20the%20division%27s%20activities.
• Ecosystem Planning & Restoration Project Announcement: https://www.eprusa.net/articles/epr-
team-awarded-pivotal-project-implementing-natural-infrastructure-flood-mitigation-in-north-
carolina/
• NC Coastal Federation Stoney Creek Project Overview: https://coastalreview.org/2021/06/flood-
resilience-study-reveals-solutions-big-challenges/
3.4.3 Triangle J Council of Government Water Resources Program
3.4.3.1 Background
The Central Pines Regional Council (CPRC), which was previously named the Triangle J Council of
Government, administers a regional water resource program for portions of the Neuse and Cape Fear
River Basins. The program facilitates intergovernmental partnerships across jurisdictional lines and
provides technical assistance to sustainably manage water supply and water quality through
watershed planning and stormwater infrastructure mapping, management, and education.
3.4.3.2 Summary of Flood Resiliency Efforts
CPRC’s Water Resources Program works through three primary efforts including the Water
Infrastructure and Watershed Protection Programs as well as the Jordan Lake One Water Coalition.
The Water Infrastructure effort is led by CPRC, in partnership with NCDEQ, the UNC Environmental
Finance Center, and other stakeholders with the purpose of working with communities to assess
current infrastructure, examine and assess potential regionalization of opportunities, and recommend
next steps.
The Watershed Protection Program is administered by CPRC in collaboration with the cities of Raleigh
and Durham, and local land trusts including the Eno River Association, the Ellerbe Creek Watershed
Association, the Tar River Land Conservancy, and the Triangle Land Conservancy. The program
evaluates and funds high priority watershed protection projects that protect source waters.
The Jordan Lake One Water (JLOW) Coalition, which recently became a nonprofit in 2022, is a regional
effort led by a variety of stakeholders including local governments, conservation groups, universities,
water utilities, agriculture, state agencies, and private industry stakeholders that is working to
produce and implement integrated watershed management recommendations for the Jordan Lake
Watershed. While the primary objective of these efforts is to restore water quality and address water
supply challenges in the watershed, the planning efforts incorporate and intersect aspects of flood
mitigation to ensure a wholistic approach is taken.
3.4.3.3 Sources of Flooding Identified
CPRC’s Water Resources Program identifies and addresses several sources of flooding through the
three efforts detailed in the previous section including flash, riverine, rain, urban and stormwater, and
agricultural flooding.
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 43
3.4.3.4 Investments in Flood Resilience
Recent efforts led by CPRC include a Stormwater Infrastructure Mapping and Assessment Project for
Siler City (2019-2020), a Wastewater Merger & Regionalization Feasibility Study in Johnston County
(2019), and the Jordan Lake One Water Vision and Recommendations Document (2017-present) (see
Table 13). The Siler City Stormwater Infrastructure project (2019-2020) helped the town and the
NCDOT staff locate, manage, and maintain stormwater infrastructure and prioritize maintenance to
help alleviate flooding concerns and improve water quality. Both a town-owned and NCDOT-owned
streets “Lookbook” were created to identify highest-priority stormwater infrastructure maintenance
needs in the city. A final report was also published that includes a comprehensive overview of the
methods used in and results of the efforts as well as lessons learned and next steps. In early 2019,
CPRC worked with the towns of towns of Kenly, Micro, Pine Level, Princeton, Selma, and Smithfield,
and Johnston County to study potential collaboration opportunities among wastewater utility
system. This effort was undertaken in response to recent flooding caused by Hurricane Florence and
Matthew that resulted in overburdened and damaged wastewater facilities in Johnston County. The
project is assessing feasible options to expand the capacity of these systems while making them more
resilient to future flood events. Recent efforts by the JLOW have resulted in several key investments
including a Strategic Conservation Strategy (2018-2019) and a unified vision for the Watershed (2021).
The conservation strategy was incorporated into the Coalition’s geographic information system (GIS)
based Watershed Protection Model that spatially identifies prioritized locations to invest in land
conservation. The watershed vision resulted in two primary recommendations including the
formation of a Transitional JLOW Organization as a nonprofit and to co-develop a framework for
collaboration between the Coalition and NCDEQ to address regulatory concerns, including nutrient
requirements.
Table 13. Flood Resilience Investments (3.4.3.)
Investment
Type
Age Maintenance
Ownership/
Management Status & Barriers S NS NBS P
Jordan Lake One Water ✓ ✓ ✓ 2017-
Present
Jordan Lake One
Water Coalition
The vision’s first goal of
becoming a registered
nonprofit was reached in
July of 2022.
Siler City Stormwater
Infrastructure Mapping
and Assessment Project
✓ ✓ 2019-2020 Siler City, NC
Department of
Transportation,
CPRC
Lookbooks and Final
Report published in 2020
Wastewater Merger &
Regionalization
Feasibility Study –
Johnston County
✓ ✓ 2019 CPRC, UNC
Environmental
Finance Center,
Towns of Kenly,
Micro, Pine
Level, Princeton,
Selma,
Smithfield, and
Johnston
County
Funded through the NC
Department of
Environmental Quality’s
(NCDEQ’s)
Merger/Regionalization
Feasibility Grant
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 44
3.4.3.5 Resources
The following hyperlinks, provided as bullets below, include the sources to each program and
document described in the previous sections, all of which are housed on Central Pines COG website.
• Central Pines COG Water Resources Program Website:
https://www.centralpinesnc.gov/environment-resilience/water-resource-management
• Jordan Lake One Water Vision and Recommendations Document:
https://www.centralpinesnc.gov/sites/default/files/uploads/jlowonewatervisionfinalsept2021.pdf
• Wastewater Merger & Regionalization Feasibility Study – Johnston County:
https://www.centralpinesnc.gov/news/wastewater-merger-regionalization-feasibility-awarded-
eastern-johnston-county-communities
• Siler City Stormwater Infrastructure Lookbook: Town-Owned Streets:
https://www.centralpinesnc.gov/sites/default/files/uploads/lookbooktownonly.pdf
• Siler City Stormwater Infrastructure: NCDOT-Owned Streets:
https://www.centralpinesnc.gov/sites/default/files/uploads/lookbookstateonly.pdf
• Final Report: Siler City Stormwater Infrastructure Mapping and Assessment Project:
https://www.centralpinesnc.gov/sites/default/files/uploads/silerreport_fortown.pdf
3.4.4 Resilient Coastal Communities Program
3.4.4.1 Background
The NCDEQ’s Division of Coastal Management in partnership with NCORR administer the Resilient
Coastal Communities Program (RCCP) with the goal of providing technical and financial assistance to
advance coastal resilience efforts in 20 North Carolina counties. The program addresses barriers such
as economic and capacity constraints that limit communities’ abilities to develop coastal resilience by
providing both a planning framework and funding source for eligible and prioritized projects.
3.4.4.2 Summary of Flood Resiliency Efforts
RCCP facilitates a community-driven process for setting coastal resilience goals, assessing existing
and needed local capacity, and identifying and prioritizing “shovel ready” projects. Communities in all
20 eligible coastal counties can apply for direct technical assistance to complete a process like the
Regional Resilience Portfolio process detailed in section 3.1.2. of this report. This process includes
four primary phases including:
1. Community engagement process and risk vulnerability assessment
2. Planning, project selection, and prioritization
3. Engineering and design
4. Implementation.
Phases 1 and 2 were completed between 2020-2022 while phase 3 (engineering and design) was
completed in 2023. Phase 4 (implementation) began in 2023 and is currently ongoing. Participating
communities follow a step-by-step planning guide created by RCCP called the “North Carolina
Resilient Coastal Communities Program Planning” that provides information on program
requirements, existing data, tools, and resources to help communities through the process to
ultimately obtain funding.
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 45
3.4.4.3 Sources of Flooding Identified
Sources of flooding identified include coastal, flash, rainfall, riverine, and urban & stormwater
flooding.
3.4.4.4 Investments in Flood Resilience
While the RCCP program extends beyond the borders of the Neuse River Basin, participating
communities located in the basin and their prioritized/funded projects can be found in Table 14
below. These projects are currently in the engineering and design phase and are expected to begin
implementation between 2023-2024.
Table 14. Flood Resilience Investments (3.4.4.)
Investment
Type
Age Maintenance
Ownership/
Management Status & Barriers S NS NBS P
Phase 1-2 - Craven County:
Resilience Strategy
✓ 2022 - County and NC
Division of
Coastal
Management
(NCDCM)
Document Complete
Phase 1-2 - Pamlico County:
Resilience Strategy
✓ 2022 - County and
NCDCM
Document Complete
Phase 1-2 - Vandemere:
Resilience Strategy
✓ 2022 - Town and
NCDCM
Document Complete
Phase 3 - Craven County: Living
Shoreline Prioritization and
Engineering Design
✓ ✓ ✓ 2023 - County and
NCDCM
Ongoing
Phase 3 - New Bern: Duffyfield
Community Resilience
Improvement-Basin Restoration
and Enhancement
✓ ✓ ✓ 2023 - City and NCDCM Complete
Phase 3 - Vandemere: Improving
Stormwater Culverts and
Drainage
✓ ✓ 2023 - Town and
NCDCM
Ongoing
Phase 4 – New Bern: Duffyfield
Community Resilience-Rose
Street Basin Restoration
✓ ✓ 2023-
2024
- City and NCDCM Ongoing
3.4.4.5 Resources
The following hyperlinks, provided as bullets below, include a link to main RCCP website as well as
three county specific resilience strategies geographically relevant to the Neuse River Basin, as well as
a link to the City of New Bern’s public engagement website for the Duffyfield Community Resilience
Improvement Project.
• NC Resilient Coastal Communities Program Website:
https://www.deq.nc.gov/about/divisions/coastal-management/coastal-adaptation-and-
resiliency/nc-resilient-coastal-communities-program#Phase3Awards2022-2023-11442
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 46
• Craven County Resilience Strategy: https://www.deq.nc.gov/craven-county-resilience-
strategypdf/open
• Pamlico County Resilience Strategy: https://www.deq.nc.gov/pamlico-county-resilience-
strategypdf/open
• Vandemere Resilience Strategy: https://www.deq.nc.gov/vandemere-resilience-strategypdf/open
• New Bern Duffyfield Community Resilience Improvement Website:
https://www.publicinput.com/project/?id=76312#:~:text=The%20City%20of%20New%20Bern%20i
s%20launching%20a,Hazard%20Mitigation%20Plan%20that%20was%20adopted%20last%20year
.
3.5 Barriers to Implementation
Identifying and evaluating barriers to implementing flood resiliency in the Neuse River Basin is a
critical component of formulating a flood mitigation strategy with the most effective and efficient
actions. Staying within the scope of this expanded literature review, the following section evaluates
barriers to implementation through the lens of capability self-assessments conducted during the
hazard mitigation process that every county within the Neuse River Basin participates in. These
assessments consider a variety of factors including current regional and local resilience staffing levels
and resources as well as relative levels and types of expertise.
3.5.1 Capability Assessments: Regional Hazard Mitigation Plans
Capability self-assessments are a critical component of the regional hazard mitigation planning
process. The assessments help regional, county, and local jurisdictions understand their ability to
implement a comprehensive mitigation action strategy as well as identify barriers to implementation.
The results assist jurisdictions in forming a mitigation plan with feasible actions within their own
context, increasing the likelihood of implementation over time. Identifying existing and potential
barriers to implementation encourages participants to prioritize resource allocations to areas of
weakness and further develop their capabilities for the next regional HMP update. Like HMP
participants, NC Flood Resiliency Blueprint will benefit from an evaluation of the Neuse River Basin’s
capacity to implement flood mitigation actions by incorporating the following findings into the Neuse
Action Strategy. There are seven regional HMPs encompassing 17 counties and 83 towns and cities
relevant (i.e., within or significantly intersecting) to the Neuse River Basin that incorporated capability
self-assessments. The capability assessments conducted during the planning processes provide a
comprehensive evaluation of the basin’s capacity to implement flood related mitigation actions at the
regional, county, and local level.
Assessments had two main components 1) an inventory of a jurisdiction’s relevant and existing plans,
ordinances, and programs and 2) a self-administered implementation capacity analysis by all
participating planning committee representatives. There were six capability categories analyzed
during this process including planning/regulatory, administrative/technical, fiscal, education and
outreach, mitigation, and political. Participants responded to several prompts within each category
and indicated whether their jurisdiction had existing, developing or no capacity/resources for a given
capability indicator. A scoring system assigned points to responses based on their relevance to hazard
mitigation as well as jurisdictions self-assessments of their own capabilities. Regional, county, local
governments received a total score and an overall capability rating of “high,” “moderate,” or “low.”
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 47
Table 15 below highlights the overall capability rating (high = green, moderate = yellow, low = red) for
HMP regions and subsequent counties that are within or significantly intersect the Neuse River Basin
(regardless of contrasting regional groupings for hazard mitigation plans). A table detailing the overall
capability rating for individual towns and cities within or intersecting the Neuse River Basin is located
Table 17 of the Appendix. The two capability tables exclude counties, cities, and towns found to be in
a different river basin. There is an even split among highly (eight counties) and moderately (eight)
capable counties in the Neuse. The one outlier that received a low rating is Wayne County in the Neuse
HMP region. Out of the 76 Neuse relevant cities and towns covered in regional HMPs 39 percent
received a “low” overall capability rating, 47 percent received a “moderate” rating, and only 13
percent received “high.”
Table 15. Regional and County Overall Capability (3.5.1)
Region County
Overall
Capability
Cape Fear Johnston High
Eno - Haw Durham High
Orange High
Person Moderate
Neuse Greene Moderate
Jones Moderate
Lenoir Moderate
Pitt High
Wayne Low
N.E.W. Nash Moderate
Wilson High
Pamlico
Sound
Carteret High
Craven Moderate
Pamlico Moderate
Tar River Franklin High
Granville High
Wake County Wake Moderate
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 48
4 Concluding Remarks
AECOM provided the first draft of this Neuse River Basin literature review expansion in August 2023.
This living document may be updated as reports, plans, studies, and other relevant resources are
published and with input from the TAGs. The next section includes an index with links to all resources
reviewed in the literature review and a subsequent Appendix with more adjacent resources for
awareness and reference.
The Neuse River Basin literature review expansion provides a robust inventory of existing and
proposed flood mitigation and resilience efforts from 32 of the most current, basin-specific, and
credible sources. The results of these efforts reveal several key gaps in our current understanding
concerning completed and ongoing efforts in the Neuse River Basin that future Blueprint tasks should
consider.
• While many resources provide an estimated project timeline for planned and recommended
actions, very few resources receive updates on a regular basis if at all. The lack of updated
resources leaves the implementation status of many resilience efforts unknown within the basin.
• Like implementation status, the reviewed resources provide some estimated maintenance costs
for planned and recommended actions but little to no information on future maintenance needs.
• Some resources, specifically Hurricane Matthew Resilient Redevelopment Plans and most research
projects, studies, technical reports, and memos, provide only generalized ownership/management
information for existing and proposed efforts (e.g., county and NCDOT). This may complicate any
future efforts to confirm action and recommendation statuses or collect other relevant project
information.
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 49
5 Appendix
The sources included in the Neuse River Basin Literature Review Expansion met the resource inclusion
criteria and were reviewed to focus efforts on Neuse River Basin resources of highest applicability,
relevance, ease of use, and foundational nature to NC Flood Resiliency Blueprint. However, there are
other resources that may be valuable for awareness and reference.
This appendix displays more adjacent resources (organized in analogous categories, with the addition
of “webpages” that may hold a collection of other nested materials, tools, studies, etc.).
5.1 Adjacent Resources
Table 16 Literature Review Adjacent Resources (5.1)
Title and Link Year Lead Agency Notes (if applicable)
Plans and Strategies
Upper Neuse Conservation Action
Strategy 2015-2045
https://issuu.com/rebeccahankins/docs/20
15-
2045_conservation_strategy#:~:text=The%
20Upper%20Neuse%20Clean%20Water%20
Initiative%202015-
2045%20Conservation,the%20Upper%20N
euse%20watershed%20in%20central%20N
orth%20Carolina
2015 Conservation Trust
for North Carolina;
Ellerbe Creek
Watershed
Association; Eno
River Association;
Tar River Land
Conservancy;
Triangle
Greenways Council;
Triangle Land
Conservancy; The
Conservation Fund
Provides a framework for protecting drinking water
supply resources through land protection, which is one
key element of a comprehensive strategy of green and
gray infrastructure investments that can help ensure
clean water for the communities that receive drinking
water from the Upper Neuse watershed in central
North Carolina.
Walnut Creek Watershed Action Plan
https://www.arcgis.com/apps/MapSeries/in
dex.html?appid=6f81e3b1ed114d9c91c91e
0bf379cbeb
2020 NC Water
Resources
Research Institute;
Partners for
Environmental
Justice; and Walnut
Creek Wetlands
Community
Partnership
An online watershed plan tool that helps in identifying
and prioritizing areas for improvement projects,
developing implementation plans and tracking water
resource improvements across the entire Walnut Creek
Watershed. The Action Plan goals are to reduce flows in
Walnut Creek and restore stream health, while
addressing social and economic goals. Improvement
efforts are concentrated into focus areas, small
sections within the watershed that contribute to the
overall health of Walnut Creek.
Black Creek Watershed Management Plan
https://www.deq.nc.gov/water-
quality/planning/npu/319/watershedmgtpl
ans-9element/black-creek-watershed-final-
report-ew06065/download
2009 N.C. State
University
The Black Creek watershed planning initiative was
intended as a highly visible effort that could serve as a
model for restoring other urbanized watersheds in the
Town of Cary and the Triangle area. The goals of the
project are to (1) work with the community to cultivate
a vision for the watershed, and then collaboratively
develop community supported recommendations (2)
provide a watershed management and restoration plan
that makes recommendations for BMP
implementation, community education, and
evaluation of the success of plan implementation (3)
conduct a watershed assessment and implement a
monitoring program that will more specifically
determine the causes and sources of Black Creek’s
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 50
Title and Link Year Lead Agency Notes (if applicable)
impairment; and (4) develop a demonstration model of
cutting edge, robust technology for watershed
assessment, monitoring, stressor amelioration
assessment, and geodatabase implementation.
Eno River 9-Element Plan Checklist
https://www.deq.nc.gov/water-
quality/planning/npu/319/watershedmgtpl
ans-9element/eno-9-element-
checklist/download
2016 Upper Neuse River
Basin Association,
Triangle J COG
(now Central Pines
Regional Council),
Tetratech, U.S.
Environmental
Protection Agency,
N.C. Division of
Water Resources,
N.C. Division of
Mitigation Services,
Piedmont Triad
Regional Council,
and the N.C.
Division of Energy,
Mineral, and Land
Resources
-
Knap of Reeds Watershed 9-Element Plan
Checklist
https://www.deq.nc.gov/water-
quality/planning/npu/319/watershedmgtpl
ans-9element/knap-reeds-9-element-
checklist/download
2016 Upper Neuse River
Basin Association,
Triangle J COG
(now Central Pines
Regional Council),
Tetratech, U.S.
Environmental
Protection Agency,
N.C. Division of
Water Resources,
N.C. Division of
Mitigation Services,
Piedmont Triad
Regional Council,
and the N.C.
Division of Energy,
Mineral, and Land
Resources
-
Lick Creek Watershed Restoration Plan
https://www.deq.nc.gov/water-
quality/planning/npu/319/watershedmgtpl
ans-9element/lick-crk-final-wrp-ew07026-
neubsn/download
2009 City of Durham and
the Upper Neuse
River Basin
Association
The Lick Creek Watershed Restoration Plan
encompasses a suite of activities aimed at addressing
the impairment of Lick Creek by improving water
quality and habitat conditions. The Goals of this plan
were to (1) Develop a hypothesis about the causes of
impairment in Lick Creek and recommend approaches
to address impairment status (2) Identify pollutants
and their sources that may be impairing aquatic
habitat and water quality in Lick Creek (water quality is
not impaired currently). Suspected pollutants include
dissolved oxygen and biochemical oxygen demand),
fecal coliform bacteria, and turbidity (3) Develop
strategies for reducing, and maintaining at levels
meeting water quality standards, the pollutants
identified in Goal two and (4) Mitigate future changes
to watershed hydrology and water quality.
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 51
Title and Link Year Lead Agency Notes (if applicable)
Upper Barton Creek Watershed 9-
Element Plan Checklist
https://www.deq.nc.gov/water-
quality/planning/npu/319/watershedmgtpl
ans-9element/upper-barton-9-element-
checklist/download
2016 Upper Neuse River
Basin Association,
Triangle J COG
(now Central Pines
Regional Council),
Tetratech, U.S.
Environmental
Protection Agency,
N.C. Division of
Water Resources,
N.C. Division of
Mitigation Services,
Piedmont Triad
Regional Council,
and the N.C.
Division of Energy,
Mineral, and Land
Resources
-
Upper Swift Creek Watershed 9-Element
Plan Checklist
https://www.deq.nc.gov/water-
quality/planning/npu/319/watershedmgtpl
ans-9element/9elementchecklist-tjcog-
submittal-upperswift-26feb2015/download
2015 Triangle J COG
(now Central Pines
Regional Council)
-
Little Lick Creek Watershed
Improvement Plan
https://www.deq.nc.gov/water-
quality/planning/npu/319/watershedmgtpl
ans-9element/little-lick-cr-watershed-
assessment-report/download
2015 City of Durham The purpose of the plan is to protect and improve the
water quality of streams, ponds, and small lakes in the
city’s watersheds and to comply with water quality
regulations instituted by the State of North Carolina
and the Federal Clean Water Act to improve and
protect the rivers and water supply reservoirs to which
they flow.
Smith Creek Watershed Restoration Plan
(Wake and Franklin Counties)
https://www.deq.nc.gov/water-
quality/planning/npu/319/watershedmgtpl
ans-9element/smith-creek-wake-
forest/download
2015 Town of Wake
Forest
The plan’s purpose is to provide a foundation for
addressing non-point source pollution sources in the
Smith Creek Watershed, to provide the community and
Town staff with recommendations of how to monitor
the progress of impairments over time and to provide
information for implementing the restoration and
monitoring efforts.
Upper Middle Creek Watershed Action
Plan
https://www.deq.nc.gov/water-
resources/planning-section/nonpoint/319-
upper-middle-creek-watershed-action-
plan/download?attachment
2022 Wake Soil and
Water
Conservation
District and local
governments
The overall goal of this document is to identify
pollution sources which have degraded water quality
and watershed habitat resulting in benthic community
declines and provide a roadmap for project partners
and other stakeholders to improve conditions, with the
ultimate result of "impaired" stream segments removal
from the impaired water list
Ellerbe Creek Watershed management
Improvement Plan
https://edocs.deq.nc.gov/WaterResources/
DocView.aspx?dbid=0&id=2409971&cr=1
2010 City of Durham The city launched the Ellerbe Creek Watershed
Management Improvement Plan at the end of 2007 to
proactively address changes the city is making to
comply with water quality regulations, to improve the
health of the Ellerbe Creek, and create value for
neighborhoods in the watershed.
Hominy Swamp Restoration Plan 2018 City of Wilson The plan’s purpose is to identify and select pollution
control strategies to deliver progress towards reducing
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 52
Title and Link Year Lead Agency Notes (if applicable)
https://edocs.deq.nc.gov/WaterResources/
DocView.aspx?dbid=0&id=2409994
sources of pollution, managing runoff in a way to treat
pollution prior to entering the water body, and
improving the resiliency of the riparian corridor and
watershed landscape in mitigating the effects of
pollution.
Neuse 01 Regional Watershed Plan Phase
II
https://files.nc.gov/ncdeq/Mitigation%20Se
rvices/Watershed_Planning/Neuse_River_B
asin/Neuse01_RWP/Final%20NS01%20Phas
e%20II%20Report%20To%20Post.pdf
2015 NC Division of
Mitigation Services
(NCDMS)
The Regional Watershed Plan (RWP) effort provides
project implementation recommendations, including
various types of projects prioritized for
implementation. DMS worked with the Interagency
Review Team to examine and prescribe both traditional
and non-tradition mitigation project opportunities
(Nutrient offset; stream, wetland, and riparian buffer
restoration, enhancement, reestablishment, and
preservation) within the RWP, thus maximizing
ecological uplift to the region’s water quality,
hydrology, and habitat.
Seven Springs Recovery Plan
https://coastalresiliencecenter.unc.edu/wp
-content/uploads/sites/845/2018/12/Seven-
Springs-Recovery-Plan-1.pdf
2018 Town of Seven
Springs, UNC-
Chapel Hill, and NC
State University
(NCSU)
This plan is focused on the steps needed to
facilitate the recovery from Hurricane Matthew.
Proposed actions fall into infrastructure, public
facilities, housing, environment, land use,
administration and finance, and economic
development categories.
Pollocksville Community Floodprint
https://static1.squarespace.com/static/5ae
3403b5ffd20f29c3730d4/t/614347f7df9f560f
fced275f/1631799295403/Pollocksville+Floo
dprint_Final_SPREADS_web_compressed.p
df
2021 Town of
Pollocksville and
NCSU
The Floodprint was created in response to flooding
caused by Hurricane Florence and acts as an integrated
portfolio of proposed resilience projects including dry
proofing of structures, structural elevations, voluntary
buyouts, and open space conversion
Triangle Land Conservancy Strategic
Action Plan 2018-2025
https://triangleland.org/about/annual-
report
2018 Triangle Land
Conservancy
The plan sets a land conservation goal of 7.000 acres by
2025 and increased community engagement, with a
focus on safeguarding clean drinking water.
Research Projects and Studies
Estimating Changes in Peak Flow and
Associated Reductions in Flooding
Resulting from Implementing Natural
Infrastructure in the Neuse River Basin,
North Carolina, USA
https://www.mdpi.com/2073-
4441/14/9/1479
2022 NCSU’s Dept. of
Biological and
Agricultural
Engineering,
College of Design,
and NC Sea Grant
-
A Framework for Planning and Evaluating
the Role of Urban Stream Restoration for
Improving Transportation Resilience to
Extreme Rainfall Events
https://www.mdpi.com/2073-
4441/12/6/1620/htm
2020 NCSU’s Dept. of
Biological and
Agricultural
Engineering and
NC Sea Grant
Proposes a framework for systematically evaluating
stream restoration in combination with engineered
improvements to culvert and bridge crossings to
identify and optimize options for mitigating extreme
events in urban areas (Goldsboro, NC Case Study)
Evaluating Nature Based Solutions for
Mitigating Riverine Flooding in Eastern
North Carolina (Video Seminar)
2022 NCSU’s Center for
Marine Sciences &
Technology and
Coastal Resilience
-
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 53
Title and Link Year Lead Agency Notes (if applicable)
https://www.youtube.com/watch?v=fNUqY
mwEHcQ
and Sustainability
Initiative
Assessing Operational Flooding Risks for
Substations and the Wider North Carolina
Power Grid
https://collaboratory.unc.edu/wp-
content/uploads/sites/476/2021/05/assessi
ng-operational-flooding-risks-for-
substations-and-the-wider-north-carolina-
power-grid.pdf
2021 NCSU’s Dept. of
Forestry and
Environmental
Resources & Dept.
of Civil,
Construction and
Environmental
Engineering
Study has three main components: preliminary
geospatial flood risk assessment for Eastern NC grid;
dynamic flood depth analysis during historical
Hurricanes and grid impacts; operational modeling of
the NC grid under recreated historical flooding
conditions.
Flood Resilience and NC Water and
Wastewater Utilities: A case study
approach to understanding utility
vulnerability and resilience
https://collaboratory.unc.edu/wp-
content/uploads/sites/476/2021/05/flood-
resilience-and-nc-water-and-wastewater-
utilities.pdf
2021 The Environmental
Finance Center at
UNC-Chapel Hill
Research included an investigation of water and
wastewater utility flood resilience, and the research
utilized a mixed methods approach, including mapping
vulnerable infrastructure, assessing financial condition
via benchmarks, investigating recovery spending, a
focus group style group discussion at a School of
Government workshop, and conducting qualitative
interviews and case studies at four utilities across the
Lumber, Neuse, and Cape Fear River basins
Falls Lake Nutrient Management Study
Primary Website:
https://nutrients.web.unc.edu/about/
2023 Falls Lake Nutrient Management
Study Research Symposium:
https://nutrients.web.unc.edu/2023-falls-
lake-research-symposium/
Latest (2022) Interim Update to the NC
General Assembly:
https://nutrients.web.unc.edu/wp-
content/uploads/sites/19393/2023/01/2022
-Collaboratory-Falls-Lake-Nutrient-
Management-Study-Interim-Update.pdf
2016-
Present
UNC-Chapel Hill
and NCSU
• Cataloguing and reviewing water quality data sets
collected throughout the Jordan Lake watershed to
identify discernible trends and conducting
additional water quality sampling to address data
gaps.
• Evaluating reservoir vulnerability to eutrophication,
including harmful algal blooms, relative to nutrient
and sediment loads, streamflow patterns, and
climate, for both current conditions and future
scenarios.
• Identifying major sources of nutrients and sediments
to Jordan Lake and the timing of loading.
• Evaluating likelihood of nutrient mitigation through
the implementation of best management practices,
regulatory measures, and restoration efforts.
• Evaluating innovative financing mechanisms for
stormwater controls and analysis of costs and
benefits of water quality improvement.
• Reviewing nutrient strategies from other states,
including the Chesapeake Bay Program, and
analyzing the impact those strategies have had on
water quality.
• Engaging with communities and stakeholders
throughout the watershed through listening
sessions, focus groups, etc.
Programs
Conservation Stewardship Program
https://www.nrcs.usda.gov/programs-
initiatives/csp-conservation-stewardship-
program/north-carolina/conservation-
stewardship
Ongoing NC Natural
Resources
Conservation
Service and the
N.C. Agriculture
Development
Farmland
Preservation Trust
Funds
Preserving Upriver Farms to Reduce Flooding in NC-
Phase II: The project should result in the permanent
protection of over 4,000 acres of working farms and
forests in the Neuse River Basin. In addition to
protection of working farms, these conservation
easements will provide additional benefits of reduced
erosion and improved water quality in the eight county
project area.
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 54
Title and Link Year Lead Agency Notes (if applicable)
Data Tools
Neuse River Basin Model
https://www.deq.nc.gov/about/divisions/w
ater-resources/water-planning/basin-
planning/neuse-river-basin-model
2008-
2009
NC Department of
Environmental
Quality -Division of
Water Resources
For long term surface water management planning, the
State can use the model in making regulatory decisions
by evaluating potential impacts of proposed projects
with significant water withdrawals within the basin and
inter-basin transfer permit application, planning for
increased water use due to continuous growth, and in
real time in managing the basin having challenges of
resources, and operational and regulatory constraints
during a drought condition.
OASIS, a patented, mass balance, water resources
simulation/optimization model will be developed for
the Neuse River basin. This basin wide model will use
the finest practical geographic resolution and timestep
5.2 Barriers to Implementation
5.2.1 Capability Assessments: Regional Hazard Mitigation Plans
Table 17. Overall Mitigation Capability Ratings for Cities and Towns in the
Neuse River Basin (5.2.1)
HMP Region County Cities and Towns
Overall Capability
Rating
Cape Fear Johnston Benson Moderate
Four Oaks Moderate
Micro Low
Pine Level Moderate
Wilson's Mills Moderate
Smithfield Moderate
Clayton Moderate
Kenly Moderate
Archer Lodge Moderate
Selma Moderate
Princeton Moderate
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 55
HMP Region County Cities and Towns
Overall Capability
Rating
Eno-Haw Durham Durham High
Orange Hillsborough Moderate
Person Roxboro Moderate
N.E. W Nash Bailey Low
Middlesex Low
Wilson Black Creek Low
Stantonsburg Low
Wilson High
Sims Low
Saratoga Moderate
Lucama town Low
Neuse Greene Snow Hill Moderate
Walstonburg Low
Hookerton Low
Jones Pollocksville Low
Trenton Low
Lenoir Kinston Moderate
Pink Hill Low
La Grange Moderate
Pitt Grifton Moderate
Farmville Moderate
Fountain Low
Greenville High
Ayden Moderate
Winterville Moderate
Wayne Fremont Low
Pikeville Low
Seven Springs Low
Walnut Creek Low
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 56
HMP Region County Cities and Towns
Overall Capability
Rating
Goldsboro High
Mount Olive Low
Eureka Low
Pamlico Sound Craven Cove City Low
Havelock Moderate
Bridgeton Low
Dover Low
New Bern Moderate
Trent Woods Moderate
Vanceboro Low
River Bend Moderate
Pamlico Alliance Low
Vandemere Moderate
Arapahoe Low
Bayboro Low
Grantsboro Low
Mesic Low
Minnesott Beach Low
Oriental Moderate
Stonewall Low
Tar River Franklin Youngsville Moderate
Granville Stem Moderate
Butner High
Creedmoor Moderate
Wake County Wake Morrisville Moderate
Wake Forest Moderate
Fuquay-Varina High
Garner Moderate
Zebulon Moderate
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 57
HMP Region County Cities and Towns
Overall Capability
Rating
Raleigh High
Apex High
Knightdale Moderate
Rolesville Moderate
Wendell Moderate
Holly Springs High
Cary High
5.3 Sources of Flooding
5.3.1 Hurricane Matthew Resilient Redevelopment Plan
Table 18. Riverine Sources of Flooding: Hurricane Matthew Resilient
Redevelopment Plan (5.3.1.)
USGS Gage County River Name and Location
Drainage
Area (sq mi)
Peak Matthew
Elevation (ft)
Previous
Record (ft)
0209205053 Craven Swift Creek at HWY 43 Near Streets Ferry, NC 269.0 8.67 12.28
02092500 Jones Trent River near Trenton, NC 168.0 18.48 22.33
02092554 Jones Trent River at Pollocksville, NC 370.0 8.5 16.29
02091814 Craven Neuse River Near Fort Barnwell, NC 3,900 20.51 22.7529
02081747 Franklin Tar River near Louisburg, NC 427.0 23.25 26.05
02081500 Granville Tar River near Tar River, NC 167.0 17.56 24.06
02091500 Greene Contentnea Creek at Hookerton, NC 733.0 24.15 28.28
02091000 Greene Nahunta Swamp near Shine, NC 80.4 17.92 21.00
02087500 Johnston Neuse River near Clayton 1,150 127.4 125.7
02087570 Johnston Neuse River at Smithfield 1,206 71.6 70.8
02089500 Lenoir Neuse River at Kinston, NC 2692.0 28.31 27.71
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 58
USGS Gage County River Name and Location
Drainage
Area (sq mi)
Peak Matthew
Elevation (ft)
Previous
Record (ft)
02082770 Nash Swift Creek at Hilliardston, NC 166.0 15.34 21.30
02081942 Nash Tar River at NC 581 near Spring Hope, NC 670.7 23.88 18.11
0208250410 Nash Tar River below dam near Langley Crossroads 775.0 19.58 12.81
02084472 Beaufort Pamlico River at Washington, NC 3,200.0 5.18 7.53
02084000 Pitt Tar River at Greenville, NC 2660.0 24.46 29.72
0208706575 Wake Beaverdam Creek at Dam near Creedmore, NC 52.5 258.93 259.89
02087182 Wake Falls Lake above Dam near Falls, NC 771.0 258.94 264.34
0208726005 Wake Crabtree Creek at Ebenezer Church Road, NC 76.0 19.96 22.40
02087275 Wake Crabtree Creek at Hwy 70 at Raleigh, NC 97.6 22.7 27.69
0208731190 Wake Crabtree Creek at Anderson Drive, Raleigh, NC 110.0 21.3 21.22
02087322 Wake Crabtree Creek at Old Wake Forest Road, Raleigh,
NC
119.0 20.12 19.93
02087324 Wake Crabtree Creek at US 1, Raleigh, NC 121.0 17.49 18.23
0208732534 Wake Pigeon house Creek at Cameron Village, Raleigh NC 0.3 4.91 8.65
0208732885 Wake Marsh Creek near New Hope, NC 6.8 11.68 13.33
0208735012 Wake Rocky Branch below Pullen Drive, Raleigh NC 1.2 9.07 9.23
02087359 Wake Walnut Creek at Sunnybrook Drive, Raleigh, NC 29.8 16.1 17.03
0209782609 Wake White Oak Creek at mouth near Green Level, NC 11.9 10.94 13.50
02087580 Wake Swift Creek near Apex, NC 21.0 12.22 13.86
0208758850 Wake Swift Creek near McCullars Crossroads, NC 35.8 14.31 14.15
02088383 Wake Little River near Zebulon, NC 55.0 5.47 3.62
02089000 Wayne Neuse River near Goldsboro, NC 2399.0 29.74 28.85
02090380 Wilson Contentnea Creek near Lucama, NC 161.0 19.46 24.82
0209050750 Wilson Hominy Swamp at Forest Hill Rd 1.8 12.91 -
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 59
Table 19. Coastal Sources of Flooding: Hurricane Matthew Resilient
Redevelopment Plan (5.3.1.)
County Site Description Body of Water
Estimated Peak
Surge (ft)
Estimated Recurrence
Interval (years)
Carteret Bogue Inlet Pier Open Coast 5.8 1-2
Carteret Oceanana Fishing Pier Open Coast 4.8 1-2
Carteret Emerald Isle Coast Guard Station Sound 4.2 1-2
Carteret Blown Kiteboarding at Broad Creek Sound 4.1 1-2
Carteret US Coast Guard Station Fort Macon Sound 4 1-2
Carteret Tradewinds Marina Sound 3.9 1-2
Carteret Duke Marine Lab Sound 3.6 1-2
Carteret North River at US Hwy 70 Sound 3.4 1-2
Carteret Cape Lookout National Seashore Visitor Center
at Harkers Island
Sound 2.9 1-2
Carteret Cape Lookout Cabins & Camps Ferry Sound 2.7 1-2
Craven Trent River @ US HWY 70 @ New Bern, NC Sound 3.3 <10
Craven Cherry Branch Ferry Terminal Sound 2.9 <10
Pamlico R.E. Mayo Seafood Sound 3.1 25
Pamlico Neuse River at Oriental Town Pier Sound 3.1 25
Pamlico Minnesott Beach Ferry Terminal Sound 2.8 25
Pamlico River Dunes Marina Sound 2.1 25
5.3.2 Regional Hazard Mitigation Plans
Table 20. Riverine Sources of Flooding: Regional Hazard Mitigation Plans (5.3.2.)
HMP Region Counties
Types of
Flooding Local Riverine Flood Sources Historical Events
Pamlico Sound Carteret,
Craven and
Pamlico
Coastal; Dam &
Levee; Flash;
Rain; Riverine;
Urban and
Stormwater
Carteret County: Deep Creek and Little Deep
Creek.
Craven County: Clubfoot Creek, East Prong
Slocum Creek and Tributary, Jimmies Creek,
Maple Cypress, Mauls Swamp, Mills Branch,
Mills Branch Tributary, Morris Branch, Mosley
Creek into Neuse River, Mosley Creek Tributary,
Samuels Creek/Rocky Run, Scotts Creek, Snake
Branch, Southwest Prong Slocum Creek, Swift
Between 1999-2018 there
were (17) coastal floods,
(44) flash floods, (26)
riverine floods and (9)
heavy rain floods in the
three identified counties.
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 60
HMP Region Counties
Types of
Flooding Local Riverine Flood Sources Historical Events
Creek, Trent River Tributary, Tucker Creek,
Village Creek, and Wilson Creek.
Pamlico County: Greens Creek, Kershaw Creek,
Morris Creek, North Prong Bay River, Smith
Creek, South Prong Bay River, Thomas Creek,
and Trent Creek.
Eno-Haw Durham,
Orange, and
Person
Dam (Levee not
included); Flash;
Rain; Riverine;
Urban &
Stormwater
Durham County: The County is more prone to
flooding by small streams than flooding by a
major river. The principal flood problems occur
on the smaller tributaries, where, due to urban
development pressures, there has been
commercial and residential construction in the
floodplains of these tributaries. However, local
flooding from the Eno River has also occurred.
Orange County: Eno River, North and South
Forks Little River, New Hope Creek, Morgan
Creek, Bolin Creek, and other streams.
Person County: Flat River, the North Flat River,
the South Flat River, Marlowes Creek and
smaller creeks and tributaries.
Between 1999-2018 there
were 99 flash floods and 7
riverine floods in the three
identified counties.
Neuse River Green,
Jones,
Lenoir, Pitt,
and Wayne
Coastal; Dam
(Levee not
included); Flash;
Rain; Riverine;
Urban &
Stormwater
Greene County: Contentnea Creek, Little
Contentnea Creek, Nahunta Swamp, Rainbow
Creek, and other streams.
Jones County: Trent River.
Lenoir County: Neuse River, Adkin Branch,
Briery Run, and other streams. Pitt County: Tar
River, Green Mill Run, Contentnea Creek, and
Little Contentnea Creek and their tributaries.
Wayne County: Neuse River, Northeast Cape
Fear River, Thunder Swamp, Lee Branch, Little
River, Nahunta Swamp, Stoney Creek, the
Slough, Walnut Creek, Walnut Creek Tributary
B, and other streams
Between 1999-2018 there
were 118 flash floods, 33
riverine floods and 16
heavy rain floods in the five
identified counties.
Wake County Wake Dam (Levee not
included); Flash;
Riverine; Urban
& Stormwater
Wake County: Black River, Contentnea River,
Haw River, Cape Fear River, and Neuse River,
according to the 2015 Preliminary Flood
Insurance Study for Wake County. These rivers
and their tributaries are susceptible to
overflowing their banks during and following
excessive precipitation events.
Between 2007-2018 there
were 82 flash floods and 5
riverine floods in the
county.
N.E.W. Nash and
Wilson
Dam & Levee;
Flash; Rain;
Riverine; Urban
& Stormwater
Nash County: Fishing Creek, Swift Creek,
Compass Creek, Pig Basket Creek, Stony Creek,
Maple Creek, Sapony Creek, Turkey Creek, and
the Tar River.
Wilson County: Black Creek, Contentnea Creek,
Hominy Swamp, Bloomery Swamp, Marsh
Swamp, Toisnot Swamp, and other streams.
Between 1999-2018 there
were 52 flash floods and 2
riverine floods in the two
identified counties.
Tar River Franklin and
Granville
Dam & Levee;
Flash; Rain;
Riverine; Urban
& Stormwater
Not Available - provides many flood hazard
area maps but no flood source summary
Between 2005-2020 there
were 16 flash floods and 1
riverine flood in the two
identified counties.
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 61
HMP Region Counties
Types of
Flooding Local Riverine Flood Sources Historical Events
Cape Fear Johnston Dam (Levee not
included); Flash;
Rain; Riverine;
Urban &
Stormwater
Not Available - provides many flood hazard
area maps but no flood source summary
Between 2005-2019 there
were 26 flash floods and 2
riverine floods in the
county.
Table 21. Coastal Sources of Flooding: Pamlico Sound Regional Hazard Mitigation
Plan (5.3.2.)
County Source of Coastal Flooding
Carteret County Surge propagates into Bogue Inlet, Bogue Sound, Core Sound, Goose Bay, the
Intracoastal Waterway, Pamlico Sound, Shackleford Slue, the Straits, and further into
Adams Creek, the Neuse River, the Newport River, and the White Oak River.
Craven County Surge extends from Pamlico Sound into the Neuse River, Hancock Creek, Jack Smith
Creek, Lawson Creek, Pamlico River, downstream portions of Rocky Run/Samuels
Creek, Slocum Creek, Southwest Prong Slocum Creek, and the Trent River.
Pamlico County Surge moves from Pamlico Sound further into Bay River, Big Porpoise Bay, Jones Bay,
Kershaw Creek, Middle Bay, Morris Creek, Pamlico River, Smith Creek, Thomas Creek,
Trent Creek, Whittaker Creek, and Raccoon Creek.
5.3.3 Neuse River Basin Flood Analysis and Mitigation Strategies Study
Table 22. Peak Discharges Recorded During Hurricane Matthew (5.3.3.)
Site Location County
Peak Discharge
(cfs)
Return Period
(years)
Crabtree Creek at Ebenezer Church Rd. Wake 5,740 12
Crabtree Ck. at Hwy 70 Wake 6,350 6
Walnut Creek at Sunnybrook Drive Wake 5,960 33
Middle Creek near Clayton Johnston 20,600 >500
Little River near Princeton Johnston 9,960 99
Neuse River at Goldsboro Wayne 54,300 222
Neuse River at Kinston Lenoir 38,200 125
Contentnea Creek near Lucama Wilson 12,000 244
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 62
Site Location County
Peak Discharge
(cfs)
Return Period
(years)
Nahunta Swamp near Shine Greene 13,600 >500
Contentnea Creek at Hookerton Greene 25,000 270
Figure 3. Location of Peak Discharges Recorded During Hurricane Matthew (5.3.3.)
5.3.4 Improving North Carolina’s Resilience to Coastal Riverine Flooding
Table 23. Observed and Modeled Peak Discharge and Runoff Volume (5.3.4)
Study Watershed Data
Peak Q
(cfs)
Volume (ac-
ft)
Time of
Peak
Nahunta Swamp
(Hurricane Matthew 10/7/16
to 10/15/16)
Observed 13,600 36,709 10/9 4:00
Modeled 13,621 36,103 10/9 3:30
Little River
(Hurricane Matthew 10/7/16
to 10/15/16)
Observed 9,370 26,018 10/9 4:00
Modeled 9,350 26,590 10/9 0:10
Bear Creek
(Hurricane Floyd 9/14/99 to
9/20/99)
Observed 11,000 28,528 9/16 12:00
Modeled 10,975 30,817 9/16 12:20
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 63
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 64
5.4 Existing and Proposed Investments
5.4.1 Hurricane Matthew Resilient Redevelopment Plans (2017)
Table 24. HMRRP – Carteret County (5.4.1.)
County Investment Type Maintenance Ownership/Management
Status &
Barriers
Carteret Acquisitions: The Carteret County Planning Dept. has a
list of repetitive loss properties and potential candidates
for elevation.
NS Green space management
post buyout and
demolition
County Planning Dept., NC Office of Recovery and
Resiliency (NCORR)
1-2 years
Carteret Education and Outreach Programs: 1) Work directly with
local church and faith-based organizations in isolated or
underserved areas to identify and reach out to residents
that may be unaware of current risks, funding
opportunities and public service programs such as
Coastal Carolina Action. 2) Place flood protection,
sheltering and other hazard education materials in all
branches of the Carteret County public library system. 3)
Support residents throughout the grant solicitation
process by assisting with the necessary forms and
paperwork."
NS - Carteret County 1-2 years
Carteret Collaboration between research institutions and local
government: strategy consists of obtaining funding for
increased collaboration between the academic research
institutions (University of North Carolina System
Universities, North Carolina State University, Duke,
Edgecombe Community College, Central Carolina
Community College) and the county science-based
depts. such as Emergency Services, GIS Services,
Environmental Health, Shore Protection, and Soil and
Water Conservation Districts (SWCD), etc.
NS, P - Carteret County emergency services (ES), GIS Services,
Environmental Health, Shoreline Protection, SWCD
1-2 years
Carteret Critical Facilities and Emergency Equipment: 1)
Evaluation of the current shelter inventory. Determine
which facilities are currently at risk. What is the current
demand and the infrastructure needed to meet it?
Consider the construction of new schools that could
double as shelters. 2) A critical need is a new facility to
S, NS, P - Carteret County 6 months - 1
year
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 65
County Investment Type Maintenance Ownership/Management
Status &
Barriers
host an alternate Emergency Operating Center and
Public Safety & 911 Center for the County. The current
facility is vulnerable to flooding and alternate locations
are problematic. Construction of a new site in the Town
of Newport would enhance the ability for emergency
operators to provide services, provide a safe location for
emergency response personnel to store equipment. 3)
Floodproofing of critical facilities such as the South River,
Marshallberg, and Stacy Fire Depts. This action involves
an evaluation of the current risks, recommendations,
and implementation of flood mitigation measures.
Carteret Countywide Drainage Improvements: A comprehensive
stormwater study, assessing current infrastructure
needs. Much of the counties drainage system needs
repair, and pipe resizing. A study is required to identify
appropriate locations for improvement and sizing for
capacity. Collaborating with local leadership (town
mayor, town manager, town administrator, etc.) to
identify areas of chronic flooding; Ditches along main
roads are property of NC Department of Transportation
(NCDOT) and therefore, cannot be maintained by the
localities.
S, P - Carteret County 6 months - 1
year
Carteret Revise Flood Studies: A new study for Carteret County is
required to protect areas of vulnerability and relieve
residents in areas of less vulnerability.
P - Carteret County 1-2 years
Carteret Ordinance Development: Adoption of improved
requirements for new developments, which include the
mandatory use of green solutions as a determined
percentage of the overall project.
NS, NBS - Carteret County 1-2 years
Carteret Increased Funding for Preserves: The goal of this action is
to implement Low Impact Development strategies such
as wetland restoration and natural water retention
facilities to slow down erosion damages in Rachel Carson
Reserve and other areas located on the Eastern side of
the County. A comprehensive study to inform prime
locations and ideal strategies would be part of this
project.
NS, NBS,
P
- Carteret County 1-2 years
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 66
County Investment Type Maintenance Ownership/Management
Status &
Barriers
Carteret A Comprehensive Plan: Preservation of Natural
Resources: The goal of this strategy is to obtain funding
for personnel to work with the Wildlife Resources
Commission to use this toolbox, which would in turn be
instrumental in developing a comprehensive, priority-
based plan for the preservation of natural resource.
NBS, P - Carteret County 1-2 years
Table 25. HMRRP – Craven County (5.4.1.)
County Investment Type Maintenance Ownership/Management Status & Barriers
Craven Mitigation reconstruction of residential properties: Demolishing and
reconstructing elevated homes to the Design Flood Elevation (DFE =
Base Flood Elevation (BFE) +2ft) reduces the risk of flood damages
occurring from the 100-yr flood event. Reconstruct homes identified
by the county to the DFE. Anchor propane tanks that cannot be
elevated.
NS - Craven County, NC Office
of Recovery and
Resiliency (NCORR)
1-3 years
Craven Elevate residential properties: Elevating Properties to the Design
Flood Elevation (DFE = BFE +2ft) reduces the risk of flood damages
occurring from the 100-yr flood event. Elevate homes identified by
the county to the DFE. Anchor propane tanks that cannot be
elevated.
NS - Craven County, NCORR 1-3 years
Craven Develop emergency shelter in Dover: Construct a new shelter on an
elevated pad on the parking lot of the existing community center
site. After the shelter is constructed, demolish the community
center, which is outdated and decrepit, and convert that part of the
site to a parking lot that is elevated out of the floodplain.
S, NS - Craven County (Town of
Dover)
1-3 years
Craven Acquire residential properties, particularly in and around
Vanceboro.
NS - Craven County (Town of
Vanceboro), NCORR
1-3 years
Craven Develop a citizen emergency preparedness guidebook: prepare a
guidebook for citizens that explains best practices for being self-
sufficient for up to 72 hours after a significant storm event. The
guidebook should identify what should be included in an
emergency kit, including food, water, and supplies, and where it
NS - Craven County 1 year
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 67
County Investment Type Maintenance Ownership/Management Status & Barriers
should be stored. It should also address preparedness for pet
owners, parents with babies, and people with functional needs.
Craven Complete floodproofing of Mills Country Store: Mills County Store is
an information hub for this part of the county and was flooded
during Hurricane Matthew. Construct a berm/bulkhead around the
store to protect it from flooding. Elevate utilities to the BFE + 2 feet
wherever possible, otherwise elevate utilities as high as possible.
Elevate shelves above the BFE and/or construct platforms that can
be raised and lowered using pulleys suspended from the ceiling.
Develop a storm preparedness plan, which will include strategies
for storing hard and electronic copies of critical records at a
floodproof location and/or on the cloud.
NS, P - Craven County (Town of
Vanceboro)
1-3 years
Craven Complete floodproofing of A&J Canvas: A&J Canvas serves the
boating industry and was flooded during Hurricane Matthew.
Construct a berm/bulkhead around the store to protect it from
flooding. Elevate utilities to the BFE + 2 feet wherever possible,
otherwise elevate utilities as high as possible. Elevate shelves above
the BFE and/or construct platforms that can be raised and lowered
using pulleys suspended from the ceiling. Develop a storm
preparedness plan, which will include strategies for storing hard
and electronic copies of critical records at a floodproof location
and/or on the Cloud.
NS, P - Craven County (Town of
Vanceboro)
1-3 years
Craven Adams Creek Rd: Portions of the roadway that are below the 100-
year flood elevation should be raised above this level. Drainage
ditches should be cleared and maintained. Culverts should be
upsized to accommodate 100-year flood flows.
S - Craven County (Town of
Havelock)
1-3 years
Craven Weyerhaeuser Road Near River Road and Elevated Train Tracks: A
hydrologic and hydraulic (H&H) Study should be completed as part
of the project to ensure that removing the bridges, which act as
bottlenecks to Swift Creek, will not adversely impact downstream
areas such as New Bern.
S, P - Craven County (Town of
Vanceboro)
1-3 years
Craven Emergency Shelter Retrofits: Design and construct upgrades to
shelters as recommended in the study; some upgrades might
include but are not limited to installing roof straps and ties, adding
fasteners, anchoring rooftop equipment, replacing the roof,
installing hurricane shutters, and replacing windows and doors.
NS - Craven County 1-2 years
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 68
County Investment Type Maintenance Ownership/Management Status & Barriers
Craven Generators: Identify which critical facilities require generators,
particularly well pumps, communications towers, and emergency
shelters. Determine power needs for generator sizing. Procure and
install an appropriately sized generator, fuel tank, and fuel pump at
each location. Include an alternate power source such as a solar
panel and/or backup battery. Establish and implement a regular
testing and maintenance program.
NS - Craven County 1-2 years
Craven Town of River Bend Water and Wastewater Treatment Plant
(WWTP): install backflow preventers to stop tidal surge backflows
into the pipes. Elevate utilities, computers, and other sensitive
equipment out of the floodplain to protect wastewater system
assets. Ensure system pumps have backup generators with
sustainable fuel sources such as solar panels/batteries.
S, NS - Craven County (Town of
River Bend)
1-3 years
Craven Fuel depot for emergency services (ES): When flooding to the west,
such as what occurred during Hurricane Matthew, cuts off access to
the county, additional fuel cannot be trucked in, and the county’s
ES Dept. runs out of fuel. Construct a fuel depot that has sufficient
capacity for a 10-day supply of fuel for ES vehicles.
NS - Craven County, Craven
County ES Dept.
3 years
Craven Jack Smith Creek area/Duffyfield Canal: The City of New Bern
undertook a hazard mitigation project to alleviate some of the
flooding in the area. However, the area still floods. Complete
additional studies to determine how Craven County can augment
the City of New Bern’s wetland mitigation project near Jack Smith
Creek to further alleviate flooding in the area. Evaluate the
sufficiency of the pipe sizes along the Duffyfield Canal. Implement
the measures recommended by the study, such as increasing
wetland area and increasing the pipe sizes along the canal.
S, NBS, P - Craven County (City of
New Bern)
1-2 years
Craven Microgrid: Overall, backup, supplemental, and redundant power is
needed to create better energy assurance post-disaster and to
make sure that critical facilities have sufficient power to maintain
operations. Determine if critical facilities could be connected to a
microgrid. Coordinate with power companies on the status of
power feeds. Design and construct a microgrid to accommodate
critical facilities identified for connection.
NS - Craven County 1-3 years
Craven Alternate fuel sources for redundant power: Many backup
generators could not be refueled because they were inaccessible
due to road flooding. Identify sustainable sources such as solar
NS - Craven County 1-2 years
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 69
County Investment Type Maintenance Ownership/Management Status & Barriers
panels for power generation and evaluate feasibility of use for
generators, communications towers, and well pumps. Procure and
install renewable backup power source to generators.
Craven Flood Barrier at 411 Craven Street: The subterranean level of 411
Craven Street, where the Emergency Operations Center is housed,
can flood and experienced minor flooding during Hurricane
Matthew. Install automatic flip-up flood barriers with uninterrupted
power supply and manual backups in the sidewalk in front of the
entrances to this level to seal the building against flooding.
S - Craven County 1-2 years
Craven West Craven High School: The school floods. It was flooded by
Hurricane Matthew and closed for one week. Construct a
berm/bulkhead around the school campus to protect the facilities.
Elevate the utilities above the BFE + 2 feet wherever possible.
Otherwise, elevate utilities as high as possible.
S, NS - Craven County (Town of
Vanceboro)
1-2 years
Craven Stream Gauges- Weyerhaeuser Rd, Maple Cypress Rd: Existing
stream gages in Craven County do not predict river crest heights or
timing. Install predictive river gages at river crossings on Swift Creek
at the Weyerhaeuser Road crossing and the Neuse River at the
Maple Cypress Road crossing and tie them to the county's Code Red
warning system.
NS - Craven County (Town of
Vanceboro, Town of
Grifton)
1-3 years
Craven Vanceboro: An area bounded by Streets Ferry Rd., River Rd., Bear
Hole Rd., and Piney Neck Rd. gets cut off due to flooding. Parts of it
flooded during Hurricane Matthew. Conduct an H&H study to
identify effective ways of redirecting flows away from the area
and/or directing the flows to facilities that can convey them away
from the area. Construct the measures that are found to be
effective. Likely projects include road and culvert improvements
and the construction of bioswales, wetlands, and rain gardens.
S, NBS, P - Craven County (Town of
Vanceboro)
2-4 years
Craven Crop buying facility, local farms: The one crop buying location in the
county, which is in Vanceboro, becomes inaccessible to farmers and
distributors due to flooding of access roads. Farmers are not able to
take harvested crops to the storage facility, and the storage facility
is not able to get stored crops out to distributors. Elevate access
roads leading to the facility out of the 100-year floodplain. Identify a
location outside of the Special Flood Hazard Area (SFHA) where an
alternate facility could be constructed and construct an alternate
NS, P - Craven County (Town of
Vanceboro)
1-3 years
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 70
County Investment Type Maintenance Ownership/Management Status & Barriers
facility. Determine the feasibility of constructing on-site storage at
farms and construct facilities at feasible locations.
Craven Animal Services Craven/Pamlico: Facility has backup generator but
cannot be refueled if road access is cut off due to flooding. While
access was not affected by Hurricane Matthew, it has been affected
by other hurricanes and severe storms. The road in front of the
facility needs to be elevated out of the 100-year floodplain and/or
the culverts need to be upsized to handle 100-year flood flows.
S, NS - Craven County (City of
New Bern), NC
Department of
Transportation (NCDOT)
-
Craven Belangia Rd: The road floods and cuts off the community. Portions
of the road need to be elevated out of the 100-year floodplain, and
culverts should be upsized to handle the flood flows.
S, NS - Craven County (Town of
Havelock), NCDOT
1-3 years
Craven Fire Dept. on Belangia Rd: The fire Dept. cannot respond to
emergencies because the road floods and cuts off access to the fire
station. This area flooded during Hurricane Matthew. Need to
elevate the roadway at the intersection of Adams Creek Rd. and
Belangia Rd. out of the 100-year floodplain and/or enlarge the
culverts to facilitate drainage of the area so that the fire station
remains accessible.
S, NS - Craven County (Town of
Havelock), NCDOT
1-3 years
Craven Broad Creek Rd: This road is the only means of ingress and egress to
Fairfield Harbour. A ¾-mile stretch floods frequently during severe
storms and cuts off access to the community, which is primarily
retirees. Elevate the stretch of roadway above the 100-year
floodplain and upsize culverts to handle the flood flows.
S, NS - Craven County (City of
New Bern), NCDOT
3-5 years
Craven New Liberty Rd: When Route 70 was improved, New Liberty Rd. was
cut in half and turned into cul-de-sacs. When New Liberty Rd. floods
during hurricanes, access for people in this area is cut off. Elevate
the roadway out of the floodplain and upsize culverts to handle the
flood flows.
S, NS - Craven County (City of
New Bern), NCDOT
1-3 years
Craven Route 55 at Core Creek: Core Creek floods across Route 55, which is
a major thoroughfare across the county. This area flooded during
Matthew. Elevate this portion of the roadway above the 100-year
flood elevation. Upsize culverts to handle the flood flows.
S, NS - Craven County (Town of
Dover), NCDOT
1-3 years
Craven Jeremy Street/Justin Street: Jeremy Street/Justin Street floods
frequently, including after hurricanes, isolating the residents along
S, NS - Craven County (Cove
City), NCDOT
1-3 years
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 71
County Investment Type Maintenance Ownership/Management Status & Barriers
the road. Elevate the road out of the floodplain. Upsize culverts to
handle flood flows.
Craven River Rd. from Streets Ferry Rd. to State Camp Rd: Flooded during
Hurricane Matthew. Floods frequently, sometimes due to significant
rain/hurricane events, sometimes due to seepage. Residents say
that flooding has become more frequent since construction of the
canal. Elevate roadway out of the 100-year floodplain and upsize
culverts to handle flood flows.
S, NS - Craven County (Town of
Vanceboro), NCDOT
1-3 years
Craven Wintergreen Rd. at Mills Branch: Mills Branch floods Wintergreen
Road and cuts off access to part of the community. Elevate the road
out of the 100-year floodplain. Upsize culverts to handle the flood
flows.
S, NS - Craven County (Cove
City), NCDOT
1-3 years
Craven WTP on Lewis Farm Rd: The facility is located on the edge of the
100-year floodplain. While it remained accessible during Hurricane
Matthew, flood waters during other hurricanes and severe storms
have inundated the roadway and cut off access to the plant. Need to
ensure access, sufficient backup power capabilities to keep the
plant running, as it is a major source of potable water for the
county. Upsize culverts to ensure they can handle 100-year flood
flows. Provide a backup generator with an alternative fuel source
such as a solar panel with battery.
S, NS - Craven County (City of
New Bern), NCDOT
1-3 years
Craven Shoreline Dr: When the canal overflows due to inundation from
severe rainstorms such as Hurricanes Matthew and Irene, Shoreline
Drive floods, isolating about 80 percent of the community, as
Shoreline Drive is the primary means of ingress/egress for the
community. Construct a road above the 100-year floodplain that
connects Old Pollocksville Road and the west end of Plantation
Drive to provide another means of access to the community.
NS - Craven County (Town of
River Bend), NCDOT
2-4 years
Craven Town of River Bend drainage swales (Esp. Channel Dr): Drainage
swales and ditches overflowed during Hurricane Mathew,
inundating private property. The drainage swales and ditches
should be regarded/reconstructed to direct water away from
private property into the stormwater conveyance system.
S - Craven County (Town of
River Bend)
2-4 years
Craven Cherry Branch-Minnesott Beach Ferry Terminal: The ferry terminal
at Cherry Point needs to be resilient to elevated water levels so that
it can remain open. Reconfigure the docks to allow the ramps to
NS - Craven County (Town of
Minnesott Beach)
3-5 years
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 72
County Investment Type Maintenance Ownership/Management Status & Barriers
extend sufficiently during times of high water such that the ramp
angle between the ferry and the dock accommodates vehicle entry
and exit.
Craven Animal rescue and distribution facility at Fairgrounds (Route 70
near Audrey Lane): Large animals are evacuated to this location
during emergencies. Flooding of Route 70 can cut off access during
hurricanes and severe storms. Need to ensure access along Route
70 is not cut off by elevating the roadway between Audrey Lane and
Taberna Way above the 100-year floodplain and/or upsizing culverts
to handle the flood flows.
S, NS - Craven Count (City of New
Bern)
1-3 years
Craven Hog waste lagoons near Quinn Rd., Craven Farms Rd., and Neuse
Farms: Several hog farms are in or within 100 feet of the SFHA. The
waste lagoons on these farms have been inundated by flood waters
and could become breached, releasing their contents into the
Neuse River. One of the lagoons was inundated during Hurricane
Matthew. This contamination would affect residents and businesses
downstream, including those in New Bern. Buyout lagoon operating
permits if feasible and if farmers are willing to sell. Otherwise, cover
lagoons to prevent water from accumulating in the lagoons and/or
pump lagoon contents to slurry holding tanks.
NS - Craven County (Town of
Cove City, Town of
Vanceboro)
1-3 years
Table 26. HMRRP – Franklin County (5.4.1.)
County Investment Type Maintenance Ownership/Management Status & Barriers
Franklin Mitigate Public Facilities Against Future Damages: This action involves work on two different
county buildings located in Louisburg adjacent to the Tar River (1) Repair or replace the
drainage system between buildings housing the County Administrative Offices and flood
proof lower-level walls (2) Relocate electrical service panels from the basement and flood
proof the basement of the Planning and Inspections building.
S, NS - Franklin County 1 year
Franklin Mitigate Public Utility Infrastructure Against Future Damages: The Youngsville Pump Station,
South Nassau Pump Station, and Franklinton Pump Station overflowed during Hurricane
Matthew due to excessive stormwater infiltration overwhelming pump station capacity. This
action will repair infiltration issues to restore pump station capacity and their ability to
operate as designed during storm events.
S - Franklin County (Town of
Youngsville)
2 years
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 73
County Investment Type Maintenance Ownership/Management Status & Barriers
Franklin Install/Improve Flood Warning System: Franklin County currently has one gage active in the
Flood Inundation Mapping and Alert Network (FIMAN) system. Installation of additional
gages will better prepare the County during flood events and help protect lives by
monitoring flood hazards real-time. Four locations have been identified. These locations will
monitor flooding sources within the county upstream of populated and commonly flooded
areas providing a good understanding of timing of flooding throughout the county during an
event.
NS - Franklin County 1-2 years
Franklin Emergency Generators for Critical Facilities: Franklin County currently has one 75KW mobile
generator to power critical facilities during emergency situations. The county has identified
the need for four additional 150KW generators to power the following facilities: Franklin
County Emergency Shelter, Franklin County Administration Building, Franklin County
Emergency Operations Center, Franklin County Senior Center.
NS - Franklin County 1-2 years
Table 27. HMRRP – Greene County (5.4.1.)
County Investment Type Maintenance Ownership/Management Status & Barriers
Greene Backup Generators: Install backup generators at pump stations and government facilities to
limit service disruptions during power loss. Four back-up generators are needed in Hookerton
for the three lift stations and for the water tower. One 150kw generator needed in Snow Hill for
an additional well site. Five 75kw generators needed for sewer pump stations in Snow Hill.
Other backup generators may be needed in the county.
NS - Greene County 1 year
Greene Relocate Generator for Greene County Courthouse: Relocate generator at the Greene County
Courthouse: The Greene County ES needs the 175 KVW generator at the Greene County
Courthouse moved to higher ground, in Hurricane Matthew the flood waters were about two
inches from breaching the generator. If a breach had occurred, Greene County would have lost
all emergency communications for fire/emergency medical services (EMS), 911 communication
center, Sheriff/Highway Patrol, justice center, clerk of court, Register of Deeds, and the
detention center which houses about 75 inmates. This generator is the lifeline for ES in the
county. Neighboring counties rent jail space from Greene County.
NS - Greene County 0-12 Months
Greene Implement Flood Warning System on Contentnea Creek: Implement Flood Warning System on
Contentnea Creek. Three additional flood monitoring/warning stations are needed.
NS - Greene County 1 year
Greene Develop Blueway Plan for Contentnea Creek: This project would fund development of a
Blueway Plan for Contentnea Creek to identify needed infrastructure and improvements to the
creek for recreation. These improvements would support canoeing and kayaking between
P, NS,
NBS,
S
- Greene County 5-10 years
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 74
County Investment Type Maintenance Ownership/Management Status & Barriers
Snow Hill and Hookerton, providing recreation and economic benefits. This project has the
potential to help reduce flooding by the development of greenways and assisting with the
long-term maintenance of the Contentnea Creek and the clearing of debris that contributes to
flooding.
Greene Create Stormwater Management Plans for Hookerton and Snow Hill. P - Greene County (Hookerton,
Snow Hill)
1-2 years
Greene Sewer Line Elevation and Pedestrian Bridge: Pedestrian bridge over Contentnea Creek near 4th
Street to connect to the park facilities and campground on the north side of Contentnea Creek.
In addition, this will provide an opportunity to elevate the sewer line that runs from the south
side of Contentnea Creek to the wastewater treatment plant on the north side of Contentnea
Creek. The elevation of the wastewater pipe will help prevent future damage to the wastewater
pipe during flooding events.
NS - Greene County 5-10 years
Greene Stormwater Retrofits: Implement stormwater retrofits such as larger culverts to address
roadway flooding.
S - Greene County (Hookerton) 1-2 years
Greene Harden Hookerton Wastewater Treatment Plant: This project would provide funding to harden
the Hookerton Wastewater Treatment Plant to prevent sewage spills during future flood
events. Following Hurricane Matthew, representatives from the Federal Emergency
Management Agency (FEMA) recommended that the three berms for the three lagoons be
armored. Action items required for this project is an engineering study on the technical
approach and design and construction.
NS, P - Greene County (Hookerton) 1-2 years
Greene Expand capacity/holding space of the Greene County Animal Control: Following Hurricane
Matthew, the Animal Control was responsible for rescuing domesticated animals that were
impacted by the flooding. They have limited shelter space/kennels that are available for
evacuated animals. This project would help address that situation by providing them with
additional kennels and space to operate from.
NS - Greene County 2-3 years
Greene Repair damaged storm water infrastructure throughout the county. Coordination with NCDOT
to determine their plans will be needed.
S - Greene County, NCDOT 2-5 years
Greene Greenways in Hookerton. This project would construct several proposed greenways in the
Town of Hookerton, including near the historic cemetery, near the Hookerton Town Park, and
along Contentnea Creek. Key steps in this project would be to conduct a feasibility study,
develop final designs, and construct the project.
NS,
NBS,
P
- Greene County (Hookerton) 5-10 years
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 75
County Investment Type Maintenance Ownership/Management Status & Barriers
Greene Transportation Infrastructure Assessment: This project would provide funding for the county to
assess roadways that were flooded during Hurricane Matthew to determine if elevating
roadways or stormwater improvement projects are needed.
P - Greene County 1 year
Greene Assess expansion of sewer service to encourage development outside of floodplain. This
project would identify land area to expand sewer service to, which would assist in the
development of land for residences and businesses outside of the floodplain.
NS,P - Greene County 1-2 years
Greene Stream and Drainage Clean Up: Partner with the NC Dept. of Agriculture and Consumer
Services (NCDACS) Division of Soil and Water Conservation District’s (SWCD’s) Stream Debris
Removal Project to remove storm debris blocking streams and drainage systems. This project
would involve collaboration with statewide Big Sweep cleanup to remove debris, provide
funding for necessary tools and equipment.
S - Greene County, NCDA&CS
SWCD's Stream Debris
Removal Project
1 year
Greene Expand Beaver Management Program: Currently Greene County only funds a part-time
employee for beaver management and this project would expand this to a full-time employee
dedicated to beaver management.
NS - Greene County 2 years
Greene Parks, Open Space, and Rural Lands System Plan: This project would provide funding to
develop and open space plan to create a county-wide plan for developing parks/recreation
facilities. The plan would include a study to identify and select strategic properties for reuse as
public spaces, parks, passive recreational areas, and community gardens, as well as identify
rural lands in need of protection. The project would also establish funds to create parks and
recreation facilities. Planned open spaces will provide recreational opportunities as well as
preserve natural and beneficial functions of floodplains which will alleviate flooding from
future storms like Hurricane Matthew.
NS,
NBS,
P
- Greene County 2-3 years
Greene Implement Riparian Buffers: This project would provide funding for the county to implement
riparian buffers along waterways. Riparian buffers improve water quality by filtering runoff and
nutrients and provide a larger buffer for flooding.
NBS - Greene County 5-10 years
Greene Turn Swine Lagoon Waste into Methane Gas: This project would work with local hog farmers to
design anaerobic bio-digesters that create biogas from hog waste, which is 65 percent
methane. The gas would be pumped to a centralized facility, where it will be upgraded to
pipeline quality. The carbon-neutral gas (compared to non-captured lagoon emissions) will
then flow into a major gas pipeline feeding into an energy utility company that would operate a
combined-cycle power plant. It will help create jobs clean energy and reduce impacts from
flooding of swine operations.
NS - Greene County 2-3 years
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 76
Table 28. HMRRP – Johnston County (5.4.1.)
County Investment Type Maintenance Ownership/Management Status & Barriers
Johnston Acquisition/Mitigation Reconstruction/Elevation of Damaged Homes: Approximately 53
affected property owners have expressed interest in participating in acquisition (42),
mitigation reconstruction (2), and elevation activities (9).
NS - Johnston County 1-3 years (varies
among mitigation
type)
Johnston Emergency Response Shelter/Coordination Facility Construction: (1) Johnston County
proposes to purchase land and construct an easily accessible centrally located large-scale
dedicated shelter facility that also serves as a warehouse that could be used for storage and
a shelter during emergencies such as hurricanes. The facility would include bays for trailers
so stored supplies can be easily deployed to serve evacuees in transit or for other shelter
locations, as well as meeting space that could be used for remote emergency operations
and coordination as needed by coastal county officials during an evacuation. A facility of this
nature located in the I-40/I-95 crossroads area would also be beneficial for NC Emergency
Management (NCEM) and other disaster response agencies for staging or other coordination
(2) The Town of Benson proposes to designate an Emergency Shelter for our community
where we can offer food, water, and a safe place to ride out the storm. Currently the
generator at the Town Hall is undersized and has been used as the standby generator. To
provide emergency shelter, the town will need to purchase a commercial backup generator
(3) Johnston County also proposes to purchase two 175-watt generators for existing school
shelters.
NS - Johnston County 2-3 years
Johnston Agriculture Recovery Grant Project Technical Assistance: Following Hurricane Matthew, the
NC General Assembly allocated funding for agriculture industry to assist with repairs to farm
ponds, roads, etc. The state agency overseeing these funds requires that Natural Resources
Conservation Service (NRCS) standards be met to be eligible to receive the funds; however,
NRCS does not have enough staff to assist farmers in proper design of projects, so the
farmers are not getting the assistance they so desperately need. Rather than continuing to
wait for NRCS assistance, enlist contracted engineering support to assist 30 farmers with
developing NRCS-compliant projects so they may access the available funding.
NS, P - - Less than 1 year
Johnston Johnston County Public Utilities Mitigation: (1) Raise the flood protection dike and access
road at the Central Johnston County Regional Wastewater Treatment Facility. Conduct a
hydrologic and hydraulic study to determine adequate flood level to base future design on
for raising the dike at the Water and Wastewater Treatment Plants (WWTP) (2) Relocate the
Southeast Lowgrounds Water Booster Station (3) Relocate the electrical service for the raw
water pumps at the Johnston County Water Treatment Plant (4) Add additional stormwater
controls at various wastewater pump stations to prevent future flooding from rain waters (5)
Implement water main relocations where existing water mains cross over culverts in the
right-of-way at creek crossing that are being replaced by NCDOT after Matthew (6) Raise the
control building at Selma Equalization and wastewater pump station (7) Re-locate the
Buffalo Creek Wastewater Pump Station (8) Implement improvements to the Four Oaks
S, NS - Johnston County 1-5 years
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 77
County Investment Type Maintenance Ownership/Management Status & Barriers
water system to mitigate damaged lines and equipment. Potential water quality issues may
impact residential and business customers in the town.
Johnston Town of Smithfield Public Utility Mitigation: (1) Spring Branch Stormwater improvement
project to increase capacity and properly handle flow in this area (2) Create a
Comprehensive Stormwater Action Plan and Stormwater Implementation Plan, include
inspection of drainage ponds to identify maintenance needs (3) Water Plant: “Harden” the
barrier around the raw water pump chamber at the reservoir; Raise the electric panels at the
reservoir; Install a lid at the water inlet vault on the southwest of the plant; Elevate the step-
down transformer in the generator building at the reservoir; Elevate the switch gear in the
generator building at the reservoir; Elevate the diesel fuel day tank in the generator building
at the reservoir; Small boat with 5-hp motor is needed to access areas during inundation to
keep system online (4) Collection System: Elevate panels, controls, fuel tank and generator
at Lift Station #1; Elevate panels, controls and generator at Lift Station #7; Elevate panels,
controls and generator at Lift Station #2; Elevate panels, controls and generator at Lift
Station #18; Generator at Lift station #5; Winches (2) installed on town vehicles/trucks.
S, NS,
P
- Johnston County (Town of
Smithfield)
1-3 years
Johnston Town of Benson Public Utility Mitigation: (1) Public Works building relocation: This proposed
project (potential new location is at 525 Market St in Benson) will purchase the property and
to complete the rehab work needed to the building so that it can provide garage space for
trucks and vehicles, equipment storage, as well as a heated office and restroom space. The
old Public Works property will be demolished and maintained as open space in perpetuity
(2) Elevate and replace/resurface entrance roadway to the damaged Benson Wastewater
Treatment Facility. The flooding from Hurricane Matthew had caused the asphalt to lift and
get carried away. Repairs will add eight inches of reinforced concrete with rebar in the
affected areas affected, and additional damaged roadway areas will add eight inches of
compacted bedrock and concrete to prevent further erosion (3) Complete a Comprehensive
Stormwater Drainage study to detail where there is a need for replacement/improvement
because of Hurricane Matthew and estimate costs for feasible projects. This is needed so
that repairs consider the entire system rather than only fixing parts and inadvertently
creating other issues (4) Elevate the Benson I-40 Lift Station and replace the generator (5)
Repair damaged culvert areas where flooding caused sinkholes and culvert failures (6)
Construct a dike around WWTP to capture overflow water in the event of another hurricane
and flooding (7) Install a cap on the storm drain lines to prevent flood from the creek
backing up into the WWTP
S, NS,
P
- Johnston County (Town of
Benson)
6 months to 3
years
Johnston Kenly Stormwater Drainage Improvements: (1) Replace tile at 407 S Alford – tile has a hole in
it and collapsed (2) Ditch and tile problem by railroad @ Ethco requires replacement of tile
under parking lot (3) Restore ditches, remove vegetative debris and repair/replace tile: First
St @ Darden; Rose Lane @ Oakmont; Entrance to K Park on Princeton/Kenly Road; N Maple
@ Third St and Fourth St; Ditch at Chevy Dealership on Seventh St – coordinate with Wilson
County at the shared county line area; Dogwood; Ditch behind Rose St houses; Goldsboro to
Chelsea; Fourth St @ Branch.
S - Johnston County (Town of
Kenly)
1 year
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 78
County Investment Type Maintenance Ownership/Management Status & Barriers
Johnston Power supply switch upgrade/obtain generators: (1) The Buffalo Road Delivery Point in
Smithfield needs interconnecting wires and switches so if one delivery feed goes out then
could switch the whole town to the other source temporarily. Purchase 10 pad-mounted
step-down transformers to be placed at strategic points in the Town system and conduct
extensive electrical wiring conversion done at both substation/delivery points (2) The Town
of Benson’s electric switchover box is located near Public Works which experienced flood
damage during Hurricane Matthew. The switchover must be elevated to prevent future
damage and loss of power during flood events (3) Purchase mobile generators and complete
electrical conversions at critical intersections that need equipment converted to add a
switch so can power by generator.
NS - Johnston County (Town of
Benson)
6 months to 1
year
Johnston Purchase Critical Emergency Response Equipment for Johnston County: (1) Install new
barricades and signage for the CSX railroad crossing in downtown Smithfield that can be
deployed wirelessly (2) Purchase barricades and emergency signage/equipment for road
closures for Johnston County ES, Town of Smithfield and Town of Benson (3) Purchase
equipment for Town of Smithfield to use in ditch maintenance that also could assist during
emergencies as well as preparedness activities such as: A 60HP 15,000lb. mini excavator to
help in tight areas such as blue-line ditches; 20ft heavy duty equipment trailer to transport
equipment; Winches for trucks (17,500lb) waterproof wireless to remove large obstructions
from culverts etc.; Large pull behind diesel trash water pumps 30HP or higher. (Minimum
1,000 gallons per minute); Jumping jacks and plate tamps for erosion control; Erosion
control fabrics and mattings; Safety equipment (e.g., trench box, gloves, ladders, ropes,
safety glasses, traffic cones).
S, NS - Johnston County (Towns of
Benson and Smithfield)
6 months to 1
year
Johnston Natural Gas Storage Facility Pump Replacement and Switch Elevation: purchase and install
a submersible pump for the site to remove rainwater, as well as elevating the electrical
switch panel to protect the components from rising water.
NS - Johnston County 6 months to 1
year
Johnston Create Johnston County ES Building/Emergency Operations Center (EOC): create a
dedicated Johnston County ES facility away from the courthouse complex with state-of-the-
art EOC space for the county, secure/hardened server storage, staff offices, and bay access
for ES vehicles and equipment. This centralized location will allow the county to deploy
resources and mange response more efficiently for all types of emergency situations.
NS - Johnston County 1-3 years
Johnston Improve Johnston County Flood Hazard Data with mapping and gages: (1) Coordinate with
USGS to install permanent river gauges on: Little River at Rains Crossroads Road in Selma;
Hannah Creek; Middle Creek; Swift Creek (2) Need detailed flood hazard study and credible
regulatory data for: Buffalo Creek and Moccasin Swamp in Smithfield; Hannah Creek in
unincorporated Johnston County; Swift Creek Watershed; Middle Creek watershed; Town of
Benson Highway 301 Corridor from J-Lee Rd to Hale St.
P, NS - - 1-5 years
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 79
County Investment Type Maintenance Ownership/Management Status & Barriers
Johnston Johnston County Stream Restoration/ Debris Removal: remove large vegetative debris from
these waterways and remove silt to restore the channel to its proper depth and allow proper
flow. This effort will restore natural floodplain functions and protect water adjacent areas
and infrastructure.
S,
NBS
- Johnston County 1-3 years
Johnston Smithfield Greenway Stabilization/Repair: repair the Hurricane Matthew damage on the
Smithfield Greenway and restore functionality as soon as possible, particularly in the area
just south of Hwy 70 where bank has eroded and exposed a county sewer line.
S - Johnston County (Town of
Smithfield)
6 months to 1
year
Table 29. HMRRP – Jones County (5.4.1.)
County Investment Type Maintenance Ownership/Management
Status &
Barriers
Jones Acquisition of approximately 17 flood prone residential properties clustered in
several flood prone areas of the county.
NS - Jones County, NC Office of
Recovery and Resiliency
(NCORR)
3 years
Jones Elevation of three flood prone residential structures. NS - Jones County, NCORR 3 years
Jones Increase GIS Capacity and Capability for Emergency Response and Damage
Assessment Functions through ARC GIS Training for Three Jones County Staff.
Redundancy staff resources with GIS capability can use flood forecasting
information to coordinate response & recovery efforts inc. damage assessment.
P - Jones County 1 year
Jones Create an outreach program on private road and “lane” maintenance for
property owners emphasizing maintenance responsibilities, culvert sizing and
replacement, grading, ditch maintenance, use of stone, etc. disperse
information through appropriate multi-media measures. Potentially sponsor
"field day" demonstrations of proper road maintenance methods.
NS - Jones County 1-2 years
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 80
County Investment Type Maintenance Ownership/Management
Status &
Barriers
Jones Development of insurance education materials to provide property owners and
renters with accurate knowledge on available insurance coverage. Confusion
persists on how insurance works especially hazard insurance for coverage of
flood or wind damage. Many property owners without mortgages or those
outside of the regulated floodplain are unaware that flood insurance is
available to them often at a very low premium. Renters are generally unaware
that insurance is available to cover their contents. This includes non-residential
renters who can replace business goods and furnishings fixtures and
equipment damaged by floods if insured. Materials customized to eastern NC
hazards to include flood, fire, wind, land subsidence and other hazards is
necessary along with standard messaging which can be deployed on local
websites, through social media and in local preparedness workshops and
events.
NS - Jones County 2 years
Jones Acquisition of one non-residential structure. NS - Jones County (Pink Hill),
NCORR
3 years
Jones Working with the NC Forest Service and NCSU, develop an economic bio-mass
production program to create a sustainable income stream for private forest
landowners. Farmers who own forest land or agricultural land which could be
converted to biofuel production have experienced several recent consecutive
low yield harvest years due to weather and market factors compounded by
Hurricane Mathew losses, in some cases catastrophic. Creation of alternative
crops which are eco-friendly and would provide a sustainable income stream
would steady the county's rural economic base and maintain the rural
character of the landscape. Could reduce agricultural erosion on abandoned
lands (reducing flood risk) and improve wildlife habitat.
NS,
NBS
- Jones County, NC Forest
Service, NCSU
5 years
Jones Debris Removal and Stream maintenance: post-Hurricane Mathew the county
received $300,000 of the requested $500,000 for stream and drainage debris
removal and drainage improvements. The funds were likely provided through
the USDA Natural Resources Conservation Service (NRCS) Disaster Emergency
Watershed Protection Program, but a $200,000 funding gap remains in the
tributaries to the Trent River.
S - Jones County 1 year
Jones Support consolidation of three Town of Trenton-area county schools into a
combined K-12 facility: Two essential county schools located in the county seat
of Trenton, are accessed via Weber Street (Rt. 41) which floods preventing
ingress and egress posing a risk to students, teachers, and staff. A new,
consolidated school is planned outside of the 1 % and 0.2% regulated
floodplain adjacent to the present high school in an area where road access will
not be threatened by high waters. The new school has been designed and
Jones County is awaiting comment from the NC Dept. of Public Instruction as
well as approval from the Local Government Commission on the proposed
NS, P - Jones County (Trenton) 3 years once
design and
financing are
approved
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 81
County Investment Type Maintenance Ownership/Management
Status &
Barriers
bond funding plan. This project would add wiring and a permanent generator
to allow the school complex to perform during periods of emergency as the
county's primary emergency shelter and provide other disaster response and
recovery services operating on redundant power.
Jones High water warning signage along priority flood prone highways and roads:
County roads are becoming even more prone to flooding posing a high risk to
residents and "pass-through" travelers. Warning signs displaying flood depths
or warning messages are viewed as an effective deterrent to drivers entering
flood impacted road.
NS - Jones County 2 years
Jones Road Drainage Enhancement: Low lying roads throughout the county isolate
settlement areas in this rural community preventing access by first responders
during medical emergencies, structure fires, floods, and coastal storms. Risk of
vehicular accidents and even fatalities is high and requests for aid strains
limited volunteer first responders. This is a pervasive issue throughout eastern
NC and would require state NCDOT financial and technical resources
coordinated with local Department of Transportation (DOT) staff. Priority areas
require technical evaluation by a transportation engineer and in some cases a
hydrologist, development and design of a preferred solution, and
implementation and maintenance. Some areas will require proper sizing and
replacement of culverts, others drainage ditch maintenance, road elevation
and bridge elevation.
S - Jones County, NCDOT 5 years
Jones Flood Forecasting Technical Enhancement: The county has access to real-time
flood gage data but does not have flood forecasting technical expertise to
predict flood levels throughout the county to appropriately evacuate citizens at
risk, deploy resources and respond safely. This project is intended to provide
technical training to at least three county employees so that redundant
technical skills are available during emergencies to analyze real-time flood data
to advise emergency response and deployment of resources.
P - Jones County 6 months
Jones Enhance non-state-maintained road drainage in priority high-water areas
which impedes public safety-first responders requiring emergency swift water
rescues. Many rural "lanes" and access roads are not state, or county
maintained and are included in property deeds. Many lead to single residences
or clusters of homes which become isolated during floods and coastal events,
impeding access by public safety-first responders during medical emergencies
and structure fires. Improved drainage could mean mitigation of culverts, ditch
expansion and maintenance, etc. State created "best management practices"
are needed for local landowners, many of whom have equipment and could
better maintain their roads and lanes with technical support. This project
would support rural road maintenance materials which could be available
online, and potentially a field demonstration day.
S - Jones County -
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 82
County Investment Type Maintenance Ownership/Management
Status &
Barriers
Jones Relocate Jones County Courthouse Basement Magistrate's Office and Jail to
higher, safer level of the building or alternate facility. The multi-story County
Courthouse is located less than two blocks from the Brock Pond dam and old
mill pond. The structure failed during Hurricane Floyd, flooding vast areas of
the Town of Trenton, including the courthouse and municipal building which
houses the County Commissioner's meetings and the local Soil and Water
Conservation District (SWCD) offices. The County Jail and Magistrate's Office
are in the basement of the courthouse building. The Magistrate high perishable
records and computer equipment is also located in the basement. In the short-
term, relocation of the Magistrate's Office to a higher location in the building
would be beneficial, relocation of incarceration facilities to a higher, safer
location should be considered to eliminate the need for dangerous prisoner
evacuations during periods of flood threats.
NS - Jones County (Trenton) Magistrate
relocation, short-
term; Jail
relocation long-
term
Jones Hofmann Forest (NCSU resource facility) drainage system mitigation: Drainage
has been enhanced throughout this 30,000-acre track to facilitate industrial
forestry practices conducive to southern pine silviculture. Enhanced drainage
throughout the 80,000-acre tract (30,000 acres in Jones County) creates high
flood flows and downstream negative agricultural impacts within the Trent and
White Oak River watersheds.
S - Jones County, NCSU Long-term
Table 30. HMRRP – Lenoir County (5.4.1.)
County Investment Type Maintenance
Ownership/
Management
Status &
Barriers
Lenoir Construct Housing at Sites previously prepped for Development after Hurricane Floyd:
Hurricane Matthew resulted in flooding to homes farms businesses and infrastructure in
Lenoir and adjacent counties and relocating and assisting displaced residents to areas
outside of the floodplain will address the unmet need of housing residents in resilient areas
not prone to flooding. This project will help fund a range of housing options at these sites that
have already been prepared for development. This project would assess the status of these
sites and determine the most suitable types and amount of housing for each site.
NS - Lenoir County, NC Office of
Recovery and Resiliency
(NCORR)
0-2 years
Lenoir Business Relocation Program: This project would target businesses along US 70 that were
impacted by the flood waters following Hurricane Matthew. This project would identify
suitable/comparable commercial sites for businesses to relocate. In addition, the project
would help create financial incentives that could include tax incentives, installation of
infrastructure, and assistance with relocation costs. The project could utilize the state's tax
increment financing program.
NS - Lenoir County 0-2 years
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 83
County Investment Type Maintenance
Ownership/
Management
Status &
Barriers
Lenoir Stormwater Improvements in LaGrange: Currently, there is poor drainage along Washington
Street in LaGrange, which results in high water on the road. This leads to road closures and
property damage. This project would improve stormwater control measures along this
roadway. Opportunities should also be evaluated for enhancements that would benefit
pedestrians, cyclists, and aesthetics along this gateway. This project will design and construct
mitigation measures to minimize or prevent future flooding.
S - Lenoir County (LaGrange) 2 years
Lenoir Stormwater Improvements in Kinston: Following Hurricane Matthew, the City of Kinston was
inundated with floodwater. Improving stormwater management in the city is important to
protecting infrastructure and utilities, to prevent infiltration of stormwater into the sewer
system. Projects to rectify the situation are needed throughout the city.
S - Lenoir County (Kinston) 2-3 years
Lenoir Backup generators: Back-up generators can supply power to critical facilities during power
outages. This project will purchase and install back-up generators for 31 critical facilities that
lack back-up power supplies in Lenoir County. The locations in need of back-up generators
include: ten pump stations in the Town of LaGrange, three emergency shelters (Kinston High
School, North Lenoir High School, and South Lenoir High School), and eighteen volunteer fire
Depts./EMS facilities. Note that two of the volunteer fire Depts. are in adjacent counties but
serve portions of Lenoir County (Seven Springs VFD is in Wayne County and Wyse Fork VFD is
in Jones County).
NS - Lenoir County (LaGrant,
Kinston)
1 year
Lenoir Develop Recreation Facilities on Hazard Mitigation Grant Program (HMGP) (FEMA) Properties:
Fund the development of soccer fields, campground, amphitheater, greenway trails, restore
natural wetlands, and recognize cultural heritage with markers that were previously
identified in local plans on properties that were acquired as a part of HMGP (FEMA) because of
previous storms. This project will implement these ideas by conducting a feasibility study, site
selection, cost estimates, and construction of these facilities.
NBS, P - Lenoir County 2-3 years
Lenoir Flood-proof Lenoir County Sheriff's Dept.: Flood Prevention Measures for the Lenoir County
Sheriff's Dept.: This project will evaluate ways to keep the basement of the Lenoir County
Sheriff's Office from flooding. Options for this project include hardening of the building, water
proofing, and/or evaluating methods to direct stormwater away from the building.
NS - Lenoir County 1-2 years
Lenoir Relocate Lenoir County Center for the NC Cooperative Extension: The Lenoir County Center
for the NC Cooperative Extension Office was damaged by floodwaters from Hurricane
Matthew. The staff of the Lenoir County Center has been operating out of temporary space in
Kinston until a permanent solution can be found. This project will identify a new permanent
location for the Lenoir County Center from which the NC Cooperative Extension can operate.
NS - Lenoir County, NC
Cooperative Extension
12-18 months
Lenoir Phase II of the Riverwalk: This project would construct the second phase of a greenway
project along the Neuse River in the City of Kinston. Note that final designs have been
completed for this project. Trails and greenways help improve air and water quality. By
protecting land along rivers and streams greenways prevent soil erosion and filter pollution
caused by agricultural and road runoff. Greenways also serve as natural floodplains. By
S, NBS - Lenoir County (Kinston) 1-2 years
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 84
County Investment Type Maintenance
Ownership/
Management
Status &
Barriers
restoring developed floodplains to their natural state many riverside communities are
preventing potential flood damage.
Lenoir Kinston Bypass Project: This project would construct the planned Kinston Bypass (STIP No. R-
2553), which would be constructed outside of or above flood levels so that roadway would
not have to be closed during future flooding events.
NS - Lenoir County (Kinston)
NCDOT
5-7 years
Lenoir Carey Road Extension Project: Following Hurricane Matthew, multiple roadways, including US
70 and other local roads, such as Vernon Avenue were closed due to flooding. This project
would extend Carey Road from Hull Road to US 258. This project would provide an alternative
east-west connection between Kinston and US 258.
NS - Lenoir County, NCDOT 3-5 years
Lenoir Global TransPark Rail Spur Project: Businesses that rely on the existing NC Railroad to
transport their goods were unable to do so for the several weeks that this railroad was closed
during the storm. This project would provide alternative access to Class I railroad for the
businesses in Lenoir County and the greater region during future flooding events.
NS - Lenoir County, NC Railroad 3-5 years
Lenoir Neuse River Regional Plan: Prepare a Neuse River Basin Regional Plan to identify the causes of
flooding and to identify preventive measures for flood prevention. The county recognizes that
flooding in the area has increased over the last decade and there are many causes that need
to be addressed regionally.
P - Lenoir County 5+ years
Lenoir Stream and Drainage Clean Up: Partner with the NCDACS Division of Soil and Water
Conservation District’s (SWCD’s) Stream Debris Removal Project to remove storm debris
blocking streams and drainage systems This project would involve collaboration with
statewide Big Sweep cleanup to remove debris, provide funding for necessary tools and
equipment.
S - Lenoir County 0-1 years
Lenoir Expand Beaver Management Program: Currently Lenoir County only funds a part-time
employee for beaver management and this project would expand this to a full-time employee
dedicated to beaver management.
P - Lenoir County 0-1 years
Lenoir Management Plan for HMGP (FEMA) Properties: The county currently maintains over 800 such
properties, and applications have been submitted for over 200 additional buyouts. The
county is seeking funding to complete a management plan to evaluate potential uses for
these vacant properties, particularly to further hazard mitigation for neighboring areas. The
plan would include a study to identify and select strategic properties for reuse as public
spaces, parks, passive recreational areas, and community gardens.
NS, P - Lenoir County 1 year
Lenoir Implement Riparian Buffers: This project would provide funding for the county to implement
riparian buffers and wetland restoration along waterways, including the Neuse River and
Adkins Branch. Riparian buffers improve water quality by filtering runoff and nutrients and
provide a larger buffer for flooding. This project would provide funding for a riparian buffer
plan that would identify areas along rivers and streams in Lenoir County that could be
NBS, P - Lenoir County 5-10 years
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 85
County Investment Type Maintenance
Ownership/
Management
Status &
Barriers
targeted for expanded riparian buffers. In addition, the project would provide funding to help
implement the expanded riparian buffers.
Table 31. HMRRP – Nash County (5.4.1.)
County Investment Type Maintenance Ownership/Management
Status &
Barriers
Nash Homeowners’ assistance to mitigate the impacts of flooding: This program would help
homeowners to mitigate the impacts of flooding. The program could include housing
elevation, installation of flood vents, the construction/improvement of drainage ditches, etc.
NS, S - Nash County Could be
implemented
immediately
upon being
funded.
Nash Increase crop loss reimbursement rates: This program would increase crop loss reimbursement
rates for farmers who are negatively impacted by flooding. Currently crop and livestock
agricultural losses because of hurricanes are reimbursed at 50%. This project would help
producers with revenue assistance up to 85% of county yield and 100% of county price.
NS - Nash County Could be
implemented
immediately
upon being
funded.
Nash Hazard Mitigation Provisions for Commercial Properties: This project would elevate critical
infrastructure and provide flood proofing at businesses in repetitive flood areas through
financial and other assistance.
NS - Nash County Could be
implemented
immediately
upon being
funded.
Nash Repairs/replacements of farm paths, culverts, bridges, ponds, etc.: Assist
producers/landowners with repairs/replacements of farm paths, culverts, bridges, ponds, etc.
that are not covered under the federal Emergency Conservation Program up to 75% of costs.
S - Nash County Could be
implemented
immediately
upon being
funded.
Nash Public Services and Wastewater Facility Relocation: This project would relocate or flood proof
critical public facilities out of flood prone areas and/or fund projects to flood proof these
facilities. Facilities identified include animal control operations and public safety radio tower in
Nashville, and sanitary sewer pump stations in Nashville and Rocky Mount.
NS - Nash County (Nashville and
Rocky Mount)
Could be
implemented
immediately
upon being
funded.
Nash Clearing and snagging of storm water conveyances: This program would provide funding for
clearing and snagging of larger storm water conveyances in partnership with local, state, and
federal partners.
S - Local Governments Could be
implemented
immediately
upon being
funded.
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 86
County Investment Type Maintenance Ownership/Management
Status &
Barriers
Nash Install generators and transfer switches at emergency shelters: Purchase and install generators
and transfer switches for emergency shelters and other critical facilities within the County
needed to support emergency response efforts. There are 35 critical facilities in Nash County.
NS - Nash County Could be
implemented
immediately
upon being
funded.
Nash Repair or replace undersized storm water infrastructure: Make drainage improvements in the
county by identifying ageing and undersized storm water infrastructure within the county such
as culverts/pipes, ditches and other drainage facilities, and repair or replace as needed.
S - Nash County Could be
implemented
within 6 months
of it being
funded.
Nash Improvement and conversion of private roads to public maintenance: provide funding for the
improvement of unimproved roads and convert publicly dedicated, non-state maintained and
non-municipal roads to public maintenance. Many of these roads experience erosion and other
degradation after heavy rain events presenting challenges to EMS and potentially isolating
residents many of whom live in low to moderate income housing.
NS - Nash County Could be
implemented
immediately
upon being
funded.
Nash Early flooding notification tool: develop an early notification tool that will warn individual
property owners of pending flooding using USGS data, the Advanced Hydraulic Prediction
Service, and NC Flood Inundation Mapping, and using a reverse 911 type of property owner
notification.
NS - Nash County 0-12 months
Nash Buyout property conversion program: convert properties bought-out after Hurricanes Floyd,
Matthew and other hurricane events to recreational uses or natural areas. It would also provide
funding for tree planting and other methods of returning the land to its natural state. It would
allow local governments in Nash County to convert the land into open and recreational space
to attract tourism.
NS,
NBS
- Nash County 6 months
Nash Clearing and snagging Stony Creek Paddle Trail: Clearing and snagging Stony Creek of debris
that prevents use of the paddle trail making it safe for recreational usage, while enhancing
channel flow during storm events.
S - Nash County 7 months
Table 32. HMRRP – Pamlico County (5.4.1.)
County Investment Type Maintenance Ownership/Management
Status &
Barriers
Pamlico Elevate homes: Properties located in the Special Flood Hazard Area (SFHA) are in constant
danger of repetitive flooding. Elevating properties to the Design Flood Elevation (DFE = Base
Flood Elevation (BFE) + 2 ft) reduces the risk of flood damages occurring from the 100-yr flood
event. Elevate flood prone properties located within the County. Priority restoration (repair)
NS - Pamlico County, NC Office of
Recovery and Resiliency
(NCORR)
The County is
concerned with
new State flood
maps that fail to
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 87
County Investment Type Maintenance Ownership/Management
Status &
Barriers
properties (based on the level of exposure and access issues) will be identified through
collaboration with the County Government. The County prefers to elevate homes whenever
and wherever feasible. They have already elevated several homes through HMGP (FEMA) and
have found this approach to be effective in protecting homes against flooding. The County has
already identified and elevated few homes and is in the process of identifying others through a
sequential process of prioritization to identify and secure funding for resilient rebuilding. It is
important to ensure that all associated utilities, including air conditioning units, propane
tanks, and other items, are elevated along with the housing itself. Additionally, propane tanks
that cannot be elevated should be tied down to avoid floating away if ever inundated. The
County is considering adopting comprehensive mitigation strategies by requiring higher
elevation of new homes in areas that saw flooding during Hurricane Irene.
take into
consideration
flooding from
Hurricane Irene
and the levels
shown are
inadequate. Areas
that are flood
prone have been
taken out of the
flood zones.
Pamlico Acquisition of Damaged Housing: The County has a significant problem of abandoned and
blighted housing in many low-to-moderate income areas. Severe flooding from hurricanes,
including Irene and Matthew, has led to various properties throughout the county being
abandoned by the owners and subsequently condemned.
NS - Pamlico County, NCORR -
Pamlico Relocate Mobile Homes: Hurricane Matthew worsened damage to mobile homes in the county
that sustained damage from previous storms. Multiple mobile homes in the County need to be
relocated out of the floodplain as a cost-effective means of increasing community resilience.
Issues regarding acquiring new property in flood resistant areas for the Mobile homes need to
be considered. Most low to moderate income families cannot afford to acquire new property or
to move their homes to more costly property.
NS - Pamlico County, NCORR -
Pamlico Emergency Preparedness Guidebook: During hurricanes such as Matthew and Irene, ES
personnel had to respond to many more emergency calls than usual. Pamlico County, together
with the Towns of Vandemere, Bayboro, Grantsboro, Alliance, Oriental, Mesic, Stonewall,
Minnesott Beach, and Arapahoe, should prepare an emergency guidebook for distribution to
all residents to educate them on what to do to remain self-sufficient for up to 72 hours after a
natural hazard event. County prefers this guidebook to be available on the County and
Chamber of Commerce websites as a download able pdf. The guidebook would be a good
place to address tying down of propane tanks.
NS - Pamlico County (Vandemere,
Bayboro, Grantsboro,
Alliance, Oriental, Mesic,
Stonewall, Minnesott Beach,
and Arapahoe)
1-2 years
Pamlico Ordinances for New Commercial Development: The County should establish and enforce
building ordinances/standards that will increase resilience of new commercial development by
elevating buildings, elevating contents, and enforcing freeboard requirements. The county is
already doing this and will continue to try to make improvements. Economic Developer
encourages new and existing businesses to build or modify to be more resilient to storm
events. County also considers of placement of types of businesses and the impact of storms on
business and community.
NS - Pamlico County -
Pamlico Relocate Business Development Corridor: Focus future development of and relocation of the
existing business development corridor to outside of the 100- and 500-year floodplains. There
NS - Pamlico County 36-48 months
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 88
County Investment Type Maintenance Ownership/Management
Status &
Barriers
are multiple high areas within the County (out of the SFHA) which could be considered for
potential relocation during future discussions with the county.
Pamlico County Jail/Sherriff's Office: The facility experienced flooding during hurricanes Irene and
Matthew, as well as frequent impacts from high tide events. The jail lost power during
Hurricane Matthew, resulting in a food shortage, and nearly necessitating the evacuation of
108 inmates. The facility needs an emergency generator with backup power source to ensure
uninterrupted power to refrigeration facilities. Adaptation strategies include elevating building
systems (heat, ventilation, and air conditioning (HVAC), lighting and electrical
breakers/controls, radios and communications, water/wastewater, and foodstuffs), installing
backup generators with fuel storage, and considering the installation and use of solar panels
with backup batteries to support the generators.
NS - Pamlico County 1 year
Pamlico Pamlico County Middle School: Pamlico County Middle School is in or on the edge of the 100-
year floodplain and is subject to inundation during flood events. Constructing berms around
the facility and/or flood proofing can help reduce flooding risk and provide for continued
operations during such events, providing critical services to citizens. Elevating essential
building systems and records and providing offsite backup servers for school records are
recommended. The county should also evaluate the possibility of constructing a new school
facility outside of floodplain or converting the existing building to multi -story construction with
open space on the ground floor. The county indicated that essential building records have
already been elevated, HVAC and electric have been raised, and the building has been adapted
to be as flood resilient as possible.
NS - Pamlico County (Bayboro) 3 years
Pamlico Pamlico County Emergency Shelter: The County would like to upgrade the Community College
shelter area to accommodate special needs individuals (including disabled access measures)
and add shower facilities. The current generator capacity should be evaluated to determine its
ability to meet the increased sheltering needs for both people and animals; if found
insufficient, generator capacity should be increased. The county indicated that a new
generator is needed for the college and are currently leasing one for $4,000 per month.
NS - Pamlico County (Grantsboro) 1-2 years
Pamlico Route 304: Due to the topography and roadway layout, this area gets flooded quickly during a
storm event. Flood depths of 2 feet-9 feet were observed during Irene and 7 feet during Isabel.
Elevate roadway or reroute to avoid 100-year floodplain. Elevate roadway or reroute to avoid
100-year floodplain. Road would be difficult to reroute due to known wetland areas.
NS - Pamlico County, NCDOT 1-2 years
Pamlico Near Callison Road Bridge: Elevate bridge and approaches out of 500-yr floodplain. Apart from
elevating the bridge and approaches out of the flood plain, retrofit the drainage to Trent Creek
by enlarging the culverts and dredging the creek.
S, NS - Pamlico County, NCDOT 1-2 years
Pamlico 3rd Street Bridge over Bay River: The bridge is the primary means of access to the state prison
and floods during hurricane events such as Matthew and Irene. Elevate bridge and approaches
out of 500-yr floodplain.
NS - Pamlico County, NCDOT 1-2 years
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 89
County Investment Type Maintenance Ownership/Management
Status &
Barriers
Pamlico Florence Road: Gets flooded during hurricanes like Mathew, Irene and even wind driven smaller
intensity/higher frequency events, cutting off access to parts of the community. Elevate the
roadway out of the floodplain and/or upsize culverts to handle the flows. This project will
prevent the roadway from cutting off connected communities, improve drainage capacity and
alleviate flooding issues.
S, NS - Pamlico County, NCDOT 1-2 years
Pamlico Lynches Beach Loop & Swan Point: Intersection of these two roads flooded during hurricanes
like Matthew, Dennis, Floyd, Isabelle, and Irene. Even floods with normal wind driven smaller
intensity/higher frequency events such as Northeasters, cutting off access to part of the
community. Proposed strategies include elevating the roadway out of the floodplain and/or
upsize culverts to accommodate the flows. The county indicated that intersection needs to be
elevated to increase community access during and after any major storm event.
S, NS - Pamlico County, NCDOT 1-2 years
Pamlico Griffin Road, Vandemere: High tide and Storm-based high water surface elevations in Log Pond
Creek result in flooding of Griffin Road, which causes flooding and access issues to the area
west of Griffin Road. Elevate or reroute Griffin Road out of 500yr floodplain if feasible. This
project will prevent flooding impacts to the roadway, maintaining access to the connected
communities, improving drainage capacity and alleviating flooding issues. Proposed strategies
include elevating or rerouting Griffin Road out of 500yr floodplain if feasible.
NS - Pamlico County (Vandemere),
NCDOT
1-2 years; The
County indicated
that it will be
difficult to
reroute Griffin
Road due to
known wetland
areas in the
vicinity.
Pamlico Pamlico Road: Road experienced flooding impacts during hurricanes Matthew, Irene and
during wind driven smaller intensity/higher frequency events, causing access to the
community to be cut off. Elevate the roadway out of the floodplain and/or upsize culverts to
accommodate the flows. This project will prevent flooding impacts to the roadway
(maintaining road access to the community), improve drainage capacity and alleviate flooding
issues.
S, NS - Pamlico County, NCDOT 1-2 years
Pamlico Stormwater ditches: Develop and implement a drainage ditch maintenance program. Acquire
necessary equipment to support the program.
S - Pamlico County 1-2 years
Pamlico County Human Services Complex: The facility got flooded during hurricanes Irene and Mathew
apart from high tide events. Adaptation strategies include elevating building systems (HVAC,
lighting and electrical breakers/controls, radios and communications, water/wastewater, and
foodstuffs), installing backup electricity storage and generation using generators with fuel
storage, and considering the installation and use of solar panels with backup batteries to
support the generators. It is also recommended that critical documents be elevated or
relocated out of the FEMA-SFHA. Document storage and servers could be relocated to the
Community College. Alternately, adding shelving and raising all documents above the base
flood elevation at the current location will help mitigate against flood hazards, and electronic
files could be backed up to public domain Cloud servers.
NS - Pamlico County (Bayboro) 1-2 years
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 90
County Investment Type Maintenance Ownership/Management
Status &
Barriers
Pamlico Town Hall, Vandemere: The facility got flooded during hurricanes Irene and Mathew apart from
high tide events. Adaptation strategies for the town hall include elevating building systems
(HVAC, lighting and electrical breakers/controls, radios and communications,
water/wastewater, and foodstuffs), installing backup electricity storage and generation using
generators with fuel storage, and considering the installation and use of solar panels with
backup batteries to support the generators. It is also recommended that the town’s document
storage facility be elevated or relocated out of the FEMA-SFHA. Document storage and servers
could be relocated. Alternately, adding shelving and raising all documents above the base
flood elevation at the current location will help mitigate against flood hazards, and electronic
files could be backed up to public domain Cloud servers.
NS - Pamlico County (Vandemere),
NCDOT
1-2 years
Pamlico County Courthouse: The facility got flooded during hurricanes Irene and Mathew apart from
high tide events. Adaptation strategies for the courthouse complex facilities include elevating
building systems (HVAC, lighting and electrical breakers/controls, radios and communications,
water/wastewater, and foodstuffs), installing backup electricity storage and generation using
generators with fuel storage, and considering the installation and use of solar panels with
backup batteries to support the generators. It is also recommended that the county’s
document storage facility be elevated or relocated out of the FEMA-SFHA. Document storage
and servers in the courthouse complex could be relocated to the Community College.
Alternately, adding shelving and raising all documents above the base flood elevation at the
current location will help mitigate against flood hazards, and electronic files could be backed
up to public domain Cloud servers. Evaluate the feasibility of constructing a berm or bulkhead
around the complex. The county indicated that the document storage area now has raised
shelving.
S, NS,
P - Pamlico County (Bayboro) 1-2 years
Pamlico Sanitary and storm sewers: Sanitary and storm sewers within the county require continuous
operations of pump stations. During severe storm events such as Matthew, power outages
coupled with access issues to the pump station facilities prevented the operation, monitoring
and refueling operations. Provision of backup generators and backup power sources for pump
stations, and evaluation of the feasibility of installing solar panels and/or backup batteries for
each station are recommended strategies.
NS - Pamlico County 1-2 years
Pamlico County Wastewater Treatment Plant: Plant becomes inaccessible due to severe storm events
due to flooding of the roadway leading to the plant. The plant is equipped with an emergency
generator but access issues from flooding prevent plant personnel from monitoring and
refueling the generator. Adaptation strategies for the wastewater treatment plant include
installation of alternate power source for the backup generator, such as solar panels and/or
backup battery. The plant should also be evaluated to determine if backflow preventers should
be installed in discharge pipes and, if appropriate, install the valves. The county indicated that
the plant is elevated, but the access to the plant is not.
NS - Pamlico County 1-3 years
Pamlico Kershaw Road Culverts: Increase culvert capacity and elevate roadway out of 500-yr floodplain,
or alternatively reroute road out of floodplain where possible. Identify restoration hotspots to
S - Pamlico County, NCDOT 1-2 years
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 91
County Investment Type Maintenance Ownership/Management
Status &
Barriers
determine proposed bridge and roadway elevations. Exact locations of the culverts should be
identified through further discussions with the county.
Pamlico Janiero Road: Elevate roadway out of 500-yr floodplain to provide access to camping and
conference center facilities.
NS - Pamlico County, NCDOT 1-2 years
Pamlico Orchard Creek Road: Elevate or reroute roadway out of 500-yr floodplain. NS - Pamlico County, NCDOT 1-2 years
Pamlico Route 55 Corridor: Approximately 2 miles of this roadway is the site of numerous hydroplaning
accidents. The roadway should be regraded to facilitate drainage and avoid ponding. Analyzing
and upgrading culverts to handle increased flooding and establishing signage to communicate
risk of hydroplaning could also decrease the risks posed by standing water on the roadway.
Elevate Route 55 Corridor out of 500yr floodplain and upgrade culverts to handle increased
flooding.
S, NS - Pamlico County, NCDOT 1-2 years
Pamlico Griggs Road, Vandemere: Vandemere and Cedar Creeks experience occasional flooding due to
high tide wind tides from the Bay River, causing inundation of Griggs Road and subsequently
resulting in access issues. Reroute and elevate Griggs Road out of 500-yr floodplain. If deemed
unfeasible, relocate isolated facilities. This project will prevent the roadway from cutting off
connected communities, improve drainage capacity and alleviate flooding issues. Proposed
strategies include rerouting and/or elevating Griggs Road out of 500yr floodplain. If deemed
unfeasible, relocate isolated facilities. The county indicated that it will be difficult to reroute
Griggs Road due to known wetland areas in the vicinity.
S, NS - Pamlico County (Vandemere),
NCDOT
1-2 years
Pamlico Jones Road and Pennsylvania Avenue, Vandemere: Areas bordered by Jones Road and
Pennsylvania Avenue are in the FEMA-SFHA and are subject to frequent flooding. Elevate Jones
Road and Pennsylvania Avenue out of FEMA-SFHA to ensure egress routes available when
coastal flooding occurs. Proposed strategies including elevating Jones Road and Pennsylvania
Avenue out of FEMA-SFHA to ensure egress routes available when coastal flooding occurs. This
project will be useful to prevent roadway from cutting off connected communities, improve
drainage capacity and alleviate flooding issues.
NS - Pamlico County (Vandemere),
NCDOT
1-2 years
Pamlico Paradise Shores: Gets flooded during hurricanes like Mathew, Irene and even wind driven
smaller intensity/higher frequency events, cutting off access to the community. Elevate the
roadway out of the floodplain and/or increase culvert sizes to handle the flows.
S, NS - Pamlico County, NCDOT 1-2 years
Pamlico Meekins Road: gets flooded during hurricanes like Mathew, Irene and even wind driven smaller
intensity/higher frequency events, cutting off access to the community. Elevate the roadway
out of the floodplain and/or upsize culverts to handle the flows.
S, NS - Pamlico County, NCDOT 1-2 years
Pamlico South Street: Elevate South Street out of 500yr floodplain, due to location improving drainage
is going to be difficult if not impossible.
NS - Pamlico County, NCDOT 1-2 years
Pamlico Straight Road: Road experienced flood impacts during hurricanes like Matthew, Irene and
during wind driven smaller intensity/higher frequency events, cutting off access to part of the
S, NS - Pamlico County, NCDOT 1-2 years
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 92
County Investment Type Maintenance Ownership/Management
Status &
Barriers
community. Elevate the road out of the floodplain and/or upsize culverts to accommodate the
flows.
Pamlico Upper Neck Road: Gets flooded during hurricanes like Mathew, Irene and even wind driven
smaller intensity/higher frequency events, cutting off part of the community. The roadway
needs to be elevated out of the floodplain and/or culvert sizes should be increased to handle
the flows.
S, NS - Pamlico County, NCDOT 1-2 years
Pamlico Crop Storage Facilities Retrofits: Crop storage and processing facilities, fishponds, access
roads, and related equipment on farms are subject to flooding during high tide and severe
storm events including hurricanes Irene and Matthew. The facilities and related equipment
should be elevated out of the floodplain.
NS - Pamlico County -
Table 33. HMRRP – Pitt County (5.4.1.)
County Investment Type Maintenance Ownership/Management
Status &
Barriers
Pitt Creation of Affordable Rental Housing: The county will explore options to purchase land
outside of the flood zones and build affordable housing units; whether those will be single
family or multifamily still needs to be determined. The new housing will keep and increase the
population within the county and therefore will positively affect the economy.
NS - Pitt County -
Pitt Acquisition of Homes within Flood Hazard Area: Residents would need to accept acquisition of
the property by the County to participate. The priority will be on repetitive loss properties as
they reduce the most suffering to resident and are most likely to be cost effective. A
requirement of participation is the relocation to another area that is not within a flood zone or
flood way.
NS - Pitt County (Greenville) -
Pitt Debris Removal and Rehab of Stormwater Drainage, Waterways, and Watersheds: Many
waterways throughout the county are so full of debris that boats, and water commerce cannot
get in or out of the areas necessary to continue business. Additionally, areas of drainage ditch
throughout the county are clogged with debris and therefore force water on to major roadways
throughout the area. Drainage ditches, waterways, and watersheds will be dredged and
cleared of debris and obstruction left in the wake of Hurricane Matthew.
S - Pitt County 1 year
Pitt Construction of Gym/Emergency Shelter on Community Center Property on County Home
Road: The community center and gym will serve as an emergency shelter out of the floodplain.
The shelter will be more reliably accessible and available to stay open in times of disaster.
NS - Pitt County (Greenville) 0-2 years
Pitt New Greenville Utilities Commission (GUC) Operations Center Phase II: The proposed new site
takes it out of the floodway and flood zone reducing risk and improving efficiency during
emergency response. GUC on plans to build a new Operations Center at its Hwy 43 West
NS - Pitt County (Greenville) 0-2 years
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 93
County Investment Type Maintenance Ownership/Management
Status &
Barriers
property to facilitate day to day operations for electric, water, sewer, natura gas operations
and support services (fleet maintenance, warehousing and storage, human resources, call
center, information technology, and risk/facilities management ). This development will
include 220,000 covered square feet on 82 acres and will incorporate offices, training and
assembly facilities, warehouses, fleet storage, maintenance shops, a garage and material lay
down and storage yard.
Pitt Relocation of Grifton Police Dept.: The police Dept. is currently located within the floodplain
and would be best suited in an area that did not flood during major flooding events. Would
allow the police dept. to relocate out of the flood zone and free up three building locations on
our Boulevard for new businesses that could bring jobs and income into the area.
NS - Pitt County (Grifton) 0-2 years
Pitt Greenville 230kV West Substation Upgrade: Installing a supplemental 120 MVA transformer at
the G230 West McGregor Down Road POD will increase redundancy and help the GUC to meet
electric peak load capacity during flood events.
NS - Pitt County (Greenville) 7 months
Pitt Pump Station Resiliency and Protection: This project addresses threats to the capacity and
operation of remote regional pump stations for GUC. Components of the project include bar
screen additions at Green Mill-Run Pump Station ($1M), Fork Swamp ($1M), Industrial Park
($1M); PLC replacement at Industrial Park, Green Mill Run and Fork Swamp regional pump
stations ($180,000); and site erosion mitigation, seal water line install, and joint
sealant/waterproofing at North Side pumping station ($113,000). Retrofitting and upgrading
pump stations will prevent not only flood water intrusion but also contamination.
NS - Pitt County (Greenville) 12-18 months
Pitt Natural Gas Bridge Attachment Relocation: This project would involve the relocation of
approximately 1,600 LF of natural gas main that are currently attached to bridges over bodies
of moving water. The project would involve burying the approximately 6,300 LF of pipe via
horizontal directional drilling to replace the bridge attachments. This project will help reinforce
Greenville Utility Commission’s gas system by burying assets that could be damaged during a
flood.
NS - Pitt County, Greenville Utility
Commission
18 months
Pitt Delineation of Environmentally Sensitive Areas with the County: Delineating environmentally
sensitive areas will potentially allow the county to identify areas in which the Clean Water
Management Trust Fund can be applied. Directing growth away from environmentally sensitive
and high hazard areas, delineate environmentally sensitive areas both are either suitable or
unsuitable for growth and development through land use planning.
NS, P - Pitt County 6 months
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 94
Table 34. HMRRP – Wake County (5.4.1.)
County Investment Type Maintenance Ownership/Management
Status &
Barriers
Wake Acquisition or Elevation of Flood-Prone Properties: Use voluntary acquisition or elevation of
flood-prone properties to remove or reduce risk in known high risk areas. These areas include
the Brook Hill Townhouse Apartments along Walnut Creek and the Riverbend Subdivision
along the Neuse River. Other areas of Repetitive Loss will be considered as well.
NS - Wake County 3-5 years
Wake City of Raleigh Crabtree Lift Station Rehabilitation: the city is currently rehabilitating this pump
station. During Hurricane Matthew this lift station overflowed in part due to heavy rainfall and
flooding of Crabtree Creek. The city estimated lift station capacity was reduced by 20% due to
Hurricane Matthew.
NS - Wake County (Raleigh) In Progress (2017)
Wake Wake County School System Un-Met Needs: Wake County Public School System has unmet
needs for cost of debris removal at schools across the county and for repairs at the Vernon
Malone College and Career Academy which experienced significant flood damage during
Hurricane Matthew and again during the rainfall event in late April 2017. The school is not
located in the floodplain per current maps.
S, NS - Wake County Immediately
(2017)
Wake Upgrade Vulnerable Roads and Bridges: Roadway and bridge improvements to alleviate
flooding. For Rose Lane (City of Raleigh owned and maintained), elevating the bridge will
ensure emergency access to residents south of Walnut Creek. Hwy 64/264 is a major artery
(NCDOT owned and maintained) into and out of Raleigh that has been flooded by Buffalo Creek
in past events, closing this major highway into and out of Raleigh. Old Stage and Fannie Brown
at Middle Creek. Another potential area for consideration includes Swift Creek at Old Stage Rd.
NS - Wake County (Raleigh, Walnut
Creek), NCDOT
3-5 years
Wake Zebulon Dam Repair: The historic Zebulon Dam was damaged during Hurricane Matthew which
coincided with flood damage to NC Hwy 97 just south of the dam. The dam was partially
breached.
S - Wake County (Zebulon) 2-3 years
Wake Assess and mitigate areas of recurring flooding: Assess viable solutions to enhance existing
strategies to mitigate the effects of recurring flooding at: Crabtree Valley Mall Area, Old wake
Forest Road at Crabtree Creek, Capital Boulevard at Marsh Creek, Brook Hill Townhouse
Apartments at Walnut Creek.
P - Wake County 2-5 years
Wake Install/Improve Flood Warning System: Install five stream gages; three along the Neuse River,
one on Walnut Creek, one on Swift Creek, one on Middle Creek and one on Crabtree Creek as
part of Flood Inundation Mapping and Alert Network (FIMAN) network. Existing USGS gage
stations that are not already in FIMAN should be considered for addition to the network.
Additional areas for potential gage placement include Swift Creek at Highway 401 and Middle
Creek at Highway 401 south of Wake Tech.
NS - Wake County, USGS 2-3 years
Wake Crabtree Creek Greenway Bridge Reconstruction: Reconstruct the Crabtree Creek Greenway
bridge near Capital Boulevard. This elevated portion of the greenway was damaged by
Crabtree Creek flooding during Hurricane Matthew and again during April 2017 flooding.
S - Wake County (Raleigh) 0-1 year
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 95
County Investment Type Maintenance Ownership/Management
Status &
Barriers
Wake Fuquay Varina Mineral Spring Park Streambank Restoration: Repair of streambank erosion and
roadway curb and gutter due to heavy rain and flooding during Hurricane Matthew.
S,
NBS
- Wake County (Fuquay Varina) 1-2 years
Wake Unmapped Stream Studies: Several areas of Wake County have stream systems that
experienced flooding, but actual flood risk is unknown. There is a need for studies to map areas
of frequent and nuisance flooding to better understand risk for future flood events.
Approximately 66 miles of streams not currently mapped as FEMA- Special Flood Hazard Area
(SFHA) may have experienced flooding during Hurricane Matthew.
P - Wake County Immediately
(2017)
Wake Debris Removal from Streams and Watercourses: Remove trees, sediments, and other litter
that have built-up in area waterways because of Hurricane Matthew. Debris removal can
reduce the potential for clogged inlets, pipes, and culverts.
S - Wake County 3-5 years
Table 35. HMRRP – Wayne County (5.4.1.)
County Investment Type Maintenance Ownership/Management
Status &
Barriers
Wayne Housing elevations, buyouts, and repairs (countywide): Fremont, Hood Drive, MacArthur Drive NS - Wayne County (Fremont) -
Wayne Gap funding program: difference between value of the house in the floodplain and out of the
floodplain— priority given to owner-occupied, and low-to-moderate income. $30,000 in
interest free, forgivable mortgage loans. Submitted by City of Goldsboro but need is
countywide.
NS - Wayne County (Goldsboro) -
Wayne Floodproofing for Businesses in Seven Springs: this project, in conjunction with business
attraction incentives, will provide a pool of funds for Seven Spring businesses - both new and
existing-to install flood proofing measures for the building and their operations, including
contingency planning.
NS - Wayne County (Seven
Springs)
-
Wayne Countywide Business Mitigation: Many industries and businesses suffered losses due to
flooding from Hurricane Matthew. This strategy would provide funds to mitigate some of these
losses and defray from the total impact to businesses across the county, in all industries,
enabling the businesses to direct their current operating budgets toward growth and jobs.
NS - Wayne County Short Term
Wayne Cooperative Business Response and Mitigation Strategy: To develop a plan that businesses
and industries can use as a guide to make decisions and to continue to operate during a
disaster. Funding would provide technical assistance from an outside consultant to prepare
and coordinate the plan as well as funding to implement.
NS, P - Wayne County Short to medium
term
Wayne Improvements to HV Brown Park in Goldsboro: HV Brown Park, located in the Little
Washington Community (a low to moderate income area), serves as a community park
attracting residents and visitors for large scale events as well as daily use. It is a part of The
P, NS - Wayne County (Goldsboro) Short to medium
term
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 96
County Investment Type Maintenance Ownership/Management
Status &
Barriers
Mountains to the Sea Trail and hosts the nation’s largest and longest running alumni weekend
each Memorial Day. This strategy would enable Goldsboro to institute recommendations made
in the 2015 Master Plan for the park and update many facilities that are in poor condition, a
problem that was exacerbated by the flooding in the aftermath of Hurricane Matthew.
Wayne Tourism Development/RV Park in Seven Springs: Seven Springs is the oldest settlement in
Wayne County and has historic significance as the location of a Civil War Battle and a resort
town renowned for its spring waters. This project would utilize land acquired during buyouts,
maintain its historic presence as a tourism destination in the state, and boost revenues for the
town--is development of a campground to support campers/R/Vs.
NS - Wayne County (Seven
Springs)
Short/medium
term
Wayne Neuse River Trail and Park Development: Regional development of river park. Countywide,
with express interest with City of Goldsboro and Seven Springs. City of Goldsboro submitted
the following request: "Project Description: Redevelopment as a passive recreation space with
‘river proof’ offerings like camping and trails are the amenities many citizens and visitors are
seeking.”
NBS,
NS
- Wayne County (Seven
Springs, Goldsboro)
-
Wayne Business Attraction/Incentives for Vacant Structures: this project would (1) Provide
administrative resources to the town to assist in locating and administering a business
attraction program (2) Provide a pool of funds to incentivize targeted businesses to locate in
Seven Springs, with a guarantee of a set term of required operations. Emphasis to be placed on
maintaining the historic exterior as much as possible, making necessary repairs, floodproofing
the building/operations, and on businesses that support Seven Springs tourism development
goals (e.g., restaurants, outfitters).
NS - Wayne County (Seven
Springs)
Short term
Wayne Seven Springs Town Hall, Historic Preservation, and Tourism Development: This project would
identify, acquire, study the feasibility of, and move a historic structure to a new, less flood
prone location to be used as a town hall/visitor center. Would also provide funds to assist in
exhibit development for town hall display and historic/recreational wayfinding signage. This
project would also look at retrofitting a vacant structure in the historic center for use as the
campground shower/restroom/laundry facility (for example, the bank building) and feasibility
of moving historic homes to the 500-year flood plain from the 100-year flood plain.
NS, P - Wayne County (Seven
Springs)
Short term
Wayne Seven Springs Fire Station: Relocate the Seven Springs Fire station to a site on higher ground,
as the current station has flooded three times in the last 50+ years: once in 1964, once during
Hurricane Floyd, and then during Hurricane Matthew. They had 4 feet7 inches of water in the
station during Matthew. He said that they are trying to stay within a half mile of the current site
to avoid redrawing any jurisdictional boundaries.
NS - Wayne County (Seven
Springs)
1-3 years
Wayne Repair flood damage to the Genoa lift station. NS - Wayne County 0-12 months
Wayne Fremont Stormwater assessment/repair: Clean and replace drains in Fremont as well as
examine sizing needs and put new drains in areas that flood frequently.
S - Wayne County (Fremont) 0-12 months
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 97
County Investment Type Maintenance Ownership/Management
Status &
Barriers
Wayne Mobile/Back Up Emergency Operations Center: Purchase and equip a mobile EOC/Forward
Command Center for use during disasters and large events. This will also serve as a backup
EOC in the event the primary EOC goes down.
NS - Wayne County -
Wayne New/Replacement EOC: 911 telecommunications and emergency operations center to
improve resources to handle disasters by having better E-911 infrastructure in place. Improved
EOC that is more accessible.
NS - Wayne County -
Wayne Dixie Trail and John Street Flooding/Stormwater: Areas that experienced flooding and
stormwater issues during the storm that need to be examined/ fixed.
S - Wayne County 0-5 years
Wayne Old Carver Elementary School Generator and Shelter Improvements: Provide generator and
improvements so that the former elementary school can be used as a shelter in storm events
for the surrounding communities.
NS - Wayne County 0-2 years
Wayne Generator for Fremont Town Hall. NS - Wayne County (Fremont) 1 month
Wayne Three backup generators for use at shelters in Goldsboro. NS - Wayne County (Goldsboro) -
Wayne Goldsboro Pump Station Hurricane Preparation: Multiple pump stations were submersed in
water due to the flooding, including Big Cherry, Little Cherry, Westbrook, New Hope, 117 and
the Water Reclamation Facility 714. This strategy would lift equipment and provide portable
fuel storage containers and submersible equipment to allow these stations to operate during
storm events.
NS - Wayne County (Goldsboro) -
Wayne Jail Annex Construction: The existing jail facility was flooded/inundated with sewage during
Hurricane Matthew. This will allow the jail facility and Sheriff's office to move.
NS - Wayne County (Goldsboro) -
Wayne Goldsboro water treatment plant earthen berm and wall and elevation of infrastructure:
During Hurricane Matthew, extensive efforts went into protecting Goldsboro water treatment
plant’s power system (commercial and emergency) and chemicals through sandbagging and
dewatering. To be proactive, this strategy would assist the city to build a dike and raise
equipment. The strategy would construct an earthen berm around the water treatment plant
site to protect all existing infrastructure two feet above historical peaks. At specific locations,
there is not sufficient room for an earthen berm; in this case, a concrete wall will be required.
S, NS - Wayne County (Goldsboro) 6-12 months
Wayne Goldsboro water treatment plant intake relocation: During periods of low flow and when the
river depth is over three feet, the diverted flow does not allow for scouring, and excessive
sedimentation builds up in the original Neuse channel around the city’s intake structure. This
strategy would relocate the intake structure and pump station upstream to a deeper part of
the river.
NS - Wayne County (Goldsboro) -
Wayne Walnut Creek Generator: This strategy would provide a generator for Walnut Creek Town Hall. NS - Wayne County (Walnut Creek) -
Wayne Walnut Creek lift stations: This strategy would provide generators for three lift stations and
elevate and floodproof additional lift station.
NS - Wayne County (Walnut Creek) 0-12 months
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 98
County Investment Type Maintenance Ownership/Management
Status &
Barriers
Wayne Engineering study and mapping of existing stormwater system: From City Submission: "Hire
outside contractor to map the city’s stormwater infrastructure system. In conjunction with
mapping, assess the current condition of the infrastructure and prioritize repairs."
P, S - Wayne County (Goldsboro) -
Wayne Water Reclamation Facility Equalization Basins #3, 4, 5: During Hurricane Matthew, Flow
Equalization Basins #1, #2, #3, #4, and #5 were overwhelmed by storm surge and flooding.
These basins were put in service in 1966 as wastewater lagoons to hold 197-million gallons of
water. They currently serve as equalization protection for the Water Reclamation Facility and
are no longer used to treat wastewater. The Equalization Basins are in the Critical and Accident
Potential Zones for Seymour Johnson Air Force Base, a safety hazard due to their waterfowl
attraction. In addition, they pose an environmental threat to downstream users if they were to
be breached in another flooding event. This strategy would deactivate basins #3, #4, and #5
and use #1 and #2 for inflow and infiltration events and make operational enhancements
necessary for safety and environmental protection.
NS - Wayne County (Goldsboro) -
Wayne Mt. Olive wastewater treatment plant: Elevate electrical infrastructure and pump station for
flooded Water and Wastewater Treatment Plant (WWTP).
NS - Wayne County (Mt. Olive) 3-12 months
Wayne Creation of County 211 Information Hotline: During Matthew and in the aftermath residents
and businesses were not always sure where to turn for information. Having a central response
location would create a coordinated response.
NS - Wayne County 0-2 years
Wayne Emergency Website Portal: one stop location—in conjunction w/ Facebook—to improve
communication.
NS - Wayne County 3-12 months
Wayne Creek Debris Removal/Restoration: Remove debris from and restore natural functions to
several creek locations including: Half mile Branch, Stoney Creek/Billy Branch, Stoney Creek
Combs, Falling Creek—Neuse to Thoroughfare Swamp, Yellow Marsh Branch—Thoroughfare
Swamp to First Congressional Church, Mt. Olive.
NS,
NBS
- Wayne County -
Wayne Fremont Lagoon Repair: The lagoon experienced damages and will be unstable if not repaired. NS - Wayne County (Fremont) 2 years
Wayne Goldsboro Mitigation of Sensitive Areas with Commercial Buyout: The City of Goldsboro seeks
to mitigate three flood-prone areas: Grantham (“Little River”) area, S. George Street and East
Ash Street. These areas have seen two major floods with significant storm and water damage
over the past twenty years. If redeveloped back into their natural state these areas would
reduce our habitable footprint in the flood plain and could provide environmentally friendly
public spaces for public recreation, bicycling, and nature trails.
NS,
NBS
- Wayne County (Goldsboro) 2-3 years
Wayne Seven Springs Open Space Reuse Options - This project would examine ways and provide
means to reuse vacant land--including planting Longleaf Pine and creating community
gardens for the wider community.
NS,
NBS
- Wayne County (Seven
Springs)
1 year
Wayne Open space strategy--develop a strategy to maintain and reuse land made available via
Buyouts.
P, NS - Wayne County 2 years
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 99
County Investment Type Maintenance Ownership/Management
Status &
Barriers
Wayne Ditch rehabilitation projects: Big Ditch, UEC Theater Ditch, Mimosa Park Ditch, Royal Meadow
Creek, Billy Branch, and Billy Bud. Within the city limits, there are six ditches that traverse
through commercial and residential areas that can impact nearby properties during heavy rain
events. The current conditions of these ditches compromise and affect the stormwater
conveyance systems to the Neuse River. The strategy would involve clearing and grubbing
existing overgrown vegetation, regrading and sloping banks along the ditch lines, reseeding
with centipede grass and plant appropriate trees to hold embankment walls, installing and/or
clearing appropriate rights-of-way where possible to provide accessibility for maintenance
equipment, replacing fencing as needed
NS, S,
NBS
- Wayne County (Goldsboro) 2-3 years
Table 36. HMRRP – Wilson County (5.4.1.)
County Investment Type Maintenance Ownership/Management
Status &
Barriers
Wilson Residential Units along Norris Blvd., Hyatt Drive, Starmount Circle, Poplar Street and Philips
Street: The City of Wilson Housing Authority has submitted a hazard mitigation application
with the City of Wilson to participate in a buyout program to permanently relocate about 40
properties out of the 100-year flood plain. The city would utilize these areas for flood retention
ponds and greenways. The city would also like to receive any additional funding available and
therefore this project is included as part of the Resilient Redevelopment Program.
NS - Wilson County (City of Wilson) 6-12 months
Wilson Installation of Flood Vents: provide funding to homeowners to bring homes into compliance
with Wilson County flood damage prevention ordinance by installing flood vents in enclosed
crawl spaces that are no more than 12 inches above adjacent ground level. The proposed
project will risk reduction by preventing structures from collapsing due to water pressure on
walls that surround crawl spaces. This will improve the structural integrity of the homes and
prevent flooding of structures.
NS - Wilson County 6-12 months
Wilson Englewood Drive, Town of Kenly: The proposed action recommended is to clean the ditch at
the intersection of Englewood Drive and Revell Road, remove the beavers in the area and raise
the roadbed where necessary. This project includes the replacement of culverts that washed
out during Hurricane Matthew plus erosion control measures and debris removal.
NS, S - Wilson County (Kenly) 3 months
Wilson Main Street and Langley Road, Town of Elm City: Main Street/Langley Road is the east -west
thoroughfare through the Town of Elm City. This entire stretch of the roadway experienced a
lot of flooding and isolated the downtown areas from other areas of the town and the county.
The proposed strategy to mitigate the flooding in a large area includes upgrading the
stormwater system in the downtown areas, cleaning out certain ditches that are full of debris
and raising the roadbed where necessary.
NS, S - Wilson County (Elm City) 6-12 months
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 100
County Investment Type Maintenance Ownership/Management
Status &
Barriers
Wilson Beacon Street, City of Wilson: Four businesses located along Beacon Street experienced
flooding following Hurricane Matthew. The businesses are near Hominy Swamp, and overbank
flooding also contributes to the flooding of the businesses. Relocation of the business, cleaning
of the ditches along Beacon Street and elevating some of the equipment at these businesses
are potential solutions to mitigate the problem.
NS - Wilson County (City of Wilson) 1-2 years
Wilson Flooding in Shannon Woods Subdivision: A portion of US-264 towards to the Shannon Woods
subdivision gets flooded during heavy rains. After Hurricane Matthew, the road was flooded for
2-3 days. Two potential reasons for the flooding and ponding of water include the presence of
clogged ditches along US 264 and the lower elevation of the road. Along with clearing of the
ditches, raising of the roadbed are proposed strategies to mitigate this issue.
NS, S - Wilson County (Stantonsburg) 6-12 months
Wilson Relocation of HQ Fire Station and EOC: The physical location of the fire station and surrounding
topography result in the station being flooded as a result. The City of Wilson Emergency
Operations is the main distribution point for the City of Wilson utility and heavy equipment
mobile resources. The waterway adjacent to this address floods and causes access problems to
and from this site. This location also serves as the City of Wilson Emergency Operations Center
and the back up 911 Communications Center.
NS - Wilson County (City of Wilson) 1-2 years
Wilson Hominy Creek: The City of Wilson has identified a stream corridor named Hominy Swamp Creek
that is used for recreation and education. Opportunities exist along Hominy Creek to reduce
flooding and improve water quality using best management practices, while also rehabilitating
wildlife habitat.
NS,
NBS
- Wilson County (City of Wilson) 6-12 months
5.4.2 Regional Resilience Portfolio Program (2022)
Table 37. RRP – Eastern Carolina (5.4.2)
Region Investment Type Maintenance Ownership/Management Status & Barriers
Eastern
Carolina
Regional Resilience funding: Establish a
circuit rider program in the region to
provide grant application services.
P - The Eastern Carolina Council This project has a short implementation timeframe (less than 5
years) with startup expected within 1–2 years. Recruitment of
funders for the local match resilience fund, as well as the first
allocation of support, is likely to take several years.
Eastern
Carolina
Regional Drainage Capacity
Assessment: develop a regional
drainage capacity assessment to
identify blocked culverts, ditches, and
natural systems within the region.
P, S - Local Floodplain Managers This project would take place over the short term, within 5
years. If given high priority by all participating municipalities,
gathering all essential municipal staff and community
organizations would likely occur within several weeks.
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 101
Region Investment Type Maintenance Ownership/Management Status & Barriers
Eastern
Carolina
Beneficial Reuse of Acquired
Properties: prioritize "green"
development of acquired flood-prone
properties to support natural
watershed functioning.
NS,
NBS
- Local Planning Depts.;
Community Technical
Assistance, Inc
If planners and supporting agencies can collaborate on design,
responsibility, approval from emergency management (EM)
officials, and implementation, green development of an
acquired parcel could occur within a matter of months. This is
possible because the proposed areas have already been
acquired and there are several interested parties interested in
being the lead implementor.
Eastern
Carolina
Vegetated Swales in Urban Flooding
Hotspots: Installing vegetated swales in
urban flooding hotspots will prevent
flood conditions from overwhelming
critical infrastructure.
NBS - Local Public Works Depts. This project could be implemented within a medium time
frame, likely within 2–3 years. Identifying the best areas for
green infrastructure projects will likely take several weeks.
Eastern
Carolina
Regional Resilience Staff Position: A
Regional Resilience Coordinator would
work to support projects and secure
resources for regional and local
resilience initiatives.
P - The Eastern Carolina Council The timeframe for this project is likely short-term (within the
next five years). Identifying the long-term funding sources for
the position, as well as the best possible candidate, will likely
take several months. Conversations with local and county
governments need to highlight the local benefit of the position
to ensure contribution.
Table 38. RRP – Mid-East (5.4.2)
Region Investment Type Maintenance Ownership/Management Status & Barriers
Mid-East Region Regional Drainage Capacity Assessment: develop
a regional drainage capacity assessment to
identify blocked culverts, ditches, and natural
systems within the region.
P, S - The Mid-East Commission 5 years (2027/2028)
Mid-East Region Prioritized Vulnerability Inventory of Bridges and
Culverts: Create an inventory of bridges and
culverts along most common evacuation routes
for prioritized cleanup efforts.
P, S - Peanut Belt Rural Planning
Organization and the Mid-East
Rural Planning Organization
This project would be implemented
over a medium-term timeframe.
Taking inventory of all bridges and
culverts along regional evacuation
routes is a task that can be
completed quickly. Determining
the priority of each for expansion or
retrofit will likely be more
complicated due to competing
priorities across jurisdictional lines.
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 102
Region Investment Type Maintenance Ownership/Management Status & Barriers
Mid-East Region Upsizing Regional Stormwater Infrastructure:
Inventory and create a map of most vulnerable
infrastructure to prioritize projects that increase
the capacity of stormwater infrastructure.
P, S - Local stormwater
administrators and
engineering staff
This project is expected to be
completed over the long term,
likely taking several years to
complete the projects. It will take
weeks to months to undertake the
inventory and produce
documentation.
Mid-East Region Green Infrastructure in Urban Flooding Hotspots:
Installing green infrastructure systems in urban
flooding hotspots will prevent flood conditions
from overwhelming critical infrastructure.
NBS - County or local public works
Depts.
This project could be implemented
within a medium time frame.
Mid-East Region Regional Information-Sharing Partnership:
Develop a Regional Hazard Information-Sharing
Partnership to reduce the burden on local
authorities to prepare and provide natural hazard
focused information.
NS, P - The Mid-East Commission The implementation timeframe for
this project is short-term.
Table 39. RRP – Upper Coastal Plain (5.4.2)
Region Investment Type Maintenance Ownership/Management Status & Barriers
Upper
Coastal
Plain Region
Housing Needs Assessment: conduct a county-by-county or
regional needs assessment, which is necessary to understand
what existing housing stock can remain viable and serve low
and middle-income families.
P - Land Development Dept., City of
Wilson, Planning Director, Town of
Tarboro
Large scale - structural inspections, ground
truthing and field surveys take a lot of time to
complete and require resources and capacity
Upper
Coastal
Plain Region
Regional Emergency Shelter Feasibility Analysis: conduct a
feasibility analysis for identifying a large (400+ person) regional
facility that could be used as a shelter during disasters and
emergencies.
P, NS - Nash County Emergency Manager,
Halifax County Emergency Manager.
-
Upper
Coastal
Plain Region
Electrical Assessment and Transfer Switches for Emergency
Shelters.
P, NS - Nash and Halifax County Emergency
Managers
Locations may require costly and time-
intensive upgrades before a transfer switch
can be installed
Upper
Coastal
Plain Region
Flood-Resilient Roadways for Critical Facilities: create a
prioritized list of regionally significant critical facilities that are
vulnerable to flooding. In addition, the project will apply for
funding to prevent flooding in priority locations that
experienced inundations in previous storms (e.g., Hurricanes
Matthew, Florence, Floyd).
P, NS - Nash County Economic Development
Administration and EM
Defining the categories of critical facilities and
then subsequently prioritizing projects for
funding
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 103
Region Investment Type Maintenance Ownership/Management Status & Barriers
Upper
Coastal
Plain Region
Comprehensive Plans and Zoning Ordinances Address Climate
Change: 1) identify the status of all Upper Coastal Plain
municipal comprehensive plans 2) conduct an audit of these
plans for references to climate change 3) create a template for
integrating climate change into existing or future
comprehensive plan updates and 4) review and amend zoning
and unified development ordinances to align with
comprehensive plan objectives related to climate change.
P, NS - Upper Coastal Plain COG 5-15 years; large undertaking for locales that
lack staff capacity and resources
Upper
Coastal
Plain Region
Inform Elected Officials about Climate Resilient Decision
Making: present information about data and findings from the
Upper Coastal Plain Region Vulnerability Assessment to city,
town and county elected officials and staff. The goal is to
clearly articulate climate hazards and vulnerabilities in each
county to increase resilient decision-making.
P - Upper Coastal Plain COG Willingness of local government staff to
participate and level of effort to make
changes to what is often the status quo
Table 40. RRP – Kerr-Tar (5.4.2)
Region Investment Type Maintenance Ownership/Management Status & Barriers
Kerr-Tar
Region
Establish a regional inventory of buildings (businesses, offices,
and industrial spaces) and identify opportunities to modify
them with more sustainable elements.
NS, P - Several persons are available to support
the project: Monique Wilkins (Economic
Development Coordinator, Town of
Louisburg), Lauren Johnson (Director of
Planning, Person County), McKinley
Perkinson (Director, Henderson Vance
EDC), Michelle Burgess (President,
Henderson Chamber of Commerce),
Michael Kelly (Kerr-Tar COG), and Grace
Lawrence (NC Dept. of Commerce).
Challenges that may arise for the
project team include how many
buildings to collect data for, and
their attributes, given the
numerous buildings in the region
Kerr-Tar
Region
Develop a plan that addresses dam safety and mitigation
actions across the region. The project would include inspection
of existing structures and their appurtenant features,
components of geotechnical and structural investigations to
establish data for risk analysis, evaluation of the design life of a
dam to ensure that it continues to perform effectively, and
developing recommendations to address potential risks factors,
repairs, and funding for repairs.
S, P - No implementers have been identified
yet. However, John Boyer with the Town
of Creedmoor could play an advisory
role.
Identifying local technical leaders
with dam safety experience and
Emergency Action Plan
knowledge; Coordination with
private dam owners
Kerr-Tar
Region
Emergency Shelters and Facilities Needs Assessment NS, P - Several EM officials throughout the
region have expressed interest in this
project including Jason Reavis (Granville
Accessing the NCSPARTA shelter
data system; obtaining data from
county GIS departments, building
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 104
Region Investment Type Maintenance Ownership/Management Status & Barriers
County EM Director), Nicholas Thorpe
(Franklin County EM Director), Chris
Tucker (Warren County EM Coordinator),
Thom Schwalenberg (Person County
Emergency Services (ES) Director), and
others.
inspections, building permits,
architectural plans, field surveys,
and other documents for existing
buildings being utilized as
shelters
Kerr-Tar
Region
Assessing private drinking water wells and water quality in
environmental justice communities to develop a final report
with findings and recommendations.
P - None identified yet Access and entry to properties
(and obtaining permission) to
perform testing of private
drinking water wells may be a
likely challenge
Kerr-Tar
Region
Recruitment of a diverse set of farmers (minority and small-
scale operators) to participate in a regenerative farming
program aimed at increasing soil health and reducing utilization
of fertilizers.
NS,
NBS
- Working Landscapes, an organization
based in Warren County, NC, has been
identified to champion this project.
Knowledge gaps in cover crop
methods
Table 41. RRP – Triangle J (5.4.2)
Region Investment Type Maintenance Ownership/Management Status & Barriers
Triangle
J Region
Develop a River Warning System NS - Emily Sutton, Haw River Assembly Haw
Riverkeeper
There is no template for developing the warning
system
Triangle
J Region
Plan and Prioritize Stream
Restoration
NBS, P - Rick Savage, Carolina Wetlands Association
Executive Director. Mr. Savage has indicated that
he has the capacity to take on the project.
Sometimes the best practice is to leave the
damage and debris alone
Triangle
J Region
Install Backup and Redundant
Power Sources
NS - Matt Britt, Lee County Emergency Management
Director
Large number of sites and large fuel requirements
Triangle
J Region
Establish a Locally Administered
Repetitive Loss Program
NS - The lead implementer recommended for this
project is Emily Barrett, Triangle J COG
Environment and Resilience Program Manager.
Risk of duplication of benefits
Triangle
J Region
Develop a Privately Owned Dam
Inventory and Dam Ownership
Guidebook
NS - The lead implementer for this project is Deborah
McGuffin, Moore County Cooperative Extension
Director.
May need assistance bringing in technical
specialists.
Triangle
J Region
Develop Regional Guidance for
Coordinated Stormwater
Infrastructure Improvements
S, NS, P - The lead implementer recommended for this
project is Stephen Wensman, Town of Smithfield
Planning Director
Timing and available funding for those
improvements
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 105
5.4.3 Regional Hazard Mitigation Plans
Table 42. RHMP – Neuse Region (5.4.3)
Region -
County - Place Investment Type Age Maintenance
Ownership/
Management
Status &
Barriers
Neuse - Greene In the event of a substantial flooding event, or other natural hazard
occurrence, perform damage assessments in coordination with NC
Emergency Management (NCEM). These assessments will assist the county
in determining the extent of the damage caused by the respective disaster
event. This data will be used as a tool for land use planning and future
hazard mitigation plan updates.
P 2020 - County emergency
management (EM),
Municipal Admins.
Ongoing – As
Needed
Neuse - Greene Request HMGP (Federal Emergency Management Agency [FEMA]) funding
for the elevation and/or acquisition of structures substantially damaged
during a natural hazard event. This funding may also be used to address
infrastructure needs, if it is determined that facilities within the county or
any of the participating jurisdictions are adversely impacted by flood
events.
NS 2020 - County Admin., County
EM, Municipal Admins.
Ongoing – As
Needed
Neuse - Greene Work to educate and inform local real estate agents, contractors,
developers and citizens about issues associated with development in the
floodplain by Ensuring that a range of materials related to flood insurance,
flood protection, floodplain management, information on floodplains, and
listings of qualified contractors familiar with floodproofing and elevation
techniques, are available through various avenues including: Placing
materials in the local library; Maintaining documents at the County Planning
and Economic Development Office; Disseminating information to local
contractors
NS 2020 - County Planning and
Admin., Municipal
Admins.
Not Started - 1
year
Implementation
Neuse - Greene Ensure information is available on the county's website regarding hazards
and development regulations within floodplains, including a link to FEMA
and National Flood Insurance Program (NFIP) resources relating to
emergency preparedness, flood protection, wind proofing, and proper
evacuation procedures.
NS 2020 - County Admin., Municipal
Admins.
Not Started - 1
year
Implementation
Neuse - Greene Consider joining the Community Rating System (CRS). The county will
assess the cost benefit of joining this program for county residents and
property owners.
NS 2020 - County Admin., Municipal
Admins.
Not Started - 2-
to-3-year
implementation
Neuse - Greene Continue to work with the NC Department of Environmental Quality
(NCDEQ) to enforce standards outlined within the statewide stormwater
management program. Currently, this program generally addresses
stormwater management for projects disturbing an area equal to or greater
than one acre. In addition, the county will monitor localized flooding issues,
S, NS 2020 - County Admin., Municipal
Admins.
Ongoing – Over
Next Five Years
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 106
Region -
County - Place Investment Type Age Maintenance
Ownership/
Management
Status &
Barriers
and where feasible address these issues through the installation of
stormwater best management practices (BMPs).
Neuse - Greene Pursue all avenues available to secure grant funding to address
improvements to the Town of Hookerton’ s Water and Wastewater
Treatment Plant (WWTP). Currently, Contentnea Creek is encroaching upon
the plant’s lagoon dike wall. NCDEQ has stated that the integrity of the
lagoon structure is at imminent risk.
NS 2020 - County Admin., Town of
Hookerton Elected Board
Not Started - 3 to
5 years
Neuse - Greene Continue to expand upon the county's Code Red Emergency Notification
System available to all residents. Greene County emergency services (ES)
will coordinate with all municipal jurisdictions regarding registration
through the Greene County Emergency Notification Registration Portal.
NS 2020 Review annually County EM, Municipal
Admins.
Ongoing
Neuse - Greene Consider establishing a program to establish Community Emergency
Response Teams (CERT) teams within the county. This effort will involve
both the recruitment and training of potential team members.
NS 2020 - County EM, Municipal
Admins.
Not Started - 2 to
3 years
Neuse - Greene Work closely with local media outlets to disseminate timely and accurate
information relating to natural hazard events. This task will involve
reporting on weather, evacuations, sheltering and facility closures.
NS 2020 - County EM, Local Media
Outlets, Municipal
Admins.
Ongoing – As the
need arises
Neuse - Greene Work to expand upon the county's Special Medical Needs Registry (SMNR).
The SMNR is available to all county residents. Effective participation will
require close cooperation between county EM and local government staff
members. All jurisdictions will work to advertise the availability of this
service within their respective communities.
NS 2020 - County EM, Municipal
Admins.
Ongoing – Next
Five years
Neuse - Greene Actively work with federal, state, local and private partners to identify
mitigation measures and secure funding via grants to alleviate flooding.
These efforts should focus on the following areas: Develop a Blueway Plan
for Contentnea Creek, county-wide stream snagging and cleanout, expand
beaver management program, expand greenways in Hookerton, develop a
riparian buffer program
S, NS,
NBS
2020 - County Board of
Commissioners, Municipal
Admins.
3 to 5 years
Neuse - Greene Work closely with the American Red Cross to establish a site for the
development of a local animal shelter to be utilized in the event of a natural
disaster.
NS 2020 - County EM, American Red
Cross
2 to 3 years
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 107
Region -
County - Place Investment Type Age Maintenance
Ownership/
Management
Status &
Barriers
Neuse - Greene Continue to support and participate in the directives of the county
Emergency Operations Plan (EOP).
NS 2020 The County will
review and
update the EOP
annually to
ensure that it
coordinates with
the most recent
NC Department of
Public Safety
(NCDPS) and NC
Office of
Emergency
Medical Services
(NCOEMS)
directives.
County ES, Municipal
Admins.
Ongoing
Neuse - Jones Consider establishing a program to establish CERT teams within the county.
This effort will involve both the recruitment and training of potential team
members.
NS 2020 - County ES Not started - 2 to
3 years
Neuse - Jones Continue working towards a long-term solution to maintaining emergency
backup generators at all facilities deemed critical in the event of a natural
disaster. At a minimum, the county will aim to establish a permanent
backup generator at the following locations: County Admin. Building, Town
of Maysville Town Hall, Comfort Volunteer Fire Dept..
NS 2020 Annually County ES, Municipal
Admins.
Ongoing
Neuse - Jones Work to expand upon the County's Special Medical Needs Registry (SMNR).
The SMNR is available to all County residents. Effective participation will
require close cooperation between county EM and local government staff
members. All jurisdictions will work to advertise the availability of this
service within their respective communities.
NS 2020 Annually County ES, Municipal
Admins.
Ongoing
Neuse - Jones Continue to improve upon capabilities available through the Nixle Based
Emergency Notification System. These efforts will involve educating the
public, municipal partners, and elected officials about the system's
capabilities and registration requirements.
NS 2020 Annually County EM, Municipal
Admins.
Ongoing
Neuse - Jones Update the county's Comprehensive Land Use Plan to ensure that the
Future Land Use Map adequately delineates portions of the county deemed
unsuitable for development due to existing environmental conditions
resulting in potential impacts from natural disasters. All municipal
jurisdictions will also take this plan into consideration when amending or
developing land use plans and/or land development regulations.
NS, P 2020 - County Admin., Municipal
Admins.
Not Started - 2 to
3 years
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 108
Region -
County - Place Investment Type Age Maintenance
Ownership/
Management
Status &
Barriers
Neuse - Jones Continue to participate in the Beaver Control Program (BCP) offered
through NCDEQ. Additionally, the county will continue to support the Town
of Trenton in its efforts to conduct its own BCP.
NS 2020 - County Admin., NCDEQ 2 to 3 years
Neuse - Jones Continue to proactively seek out grant funding through NCEM and FEMA for
mitigation of repetitive loss properties from future flooding events. The
county will maintain a list of repetitive loss properties. Jones County will
assist all municipal jurisdictions in working through the structural
mitigation grant funding process.
NS 2020 On an annual
basis, will apply
for funding for all
structures that
meet cost-benefit
thresholds as
defined by FEMA.
County Admin., Municipal
Admins.
Ongoing – as
opportunities
arise
Neuse - Jones Review respective Flood Damage Prevention Ordinances annually to assess
whether any revisions and/or updates have been mandated by FEMA or
NCEM. In addition, jurisdictions will consider whether regulatory options are
available to provide for more effective floodplain management. Through
these efforts, the county will continue to enforce a two-foot freeboard
requirement.
P, NS 2020 - County Inspections
(including municipalities
under interlocal
agreement), Municipal
Admins.
Ongoing – next
five years
Neuse - Jones Ensure that a range of materials related to flood insurance, flood protection,
floodplain management, information on floodplains, and listings of
qualified contractors familiar with floodproofing and elevation techniques,
are available to the realtors, developers, contractors, and citizens through
various means including: placing materials in the local library, maintaining
documents at the county admin. building, disseminating information to
local contractors, and maintaining information in the county inspection
offices.
NS 2020 - County Admin., Municipal
Admins.
Ongoing – next
five years
Neuse - Jones Ensure information is available on the county's website regarding hazards
and development regulations within floodplains, including a link to FEMA
and NFIP resources relating to emergency preparedness, flood protection,
wind-proofing, and proper evacuation procedures. In addition, the towns
will provide a link to this page through their respective municipal websites.
NS 2020 - County Admin., Municipal
Admins.
Ongoing – next
five years
Neuse - Jones Due to the widespread impacts of Hurricanes Matthew and Florence, work
to identify funding to assist with the acquisition of non-residential
structures in need of assistance.
NS 2020 - County Admin., Municipal
Admins.
Ongoing – As
need is
determined
Neuse - Jones Create a guidebook for non-governmental organizations and faith-based
organizations on emergency preparedness and their role in outreach,
sheltering, and recovery.
NS 2020 - County EM, American Red
Cross, Faith-Based
Organizations
Not Started - 2 to
3 years
Neuse - Jones Work closely with the Town of Trenton in identifying funding and a location
for the relocation of the county water treatment plant due to flooding.
NS 2020 - County Board of
Commissioners, Town of
Trenton Town Council
Not Started- 2 to
3 years
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 109
Region -
County - Place Investment Type Age Maintenance
Ownership/
Management
Status &
Barriers
Neuse - Jones Relocate the Jones County Courthouse Basement Magistrate's Office and
Jail to a higher, safer level of the building or to an alternate site.
NS 2020 - County Board of
Commissioners
Not Started - 2 to
3 years
Neuse - Jones Back wire electrical systems to accept permanent generators and provide
generators for three county elementary schools. Also, establish permanent
pad mount generators at these facilities.
NS 2020 - County Admin. 2 to 3 years
Neuse - Jones Implement all strategies outlined within the Hurricane Matthew Resilient
Redevelopment Plan.
P 2020 - County EM, Municipal
Admins.
2 to 3 years
Neuse - Lenoir Continue to maintain CRS rating through implementation of a
comprehensive floodplain management program.
NS 2020 - County Admin., Municipal
Admins.
Ongoing – over
next five years
Neuse - Lenoir Work closely with the American Red Cross to address the sheltering needs of
county residents. The county will continue to improve the preparedness of
all existing shelter facilities, including the installation of on- site
transformers at all shelter locations. In addition, these efforts will involve
support of the NC Coastal Region Evacuation and Sheltering (CRES) plan
aimed at providing inland sheltering resources for coastal counties.
NS 2020 - County ES, Municipal
Admins.
Ongoing – as
funding becomes
available
Neuse - Lenoir Educate, inform, and provide educational materials to citizens, contractors,
local real estate agents, and homeowners regarding the hazards associated
with floodplain development. In addition, the county will use this service to
inform the public about the potential natural hazards impact throughout
Lenoir County and services available to provide assistance if the county is
impacted.
NS 2020 - County Planning, County
Admin., Municipal
Admins.
Ongoing – over
next five years
Neuse - Lenoir Ensure that a variety of materials related to flood insurance, emergency
response, flood protection, floodplain management, increased cost of
compliance coverage, information on floodplains, and listings of qualified
contractors familiar with floodproofing and elevation techniques, are
available through various methods including placing materials in the county
library, maintaining documents at the inspection’s office, disseminating
information to local contractors on the County website
NS 2020 - County Planning, County
Admin., Municipal
Admins.
Ongoing – over
next five years
Neuse - Lenoir Review the county's Comprehensive Land Use Plan to ensure that the
Future Land Use Map adequately delineates portions of the county deemed
unsuitable for development due to existing environmental conditions or the
presence of natural hazard areas.
NS, P 2020 - County Planning, County
Admin., Municipal
Admins.
Not Started- 2 to
3 years
Neuse - Lenoir Work closely with local media outlets to disseminate timely and accurate
information relating to natural hazard events. This task will involve
reporting on weather, evacuations, sheltering and facility closures.
NS 2020 - County EM, Municipal
Admins.
Ongoing – Next
Five Years
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 110
Region -
County - Place Investment Type Age Maintenance
Ownership/
Management
Status &
Barriers
Neuse - Lenoir Continue to monitor drainage conditions throughout the county. In
addition, the county will continue to enforce and support the following
programs relating to stormwater management: NCDEQ Coastal Stormwater
Rules, NCDEQ Sedimentation & Erosion Control Regulations, NCDEQ
Statewide Stormwater Regulations, NCDEQ Coastal Area Management Act
Regulations, USACE Non-Coastal Wetland Regulations
NS 2020 - County Admin., Municipal
Admins.
Ongoing – Next
Five Years
Neuse - Lenoir Following the impacts of Hurricanes Mathew and Florence, establish new
development within sites throughout the county that were cleared for
development following Hurricane Floyd in 1998. This effort will address both
redevelopments, as well as affordable housing needs.
NS 2020 - County Admin., Municipal
Admins.
Ongoing – As
opportunities
arise
Neuse - Lenoir Work to develop a management/reuse plan to address property acquired
through the HMGP (FEMA).
NS, P 2020 - County Admin., Municipal
Admin.
2 to 3 years
Neuse - Lenoir Actively work with federal, state, local and private partners to identify
mitigation measures and secure funding via grants to alleviate flooding.
These efforts should focus on the following areas: Arterial stream and ditch
cleanup, MS4 in La Grange, MS4 in Kinston, Dam facilities at Till’s Mill Pond,
Stormwater improvements at Tick Bite
S, NS 2020 - County Admin., Municipal
Admin.
5 years
Neuse - Lenoir Acquire generators or other forms of redundant power supply to ensure that
critical facilities and infrastructure remain operational where normal power
supply is not available.
NS 2020 - County ES, Municipal
Admins.
2 to 3 years
Neuse - Lenoir Seek grant funding for mitigation opportunities eligible under the most
current version of the Hazard Mitigation Assistance (HMA) (FEMA) guidance
and Public Assistance 406 Mitigation Guidance at the time of application.
Projects may include but are not limited to acquisition/elevation,
mitigation/reconstruction, and wet/dry floodproofing to residential and
non-residential structures. Funding may also be utilized for redundant
power to critical facilities, wind retrofits to critical facilities, storm shelters
and other activities that reduce the loss of life and property.
S, NS 2020 - County Admin., Municipal
Admins.
Ongoing – As
Needed
Neuse - Pitt Review the County's Comprehensive Land Use Plan (adopted December 5,
2011) annually to ensure that the Future Land Use Map adequately
delineates portions of the County deemed unsuitable for development due
to existing environmental conditions.
NS, P 2020 Review Annually County Planning Dept.,
County Board of
Commissioners, Municipal
Admins.
Ongoing
Neuse - Pitt Continue to coordinate and collaborate with East Carolina University and
Pitt Community College through the development of their respective hazard
mitigation plans. Through implementation of this update, Pitt County
Planning will incorporate Vidant, GUC, and Duke Energy into the county’s
Mitigation Planning efforts.
P 2020 - County Admin., Municipal
Admins., East Carolina
University, Pitt
Community College
Ongoing – over
the next five
years
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 111
Region -
County - Place Investment Type Age Maintenance
Ownership/
Management
Status &
Barriers
Neuse - Pitt Continue to impose a two-foot freeboard requirement for all development
located within a defined flood hazard area. Through this plan update, Pitt
County will consider amending its Flood Damage Prevention Ordinance to
require two feet finished floor elevation above the lowest adjacent grade
within the FEMA defined shaded X zone.
NS, P 2020 Review Annually County Board of
Commissioners, County
Planning Board
Ongoing
Neuse - Pitt Maintain all FEMA Elevation Certificates and FEMA Floodproofing
Certificates for residential and non- residential structures for all structures
built or floodproofed since application to the CRS. Non-CRS communities
will
also carry out this strategy to prepare for a potential application to the CRS
Program.
NS 2020 - County Planning Dept.,
Municipal Admin.
Ongoing – over
next five years
Neuse - Pitt Consider the data and recommendations outlined within this plan when
preparing updates to the county's Capital Improvements Plan. All
recommendations regarding capital expenditures will focus on siting all
infrastructure and critical facilities outside of the Flood Hazard Area.
NS, P 2020 Annually County Planning Dept.,
County Board of
Commissioners, Municipal
Admins.
Ongoing
Neuse - Pitt Continue to proactively seek out grant funding through NCEM and FEMA for
mitigation of repetitive loss properties from future flooding events. The
County will maintain a list of repetitive loss properties and will apply for
funding for all structures that meet cost-benefit thresholds as defined by
FEMA. Pitt County will assist all municipal jurisdictions in working through
the structural mitigation grant funding process.
NS 2020 - County Board of
Commissioners, Municipal
Admins.
Ongoing – as
opportunities
arise
Neuse - Pitt Coordinate with NCDEQ to enforce all NC State Erosion and Sedimentation
and Erosion Control Regulations.
NS 2020 - County Planning Dept.,
Municipal Admins.
Ongoing – over
next five years
Neuse - Pitt Continue to expand upon the Alert Emergency Notification System available
to all residents. Pitt County EM will coordinate with all municipal
jurisdictions regarding registration through the Pitt County Emergency
Notification Registration Portal (https://pittcountync.onthealert.com). The
county will work with NCDPS to incorporate the “Know Your Zone” program
into this process. Efforts will be made to educate the public about the
location and published resources defining evacuation zones and
procedures.
NS 2020 Review Annually County EM, Municipal
Admins.
Ongoing
Neuse - Pitt Pitt County EM, in conjunction with the County Planning Dept., will evaluate
and assess the availability and effectiveness of all critical facilities outlined
within this plan. Pitt County will coordinate with NCEM, Red Cross, local
animal shelters, local care homes etc. in making determinations relating to
need and capacity.
NS, P 2020 Review Annually County EM, American Red
Cross, Municipal Admins.
Ongoing
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 112
Region -
County - Place Investment Type Age Maintenance
Ownership/
Management
Status &
Barriers
Neuse - Pitt Pitt County EM, in conjunction with annual EOP updates, will determine if
access to all critical facilities is readily available in the event of a flooding
event. Careful consideration should be given to localized flooding issues
that may restrict access along limited access thoroughfares. Where access
issues are identified, Pitt County will establish a plan for alternative
transportation.
NS, P 2020 Review Annually County EM, American Red
Cross, Municipal Admins.
Ongoing
Neuse - Pitt Continue to maintain the county's COOP. This effort will include an annual
update addressing risk management, service retention, alternative staffing
procedures and recovery checklist for each county dept..
P 2020 Review annually County EM, Municipal
Admins.
Ongoing
Neuse - Pitt Pitt County EM will review and update the County Emergency Operations
Plan on an annual basis. This update will involve coordination with all
municipalities to ensure that all emergency contacts are accurate.
P 2020 Review annually County EM, Municipal
Admins.
Ongoing
Neuse - Pitt Pitt County in coordination with all municipalities, will maintain the
county's Special Medical Needs Registry (SMNR). The SMNR is available to
all County residents. Effective participation will require close cooperation
between County EM and local government staff members. All jurisdictions
will work to advertise the availability of this service within their respective
communities.
NS 2020 - County Social Services,
County EM, Municipal
Admins.
Ongoing – over
next five years
Neuse - Pitt Continue to maintain a library of materials focused on educating citizens,
builders, realtors, and developers about the dangers associated with
floodplain development. This information will also provide material
outlining sound techniques for floodplain development and floodproofing
of existing structures. The county will also maintain staff educated on these
issues to work with prospective builders.
NS 2020 - County Planning Dept.,
Municipal Admins.
Ongoing – over
next five years
Neuse - Pitt Continue to work closely with real estate agents to ensure that prospective
buyers are educated about development within a flood hazard area. The
County will prepare materials for dissemination to local real estate agents
to assist in this education process.
NS 2020 - County Planning Dept.,
Municipal Admins.
Ongoing – over
next five years
Neuse - Pitt Work closely with the Greenville Utilities Commission and the Neuse
Regional Water & Sewer Authority to establish a memorandum of
understanding regarding supplemental resource and capacity availability in
the event of an emergency.
NS, P 2020 - County Board of
Commissioners, Municipal
Admins.
Not Started - 2 to
3 years
Neuse - Pitt Use recently upgraded storm surge inundation data provided through
NCEM. This data will be utilized when making changes to land use policy
and regulatory documents. This data will also be used as a component of
the NCDPS “Know Your Zone” program.
P 2020 - County EM, Municipal
Admins.
2 to 3 years
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 113
Region -
County - Place Investment Type Age Maintenance
Ownership/
Management
Status &
Barriers
Neuse - Pitt Work closely with the American Red Cross, NCDPS, and local care homes to
identify a location for and ultimately establish a special medical needs
shelter for county residents.
NS 2020 - County Board of
Commissioners, Municipal
Admins.
3 to 5 years
Neuse - Pitt Work to proactively implement the recommendations of the Hurricane
Matthew Resilient Redevelopment Plan developed in coordination with the
NCDPS.
P 2020 - County Board of
Commissioners, Municipal
Admins.
3 to 5 years
Neuse – Pitt
County - City of
Greenville
The City of Greenville will strengthen the city’s existing stormwater control
ordinances to require new residential development to provide 10-year flood
ponds, instead of 1- year flood ponds. The city will ensure that development
complies with all stormwater regulations.
P, NS,
NBS
2020 - City Council, Community
Development Dept.
2 to 3 years
Neuse – Pitt
County - Town of
Farmville
The Town of Farmville will build a new 500,000 gallon above ground storage
tank to enhance/increase the town’s storage capacity to 1.8 million gallons
of water, which exceeds current average daily consumption.
NS 2020 - Town Council, Staff 5 years
Neuse - Wayne Continue to impose a freeboard requirement through enforcement of their
respective Flood Damage Prevention Ordinances. The freeboard
requirement for Wayne County (including communities under interlocal
agreement) and Goldsboro is 2 feet; Mount Olive is 1 foot.
NS 2020 - County Inspections
(including municipalities
under interlocal
agreement), Goldsboro
Inspections, Mount Olive
Inspections
Ongoing – next
five years
Neuse - Wayne Maintain a comprehensive Floodplain Management Program through the
Community Rating System Program aimed at maintaining the lowest rating
available to Wayne County flood insurance policyholders.
NS 2020 - County Planning,
Municipal Admins.
Ongoing – next
five years
Neuse - Wayne Review the vulnerability of all critical facilities identified in this plan as a
component of annual County Emergency Operations Plan updates. This
effort will involve an assessment of whether facilities are readily accessible
before, during, or after a natural hazard event has transpired. The County
will also consider all information and data outlined in this plan when
making determinations on the location of all future critical facilities to
ensure that they are not located within the Flood Hazard Area.
NS, P 2020 Annually County ES, County
Admin., Municipal
Jurisdictions
Ongoing
Neuse - Wayne Educate, inform, and provide educational materials to citizens, contractors,
local real estate agents and homeowners regarding information that will
advise individuals about the hazards associated with floodplain
development. In addition, the county will use this service to inform a range
of interest groups about the natural hazards present throughout Wayne
County and services available to provide assistance, if and when the county
is impacted.
NS 2020 - County ES, County Admin. Ongoing – next
five years
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 114
Region -
County - Place Investment Type Age Maintenance
Ownership/
Management
Status &
Barriers
Neuse - Wayne Post flood level signs at prominent locations throughout the county
displaying past flood levels to remind citizens of the past and potential
flood dangers that exist within their community.
NS 2020 - County ES, County Admin. Not Started - 2 to
3 years
Neuse - Wayne Continue to promote the availability of flood insurance available through
the NFIP (FEMA) using the following means: post on County website, provide
information on building permit applications, make available at the county
library, display information in the Inspections Dept.
NS 2020 - County Inspections,
Municipal Admins.
Ongoing – next
five years
Neuse - Wayne Continue to proactively seek out grant funding through NCEM and FEMA for
mitigation of repetitive loss properties (repetitive loss properties) from
future flooding events. The county will maintain a list of repetitive loss
properties, and on an annual basis, will apply for funding for all structures
that meet cost-benefit thresholds as defined by FEMA. The priority will be
for the elevation of structures in Seven Springs and acquisition of structures
in all other jurisdictions. The county will assist municipal jurisdictions in
facilitating the grant submittal process.
NS 2020 - County Admin., Municipal
Admins.
Ongoing – as
opportunities
arise
Neuse - Wayne Continue to monitor drainage conditions throughout the county. In
addition, the county will continue to enforce and support the following
programs relating to stormwater management: NCDEQ Coastal Stormwater
Rules, NCDEQ Sedimentation & Erosion Control Regulations, NCDEQ
Statewide Stormwater Regulations, NCDEQ Coastal Area Management Act
Regulations, USACE Non-Coastal Wetland Regulations
NS 2020 - County Public Works,
Municipal Public Works
Depts
Ongoing – next
five years
Neuse - Wayne Continue to support and recruit for participants for CERT. This effort will be
coordinated with NCEM.
NS 2020 - County ES Not Started - 2 to
3 years
Neuse - Wayne Continue to expand upon the county's Code Red Emergency Notification
System available to all residents. The Wayne County Office of ES will
coordinate with all municipal jurisdictions regarding registration through
the Wayne County Emergency Notification Registration Portal.
NS 2020 - County ES Not Started - 1
year
Neuse - Wayne Work to expand upon the county's Special Medical Needs Registry (SMNR).
The SMNR is available to all county residents. Effective participation will
require close cooperation between the county office of emergency services
and local government staff members. All jurisdictions will work to advertise
the availability of this service within their respective communities.
NS 2020 Annually County ES, Municipal
Admins.
Ongoing
Neuse - Wayne Actively work with federal, state, local and private partners to identify
mitigation measures and secure funding via grants to alleviate flooding.
These efforts should focus on the following areas: Stormwater
Assessment/Repair – Fremont; Stormwater Assessment/Repair – Pikeville;
Dixie Trail and John St (Flooding/Stormwater) – Goldsboro; Engineering
study of existing stormwater utility/drainage – County
S, NS,
P
2020 - County Public Works,
Municipal Admins.
3 to 5 years
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 115
Region -
County - Place Investment Type Age Maintenance
Ownership/
Management
Status &
Barriers
Neuse - Wayne Work to establish pad mount backup generators at all county/critical
facilities to facilitate the efficient utilization of designated shelter facilities
and facilitate post disaster response.
NS 2020 - County ES, County Board
of Commissioners,
Municipal Admins.
2 to 3 years
Neuse - Wayne Work to proactively implement the recommendations of the Hurricane
Matthew Resilient Redevelopment Plan developed in coordination with the
NCDPS.
P 2020 - County ES, Municipal
Admins.
5 years
Table 43. RHMP – Pamlico Sound Region (5.4.3)
Region - County
- Place Investment Type Age Maintenance Ownership/Management
Status &
Barriers
Pamlico Sound –
Carteret
Address the sheltering needs of County residents. Continue to work on
improving the preparedness of all existing shelter facilities, including the
installation of onsite generators at all shelter locations. Maintain updated
information regarding all shelters on the County website. Continue
support of the NC CRES plan aimed at providing inland sheltering
resources for coastal counties and preparation and adoption of a county
sheltering plan.
NS, P 2020 - County ES, County Social
Services
2-3 years
Pamlico Sound –
Carteret
Provide information regarding evacuation procedures and routes through
county and municipal websites, as well as other means when feasible.
These efforts will involve assisting the Towns of Atlantic Beach, Cape
Carteret, Indian Beach, Morehead City, and Pine Knoll Shores with efforts
relating to bridge closures and re-entry policies and procedures. As part of
these efforts, the county will make handouts available for citizens and
visitors outlining evacuation routes and procedures provide education
and outreach for implementation of the Know Your Zone initiative.
NS 2020 - County ES, NC Highway Patrol,
Atlantic Beach Admin., Cape
Carteret Admin., Indian Beach
Admin., Morehead City Admin.,
Pine Knoll Shores Admin.
1 year
Pamlico Sound –
Carteret
Annually review and maintain the county's Continuity of Operations Plan
to ensure ongoing governmental operations following a natural or human
induced disaster event. The county, in conjunction with all participating
municipal jurisdictions, will review this plan annually and update as
deemed necessary.
P 2020 Reviewed
Annually
County ES, Municipal Admins. Ongoing- next 5
years
Pamlico Sound –
Carteret
Annually review and update the County's EOP to ensure compliance with
all NC Emergency Management (NCEM) and NCOEMS procedures and
policies. Through these updates, the county will work closely with all
participating municipalities to ensure that all jurisdictions continue to be
educated and prepared for activation of the EOP in the event of a disaster
event.
P 2020 Reviewed
Annually
County ES Ongoing- next 5
years
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 116
Region - County
- Place Investment Type Age Maintenance Ownership/Management
Status &
Barriers
Pamlico Sound –
Carteret
Maintain, and where necessary, establish backup generators at all
identified critical facilities. In addition, the county ES will evaluate the
equipment on a regular basis to assure it continues to meet operational
demands at county facilities.
NS 2020 Evaluate all
emergency
generators on
a regular basis
to ensure
operability.
County ES, Independent
Facility Operators, Town
Public Utilities
Ongoing- next 5
years
Pamlico Sound –
Carteret
Maintain a contract with a qualified post-disaster recovery service
provider. This contract will include the provision of essential services and
equipment, including generators, and will include documentation
required for reimbursement from FEMA/NCEM.
NS 2020 Reviewed
Annually
County Governing Board,
Municipal Governing Boards
Ongoing
Pamlico Sound –
Carteret
Continue to maintain the county's Crisis Management System to
efficiently deal with emergency situations. These efforts will involve
training for officials and relevant staff regarding use of the program.
NS 2020 - County ES, County Planning Ongoing- next 5
years
Pamlico Sound –
Carteret
Meet annually with all electric service providers operating within the
county prior to hurricane season, in preparation for the effects of severe
weather, and will provide the preliminary planning steps required for
effective post-disaster recovery.
NS, P 2020 Meet Annually County ES, Municipal Admins. Ongoing
Pamlico Sound –
Carteret
Maintain all property acquired within the Special Flood Hazard Area
(SFHA) as undisturbed open space in perpetuity. Continue to proactively
establish open space within the floodplain and floodway as HMGP (FEMA)
grant funds become available to carry out this initiative.
NS,
NBS
2020 - County Planning, Municipal
Admins.
Ongoing- next 5
years
Pamlico Sound –
Carteret –
Morehead City
Integrate, when feasible, new greenway and public park improvements
into comprehensive planning and capital improvement efforts (including
coordination with the county's certified Coastal Area Management Act
Land Use Plans).
NS,
NBS,
P
2020 - County Parks and Recreation,
County Planning, Morehead
City Parks and Recreation
Other- as
opportunities
arise
Pamlico Sound –
Carteret
Review and update respective Flood Damage Prevention Ordinances as
deemed necessary. Once annually, all jurisdictions will conduct a review
to ensure that the current Flood Damage Prevention Ordnance is
compliant with all FEMA and NCEM mandates.
NS 2020 Reviewed
Annually
County Planning, Municipal
National Flood Insurance
Program (NFIP) participants
Ongoing- next 5
years
Pamlico Sound –
Carteret
Strive to maintain respective CRS ratings through implementation of a
comprehensive floodplain management program
NS, P 2020 - County Planning, Municipal
Admins.
Ongoing- next 5
years
Pamlico Sound –
Carteret
Maintain a map information service involving the following: (1) Provide
information relating to Flood Insurance Rate Maps (FIRMs) to all inquirers,
including a provision of information on whether a given property is
located with a flood hazard area (2) Provide information regarding the
flood insurance purchase requirement (3) Maintain historical and current
FIRMs (4) Advertise once annually in the local newspaper the availability
NS, P 2020 - County Planning, Municipal
Admins.
Ongoing- next 5
years
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 117
Region - County
- Place Investment Type Age Maintenance Ownership/Management
Status &
Barriers
of FIRMs and (5) Provide information to inquirers about local floodplain
management requirements
Pamlico Sound –
Carteret
Mail a notice annually to all property owners to educate citizens about
dangers associated with flooding in low-lying coastal areas.
NS 2020 Once Annually County Planning, Municipal
Admins.
Ongoing
Pamlico Sound –
Carteret
Make information regarding hazards and development regulations within
floodplains available through: (1) Ensure that the local library maintains
information relating to flooding and flood protection (2) Provide a link on
the county website to FEMA resources addressing flooding and flood
protection (3) Provide a link on all participating municipalities’ websites
to FEMA resources addressing flooding and flood protection, evacuation
procedures, disaster preparedness, and post-disaster recovery and (4)
Provide website links to relevant hazard mitigation websites (5) Provide
information to local real estate agents
NS 2020 - County Planning, Municipal
Admins.
Ongoing- next 5
years
Pamlico Sound –
Carteret
Continue to proactively seek out grant funding through NCEM and FEMA
for mitigation of repetitive loss properties from future flooding events.
The County will maintain a list of repetitive loss properties and on an
annual basis, will apply for funding for all structures that meet cost-
benefit thresholds as defined by FEMA. Carteret County will assist all
municipal jurisdictions in working through the structural mitigation grant
funding process
NS 2020 - County Planning Dept., County
Board of Commissioners,
Municipal Admins.
Ongoing- next 5
years
Pamlico Sound –
Carteret
Increase the availability of skilled contractors to perform needed work
post hazard by: Developing a partnership with major national contractors
in selected areas (roofing, tree trimming, etc.), such that they will deploy
resources and skilled contractors to affected areas as needed; Creating
local contractor retention plan (perhaps with incentives related to
permits, commitments for county/city projects, a reduction in community
college tuition, etc.) to reduce the flight of local skilled labor.
NS, P 2020 - County Planning Dept., County
Board of Commissioners,
Municipal Admins.
2 to 3 years
Pamlico Sound –
Carteret
Improve awareness regarding the intensity of natural hazard events as
they materialize and subside by establishing an emergency radio
broadcast frequency that runs a recorded message pre- and post-hazard
to communicate critical-time sensitive information. It could include things
like routes/ bridges that are open or closed, weather/hazard forecasts,
location of emergency shelters; more fully utilizing county/town websites
to provide pre-hazard and post-hazard recovery info (debris pick up
schedule, critical dates, forms, phone numbers, housing availability, etc.).
NS 2020 - County ES, County Board of
Commissioners, Municipal
Admins.
2 to 3 years
Pamlico Sound –
Craven
Review respective Comprehensive Land Use Plans annually to ensure that
the Future Land Use Map adequately delineates portions of the
community deemed unsuitable for development due to existing
environmental conditions. This effort will also involve the identification of
NS,
NBS,
P
2020 - County Planning Dept., County
Board of Commissioners,
Municipal Admins.
2 to 3 years
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 118
Region - County
- Place Investment Type Age Maintenance Ownership/Management
Status &
Barriers
potential drainage easements and open space areas that will positively
affect drainage conditions within areas documented as
stormwater/flooding hot spots. In addition, the county will attempt to
identify portions of the county susceptible to wildfire damage.
Pamlico Sound –
Craven
Review respective Flood Damage Prevention Ordinances to assess
whether any revisions and/or updates have been mandated by FEMA or
NCEM. In addition, jurisdictions will consider whether regulatory options
are available to provide for more effective floodplain management.
P 2020 Review
annually
County Planning Dept., County
Board of Commissioners,
Municipal Admins.
Ongoing as
Needed
Pamlico Sound –
Craven
Continue to support NCDENR in efforts to enforce the Neuse River Basin
wide Water Quality Management Rules.
NS 2020 - County Planning Dept.,
Municipal Admins.
Ongoing- next 5
years
Pamlico Sound –
Craven
Continue to proactively seek out grant funding through NCEM and FEMA
for mitigation of repetitive loss properties from future flooding events.
The County will maintain a list of repetitive loss properties, and on an
annual basis, apply for funding for all structures that meet cost -benefit
thresholds as defined by FEMA. Craven County will assist all municipal
jurisdictions in working through the structural mitigation grant funding
process.
NS 2020 - County Planning Dept., County
Board of Commissioners,
Municipal Admins.
Ongoing – as
needed
Pamlico Sound –
Craven
Consider the data and recommendations outlined within this plan when
preparing updates to respective Capital Improvements Plans. All
recommendations regarding capital expenditures will focus on siting
infrastructure and public facilities outside of the Flood Hazard Area
P 2020 Review
annually with
budget
preparation
County Board of
Commissioners, Municipal
Elected Boards
In Progress
Pamlico Sound –
Craven
Consider all the data, information, maps, and recommendations outlined
throughout this plan when siting for the development of all new critical
facilities
NS, P 2020 - County Board of
Commissioners, Municipal
Elected Boards
Ongoing – as
needed
Pamlico Sound –
Craven
In conjunction with annual EOP updates, determine if access to all critical
facilities is readily available in the event of a flooding event. Careful
consideration should be given to localized flooding issues that may
restrict access along limited access thoroughfares. Where access issues
are identified, the county will establish a plan for alternative
transportation.
NS, P 2020 - County ES, Municipal Admins. Ongoing – as
needed
Pamlico Sound –
Craven
Work to expand upon the county’s Special Medical Needs Registry
(SMNR). The SMNR is available to all county residents. Effective
participation will require close cooperation between County ES and local
government staff members. All jurisdictions will work to advertise the
availability of this service within their respective communities. It should
be noted that applicants must be approved once application is made.
Application alone does not result in guaranteed emergency service
NS 2020 - County ES, Municipal Admins. Ongoing- over
next 5 years
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 119
Region - County
- Place Investment Type Age Maintenance Ownership/Management
Status &
Barriers
Pamlico Sound –
Craven
Continue to provide detailed information regarding properties located
within flood hazard areas as outlined under CRS Manual Section 322.a
through 322. g.
NS 2020 - County Planning Dept., County
Board of Commissioners,
Municipal Admins.
Ongoing- over
next 5 years
Pamlico Sound –
Craven
Continue to maintain a library of materials focused on educating citizens,
builders, realtors, and developers about the dangers associated with
floodplain development. This information will also provide material
outlining sound techniques for floodplain development and floodproofing
of existing structures. The county will also maintain staff educated in
these issues to work with prospective builders
NS 2020 - County Planning Dept., County
Board of Commissioners,
Municipal Admins.
Ongoing- over
next 5 years
Pamlico Sound –
Craven
Work to implement all strategies outlined within the Hurricane Matthew
Resilient Redevelopment Plan.
P 2020 - County Board of
Commissioners, Municipal
Governing Boards
Ongoing- over
next 5 years
Pamlico Sound –
Craven
Continue to proactively seek out grant funding through NCEM and FEMA
for mitigation of Craven County Schools and other critical facilities that
involves public usage during and after disaster events (such as
generators, structural modifications, etc.) which would make structures
more resilient during future storms and natural hazard events.
NS 2020 - County Planning Dept., County
Admin., Municipal Admins.
2 to 3 years
Pamlico Sound –
Craven
Continue to expand upon the county’s Emergency Notification System
available to all residents. Craven County ES will coordinate with all
municipal jurisdictions regarding registration
NS 2020 - County ES, Municipal Admins. Ongoing- over
next 5 years
Pamlico Sound –
Craven
Continue to maintain the COOP. This effort will include an annual update
addressing risk management, service retention, alternative staffing
procedures and recovery checklist for each county dept.
P 2020 Reviewed
annually
County ES, Municipal Admins. Ongoing- over
next 5 years
Pamlico Sound –
Craven
Review and update the County Emergency Operations Plan. This update
will involve coordination with all municipalities to ensure that all
emergency contacts are accurate
P 2020 Reviewed
annually
County ES, Municipal Admins. Ongoing- over
next 5 years
Pamlico Sound –
Craven
Maintain a contract with a qualified post-disaster recovery service
provider. This contract will include the provision of essential services and
equipment, including generators, and will include documentation
required for reimbursement from FEMA/NCEM.
NS 2020 Reviewed
annually
County Board of
Commissioners, Municipal
Governing Boards
Ongoing
Pamlico Sound –
Craven
Maintain information on the County website relating to evacuation and
sheltering. Emergency information on the website will include evacuation
routes, sheltering, delays and closures, pet sheltering options, and special
needs information.
NS 2020 - County ES, Municipal Admins. Ongoing- over
next 5 years
Pamlico Sound –
Craven
Develop a formal system and plan for evaluating and assessing the
availability and effectiveness of all critical facilities outlined within this
plan. Craven County will coordinate with NCEM, American Red Cross, local
P 2020 Annual
updates
County Emergency Services,
County Board of
2-3 years
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 120
Region - County
- Place Investment Type Age Maintenance Ownership/Management
Status &
Barriers
animal shelters, local care homes, etc., in making determinations related
to need and capacity required in the event of a disaster.
Commissioners, Municipal
Elected Boards
Pamlico Sound –
Pamlico
In the event of a substantial flooding event, or other natural hazard
occurrence, perform damage assessments in coordination with NCEM.
These assessments will assist the County in determining the extent of the
damage caused by the respective disaster event. This data will be utilized
as a tool for land use planning and future hazard mitigation plan updates
and to gauge the effectiveness of the county's 2-foot freeboard
requirement.
P 2020 - County ES, County Admin,
Municipal Admins.
Ongoing – as
necessary
Pamlico Sound –
Pamlico
Continue to monitor drainage conditions throughout the County: in
particular, issues associated with drainage ditches and agricultural runoff
canals situated throughout the county. Once issues are identified, the
county will work with municipal jurisdictions and state agencies to
identify short- and long-term solutions to these issues.
NS, P 2020 - County Admin., County ES,
Municipal Admins.
Ongoing- in
process
Pamlico Sound –
Pamlico
Continue to proactively seek grant funding through NCEM and FEMA for
mitigation of repetitive loss properties (repetitive loss properties) from
future flooding events. The county will maintain a list of repetitive loss
properties, and on an annual basis, will apply for funding for all structures
that meet cost-benefit thresholds as defined by FEMA. Pamlico County
will assist all municipal jurisdictions in working through the structural
mitigation grant funding process
NS 2020 - County Planning Dept., County
Board of Commissioners,
Municipal Admins.
Ongoing – as
needed
Pamlico Sound –
Pamlico
Continue to educate county residents about the linkage between flooding
(standing water) and the proliferation of mosquitos. These efforts will
focus on teaching property owners how to mitigate mosquito issues
throughout the county.
NS 2020 - County Admin., County ES,
Municipal Admins.
Ongoing- in
process
Pamlico Sound –
Pamlico
Make a range of materials related to flood insurance, flood protection,
floodplain management, information on floodplains, and listings of
qualified contractors/realtors familiar with floodproofing and elevation
techniques, available through various avenues including: placing
materials in the local library; maintaining documents at the County
Planning and Economic Development office; disseminating information to
local contractors; distributing information to churches and other
community-based organizations; establishing a means to distribute
information to schoolchildren
NS 2020 - County Planning Dept., County
Board of Commissioners,
Municipal Admins.
Ongoing- over
next 5 years
Pamlico Sound –
Pamlico
Review and update the County Emergency Operations Plan on an annual
basis. This update will involve coordination with all municipalities to
ensure that all emergency contacts are accurate and that all jurisdictions
are adequately prepared.
P 2020 - County ES, Municipal Admins. Ongoing – as
needed
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 121
Region - County
- Place Investment Type Age Maintenance Ownership/Management
Status &
Barriers
Pamlico Sound –
Pamlico
Develop a formal system and plan for evaluating and assessing the
availability and effectiveness of all critical facilities outlined within this
plan. Pamlico County will coordinate with NCEM, Red Cross, local animal
shelters, local care homes etc., in making determinations relating to need
and capacity.
P 2020 Update
annually
County ES, County Board of
Commissioners, Municipal
Elected Boards
2 to 3 years
Pamlico Sound –
Pamlico
Continue to maintain all development regulations, emergency and land
use related plans, and applications for permits on the respective
jurisdictions’ website. This information will be maintained and updated as
deemed necessary. If a local website does not exist, municipal
jurisdictions will consider developing one through implementation of this
plan.
NS, P 2020 - County Administration,
Municipal Admins.
3 to 5 years
Pamlico Sound –
Pamlico
Maintain Debris Removal and Monitoring Services Contracts for post
disaster response. These services should focus on preparing
documentation necessary to ensure full reimbursement of cost associated
with community cleanup and immediate infrastructure restoration
NS 2020 - County ES, County Board of
Commissioners, Municipal
Admins.
Ongoing- as
needed
Pamlico Sound –
Pamlico
Continue to work with the NCDEQ to enforce standards outlined within
the statewide stormwater management program. Currently, this program
generally addresses stormwater management for projects disturbing an
area equal to or greater than one acre. In addition, the county will
monitor localized flooding issues and, where feasible, address these
issues through the installation of stormwater best management practices.
S, NS 2020 - County Admin., Municipal
Admin.
Ongoing- in
process
Pamlico Sound –
Pamlico
Develop a formal system and plan for evaluating and assessing the
availability and effectiveness of all critical facilities outlined within this
plan. Pamlico County will coordinate with NCEM, Red Cross, local animal
shelters, local care homes etc., in making determinations relating to need
and capacity.
P 2020 - County ES, County Board of
Commissioners, Municipal
Elected Boards
2 to 3 years
Pamlico Sound –
Pamlico
Maintain all property acquired through annual and post disaster
mitigation funding as open space in perpetuity. In addition, appropriate
reuse strategies will be developed regarding this dedicated open space
NS,
NBS
2020 - County Admin., Municipal
Admins.
Ongoing- in
process
Pamlico Sound –
Pamlico – Town of
Oriental
Annual outreach to residents for hurricane season preparations, quarterly
meetings with church reps to disseminate prep materials, instructions for
before, during, and following disasters. Keep seasonal information in
Town Hall and disseminate to businesses. Distribute through mailings
(newsletter), social media, traditional media materials. Disseminate info
on elevation for new construction, restrict building in floodplain
NS 2020 - Town Admin. Ongoing
Pamlico Sound –
Pamlico – Town of
Oriental
Annual outreach to realtors to make sure most updated building
restrictions in Growth Management Ordinance are disseminated to all
potential buyers
NS 2020 - Town Admin. Ongoing
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 122
Region - County
- Place Investment Type Age Maintenance Ownership/Management
Status &
Barriers
Pamlico Sound –
Pamlico – Town of
Oriental
Annual review by Planning Board and Town Board and make changes to
Growth Management Ordinance that prevent recurrent flooding and
enhance drainage capacity
NS, P 2020 Annually Town Admin. Ongoing
Pamlico Sound –
Pamlico – Town of
Oriental
Annual ditch clearing and assessment of town maintained open and
covered culverts. Annual education of residents/businesses about the
flow of drainage (culverts not there to take water away, but to settle
solids), Priority list established and reviewed for clearing/blockage of
street culverts, education about ownership of land vs. rights-of-way,
necessity of clearing residentially maintained ditches
S, NS,
P
2020 Annually Town Admin. Ongoing
Table 44. RHMP – Eno-Haw Region (5.4.3)
Region - County -
Place Investment Type Age Maintenance
Ownership/
Management Status & Barriers
Eno-Haw – Durham
County – City of
Durham
Identify and obtain additional properties to increase protected
open space as a land-use tool to reduce adverse impacts from
floods.
NS,
NBS
2020 - City & County
Planning Dept.
2025
Eno-Haw – Durham
County
Implement a Stormwater Utility Fee for all properties within the
unincorporated areas of Durham County.
NS 2020 - County
Engineering and
Environmental
Services
New
Eno-Haw – Orange
County
Continue participation in the CRS and annual recertification to
increase public safety, reduce property damage, avoid economic
loss, and allow for a decrease in flood insurance premiums for
Orange County residents.
NS 2020 - County Planning
and Inspections
Dept.
2020-2025
Eno-Haw – Orange
County
Continue to enforce floodplain regulations through the county's
Special Flood Hazard Area (SFHA) Overlay District contained within
the Orange County Unified Development Ordinance and continue
training efforts for the Certified Floodplain Manager.
NS 2020 - County Planning
and Inspections
Dept.
2020-2025
Eno-Haw – Orange
County
Continue to collaborate and support municipal mitigation
strategies
P, NS,
S, NBS
2020 - County ES 2025
Eno-Haw – Orange
County
Continue enforcement of the North Carolina State Building Code. NS 2020 Updated every
6 years and
next scheduled
update is Jan.
2025.
County Planning
and Inspections
Dept.
2025 - Currently operating
under the 2018 edition of the NC
State Building Codes and 2017
edition of the National Electrical
Code.
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 123
Region - County -
Place Investment Type Age Maintenance
Ownership/
Management Status & Barriers
Eno-Haw – Orange
County
Continue participation in the NFIP (FEMA) to reduce the impact of a
future flood event, mitigate effects of flooding, and allow citizens to
be eligible for affordable flood insurance.
NS 2020 - County Planning
and Inspections
Dept.
2020-2025
Eno-Haw – Orange
County
Identify potential flood hazards of critical infrastructure and
mitigation measures to address.
NS 2020 - Water and Sewer
Authority
2020-2025
Eno-Haw – Orange
County
Strive to ensure future development occurs in a manner that
protects floodplains, streams, wetlands, and other natural features
which work to reduce flood hazard susceptibility and continue to
enforce existing regulations pertaining to stormwater management
and erosion control standards contained within the Orange County
Unified Development Ordinance.
NS 2020 - County Planning
and Inspections
Dept.
2025
Eno-Haw – Orange
County
Identify and implement strategies to increase swift water rescue
capacity.
NS 2020 - County ES 2025
Eno-Haw – Orange
County
Provide staff support and information on Orange County's website
to provide education and assistance to residents experiencing
floodplain, stormwater, and erosion control issues.
NS 2020 - County Planning
and Inspections
Dept., ES
2025
Eno-Haw – Orange
County – Town of
Hillsborough
Work with the Tree Board, Public Works Dept., and utility companies
to ensure that dangerous situations are addressed in a timely
manner
NS 2020 - Public Works
Dept.
2025
Eno-Haw – Orange
County – Town of
Hillsborough
Work with state efforts to study hydrology and maps/designate any
new flood prone areas
P 2020 - Planning Dept. 2019-2025 - New flood maps
and GIS maps have been drawn
for a good portion of our
jurisdiction as of 2017, but the
northwest, south, and
southwest areas of town still
utilize 2007 FIRM panels.
Eno-Haw – Orange
County – Town of
Hillsborough
Construct new recreational facilities out of flood-resistant and
resilient building materials due to their locations in flood prone
areas
NS 2020 - Public Space and
Public Works
2020-2025 - Due to the
propensity for recreational land
and structures to be located in
flood prone areas, this will
become a higher priority as the
Town develops new public
spaces and amenities
Eno-Haw – Orange
County – Town of
Hillsborough
Relocate the Public Works operation to a non-flood prone site. This
is a sizable project and is expected to be completed in the next 5-7
years.
NS 2020 - Public Works
Dept.
2023-2024 - This was originally
budgeted for a contract for the
2016-2017 budget cycle, but
due to funding and project
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 124
Region - County -
Place Investment Type Age Maintenance
Ownership/
Management Status & Barriers
delays, this will likely be
reprioritized to the 2023-2024
Eno-Haw – Person Update the Person County Floodplain Ordinance to comply with
state and national standards.
NS 2020 - County Planning 2020 - Floodplain Ordinance
update is in progress
Eno-Haw – Person –
City of Roxboro
Revise and update the regulatory floodplain maps. P 2020 - County & City
Planning and GIS
Depts
2020 - Floodplain map updates
are in progress (per FEMA).
Eno-Haw – Person –
City of Roxboro
Use GIS to map 50' riparian buffers as required by the State within
watersheds
P 2020 - GIS Staff 2021 - Riparian buffers have not
yet been mapped by the County
due to administrative
limitations.
Eno-Haw – Person –
City of Roxboro
Public Services receive training on erosion and sedimentation
control and assists property owners and developers with issues.
Planning Director, who serves Floodplain Administrator, attends
regular NFIP workshops for updates and provides information to
property owners regarding proper floodplain development
practices. Public Services Director requires sedimentation and
erosion control data on all new development projects.
NS 2020 - Admin., Planning
and Public
Services
2020-2025
Eno-Haw – Person –
City of Roxboro
At the next update of the Land Use Plan, consider incorporating a
Greenway or Open Space Plan
NBS, P 2020 - Planning 2020 - There are some
provisions in the existing
Unified Development Ordnance
(UDO), additional
improvements may be
considered, pending the
political climate
Eno-Haw – Person –
City of Roxboro
Enforce impervious surface calculation/ limitation for residential
and non-residential development.
NS 2020 City requires
Stormwater
Administrator
review and
approval of all
new
construction/
redevelopment
projects
Planning 2024
Eno-Haw – Person –
City of Roxboro
Enforce minimum housing standards ordinance NS 2020 - Planning & Code
Enforcement
2025 - Have increased
contracted hours with Code
Enforcement officer to be able
to maintain activity on
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 125
Region - County -
Place Investment Type Age Maintenance
Ownership/
Management Status & Barriers
minimum housing enforcement
issues throughout the City and
will continue to monitor the
need to determine if further
increases are necessary.
Eno-Haw – Person –
City of Roxboro
Create and maintain a list of repetitive flood loss properties.
Currently none to record/map
P 2020 - County & City
Planning and GIS
as well as
Inspections
2021
Eno-Haw – Person –
City of Roxboro
Enforce Stormwater Ordinance for new and redevelopment on
residential and commercial properties.
NS 2020 - County and City
Planning
2025
Eno-Haw – Person –
City of Roxboro
Establish Enhanced Voluntary Agricultural District Ordinance NS 2020 - Stormwater 2025
Eno-Haw – Person –
City of Roxboro
Develop a conservation easement program NS 2020 - Stormwater,
Planning
2025
Eno-Haw – Person –
City of Roxboro
Encourage participation in State & Federal Cost Share programs NS 2020 - Stormwater,
Natural Resource
Conservation
Service (NRCS)
(USDA) and NC
Forestry
2020-2025
Eno-Haw – Person –
City of Roxboro
Conduct landowner/farmer workshops on conservation practices NS 2020 - Stormwater &
NCDACS
2020-2025
Eno-Haw – Person –
City of Roxboro
All portions of the buildings that have been submerged for any
length of time will be inspected for flood related damage as well as
other conditions that may be dangerous to live, health or property
NS 2020 Performed by
Building
Inspections on
a case-by-case
basis, as
needed. Re-
evaluate
program
success in next
update
Inspections 2025
Eno-Haw – Person –
City of Roxboro
Track drainage, erosion, and flooding problems within the city
planning jurisdiction
NS, P 2020 - Planning & Public
Services
2025 - Tracking underway and
will be ongoing through next
plan update from NCOEM, Plans
and GIS.
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 126
Region - County -
Place Investment Type Age Maintenance
Ownership/
Management Status & Barriers
Eno-Haw – Person –
City of Roxboro
Continue to maintain a debris removal program for problem sites S 2020 - Planning 2025 - Some work complete,
further may be necessary.
County is looking at
participating in the State’s Pre-
Position Debris Contract
Program and we are in
conversation with Private
Sector about contractor. This is
ongoing through next plan
update.
Eno-Haw – Person –
City of Roxboro
Place flood protection and other hazard mitigation education
materials in public buildings (i.e., City Hall, county offices, library
etc.)
NS 2020 - County and City
Planning & ES
2025
Eno-Haw – Alamance
– City of Mebane
Maintain shelter agreements with the American Red Cross NS 2020 - County/City 2025
Eno-Haw – Alamance
– City of Mebane
Expand the county's GIS capabilities to include maintaining
elevation certificates
NS, P 2020 County
maintains GIS
but City
maintains
elevation
certificates
County and City 2025
Eno-Haw – Alamance
– City of Mebane
Continue the City of Mebane’s participation in the NFIP (FEMA) NS 2020 The city has
maintained
compliance
with the NFIP
and will
continue to do
so as part of
plan review
and permitting
process.
City of Mebane 2025
Eno-Haw – Alamance
– City of Mebane
Monitor reservoirs, lakes, and streams for potential flooding
problems and note any unexpected flooding issues
NS 2020 - City of Mebane 2025 - City has checked culverts
and streams along outfalls
ahead of large, predicted storm
events and cleared debris as
necessary to prevent flooding.
No major issues beyond
maintenance needs have been
noted.
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 127
Region - County -
Place Investment Type Age Maintenance
Ownership/
Management Status & Barriers
Eno-Haw – Alamance
– City of Mebane
When county land use plan is complete, create a land use map with
an overlay for flood hazards and any other natural hazards
P 2020 Will look to
provide
additional
mapping as
data becomes
available
City of Mebane 2025 - Land use plan completed
locally. County has flood hazard
on the County GIS.
Eno-Haw – Alamance
– City of Mebane
Monitor structures affected by flood and track damages and repair
costs.
NS 2020 - City of Mebane 2020-2025 - No progress to
report due to low priority. City
owned structures will be
monitored and tracked. Private
structures will be tracked by
building permits
Eno-Haw – Alamance
– City of Mebane
Seek funding to install backup generators or quick connect hook
ups for mobile generators on any newly constructed county/town
critical facilities
NS 2020 - City of Mebane 2025 - Backup generators have
now been installed at nearly all
existing facilities. All new
construction facilities will be
evaluated as part of plan
review.
Eno-Haw – Alamance
– City of Mebane
Encourage familiarity with NFIP (FEMA) NS 2020 - Planning, Zoning,
and Inspections
2025 - No new progress to
report due to limited
administrative resources. Will
continue existing outreach as
part of plan review and
permitting process
Eno-Haw – Alamance
– City of Mebane
Encourage citizens and businesses to develop emergency
preparedness plans
NS, P 2020 - City of Mebane 2025 - No progress made due to
administrative limitations. Will
place information on the
website encouraging
development of emergency
preparedness plans.
Eno-Haw – Alamance
– City of Mebane
Encourage homeowners to review insurance policies as part of an
overall family disaster plan
NS, P 2020 - City of Mebane 2025 - Educational material is
posted on website/handouts
Eno-Haw – Alamance
– City of Mebane
Increase awareness of the natural hazards potential to officials,
public and industry
NS 2020 - City of Mebane 2025 - Code Red information is
placed on the City’s website.
Citizens are informed by Code
Red notifications as hazards
arise.
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 128
Region - County -
Place Investment Type Age Maintenance
Ownership/
Management Status & Barriers
Eno-Haw – Alamance
– City of Mebane
Provide local real estate agents with handouts that will advise
potential buyers to investigate the flood hazards for the property
under consideration
NS 2020 Planning Dept.
provides
information to
agents and
developers
City of Mebane 2025
Table 45. RHMP – Wake County (5.4.3)
Region - County -
Place Investment Type Age Maintenance
Ownership/
Management
Status &
Barriers
Wake County Partner with other governmental units and other interested parties to
jointly identify and acquire 30,000 acres of open space lands
NS, NBS 2019 - County Community
Services
3-5 years
Wake County Identify road network segments no longer maintained by NCDOT and
provide funding and planning resources for mitigation and recovery
efforts to communities to ensure infrastructure and transportation
resiliency. Assist in reinstating water and sewer services post disaster.
NS, P 2019 - County Community
Services
5 years
Wake County Replace emergency generators located at facilities that serve as
emergency shelter locations based on their scheduled end of life cycle
NS 2019 - County Facilities
Design &
Construction
More than 5 years
Wake County Construction of a new Emergency Operations Center adequate for the
size and complexity of the jurisdiction
NS 2019 - County EM Completed
October 2023
Wake County Recovery Plan. Develop a comprehensive disaster recovery plan for Wake
County consistent with the vision and goals described in Presidential
Policy Directive-8 and the National Disaster Recovery Framework.
P 2019 - County EM 3-5 years
Wake County Upload dam failure inundation maps to Everbridge system for
notification and evacuation
NS 2019 - County EM 1 year
Wake County Increase public awareness and participation in the Ready Wake program
and resources.
NS 2019 - County Fire Service
and EM
2-3 years
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 129
Region - County -
Place Investment Type Age Maintenance
Ownership/
Management
Status &
Barriers
Wake County – City of
Raleigh
Establish a Lake Preservation Policy that encourages private property
owners to preserve existing lakes and ponds, and in certain
circumstances provides for public assistance.
NS, NBS 2019 - Engineering
Services
1 year
Wake County – City of
Raleigh
Develop ongoing multi-year program of detailed basin studies for each
watershed in City’s jurisdiction. Fifteen basin studies are complete with
ten additional studies budgeted in the capital program. (CRS 410).
P 2019 - Engineering
Services
1 year
Wake County – City of
Raleigh
Planning Commission to consider program to develop future conditions
floodplain mapping for all FEMA mapped areas (this is already done for
non-FEMA mapped areas). The program would consist of a multi-year
capital program for mapping for all FEMA streams in the extra-territorial
jurisdiction (ETJ) and consideration of changes to development
regulations in these areas. Future conditions would be based on
expected development per the Comprehensive Plan and zoning maps
NS, P 2019 - Engineering
Services
3-5 years
Wake County – City of
Raleigh
Develop a written Resiliency Plan for City of Raleigh operations and
services, including infrastructure resilience, community resilience,
ecosystem resilience and governance resilience
P 2019 - Office of
Sustainability
2-3 years
Wake County – City of
Raleigh
Update and maintain GIS data of building footprints, parcels, and critical
facilities, and use it to regularly identify buildings in need of mitigation.
P 2019 - City Information
Technology & GIS
Staff
5 years
Wake County – City of
Raleigh
Develop ongoing program designed to utilize Federal grant resources to
assist private property owners in relocating existing structures out of
flood hazard zones.
NS 2019 - Engineering
Services
3-5 years
Wake County – City of
Raleigh
Develop an ongoing program designed to utilize federal grant resources
to assist private property owners in renovating and retrofitting existing
structures in flood hazard zones to reduce vulnerability to flooding
damage.
NS 2019 - Engineering
Services
Ongoing - next 5
years
Wake County – City of
Raleigh
Program to install emergency electrical generators at all public utility
facilities. Current focus on redundant generators at critical facilities,
second fuel truck and completion of 100% generator coverage in Garner
area.
NS 2019 - City Public Utilities 2-3 years - Now
have emergency
backup power
generators at all
our critical
facilities except
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 130
Region - County -
Place Investment Type Age Maintenance
Ownership/
Management
Status &
Barriers
for South Raleigh
Facility.
Wake County – City of
Raleigh
Install cameras in flood prone areas throughout the City of Raleigh to
allow us to view these locations and make informed decisions as it
relates to flooding
NS, P 2019 - Transportation 3-5 years
Wake County – City of
Raleigh
Provide and enhance technical rescue capabilities more equitably
throughout the city.
NS 2019 - Fire 2-3 years
Wake County – City of
Raleigh
Design GIS programming capable of providing real-time data to
emergency managers and historic data for future emergency response
planning.
NS, P 2019 - City Manager and
Information
Technology
3-5 years
Wake County – City of
Raleigh
Continue to conduct disaster tabletop exercise program. NS 2019 Annual Public Utilities,
Fire, Police, City
Manager, EM, and
Engineering
Services
5 years
Wake County – City of
Raleigh
Establish cross-functional team to develop Debris Management Plan.
Team should work to identify and prepare additional debris
management sites.
NS, P 2019 - Transportation 1 year
Wake County – Town
of Apex
Revise and update the regulatory floodplain boundary, including flood
studies.
NS, P 2019 - Public Works &
Transportation
(Floodplain
Administrator)
Ongoing - next 5
years
Wake County – Town
of Apex
Develop an environmental committee that meets regularly to discuss
issues and recommend projects.
P 2019 - Water Resources
(Stormwater and
Utility Engineering
Manager)
5 years
Wake County – Town
of Apex
Encourage the use of Low Impact Development techniques NS 2019 - Water Resources
(Stormwater and
Utility Engineering
Manager)
Ongoing - next 5
years
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 131
Region - County -
Place Investment Type Age Maintenance
Ownership/
Management
Status &
Barriers
Wake County – Town
of Apex
Use system development fees to help fund public projects NS 2019 - Water Resources
(Stormwater and
Utility Engineering
Manager)
3-5 years
Wake County – Town
of Apex
Update the Unified Development Ordnance (UDO) & Design and
Development Manual to incorporate proper species selection and
practices for planting and maintenance into the landscape ordinance
P, NBS 2019 - Planning Dept. 2-3 years
Wake County – Town
of Apex
Incorporate GIS data and risk analysis into the development review
process.
P 2019 - Fire Dept. &
Planning Dept.
5 years
Wake County – Town
of Apex
Create a Stormwater Utility to fund the Town's Stormwater Program. NS 2019 - Water Resources
(Stormwater and
Utility Engineering
Manager)
2-3 Years
Wake County – Town
of Apex
Annually update the comprehensive occupancy pre-plan program with
local data for use in risk analysis
P 2019 Annual Fire Dept. Ongoing - next 5
years
Wake County – Town
of Apex
Restore streams to slow the speed of water and reduce erosion to
prevent both private property loss and public infrastructure damage.
NBS 2019 - Water Resources
(Stormwater and
Utility Engineering
Manager)
Ongoing - next 5
years
Wake County – Town
of Apex
Middle Creek Greenway (Miramonte to Holly Springs). NS, NBS 2019 - Parks and
Recreation
3-5 years – under
construction
Wake County – Town
of Apex
White Oak Creek Greenway NS, NBS 2019 - Parks and
Recreation
3-5 years – under
construction
Wake County – Town
of Apex
During development review, ensure new development complies with
floodplain development restrictions listed in UDO Section 6.2 Flood
Damage Prevention Overlay District
NS 2019 - Public Works and
Transportation
(Floodplain
Administrator)
Ongoing - next 5
years
Wake County – Town
of Apex
During development review, ensure new development complies with
UDO stream buffer standards.
NS, NBS 2019 - Town of Apex
Water Resources
(Stormwater and
Ongoing - next 5
years
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 132
Region - County -
Place Investment Type Age Maintenance
Ownership/
Management
Status &
Barriers
Utility Engineering
Manager)
Wake County – Town
of Apex
During development review, ensure SCMs are designed in accordance
with State criteria to safely pass 100-year storm.
NS, P 2019 - Water Resources
(Stormwater and
Utility Engineering
Manager)
Ongoing - next 5
years
Wake County – Town
of Apex
Build Jessie Drive to connect TenTen Rd and NC-55. This will provide
greater connectivity and make evacuation faster & safer
NS 2019 - Public Works and
Transportation
3-5 years
Wake County – Town
of Apex
Relocate Beaver Creek Sewer Line out of the creek. NS 2019 - Water Resources
(Stormwater and
Utility Engineering
Manager)
3-5 years
Wake County – Town
of Apex
Finish the Peakway loop road. Will provide greater connectivity, faster
emergency response times, and make evacuation faster & safer.
NS 2019 - Public Works and
Transportation
More than 5 years
Wake County – Town
of Apex
Town website and utility billing announcing National Preparedness
Month (September) reminding citizens to have a plan and be prepared.
NS 2019 Annual Public Information
Officer
5 years
Wake County – Town
of Apex
Include Environment Education Station and classroom at Nature Park. NS 2019 - Parks and
Recreation
2022
Wake County – Town
of Apex
Hand out hazards educational materials at Apex festivals. NS 2019 - Planning Dept. &
Water Resources
5 years
Wake County – Town
of Apex
Use social media to inform residents about local hazards NS 2019 - Public Information
Office & Planning
Dept.
5 years
Wake County – Town
of Cary
Adaptive Approach to Stormwater NBS 2019 - Stormwater Ongoing
Wake County – Town
of Cary
Stormwater Condition Assessment Program P 2019 - Stormwater 2-3 years
Wake County – Town
of Cary
Develop flood model for upper Swift Creek watershed P 2019 - Stormwater 1 year
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 133
Region - County -
Place Investment Type Age Maintenance
Ownership/
Management
Status &
Barriers
Wake County – Town
of Cary
Develop flood model for Symphony Lake P 2019 - Stormwater 2-3 years
Wake County – Town
of Cary
Engineering evaluation of Tryon Road dam P 2019 - Stormwater 3-5 years
Wake County – Town
of Cary
Conduct study and develop improvement plan for Twin Lakes dam P 2019 - Stormwater 3-5 years
Wake County – Town
of Cary
Conduct flood study on Town-owned Lake/dam, including breach
analysis
P 2019 - Stormwater 2-3 years
Wake County – Town
of Cary
Triangle Regional Resiliency Partnership P 2019 - Town of Cary Ongoing
Wake County – Town
of Cary
Culvert Replacement - Arbor Brook S 2019 - Stormwater 1 year
Wake County – Town
of Cary
Culvert Replacement - Two Creeks S 2019 - Stormwater 1 year
Wake County – Town
of Cary
Downtown Park NS, NBS 2019 - Stormwater and
Facilities
2-3 years
Wake County – Town
of Cary
Buffer and UTB Protection NS, NBS 2019 - Stormwater and
Cary Planning
Ongoing - next 5
years
Wake County – Town
of Cary
Infrastructure improvements on Summer Lakes Dr S 2019 - Stormwater 1 year
Wake County – Town
of Cary
Infrastructure improvements on Vincrest Ct S 2019 - Stormwater 2-3 years
Wake County – Town
of Cary
Water System Risk Analysis P 2019 - Town of Cary 1 year
Wake County – Town
of Cary
Provide and enhance technical rescue capabilities throughout the Town NS 2019 - Fire Dept. 5 years
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 134
Region - County -
Place Investment Type Age Maintenance
Ownership/
Management
Status &
Barriers
Wake County – Town
of Cary
Provide after-action report of emergency response to severe weather
events to improve planning for future disasters
P 2019 - Fire, Water
Resources, and
Facilities Design &
Transportation
Services
5 years
Wake County – Town
of Cary
Establish a relationship/partnership with the Renaissance Computing
Institute to create a web-based tool capable of providing real-time flood
data to emergency managers and historic data for future emergency
response planning.
NS, P 2019 - Fire and
Technological
Services
Ongoing - next 5
years
Wake County – Town
of Cary
Citizen volunteers make up the Community Emergency Response Team
(CERT). CERT training is a Citizens Corps program designed to enable
citizens to care for themselves and their neighbors during the first three
days following a disaster event. Participants are educated about disaster
preparedness, CERT organization, light search and rescue, medical care,
fire extinguisher use and disaster psychology.
NS 2019 - Police Dept. and
Fire Dept.
5 years
Wake County – Town
of Cary
Environmental Education "green infrastructure" signage on Dry Avenue
Properties that were bought out due to flooding. Signs to be installed
early 2019
NS 2019 - Stormwater and
Sustainability
Ongoing - next 5
years
Wake County – Town
of Fuquay-Varina
Require pre and post construction certification for residential lot
development within ten feet of Wake County Flood Hazard Soils
NS 2019 - Planning Ongoing- next 5
years
Wake County – Town
of Fuquay-Varina
Annually calculate acreage of flood prone property preserved as open
space.
P, NBS 2019 - Planning Ongoing- next 5
years
Wake County – Town
of Fuquay-Varina
Provide for public dissemination building inspections brochures
regarding high winds, water damage prevention, and tie downs for
accessory structures.
NS 2019 - Inspections Ongoing- next 5
years
Wake County – Town
of Fuquay-Varina
Map storm water drainage system as part of Phase II Stormwater
Management Plan
P 2019 - Engineering Ongoing- next 5
years
Wake County – Town
of Fuquay-Varina
Review and update the 2014 Comprehensive Systemwide Parks,
Recreation & Cultural Resources Master Plan for inclusion of hazard
safety information at facilities
NS 2019 - Planning and
Parks, Recreation &
Cultural Resources
3-5 years
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 135
Region - County -
Place Investment Type Age Maintenance
Ownership/
Management
Status &
Barriers
Wake County – Town
of Fuquay-Varina
Continue to enforce the Flood Damage Prevention Ordinance for all new
construction or substantial building rehabilitations.
NS 2019 - Planning Ongoing - next 5
years
Wake County – Town
of Fuquay-Varina
Require minimum finished floor elevation in known FEMA flood hazard
zones be minimum 2 feet above base flood elevation
NS 2019 - Planning and
Inspections
Ongoing - next 5
years
Wake County – Town
of Fuquay-Varina
Identify and inventory buildings that are in FEMA flood zones to
determine which structures may be prone to flooding (possible
relocation and/or elevation).
NS, P 2019 - Planning and
Engineering
Ongoing - next 5
years
Wake County – Town
of Fuquay-Varina
Work with the US Army Corps of Engineers on wetland protection NBS 2019 - Planning Ongoing - next 5
years
Wake County – Town
of Fuquay-Varina
Notify Wake County of any illegal stream dumping instances NS 2019 - Planning and
Public Utilities
Ongoing - next 5
years
Wake County – Town
of Fuquay-Varina
Enforce standards for tree protection and control of clear cutting (town
has received legislative authority to enact tree protection and control of
clearcutting standards.)
NS, NBS 2019 - Planning Ongoing - next 5
years
Wake County – Town
of Fuquay-Varina
Install a generator at the new town hall NS 2019 - All Depts. 1 year
Wake County – Town
of Fuquay-Varina
Maintain current warning system with local sirens on elevated platforms
and use of the Emergency Broadcast System.
NS 2019 - Planning, Fire and
Police
Ongoing - next 5
years
Wake County – Town
of Fuquay-Varina
Coordinate an incident command course for all town employees, related
to Emergency Operations Plan and Disaster Operations Plan for the
Town.
NS, P 2019 - Fire and Police Ongoing - next 5
years
Wake County – Town
of Fuquay-Varina
Conduct a scenario-based training exercise, related to Emergency
Operations Plan and Disaster Operations Plan for the town.
NS, P 2019 - Fire and Police Ongoing – next 5
years (lack of
staffing has
prevented
implementation)
Wake County – Town
of Fuquay-Varina
Continue to evaluate and improve response and recovery methods
following each hazard event.
NS 2019 - Fire and Police Ongoing – next 5
years
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 136
Region - County -
Place Investment Type Age Maintenance
Ownership/
Management
Status &
Barriers
Wake County – Town
of Fuquay-Varina
Finalize implementation of new/updated radio communication
equipment.
NS 2019 - Fire and Police Ongoing – next 5
years
Wake County – Town
of Fuquay-Varina
Maintain floodplain maps for public use and produce other maps as
needed
P 2019 - Planning and
Engineering
Ongoing – next 5
years
Wake County – Town
of Fuquay-Varina
Develop and maintain a hazard mitigation section on the Town website
that is updated every 5 years as the plan is updated.
P 2019 - Public Information
and Information
Technology
Ongoing - next 5
years
Wake County – Town
of Fuquay-Varina
Collect educational materials on disaster preparedness and display at
public library and local government offices
NS 2019 - Planning,
Inspections, Police,
and Fire
Ongoing - next 5
years (lack of
staffing has
prevented
implementation)
Wake County – Town
of Fuquay-Varina
Educate public on importance of channel maintenance as part of Phase II
Stormwater Management Plan
NS, P 2019 - Engineering Ongoing - next 5
years
Wake County – Town
of Fuquay-Varina
Work with local real estate agents to ensure that potential buyers are
aware of properties that are exposed to potential flood damage
NS 2019 - Planning Ongoing - next 5
years
Wake County – Town
of Fuquay-Varina
Require delineation of Wake County Flood Hazard Soils, FEMA flood
zones, and wetlands on final plats.
NS 2019 - Planning Ongoing - next 5
years
Wake County – Town
of Fuquay-Varina
Annual participation in Hurricane Prep Week (May 13-19) via Weather
Channel (social media campaign, newsletter, published materials)
NS 2019 - Planning and
Public Information
Ongoing - next 5
years
Wake County – Town
of Fuquay-Varina
Annual participation in National Preparedness Month (September)
Ready.gov (social media campaign, newsletter, published materials)
NS 2019 - Planning and
Public Information
Ongoing - next 5
years
Wake County – Town
of Fuquay-Varina
Annual participation in National Dam Safety Awareness Day (May 31)
Ready.gov (social media campaign, newsletter, published materials)
NS 2019 - Planning and
Public Information
Ongoing - next 5
years
Wake County – Town
of Fuquay-Varina
Structured public education through social media, brochures, and flyers
in critical facilities
NS 2019 - Planning, Fire &
Police, and Public
Information
Ongoing - next 5
years
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 137
Region - County -
Place Investment Type Age Maintenance
Ownership/
Management
Status &
Barriers
Wake County – Town
of Garner
Evaluate the need for regulations to encourage use of low impact
development site planning principles to help control stormwater volume
impacts.
NS 2019 - Engineering and
Planning
Not Started - 2-3
years (2021)
Wake County – Town
of Garner
UDO: Continue to provide stream and creek buffers, and floodplain and
wetland protection.
NBS, NS 2019 - Planning 2-3 years (2021)
Wake County – Town
of Garner
Garner Transportation Plan – Continue to address disaster preparedness
(evacuation) through road interconnectivity, paved roads, and widening
of roads
NS, P 2019 - Planning and
Public Works
Ongoing - next 5
years
Wake County – Town
of Garner
Develop for public dissemination building inspections brochures
regarding high winds, water damage prevention, and tie downs for
accessory structures.
NS 2019 - Inspections Ongoing - next 5
years
Wake County – Town
of Garner
The town will inventory all its structures located within or immediately
adjacent to known flood hazard areas.
NS, P 2019 - Planning and
Engineering
Ongoing - next 5
years
Wake County – Town
of Garner
The town has a service to respond to requests and questions from
citizens regarding actions they may take to improve drainage, halt
erosion, and to relocate, renovate or retrofit structures being flooded.
NS 2019 - Engineering Ongoing - next 5
years
Wake County – Town
of Garner
Develop and adopt a conservation subdivision ordinance to help
preserve significant natural features.
NS, NBS 2019 - Planning Not Started - 2-3
years (2021)
Wake County – Town
of Garner
Pursue stream restoration projects NS, NBS 2019 - Engineering Not Started - 2-3
years (2021)
Wake County – Town
of Garner
Develop a Business Continuity Plan that is the primary document
housing all disaster related plans and procedures including Hazard
Mitigation Plan, Debris Management Plan, Multi-Hazard Plan as well as
disaster response plans for all town depts..
P 2019 - Police, Public
Works, and
Administration
2-3 years (target
2021)
Wake County – Town
of Garner
Town website will be updated with public access to information
pertaining to evacuation routes, emergency contact numbers, and
detailed weather reports in case of emergency.
NS 2019 - Police & Fire Depts,
Communications
Ongoing - next 5
years
Wake County – Town
of Garner
Develop and maintain a hazard mitigation section on the Town website. NS 2019 - Communications
and IT
2-3 years (target
2021)
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 138
Region - County -
Place Investment Type Age Maintenance
Ownership/
Management
Status &
Barriers
Wake County – Town
of Garner
Website - The town maintains its own website which can provide up to
date information for the public. Town continuously updates the site with
additional resources.
NS 2019 - Police & Fire,
Communications,
and IT
Ongoing - next 5
years
Wake County – Town
of Holly Springs
Update Floodplain Development Regulations - The town has an
ordinance developed to minimize public and private losses due to flood
conditions. The latest update of the Flood Damage Prevention Ordinance
was May 2, 2006.
NS 2019 - Engineering 3-5 years
Wake County – Town
of Holly Springs
Implement Floodplain Development Regulations related to participating
in the National Flood Insurance Program (NFIP) (FEMA)
NS 2019 - Engineering Not Started - 2-3
years
Wake County – Town
of Holly Springs
Floodplain Development Regulations - The town has been a participating
member of the NFIP (FEMA) since 1992, The town evaluated the town’s
potential participation in the CRS and determined that the number of
insured properties in the Town did not warrant participation in the CRS.
However, staff will reevaluate this determination in the future through
the implementation of the Floodplain Management Program.
NS, P 2019 - Engineering Ongoing - next 5
years
Wake County – Town
of Holly Springs
Building Acquisition and Clearance - The town is willing to develop a plan
designed to utilize federal grant resources to assist private property
owners in purchasing properties located in flood hazard zones.
NS, P 2019 - Code Enforcement Not Started - 2-3
years
Wake County – Town
of Holly Springs
Building Relocation - The town is willing to develop a plan designed to
utilize federal grant resources to assist private property owners in
relocating existing structures out of flood hazard zones.
NS, P 2019 - Code Enforcement Not Started - 2-3
years
Wake County – Town
of Holly Springs
Building Retrofit - The Town is willing to develop a plan to utilize Federal
grant resources to assist private property owners in renovating and
retrofitting existing structures in flood hazard zones to reduce
vulnerability to flooding damage
NS, P 2019 - Code Enforcement Not Started - 2-3
years
Wake County – Town
of Holly Springs
Backup Power to Fire and Police Stations – The town provides backup
power to all fire and police stations. Fire Station 1 – backup power
provided by a grant; backup power to Fire Station 2 and Fire Station 3
and Police Station provided by local funds.
NS 2019 - Public Safety 3-5 years
Wake County – Town
of Holly Springs
Emergency Generator for Public Works Building - The town currently has
an emergency generator to provide power to the Front Office of the
NS 2019 - Public Works 3-5 years
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 139
Region - County -
Place Investment Type Age Maintenance
Ownership/
Management
Status &
Barriers
Public Works Building during emergencies. Future goal is to provide
100% generator power to the building.
Wake County – Town
of Holly Springs
Install additional Generators - Over the next ten years, the town would
like to purchase generators for lift stations that do not currently have
generators.
NS 2019 - Public Utilities 1 year
Wake County – Town
of Holly Springs
Purchase of Open Space, Parks, and Greenways - The Parks and
Recreation Dept. is asking for $500,000 for Capital Improvement Projects
to purchase open space. The town also works with Wake County and
other agencies to find other funding for open space acquisition. Once
funds are obtained the town will acquire land consistent with Land Use
and Master Open Space Plans
NS,
NBS, P
2019 - Parks and
Recreation
More than 5 years
Wake County – Town
of Holly Springs
As part of the next phases(s) of the Town's Watershed Masterplan, a map
of impervious cover will be created. This information may be used
overlain to show which structures are in hazardous locations.
P 2019 - Engineering 3-5 years
Wake County – Town
of Holly Springs
The town is in the process of pursuing options to improve the existing
spillway or create a secondary spillway. Per an agreement with NC Dam
Safety, this will be completed within the next 5 years.
S 2019 - Engineering, Parks
& Recreation
3-5 years
Wake County – Town
of Holly Springs
Reservoirs/Retention/Detention Basins - The town does not currently
maintain any retention or detention basins. The town does maintain Bass
Lake Dam. The town regularly provides maintenance of vegetation and
minor erosion while providing visual inspections of the dam. If larger
repairs are required, the town will find appropriate means to resolve the
problem. The town also has a few small ponds located on existing parks.
The town maintains these ponds consistent with measures taken to
maintain the Bass Lake Dam.
S 2019 - Parks & Recreation Ongoing - next 5
years
Wake County – Town
of Holly Springs
Technical Rescue Capabilities - Provide and enhance technical rescue
capabilities more equitably throughout the town.
NS 2019 - Public Safety 3-5 years –
currently looking
into specialty
training
Wake County – Town
of Holly Springs
GIS Programming - Design GIS programming capable of providing real-
time data to emergency managers and historic data for future emergency
response planning.
NS, P 2019 - Public Safety 3-5 years -
Currently in the
implementation
phase. The new
Wake County
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 140
Region - County -
Place Investment Type Age Maintenance
Ownership/
Management
Status &
Barriers
computer aided
design (CAD)
system will be
issued in May
2019. This is a no
cost to the Town.
Wake County – Town
of Holly Springs
Purchase ACU 1000 Communications Unit – System should allow all
agencies on ACU 1000 to communicate using own radios and frequencies
NS 2019 - Public Safety 3-5 years - In
process of
purchasing, but
not yet
completed.
Wake County – Town
of Holly Springs
Tabletop Exercise Program - Continue to conduct disaster tabletop
exercise program with Wake County
NS 2019 - Public Safety Ongoing - next 5
years
Wake County – Town
of Holly Springs
Counseling – Police psychologist and Critical Incident Stress Debriefing
Team training to provide debriefing sessions for personnel
NS 2019 - Police Dept. 5 years - Partially
implemented,
under
construction
Wake County – Town
of Holly Springs
Environmental education NS 2019 - Engineering Ongoing - next 5
years
Wake County – Town
of Holly Springs
Website - The town maintains its own website, which can provide up to
date information for the public. The town is continuously updating the
site with additional resources.
NS 2019 - Governing Body Ongoing - next 5
years
Wake County – Town
of Knightdale
Pursue grants to acquire, elevate and or relocate flood prone structures
and property.
NS 2019 - Planning Ongoing - next 5
years
Wake County – Town
of Knightdale
Establish post-disaster clean-up procedures. P 2019 - Public Works Ongoing - next 5
years
Wake County – Town
of Knightdale
Prepare debris removal and disposal plan P 2019 - Public Works Ongoing - next 5
years
Wake County – Town
of Knightdale
Dredging, new riser and plunge pool for pond restoration at
Environmental Park
NBS 2019 - Admin., Public
Works
3-5 years
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 141
Region - County -
Place Investment Type Age Maintenance
Ownership/
Management
Status &
Barriers
Wake County – Town
of Knightdale
Have a town staff member that is a Certified Floodplain Manager. NS 2019 - Engineering/Public
Works
2-3 years
Wake County – Town
of Knightdale
Issue an annual local proclamation for Severe Weather Awareness Week
and conduct associated promotional activities
NS 2019 - Fire 5 years – Not
started (due to
staff turnover this
item has not been
started)
Wake County – Town
of Morrisville
Update Land Use Plan to ensure protection of natural resources,
strengthen existing development to resist hazards, and guide future
development away from hazard prone areas.
NS,
NBS, P
2019 - Town of Morrisville 2-3 years
Wake County – Town
of Morrisville
Obtain frequently updated, high-resolution aerial photography to assist
with land use decisions, emergency response planning, and code
enforcement
NS, P 2019 - Town of Morrisville Ongoing - next 5
years
Wake County – Town
of Morrisville
Working through the Triangle Water Supply Partnership, draft an
Emergency Spill Response and Mitigation Plan to protect watersheds and
other water resources from hazardous spills.
P 2019 - Triangle Water
Supply
Partnership, Town
of Morrisville
3-5 years
Wake County – Town
of Morrisville
Transition Wake County's sedimentation and erosion control permitting
and monitoring to Town of Morrisville for better increased processing
efficiency and faster incident response.
NS 2019 - Town of Morrisville 2-3 years
Wake County – Town
of Morrisville
Conduct a complete review and update to the town's stormwater
management program, which helps mitigate effects of stormwater runoff
and flooding.
P 2019 - Town of Morrisville 2-3 years
Wake County – Town
of Morrisville
Seek Federal, State, and County funding opportunities to purchase
property located completely or partially in FEMA designated floodplains
to mitigate potential property damage and protect natural resources.
NS 2019 - Director of
Community
Services, Director
of Development
Services
More than 5 years
Wake County – Town
of Morrisville
Construct Green Drive and Fairview Road Flood Reduction Drainage
Project to mitigate potential flood hazards.
S 2019 - Town of Morrisville 2-3 years
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 142
Region - County -
Place Investment Type Age Maintenance
Ownership/
Management
Status &
Barriers
Wake County – Town
of Morrisville
Construct new public works facility, which will increase town's capacity
to respond to hazards and other safety concerns
NS 2019 - Town of Morrisville 3-5 years
Wake County – Town
of Morrisville
Monitor the status of backup generators, communications and vehicles
for all Morrisville owned critical public facilities.
NS 2019 - Town of Morrisville Ongoing - next 5
years
Wake County – Town
of Morrisville
Install new generators for Town Hall and Police Station to ensure
continuity of critical operations during a power outage
NS 2019 - Town of Morrisville 1 year
Wake County – Town
of Morrisville
Update Town's Emergency Operations Plan to ensure best processes and
procedures for the most likely and applicable emergency scenarios.
P 2019 - Town of Morrisville 3-5 years
Wake County – Town
of Morrisville
Implement Wake County's Everbridge text alert system to notify citizens
and Town staff of potential safety hazards or concerns.
NS 2019 - Wake County 1 year
Wake County – Town
of Morrisville
Purchase and implement new online civic engagement platform to be
used in part to inform citizens on disaster preparation, emergency
response training opportunities, and evacuation information.
NS 2019 - Town of Morrisville 1 year
Wake County – Town
of Morrisville
Use volunteer citizen committees, such as CERT or Public Safety
Committee, to educate residents in preparing for natural hazards.
NS 2019 - Town of Morrisville Ongoing - next 5
years
Wake County – Town
of Wake Forest
Prepare a Storm Drainage Master Plan to include all storm drainage,
infrastructure, and capacity analysis
P 2019 - Engineering 2019
Wake County – Town
of Wake Forest
Become a CRS community NS 2019 - Public Works 2022
Wake County – Town
of Wake Forest
Explore the use of Stormwater Utility Fees NS 2019 - Admin. 2020
Wake County – Town
of Wake Forest
Maintain a GIS database of building footprints and use it to regularly
update a map of critical facilities and vulnerable buildings
P 2019 Annual Town GIS Ongoing
Wake County – Town
of Wake Forest
Document each historic structure in Wake Forest town limits and ETJ P, NS 2019 - Planning 2020
Wake County – Town
of Wake Forest
Provide for primary or mobile generators to shelter sites NS 2019 - Wake Forest EM
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 143
Region - County -
Place Investment Type Age Maintenance
Ownership/
Management
Status &
Barriers
Wake County – Town
of Wake Forest
Assess facilities for the need for emergency generation, considering
alternate facility sites
P 2019 - Wake Forest Power
Wake County – Town
of Wake Forest
Manage the Wake Forest Reservoir for hazard mitigation S 2019 - Public Works 2021
Wake County – Town
of Wake Forest
Expansion of our greenway trail network NS, NBS 2019 - Planning 2024
Wake County – Town
of Wake Forest
Conduct stream mitigation projects on Old Mill Stream, Richland Creek,
and others subject to flooding or erosion.
NBS 2019 - Engineering 2024
Wake County – Town
of Wake Forest
See that all nursing homes and assisted living facilities have backup
generators.
NS 2019 - Property Owners 2022 - Existing
facilities without
generators are
financially
constrained and
have little ability
to add generators
Wake County – Town
of Wake Forest
Develop a policy and advise the public that all outside above ground
liquid propane or propane gas tanks be cut off during a major event.
NS 2019 - Communications 2020
Wake County – Town
of Wendell
Amend the Town's Water Allocation Policy to add a new point category
for voluntarily increasing undisturbed riparian buffer protections from 50
to 100 feet around Neuse perennial streams
NS, NBS 2019 - Planning 1 year
Wake County – Town
of Wendell
Add environmentally sensitive and hazard areas to the Future Land Use
Map and adopt updated Comprehensive Plan, which will allow
environmental conditions and hazard areas to guide zoning and density
decisions
P 2019 - Planning 2-3 years
Wake County – Town
of Wendell
Consider amendments to the UDO to establish minimum ingress/egress
standards for new residential development based on density/# of lots
NS 2019 - Planning 1 year
Wake County – Town
of Wendell
Encourage the use of low-impact development techniques through
amendments to the town's Water Allocation Policy
NS 2019 - Planning 1 year
Wake County – Town
of Wendell
Consider regulations to regulate clear-cutting to help control erosion
from construction sites
NS 2019 - Planning 2-3 years
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 144
Region - County -
Place Investment Type Age Maintenance
Ownership/
Management
Status &
Barriers
Wake County – Town
of Wendell
Evaluate potential changes to the town's Arterial and Collector Street
Plan to minimize adverse impacts to environmentally sensitive areas due
to new roadway construction or widening
P 2019 - Planning 2-3 years
Wake County – Town
of Wendell
Perform environmental asset mapping to identify areas most key for
preservation and potential acquisition due to an array of environmental
factors
P 2019 - Planning 2-3 years
Wake County – Town
of Wendell
Evaluate policy regarding greenway dedication requirements to expand
greenway network and further protect riparian corridors
NS, NBS 2019 - Planning 2-3 years
Wake County – Town
of Wendell
Perform improvements to existing open drainage device near
intersection of 1st St & Pine St. to increase total water volume & flow
S 2019 - Public Works 3-5 years
Wake County – Town
of Wendell
Develop Adverse Weather Plan Map for Public Works crew NS, P 2019 - Planning 1 year
Wake County – Town
of Wendell
Evaluate potential locations for a future public works debris site, to
accommodate debris associated with natural hazards
P 2019 - Public Works 3-5 years
Wake County – Town
of Wendell
Provide written after-action report of response to severe weather and
hazard events to include recommendations for process improvements
and improve planning for future disasters
P 2019 - Police Dept. 2-3 years
Wake County – Town
of Wendell
Secure and use visual warning barricades for vehicular and pedestrian
traffic to block properties, roadways, etc. for public safety during or
following hazard events
NS 2019 - Public Works 3-5 years
Wake County – Town
of Wendell
Conduct periodic training exercises, related to higher-risk hazard threats
identified by the Hazard Mitigation Plan
NS 2019 - Police Dept. 2-3 years
Wake County – Town
of Wendell
Work with Wake County and the City of Raleigh to operate and update
the County's Master Address Repository program, which will support
emergency response following hazards.
P 2019 - Planning 2-3 years
Wake County – Town
of Wendell
Modify the town's "Tell Wendell” webpage application to allow citizens o
report flood issues and create a tracking mechanism for the Town
NS 2019 - Planning 2-3 years
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 145
Region - County -
Place Investment Type Age Maintenance
Ownership/
Management
Status &
Barriers
Wake County – Town
of Wendell
Incorporate hazard awareness class into the Track-Out Camp run by the
Wendell Parks & Recreation Dept
NS 2019 - Parks and
Recreation
2-3 years
Wake County – Town
of Wendell
Facilitate community outreach and distribution of educational materials
regarding hazard awareness to the community, to include participation
at community events such as Public Safety Day.
NS 2019 - Public Works 2-3 years
Wake County – Town
of Wendell
Perform Continuing Education Training for select Public Works personnel
as it relates to state storm water regulations
NS 2019 - Public Works 2-3 years
Wake County – Town
of Zebulon
Enforce subdivision standards for development in flood hazard areas. NS 2019 - Planning &
Inspections
2019
Wake County – Town
of Zebulon
Further restrict development in floodplain by prohibiting development or
requiring two feet of freeboard
NS 2019 - Planning 2019
Wake County – Town
of Zebulon
Revise floodplain ordinance. NS 2019 - Planning 2019
Wake County – Town
of Zebulon
Resolve localized flooding issue that occurs in/around West Sycamore
Streets, Gannon Avenue, and North Arendell Avenue during heavy rainfall
events.
S, NS 2019 - Admin., Public
Works
2019
Wake County – Town
of Zebulon
Develop an Emergency Operations Plan P 2019 - Fire Dept. 2019 - in the
process of
developing an
Emergency
Operations Plan
and hopes to
adopt the plan
within the year
Wake County – Town
of Zebulon
Develop a public education program to provide hazard risk and
preparedness education via social media
NS 2019 - Fire Dept. 2019
Wake County – Town
of Zebulon
Require disclosure of flood hazard in real estate transactions. NS 2019 - Planning 2019
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 146
Table 46. RHMP – N.E.W. Region (5.4.3)
Region - County
- Place Investment Type Age Maintenance
Ownership/
Management Status & Barriers
N.E.W. – Nash
County
Establish a three or more-member local Hazard Mitigation
Committee
P 2020 - County EM Director,
Planning Director, &
Public Utilities
Director
2021
N.E.W. – Nash
County
Expand Emergency Shelter Capabilities with the installation of
transfer switches at identified shelter sites to enable use of backup
power to these critical facilities.
NS 2020 - Nash County EM
Services
2021 - Grant funds applied for
under Pre-Disaster Mitigation
Program in 2017 to install
transfer switches at Southern
Nash High School & Nash
Central High School, but funds
not received
N.E.W. – Nash
County
Establish predetermined evacuation areas in flood-prone areas.
Use NC Flood Inundation Mapping and Alert Network (FIMAN) data
to identify flood prone areas for potential pre1storm evacuation.
Consider utilizing the services of the US Army 83rd Civil Affairs
Battalion to survey, inventory, and categorize critical facilities and
infrastructure throughout the county and develop
recommendations for protection. Enter critical facilities into
existing Orion Damage Assessment Solution software for tracking.
NS 2020 - County EM Services 2022
N.E.W – Nash –
Town of Bailey
Strengthen the Public Water and Sewer Ordinance by adding
language that specifically prohibits extending public services and
utilities into flood hazard or other environmentally sensitive areas
to discourage growth
NS 2020 - Town Board 2023
N.E.W – Nash –
Town of Bailey
Identify roads that had a problem with high water during Hurricane
Floyd and place signs on streets stating "Road Subject to Flooding"
P, NS 2020 - Public Works, NCDOT 2021
N.E.W – Nash –
Town of Bailey
Obtain a generator(s) to provide emergency power for critical town
facilities
NS 2020 - Town Admin. 2021
N.E.W – Nash –
Town of Bailey
Establish a three or more-member local Hazard Mitigation
Committee
P 2020 - Town Board and
Mayor
2025
N.E.W – Nash –
Town of Bailey
Obtain FEMA handouts & make available for residents at town hall NS 2020 - Town Clerk 2023
N.E.W – Nash –
Town of Middlesex
Work to adopt a floodplain ordinance NS 2020 - Planning &
Development
2023 – postponed but still a
priority
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 147
Region - County
- Place Investment Type Age Maintenance
Ownership/
Management Status & Barriers
N.E.W – Nash –
Town of Middlesex
Seek funding to place generators at our lift stations that do not
have them to ensure this critical infrastructure continues
functioning during power outages
NS 2020 - Admin., Town Board 2025
N.E.W – Nash –
Town of Middlesex
Establish a three or more-member local Hazard Mitigation
Committee
P 2020 - Board and Mayor 2022 – Town currently has two
representatives
N.E.W – Nash –
Town of Middlesex
Expand the use of new website for public information & emergency
updates
NS 2020 Regular
updates
Town Clerk Ongoing
N.E.W – Wilson
County
Add drainage as an issue to be discussed during Technical Review
Committee review of proposed development plans
P 2020 - County Planning and
Inspections
2025 – in process of creating
Technical Review Committee
N.E.W – Wilson
County
Inventory existing lots and structures within flood hazard areas to
establish baseline data regarding current state of development
within flood hazard areas
P 2020 - County Planning and
Inspections
2025
N.E.W – Wilson
County
Establish coordinating committee to ensure that all parties
responsible for stormwater management communicate to ensure
maximum cooperation in developing and maintaining stormwater
drainage systems within the County
P 2020 - County Planning and
Inspections
2025
N.E.W – Wilson
County
Establish and maintain coordinated debris inspection program with
debris removal program to correct problem sites.
P 2020 - County Planning and
Inspections, Natural
Resource
Conservation Service
(NRCS), EM, Solid
Waste Dept.
2025 – not complete due to lack
of funding
N.E.W – Wilson
County
Update flood maps to reflect new subdivisions, changes in
corporate limits, and all new FIRM data; publicize the availability of
maps and keep record of service (CRS 320)
P 2020 - County Manager and
Commissioners
2025
N.E.W – Wilson
County
Establish a three or more-member local Hazard Mitigation
committee with private sector participation
P 2020 - County Fire Marshal
and County Admin.
2025 – need to identify private
sector participation and
formalize committee’s role
N.E.W – Wilson
County
Acquire destroyed or substantially damaged properties and
relocate households (voluntary program) (CRS 520/420)
NS 2020 - County Planning and
Inspections
Ongoing
N.E.W – Wilson
County
Require all developments that involve the disturbance of more than
one acre of land to receive a sediment/erosion control permit from
NCDEQ
NS 2020 - County Planning and
Inspections, NCDEQ
Ongoing
N.E.W – Wilson
County
Evaluate evacuation routes considering road upgrades and new
road construction
P, NS 2020 - County EM and
Planning
2025
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 148
Region - County
- Place Investment Type Age Maintenance
Ownership/
Management Status & Barriers
N.E.W – Wilson
County
Advise/assist property owners in retrofitting homes and businesses
(retrofitting is defined as any modification to an existing building or
yard to protect the property from flood damage)
NS 2020 - County Planning and
Inspections
Ongoing – retrofitting
information is provided when
building permits are applied for
to develop in flood prone areas
N.E.W – Wilson
County
Establish and maintain information on retrofitting techniques at
the Planning and Inspections Dept. and, at the public library.
Publicize through citizen news bulletins or newsletters (CRS
330/350/360)
NS, P 2020 - County Planning and
Inspections
Ongoing – inclusion in citizen
news bulletins
N.E.W – Wilson
County
Provide information on the county website about hazard risk,
mitigation, and preparedness
NS 2020 - County Planning and
Inspections
Ongoing
N.E.W – Wilson –
Town of Lucama
Establish a three or more-member local Hazard Mitigation Advisory
Committee
P 2020 - Town Board and
Mayor
2022 - Full committee was not
in place for this plan update.
The Town will expand
participation in future regional
mitigation planning through
this effort
N.E.W – Wilson –
Town of Lucama
Conduct an internal review and prepare a report that: evaluates all
critical facilities for possible improvements to reduce their
exposure to hazards and includes all findings that will be presented
in a report to the elected governing board
P 2020 - Town Board and
Admin.
2023
N.E.W – Wilson –
Town of Lucama
Obtain FEMA handouts & make available for residents at Town Hall NS 2020 - Town Admin. 2023
N.E.W – Wilson –
Town of Saratoga
Establish or continue a three or more-member local Hazard
Mitigation Committee with private sector participation
P 2020 - Town Council 2021 - Town Council to
formalize committee role
N.E.W – Wilson –
Town of Saratoga
Conduct an internal review and prepare a report that: evaluates all
critical facilities for possible improvements to reduce their
exposure to hazards and includes all findings that will be presented
in a report to the elected governing board
P 2020 - Town Council and
Admin.
2023 - Will continue to evaluate
need and pursue funding for
additional critical facility
improvements.
N.E.W – Wilson –
Town of Saratoga
Obtain FEMA Hazard Mitigation Related handouts & make available
for residents at Town Hall and/or as inserts in utility bills
NS 2020 - Town Admin. 2023
N.E.W – Wilson –
Town of Sims
Establish a three or more-member local Hazard Mitigation
Committee
P 2020 - Town Board and
Mayor
2022
N.E.W – Wilson –
Town of Sims
Obtain a generator(s) to provide emergency power for critical town
facilities (water well & town hall)
NS 2020 - Town Board and
Admin.
2021
N.E.W – Wilson –
Town of Sims
Obtain new FEMA handouts & make available for residents at Town
Hall
NS 2020 - Town Clerk 2023
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 149
Region - County
- Place Investment Type Age Maintenance
Ownership/
Management Status & Barriers
N.E.W – Wilson –
Town of
Stantonsburg
Update and amend the Zoning Ordinance (1985) NS 2020 - Planning Board and
Town Council
2023 - This update was delayed
due to budgetary restraints and
other ongoing capital projects.
However, some minor
amendments have been
approved
N.E.W – Wilson –
Town of
Stantonsburg
Update Town website with accurate information on hazard risk and
mitigation options to reduce risk.
NS 2020 - Town Manager and
Council
2021 - This update was delayed
due to budgetary restraints and
other ongoing capital projects.
N.E.W – Wilson –
Town of
Stantonsburg
Establish a three or more-member local Hazard Mitigation
Committee
P 2020 - Mayor and Town
Board
2022 - the establishment of this
committee was delayed until a
future date
N.E.W – Wilson –
Town of
Stantonsburg
Conduct an internal review and prepare a report that: evaluates all
critical facilities for possible improvements to reduce their
exposure to hazards and includes all findings that will be presented
in a report to the elected governing board
P 2020 - Public Works 2023 - This project was delayed
due to budgetary restraints and
other ongoing capital projects.
N.E.W – Wilson –
Town of
Stantonsburg
Update and amend the Wellhead Protection Plan to correspond to
new flood maps
P 2020 - Town Manager and
Town Council
2023 - This revision was delayed
allowing for the completion of a
new water supply well to be
constructed outside the Central
Coastal Plains Capacity Use
Area
N.E.W – Wilson –
City of Wilson
Floodplain Management: Consider a floodplain/stream modeling
program that allows evaluation of flooding potential along streams
based upon new developments that occur upstream
P 2020 - Stormwater 2025 – seeking grant funding
N.E.W – Wilson –
City of Wilson
Building Code: Encourage builders to incorporate mitigative
measures for disaster resiliency during construction
NS 2020 - Construction
Standards
2025: discussed mitigation
measures at their annual
meeting with contractors
N.E.W – Wilson –
City of Wilson
Capital Improvement Program: Evaluate the feasibility the
relocation/elevation/flood proofing needs of designated critical
facilities
P, NS 2020 - Engineering, Planning
& Development
Services, Utilities
2025
N.E.W – Wilson –
City of Wilson
Repetitive Loss: Wilson seeks funds to buyout repetitive loss
properties.
NS 2020 - Planning &
Development Services
2025 – seeking grant funding
N.E.W – Wilson –
City of Wilson
Preservation: Seek funding for acquisition of properties within the
floodplain, apply for acquisition funds to purchase other properties
flooded
NS 2020 - Engineering,
Stormwater, Planning
& Development
Services
2025 – seeking grant funding
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 150
Region - County
- Place Investment Type Age Maintenance
Ownership/
Management Status & Barriers
N.E.W – Wilson –
City of Wilson
Stormwater Management: Acquire easements along drainage
features and streams for public maintenance
NS 2020 - Engineering,
Stormwater, Planning
& Development
Services
2025 – seeking grant funding
N.E.W – Wilson –
City of Wilson
Stormwater management: install detention facilities to mitigate
peak flow in the downtown area
S 2020 - Engineering,
Stormwater, Land
Development,
Planning &
Development Services
2025 – city peak flow policy
exceeds state requirements
N.E.W – Wilson –
City of Wilson
Restoration Program: Begin design and development of Hominy
Creek Water Quality Park & Greenway Plan.
NS,
NBS,
P
2020 - Engineering,
Stormwater, Planning
& Development
Services
2025 – seeking grant funding
N.E.W – Wilson –
City of Wilson
Stormwater Management: Continue improving and maintaining
streams throughout the community
NBS 2020 - Public Services,
Stormwater
2025
N.E.W – Wilson –
City of Wilson
Capital Improvement Program: Install monitoring systems for flood
waters.
NS 2020 - Engineering,
Stormwater
2025 – seeking grant funding
Table 47. RHMP – Tar River (5.4.3)
Region -
County -
Place Investment Type Age Maintenance
Ownership/
Management Status & Barriers
Tar River –
Franklin
County
Work with the State Office of Dam Safety (ODS) to 1) ensure that
all dams in Franklin County for which the ODS has jurisdiction are
inspected on a regular basis; 2) ensure that ODS notifies the
Franklin County EM office of all ODS jurisdictional dams classified
as “high hazard” or “distressed” dams; c) attempt to ensure that
all high hazard or distressed dams in the county have an updated
and implemented operations and maintenance plan and
emergency action plans; and d) provide the county EM office with
an inventory of all ODS jurisdictional dams in the county.
S, NS,
P
2021 - County EM
Director
2026 – To be continued (TBC): Although
there have been some efforts to
coordinate this inspection process,
there is still a great deal of coordination
that needs to be worked out to ensure
inspections of all high hazard dams are
taking place and that the county is
involved in the process.
Tar River –
Franklin
County
The responsible party will coordinate with each Dept. head in the
local government and produce a report on ways in which hazard
mitigation goals, objectives, and tasks can be incorporated into
P 2021 - County Planning
Director
2026 - TBC: The county planning Dept.
has worked on including mitigation
goals/tasks into existing
policies/programs, but there is still a
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 151
Region -
County -
Place Investment Type Age Maintenance
Ownership/
Management Status & Barriers
existing policies and implemented through existing programs
and personnel.
good deal of effort that needs to be
made to fully incorporate hazard
mitigation into other areas of local
governance.
Tar River –
Franklin
County
Each local government participating in this Hazard Mitigation
Plan (HMP) will: 1) continue to monitor the types and numbers of
structures (including infrastructure and critical facilities) that
might be in known hazard areas based on their best available
current projections and 2) calculate aggregate projected dollar
losses for each type of development and for each hazard risk
P 2021 - County Planning
Director
2026 - TBC: Local governments have
worked to monitor their structures that
might be in known hazard areas and
continue to do so, through this
planning effort. However, all
jurisdictions need to make a stronger
effort to assess potential solutions
going forward, so this action will
remain in place
Tar River –
Franklin
County
Work with the NCDOT Division Five Highway Operations unit and
convene a working group (county-wide or local) to develop
solutions to localized drainage issues caused (in part or in whole)
by NCDOT maintained drainage facilities.
S, P 2021 - County Planning
Director
2026 - TBC: Local drainage issues have
been addressed in some of the recent
NCDOT projects, but there remain
many drainage issues throughout the
county that will need to be resolved
before this action can be considered
complete.
Tar River –
Franklin
County
Apply for funding from HMGP and other Hazard Mitigation
Assistance Programs for hazard mitigation projects
S, NS,
NBS,
P
2021 - County Planning
Director
2026 - TBC: There has generally not
been successful funding of brick-and-
mortar type projects. Therefore, the
jurisdiction will continue to pursue this
action
Tar River –
Franklin
County
Apply for funding through the FEMA High Hazard Dam Repair
Program for mitigation measures associated with high hazard
dams to include: (1) Geotechnical investigation to establish data
for risk analysis and development of engineering
designs/solutions (2) Build upstream dam to reduce load on
existing dam (3) Property Acquisition in inundation areas below
dam (4) Raise crest of dam to increase storage capacity (5) Add
additional spillways, widen or lower existing spillways to
increase discharge capacity (6) Warning systems to alert
downstream areas of potential dam failure (7) Improve flow path
below dam to increase conveyance capacity (8) Encourage
conservation or re-forestation of upstream land to reduce runoff
(9) Development of community Stormwater Management Plans
for upstream communities (10) Complete an Emergency Action
NS, S,
P
2021 - County EM
Director
2026
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 152
Region -
County -
Place Investment Type Age Maintenance
Ownership/
Management Status & Barriers
Plan in conjunction with NCDEQ for all High Hazard Dams in the
county
Tar River –
Franklin
County
NCDEQ Dam Safety developed a risk-based selection and
prioritization process for addressing high hazard dams as
funding becomes available. This process will be employed by
NCEM and by communities that wish to participate in the High
Hazard Dam Rehabilitation program. The analysis complies with
the latest practices in dam safety risk management and are
compliant with FEMA’s Federal Guidelines for Dam Safety Risk
Management, FEMA publication P11025. Initial screening steps
include securing buy in and support from the local
government/dam owner(s) and assurance that cost-matching
requirements can be met by the local government. The second
level of screening involves confirming that a particular dam is
identified as a High Hazard Dam and has of updated Emergency
Action Plan
S, P 2021 - County EM
Director
2026
Tar River –
Franklin
County
Implement public education efforts designed to help inform the
public of their exposure to all natural hazards and to inform them
of actions they can take to mitigate the damages to their health
and property from natural hazards.
NS 2021 - County Planning
Director; County
ES/EM
2026 - TBC: The county has worked with
the Red Cross to try to improve efforts
by the public to mitigate damage, but
there is still significant work that needs
to be done to educate the public on
these matters. This action will remain
in the plan.
Tar River –
Franklin
County
Ensure that the local library maintains documents about flood
insurance, flood protection, floodplain management, and natural
and beneficial functions of floodplains. Many documents are
available free of charge from FEMA.
NS 2021 - County Planning
Director, County
ES/EM
2026 - TBC: Local libraries have
maintained information about flood
insurance and protection, but the
materials have not been evaluated
recently and may need to be replaced
to ensure they reflect the most up to
date information
Tar River –
Franklin
County
Encourage builders, developers, and architects to become
familiar with the National Flood Insurance Program (NFIP) land
use and building standards by attending annual workshops
presented by the NCEM. This can be accomplished by creating a
mailing list and providing it to NCEM to use for its
announcements. This task can be further supported by
distributing copies of NCEM’s announcement from the city and
county inspections Depts when builders and developers apply for
permits.
NS 2021 - County Planning
Director
2026 - TBC: Builders/developers/etc.
are always able to attend these
workshops, but there has not been
much effort made to encourage these
groups to attend these kinds of
sessions. The county will need to
reevaluate its process for implementing
this.
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 153
Region -
County -
Place Investment Type Age Maintenance
Ownership/
Management Status & Barriers
Tar River –
Franklin
County
Send a flood protection flyer to all properties in the county
through a community newsletter, utility bill, telephone book, or
other document that is distributed to all residences. The flyer
should include the following information: the name and location
of the closest, county-approved shelter, a general identification
of the local flood hazard, flood safety, flood insurance, property
protection, floodplain development permit requirements, and
drainage system maintenance.
NS 2021 - County Planning
Director
2026 - TBC: The county and city have
pushed out information to some
residents via flyers, but they have not
been able to reach all residents so there
will need to be additional efforts to
evaluate the best techniques for getting
this information out to the public. The
county and city will evaluate this action
and try to improve it going forward.
Tar River –
Franklin
County
Provide local real estate agents with handouts that will advise
potential buyers to investigate the flood hazard for the property
they are considering purchasing
NS 2021 - County Planning
Director
2026 In progress: Some handouts have
been developed by the county and
passed along to real estate agents, but
not every agent has been reached and
it is likely that the information needs to
be updated, so the county will keep this
action in place.
Tar River –
Franklin
County
Create outreach website for public designed to display risk
information developed during the Hazard Mitigation Plan
process.
NS 2021 - Tar River Region,
Franklin County
2026 - In progress: no measurable
progress due to lack of funding and
staff
Tar River –
Franklin –
Town of
Youngsville
The responsible party will coordinate with each Dept. head in the
local government and produce a report on ways in which hazard
mitigation goals, objectives, and tasks can be incorporated into
existing policies and implemented through existing programs
and personnel.
P 2021 - Town
Administrator/
Manager
2026 - TBC: The town manager has
worked on including mitigation
goals/tasks into existing
policies/programs, but there is still a
good deal of effort that needs to be
made to fully incorporate hazard
mitigation into other areas of local
governance.
Tar River –
Franklin –
Town of
Youngsville
Each local government participating in this HMP will: 1) continue
to monitor the types and numbers of structures (including
infrastructure and critical facilities) that might be in known
hazard areas based on their best available current projections
and 2) calculate aggregate projected dollar losses for each type
of development and for each hazard risk
P 2021 - Town
Administrator/
Manager
2026 - TBC: The town has worked to
monitor its structures that might be in
known hazard areas and has continued
to do so through this planning effort.
However, the town needs to make a
stronger effort to assess potential
solutions going forward, so this action
will remain in place
Tar River –
Franklin –
Work with the NCDOT Division Five Highway Operations unit and
convene a working group (county-wide or local) to develop
S, P 2021 - Public Works
Director/Water
System Operator
2026 - TBC: Local drainage issues have
been addressed in some of the recent
NCDOT projects, but there remain
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 154
Region -
County -
Place Investment Type Age Maintenance
Ownership/
Management Status & Barriers
Town of
Youngsville
solutions to localized drainage issues caused (in part or in whole)
by NCDOT maintained drainage facilities.
many drainage issues throughout the
county that will need to be resolved
before this action can be considered
complete. The town will work with
county officials and NCDOT on this
issue.
Tar River –
Franklin –
Town of
Youngsville
Apply for funding from the HMGP (FEMA) for mitigation related
projects.
S, NS,
NBS,
P
2021 - Town
Administrator/
Manager
2026 - TBC: There has generally not
been successful funding of brick-and-
mortar type projects. Therefore, the
jurisdiction will continue to pursue this
action.
Tar River –
Franklin –
Town of
Youngsville
Implement public education efforts designed to help inform the
public of their exposure to all natural hazards and to inform them
of actions they can take to mitigate the damages to their health
and property from natural hazards
NS 2021 - Town Clerk 2026 - TBC: The county and town have
worked with the Red Cross to try to
improve efforts by the public to
mitigate damage, but there is still
significant work that needs to be done
to educate the public on these matters.
This action will remain in the plan.
Tar River –
Franklin –
Town of
Youngsville
Ensure that the local library maintains documents about flood
insurance, flood protection, floodplain management, and natural
and beneficial functions of floodplains. Many documents are
available free of charge from FEMA.
NS 2021 - Town Clerk 2026 - TBC: Local libraries have
maintained information about flood
insurance and protection, but the
materials have not been evaluated
recently and may need to be replaced
to ensure they reflect the most up to
date information
Tar River –
Franklin –
Town of
Youngsville
Encourage builders, developers, and architects to become failure
with the NFIP land use and building standards by attending
annual workshops presented by the NCEM. This can be
accomplished by creating a mailing list and providing it to NCEM
to use for its announcements. This task can be further supported
by distributing copies of NCEM’s announcement from the city
and county inspections Depts when builders and developers
apply for permits.
NS 2021 - Town Clerk 2026 - TBC: Builders/developers/etc.
are always able to attend these
workshops, but there has not been
much effort made to encourage these
groups to attend these kinds of
sessions. The county will need to
reevaluate its process for implementing
this action.
Tar River –
Franklin –
Town of
Youngsville
Send a flood protection flyer to all properties in the county
through a community newsletter, utility bill, telephone book, or
other document that is distributed to all residences. The flyer
should include the following information: the name and location
of the closest, county-approved shelter, a general identification
NS 2021 - Town Clerk 2026 - TBC: The county and city have
pushed out information to some
residents via flyers, but they have not
been able to reach all residents so there
will need to be additional efforts to
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 155
Region -
County -
Place Investment Type Age Maintenance
Ownership/
Management Status & Barriers
of the local flood hazard, flood safety, flood insurance, property
protection, floodplain development permit requirements, and
drainage system maintenance
evaluate the best techniques for getting
this information out to the public. The
county and city will evaluate this action
and try to improve it going forward.
Tar River –
Franklin –
Town of
Youngsville
Provide local real estate agents with handouts that will advise
potential buyers to investigate the flood hazard for the property
they are considering purchasing.
NS 2021 - Town Clerk 2026 - In progress: Some handouts have
been developed by the county and
passed along to real estate agents, but
not every agent has been reached and
it is likely that the information needs to
be updated, so the county will keep this
action in place
Tar River –
Franklin –
Town of
Youngsville
Create outreach website for public designed to display risk
information developed during the Hazard Mitigation Plan
process.
NS 2021 - County/Town 2026 - In progress: no measurable
progress due to lack of funding and
staff
Tar River –
Granville
County
Work with the State Office of Dam Safety (ODS) to a) ensure that
all dams in Granville County for which the ODS has jurisdiction
are inspected on a regular basis b) ensure that ODS notifies the
Granville County EM (EM) office of all ODS jurisdictional dams
classified as “high hazard” or “distressed” dams c) attempt to
ensure that all high hazard or distressed dams in the county has
an updated and implemented operations and maintenance plan
and emergency action plans and d) provide the county EM office
with an inventory of all ODS jurisdictional dams in the county
S, NS,
P
2021 - County EM
Director
2026 - TBC: The county has worked to
identify dams located within the
county, including through this
mitigation planning effort. Dam Safety
Action Plans have been completed and
reviewed by Cities of Oxford and
Creedmoor. However, further efforts
are needed to ensure that all high
hazard dams have sufficient plans in
place and that coordination with state
dam safety officials are maintained to
keep dam information up to date at the
county level
Tar River –
Granville
County
Adopt flood maps as they are updated by FEMA and/or the state. P 2021 - County Planning 2026 - In progress: Last update in
December 2019. Maps are updated
periodically as directed by FEMA and
the State of NC
Tar River –
Granville
County
Work with the NCDOT Division Five Highway Operations unit and
convene a working group to develop solutions to localized
drainage issues caused (in part or in whole) by NCDOT
maintained drainage facilities
S, P 2021 - County Planning
Director
2021 - Deleted: The county has
determined that this action may not be
necessary as the NCDOT generally
addressed drainage issues through its
programs without the need to convene
a working group.
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 156
Region -
County -
Place Investment Type Age Maintenance
Ownership/
Management Status & Barriers
Tar River –
Granville
County
Apply for funding from the Hazard Mitigation Grant Program
(HMGP) and other Hazard Mitigation Assistance (HMA) grants.
S, NS,
NP, P
2021 - County EM
Director
2026 - TBC: In general, the county has
not received grant funding for brick and
mortar projects under the HMGP, but
this is still an action the county would
like to have in place going forward as it
pursues these types of projects. Eligible
projects have not been identified.
Tar River –
Granville
County
Provide backup power for critical facilities. NS 2021 - County ES 2026
Tar River –
Granville
County
Work with local American Red Cross (ARC) officials to develop a
plan and implementation goals for ensuring that all county-
sponsored shelters meet ARC shelter operations standards for
mitigation from all hazards, most especially wind and flood
hazards.
P 2021 - County ES 2026 - TBC: The county has worked with
ARC officials to ensure that identified
shelters are protected as effectively as
possible.
Tar River –
Granville
County
Implement public education efforts designed to help inform the
public of their exposure to natural hazards and to inform them of
actions they can take to mitigate the damages to their health and
property from all natural hazards.
NS 2021 - County EM
Director
2026 - TBC: The county has
implemented several types of public
education efforts in the past such as
GranvilleAlert.com and the new county
website, but as the most effective
techniques are constantly evolving, the
county will need to evaluate its
outreach program in the future and
ensure it is communicating effectively
with the public.
Tar River –
Granville
County
Ensure that the local library maintains documents about flood
insurance, flood protection, floodplain management, and natural
and beneficial functions of floodplains. Many documents are
available free of charge from FEMA
NS 2021 - County EM
Director
2026 - TBC: Several libraries in the
county have kept information on the
flood hazard on hand over the past 5
years, however, this information is
likely outdated and should be
evaluated and replaced as needed.
Therefore, this action will remain in
place. Much of this information is
available online.
Tar River –
Granville
County
Encourage buildings, developers, and architects to become
familiar with the NFIP land use and building standards by
attending annual workshops presented by the NCEM. This can be
accomplished by creating a mailing list and providing it to NCEM
NS 2021 - County EM
Director
2026 - TBC: The development
community has been made aware of
programs from NCEM to some degree,
but the county would like to implement
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 157
Region -
County -
Place Investment Type Age Maintenance
Ownership/
Management Status & Barriers
to use for its announcements. This task can be further supported
by distributing copies of NCEM’s announcement from the
county’s inspections Dept. when builders and developers apply
for permits
a bigger push to let this community
know about potential
programs/workshops that are available
and to encourage attendance. EM and
zoning officials attend annual
conferences and have input on plans
for sites with floodplains.
Tar River –
Granville
County
Provide information to residents via various communication
methods: the name and location of the closest, county-approved
shelter, a general identification of the local flood hazard, flood
safety, flood insurance, property protection, floodplain
development permit requirements, and drainage system
maintenance.
NS 2021 - County EM
Director
2026 - TBC: The county has pushed out
information to some residents via
social media and the county website,
but the county has not been able to
reach all residents so there will need to
be additional efforts to evaluate the
best techniques for getting this
information out to the public. The
county will evaluate this action and try
to improve it going forward via online
management.
Tar River –
Granville
County
Provide local real estate agency with handouts that will advise
potential buyers to investigate the flood hazard for the property
they are considering purchasing
NS 2021 - County EM
Director
2021 - Delete: Only a small portion of
the county is in floodplain. Action PEA-4
more effectively addresses this
mitigation opportunity.
Tar River –
Granville
County
Create outreach website for public designed to display risk
information for all hazards developed during the Hazard
Mitigation Plan process
NS 2021 - Tar River Region,
Granville County
2026 - TBC: A website will continue to
be updated and available with
information for the community.
Tar River –
Granville
County –Town
of Butner
Development and updated of a Parks and Recreation Master
Plan, focusing priority on purchase and development of flood-
prone lands for recreational activities.
P 2021 - Town Planner 2026 - TBC: Plan adopted and will
update, as necessary.
Tar River –
Granville
County –Town
of Butner
Apply for funding from the Hazard Mitigation Grant Program
(HMGP) and other Hazard Mitigation Assistance (HMA) grant
programs for mitigation related project grants
S, NS,
NBS,
P
2021 - Town Planner 2026 - In progress: In general, the town
has not received grant funding for
brick-and-mortar projects under the
HMGP, but this is still an action the
town would like to have in place going
forward as it pursues these types of
projects
Tar River –
Granville
Implement public education efforts designed to help inform the
public of their exposure to all natural hazards and to inform them
NS 2021 - Town Planner 2026 - In progress: The county and
town have implemented several types
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 158
Region -
County -
Place Investment Type Age Maintenance
Ownership/
Management Status & Barriers
County –Town
of Butner
of actions they can take to mitigate the damages to their health
and property from all-natural hazards.
of public education efforts in the past,
but as the most effective techniques
are constantly evolving, the county and
town will need to evaluate their
outreach programs in the future and
ensure they are communicating
effectively with the public
Tar River –
Granville
County –Town
of Butner
Ensure that the local library maintains documents about flood
insurance, flood protection, floodplain management, and natural
and beneficial functions of floodplains. Many documents are
available free of charge from FEMA
NS 2021 - Town Planner 2026 - In progress: Several libraries in
the county have kept information on
the flood hazard on hand over the past
5 years, however, this information is
likely outdated and should be
evaluated and replaced as needed.
Therefore, this action will remain in
place
Tar River –
Granville
County –Town
of Butner
Encourage buildings, developers, and architects to become
familiar with the NFIP land use and building standards by
attending annual workshops presented by the NCEM.
NS 2021 - Town Planner 2026 - In progress: The development
community has been made aware of
programs from NCEM to some degree,
but the town would like to implement a
bigger push to let this community know
about potential programs/workshops
that are available and to encourage
attendance.
Tar River –
Granville
County –Town
of Butner
Send a flood protection flyer to all properties in the county
through a community newsletter, utility bill, telephone book, or
other document that is distributed to all residences. The flyer
should include the following information: the name and location
of the closest, county-approved shelter, a general identification
of the local flood hazard, flood safety, flood insurance, property
protection, floodplain development permit requirements, and
drainage system maintenance.
NS 2021 - Town Planner 2026 - TBC: The county and city have
pushed out information to some
residents via flyers, but they have not
been able to reach all residents so there
will need to be additional efforts to
evaluate the best techniques for getting
this information out to the public. The
county and city will evaluate this action
and try to improve it going forward.
Tar River –
Granville
County –Town
of Butner
Provide local real estate agency with handouts that will advise
potential buyers to investigate the flood hazard for the property
they are considering purchasing
NS 2021 - Town Planner 2026 - In progress: Local real estate
agents have been given some
information that can be passed along
to potential home buyers, but the
county and town will need to
determine if this strategy has been
effective and if the information needs
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 159
Region -
County -
Place Investment Type Age Maintenance
Ownership/
Management Status & Barriers
to be updated. This action will remain
in the plan
Tar River –
Granville
County –Town
of Butner
Create outreach website for public designed to display risk
information regarding all hazards developed during the Hazard
Mitigation Plan process.
NS 2021 - Tar River Region,
Granville County,
Town of Butner
2026 - In progress: no measurable
progress due to lack of funding.
Tar River –
Granville
County – City of
Creedmoor
Continue pursuit of grants and alternative funding sources to
increase staff and resources to address current and future hazard
mitigation needs
P 2021 - City Admin. 2026 - In progress: The city has worked
to pursue some grants and mitigation
funding in the past, but there are still
many projects that have not been
completed that the city would like to
pursue, so this action will remain in
place
Tar River –
Granville
County – City of
Creedmoor
As part of the continuing process to review and revise city Zoning
and Subdivision Ordinances, primary hazard areas for the city to
consider are the floodplains bordering the east and west areas of
the city’s ETJ. The city should ultimately direct development
away from the floodplains, but the following recommendations
should be considered 1) increase the minimum vegetative buffer
requirements associate with development near perennial and
intermittent water sources (streams, creeks, surface waters as
identified on USGS maps; and 2) incorporate a minimum 200’
vegetative buffer surrounding Lake Rogers, measured at normal
lake elevation)
NS 2021 - City Admin. Completed - The city has adopted both
requirements identified in this action
so this action is completed.
Tar River –
Granville
County – City of
Creedmoor
Continued coordination with property owners/business owners
to obtain flood insurance (under Community Rating System-CRS
of NFIP)
NS 2021 - City Admin. 2026 - TBC: The city has not joined the
CRS program of the NFIP, but it will
continue to work on further developing
its program so that it is able to qualify
for reduced flood insurance rates under
the program.
Tar River –
Granville
County – City of
Creedmoor
Maintain/provide current information, services, procedures, and
code revisions in relation to all current/future natural human
induced hazards within Granville County, the City of Creedmoor
area, and State of North Carolina for public consumption.
NS 2021 - NCEM, Granville
County, City
Admin.
2026 - In progress: The city has worked
in conjunction with the county and the
state to provide the necessary services
and procedures to reduce risk to
hazards, but there is still significant
work that can be done to try to prevent
damage from these hazards via
regulatory means and the city would
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 160
Region -
County -
Place Investment Type Age Maintenance
Ownership/
Management Status & Barriers
like to keep this action in place going
forward
Tar River –
Granville
County – City of
Creedmoor
Obtain computer and paper copy of current FEMA flood maps for
the Neuse River Basin
P 2021 - NCEM Completed - Through this planning
process flood maps are now available
to the city and will continue to be
available in the future through NC
Floodplain Mapping Program’s website.
Tar River –
Granville
County – City of
Creedmoor
Consider revisions to the city’s Flood Ordinance for the following
(more stringent than the state minimum requirements): raise
finished flood elevation requirements for new structures where
the Base Flood Elevation (BFE) has been determined per updated
Floodplain Zones (FEMA 2003-established by the National Flood
Insurance Rate Maps); structures located within zones where BFE
are identified, are required to elevate two (2) feet above base
flood elevation (state minimum-allows for ductwork and wiring
to be below this elevation); and to increase the opportunity for
ductwork and wiring to be out of range for damage in the event
of potential future flood event, the following medication is
recommended: increase BFE by one (1) foot, total of three (3) feet
NS 2021 - City Admin. 2026 - TBC: The city has introduced
revisions to the Flood Ordinance to
address some of the regulatory
standards identified in this action,
however, the city would like to
integrate additional updates to its
ordinance as well, so it will keep this
action in the plan.
Tar River –
Granville
County – City of
Creedmoor
Review and update the City’s Comprehensive Development Plan
to ensure that development is occurring in a pattern that best
suits the needs of the changing population for the city, with
consideration to areas prone to hazard (such as floodplains).
P 2021 - City Admin. 2026 - TBC: Although the city has
developed a Comprehensive
Development Plan that considers areas
prone to hazards, the city will need to
update this plan to ensure that it
continues to address this area of
concern by limiting development in
high hazard areas.
Tar River –
Granville
County – City of
Creedmoor
Consider revising local ordinances to require new manufactured
housing units (after adoption of this ordinance) to have
permanent foundations
NS 2021 - City Admin. 2026 - TBC: The city has not revised its
local ordinance to require new
manufacture housing units have
permanent foundations. This action
will remain in the plan as the city
continues to consider this requirement
Tar River –
Granville
County – City of
Creedmoor
Apply for funding from the HMGP (FEMA) and HMA (FEMA) for
mitigation projects.
P 2021 - City Manager 2026 - In progress: In general, the city
has not received grant funding for
brick-and-mortar projects under the
HMGP, but this is still an action the city
would like to have in place going
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 161
Region -
County -
Place Investment Type Age Maintenance
Ownership/
Management Status & Barriers
forward as it pursues these types of
projects.
Tar River –
Granville
County – City of
Creedmoor
Consider developing ordinances to protect natural resources and
use them as natural greenways, limiting the opportunity for
damage from hazards (floodplains, large open areas prone to
wind damage). Use of floodplains as green space and greenways
preserved for these uses and not developed through
development of a Natural Resources Protection Ordinance. Used
to protect the natural resources of Creedmoor and incorporate
practices that will still allow of managed development. Include
sections in this ordinance for best management practices
(control runoff), erosion/sediment controls ordinance, and
floodplain regulations. Included in this process would be
incorporation of a greenway system.
NS,
NBS
2021 - City Admin. 2026 - In progress: The city has
developed some ordinances that
protect natural resources and thus
mitigate hazards such as flooding.
However, the city would like to keep
this action in place as it continues to
pursue ordinances that can preserve
natural areas.
Tar River –
Granville
County – City of
Creedmoor
Review and update EM plans/operations on a yearly basis or as
circumstances dictate with regards to natural and human
induced hazards.
P 2021 Annual
updates
City Admin. 2026 - TBC: The city has updated its
EOP on an annual basis and will work
to enact its next update of the plan
within one year to incorporate
improvements to the plan and ensure it
addresses any new issues.
Tar River –
Granville
County – City of
Creedmoor
Implement public education efforts designed to help inform the
public of their exposure to natural hazards and to inform them of
actions they can take to mitigate the damages to their health and
property from all natural hazards.
NS 2021 - City Manager 2026 - TBC: The county and city have
implemented several types of public
education efforts in the past, but as the
most effective techniques are
constantly evolving, the county and city
will need to evaluate their outreach
programs in the future and ensure they
are communicating effectively with the
public.
Tar River –
Granville
County – City of
Creedmoor
Ensure that the local library maintains documents about flood
insurance, flood protection, floodplain management, and natural
and beneficial functions of floodplains. Many documents are
available free of charge from FEMA.
NS 2021 - City Manager 2026 - TBC: Several libraries in the
county have kept information on the
flood hazard on hand over the past 5
years, however, this information is
outdated, should be evaluated, and
replaced as needed. Therefore, this
action will remain in place.
Tar River –
Granville
Encourage buildings, developers, and architects to become
familiar with the NFIP land use and building standards by
NS 2021 - City Manager 2026 - In progress: The development
community has been made aware of
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 162
Region -
County -
Place Investment Type Age Maintenance
Ownership/
Management Status & Barriers
County – City of
Creedmoor
attending annual workshops presented by the NCEM. This can be
accomplished by creating a mailing list and providing it to NCEM
to use for its announcements. This task can be further supported
by distributing copies of NCEM’s announcement from the
county’s inspections Dept. when builders and developers apply
for permits
programs from NCEM, but the city
would like to implement a bigger push
to let this community know about
potential programs/workshops that are
available and to encourage attendance.
Tar River –
Granville
County – City of
Creedmoor
Send a flood protection flyer to all properties in the county
through a community newsletter, utility bill, telephone book, or
other document that is distributed to all residences. The flyer
should include the following information: the name and location
of the closest, county-approved shelter, a general identification
of the local flood hazard, flood safety, flood insurance, property
protection, floodplain development permit requirements, and
drainage system maintenance.
NS 2021 - City Manager 2026 - TBC: The county and city have
pushed out information to some
residents via flyers, but they have not
been able to reach all residents so there
will need to be additional efforts to
evaluate the best techniques for getting
this information out to the public. The
county and city will evaluate this action
and try to improve it going forward.
Tar River –
Granville
County – City of
Creedmoor
Provide local real estate agency with handouts that will advise
potential buyers to investigate the flood hazard for the property
they are considering purchasing.
NS 2021 - Creedmoor
Manager
2026 - TBC: Local real estate agents
have been given some information that
can be passed along to potential home
buyers, but the county and city will
need to determine if this strategy has
been effective and if the information
needs to be updated. This action will
remain in the plan.
Tar River –
Granville
County – City of
Creedmoor
Provide public education forums, workshops, and related
meetings regarding required methods and materials for hazard
mitigation for all hazards
NS 2021 - City of
Creedmoor,
Granville County,
NCEM
2026 - TBC: The city has held some
public education forums on how to
mitigate and has passed out materials
to citizens on this subject. However,
there is still significant public outreach
work that needs to be conducted
through workshops and meetings so
this action will remain in the plan
Tar River –
Granville
County – City of
Creedmoor
Create and update outreach website for public designed to
display risk information for all hazards developed during the
Hazard Mitigation Plan process.
NS 2021 - Tar River Region,
Granville County,
City of
Creedmoor
2026 - In progress: No measurable
progress due to lack of staff and
funding.
Tar River –
Granville
Development of a Parks and Recreation Master Plan, focusing
priority on purchase and development of flood-prone lands for
recreational activities
NS, P 2021 - Town Mayor 2026 - In progress: Although the city has
many parks and recreational facilities,
it has not developed a Parks and
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 163
Region -
County -
Place Investment Type Age Maintenance
Ownership/
Management Status & Barriers
County – Town
of Stem
Recreation Master Plan that focuses on
purchase of flood prone lands. The
town will pursue this action going
forward
Tar River –
Granville
County – Town
of Stem
Apply for funding from the HMGP (FEMA) P 2021 - Town Mayor 2026 - TBC: In general, the town has not
received grant funding for brick-and-
mortar projects under the HMGP, but
this is still an action the town would
like to have in place going forward as it
pursues these types of projects.
Tar River –
Granville
County – Town
of Stem
Implement public education efforts designed to help inform the
public of their exposure to all natural hazards and to inform them
of actions they can take to mitigate the damages to their health
and property from natural hazards.
NS 2021 - Town Mayor 2026 - TBC: The county and town have
implemented several types of public
education efforts in the past, but as the
most effective techniques are
constantly evolving, the county and
town will need to evaluate their
outreach programs in the future and
ensure they are communicating
effectively with the public.
Tar River –
Granville
County – Town
of Stem
Ensure that the local library maintains documents about flood
insurance, flood protection, floodplain management, and natural
and beneficial functions of floodplains. Many documents are
available free of charge from FEMA.
NS 2021 - Town Mayor 2026 - TBC: Several libraries in the
county have kept information on the
flood hazard on hand over the past 5
years, however, this information is
outdated, should be evaluated, and
replaced as needed. Therefore, this
action will remain in place.
Tar River –
Granville
County – Town
of Stem
Encourage buildings, developers, and architects to become
familiar with the NFIP land use and building standards by
attending annual workshops presented by the NCEM. This can be
accomplished by creating a mailing list and providing it to NCEM
to use for its announcements. This task can be further supported
by distributing copies of NCEM’s announcement from the
county’s inspections Dept. when builders and developers apply
for permits.
NS 2021 - Town Mayor 2026 - In progress: The development
community has been made aware of
programs from NCEM, but the city
would like to implement a bigger push
to let this community know about
potential programs/workshops that are
available and to encourage attendance.
Tar River –
Granville
County – Town
of Stem
Send a flood protection flyer to all properties in the county
through a community newsletter, utility bill, telephone book, or
other document that is distributed to all residences. The flyer
should include the following information: the name and location
NS 2021 - Town Mayor 2026 - TBC: The county and city have
pushed out information to some
residents via flyers, but they have not
been able to reach all residents so there
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 164
Region -
County -
Place Investment Type Age Maintenance
Ownership/
Management Status & Barriers
of the closest, county approved shelter, a general identification
of the local flood hazard, flood safety, flood insurance, property
protection, floodplain development permit requirements, and
drainage system maintenance
will need to be additional efforts to
evaluate the best techniques for getting
this information out to the public. The
county and city will evaluate this action
and try to improve it going forward.
Tar River –
Granville
County – Town
of Stem
Provide local real estate agency with handouts that will advise
potential buyers to investigate the flood hazard for the property
they are considering purchasing
NS 2021 - Town Mayor In progress: Local real estate agents
have been given some information that
can be passed along to potential home
buyers, but the county and town will
need to determine if this strategy has
been effective and if the information
needs to be updated. This action will
remain in the plan.
Tar River –
Granville
County – Town
of Stem
Create outreach website for public designed to display risk
information developed during the Hazard Mitigation Plan
process.
NS 2021 - Tar River Region,
Granville County,
Town of Stem
2026 - In progress: no measurable
progress due to lack of funding and
staff
Table 48. RHMP – Cape Fear Region (5.4.3)
Region - County -
Place Investment Type Age Maintenance
Ownership/
Management Status & Barriers
Cape Fear – Harnett
County – Town of
Angier
Create and define suitable areas for growth by
updating existing land use plan or creation of a
new land use plan that considers mitigation of
all hazards
P 2020 Further
updates of the
land use plan
will be
required
Zoning/Planning
Administrator,
Town
Administrator
2025 - TBC: The town has updated its existing land
use plan to identify areas suitable for growth. The
Town adopted a Comprehensive Land Use Plan in
2017. The Land Use Map was updated in 2019 to
account for the proposed NC 55 Bypass and
encourage growth on the West side of Town.
Cape Fear – Harnett
County – Town of
Angier
Create a yearly checklist that will help monitor
and protect infrastructure and existing
structures from all hazards
NS, P 2020 Reviewed
annually
Public Works
Director,
Building
Inspector
2025 - TBC: The town has developed a checklist that
will help it to monitor its infrastructure and existing
structures.
Cape Fear – Harnett
County – Town of
Angier
The town will involve county officials with future
growth plans and patterns and hold community-
visioning meetings to educate the public and
P 2020 - Town
Administrator,
Planning
Director,
2025 - TBC. Planning Staff is in periodic
communication with County Planners to be sure
County officials are aware of growth projections in
Angier. The Town has also held public input
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 165
Region - County -
Place Investment Type Age Maintenance
Ownership/
Management Status & Barriers
developers about future growth and hazard
mitigation planning for all hazards
Town/County
Boards
sessions for various growth-related initiatives
including updates to the Ordinance and the 2019
Land Use Plan update.
Cape Fear – Harnett
County – Town of
Angier
Create new ordinances and/or strengthen
existing ordinances to protect and preserve
environmentally sensitive areas and open space.
NS 2020 - Town
Administrator,
Planning/Zoning
Administrator,
Town/County
Boards
2025 - TBC. Planning Staff has recently overhauled
the Open Space chapter of the Unified
Development Ordnance (UDO) to ensure adequate
open space is dedicated in new development,
ensure recreational opportunities are widely
available, and to protect wetlands and flood plains
as vacant land is developed. Ordinances have been
developed in a way that attempts to minimize
degradation to environmentally sensitive areas and
to preserve open space. There are still revisions that
could be made to the town’s ordinances that would
further reduce risk and the town will investigate
making those changes going forward.
Cape Fear – Harnett
County – Town of
Angier
Pursue state and Federal grants that would help
improve ES along with mitigation planning for all
hazards.
P 2020 - Town/County
Manager,
Planning
Director,
Finance Director
2025 - TBC: Town staff will continue to monitor and
apply for grants, as it relates to identified mitigation
projects.
Cape Fear – Harnett
County – Town of
Angier
Try to set aside monies for long range Capital
Improvement Projects that would help protect
public health and safety from all hazards.
NS, P 2020 - Town/County
Manager,
Planning
Director,
Finance Director
2025 - TBC. Through the collection of System
Development Fees for new development, the Town
has and will continue to set aside money for long-
range capital improvement projects such as
partnering in the future expansion of the Northwest
Harnett Regional Treatment Plant to serve the
needs of new development.
Cape Fear – Harnett
County – Town of
Angier
Provide backup power for critical facilities NS 2020 - Town/County
Manager,
Planning
Director
2025
Cape Fear – Harnett
County – Town of
Angier
Make a list available for distribution at the
Inspections Dept. of contractors and consultants
knowledgeable or experienced in
retrofitting/construction techniques for
mitigation of all hazards.
P 2020 - Chief Building
Inspector,
Harnett County
Planning and
Inspections
Dept.
2025 - TBC: The town has developed a list of
contractors that are knowledgeable in retrofitting
homes and other structures. This list is available at
the Inspections Dept. but needs to be reviewed and
updated annually.
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 166
Region - County -
Place Investment Type Age Maintenance
Ownership/
Management Status & Barriers
Cape Fear – Johnston
County
Johnston County will apply to reduce their
National Flood Insurance Program (NFIP)-CRS
(Community Rating System) score.
NS, P 2020 - ES Coordinator,
Environmental
Protection
Administrator
2025 - TBC: Johnston County Planning Dept.
continues to work on floodplain management
program that will facilitate reducing the CRS score.
Cape Fear – Johnston
County
Conduct a county dam safety inventory. People
downstream of hazardous dams would be
notified. Owners would be notified of ways to
reduce the risk of their dams.
P, S 2020 - Public Utilities
Director
2025 - In progress: Not sufficient funding or
resources to complete at this time.
Cape Fear – Johnston
County
Relocation of four server boxes located in the
basement of the Johnston County courthouse
and/or increase from one to multiple servers at
the Johnston County Health Dept. to increase
redundancy
NS 2020 - Technology
Services
Director
2025 - TBC: the county continues to work to
increase redundancy in all its systems and will
replace as funding becomes available.
Cape Fear – Johnston
County
Replace generator at Pine Level wastewater
pump station.
NS 2020 - Public Utilities
Director
2025 - In progress: No measurable progress due to a
lack of funding
Cape Fear – Johnston
County
Provide auxiliary heating and cooling capability
and generator connections to shelter sites at
North Johnston Middle School, West Johnston
High School, and First Baptist Church Smithfield.
NS 2020 - ES Director,
Johnston
County School
System
2025 - TBC: identifying ways to facilitate generator
power to critical structure such as shelter during
disasters for specified locations
Cape Fear – Johnston
County
Provide backup power to critical facilities. NS 2020 - ES Director 2025
Cape Fear – Johnston
County
Flood damage prevention ordinance NS 2020 Reviewed and
updated
regularly.
Town Admin. 2025 - TBC: 2009 flood prevention ordinance
updated and re-adopted June 4, 2018
Cape Fear – Johnston
County
Complete rehabilitation work on three gravity
sewer outfalls to reduce system infiltration
S 2020 - Public Utilities
Director
2025 - In progress: No measurable progress due to a
lack of funding.
Cape Fear – Johnston
County
Replace bridge No. 40 located on US 70 Business
(Market St.) over Neuse River
S 2020 - ES Director 2025 - In progress: No measurable progress due to a
lack of funding
Cape Fear – Johnston
County
The Johnston County Continuity of Operations
Plan (COOP) will be upgraded
P 2020 Updated
annually
ES Director 2025 - In progress: COOP was updated in 2019
Cape Fear – Johnston
County
Establish a site for supporting an NCOEMS
Medical Support Shelter. (CapRac).
NS 2020 - ES Dept. 2025 - In progress: JCES, CapRac and NC Emergency
Management (NCEM) have worked with C3 church
to use their facility for a Special Medical Needs
Shelter
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 167
Region - County -
Place Investment Type Age Maintenance
Ownership/
Management Status & Barriers
Cape Fear – Johnston
County
On an annual basis, the FEMA repetitive loss
property list will be obtained from NCEM. At that
time, letters will be sent to the owners of the
repetitive loss structures to notify them of their
status and to offer information on programs that
could help.
NS 2020 - GIS Application
Analyst,
Emergency
Services
Coordinator
2025 - TBC: The county continues to update its
repetitive loss list and, will continue to attempt to
notify property owners to institute mitigation.
Cape Fear – Johnston
County
Update and maintain educational information
and links on County website for the public to
access to stay informed regarding all natural
hazards.
NS 2020 - ES Dept. 2025 - In progress: The county website includes
information for hazard and mitigation for the
public.
Cape Fear – Johnston
County
Develop and print a brochure outlining wind
proofing methods above and beyond Code. This
will be offered in the Inspections Dept.
receptionist area.
NS 2020 - Steven Finn
(Planning and
Inspections
Director)
2025 - TBC: The county continues to work to
develop a brochure concerning wind proofing
methods
Cape Fear – Johnston
County – Town of
Archer Lodge
Provide backup power to critical facilities. NS 2020 - Public Works 2025
Cape Fear – Johnston
County – Town of
Archer Lodge
Work with Johnston County to upgrade COOP. P 2020 - ES Director 2025 - TBC: continually working with county to
meet goal.
Cape Fear – Johnston
County – Town of
Archer Lodge
Collaborate with Johnson County EM
(emergency medical services [EMS]) by reviewing
and suggesting applicable updates to available
information on Johnston County’s EMS Website
for the public to access/stay informed on natural
hazard risks and mitigation techniques
NS 2020 Annual review Town Admin. 2025 - TBC: 2020 Annual Review completed of
applicable information on Johnston County’s EM
Website.
Cape Fear – Johnston
County – Town of
Archer Lodge
Make available to public any
brochures/materials that may be available from
the county, state, or federal level that outline
homeowner mitigation techniques for all
hazards.
NS 2020 - Town Admin. 2025 - TBC: Dissemination of information occurs
regularly. 2020 Archer Lodge Website updated.
Under local Information Tab installed link to
connect to: Johnston County EM web page
Cape Fear – Johnston
County –Town of
Benson
Propose a stormwater drainage study. P 2020 Updated every
5 years
Planning, Public
Works
2025 - TBC: Baseline model completed
Cape Fear – Johnston
County –Town of
Benson
Maintain list of residents with special needs. P - Admin. 2025 - TBC: This information is kept in the utility
software and updated as needed
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 168
Region - County -
Place Investment Type Age Maintenance
Ownership/
Management Status & Barriers
Cape Fear – Johnston
County –Town of
Benson
Maintain a list of contractors to assist town in
emergencies
P Annual Admin. 2025 - TBC: Public Utilities has this information
updated annually and submitted to the State with
permits
Cape Fear – Johnston
County –Town of
Benson
Maintain all utility rights-of-way by trimming
trees around power lines and maintain right-of-
way of water/sewer lines.
NS Annual Electric Dept.,
Public Works
Dept.
2025 - TBC: Tree trimming is maintained on an
annual basis by Electric & Public Works Depts to
ensure all utilities are accessible
Cape Fear – Johnston
County –Town of
Benson
Conduct smoke testing and camera system of
existing sewer lines
NS 2020 Every 10 years Public Works 2025 - TBC: American Institute of Architects study
was performed in 2018
Cape Fear – Johnston
County –Town of
Benson
Conduct a comprehensive drainage study. P 2020 Every 5 years Public Works 2025 - TBC: Baseline model completed
Cape Fear – Johnston
County –Town of
Benson
Replace three existing pump stations. NS 2020 - Public Works 2025 - In progress: Funding not available at this
time
Cape Fear – Johnston
County –Town of
Benson
On pump stations, raise all controls above Base
Flood Elevation. Lift Station needs to be 2ft
higher.
NS 2020 - Public Works 2025 - In progress: Funding not available at this
time
Cape Fear – Johnston
County –Town of
Benson
Provide backup power to critical facilities NS 2020 - Public Works 2025
Cape Fear – Johnston
County –Town of
Benson
Continue upgrades of sanitary sewer system NS 2020 - Wastewater
Treatment,
Public Works
2025 - TBC: $875,000 grant applied towards
replacement and repairs to sewer system. This
project is continuing as funding becomes available.
Cape Fear – Johnston
County –Town of
Benson
Enter into agreement with Johnston County to
use current county hazard notification system.
NS 2020 - Admin. 2025 - n progress: At one time we had use of Code
Red to notify our citizens, we no longer have access
to this until funding becomes available.
Cape Fear – Johnston
County –Town of
Benson
Maintain and update the Town of Benson
website
NS 2020 - Admin. 2025 - TBC: As events occur, we have a staff
member that keeps this information updated.
Cape Fear – Johnston
County –Town of
Benson
Educate public of all potential natural disasters. NS 2020 - Admin. 2025 - TBC: The town continues to keep the public
well informed. We have a Public Information Officer
on staff that continually monitors and educates as
events occur
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 169
Region - County -
Place Investment Type Age Maintenance
Ownership/
Management Status & Barriers
Cape Fear – Johnston
County –Town of
Clayton
Develop comprehensive plan. P 2020 - Planning Dept. 2021 - In progress, 10% complete. Anticipate
completion July 2021
Cape Fear – Johnston
County –Town of
Clayton
Provide backup power for critical facilities. NS 2020 - Fire Dept. 2025
Cape Fear – Johnston
County –Town of
Clayton
The Johnston County COOP will be upgraded. P 2020 - Emergency
Services
Director
2025 - In progress: no measurable progress due to
limited funds.
Cape Fear – Johnston
County –Town of
Clayton
Conduct Annual Emergency Operations Center
(EOC) training.
NS 2020 Annual Fire Dept. 2025
Cape Fear – Johnston
County –Town of
Clayton
Develop and print a brochure outlining wind
proofing methods above and beyond Code. This
will be offered in the Inspections Dept.
receptionist area.
NS 2020 - Steven Finn
(Planning and
Inspections
Director)
2025 - In progress: No measurable progress due to
limited funds.
Cape Fear – Johnston
County –Town of
Clayton
Develop hazard mitigation materials for all
hazards for print and/or use on websites/social
media.
NS 2020 - Steven Finn
(Planning and
Inspections
Director)
2025
Cape Fear – Johnston
County – Town of Four
Oaks
Maintain all utility rights-of-way by trimming
trees around power lines and maintain right-of-
way of water/sewer line
NS 2020 Annual Public
Works/Duke
Energy
2025 - TBC: The town along with Duke Energy
automatically has this on their check all the time
list.
Cape Fear – Johnston
County – Town of Four
Oaks
Maintain a list of contractors to assist town in
natural hazards.
P 2020 Updated
annually
Admin. 2025
Cape Fear – Johnston
County – Town of Four
Oaks
Digitize copies of town ordinances, polices, and
procedures.
NS 2020 - Admin. and
Town Council
2025 - TBC: Working on updates along with the
Chapter 160D
Cape Fear – Johnston
County – Town of Four
Oaks
Town of Four Oaks public power electric system
upgrade and relocation of overhead power lines
NS 2020 - Public
Works/Duke
Energy
2025 - In progress: no measurable progress due to
lack of funding
Cape Fear – Johnston
County – Town of Four
Oaks
Assess sewer lines due to infiltration issues.
Need to address five to six utility access holes
per year.
NS, P 2020 - Public Works 2025 - In progress: no measurable progress due to
lack of funding.
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 170
Region - County -
Place Investment Type Age Maintenance
Ownership/
Management Status & Barriers
Cape Fear – Johnston
County – Town of Four
Oaks
Clean street grates before heavy rains and in
large drain tiles to accommodate water.
NS 2020 - Public Works 2025 - In progress: no measurable progress due to
lack of funding
Cape Fear – Johnston
County – Town of Four
Oaks
Install drainage pipe to relieve storm runoff and
clean culvert areas.
S 2020 - Public Works 2025 - In progress: no measurable progress due to
lack of funding.
Cape Fear – Johnston
County – Town of Four
Oaks
Provide backup power for critical facilities. NS 2020 - Public Works 2025
Cape Fear – Johnston
County – Town of Four
Oaks
Develop ordinance to penalize intentional or
malicious damage to canal and drainage system.
NS 2020 - Town Manager,
Town Council
2025 - In progress: no measurable progress due to
lack of funding
Cape Fear – Johnston
County – Town of Four
Oaks
Clean out and improve drainage pipe located on
CSX Railroad right-of-way.
NS 2020 - Town Manager,
Town Council
2025 - In progress: no measurable progress due to
lack of funding
Cape Fear – Johnston
County – Town of Four
Oaks
Maintain a system for identifying special needs
citizens in the town.
P 2020 - Police Dept.,
Admin.
2025 - In progress: no measurable progress due to
lack of funding
Cape Fear – Johnston
County – Town of Four
Oaks
Maintain town’s website to include links to
ReadyNC.org and FEMA
NS 2020 - Admin. 2025 - In progress: no measurable progress due to
lack of funding
Cape Fear – Johnston
County – Town of Four
Oaks
Provide citizens with educational materials
regarding the mitigation of all hazards through a
variety of mediums.
NS 2020 - Admin. 2025
Cape Fear – Johnston
County – Town of Four
Oaks
Digitize copies of town ordinances, polices, and
procedures.
NS 2020 - Town Manager 2025 - In progress: no measurable progress due to
lack of funding.
Cape Fear – Johnston
County – Town of Four
Oaks
Develop ordinance to penalize intentional or
malicious damage to canal and drainage system
NS 2020 - Town Manager,
Town Council
2025 - In progress: no measurable progress due to
lack of funding.
Cape Fear – Johnston
County – Town of Four
Oaks
Clean out and improve drainage pipe located on
CSX Railroad right-of-way
NS 2020 - Town Manager,
CSX Officials
2025 - In progress: no measurable progress due to
lack of funding.
Cape Fear – Johnston
County – Town of Kenly
Remove beaver dam and trap beavers on east
side of town to improve drainage and prevent
flooding of low-lying areas and streets.
S 2020 - Town Manager,
CSX Officials
2025 - In progress: no measurable progress due to
lack of funding
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 171
Region - County -
Place Investment Type Age Maintenance
Ownership/
Management Status & Barriers
Cape Fear – Johnston
County – Town of Kenly
Conduct study of drainage system to look for
ways to improve drainage in southwest part of
Town.
P 2020 - Town Manager 2025 - In progress: no measurable progress due to
lack of funding
Cape Fear – Johnston
County – Town of Kenly
Conduct smoke test and sewer system audit to
study excess water that flows into sewer pipes
from groundwater and storm water infiltration
and inflow.
NS, P 2020 - Town Manager,
Engineering
Firm
2025 - In progress: no measurable progress due to
lack of funding
Cape Fear – Johnston
County – Town of Kenly
Create a process and infrastructure to backup
documents and records on town computers.
NS, P 2020 - Town Manager,
Town Staff
2025 - In progress: no measurable progress due to
lack of funding
Cape Fear – Johnston
County – Town of Kenly
Provide backup power at critical facilities such
as lift stations.
NS 2020 - Town Manager,
Town Council
2025
Cape Fear – Johnston
County – Town of Kenly
Acquire or elevate flood prone properties NS 2020 - Town Manager 2025
Cape Fear – Johnston
County – Town of Kenly
Improve drainage ditches and canal system in
Town and other areas located in the ETJ.
S 2020 - Town Manager,
Town Council
2025 - In progress: no measurable progress due to
lack of funding
Cape Fear – Johnston
County – Town of Kenly
Water/Sewer Main Project – Upgrade and loop
water mains to improve water for domestic
consumption and fire protection, upgrade sewer
lines to prevent infiltration of storm water into
sewer system
NS 2020 - Town of Kenly,
Johnston
County, Wilson
County
2025 - In progress: no measurable progress due to
lack of funding
Cape Fear – Johnston
County – Town of Kenly
Develop a COOP for the Town of Kenly. P 2020 - Town Council,
Town Gov.
2020 - Complete
Cape Fear – Johnston
County – Town of Kenly
On an annual basis, the FEMA repetitive loss
property list will be obtained from NCEM. At that
time, letters will be sent to the owners of the
repetitive loss structures to notify them of their
status and to offer information on programs that
could help
NS 2020 - Town Manager 2025 - In progress: no measurable progress due to
lack of funding
Cape Fear – Johnston
County – Town of Kenly
Conduct a dam/hog lagoon safety inventory.
People downstream of hazardous dams/hog
lagoons would be notified. Owners would be
notified of ways to reduce the risk of their
dams/lagoons.
P, S 2020 - Public Utilities
Director for
Johnston
County
2025 - In progress: no measurable progress due to
lack of funding
Cape Fear – Johnston
County – Town of Kenly
Develop and print a brochure outlining wind
proofing methods above and beyond code. This
NS 2020 - Johnston
County Planning
and Inspections
2025 - In progress: no measurable progress due to
lack of funding
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 172
Region - County -
Place Investment Type Age Maintenance
Ownership/
Management Status & Barriers
will be offered in the Inspections Dept.
receptionist area
Cape Fear – Johnston
County – Town of Kenly
Provide education materials on
preparedness/mitigation measures for all
hazards and display at the Town Hall, Town
Library, and Town Website
NS 2020 - Town Staff 2025 - In progress: no measurable progress due to
lack of funding
Cape Fear – Johnston
County – Town of Micro
Adopt and maintain NFIP compliance. NS 2020 - Town Board 2025 - TBC: The town is a participating member of
the NFIP and will continue to maintain
Cape Fear – Johnston
County – Town of Micro
Improve drainage in Micro. S, NS 2020 - Town Board 2025 - In progress: The town is working to improve
drainage throughout the town in many ways, but
there are still several projects that need to be
completed to improve drainage further.
Cape Fear – Johnston
County – Town of Micro
Create a process and infrastructure to backup
documents, forms, and utility records on town
computers.
NS 2020 - Town Staff 2025 - TBC: Water and Sewer Dept. has paper
copies. Keeps for 5 years.
Cape Fear – Johnston
County – Town of Micro
Provide for a secondary means of power for
wells and sewer lift stations through the
installation of appropriate electrical connections
and purchase of 40 KW generator
NS 2020 - Town Staff 2025 - In progress: Town has backup generator for
sewer pump stations but not wells.
Cape Fear – Johnston
County – Town of Micro
Provide backup power for critical facilities NS 2020 - Town Boards 2025 - In progress: No measurable progress due to
lack of funding.
Cape Fear – Johnston
County – Town of Micro
Upsize culvert located on CSX Railroad right-of
way to handle storm water drainage from the
new North Johnston Middle School
S 2020 - Town Board,
CSX Railroad
2025 - In progress: No communications with CSX.
Cape Fear – Johnston
County – Town of Micro
On an annual basis, the FEMA repetitive loss
property list will be obtained from NCEM. At that
time, letters will be sent to the owners of the
repetitive loss structures to notify them of their
status and to offer information on programs that
could help
NS 2020 Annual update GIS Application
Analyst, ES
coordinator
2025 - In progress: The town currently has an up-to-
date repetitive loss list, and it will annually work to
update that list and attempt to encourage property
owners to take action to mitigate
Cape Fear – Johnston
County – Town of Micro
Develop and print a brochure outlining wind
proofing methods above and beyond Code. This
will be offered in the Inspections Dept.
receptionist area.
NS 2020 - Steven Finn
(Planning and
Inspections
Director)
2025 - In progress: The town will work to develop a
brochure concerning wind proofing methods and
will offer help from the Inspections Dept..
Cape Fear – Johnston
County – Town of Micro
Provide education materials on
Preparedness/mitigation measures for all
NS 2020 - Town Staff 2025 - In progress. No measurable progress due to
lack of funding.
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 173
Region - County -
Place Investment Type Age Maintenance
Ownership/
Management Status & Barriers
hazards and display at the Town Hall, and Town
Website.
Cape Fear – Johnston
County – Town of Pine
Level
Adopt a flood ordinance that is more restrictive
on construction within a 100-year flood zone
NS 2020 - Zoning
Administrator,
Board of
Commissioners
2025 - The town has adopted an ordinance that is
more restrictive on construction within the 100-
year flood zone. This action will be removed from
the next update as a capability.
Cape Fear – Johnston
County – Town of Pine
Level
Develop a systematic inspection process of the
Town’s public facilities and utilities to prevent or
minimize potential damage.
P 2020 Update
annually
Director of
Public Works
2025 - TBC: The town has developed a systematic
inspection process for its public utilities, but this
process will need to be carried out, reviewed, and
updated on at least an annual basis, so it will
remain in the plan
Cape Fear – Johnston
County – Town of Pine
Level
Improve drainage in southern part of town based
on comprehensive drainage study
S, NS 2020 Occurs
annually
Public Works 2025 - TBC
Cape Fear – Johnston
County – Town of Pine
Level
Provide backup power for critical facilities. NS 2020 - Public Works 2025
Cape Fear – Johnston
County – Town of Pine
Level
Upgrade lift station located on the East Side due
to its location being in a low point in the flood
plain
NS 2020 - Public Works 2025 - In progress: Will be upgraded during the
water and sewer project to be completed by 2021.
Cape Fear – Johnston
County – Town of Pine
Level
Increase public awareness of risk and mitigation
measures for all hazards available through a
series of informative news articles.
NS 2020 Updated
annually
Zoning
Administrator,
Town Clerk
2025 - TBC: In the past, the town has developed and
published articles on risks and mitigation for its
citizens, but the town is planning to continue this
process by developing these articles at least
annually
Cape Fear – Johnston
County – Town of Pine
Level
On an annual basis, the FEMA repetitive loss
property list will be obtained from NCEM. At that
time, letters will be sent to the owners of the
repetitive loss structures to notify them of their
status and to offer information on programs that
could help
NS 2020 Updated
annually
GIS Application
Analyst, ES
coordinator
2025 - TBC: The town will annually update its
repetitive loss list and, will continue to attempt the
property owners to institute mitigation
Cape Fear – Johnston
County – Town of Pine
Level
Develop and print a brochure outlining wind
proofing methods above and beyond Code. This
will be offered in the Inspections Dept.
receptionist area
NS 2020 - Steven Finn
(Planning and
Inspections
Director)
2025 - TBC: The town will work to develop a
brochure concerning wind proofing methods and
will offer help from the Inspections Dept..
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 174
Region - County -
Place Investment Type Age Maintenance
Ownership/
Management Status & Barriers
Cape Fear – Johnston
County – Town of
Princeton
Maintain a list of contractors to assist town in
emergencies.
P 2020 - Admin. 2025 - TBC: occurs on a regular as needed basis.
Cape Fear – Johnston
County – Town of
Princeton
Maintain town ordinances, policies, and
procedures for the Town of Princeton on their
website.
NS 2020 - Admin. 2025 – TBC: list is updated as needed.
Cape Fear – Johnston
County – Town of
Princeton
Maintain Moccasin Creek and right away from
erosion.
NS,
NBS
2020 - Public Works 2025 – Permitting nearing completion. Expect bids
in Fall 2020 with completion Fall 2021.
Cape Fear – Johnston
County – Town of
Princeton
Conduct annual smoke testing of existing sewer
lines. Ten percent of lines to be tested annually
NS 2020 Testing occurs
annually
Public Works 2025 – TBC
Cape Fear – Johnston
County – Town of
Princeton
Install stationary 75kw generator for Town Hall NS 2020 - Public Works 2025 – In progress: no measurable progress due to
lack of funding.
Cape Fear – Johnston
County – Town of
Princeton
Provide backup power at critical facilities NS 2020 - Admin. 2025
Cape Fear – Johnston
County – Town of
Princeton
Upgrade existing manual bar screen with an
automatic bar screen at Wastewater Treatment
Facility.
NS 2020 - Public Works 2025 – In progress: Project is funded. Expected to be
permitted and bid in 2021
Cape Fear – Johnston
County – Town of
Princeton
Upgrade grit removal system at Wastewater
Treatment Plan
NS 2020 - Public Works 2025 – In progress: Project is funded. Expected to be
permitted and bid in 2021.
Cape Fear – Johnston
County – Town of
Princeton
Maintain a system at Town Hall for identifying
towns’ special needs citizens within the
Princeton area.
P 2020 - Police Dept.,
Admin.
2025 – In progress: no measurable progress due to
lack of funding
Cape Fear – Johnston
County – Town of
Princeton
Provide warning communications to citizens for
all hazards.
NS 2020 - Police Dept.,
Admin.
2025
Cape Fear – Johnston
County – Town of
Princeton
Develop and print a brochure outlining wind
proofing methods above and beyond code. This
will be offered in the Inspections Dept.
receptionist area.
NS 2020 - Steven Finn
(Planning and
Inspections
Director)
2025 – TBC: Johnston County is currently handling
building inspections and providing this information.
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 175
Region - County -
Place Investment Type Age Maintenance
Ownership/
Management Status & Barriers
Cape Fear – Johnston
County – Town of
Princeton
Educate public on all potential natural disasters
by maintaining town’s website to include links to
ReadyNC.org and FEMA –www.dhs.gov/ready.
NS 2020 - Town Admin. 2025 – In progress: no measurable progress due to
lack of funding
Cape Fear – Johnston
County – Town of
Selma
Update Town Development Code with latest
hazard mitigation measures; revise floodplain
and stormwater regulations
NS 2020 - Planning and
Inspections
2025 – In progress: no measurable progress due to
lack funding
Cape Fear – Johnston
County – Town of
Selma
Incorporate latest NC Building Code regulations NS 2020 - Planning and
Inspections,
Admin.
2025 – TBC: will update as necessary
Cape Fear – Johnston
County – Town of
Selma
Provide Cloud access for government software
and date.
NS 2020 - Admin. 2019 – completed
Cape Fear – Johnston
County – Town of
Selma
Develop a fuel back up plan. P 2020 - Public works,
Fire
2025 – In progress: no measurable progress due to
lack funding
Cape Fear – Johnston
County – Town of
Selma
Maintain a list of contractors to assist in town
emergency recovery.
P 2020 - Public works 2025 – TBC: will update as necessary
Cape Fear – Johnston
County – Town of
Selma
Improve Storm water drainage. S, NS 2020 - Public works In progress: no measurable progress due to lack
funding.
Cape Fear – Johnston
County – Town of
Selma
Complete storm water GIS mapping project P 2020 - Public works In progress: no measurable progress due to lack
funding.
Cape Fear – Johnston
County – Town of
Selma
Complete sewer inspection to eliminate inflow
and infiltration
NS 2020 - Public Works 2025 – In progress: no measurable progress due to
lack funding
Cape Fear – Johnston
County – Town of
Selma
Install emergency power back up to all critical
facilities
NS 2020 - Admin. 2025 – In progress: no measurable progress due to
lack funding
Cape Fear – Johnston
County – Town of
Selma
Install emergency power back up to critical wells
and lift stations.
NS 2020 - Admin. 2025 – In progress: no measurable progress due to
lack funding
Cape Fear – Johnston
County – Town of
Selma
Incorporate an EOC into the Town Hall. P 2020 - Admin. 2025 – In progress: no measurable progress due to
lack funding
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 176
Region - County -
Place Investment Type Age Maintenance
Ownership/
Management Status & Barriers
Cape Fear – Johnston
County – Town of
Selma
Improve drainage ditches and canal system in
areas outside of the incorporated area.
S 2020 - Public Works 2025 – In progress: no measurable progress due to
lack funding
Cape Fear – Johnston
County – Town of
Selma
Increase staff of the Fire Dept. to meet National
Fire Protections Association 1710.
NS 2020 - Fire 2020 – In progress: 80% complete
Cape Fear – Johnston
County – Town of
Selma
Develop the Fire Dept. Training room into an
EOC by adding data, and phone lines
NS 2020 - Fire, Police 2025 – In progress: no measurable progress due to
lack funding
Cape Fear – Johnston
County – Town of
Selma
Develop a list of special needs citizens in need of
assistance during a disaster
P 2020 - Fire, Police 2025 – In progress: no measurable progress due to
lack funding
Cape Fear – Johnston
County – Town of
Selma
Develop and exercise the towns emergency plan
annually with all Depts
P 2020 - Fire 2025 – In progress: no measurable progress due to
lack funding
Cape Fear – Johnston
County – Town of
Selma
Develop a shelter plan for the Town. P 2020 - Fire, Police 2025 – In progress: no measurable progress due to
lack funding
Cape Fear – Johnston
County – Town of
Selma
Purchase a mobile Command Center NS 2020 - Police 2025 – In progress: no measurable progress due to
lack funding
Cape Fear – Johnston
County – Town of
Selma
Collect education materials on
preparedness/mitigation measures for all
hazards and display at both the Town Hall and
Town Library.
NS 2020 - Planning and
Inspections,
Admin.
2025 – In progress: no measurable progress due to
lack funding
Cape Fear – Johnston
County – Town of
Selma
Advertise and promote the availability of flood
insurance to town residents and property
owners by including such information in the
Town’s water billing at least once a year
NS 2020 - Planning and
Inspections
Admin.
2025 – In progress: no measurable progress due to
lack funding
Cape Fear – Johnston
County – Town of
Smithfield
Complete stormwater GIS mapping project, with
elevations showing where deficiencies exist in
the storm water system.
P 2020 - Director of
Public Works
2025 – In progress: no measurable progress due to
lack of funding and due to past budget constraints.
Cape Fear – Johnston
County – Town of
Smithfield
The development of a (COOP for the Town of
Smithfield.
P 2020 - ES Director,
Town Manager
2025 – The Town of Smithfield adopts the County’s
COOP which was update last year.
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 177
Region - County -
Place Investment Type Age Maintenance
Ownership/
Management Status & Barriers
Cape Fear – Johnston
County – Town of
Smithfield
Install generators to at least two, possibly three,
critical sewer lift stations within the Town of
Smithfield
NS 2020 - Director of
Public Works
2025 – In progress: 15 of 19 Town lift stations are
equipped with Generators. Two of the four without
generators have “overflow” lines.
Cape Fear – Johnston
County – Town of
Smithfield
Provide backup power to critical facilities. NS 2020 - Director of
Public Works
2025
Cape Fear – Johnston
County – Town of
Smithfield
Complete the Spring Branch Wetlands
Restoration Project to improve the quality of
stormwater runoff before it enters the Neuse
River.
NBS 2020 - Director of
Public Works
2025 – In progress: The wetland facility was
restored in 2019 and a grant has been applied for to
do additional work. They also received grant
funding for a constructed wetland and stream bank
restoration project along the Spring Branch to be
completed in 2022
Cape Fear – Johnston
County – Town of
Smithfield
On an annual basis, the FEMA repetitive loss
property list will be obtained from NCEM. At that
time, letters will be sent to the owners of the
repetitive loss structures to notify them of their
status and to offer information on programs that
could help
NS 2020 Annual review
and update
GIS Application
Analyst, ES
coordinator
2025 – TBC
Cape Fear – Johnston
County – Town of
Smithfield
Develop and print a brochure outlining wind
proofing methods above and beyond Code. This
will be offered in the Inspections Dept.
receptionist area.
NS 2020 - Steven Finn
(Planning and
Inspections
Director)
2025 – TBC: Town staff will work together to
develop a brochure
Cape Fear – Johnston
County – Town of
Smithfield
Update and maintain educational information
and links on website for the public to access to
stay informed on all-natural hazard risks and
mitigation techniques.
NS 2020 - Town Admin. 2025 – TBC: The Town of Smithfield will link to the
County’s website or educational information
Cape Fear – Johnston
County – Town of
Wilson’s Mills
Adopt NFIP. NS 2020 - Town Staff 2025 – In progress: no measurable progress due to
lack of funding.
Cape Fear – Johnston
County – Town of
Wilson’s Mills
Improve drainage in Wilson’s Mills. S 2020 - Town Staff 2025 – In progress: no measurable progress due to
lack of funding.
Cape Fear – Johnston
County – Town of
Wilson’s Mills
Maintain all utility rights-of-way by trimming
trees around power lines and maintain right-of-
way of water/sewer lines.
NS 2020 Conducted
annually
Public
Works/Duke
Energy
2025 – In progress: no measurable progress due to
lack of funding.
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 178
Region - County -
Place Investment Type Age Maintenance
Ownership/
Management Status & Barriers
Cape Fear – Johnston
County – Town of
Wilson’s Mills
Maintain a list of contractors to assist town in
emergencies.
P 2020 Updated
annually
Admin. 2025 – In progress: no measurable progress due to
lack of funding.
Cape Fear – Johnston
County – Town of
Wilson’s Mills
Digitize copies of town ordinances, polices, and
procedures
NS 2020 - Admin. And
Town Council
2025 – In progress: no measurable progress due to
lack of funding.
Cape Fear – Johnston
County – Town of
Wilson’s Mills
Work with NCEM to acquire grant funding that
will be utilized to acquire and locate flood
gauges strategically along watercourses
impacting the County & Town limits. The goal of
this effort will be to provide the pertinent
agencies with better information regarding river
water levels.
P, NS 2020 - Public Works 2025 – In progress: no measurable progress due to
lack of funding.
Cape Fear – Johnston
County – Town of
Wilson’s Mills
After the establishment of additional stream
gauges as noted above, establish a working
group including all individuals charged with
floodplain and dam management within the
County
P 2020 - Public Works 2025 – In progress: no measurable progress due to
lack of funding.
Cape Fear – Johnston
County – Town of
Wilson’s Mills
Install generators to sewer pumps. NS 2020 - Public Works 2025 – In progress: no measurable progress due to
lack of funding.
Cape Fear – Johnston
County – Town of
Wilson’s Mills
Provide backup power to critical facilities. NS 2020 - Public Works 2025
Cape Fear – Johnston
County – Town of
Wilson’s Mills
When appropriate, continue accepting
dedication of open space within all new major
subdivisions, especially when environmentally
sensitive areas are present
NS,
NBS
2020 - Planning 2025 – In progress2025 – In progress: no
measurable progress due to lack of funding.
Cape Fear – Johnston
County – Town of
Wilson’s Mills
Maintain a system for identifying special needs
citizens in the town.
P 2020 - Police Dept.,
Admin.
2025
Cape Fear – Johnston
County – Town of
Wilson’s Mills
Establishment of additional Community
Emergency Response Teams (CERT). This effort
will so address the ongoing training and support
of the eleven teams currently operating within
the county.
P 2020 - Police Dept.,
Admin.
2025 – In progress: no measurable progress due to
lack of funding.
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 179
Region - County -
Place Investment Type Age Maintenance
Ownership/
Management Status & Barriers
Cape Fear – Johnston
County – Town of
Wilson’s Mills
Use the Town’s Blackboard Connect system to
notify town residents and business owners
regarding natural and human induced hazard
events. Town residents should not rely on this
system in taking preparedness measures. The
first line of communication should come through
a National Oceanic and Atmospheric
Administration weather radio system.
NS 2020 - Admin. 2025 – In progress: no measurable progress due to
lack of funding.
Cape Fear – Johnston
County – Town of
Wilson’s Mills
Develop and print a brochure outlining wind
proofing methods above and beyond code. This
will be offered in the Inspections Dept.
receptionist area.
NS 2020 - Steven Finn
(Planning and
Inspections
Director)
2025 – In progress: no measurable progress due to
lack of funding.
Cape Fear – Johnston
County – Town of
Wilson’s Mills
Maintain town’s website to include links to
ReadyNC.org and FEMA
NS 2020 - Admin. 2025 – In progress: no measurable progress due to
lack of funding.
Cape Fear – Johnston
County – Town of
Wilson’s Mills
Conduct research activities aimed at educating
business owners about how to address the issue
of continuity of operations in the face of all
natural and human induced disasters, since
following a disaster, the reopening of
commercial operations is critical to recovery
efforts
NS, P 2020 - Planning 2025 (after disaster events) – In progress: no
measurable progress due to lack of funding.
Cape Fear – Johnston
County – Town of
Wilson’s Mills
Advertise and promote the availability of flood
insurance to town residents and property
owners by including such information on the
town website as well as through a Blackboard
Connect message
NS 2020 Annual review
and update
Planning 2025 – In progress: no measurable progress due to
lack of funding.
Cape Fear – Johnston
County – Town of
Wilson’s Mills
Update and maintain educational information
and links on website for the public to access to
stay informed on all-natural hazard risks and
mitigation techniques.
NS 2020 Annual review
and update
Town Admin. 2025 – TBC: The Town will link to the County’s
website or educational information
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 180
5.4.4 Neuse River Basin Flood Analysis and Mitigation Strategies Study (2018)
Table 49. Neuse River Basin Flood Analysis and Mitigation Strategies Study (5.4.4.)
Investment Type Age Maintenance (30-yr.)
Ownership/
Management Status & Barriers
New Detention Facilities: Scenarios 1-8 S Proposed
(2018)
Scenario 1 - $5.7M
Scenario 2a – $600K
Scenario 2b - $9M
Scenario 3 - $9.6M
Scenario 4 - $1.8M
Scenario 5 - $4.5M
Scenario 6 - $5.1M
Scenario 7 - $600K
Scenario 8 - $600K
NC Emergency
Management
(NCEM) & NC
Department of
Transportation
(NCDOT)
Demand for new municipal water sources and existing
wastewater treatment plant restraints may outweigh flood
storage needs; TMDL rules; rare and endangered species
Channel Modification at Kinston: Scenario 9 S Proposed
(2018)
Scenario 9: Dredging would
be required 180 approx.
every four years ($12M)
NCEM & NCDOT Sedimentation and downstream water surface elevation
concerns; public buy-in
New Embankment Structure – Levee at
Seven Springs: Scenario 10
S Proposed
(2018)
$150K NCEM & NCDOT Risk associated with potential failure of the structure, and if
overtopping occurs the consequence would be extreme
flooding; public buy-in
Clear Span of Floodplain Downstream of
Smithfield: Scenario 11
S Proposed
(2018)
- NCEM & NCDOT Increased water surface downstream; permitting
considerations and interruptions to railroad
Elevation, Acquisition, Relocation:
Scenarios (12a-12d)
NS Proposed
(2018)
- NCEM & NCDOT Elevation does not remove structures from being at risk; there
may be a gap between funds for buyouts and the money
needed to acquire comparable living space outside of flood
prone areas; stress to infrastructure in new communities
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 181
5.4.5 Flood Abatement Assessment for Neuse River Basin (2020)
Table 50. Flood Abatement Assessment for Neuse River Basin (5.4.5)
Investment Type Age Maintenance
Ownership/
Management Status & Barriers
Identify community level and regional resilient transportation routes using a geospatial and
systems/network analysis process considering existing infrastructure flood vulnerability;
infrastructure upgrade costs and the location of industry, commerce, communities, military
bases, and evacuation routes.
P 2020 - NCDOT -
Identify, test, and compare costs of new design standards for all roads, bridges, and culverts
along the resilient route corridors.
S, NS, P 2020 - NCDOT -
Work with NC Emergency Management (NCEM) and USGS to install new flow, stage, and
rainfall gages in basin with a focus on improving early warning systems and hydrology model
validation.
NS 2020 - NCDOT -
Install low costs sensors at bridges throughout the basin to document road and bridge
overtopping events.
NS 2020 - NCDOT -
Establish an online reporting system for DOT division staff and citizens to report road and
bridge flooding.
NS 2020 - NCDOT -
Set up alerts for USGS Neuse river gages in Smithfield, Goldsboro, and Kinston (02087570,
02089000 and 02089500) to alert NC DOT hydraulics unit and division staff of impending
road/bridge overtopping locations.
NS 2020 - NCDOT -
Work with NCEM, Southeast River Forecast Center, and the National Weather Service to
establish a terminology and protocol for communicating transportation warnings, road
closures and/or recommended transportation corridors to the public.
NS 2020 - NCDOT -
Develop a protocol for DOT division staff and/or law enforcement to be notified and
deployed to barricade roads, bridges, and culvert crossings as necessary due to overtopping.
NS 2020 - NCDOT -
Develop a pilot project that combines hydrologic modeling with machine learning to predict
where road overtopping and washout are at risk of occurring based on predicted rainfall and
resulting discharge and flooding.
P 2020 - NCDOT -
Develop internal policies that assign higher priority (ranking) of transportation upgrades and
investments to projects that meet higher standards of resilience and are in communities that
have adopted better floodplain management and more stringent floodplain ordinances.
NS 2020 - NCDOT -
Develop and adopt policies that accept only private roads that have been built too certain
specific flooding standards.
NS 2020 - NCDOT -
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 182
5.4.6 Improving North Carolina’s Resilience to Coastal Riverine Flooding (2021)
Table 51. Improving North Carolina’s Resilience to Coastal Riverine Flooding (5.4.6.)
Investment Type Age Maintenance
Ownership/
Management Status & Barriers
Reforestation/Agroforestry Potential
• Neuse River Basin: 97,050 ac.
• Little River: 2,327 ac.
• Nahunta Swamp: 885 sc.
• Bear Creek (HUC10): 3,975 ac.
NBS 2021 $11/acre/year Recommended
Agency: NC Division of
Mitigation Services
(NCDMS)
Barriers include landowner
participation, crop yield, crop
pests, and wildfire risk if not
managed properly
Water Farming Potential
• Neuse River Basin: 10,530 ac.
• Nahunta Swamp: 2,505 ac.
• Bear Creek: 1,995 ac.
NBS 2021 $250/acre/year Recommended
Agency: NCDMS
-
Wetland Restoration Potential
• Neuse River Basin: 5,157 ac.
• Little River: 55 ac.
• Nahunta Swamp: 605 ac.
• Bear Creek: 798 ac.
NBS 2021 $500/acre/year Recommended
Agency: NCDMS
Barriers include landowner
participation and flood mitigation
benefits that may not be present
for decades
Adopt policies that prevent future development and redevelopment within the
100-year floodplain and that severely restricts development in the 500-year
floodplain. It should be noted that all encroachment into the floodplain (i.e.,
elevated structures) reduces the water storage capacity of the floodplain during
extreme events.
NS 2021 - Recommended
Agency: NCDMS
-
Continue to pursue buyout and elevation of structures and infrastructure located
within the 100-year floodplain to avoid inevitable repeat loss of these structures.
NS 2021 - Recommended
Agency: NCDMS
-
Invest in improving resilience of all critical infrastructure that is vulnerable to
flooding (roads, bridges, stormwater systems, reservoirs, water and wastewater
treatment facilities and networks, energy supply) to minimize loss of life,
emergency rescue, loss of use and negative impacts to commerce and economic
impacts during future extreme storm events
S, NS 2021 - Recommended
Agency: NCDMS
-
Develop a pilot flood mitigation program for a targeted sub watershed with
documented flooding issues. The program would allow the ecological restoration
industry to implement flood mitigation projects. Flood storage benefits could be
estimated by comparing model results of the peak flow reduction, peak flow delay
and volume of water stored for existing and proposed condition during the
several return intervals storms (e.g., 50-, 100-year storm). Track the economic
and employment impacts of this program.
NBS,
P
2021 - Recommended
Agency: NCDMS
-
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 183
Investment Type Age Maintenance
Ownership/
Management Status & Barriers
Invest in research to develop and monitor a pilot water farming project. The
research should focus on evaluating water management systems, storage, and
peak flow reductions, impacts to soils and crops and other agricultural
management processes, and associated economic factors.
NBS,
P
2021 - Recommended
Agency: NCDMS
-
Sponsor research to examine similar flood mitigation potential on other
watersheds, and with other measures, and estimate flood and damage reduction
impacts at the farm to local to community scales.
NBS,
P
2021 - Recommended
Agency: NCDMS
-
Natural Infrastructure (NI) programs can have major, localized environmental
economic impacts in rural areas, especially when watersheds undergo sustained
investments over many years. Economic impact analyses – including
investigations of the extent to which NC is producing a “home grown” ecological
restoration industry – should be conducted as part of the evaluation of State NI
programs, including those currently administered by NCDMS
NBS,
P
2021 - Recommended
Agency: NCDMS
-
Investigate other conservation-based flood mitigation programs (e.g., Iowa,
Minnesota) to identify and evaluate program scope, authority, funding,
management, intergovernmental agreements, streamlined permitting processes,
and implementation options.
NBS,
P
2021 - Recommended
Agency: NCDMS
-
Assemble a team of scientists/engineers and stakeholders to develop a state -run
Implementation program. The program must include a process for involving
landowners early in the program design stage, providing multiple ways to give
input and feedback to the program design and implementation.
P 2021 - Recommended
Agency: NCDMS
-
Subtask 2.3: Draft Neuse River Basin Literature Review Expansion | 184
5.5 Other Relevant Information
5.5.1 Financial Risk of Flood Events in Eastern North Carolina (2021)
Table 52. Hurricane Florence Risk Profiles in Counties Contained by the Neuse Watershed (5.5.1.)
Area NFIP Property Owners Lenders/Banks Local Governments Total Risk
Carteret 6.32 5.36 2.70 11.30 25.68
Craven 205.93 343.36 80.42 91.02 720.72
Durham 0.77 3.91 0.95 0.00 5.63
Greene 0.00 0.02 0.00 0.00 0.02
Johnston 0.07 0.40 0.04 0.58 1.08
Jones 18.54 13.72 3.53 21.92 57.70
Lenoir 25.58 16.08 5.18 1.34 48.18
Pamlico 63.21 175.92 17.45 166.94 423.53
Pitt 0.00 0.01 0.10 0.06 0.16
Wayne 0.51 0.92 0.12 0.98 2.53
Wilson 0.03 0.28 0.04 0.36 0.71
Neuse (Basin-wide) 320.95 559.98 110.52 294.50 1285.95
*Values in $MM