Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Compensatory Mitigation in North Carolina & Challenges in Urban SettingsRussellSWwebinarMarch_16-2022_0
March 16, 2022 Compensatory Mitigation in North Carolina & Challenges in Urban Settings Periann Russell Division of Mitigation Services Compensatory Mitigation Defined Section 404 of the Clean Water Act (CWA) regulates the discharge of dredge and fill material in waters of the United States, including many wetlands and streams 2 Compensatory Mitigation (permitting component of CWA) defined as offsetting unavoidable impacts to wetlands, streams, and other aquatic resources via restoration, establishment, enhancement, and/or preservation (National Wetlands Newsletter, Vol. 37, No. 6, Copyright © 2015 Environmental Law Institute ® Washington, DC, USA By Joseph A. Morgan and Palmer Hough) NC Compensatory Mitigation Part of the 404/401 permitting process Subject to review and approval by Federal and State Agencies Success/Credits of projects based on performance standards 3 DMS NCDOT Stream & Wetland ILF Nutrient Offset ILF Riparian Buffer ILF Statewide Stream & Wetland ILF DMS Programs 4 5 650 total projects Over 200 active 2.7 million stream credits Approx. 4 million linear feet Over 12,000 wetland credits Approx. 29,000 wetland acres Average 20 projects contracted per year (44 projects contracted last year) We Suffer from Urban Stream Syndrome Describes the ecological degradation of streams draining urban land (Walsh et.al 2022) Flashy hydrograph High nutrient concentrations Altered channel morphology Changes in groundwater discharge Degraded (or absent) riparian vegetation 6 Disruption of the hydrologic cycle NC Mitigation in Urban Areas -CHALLENGES 7 •Credits •Cost •Goals •Site Location •Design •Public Perception •Maintenance NC Regulatory Credit Structure Credit Ratios •Restoration 1:1 (1’ of stream restoration = 1 credit) •Enhancement I 1.5:1 •Enhancement II 2:1 Predictable ratios allow for economically feasible restoration 8 Urban Credit Structure Non-urban Credit Structure is not Applicable to Urban Stream Restoration Additional Considerations for economical feasibility o Stormwater Measures o Non-traditional Buffer widths o Educational Value (greenways, interpretative centers, signage) 9 Freedom Park Sugar Creek, Charlotte, NC Cost Double/Triple Land Stormwater Control MeasuresRetrofitConstraints Measurable GoalsNutrientsAquatic habitatBiologyVertical and Lateral ErosionBuffer Vegetation 10 https://chesapeakestormwater.net/the-bubbas/2014-bubbas/2014-urban-stream-restoration/ Site Location 11 •Constraints Sewer lines Power lines Buildings Culverts •Willing landowners Capital Blvd adjacent to Pigeon House Branch Design •Hydrology –Water, Water, Water •Sediment Supply and Transport •Existing Infrastructure •Stormwater Control Measures •Riparian Vegetation 12 Courtesy Capital Region Watershed District 13 Alluvial deposition on bench in Hillsdale Park Greensboro, NC Confined stream and buffers on bench Chavis Park Raleigh, NC Confined Stream Starmount park country club Greensboro, NC Public Perception ‘deficit model’ of public understanding and from a lack of fit between the expectations of restoration and policy workers and those of their local publics Environment and Planning C: Government and Policy,Volume: 24 issue: 5,page(s): 661-680 Issue published:October 1, 2006 •Aesthetics •Concerns e.g., crime, snakes •Expectations 15 Maintenance •Stormwater Control Measures (SCM) SCMs must be maintained properly Maintenance needs depend on the type of SCM SCMs inspected on a minimum quarterly basis •Costs •Vegetation Management 16 Stormwater Wetland 17 one cell of an experimental 3-tiered stormwater wetland in need of maintenance 18 Oak planting being overtaken by honeysuckle, Chavis Park, NC Functional Uplift in Successful Urban Mitigation 19 Mitigation Functional Returns Hope for the Future? North Carolina Natural Infrastructure Program (NCNIP) 2020 NC General Assembly amended DMS enabling legislation Blueprint Stoney Creek Pilot Flooding funds are targeted for Municipalities 20 Questions? 21 NC In-Lieu Fee Program Basics 22 Developer Impacts Mitigation Permittee Responsible Mitigation Bank Credits In-Lieu Fee to DMS