Buffer Authorization Application Form

  • For instructions on how to fill out this form, see the Buffer Authorization Application Help Document  posted on DWR's 401 & Buffer page.

    Please note: fields marked with a red asterisk * below are required.  You will not be able to submit the form until all mandatory questions are answered.

A. Owner/Applicant Information

section

    General Information

    section Expanded

    • Is this project a public transportation project?
    • Who is submitting the application?
    • Is there an agent working on this application but not submitting it?
    • Is this application for a project associated with emergency response/repairs from Hurricane Helene impacts to your project or property?
    • 1. Property Owner Information:


    • 3. Agent Information:

      • Drop files here

    • If the applicant is not the property owner, in addition to providing the Agent’s information, select ‘Applicant other than Owner’ above, enter the applicant’s information, and attach an authorization granting the applicant owner approval.

    B. Project Information and Prior Project History

    section

      1. Project Information

      section Expanded

      • If your project has a formal name please use this. If your project does not have a formal name, please identify your project by the owner name and proposed activity (Jones Property Access Road, Smith Guest House, etc.) List in parentheses any other names that have been used to identify the project in the past.

      • 1b. Is this a publicly-funded transportation project?
      • Row 1
        Add additional county
      • Row 1
        Date Selection
        Add another ID
      • 1i. Deed Information

        Type of Book
        Deed
        Map
      • Drop files here
      • 1k. How would you like to provide the Latitude and Longitude information?
      • 1l. Is the project located in any of North Carolina’s twenty coastal counties?
      • Coastal Management information can be found at:

      2. Surface Waters

      section Expanded

      • Link to NRCS Published Soil Survey/USGS Topo Mapping Tool.  (Please see instructions in the Help Document  to determine the most recent published version.)

      3. Project Description:

      section Expanded

      • Drop files here
      • Drop files here

      4. Proposed Activity

      section Expanded

      • Drop files here
      • **  Below is a link with instructions on what you will need to show on your site plan.

        https://edocs.deq.nc.gov/WaterResources/DocView.aspx?dbid=0&id=2488202 

      5. Jurisdictional Determinations

      section Expanded

      • 5a. Have jurisdictional wetlands or stream determinations by the Corps or State been requested or obtained for this property/project (including all prior phases) in the past?

      6. Project History

      section Expanded

      • 6a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past?

      7. Future Project Plans

      section Expanded

      • 7a. Is this project a phased project?

      C. Proposed Impacts Inventory

      section Expanded

        Buffer Impacts

        section Expanded

        • 1a. Project is in which protected Basin?
        • You can find which river basin you live in at the link below.

          North Carolina Protected River Basins

        • 1c. Individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form.

        • Please note: if the impact you list below requires mitigation choose "allow w/ mitigation" under impact type.

        • B 1
          Add another impact

        D. Impact Justification and Mitigation

        section

          1. Avoidance and Minimization

          section Expanded

          E. Diffuse Flow Plan

          section

          • All buffer impacts & high ground impacts require diffuse flow or other form of stormwater treatment.  If the project is subject to a state implemented riparian buffer program, upload a plan that fully documents how diffuse flow will be maintained.  All stormwater control measures (SCMs) must be designed in accordance with the NC Stormwater Design Manual. Associated supplement forms and other documentation must be provided. 


            For a list of options to meet the diffuse flow requirements, click Here

          • 1a. What type of SCM are you providing?
          • Drop files here

          F. Supplementary Information

          section Expanded

          • Environmental Documentation

            • 1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?

          • Violations

            • 2a. Is the site in violation of DWR Wetland Rules (15A NCAC 02H .0500), Isolated Wetland Rules (15A NCAC 02H .1300), DWR Surface Water or Wetland Standards, or Riparian Buffer Rules (15A NCAC 02B .0200)?
            • 2b. Is this an after-the-fact buffer authorization application?

          G. Additional Information

          section Expanded

          • Please upload any additional information you would like the Division to consider during application review.

          • Drop files here

          G. Sign and Submitt

          section Expanded

          • By digitally signing below, I certify that:

            • I have given true, accurate, and complete information on this form;  
            • I agree that submission of this form is a “transaction” subject to Chapter 66, Article 40 of the NC General Statutes (the  “Uniform Electronic Transactions Act”)
            • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the  “Uniform Electronic Transactions Act”); 
            • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND 
            • I  intend to electronically sign and submit the application form.”