Loading...
HomeMy WebLinkAboutSheet 7a typical buffer cross section size 24-36Typ ica Permit Bounda r Y, Berm and Borrow Pit Cross-section UMC PG.66 Permit Boundary Ridgeville Road Or Wrenn Road Right .f ..a, fence Visual Slopec-- I O'1 n Screening Berm 3'_.1' Height 2: 0' U n excavated Overburden S�o es 2'o- 1 26'�n Heo�ght Visual Screening Berm Construction Sequence (Initial Site Construction) 1. Install silt fence along roadway easement 2. Install Sediment Basins 1 & 2 with Associated diversions. 3. Construct all visual screening berms 3 horizontal to 1 foot vertical 4. Stabilization and permanent seeding of visual screening berms and roadway frontage as needed. 5. Upon stabilization remove silt fence and planting of screening shrubs and trees along crest of berm. 6. Upon completion of all visual screening berms Borrow area to be graded and stabilized to a 2-foot horizontal and 1 foot vertical slope. 7. Borrow area to be seeded and planted with shorleaf pines. 8. Upon stabilization and established germination removal of sediment Basins 1 and 2. al Permit Boundary ectioflz, Proposed Bo ° �,ele ation \ 6 t Cut Slope t0 �n�tial Visual 2 to 1 sl°p used to colystruct germs Along R�d9�i lle &Wre Material Barricade Boundary Perimeter Disposal Berm Construct Road ion Proposed Borrow Pit Cut Slope to 680'MSL 2 to 1 slope to allow for positive dranage towards Basin 2 Material used to construct initial Visual Screening Berms Along Ridgville & Wrenn Rds. Upon Completion of Berms Borrow area to stabilized/reclaimed and forested with Shortleaf Pines Overburden Disposal Berm Construction Sequence 1. All Overburden Disposal Berms shall be constructed as needed throughout the life of the mine. 2. Install silt fence behind landscaping of visual screening berm or along undisturbed buffer boundary 3. Install Sediment Basins within vicinity of berms and associated diversions 4. Construct all overburden berms 2 horizontal to 1 foot vertical 5. Upon suspension of construction of the overburden berm, provide temporary seeding 6. Upon completed construction of the overburden berms, provide permanent seeding of the berm and the roadway frontage, as needed. 7. Upon permanent stabilization of the overburden berms, remove silt fence and sediment basins (area dependent). 8. Upon permanent stabilization of the overburden berm, remove silt fence and sediment basins (area dependent) General Notes Property Line 100' Undisturbed Buffer 100' or 200' Unexcavated Buffer No Excavation i N Silt Fence Location Silt fence to be adjusted as need No. Revision/Issue Date Firm Name and Address CAROLINA SUNROCK LLC 200 HORIZON DRIVE, SUITE 100 RALEIGH, NC 27615 Project Name and Address Prospect Hill Quarry & Distribution Center Typical Permit Boundary Berm Construction Borrow Pit Cross —Section Drawn By: S Martino Project Sheet PLANT Date 08-06-2019 Scale 199=155