HomeMy WebLinkAboutSheet 5a Mine Mpas-size 24X36H TALEN
47 �
DD ❑
S � \
LOMON �
PG.705
EDWARD DOUGHERT
FOR D.B.603—PG.10�
USAN ALLEN
OOREFIELD
90
.358
SEE MAP FOR
S. C. WILKINSON EST.
BY W. R. CATES, JR.
10
Unexcavated
Undisturbed to Be
Re -Forested With
Shortleaf Pine
SEE MAP FOR
JOHN C. WRENN, JR.
SIMMONS ENGINEERIN
9-01-2014
WILLIAM E. MORFRS s.
D. B.573— PG.1033
SEE P.B.11—PG.425 s
s1 `.
BETH UMC
D.B. 18-PG.660
D.B.8 PG.331
SEE P.B.12—
PG.668
iti
J.C. WILKINSON, JR.
D.B.326—PG.263
SEE P.B.5—PG.325 s `'
SEE P.B.12—PG.629
pit
proposed Borrow
15-ac 680'elevation
Cut Slope t° Visual
2 to 1 slope to construct init►al r nn
long Ridgeville & W
Material used
B rrica
R S. \
s
�
B s �t_
T. SOLOM N 8c
an s g
oa ng&S- ! -
A M. SOLOMON ❑Ign
40— P G. 401
MAP FOR / MARK A.
T. SOLOM ON & WREN N
AL C. HAMLETT D.B.576—
MBER, 1986 P PG.1575
.10—PG.671 ❑
1 /2"
T SEE MAP FOR
� � ERNEST A. KOURY, JR.
T. SOLOMN &E.I.P. BY W.C. MOOREFIELD
4 �
IMMM
mn
9I �
Undisturbed to Be
C;710%11i With
�. W0901
W
ETREE, LLC
D.B.604—PG.816
"PARCEL 4"
TAX NUMBER: 0133.00.00.0005
Hot Mix Asphalt Plant, Ready Xfix Con to PI d
Stock Piles. 19 AC. 0-
6
Maintenance
„ PS raa _. Grape\ o\ Shop/Lab
O O P e EgU\Qme
91h� s s s Unexcavateup%
Payed fir, sting Pond �. p 1ceee
lEm
\on p\art s ua arnca m
VAN
7, W.0 � M
10
za_mN%k*N7*
ETREE, LLC
D.B.604—PG.816
"PARCEL 7"
TAX NUMBER: 0133.00.00.0045
ndisturbed 100' Buffer
—�� Ultimate Quarry Pil A Limit 9
� / I(PI t r
al ac
�ap Phase II
25- Acr
-�, uen oispo SC-;_�
E_NN RD
=0 C=
a P ling
—3 A res - 7 5,48 gal Capz
94,31 .08 StoP ram
/with Diverter Box
V-18"HDPE
_
T
AFM
General Notes
Property Line
100' Undisturbed Buffer
100' Disturbed Buffer
No Excavation
100' Perennial Undisturbed Stream Buffer
50' intermittent Stream and Wetland
Undisturbed Buffer
Stream
100 Year Flood Plain
Open Pit Crest
Open Pit Mid —Bench
Open Pit Bench Toe
2' Contour Interval
10' Contour Interval
- Planned Sed. Basin
See Supplied Detail Drawling's
from Timmions Group
Adjoining Property
John B. Drumwright Estate
25.91 ac.
Record # 379
Non —owned Structure
Adjoining Property Boundary
Power Pole
N Silt Fence Location
Silt fence to be adjusted as need
Initial Pit Opening Phase I
Phase 11
Phase III
Phase IV
Phase IV includes mining through
streams and wetlands in Pit A
and Pit B after 401-404
approvals have been issued
along with mine permit
modification
No.
Revision/Issue
Date
Firm Name and Address
lf7)U�JROCK
CAROLINA SUNROCK LLC
200 HORIZON DRIVE, SUITE 100
RALEIGH, NC 27615
Project Name and Address
Prospect Hill Quarry
& Distribution Center
Initial Mine Map
Drawn By: S Martino
Project
Sheet
PLANT
Date
07-29-2019
)
0
Scale
1"=175'