Loading...
HomeMy WebLinkAboutSheet 5 Mine Mpas-Sheet 5JAMES C. WILKINSON, JR. W.B.10E—PG.21 D.B.167—PG.791 SEE MAP FOR S. C. WILKINSON EST. BY W. R. CATES, JR. MARCH, 1973 P.B.5—PG.326 J ❑ r Undisturbed 0' Bu �\ UndisturbeGl/ 100' Bu r ^ CL V Unexcavated ¢ Undisturbed to Be Re -Forested wit Shortleaf Pine / T ° ° am Buffer SCOTT WILSON—HOUGHTALEN o trea ° `' m Buffer ° Tri td D. B.587— PG.1047 JOH N C. WRENN ory SEE MAP FOR JO ANN W. WRENN HASSELL N. RUDD ❑ D.B.212—PG.859 \ BY W.R. CATES 6-13-1964 0 SEE MAP FOR P.B.3—PG.622 JOHN C. WRENN, JR. UndisturLn bedtoBe �\ SIMMONS ENGINEERIN Re Forested with Q Shortleaf Pine 9—-2014 P B.16—PG 874 ❑ ❑ ❑ b AD o wti GARY SOLOMON �- th D B 2 6 0— P G 705 0 undisturbed to Be T I / LVVV P.B.15—PG.871 ❑ © SEE MAP FOR ® SUDIE N. WRENN —J BY TERRY L. P.B.11— PG. 184 Q WESTENDORF w 3-6-1989 Ln P.B.11—PG.135 El CO O U � O WI DALE R. KEMPER TRUSTEE WILLIAM J. WRENN D.B.596—PG.972 o m D.B.253—PG.656 DAVID E. HEDRICK 8c SARA C. COOK P.B.11—PG.184 SYLVIA W. HEDRICK D.B.545—PG.1264 w D.B.322—PG.156 Q Y SEE MAP FOR \ ° A. A. OAKES ESTATE d 4�iob e"r BY PHILLIP J. HALL Undisturbed 100' Buffer JUNE, 1976 ° ° P.B.4—PG.195 xc vat 0' '`€er ° x,• T m Ba in 16 ' \ \ /i 5P78 ® o Temp # 1 Itimate Quarry vil A Limit 92-Acr � •wE,•, , F �, , I e- er d/PI t r � �� � cr1,4 0 , 0 •S / E O erburden/Pon sa �� O 37 e ra al al ac Phase PhIII P /l YI 1 .5 AC. \h a 9 67647 cw ty T :.� ion 25 Acr ... 06 a An istu--rbe ,tr �� NIL- I \ � GO�s P a P III,,, ��� ''=�,, Ill II%-� �y VA ad NA IN Well V0�1`xggW4����1 r ag r � e Undistur 10 r est Shortl ine —lu.• 11 EDWARD DOUGHERT SEE MAP FOR D.B.603—PG.10� PHILIP & SUSAN ALLEN BY W.C. MOOREFIELD 4-10-1990 P.B.11—PG.358 Tem B 2 WILLIAM E. MORF®S D.B.573—PG.1033 ` ,� roWpit ❑ prop°Sed Bor SEE P.B.11—PG.425 �, 680'elevationto \/ / i. = Cut Slope co e nstruct initial Visual nn J. C. WILKINSON, JR. fi I d I Mater aloused t0 Ion9 Ridgeville & W r _ \ D.B.249—PG.720 BETH UMC g rrica SEE P.B.10—PG.725 SEE B.12— PG.668 C 0 J.C. WILKINSON, JR. D.B.326—PG.263 SEE P.B.5—PG.325 SEE P.B.12—PG.629 ❑ is EARL T. SOLOMN & GLENDA M. SOLOMON 0 ng&Sigh D.B.240—PG.401 ETREE, LLC SEE MAP FOR MARK A. D;B.604—PG.,816 EARL T. SOLOMON & WRENN PARCEL 4 BY NEAL C. HAMLETT 3 D.B.576— TAX NUMBER: 0133.00.00.0005 NOVEMBER, 1986 PG.1575 P.B.10—PG.671 ❑ 1 /2" 3 O O SEE MAP FOR EARL T. SOLOMN 8c E.I.P. ERNEST A. KOURY, JR. GLENDA M. SOLOMON ❑ o BY W.C. MOOREFIELD 4-20-1989 D.B.266—PG.427 P.B.13—PG79 O SEE P.B.13—PG79 SEE MAP FOR EARL T. SOLOMON & 1/2" GLENDA M. SOLOMON E.I.P. BY JOHN JENNINGS MARK A. MARCH, 1991 WRENN P.B.11—PG.600 D.B.545— PG.285 D AAR Summary Tailings Ponds 10—cc Stock Piles 30 ac Waste Piles 82 ac Plant Area/Haul Roads 40 ac Pit A Mine Ex. 92 ac Future Pit B Mine Ex, 107 ac Asphalt/Concrete Plant 19 ac Total Disturbed 380—cc Hot Mix Asphalt nt, Ready Oix Con to PI�C^P id Stock Piles. 19 A 1 F� Te #,�1 S f PFed PeJ -4 _ �' Maintenanc Ps�p / GeJe ma� U avate up r ,e� —0- " C�,eee i ETREE, LLC D.B.604—PG.816 "PARCEL 7" TAX NUMBER: 0133.00.00.0045 Below is the summary of the sea uence of events for the development of the nroner ENTRANCES: 1. Establishment of the three (3) construction entrances to the property off Wrenn Road as shown in the stone water detail maps VISUAL SCREENING BERMS: 1. Establishiment of sediment and erosion controls (silt fence, Basins land 2 and associated diversion berms/ditches) per the attached plans 2. Begin construction of all visual screening berms using material from the proposed borrow pit located on the western end of the permitted area per the attached plans 3. Upon completion of final grading of the visual barricade berms, the berms will be stabilized and seeded per the seeding specifications and schedule provided within this application 4. Stabilization and seeding of the borrow pit area once its useful purpose has ended 5. Upon stabilization of the borrow pit and visual barricade berms, specific sediment and erosion control devices serving these areas will be removed and the remaining areas stabilized with groundcover ASPHALT/CONCRETE PLANTS AREA: 1. Installation of silt fence around asphalt/concrete plant area 2. Installation of Basins 3, 9, and 10 within the asphalt and concrete plants' sites 3. Construction of diversion berms/ditches to basins 4. Grading and construction of the asphalt and concrete plant facilities PIT DEWATERING POND AND SETTLING PONDS: 1. Installation of silt fence and Basins 13 and 16 including associated berms and ditches as indicated in the construction sequence and as shown on the attached plans 2. Begin excavation of pit dewatermg pond and settling ponds. QUARRY PLANT AND STOCKPILE YARD: 1. Install silt fence along outside toe of location of diversion berms and diches 2. Installation of diversion berms leading to Basins 10, 11, 12, 15, and 26 3. Upon completion of diversion berms/ditches, the berms will be stabilized and seeded 4. Installation of permanent access to quarry facility 5. Connection and closure of visual barricade berm at original construction entrance 6. Begin grading Quarry plant and stockpile area 7. Installation of scale house, employee building maintenance facility, and associated auxiliary features. 8. Begin construction of quarry plant facilities CREEK CROSSING: 1. Installation of horse shoe filters 1, 2, 3, and 4 and associated diversion ditches in area of creek crossing to overburden disposal area 2. Excavate existing crossing 3. Installation of new culvert crossing as shown on sheet 7e OVERBURDEN DISPOSAL AREAS (ODA 1, ODA 2, ODA 3) 1. Install silt fence as displayed on mine maps 2. Install Basins, 6, 7, and 8 (ODA- 2)- Basins 5, 6, and 7 (ODA-1); Basins 38, 39, 40. and 41 (ODA-3) including all associated diversion berms/ditches 3. Removal of existing vegetation and topsoil within each 10' interval lifts, ultimate foot print of eacah overburden disposal area, as storage is needed 4. Construction will begin at topographical low raising contours in 10' intervals along existing topography Bone L SEE MAP FOR C. S. PAINTER LANDS BY W. R. CATES 8-24-1938 P.B.12—PG.661 ETREE, LLC D.B.604—PG.816 "PARCEL 6" TAX NUMBER: 0148.00.00.0002 moo Existing Known Off Site Well I �' 1, 107- 0o ° ° 6 o a a� 9 Area Undi � 3 W N. o ° n °° ° - ,17 •Iv e ° 11, 1x�` O f v M O �m� O oO M CJ0C) m N_�(,l N 10 fT1 �Im � 4, P M BRADLEY &MARIE p j- K O ASHBAUGH & OTHERS M > D.B.588— PG. 1183 RICHARD 8c JERRY CATES D.B.587—PG.651 SEE MAP FOR I RICHARD L. CATES, WILLIAM D. CATES ' l 1/ & JERRY W. CATES I BY NEAL C. HAMLETT to main e L JUNE, 1986 sturb d P.B.9—PG.318 0 0° STEPHEN C. & VIRGINIA 6 PIETSCH .� D.B.259—PG.102 SEE MAP FOR $ STEPHEN C. PIETSCH & D VIRGINIA F. PIETSCH BY E. B. WOOD, JR. FEB., 1990 P.B.11—PG.328 GEORGIA T. GRAVITTE & OTHERS D.B.259— PG. 104 SEE MAP FOR O GEORGIA P. LEWIS n BY E. B. WOOD FEB., 1990 < P.B.11—PG.329 Welllp SEE MAP FOR ,�°°• CHRISTOPHER D. %'\\ 'F° MCKINNEY cr O BY E. B. WOOD I'I II rD AUG., 1990 rD 73 o WILLIAM N. &P.B.11—PG.443 DONNA BROWN D. B.374— PG.61 II I I III II I III O Jr 7 I I y , WILLIAM MORRIS & m I' RITA HUDGINS D.B.593—PG.735 All "1 61,111 1 �� i i�i l • � o o cc, Area &Pain C _ � 1 Undi ur - Iil o W II o o ell � I oQt` o 11' -37 1; o N 1, `A o ,11 M I .\ I ,:6'11j ° 11,41 II o I 11 I I i.- I o \ air 8 r s 0 Vn o ° 9 I nit ' , 4 .4 i �l ,11 r , ' �f r / ° II o o �I� f o tIl o o �° 0 it I o 1 jl o r 0 d r 1 , ;Q C JJ cRitcPRem / CTUAL PROPERTY LINE 0 o disturbeo� FOLLOWS THE MEANDERS OF THE CREEK NATHANIEL C. TALLEY 8c JESSE D. TALLEY D.B.532—PG.1333 SEE P.B.16—PG.167 SUSAN HESTER SEE MAP FOR & ET AL CITY OF ROXBORO BY NEAL C. HAMLETT D.B.379—PG.23 JAN., 1981 MAP CABINET 1— PG.154(PERSON CO.) CITY OF ROXBORO D.B.275—PG.145 SUSAN HESTER & ET AL D.B.379—PG.23 NA W _z _J PPROXIMATE LOCATION F_w D Of 0 EAR FLOOD HAZARD LIMITS v P R MAP# 3710995200K EFFECTIVE DATED:9-28-07 o 0 W O U oo U __JQ" I= W z J LLJ 00 O i (/) Ld ►— W Q <� U x < O �a CONTROL CORNER a- STONE FD. Q m (0.7' AG) N:924,474.66 E:1,954,674.49 NAD83(2011) STONE FOUND AS SHOWN ON MAP FOR "R.L. MITCHELL LANDS" DATED: JULY, 1934 SEE D.B.315—PG.102 NATHANIEL C. TALLEY & JESSE D. TALLEY D.B.514—PG.351 SEE MAP FOR NATHANIEL C. TALLEY & JESSE D. TALLEY BY NEAL C. HAMLETT NOVEMBER, 2006 P.B.15—PG.972 1 /2" E.I.P. General Notes Property Line 100' Undisturbed Buffer 100' Disturbed Buffer No Excavation 100' Perennial Undisturbed Stream Buffer 50' intermittent Stream and Wetland Undisturbed Buffer Stream 100 Year Flood Plain Open Pit Crest Open Pit Mid —Bench Open Pit Bench Toe 2' Contour Interval 10' Contour Interval - Planned Sed. Basin See Supplied Detail Drawling' from Timmions Group Adjoining Property John B. Drumwright Estate 25.91 ac. Record # 379 Non —owned Structure Adjoining Property Boundary Power Pole Silt Fence Location Silt fence to be adjusted as need 0 Initial Pit Opening Phase I Phase II Phase III Phase IV Phase IV includes mining through streams and wetlands in Pit A and Pit B after 401-404 approvals have been issued along with mine permit modification No. Revision/Issue Date Firm Name and Address U�11��]Rocic CAROLINA SUNROCK LLC 200 HORIZON DRIVE, SUITE 100 RALEIGH, NC 27615 Project Name and Address Prospect Hill Quarry & Distribution Center Initial Mine Map Drawn By: S Martino Project Sheet Date 07-29-2019 ) a Scale 1 " = 250'