HomeMy WebLinkAbout20260123_NOCAV_61-22 I, �e SfATF o JOSH STEIN ["... Governor ' ;€ D.REID WILSON . Secretary WILLIAM E.TOBY VINSON,JP NORTH CAROLINA Director Environmental Quality January 23, 2026 NOTICE OF CONTINUING AND ADDITIONAL VIOLATIONS FOR MINING WIT IIOUT A PERMIT WITH NOTICE OF INTENT TO ENFORCE Certified Mail Return Receipt Requested 9589 0710 5270 3110 8788 63 Horizon 30, LLC i Attn: Brent Fernandes E 3639 North Kilroy Road Turlock, CA 95382 Certified Mail Return Receipt Requested 9589 0710 5270 3110 8788 18 Sean Chipman 512 West Hamilton Street, Ste. 1800 Allentown, PA 18101 Certified Mail Return Receipt Requested 9589 0710 5270 3110 8762 58 Horizon 30 LLC c/o Registered Agents Inc. 4030 Wake Forest Road, Ste 349 Raleigh,NC 27609 Certified Mail Return Receipt Requested 9589 0710 5270 3110 8762 03 Horizon 30 LLC Attn: Brent Fernandes 512 West Hamilton Street Allentown, PA 18101 RE: Subject: Horizon 30, LLC—Mining Without a Permit River Basin: French Broad County: Mitchell Dear Mr. Fernandez and Mr. Chipman: D_Hn 0% North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources Asheville Regional Office 12090U.SHlghway701 Swannanoa,North Carolina28778 �v+o � 828.296AS00 Notice of Continuing and Additional Violations Sean Chipman, Brent Fernandes January 23, 2026 Page 2 of 4 This Notice is to inform you that you and/or your firm remain in violation of the Mining Act of 1971 for operation of a mine without a valid permit as required by North Carolina General Statutes (hereinafter N.C.G.S.) §74-46, et seq., as amended. On March 7, 2025, Horizon 30, LLC was sent a Notice of Regulatory Requirement informing you that you were operating a site that required a permit under the North Carolina Mining Act. On April 11, 2025, an incomplete application was received by the Mining Program for this operation. On May 6, 2025, Horizon 30, LLC was sent a Notice of Violation (NOV) for mining without a permit. The NOV specifically required you to cease all mining activities without a permit and to either submit a complete mining permit application or to restore the site. A complete application was not received until May 16, 2025, when the permit application fee was received. On June 5, 2025,Horizon 30,LLC was sent a Notice of Continuing Violations(NOCV)for mining without a permit. The NOCV specifically required you to cease all mining activities without a permit and to either submit a reclamation bond if the mining permit application was approved or to restore the site. On August 13, 2025, Judge Theodore McEntire issued a Preliminary Injunction against Horizon 30, LLC. The Preliminary Injunction required Horizon 30, LLC to immediately cease mining operations,immediately cease transfer of materials off-site,and within 30 days of execution submit a reclamation plan to the Mining Program pursuant to N.C.G.S. §74-53. On August 22, 2025,pursuant to N.C.G.S. 74-51(d)(7),Horizon 30,LLC's permit application was denied. On September 17, 2025, a proposed Reclamation Plan was received by the Mining Program purporting to comply with the requirements of N.C.G.S. §74-53. On September 25, 2025, Horizon 30, LLC, was sent a Notice of Continuing and Additional Violations (NOCAV) for not addressing some of the violations outlined in the NOV and NOCV which remained uncorrected and additional violations which were observed. On October 20, 2025, a revised proposed Reclamation plan was received by the Mining Program purporting to comply with the requirements of N.C.G.S. §74-53. On November 7,2025,a courtesy copy of the September 25,2025,NOCAV was sent to additional addresses for the Horizon 30, LLC. Notice of Continuing and Additional Violations Sean Chipman, Brent Fernandes January 23, 2026 Page 3 of 4 f On December 10,2025, Horizon 30,LLC was assessed a civil penalty for violations of the Mining Act or the rules adopted thereunder occurring on the subject property from May 6, 2025 thru August 6, 2025. i On December 16, 2025, Horizon 30, LLC, was issued a letter of Approval with Modifications for the proposed Reclamation Plan that was submitted on October 20, 2025. j On January 12, 2026, DEQ personnel conducted a follow-up inspection of the mining operation. The inspection results revealed that some of the violations outlined in the NOV, NOCV and i NOCAV remained uncorrected and additional violations were observed. This office requests that you respond in writing within 30 days of receipt of this notice. Your response should address each of the below listed items (1 through 2). Please mail your response to me at: Mr. Stan Aiken PE Asheville Regional Office Division of Energy, Mineral and Land Resources 2090 U.S. Highway 70 Swannanoa,NC 28778 Pursuant to 15A NCAC 05F .0105(a), you are required to take the following corrective actions to bring this site into compliance: 1. Implement the Reclamation Plan that was approved with modifications on December 16, 2025, stabilize the bare area above the unnamed tributary with groundcover, establish a temporary groundcover on all bare areas, re-work and repair slope areas where rills and gullies have formed, clean and repair measures, install additional erosion control measures to retain sediment onsite. Prevent any further off-site sediment damage from occurring. As per N.C.G.S. §74-64(a)(1)(a), any person who fails to secure a valid operating permit prior to engaging in mining could be subject to a civil penalty of up to $5,000.00 per day for each day of a continuing violation. In accordance with 15A NCAC 05F .0105(b), a penalty may be assessed for violations committed both prior or subsequent to your receipt of this notice. Should you fail to comply with the terms of this Notice within the prescribed time frames, additional enforcement action may be taken, including the seeking of injunctive relief pursuant to N.C.G.S. 74-64(a)(5) and 15A NCAC 05F .0112 or criminal penalties pursuant to N.C.G.S. 74-64(b). At this time,this operation has been referred to the Director for enforcement action. Your response to this letter will be considered as part of any further enforcement action reconmiendations. Notice of Continuing and Additional Violations Sean Chipman, Brent Fernandes January 23, 2026 Page 4 of 4 It is your responsibility to understand and comply with the Mining Act and the North Carolina Administrative Code. Copies of the relevant statutes and administrative rules may be examined at this office or will be sent to you upon request. The subject site will not be considered in compliance with the Act until you have obtained a valid mining permit and/or satisfactorily completed the required reclamation work. If you believe that any of the information in this Notice is incorrect and that a violation has not occurred or should you have questions concerning this notice or the Mining Act, please do not hesitate to contact either Shawna Riddle(828-296-4617) or myself(828-296-4610). Sincerely, 1, Regional En Asheville gionalOffice Enclosures: Inspection Report cc: Adam Parr, PE, Deputy Director(adam.parr@deq.nc.gov) North Carolina Department of Environment and Natural Resources, Division of Energy, Mineral, and Land Resources, Land Quality Section E i MINE INSPECTION REPORT ❑ PERMITTED MINE SITE ® UNPERMITTED MINE SITE i ff Hwy 197 1. MINE NAME: Horizon 30,LLC 2. MINE LOCATION: o 3. COUNTY: Mitchell 4. RIVER BASIN: French Broad 5. CASE: 6. OPERATOR: Horizon 30 LLC,Brent Fernandes,Sean Chipman 7. ADDRESS: 3696 North Kilroy Road,Turlock,CA 95382/512 West Hamilton Ave.,Ste.1800,Allentown,PA 18101 8. MINING PERMIT#: ® N/A 9. PERMIT EXPIRATION DATE: ❑N/A 10. PERSON(S) CONTACTED AT SITE: 11. PICTURES? ® Yes ❑No TAKEN BY: Shama Riddle 12. TYPE OF INSPECTION: ❑ A. Initial Inspection(Unpermitted Mine Sites) 1. Size of affected land: ac. (attach sketch map) 2. How was this area measured? Measured by: ❑ B. Routine Inspection(Permitted Mine Sites) C. Follow-up Inspection 13. Date of last inspection: 12/16/2025 14. Any mining since that date? ❑ Yes ® No If yes, cite evidence of such mining activity: 15. Was mine operating at time of inspection? ❑ Yes ® No If yes,explain: 16. Is the mine in compliance with the Operating Conditions of the Permit? ❑ Yes ❑No ® N/A If no,explain: 17. Is the mine in compliance with the Reclamation Conditions of the Permit? ❑ Yes ❑ No N/� If no,explain: 18. Is there any off-site damage? A. ❑ Yes B. ® No C. ❑ None observed If A,describe the type and severity of the damage: If B or C,is there potential for offsite damage? ®Yes ❑ No Explain: Bare area above the unnamed tributary Is not stable and has the potential to deposit sediment and turbid water into the tributary by overland flow. 19. Corrective measures needed and/or taken: Immediately implement the reclamation plan that was approved with modifications on December 16,2025.Stabilize the bare area above the unnamed tributary with groundcover,establish a temporary groundcover on all bare areas, re-work and repair slope areas where rills and gullies have formed,clean and repair measures and install additional measures as needed. 20. Other recommendations and comments: Continue reclamation of the site.Addilonal measures have been installed onsite. Continue to maintain additonal measures installed and establish a temporary groundcover on all bare areas.Repairs are needed to slopes,main access '.. road,rills and gullies.Current activities onsite do not conform to the approved reclamation plan and must be brought into compliance with the plan. 21. Is the Annual Reclamation Report+/-map accurate? ❑Yes❑No(Explain) ❑ Not Reviewed ® N/A 22. Follow-up inspection needed? ® Yes ❑ No Proposed date monthly 23. No. of additional pages of Inspection Report 24. Copy of Report sent to operator with NOCAV INSPECTED BY: awya lRj&je. Mike Smith DATE 01/12/2026 Telephone No: 828-296-4500 Copy to file Copy to operator Copy to Mining Specialist