Loading...
HomeMy WebLinkAboutAppendix F_Waste_flowsheetPiedmont Lithium Carolinas, Inc. I Response to Additional Information Request (dated January 14, 2022) Appendix F: Solid and Liquid Waste Flowsheets PIEDAA'ONT LITHIUM Appendix F: Solid and Liquid Waste Flowsheets This page intentionally left blank. Piedmont Lithium Carolinas, Inc. I Response to Additional Information Request (dated January 14, 2022) Appendix F: Solid and Liquid Waste Flowsheets F.1 Attachment 1 — Overall Site Solid Waste Flowsheet This page intentionally left blank. 2,963 t/h mined CAROLINA LITHIUM PROJECT - SOLID MASS BALANCE NOMINAL FLOW 2,707 t/h waste rock MINE + CRUSHING 118 t/h DMSTailings 256 t/h Crushed Ore Flotation Reagents 20 Magnafloc (neat) g/t 5 kg/h Magnafloc (neat) 350 FA-2 (100% Oleic Acid) g/t 90 kg/h FA-2 (100% Oleic Acid) 11 M I BC (100%) g/t 3 kg/h MIBC(100%) 62 Armac T/C (50/50 @ 1%w/w solution sti 16 kg/h Armac T/C (50/50 @ 1%w/w solut on strength) 140 F220 (5% w/w solution) g/t 36 kg/h F220 (5% w/w solution) 254 NaOH (50%w/w) g/t 65 kg/h NaOH (50%w/w) 79 Na2CO3 (20%w/w) g/t 20 kg/h Na2CO3 (20%w/w) Byproducts Reagents 162 Armac C (1% w/w) g/t 41 kg/h Armac C (1% w/w) 735 HF (49%w/w) g/t 188 kg/h HF (49%w/w) 68 Kerosene (100%) g/t 17 kg/h Kerosene (100%) 129 H2SO4 (98%) g/t 33 kg/h H2SO4(98%) L 97.5 DMS CIRCUIT 124 t/h F FLOTATION CIRCUIT WASTE ROCK STOPILE 5.6 t/h CaC Spodumene Concentr CONVERSI Spodumene to Market BYPRODUCTS 59 t/h Feldspar Dried FELDSPAR 6 t/h Feldspar to PRODUCTION STORAGE 53 t/h Feldspar to Market 38 t/h Quartz Product QUARTZ 4 t/h Quartz to Tailings STORAGE 34 t/h Quartz to Market .4 t/h Na2CO3 2,877 t/h to waste stockpile NOTES 1. STREAM DATA SHOWS SOLID FLOW ONLY 2. THE MAJORITY OF REAGENTS IN DO NOT REPORT OUT WITH SOLIDS 3. FLOW RATES SHOWN ARE NOMINAL RATES, BASED ON 85% PLANT AVAILABILITY. This page intentionally left blank. Piedmont Lithium Carolinas, Inc. I Response to Additional Information Request (dated January 14, 2022) Appendix F: Solid and Liquid Waste Flowsheets F.2 Attachment 2 — Overall Site Liquid Waste Flowsheet This page intentionally left blank. PIEDAAONT Stream and Wetlands Water Intake L I T H I U M (Temporary/ Water Balance Flow Chart Emergency) 115 qpm 165.6k d Waste ck Disposal Freshwater Demand I^ 50 gpm Q (72k gpd) 0 Y I 00 CO co Cn Concentrator Plant 124 I Wastewater Effluent Discharge 192 gpm (276k gpd) Process Water Treatment I Waste Water Pump Station 5.2 gpm (7.6k gpd) 1 199 gpm (287k gpd) Total Effluent Potable Water Demand 2.5 gpm (3.6k gpd) m 175 gpm (252k gpd) Fire] 1 Single Fill of 90k gal Wastewater Effluent (option) Sewer Water Discharge 2.7 gpm (4k gpd) Fire Conversion Plant Single Fill of 90k gal Total Freshwater Demand 265 gpm (382k gpd) Concentrator Plant + Mining In -Pit Crushing and Belt Dust Control 60 gpm (86.4k gpd) Road Dust Control 30 gpm (43.2k gpd) -------------------------------------------------------------- Total Mining 90 gpm (129.6k gpd) f Potable Water Demand 2.7 gpm (4k gpd) Sewer Water Dis, 2 gpm (2.9k g Municipal Demand 350 gpm (504k gpd) e Freshwater Discharge avg. Discharge = 1060 gpm (1526.4k gpd) min. Discharge = 360 gpm (518.4k gpd) max. Discharge = 2060 gpm (2966.4k gpd) Pit Discharge Ponds t -7 Pits IFreshwater Inflow avg. Inflow = 1300 gpm (1872k gpd) min. Inflow = 600 gpm (864k gpd) max. Inflow = 2300 gpm (3312k gpd) I L _ As Required Potable Water Demand 5.2 gpm (7.6 gpd) + 180k gal Fire Water Note: Difference between freshwater demand in and wastewater out is water loss due to evaporation, water loss to tailings, and instantaneous demand for feed process requirements. Mining Personnel Municipal Water Supply (Potable) [Total Required 357 gpm (514k gpd) + 180k gal Fire Water] Potable Water Demand 2 gpm (2.9k gpd) This page intentionally left blank.