Appendix B.2_Response_DEMLR_comments
Piedmont Lithium Carolinas,Inc. I Response to Additional Information Request(dated January 14,2022) Appendix B:Response to Mooresville Regional Office Comments B.2 Attachment 2 — Conversion Plant Drainage Calculations This page intentionally left blank. FYZ Stormwater PIEDMONT LITHIUM Calculations Lithium Hydroxide Conversion Plant Gaston County, North Carolina May 31, 2022 CARC�'�''�. •�� SEAL �� •� = 032062 Valerie K.Hay,K4f.*Jl Jrg,2 1 .l v f///ll111100 This page intentionally left blank. PLC I Lithium Hydroxide Conversion Plant—Stormwater Calculations Contents Contents 1.0 Project Description.............................................................................................................1 2.0 Site Information..................................................................................................................1 2.1 Project Location..............................................................................................................1 2.2 Soils................................................................................................................................1 2.3 Topography ....................................................................................................................1 2.4 Site Characteristics.........................................................................................................1 3.0 Erosion Control Calculations..............................................................................................1 3.1 Sediment Basins.............................................................................................................1 3.2 Sediment Traps ..............................................................................................................2 3.3 Skimmer Basins..............................................................................................................2 4.0 Stormwater Calculations ....................................................................................................2 5.0 Culvert and Stream Crossing Calculations ........................................................................2 Appendices Appendix A— FEMA Firmette Map Appendix B — USGS Topo Map Appendix C — Drainage Area Maps Appendix D — Soil Map and Report Appendix E — Curve Number and Time of Concentration Appendix F — NOAA Rainfall Data Appendix G — Sediment Basin Calculations Appendix H — Sediment Trap and Skimmer Basin Calculations Appendix I —Stormwater Calculations Appendix J — Stream and Culvert Crossing Calculations Appendix K— Outlet Protection Calculations 1 PLC I Lithium Hydroxide Conversion Plant—Stormwater Calculations ��� Project Description 1 .0 Project Description Piedmont Lithium Carolinas, Inc. is proposing an integrated facility in Gaston County, North Carolina that will include both Concentrate Operations (including Mine #1, Concentrate Plant, and Industrial Minerals Plant) as well as a Lithium Hydroxide Conversion Plant. HDR Engineering, Inc. of the Carolinas (HDR) is providing site layout, grading, stormwater, and erosion control plans for the Lithium Hydroxide Conversion Plant. This will include an entrance road, rail access, rail storage, the plant and associated administrative, operations, and maintenance buildings. This report will address the site stormwater analysis and design. 2.0 Site Information 2.1 Project Location The Lithium Hydroxide Conversion Plant will be located east of Cherryville on a combined parcel of property just south of Hephzibah Church Road. The property is bound on the west by Anthony Grove Road, and on the east by Saint Marks Church Road. 2.2 Soils The onsite soils consist of both sandy and clay loams, (see soils map in Appendix D) with moderate to poor infiltration rates. The majority of the site soils have a hydrologic soil group rating 'B', with a small percentage of`D' or 'B/D' ratings. 2.3 Topography Elevations range from 910 feet NAVD at the corner of Anthony Grove Road and Hephzibah Church Road to 795 feet NAVD where Beaverdam Creek crosses St. Marks Church Road. The existing topography is shown on the Drainage Area Maps in Appendix C of this report. 2.4 Site Characteristics This site is located within a Water Supply— IV (WS-IV)watershed protected area. The site will be developed under the low density option with less than 24% built upon area and 30-foot stream buffers, following the standard rules for erosion and sediment controls, as set forth by the North Carolina Department of Environmental Quality (NCDEQ). 3.0 Erosion Control Calculations 3.1 Sediment Basins All sediment basins are designed per NCDEQ standards. They are designed for a 25-year design storm, using local rainfall data (see Appendix F). Basins have a minimum surface area ratio of 435 ftz/cfs or greater, with appropriate length-to-width ratios and inflow points located as far as possible from the principal spillway inlet. All basins exceed the minimum volume requirement of 1,800 ft3/acre. Basins are to be constructed with a primary spillway and skimmer, as well as an emergency spillway designed to maintain 1-foot of freeboard. Porous baffles are 1 PLC I Lithium Hydroxide Conversion Plant—Stormwater Calculations ��� Stormwater Calculations to be installed to reduce velocity and turbulence of the water flowing through the basin (see plan sheet OOG-007 for details). 3.2 Sediment Traps For drainage areas less than 1 acre, sediment traps have been designed per NCDEQ standards with a 25-year design storm based on local rainfall data (see Appendix F). Each trap has a minimum surface area ratio of 435 ftz/cfs or greater and meet the minimum volume requirement of 3,600 ft3/acre of disturbed area. All sediment traps are to be constructed per NCDEQ minimum design criteria with a modified spillway designed to detain flow and allow improved sediment trapping (see plan sheet OOG-007 for details). 3.3 Skimmer Basins For drainage areas between 1 and 5 acres, skimmer sediment basins have been designed per NCDEQ standards with a 25-year design storm based on local rainfall data. Each skimmer basin has a minimum surface area ratio of 325 ftz/cfs or greater and a minimum volume requirement of 1800 ft3/acre of disturbed area. The orifice of a skimmer should be selected in order to achieve the desired dewatering time of 3 days (see plan sheet OOG-007 for details). 4.0 Stormwater Calculations Storm sewer piping will convey stormwater runoff from the roadside ditches surrounding conversion plant to the sediment basins. Using HydroCAD version 10.10-5a analysis software, the storm sewer was designed based on the 25-year storm, as developed from local rainfall data (see Appendix F). The storm sewer sizes were designed for full development, using a minimum time of concentration of 6 minutes. All proposed storm sewer pipes were designed assuming a minimum slope of 1% and a roughness coefficient of n= 0.012. The roadside ditches surrounding the conversion plant were also designed based on the 25-year storm and local rainfall data. The ditches are designed at a minimum slope of 1% with a 1-foot flat bottom and 3:1 side slopes assuming a roughness coefficient of n= 0.025 (see Appendix 1). 5.0 Culvert and Stream Crossing Calculations To provide access to the site, an entrance road must be constructed from Hephzibah Church Road to the plant and will include 3 different culvert crossings along the route. The 3 crossings are designed for the 25-year design storm and checked for the 100-year storm to prevent overtopping using local rainfall data (see Appendix F). The first culvert crossing will consist of a 24-inch culvert with a contributing drainage area of 2.50 acres. The second crossing was sized as 36-inch culvert for the 5.59 acres of contributing drainage area. The last culvert along the entrance road, with a 74.73-acre drainage area, was sized to be an open bottom metal arch span of 10 ft. with a rise of 5.25-ft. The open bottom arch will allow the delineated stream to be unimpacted in the area (see Appendix J). 2 PLC I Lithium Hydroxide Conversion Plant—Stormwater Calculations ��� Culvert and Stream Crossing Calculations A railroad system is also shown to the south of the main entrance road. It will provide service from the main CSX line, north of Hephzibah Church Road, to the plant site. The railroad will require 2 drainage crossings: a culvert crossing near Hephzibah Church Road and a crossing along the delineated stream. The culvert crossing will be a 48-inch culvert with a contributing drainage area of 14.22 acres. The stream crossing has a contributing drainage area of 149.8 acres. An open bottom arch span of 14-feet with a rise of 7.25-feet was sized to accommodate the crossing and to prevent the stream from being impacted (see Appendix J). The hydrographs for each culvert were created using Hydraflow Extensions for Civil 3D 2018 (see Appendix J). The curve numbers and time of concentrations are showing in Appendix E for they hydrograph calculations. The culvert crossing design and analysis were performed using HY8 version 7.60 by FHA (see Appendix J). 3 PLC I Lithium Hydroxide Conversion Plant—Stormwater Calculations ��� Appendix A—FEMA Firmette Map AppendixA — FEMA Firmette Map PLC I Lithium Hydroxide Conversion Plant—Stormwater Calculations ��� Appendix A—FEMA Firmette Map This page intentionally left blank. National Flood Hazard Layer FIRMette FEMA Legend 81°19'48"W 35o24'3"N SEE FIS REPORT FOR DETAILED LEGEND AND INDEX MAP FOR FIRM PANEL LAYOUT f yl Without Base Flood Elevation(BFE) Zone A,V,A99 w Iww% t SPECIAL FLOOD With BFE or Depth Zone Ae,AO,AH,VE,AR _ lei r HAZARD AREAS Regulatory Floodway + ICI s 0.2%Annual Chance Flood Hazard,Areas - of 1%annual chance flood with average I�it # * depth less than one foot or with drainage f * ', ` f, I # r {i areas of less than one square mile zone x *!r FFuture Chance Flood l%Annual _ Chance Flood Hazard zone Area with Reduced Flood Risk due to - •t OTHER AREAS OF Levee.See Notes.zone x } # FLOOD HAZARD Area with Flood Risk due to Leveezone D NO SCREEN Area of Minimal Flood Hazard zonex ' Q Effective LOMRs # OTHER AREAS Area of Undetermined Flood Hazard zone GENERAL ---- Channel,Culvert,or Storm Sewer STRUCTURES IIIIIII Levee,Dike,or Floodwall Cross AREA OF IVIINI VIAL FLOOD I-IP I RD � Water Surface Elevation 1%Annual Chance i 17•5 Water Surface Elevation Z?O 8- - - Coastal Transect b _ ^^^^ 513— Base Flood Elevation Line(BFE) •- LTA " + tr L }+ Limit of Study Jurisdiction Boundary 370455 —--- Coastal Transect Baseline OTHER _ Profile Baseline FEATURES Hydrographic Feature w Digital Data Available N dIP + 4 No Digital Data Available +y } Awl' . _ . t MAP PANELS Unmapped iF F •di. q Q rt '; The pin displayed on the map is an approximate + point selected by the user and does not represent ■ an authoritative property location. This map complies with FEMA's standards for the use of w _ digital flood maps if it is not void as described below. The basemap shown complies with FEMA's basemap accuracy standards The flood hazard information is derived directly from the # authoritative NFHL web services provided by FEMA.This map was exported on 8/26/2021 at 5:09 PM and does not r A Y• reflect changes or amendments subsequent to this date and .. • I qp time.The NFHL and effective information may change or y Z on 2 E become superseded by new data over time. This map image is void if the one or more of the following map elements do not appear:basemap imagery,flood zone labels, legend,scale bar,map creation date,community identifiers, EKZZZM 81019'11"W 35023'34"N FIRM panel number,and FIRM effective date.Map images for Feet 1:6 000 unmapped and unmodernized areas cannot be used for 0 250 500 1,000 1,500 2,000 regulatory purposes. Basemap:USGS National Map:Orthoimagery.Data refreshed October,2020 This page intentionally left blank. PLC I Lithium Hydroxide Conversion Plant—Stormwater Calculations ��� Appendix B—USGS Topo Map Appendix B — USGS Topo Map PLC I Lithium Hydroxide Conversion Plant—Stormwater Calculations ��� Appendix B—USGS Topo Map This page intentionally left blank. m ro a Q c d -- t kkCC1155 C�6GG�m I Caw' AA *00 41* 41f- cc "Soso A L 7A Dw � � m ca eam�m .' o �x 1 e 111 This page intentionally left blank. PLC I Lithium Hydroxide Conversion Plant—Stormwater Calculations ��� Appendix C—Drainage Area Maps Appendix C — Drainage Area Maps PLC I Lithium Hydroxide Conversion Plant—Stormwater Calculations ��� Appendix C—Drainage Area Maps This page intentionally left blank. "N ��-� ��'�\•`r�,�- l��l�����������ll� lJILi/ � � _ _ _ �� � 1>> 1� � � , 1 _ _ _ � �� 11 ��-,�� DA1:74.73 AC TOC:28.1 MIN �� \ �� CN.78 �/- ) I /�" r� IT �� Wli �_\ � ��� �j� l 500 0 500 1000 \ /-A r SCALE: 1" = 500' /OP 'ice TOC:CN479MI\ ` ` �.\ \� \� (O -/ MA GENERAL LEGEND TOC:12.9 5.59 IN C �.� CN:78 J I . ■ ■ ■ ■ ■ ■ ■ ■ ■ STREAM CROSSING DRAINAGE AREA i� �� �- x -x �' A +�" ��— ' X 1 TIME OF CONCENTRATION SEDIMENT BASIN/TRAP DRAINAGE AREA goo � ' - X fldh 1`4--x x-x-x x- -x-x x It r , r _ I X _ _ o ° ° 0 0 0 0 0 a 1 � DA5:14.22 AC -- - �.• •� ° TOC:16.1 MIN CN:79 -'���\� A\ V °8. °8 a _ o °o DA4:149.8 A aC ° l 00 6 (INCLUDES DA1-3,5) I I \ ---- __--- �a o o : O �• TOC:27.7 MIN CN:76 — •�- Do, - SS 1 I X I X SHEET TITLE FILENAME OOC-02.DWG DRAINAGE ANALYSIS MAP, SCALE 1"=500' PIEDMONT PLAN VIEW SHEET OOC 02 LITHIUM HYDROXIDE CONVERSION PLANT This page intentionally left blank. PLC I Lithium Hydroxide Conversion Plant—Stormwater Calculations ��� Appendix D—Soil Map and Report Appendix D — Soil Map and Report PLC I Lithium Hydroxide Conversion Plant—Stormwater Calculations ��� Appendix D—Soil Map and Report This page intentionally left blank. 3 Hydrologic Soil Group—Gaston County, North Carolina N M O W N W W 469700 470000 470300 470600 470900 471200 471500 471800 35'24'30"N 35'24'30"N 00 wr e R3 &npV o � o • es D D �( ° JJ `F l • D D o D -4 4 35'22'57"N 35'22'57'N 469700 470000 470300 470600 470900 471200 471500 471800 3 3 N i0 Map Scale:1:14,000 if printed on A portrait(8.5"x 11")sheet. o N Meters 0 200 400 800 1200 Feet 0 500 1000 2000 3000 Map projection:Web Mercator Comer coordinates:WGS84 Edge tics:L TM Zone 17N WGS84 UsDA Natural Resources Web Soil Survey 8/26/2021 Conservation Service National Cooperative Soil Survey Page 1 of 5 Hydrologic Soil Group—Gaston County, North Carolina MAP LEGEND MAP INFORMATION Area of Interest(AOI) p C The soil surveys that comprise your AOI were mapped at Area of Interest(A01) 0 C/D 1:24,000. Soils Please rely on the bar scale on each map sheet for map Soil Rating Polygons 0 D measurements. 0 A p Not rated or not available Source of Map: Natural Resources Conservation Service 0 A/D Water Features Web Soil Survey URL: Streams and Canals Coordinate System: Web Mercator(EPSG:3857) 0 B Transportation Maps from the Web Soil Survey are based on the Web Mercator 0 B/D projection,which preserves direction and shape but distorts Rails distance and area.A projection that preserves area,such as the 0 C #%-0 Interstate Highways Albers equal-area conic projection,should be used if more accurate calculations of distance or area are required. C/D US Routes 0 This product is generated from the USDA-NRCS certified data as p Major Roads of the version date(s)listed below. Not rated or not available Local Roads Soil Survey Area: Gaston County,North Carolina Soil Rating Lines Background Survey Area Data: Version 20,Jun 4,2020 " x A ® Aerial Photography Soil map units are labeled(as space allows)for map scales " r A/D 1:50,000 or larger. B Date(s)aerial images were photographed: Apr 23,2014—Nov B/D 28,2017 The orthophoto or other base map on which the soil lines were " x C compiled and digitized probably differs from the background " 0 C/D imagery displayed on these maps.As a result,some minor shifting of map unit boundaries may be evident. " r D " r Not rated or not available Soil Rating Points 0 A 0 A/D B B/D UU� Natural Resources Web Soil Survey 8/26/2021 � Conservation Service National Cooperative Soil Survey Page 2 of 5 Hydrologic Soil Group—Gaston County, North Carolina Hydrologic Soil Group Map unit symbol Map unit name Rating Acres in AOI Percent of AOI ApB Appling sandy loam, 1 to B 181.2 28.5% 6 percent slopes CeB2 Cecil sandy clay loam,2 B 87.3 13.7% to 8 percent slopes, moderately eroded CeD2 Cecil sandy clay loam,8 B 53.9 8.5% to 15 percent slopes, moderately eroded CfB Cecil-Urban land B 7.5 1.2% complex,2 to 8 percent slopes ChA Chewacla loam,0 to 2 B/D 50.6 7.9% percent slopes, frequently flooded HeB Helena sandy loam, 1 to D 14.5 2.3% 6 percent slopes LdB2 Lloyd sandy clay loam,2 B 53.0 8.3% to 8 percent slopes, moderately eroded MaB2 Madison sandy clay B 0.7 0.1% loam,2 to 8 percent slopes,moderately eroded MaD2 Madison sandy clay B 0.1 0.0% loam,8 to 15 percent slopes,moderately eroded PaD2 Pacolet sandy clay B 9.1 1.4% loam,8 to 15 percent slopes,moderately eroded PaE Pacolet sandy loam, 15 B 71.8 11.3% to 25 percent slopes W Water 2.2 0.3% WeD Wedowee sandy loam,6 B 98.3 15.4% to 15 percent slopes WoA Worsham loam,0 to 2 D 6.3 1.0% percent slopes Totals for Area of Interest 636.4 100.0% USDA Natural Resources Web Soil Survey 8/26/2021 Conservation Service National Cooperative Soil Survey Page 3 of 5 Hydrologic Soil Group—Gaston County, North Carolina Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long-duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential)when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential)when thoroughly wet. These consist chiefly of clays that have a high shrink-swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Rating Options Aggregation Method: Dominant Condition usDA Natural Resources Web Soil Survey 8/26/2021 Conservation Service National Cooperative Soil Survey Page 4 of 5 Hydrologic Soil Group—Gaston County, North Carolina Aggregation is the process by which a set of component attribute values is reduced to a single value that represents the map unit as a whole. A map unit is typically composed of one or more "components". A component is either some type of soil or some nonsoil entity, e.g., rock outcrop. For the attribute being aggregated, the first step of the aggregation process is to derive one attribute value for each of a map unit's components. From this set of component attributes, the next step of the aggregation process derives a single value that represents the map unit as a whole. Once a single value for each map unit is derived, a thematic map for soil map units can be rendered. Aggregation must be done because, on any soil map, map units are delineated but components are not. For each of a map unit's components, a corresponding percent composition is recorded. A percent composition of 60 indicates that the corresponding component typically makes up approximately 60% of the map unit. Percent composition is a critical factor in some, but not all, aggregation methods. The aggregation method "Dominant Condition"first groups like attribute values for the components in a map unit. For each group, percent composition is set to the sum of the percent composition of all components participating in that group. These groups now represent"conditions" rather than components. The attribute value associated with the group with the highest cumulative percent composition is returned. If more than one group shares the highest cumulative percent composition, the corresponding "tie-break" rule determines which value should be returned. The "tie-break" rule indicates whether the lower or higher group value should be returned in the case of a percent composition tie. The result returned by this aggregation method represents the dominant condition throughout the map unit only when no tie has occurred. Component Percent Cutoff. None Specified Components whose percent composition is below the cutoff value will not be considered. If no cutoff value is specified, all components in the database will be considered. The data for some contrasting soils of minor extent may not be in the database, and therefore are not considered. Tie-break Rule: Higher The tie-break rule indicates which value should be selected from a set of multiple candidate values, or which value should be selected in the event of a percent composition tie. usDA Natural Resources Web Soil Survey 8/26/2021 Conservation Service National Cooperative Soil Survey Page 5 of 5 This page intentionally left blank. PLC I Lithium Hydroxide Conversion Plant—Stormwater Calculations ��� Appendix E—Curve Number and Time of Concentration Appendix E — Curve Number and Time of Concentration PLC I Lithium Hydroxide Conversion Plant—Stormwater Calculations Appendix E—Curve Number and Time of Concentration This page intentionally left blank. Table -12 Runoff Curve Numbers Curve numbers for -- -------------C'r�wtr lkcrip�it>rti -------------------------- -- —L�yllrulslgie sail gr�1P--- - AYcrakc Ir avcr typc and hydrologi a cued i 6011 iii5�rt4'i�Yu�,arCu A $ L' I 'FAY den-eli ed whalr-ur vas (w -gelalk,n e.xwhf phed) Opc;i spmx(Isuais,parks, *alf courses.cernalerks.cle,} 5v- Poor condition (grass cover< 3 ia)............................ bpi 79 86 89 F air vandifion I grates cow 50% to 7M.................... 49 69 79 R4 GoM caiiditlan(gra_s.,over>75%)-------------------........ 34 61 74 80 P;1 vd parking]at!;,roofs,drivrwxys.E4r. (excluding ri hl-of-wa )............................,,.,..,.. 98 48 99 48 SIrew and roads: Parrs& curbs and storm scwcrs(cxcluding right-cf-way)...,,,.,.,,,,,,,,,,,,,,,,,,,,,.--.................... 98 9?: 9H 98 Paved.ap4i &fi�hts(Iris luding rjpt-af vray} .... 83 8is 92 93 Gravet(including right,I'-way).......................... 76 8S 89 91 DO{indudirig righi-or-way] .............................. 72 82 R7 get Urban dratncts: Commcrcial and business„,,,,,,.,............................... , 85 89 92 94 95 lnduStrial................................,,,,,................................ 72 81 88 l 93 Resi&nval digricts key airtrige lc sixlw Ii� acm or lcs&(t#tivr! hcascSI.-. •-------...---............. 65 77 95 90 92 1.4 acrr.....-------------------------.............._. _ ........ 38 61 _ 83 87 111 acre,,............................,.-..........................__......... 30 57 81 86 I�2 acre,,,,...........................,,... ..............................,,.. 25 54 71, 80 SS Iacrc,,,,,,.—....................................,............................ 20 51 6S. 79 M ................,,,, 13 46 65 77 ST AgF#cu l rrrf bawds Pasture, grassland or range i con wwous for age for gazingl' Poor hydrologic condition....."I'll-,............................ 68 79 86 \4) Fair h}dmlogiccondil Pon............................................ 79 H4 GJn~W hydrV19.9i-C c(widilion .......................................... 39 fit 74 NO W Poor hydrolcP& can itran.,,....--•-------------........................................... 45 w, r 8.3 Fair hydra ogic co ilion„,-....-.--------------............................... 6 6I] 73 79 {pDod hydrolo4ic cwrdition ....-.-.....................,,.,.,,., M r 77 Nc u'ly graded (I Vious arm Ofily.r�o Vqa>ilIUd)-,,,,,,,,,,,,,,,,,--,,.... NO 91 94 1 Mwaie nanoff"L"iion,and la- IF,2S. 2 TIw at•rrio pemm mkpm arts shown wda wTd 404C%'el*p ilr{C+Mp):+ic CN'J.11DACr tsrllmpliafk�WC&I follMV$!impar+'kK*ArM "dlrms yconncsicd w ihe*minage 4pirm ampmi.o sarm have a of".and prrviuw armor air cimriderc4 equivalerrt co apen tipara in goad hydrolo it cmWliion, I :�Thow"arc Oviv*lepl NoIhaac a1,rm-% rc.Cwr iw(N'a may 1 e w"cd fog odor vmibanwlim orapo Ip�woca "lypc' 4 Pax:Fewil biker,mull hers,mid bnjAaw desrroyrd by hemN g,=ing 4r regvtar huming. Fsir: Woo&arc grazed Irill rLw burued ind skifix fin€I Boer c-avers Ihr>oil. l}m d: Wo ds arc pnAceled from graai.ag-and I1cL{[,ind brush Adegostety 4ovrr Ute sail, COMPOSITE CURVE NUMBER CALCULATIONS DA1-STREAM CROSSING AT ROAD SOIL GROUP COVER TYPE ACRES % CN %of DA B Pvmt/Sidewalk/Equipment pads 13.43 0.18 98 0.97 Woods 28.21 0.39 66 Grass 130.99 0.43 79 D lWoods 12.10 11.00 183 10.03 COMPOSITE (B) 77.5 COMPOSITE (D) 83.0 TOTAL COMPOSITE CN 78 DA2-CROSSING AT ROAD SOIL GROUP COVER TYPE ACRES % JCN %of DA B Pvmt/Sidewalk/Equipment pads 0.06 0.02 198 11.00 Grass 2.44 0.98 179 TOTAL COMPOSITE CN 79 DA3-CROSSING AT ROAD SOIL GROUP COVER TYPE ACRES % CN %of DA B Pvmt/Sidewalk/Equipment pads 0.13 0.02 98 1.00 Woods 0.68 0.12 66 Grass 14.77 0.85 79 TOTAL COMPOSITE CN 78 DA4-STREAM CROSSING AT RAILROAD SOIL GROUP COVER TYPE ACRES % CN %of DA B Pvmt/Sidewalk/Equipment pads 14.74 0.10 98 0.96 Woods 55.09 0.38 66 Grass 75.95 0.52 79 D Woods 3.87 0.96 83 0.04 Grass 0.16 10.04 189 COMPOSITE (B) 76.0 COMPOSITE (D) 83.2 TOTAL COMPOSITE CN 76 DA5-CROSSING AT RAIL SOUTH SOIL GROUP COVER TYPE ACRES % CN %of DA B Pvmt 1.06 0.07 98 1.00 Woods 1.30 0.09 66 Grass 111.86 0.83 79 TOTAL COMPOSITE CN I79 12/10/2021 Time of Concentration Worksheet F:)R SCS TR-55 Method PROJECT: PLI DATE: 12/10/21 SCENARIO: DA1-Stream Crossing at Road PREPARED BY: FLS Drainage Area Info IM Drainage Area Tc Summary Data DRAINAGE AREA ID: DA 1 Flow Type Length(ft) Elev.Diff. Tc TOTAL BASIN LENGTH: 1980.7 ft Sheet Flow 100.0 0.50 17.4 mins. TOTAL ELEVATION UP: 888.00 Shallow Concentrated Flow 1880.7 55.50 10.8 mins. TOTAL ELEVATION DOWN: 832.00 Channel Flow-Rectangular 0.0 0.00 0.0 mins. TOTAL ACRES: 74.73 Channel Flow-Triangular 0.0 0.00 0.0 mins. Channel Flow-Trapezoidal 0.0 0.00 1 0.0 mins. Channel Flow-Circular 0.0 0.00 0.0 mins. Basin Totals1980.7 56.0028.1 mins. This time of concentration calculation is based on survey data,aerial photography,and field investigation. 2. SHALLOW CONCENTRATED FLOW Segment#1 Segment#2 Segment#3 Surface Description Grass Segment#1 Segment#2 Segment#3 Manning's"n" 0.16 Surface Description Paved Unpaved 2-Year,24-Hr.Rain Fall(In) 3.43 Flow Length(ft) 468.3 ft 1412.4 ft Flow Length(ft) 100.0 ft Elevation Up(ft) 887.50 872.00 Elevation Up(ft) 888.00 Elevation Down(ft) 872.00 832.00 Elevation Down(ft) 887.50 Watercourse Slope(ft/ft) 0.033 0.028 Land Slope(ft/ft) 0.005 Average Velocity(ft/Sec) 3.7 2.7 Time Of Concentration(Mins) 17.35 Time Of Concentration(Mins) 2.11 8.67 Total Sheet Flow Tc(Minutes): 17.4 min. Total Shallow Concentrated Tc(Mins):j 10.8 min. cApw rking\east01\d2277368\ PLI TOC.Asm DA 1-Road 4 of]8 12/10/2021 Time of Concentration Worksheet F:)R SCS TR-55 Method PROJECT: PLI DATE: 12/10/21 SCENARIO: DA1-Stream Crossing at Road PREPARED BY: FLS 3. CHANNEL FLOW-RECTANGULAR CHANNEL Segment#1 Segment#2 Segment#3 Segment#4 Segment#5 Segment#6 Segment#7 Segment#8 Segment#9 Surface Description Bottom Width(ft) Depth(ft) Area(Sq.ft) Wetted Perimeter(ft) Hydraulic Radius(ft) Flow Length(ft) Elevation Up(ft) Elevation Down(ft) Channel Slope(ft/ft) Manning's"n" Average Velocity(ft/Sec) Time Of Concentration(Mins) Total Rectangular Channel Tc(Mins): 0.0 mins. 4. CHANNEL FLOW-TRIANGULAR CHANNEL Segment#1 Segment#2 Segment#3 Segment#4 Segment#5 Segment#6 Segment#7 Segment#8 Segment#9 Surface Description Top Width(ft) Depth(ft) Area(Sq.ft) Wetted Perimeter(ft) Hydraulic Radius(ft) Flow Length(ft) Elevation Up(ft) Elevation Down(ft) Channel Slope(ft/ft) Manning's"no Average Velocity(ft/Sec) Time Of Concentration(Mins) Total Triangular Channel Tc 0.0 min. cApw rking\east01\d2277368\ PLI TOCAsm DA 1-Road 5 of 18 12/10/2021 Time of Concentration Worksheet F:)R SCS TR-55 Method PROJECT: PLI DATE: 12/10/21 SCENARIO: DA1-Stream Crossing at Road PREPARED BY: FLS 5. CHANNEL FLOW-TRAPEZOIDAL CHANNEL Segment#1 Segment#2 Segment#3 Segment#4 Segment#5 Segment#6 Segment#7 Segment#8 Segment#9 Surface Description Bottom Width(ft) Depth(ft) Side Slopes(?H:1V)(ft) Area(Sq.ft) Wetted Perimeter(ft) Hydraulic Radius(ft) Flow Length(ft) Elevation Up(ft) Elevation Down(ft) Channel Slope(ft/ft) Manning's"no Average Velocity(ft/Sec) Time Of Concentration(Mins) Total Trapezoidal Channel Tc 0.0 min. 6. CHANNEL FLOW-CIRCULAR CHANNEL(Gravity Flow) Segment#1 Segment#2 Segment#3 Segment#4 Segment#5 Segment#6 Segment#7 Segment#8 Segment#9 Surface Description Pipe Diameter(In) Area(Sq.ft) Wetted Perimeter(ft) Hydraulic Radius(ft) Flow Length(ft) Elevation Up(ft) Elevation Down(ft) Channel Slope(ft/ft) Manning's"n" Average Velocity(ft/Sec) Time Of Concentration(Mins) Total Circular Channel Tc(Mins): 0.0 min. 7.Total Basin Time of Concentration (Mintues) Total Basin Tc(Mins): 28.1 min. cApw rking\east01\d2277368\ Pu TOCAsm DA 1-Road 6 of]8 12/10/2021 Time of Concentration Worksheet F:)R SCS TR-55 Method PROJECT: PLI DATE: 12/10/21 SCENARIO: DA2-Crossing at Road PREPARED BY: FLS Drainage Area Infor 1. M Drainage Area Tc Summary Data DRAINAGE AREA ID: DA 2 Flow Type Length(ft) Elev.Diff. Tc TOTAL BASIN LENGTH: 367.1 ft Sheet Flow 100.0 1.00 13.1 mins. TOTAL ELEVATION UP: 897.00 Shallow Concentrated Flow 267.1 8.00 1.6 mins. TOTAL ELEVATION DOWN: 888.00 Channel Flow-Rectangular 0.0 0.00 0.0 mins. TOTAL ACRES: 12.50 Channel Flow-Triangular 0.0 0.00 0.0 mins. Channel Flow-Trapezoidal 0.0 0.00 0.0 mins. Channel Flow-Circular 0.0 0.00 0.0 mins. Basin Totals367.1 9.0014.7 mins. This time of concentration calculation is based on survey data,aerial photography,and field investigation. 2. SHALLOW CONCENTRATED FLOW Segment#1 Segment#2 Segment#3 Surface Description Grass Segment#1 Segment#2 Segment#3 Manning's"n" 0.16 Surface Description Unpaved 2-Year,24-Hr.Rain Fall(In) 3.43 Flow Length(ft) 267.1 ft Flow Length(ft) 100.0 ft Elevation Up(ft) 896.00 Elevation Up(ft) 897.00 Elevation Down(ft) 888.00 Elevation Down(ft) 896.00 Watercourse Slope(ft/ft) 0.030 Land Slope(ft/ft) 0.010 Average Velocity(ft/Sec) 2.8 Time Of Concentration(Mins) 13.15 Time Of Concentration(Mins) 1.59 Total Sheet Flow Tc(Minutes): 13.1 min. Total Shallow Concentrated Tc(Mins):1 1.6 min. cApw rking\east01\d2277368\ PLI TOC.Asm DA 2-Road 7 of]8 12/10/2021 Time of Concentration Worksheet F:)R SCS TR-55 Method PROJECT: PLI DATE: 12/10/21 SCENARIO: DA2-Crossing at Road PREPARED BY: FLS 3. CHANNEL FLOW-RECTANGULAR CHANNEL Segment#1 Segment#2 Segment#3 Segment#4 Segment#5 Segment#6 Segment#7 Segment#8 Segment#9 Surface Description Bottom Width(ft) Depth(ft) Area(Sq.ft) Wetted Perimeter(ft) Hydraulic Radius(ft) Flow Length(ft) Elevation Up(ft) Elevation Down(ft) Channel Slope(ft/ft) Manning's"no Average Velocity(ft/Sec) Time Of Concentration(Mins) Total Rectangular Channel Tc(Mins): 0.0 mins. 4. CHANNEL FLOW-TRIANGULAR CHANNEL Segment#1 Segment#2 Segment#3 Segment#4 Segment#5 Segment#6 Segment#7 Segment#8 Segment#9 Surface Description Top Width(ft) Depth(ft) Area(Sq.ft) Wetted Perimeter(ft) Hydraulic Radius(ft) Flow Length(ft) Elevation Up(ft) Elevation Down(ft) Channel Slope(ft/ft) Manning's"no Average Velocity(ft/Sec) Time Of Concentration(Mins) Total Triangular Channel Tc 0.0 min. cApw orking\east01\d2277368\ PLI MCA— DA 2-Road 8 or 18 12/10/2021 Time of Concentration Worksheet F:)R SCS TR-55 Method PROJECT: PLI DATE: 12/10/21 SCENARIO: DA2-Crossing at Road PREPARED BY: FLS 5. CHANNEL FLOW-TRAPEZOIDAL CHANNEL Segment#1 Segment#2 Segment#3 Segment#4 Segment#5 Segment#6 Segment#7 Segment#8 Segment#9 Surface Description Bottom Width(ft) Depth(ft) Side Slopes(?H:1V)(ft) Area(Sq.ft) Wetted Perimeter(ft) Hydraulic Radius(ft) Flow Length(ft) Elevation Up(ft) Elevation Down(ft) Channel Slope(ft/ft) Manning's"no Average Velocity(ft/Sec) Time Of Concentration(Mins) Total Trapezoidal Channel Tc 0.0 min. 6. CHANNEL FLOW-CIRCULAR CHANNEL(Gravity Flow) Segment#1 Segment#2 Segment#3 Segment#4 Segment#5 Segment#6 Segment#7 Segment#8 Segment#9 Surface Description Pipe Diameter(In) Area(Sq.ft) Wetted Perimeter(ft) Hydraulic Radius(ft) Flow Length(ft) Elevation Up(ft) Elevation Down(ft) Channel Slope(ft/ft) Manning's"n" Average Velocity(ft/Sec) Time Of Concentration(Mins) Total Circular Channel Tc(Mins): 0.0 min. 7.Total Basin Time of Concentration (Mintues) Total Basin Tc(Mins): 14.7 min. cApw rking\east01\d2277368\ PLI TOCAsm DA 2-Road 9 of 18 12/10/2021 Time of Concentration Worksheet F:)R SCS TR-55 Method PROJECT: PLI DATE: 12/10/21 SCENARIO: DA3-Crossing at Road PREPARED BY: FLS Drainage Area Info Drainage Area Tc Summary Data DRAINAGE AREA ID: DA 3 Flow Type Length(ft) Elev.Diff. Tc TOTAL BASIN LENGTH: 680.7 ft Sheet Flow 100.0 2.00 10.0 mins. TOTAL ELEVATION UP: 897.00 Shallow Concentrated Flow 580.7 25.00 2.9 mins. TOTAL ELEVATION DOWN: 870.00 Channel Flow-Rectangular 0.0 0.00 0.0 mins. TOTAL ACRES: 15.59 Channel Flow-Triangular 0.0 0.00 0.0 mins. Channel Flow-Trapezoidal 0.0 0.00 0.0 mins. Channel Flow-Circular 0.0 0.00 0.0 mins. Basin Totals •:i 12.9 mins. This time of concentration calculation is based on survey data,aerial photography,and field investigation. 2. SHALLOW CONCENTRATED FLOW Segment#1 Segment#2 Segment#3 Surface Description Grass Segment#1 Segment#2 Segment#3 Manning's"n" 0.16 Surface Description Unpaved 2-Year,24-Hr.Rain Fall(In) 3.43 Flow Length(ft) 580.7 ft Flow Length(ft) 100.0 ft Elevation Up(ft) 895.00 Elevation Up(ft) 897.00 Elevation Down(ft) 870.00 Elevation Down(ft) 895.00 Watercourse Slope(ft/ft) 0.043 Land Slope(ft/ft) 0.020 Average Velocity(ft/Sec) 3.3 Time Of Concentration(Mins) 9.97 Time Of Concentration(Mins) 2.89 Total Sheet Flow Tc(Minutes): 10.0 min. Total Shallow Concentrated Tc(Mins):1 2.9 min. cApw rking\east01\d2277368\ PLI TOC.Asm DA 3-Road 10 of 18 12/10/2021 Time of Concentration Worksheet F:)R SCS TR-55 Method PROJECT: PLI DATE: 12/10/21 SCENARIO: DA3-Crossing at Road PREPARED BY: FLS 3. CHANNEL FLOW-RECTANGULAR CHANNEL Segment#1 Segment#2 Segment#3 Segment#4 Segment#5 Segment#6 Segment#7 Segment#8 Segment#9 Surface Description Bottom Width(ft) Depth(ft) Area(Sq.ft) Wetted Perimeter(ft) Hydraulic Radius(ft) Flow Length(ft) Elevation Up(ft) Elevation Down(ft) Channel Slope(ft/ft) Manning's"no Average Velocity(ft/Sec) Time Of Concentration(Mins) Total Rectangular Channel Tc(Mins): 0.0 mins. 4. CHANNEL FLOW-TRIANGULAR CHANNEL Segment#1 Segment#2 Segment#3 Segment#4 Segment#5 Segment#6 Segment#7 Segment#8 Segment#9 Surface Description Top Width(ft) Depth(ft) Area(Sq.ft) Wetted Perimeter(ft) Hydraulic Radius(ft) Flow Length(ft) Elevation Up(ft) Elevation Down(ft) Channel Slope(ft/ft) Manning's"no Average Velocity(ft/Sec) Time Of Concentration(Mins) Total Triangular Channel Tc 0.0 min. cApw orking\east01\d2277368\ PLI MCA— DA 3-Road I I or 18 12/10/2021 Time of Concentration Worksheet F:)R SCS TR-55 Method PROJECT: PLI DATE: 12/10/21 SCENARIO: DA3-Crossing at Road PREPARED BY: FLS 5. CHANNEL FLOW-TRAPEZOIDAL CHANNEL Segment#1 Segment#2 Segment#3 Segment#4 Segment#5 Segment#6 Segment#7 Segment#8 Segment#9 Surface Description Bottom Width(ft) Depth(ft) Side Slopes(?H:1V)(ft) Area(Sq.ft) Wetted Perimeter(ft) Hydraulic Radius(ft) Flow Length(ft) Elevation Up(ft) Elevation Down(ft) Channel Slope(ft/ft) Manning's"no Average Velocity(ft/Sec) Time Of Concentration(Mins) Total Trapezoidal Channel Tc 0.0 min. 6. CHANNEL FLOW-CIRCULAR CHANNEL(Gravity Flow Segment#1 Segment#2 Segment#3 Segment#4 Segment#5 Segment#6 Segment#7 Segment#8 Segment#9 Surface Description Pipe Diameter(In) Area(Sq.ft) Wetted Perimeter(ft) Hydraulic Radius(ft) Flow Length(ft) Elevation Up(ft) Elevation Down(ft) Channel Slope(ft/ft) Manning's"no Average Velocity(ft/Sec) Time Of Concentration(Mins) Total Circular Channel Tc(Mins): 0.0 min. PLBasin Time of Concentration(Mintues) Total Basin Tc(Mins): 12.9 min. cApw rking\east01\d2277368\ PLI TOCAsm DA 3-Road 12 of]8 12/10/2021 Time of Concentration Worksheet F:)R SCS TR-55 Method PROJECT: PLI DATE: 12/10/21 SCENARIO: DA4-Stream Crossing at Railroad PREPARED BY: FLS Drainage Area Info Drainage Area Tc Summary Data DRAINAGE AREA ID: DA 4 Flow Type Length(ft) Elev.Diff. Tc TOTAL BASIN LENGTH: 3117.8 ft Sheet Flow 100.0 0.50 17.4 mins. TOTAL ELEVATION UP: 888.00 Shallow Concentrated Flow 730.3 25.50 3.5 mins. TOTAL ELEVATION DOWN: 810.00 Channel Flow-Rectangular 0.0 0.00 0.0 mins. TOTAL ACRES: 149.81 Channel Flow-Triangular 2287.5 52.00 6.8 mins. Channel Flow-Trapezoidal 0.0 0.00 0.0 mins. Channel Flow-Circular 0.0 0.00 0.0 mins. Basin Totals3117.8 78.0027.7 mins. This time of concentration calculation is based on survey data,aerial photography,and field investigation. 2. SHALLOW CONCENTRATED FLOW Segment#1 Segment#2 Segment#3 Surface Description Grass Segment#1 Segment#2 Segment#3 Manning's"n" 0.16 Surface Description Paved Unpaved 2-Year,24-Hr.Rain Fall(In) 3.43 Flow Length(ft) 468.3 ft 262.0 ft Flow Length(ft) 100.0 ft Elevation Up(ft) 887.50 872.00 Elevation Up(ft) 888.00 Elevation Down(ft) 872.00 862.00 Elevation Down(ft) 887.50 Watercourse Slope(ft/ft) 0.033 0.038 Land Slope(ft/ft) 0.005 Average Velocity(ft/Sec) 3.7 3.2 Time Of Concentration(Mins) 17.35 Time Of Concentration(Mins) 2.11 1.39 Total Sheet Flow Tc(Minutes): 17.4 min. Total Shallow Concentrated Tc(Mins):1 3.5 min. cApw rking\east01\d2277368\ PLI TOCxlsm DA 4-Railroad 13 of]8 12/10/2021 Time of Concentration Worksheet F:)R SCS TR-55 Method PROJECT: PLI DATE: 12/10/21 SCENARIO: DA4-Stream Crossing at Railroad PREPARED BY: FLS 3. CHANNEL FLOW-RECTANGULAR CHANNEL Segment#1 Segment#2 Segment#3 Segment#4 Segment#5 Segment#6 Segment#7 Segment#8 Segment#9 Surface Description Bottom Width(ft) Depth(ft) Area(Sq.ft) Wetted Perimeter(ft) Hydraulic Radius(ft) Flow Length(ft) Elevation Up(ft) Elevation Down(ft) Channel Slope(ft/ft) Manning's"n" Average Velocity(ft/Sec) Time Of Concentration(Mins) Total Rectangular Channel Tc(Mins): 0.0 mins. 4. CHANNEL FLOW-TRIANGULAR CHANNEL Segment#1 Segment#2 Segment#3 Segment#4 Segment#5 Segment#6 Segment#7 Segment#8 Segment#9 Surface Description Stream-Clean Top Width(ft) 5.0 Depth(ft) 1.5 Area(Sq.ft) 3.8 Wetted Perimeter(ft) 5.8 Hydraulic Radius(ft) 0.6 Flow Length(ft) 2287.5 Elevation Up(ft) 862.00 Elevation Down(ft) 810.00 Channel Slope(ft/ft) 0.023 Manning's"no 0.030 Average Velocity(ft/Sec) 5.6 Time Of Concentration(Mins) 6.84 Total Triangular Channel Tc 6.8 min. cApw rking\east01\d2277368\ PLI TOCAsm DA 4-Railroad 14 of 18 12/10/2021 Time of Concentration Worksheet F:)R SCS TR-55 Method PROJECT: PLI DATE: 12/10/21 SCENARIO: DA4-Stream Crossing at Railroad PREPARED BY: FLS 5. CHANNEL FLOW-TRAPEZOIDAL CHANNEL Segment#1 Segment#2 Segment#3 Segment#4 Segment#5 Segment#6 Segment#7 Segment#8 Segment#9 Surface Description Bottom Width(ft) Depth(ft) Side Slopes(?H:1V)(ft) Area(Sq.ft) Wetted Perimeter(ft) Hydraulic Radius(ft) Flow Length(ft) Elevation Up(ft) Elevation Down(ft) Channel Slope(ft/ft) Manning's"no Average Velocity(ft/Sec) Time Of Concentration(Mins) Total Trapezoidal Channel Tc 0.0 min. 6. CHANNEL FLOW-CIRCULAR CHANNEL(Gravity Flow) Segment#1 Segment#2 Segment#3 Segment#4 Segment#5 Segment#6 Segment#7 Segment#8 Segment#9 Surface Description Pipe Diameter(In) Area(Sq.ft) Wetted Perimeter(ft) Hydraulic Radius(ft) Flow Length(ft) Elevation Up(ft) Elevation Down(ft) Channel Slope(ft/ft) Manning's"n" Average Velocity(ft/Sec) Time Of Concentration(Mins) Total Circular Channel Tc(Mins): 0.0 min. 7.Total Basin Time of Concentration (Mintues) Total Basin Tc(Mins): 27.7 min. cApw rking\east01\d2277368\ PLI TOCAsm DA 4-Railroad 15 of 18 12/10/2021 Time of Concentration Worksheet F:)R SCS TR-55 Method PROJECT: PLI DATE: 12/10/21 SCENARIO: DA5-Stream Crossing at Railroad PREPARED BY: BSS Drainage Area Info Drainage Area Tc Summary Data DRAINAGE AREA ID: DA 5 Flow Type Length(ft) Elev.Diff. Tc TOTAL BASIN LENGTH: 1025.0 ft Sheet Flow 100.0 1.50 11.2 mins. TOTAL ELEVATION UP: 915.00 Shallow Concentrated Flow 925.0 34.50 4.9 mins. TOTAL ELEVATION DOWN: 879.00 Channel Flow-Rectangular 0.0 0.00 0.0 mins. TOTAL ACRES: 14.22 Channel Flow-Triangular 0.0 0.00 0.0 mins. Channel Flow-Trapezoidal 0.0 0.00 0.0 mins. Channel Flow-Circular 0.0 0.00 0.0 mins. Basin Totals1025.0 36.0016.1 mins. This time of concentration calculation is based on survey data,aerial photography,and field investigation. 2. SHALLOW CONCENTRATED FLOW Segment#1 Segment#2 Segment#3 Surface Description Grass Segment#1 Segment#2 Segment#3 Manning's"n" 0.16 Surface Description Unpaved 2-Year,24-Hr.Rain Fall(In) 3.43 Flow Length(ft) 925.0 ft Flow Length(ft) 100.0 ft Elevation Up(ft) 913.50 Elevation Up(ft) 915.00 Elevation Down(ft) 879.00 Elevation Down(ft) 913.50 Watercourse Slope(ft/ft) 0.037 Land Slope(ft/ft) 0.015 Average Velocity(ft/Sec) 3.1 Time Of Concentration(Mins) 11.18 Time Of Concentration(Mins) 4.95 Total Sheet Flow Tc(Minutes): 11.2 min. Total Shallow Concentrated Tc(Mins):1 4.9 min. cApw rking\east01\d2277368\ PLI TOCxlsm DA 5-Railroad South 16 ofls 12/10/2021 Time of Concentration Worksheet K)R SCS TR-55 Method PROJECT: PLI DATE: 12/10/21 SCENARIO: DA5-Stream Crossing at Railroad PREPARED BY: BSS 3. CHANNEL FLOW-RECTANGULAR CHANNEL Segment#1 Segment#2 Segment#3 Segment#4 Segment#5 Segment#6 Segment#7 Segment#8 Segment#9 Surface Description Bottom Width(ft) Depth(ft) Area(Sq.ft) Wetted Perimeter(ft) Hydraulic Radius(ft) Flow Length(ft) Elevation Up(ft) Elevation Down(ft) Channel Slope(ft/ft) Manning's"n" Average Velocity(ft/Sec) Time Of Concentration(Mins) Total Rectangular Channel Tc(Mins): 0.0 rains. 4. CHANNEL FLOW-TRIANGULAR CHANNEL Segment#1 Segment#2 Segment#3 Segment#4 Segment#5 Segment#6 Segment#7 Segment#8 Segment#9 Surface Description Top Width(ft) Depth(ft) Area(Sq.ft) Wetted Perimeter(ft) Hydraulic Radius(ft) Flow Length(ft) Elevation Up(ft) Elevation Down(ft) Channel Slope(ft/ft) Manning's"no Average Velocity(ft/Sec) Time Of Concentration(Mins) Total Triangular Channel Tc 0.0 min. cApw rking\east01\d2277368\ PLI TOCAsm DA 5-Railroad South 17 of1s 12/10/2021 Time of Concentration Worksheet K)R SCS TR-55 Method PROJECT: PLI DATE: 12/10/21 SCENARIO: DA5-Stream Crossing at Railroad PREPARED BY: BSS 5. CHANNEL FLOW-TRAPEZOIDAL CHANNEL Segment#1 Segment#2 Segment#3 Segment#4 Segment#5 Segment#6 Segment#7 Segment#8 Segment#9 Surface Description Bottom Width(ft) Depth(ft) Side Slopes(?H:1V)(ft) Area(Sq.ft) Wetted Perimeter(ft) Hydraulic Radius(ft) Flow Length(ft) Elevation Up(ft) Elevation Down(ft) Channel Slope(ft/ft) Manning's"no Average Velocity(ft/Sec) Time Of Concentration(Mins) Total Trapezoidal Channel Tc 0.0 min. 6. CHANNEL FLOW-CIRCULAR CHANNEL(Gravity Flow) Segment#1 Segment#2 Segment#3 Segment#4 Segment#5 Segment#6 Segment#7 Segment#8 Segment#9 Surface Description Pipe Diameter(In) Area(Sq.ft) Wetted Perimeter(ft) Hydraulic Radius(ft) Flow Length(ft) Elevation Up(ft) Elevation Down(ft) Channel Slope(ft/ft) Manning's"n" Average Velocity(ft/Sec) Time Of Concentration(Mins) Total Circular Channel Tc(Mins): 0.0 min. 7.Total Basin Time of Concentration (Mintues) Total Basin Tc(Mins): 16.1 min. cApw rking\east01\d2277368\ PLI TOCAsm DA 5-Railroad South 18 ores This page intentionally left blank. PLC I Lithium Hydroxide Conversion Plant—Stormwater Calculations ��� Appendix F—NOAA Rainfall Data Appendix F — NOAA Rainfall Data PLC I Lithium Hydroxide Conversion Plant—Stormwater Calculations Appendix F—NOAA Rainfall Data This page intentionally left blank. NOAA Atlas 14,Volume 2,Version 3 ' Location name:Crouse,North Carolina,USA* Latitude:35.3949*, Longitude: -81.32140 Elevation: 809.16 ft** source:ESRI Maps m y� **source:USGS POINT PRECIPITATION FREQUENCY ESTIMATES G.M.Bonnin,D.Martin,B.Lin,T.Parzybok,M.Yekta,and D.Riley NOAA,National Weather Service,Silver Spring,Maryland PF tabular I PF graphical I Maps & aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches/hourp Average recurrence interval(years) Duration 1� 100 ���� 2 5 10 25 50 200 500 1000 5-min 4.70 1 5.57 6.55 7.28 8.18 F 8.84 9.49 10.1 10.9 11.5 (4.32-5.14) 1 (5.11-6.08) 1 (6.00-7.15) (6.65-7.94) (7.43-8.93) 1 (7.98-9.65) (8.51-10.4) 1 (8.99-11.1) 1 (9.56-12.0) 1 (9.97-12.7) 10-min 3.76 4.46 5.25 5.83 6.53 7.04 7.54 -----IF8.60 9.03 (3.46-4.10) 11 (4.09-4.87) 1 (4.80-5.73) (5.32-6.35) (5.92-7.12) 11 (6.35-7.69) (6.76-8.24) 1 (7.13-8.77) 1 (7.56-9.46) 1 (7.85-9.98) 15-min 3.13 3.74 4.42 4.92 5.52 5.95 6.35 6.74 7.22 7.56 (2.88-3.42) (3.43-4.08) 1 (4.05-4.83) 1 (4.48-5.36) 1 (5.00-6.01) 1 (5.36-6.49) 1 (5.70-6.94) 11 (6.00-7.38) 1 (6.34-7.94) 11 (6.57-8.35) 30-min 2.15 2.58 3.14 3.56 4.08 4.48 4.87 5.24 5.74 6.12 (1.97-2.34) (2.37-2.82) 1 (2.88-3.43) 1 (3.25-3.88) 1 (3.71-4.45) 1 (4.04-4.89) 1 (4.36-5.31) 1 (4.67-5.74) 1 (5.05-6.32) 1 (5.32-6.76) 60-min 1.34 1.62 2.02 2.32 2.72 3.03 3.35 3.68 4.12 4.47 (1.23-1.46) 1 (1.49-1.77) 1 (1.84-2.20) 1 (2.12-2.53) 1 (2.47-2.96) 1 (2.74-3.31) (3.01-3.66) (3.27-4.03) (3.62-4.53) 11 (3.88-4.94) 2-hr 0.780 0.946 1.19 1.37 1.63 1.84 2.05 2.27 2.58 2.84 (0.714-0.854) (0.866-1.04) 1 (1.08-1.30) 1 (1.25-1.50) 1 (1.48-1.78) 1 (1.65-2.01) 1 (1.83-2.25) (2.02-2.50) (2.26-2.85) (2.45-3.15) 3-hr 0.555 0.671 0.844 0.982 1.18 1.34 ( 1.51 1.69 1.95 2.16 (0.508-0.611) (0.614-0.739) (0.770-0.929) (0.892-1.08) (1.06-1.29) (1.20-1.47) 1.34-1.66) (1.49-1.86) 1 (1.68-2.16) 1 (1.85-2.41) 6-hr 0.342 0.411 0.515 0.599 0.718 0.817 0.921 1.03 1.20 1.33 (0.314-0.373) (0.378-0.451) (0.472-0.564) (0.547-0.654) (0.651-0.784) (0.736-0.892)1(0.822-1.01) (0.913-1.13) 1 (1.04-1.32) 1 (1.14-1.47) 12-hr 0.206 0.248 0.311 0.362 0.433 0.492 0.554 0.620 0.715 0.794 (0.190-0.224) (0.229-0.271) (0.286-0.339) (0.331-0.394) (0.394-0.471) (0.444-0.535) (0.496-0.602) (0.549-0.675) (0.624-0.780) (0.683-0.868) 24-hr 0.124 0.150 0.188 0.219 0.260 0.294 0.328 0.364 0.413 0.453 (0.115-0.133) (0.140-0.161) (0.175-0.202) (0.203-0.235) (0.241-0.279) (0.271-0.315) (0.302-0.352) (0.333-0.391) (0.377-0.444) (0.411-0.487) 2-day 0.073 0.088 ) ( 0.111 0.128 0.152 ) ( 0.171 ) 0.190 ) 0.210 0.238 0.260 (0.068-0.079) (0.082-0.095 0.103-0.119) (0.119-0.137) (0.140-0.163 0.157-0.183 (0.175-0.204 (0.193-0.226) (0.217-0.256) (0.236-0.280) 3-day 0.052 0.062 0.078 0.089 0.106 0.119 0.132 IF 0.146 F 0.164 F 0.1 99 (0.048-0.056) (0.058-0.067) (0.072-0.083) (0.083-0.096) (0.098-0.113) (0.110-0.127) (0.121-0.141) (0.134-0.156) (0.150-0.177) (0.163-0.193) 4-day 0.041 0.049 0.061 0.070 0.083 0.093 0.103 0.113 0.128 0.139 (0.038-0.044) (0.046-0.053) (0.057-0.065) (0.065-0.075) (0.077-0.089) (0.086-0.099) (0.095-0.110) (0.104-0.121) (0.117-0.137) (0.127-0.149) 7-day 0.027 0.033 0.040 0.045 0.053 0.059 0.065 F 0.072 70.080 F 0.087 (0.026-0.029) (0.030-0.035) (0.037-0.042) (0.042-0.048) (0.049-0.056) (0.055-0.063) (0.061-0.069) (0.066-0.076) (0.074-0.086) (0.080-0.093) 10-day 0.022 0.026 0.031 0.035 0.041 0.045 0.049 IF 0.054 F 0.060 F 0.0 44 (0.021-0.023) (0.024-0.027) (0.029-0.033) (0.033-0.037) (0.038-0.043) (0.042-0.048) (0.046-0.052) (0.050-0.057) (0.055-0.063) (0.059-0.068) 20-day 0.015 0.017 0.020 0.023 0.026 0.029 0.031 0.034 0.037 0.040 (0.014-0.015) (0.016-0.018) (0.019-0.021) (0.021-0.024) (0.024-0.027) (0.027-0.030) (0.029-0.033) (0.032-0.036) (0.035-0.039) (0.037-0.042) F��d:a:y] 0.012 0.014 0.016 0.018 0.020 0.022 0.024 0.025 0.028 0.029 (0.011-0.012) (0.013-0.015) (0.015-0.017) (0.017-0.019) (0.019-0.021) (0.021-0.023) (0.022-0.025) (0.024-0.027) (0.026-0.029) (0.028-0.031) --[45-day 0.010 0.012 0.013 0.015 0.016 0.017 0.019 0.020 0.021 0.022 (0.010-0.010) (0.011-0.012) (0.013-0.014) (0.014-0.015) (0.015-0.017) (0.017-0.018) (0.018-0.019) (0.019-0.021) (0.020-0.022) (0.021-0.024) �-day 0.009 0.010 0.012 0.013 0.014 0.015 0.016 0.017 0.018 0.019 (0.009-0.009) (0.010-0.011) (0.011-0.012) (0.012-0.013) (0.013-0.015) (0.014-0.016) (0.015-0.017) (0.016-0.018) (0.017-0.019) (0.018-0.020) Precipitation frequency(PF)estimates in this table are based on frequency analysis of partial duration series(PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90%confidence interval.The probability that precipitation frequency estimates(for a given duration and average recurrence interval)will be greater than the upper bound(or less than the lower bound)is 5%.Estimates at upper bounds are not checked against probable maximum precipitation(PMP)estimates and may be higher than currently valid PIMP values. Please refer to NOAA Atlas 14 document for more information. Back to Top PF graphical PDS-based intensity-duration-frequency (IDF) curves Latitude: 35.39491, Longitude: -31.32141 100-000 Average recurrence Ynlerval 10-000 '....:.....:.... ... --- (years) L 2 1.000 -------- ........ .......... --- — 5 di C 1Q G 25 i �2 0.100 ------- _--------- +� 50 V a 2Qd 0.010 _____ ______________________ ___ — 500 - 10UU 0-001 L L L L L rp rq r4 M r4 r4 rp r9 r4 o o o A A 46 H A4 � a o o �o ,4 ,4 m w H N rn v Ln Duration 100-000 10-000 ................................................. .... Duration ZI 1-000 ..... .... .... ....................... ................. — "in — 2-day 76-min — 3-day C I5-min — 4-day }°- 0-100 . ........ ..... . ---- ...... ----.. — 30�-min — 7-day — 60-min — 10-eay — 2-nr — 2D-clay a0-010 :. :_._._.._.: ---- - — 3-hr — 3OL--day — 6-hr — 45-day — 12-hr — 6o-eay 0-001 — 24-hr 1 2 5 10 25 50 100 200 500 1000 Average recurrence interval (years) NDAAAtlas 14,Volume 2,Version 3 Created{GMTY Tue May 31 19:17:12 2022 Back to Top Maps & aerials Small scale terrain .8 ",at Crouse rous clierryvillE 3km .Large scale terrain KingS13011' Bristol Johnson city* Dul Greensboro L 1A NORTH C A P,0 L I N A Charlotte 'Greenville ` 100krn OUTH CAROLINA Large scale map B11A.-I Johnson City Winston-Salem Greensbou Ash Fie North Carolina arlotte 100krn M1 Large scale aerial _KingsWrt Bri sti J. i Greensboro Durh AsheyiLle North Ue 'LK&iotte I - 700km 60mi Back to Top US Department of Commerce National Oceanic and Atmospheric Administration National Weather Service National Water Center 1325 East West Highway Silver Spring,MD 20910 Questions?:HDSC.Questions@noaa.gov Disclaimer PLC I Lithium Hydroxide Conversion Plant—Stormwater Calculations ��� Appendix G—Sediment Basin Calculations Appendix G — Sediment Basin Calculations PLC I Lithium Hydroxide Conversion Plant—Stormwater Calculations Appendix G—Sediment Basin Calculations This page intentionally left blank. RISER SEDIMENT BASIN CALCULATIONS Lithium Hydroxide Conversion Plant HDR PROJECT NO.: 10302238 DATE: 08.27.2021 BY: AKL REVISED: 05.31.2022 RVW: VH Riser Sediment Basin: SB-201 Drainage Area Characteristics Required Storage Volume Total drainage area(TDA)1 11.16 ac 10 Yr Peak Flow(Q10) 48.61 cfs Disturbed area(DA) 8.90 ac 25 Yr Peak Flow(Q25) 54.77 cfs Rational Coefficient(C)2 0.60 Req'd Min.Surface Area (435 sf per cfs of Q25)5 23,826 sf Time of Concentration(TC)3 5.0 min Req'd Min.Storage Volume (1800 cf per ac of TDA)5 20,088 cf 10 Yr Storm Rainfall Intensity(i)4 7.3 in/hr 25 Yr Storm Rainfall Intensity(i)4 8.2 in/hr Design Criteria Basin Size Bottom Elevation 833.00 msl Elev.(msl) Depth(ft) Area(sf) Cumulative Volume(cf) Depth of Storage Volume 2.50 ft 833.00 0.00 20,173 0 Depth of Flow over Riser(1 ft min)5 1.00 ft 834.00 1.00 22,098 21,128 Depth of Flow over Emergency Spillway 0.50 ft 834.25 1.25 22,588 26,714 25 Yr Storm Freeboard(1 ft req'd)5 1.00 ft 835.00 2.00 24,079 44,211 835.50 2.50 25,091 56,503 Basin Configuration 836.00 3.00 26,116 69,304 Bottom Elevation 833.00 msl 836.50 3.50 27,157 82,621 Sediment Storage Elevation 835.50 msl 837.00 4.00 28,211 96,462 Riser Crest 835.50 msl 838.00 5.00 30,362 125,742 Emergency Spillway Crest 836.50 msl Top of Berm 838.00 msl Skimmer Outlet Basin Size Check Desired Skimmer Drawdown Time(td)6 72 hrs Basin Surface Area Provided at Spillway Crest 25,091 sf Desired Skimmer Drawdown Rate(Qd) 6,696 ft3/day Basin Storage Volume Provided Below Spillway Crest 56,503 cf Skimmer Size 5.0 in Head on Orifice(H)5 0.333 ft Calculated Orifice Diameter' 2.241 in Actual Orifice Diameter' 2.250 in Actual Skimmer Drawdown Time' 71 hrs Riser Structure Riser Inside Dimension(square) 6 ft Riser Flow as Weir13 62.00 cfs Barrel Diameter' DOUBLE 30 in Riser Flow as Orifice14 120.37 cfs Barrel Invert Elevation 832.50 msl Barrel Length 70.00 ft Barrel Flow as Orifice14 78.39 cfs Barrel Manning's N10 0.025 Barrel Flow as Pipe15 62.37 cfs Sharp Crested Weir Coefficient(C)11 3.1 Orifice Coefficient(C)12 0.6 Controlling Flow through Riser and Barrel Spillway 62.00 cfs Emergency Spillway Design Minimum Allowable Spillway Length16 20 ft Difference b/n 25 Yr Peak Flow and Riser/Barrel Flow -7.23 cfs Broad Crested Weir Coefficient(C)17 2.80 Ell Design Spillway Length13 20 ft Riser Concrete Anchor Design Length of Exposed Outlet Pipe 10 ft Buoyancy18 13770 Ibs Concrete Anchor Width 8.0 ft Weight of Concrete Anchor 18560 Ibs Concrete Anchor Length 8.0 ft Concrete Anchor Thickness 2.00 ft Safety Factor19 1.3 Notes 1.See attached drainage area map. 2.Entire area is denuded.Conservative rational coefficient for smooth bare packed soil is 0.60. Page 1 of 51 RISER SEDIMENT BASIN CALCULATIONS Lithium Hydroxide Conversion Plant HDR PROJECT NO.: 10302238 DATE: 08.27.2021 BY: AKL REVISED: 05.31.2022 RVW: VH 3.Time of concentration was assumed to be the minimum of 5 minutes. 4.Rainfall intensity at project location was acquired from the NOAA website,hftp://hdsc.nws.noaa.gov/hdsc/pfds/pfds_map_cont.html. 5.From Section 6.61-Sediment Basin of the NCDEQ Erosion and Sediment Control Planning and Design Manual. 6.Basin is required to be dewatered by the skimmer in 48 to 120 hours.The optimal dewatering time is 72 hours(see note 5). 7.Skimmer orifice equatic I D= V Qa/(2370*V H) (inches) (see note 5) 8.Actual skimmer orifice diameter is rounded to the nearest 1/4 inch. 9.Riser cross-sectional area is required to be more than 1.5 times the barrel cross-sectional area. 10.Use 0.025 for CMP and 0.013 for RCP. 11.3.1 for sharp-crested wiers. 12.0.6 for sharp-edged orifice. 13.Weir equation: Q= CLH's (see note 11) 14.Orifice equation: Q=CA(2gH)R5 (see note 12) 15.Pipe Flow equation: 2gh O5 *See Section 8.07-Sediment Basin Design of the NCDEQ Erosion and Sediment Control Q=a [1+Km+K,L 16.Minimum allowable emergency spillway length is 20 feet(see note 5). 17.2.80 is the maximum allowable coefficient per Section 8.07-Sediment Basin Design of the NCDEQ Erosion and Sediment Control Planning and Design Manual. 18.Weight of water displaced by riser and exposed outlet pipe. 19.Minimum safety factor is 1.25,exceeding requirements of Section 8.07-Sediment Basin Design of the NCDEQ Erosion and Sediment Control Planning and Design Mar Page 2 of 51 RISER SEDIMENT BASIN CALCULATIONS Lithium Hydroxide Conversion Plant HDR PROJECT NO.: 10302238 DATE: 08.27.2021 BY: AKL REVISED: 05.31.2022 RVW: VH Riser Sediment Basin: SB-202 Drainage Area Characteristics Required Storage Volume Total drainage area(TDA)1 5.65 ac 10 Yr Peak Flow(Q10) 24.61 cfs Disturbed area(DA) 5.79 ac 25 Yr Peak Flow(Q25) 27.73 cfs Rational Coefficient(C)2 0.60 Req'd Min.Surface Area (435 sf per cfs of Q25)5 12,063 sf Time of Concentration(TC)3 5.0 min Req'd Min.Storage Volume (1800 cf per ac of TDA)5 10,170 cf 10 Yr Storm Rainfall Intensity(i)4 7.3 in/hr 25 Yr Storm Rainfall Intensity(i)4 8.2 in/hr Design Criteria Basin Size Bottom Elevation 825.00 msl Elev.(msl) Depth(ft) Area(sf) Cumulative Volume(cf) Depth of Storage Volume 2.50 ft 825.00 0.00 9,393 0 Depth of Flow over Riser(1 ft min)5 1.00 ft 826.00 1.00 11,000 10,186 Depth of Flow over Emergency Spillway 0.50 ft 826.25 1.25 11,411 12,987 25 Yr Storm Freeboard(1 ft req'd)5 1.00 ft 827.00 2.00 12,665 22,012 827.50 2.50 13,518 28,556 Basin Configuration 828.00 3.00 14,386 35,531 Bottom Elevation 825.00 msl 828.50 3.50 15,267 42,943 Sediment Storage Elevation 827.50 msl 829.00 4.00 16,162 50,799 Riser Crest 827.50 msl 830.00 5.00 17,996 67,870 Emergency Spillway Crest 828.50 msl Top of Berm 830.00 msl Skimmer Outlet Basin Size Check Desired Skimmer Drawdown Time(td)6 72 hrs Basin Surface Area Provided at Spillway Crest 13,518 sf Desired Skimmer Drawdown Rate(Qd) 3,390 ft3/day Basin Storage Volume Provided Below Spillway Crest 28,556 cf Skimmer Size 8.0 in Head on Orifice(H)5 0.500 ft Calculated Orifice Diameter' 1.441 in Actual Orifice Diameter' 1.500 in Actual Skimmer Drawdown Time' 66 hrs Riser Structure Riser Inside Dimension(square) 4 ft Riser Flow as Weir13 37.20 cfs Barrel Diameter' DOUBLE 24 in Riser Flow as Orifice14 43.33 cfs Barrel Invert Elevation 824.50 msl Barrel Length 50.00 ft Barrel Flow as Orifice14 52.40 cfs Barrel Manning's N10 0.025 Barrel Flow as Pipe15 42.13 cfs Sharp Crested Weir Coefficient(C)11 3.1 Orifice Coefficient(C)12 0.6 Controlling Flow through Riser and Barrel Spillway 37.20 cfs Emergency Spillway Design Minimum Allowable Spillway Length16 20 ft Difference b/n 25 Yr Peak Flow and Riser/Barrel Flow -9.47 cfs Broad Crested Weir Coefficient(C)17 2.80 Ell Design Spillway Length" 20 ft Riser Concrete Anchor Design Length of Exposed Outlet Pipe 10 ft Buoyancy18 7821 Ibs Concrete Anchor Width 7.0 ft Weight of Concrete Anchor 10658 Ibs Concrete Anchor Length 7.0 ft Concrete Anchor Thickness 1.50 ft Safety Factor19 1.4 Notes 1.See attached drainage area map. 2.Entire area is denuded.Conservative rational coefficient for smooth bare packed soil is 0.60. Page 3 of 51 RISER SEDIMENT BASIN CALCULATIONS Lithium Hydroxide Conversion Plant HDR PROJECT NO.: 10302238 DATE: 08.27.2021 BY: AKL REVISED: 05.31.2022 RVW: VH 3.Time of concentration was assumed to be the minimum of 5 minutes. 4.Rainfall intensity at project location was acquired from the NOAA website,hftp://hdsc.nws.noaa.gov/hdsc/pfds/pfds_map_cont.html. 5.From Section 6.61-Sediment Basin of the NCDEQ Erosion and Sediment Control Planning and Design Manual. 6.Basin is required to be dewatered by the skimmer in 48 to 120 hours.The optimal dewatering time is 72 hours(see note 5). 7.Skimmer orifice equatic I D= V Qa/(2370*V H) (inches) (see note 5) 8.Actual skimmer orifice diameter is rounded to the nearest 1/4 inch. 9.Riser cross-sectional area is required to be more than 1.5 times the barrel cross-sectional area. 10.Use 0.025 for CMP and 0.013 for RCP. 11.3.1 for sharp-crested wiers. 12.0.6 for sharp-edged orifice. 13.Weir equation: Q= CLH's (see note 11) 14.Orifice equation: Q=CA(2gH)R5 (see note 12) 15.Pipe Flow equation: 2gh O5 *See Q=a [1+Km+KPL 16.Minimum allowable emergency spillway length is 20 feet(see note 5). 17.2.80 is the maximum allowable coefficient per Section 8.07-Sediment Basin Design of the NCDEQ Erosion and Sediment Control Planning and Design Manual. 18.Weight of water displaced by riser and exposed outlet pipe. 19.Minimum safety factor is 1.25,exceeding requirements of Section 8.07-Sediment Basin Design of the NCDEQ Erosion and Sediment Control Planning and Design Mar Page 4 of 51 RISER SEDIMENT BASIN CALCULATIONS Lithium Hydroxide Conversion Plant HDR PROJECT NO.: 10302238 DATE: 08.27.2021 BY: AKL REVISED: 05.31.2022 RVW: VH Riser Sediment Basin: SB-203 Drainage Area Characteristics Required Storage Volume Total drainage area(TDA)1 3.93 ac 10 Yr Peak Flow(Q10) 17.12 cfs Disturbed area(DA) 3.93 ac 25 Yr Peak Flow(Q25) 19.29 cfs Rational Coefficient(C)2 0.60 Req'd Min.Surface Area (435 sf per cfs of Q25)5 8,390 sf Time of Concentration(TC)3 5.0 min Req'd Min.Storage Volume (1800 cf per ac of TDA)5 7,074 cf 10 Yr Storm Rainfall Intensity i 4 7.3 in/hr 25 Yr Storm Rainfall Intensity(i)4 8.2 in/hr Design Criteria Basin Size Bottom Elevation 808.00 msl Elev.(msl) Depth(ft) Area(sf) Cumulative Volume(cf) Depth of Storage Volume 2.50 ft 808.00 0.00 5,857 0 Depth of Flow over Riser(1 ft min)5 1.00 ft 809.00 1.00 7,118 6,477 Depth of Flow over Emergency Spillway 0.50 ft 809.25 1.25 7,442 8,297 25 Yr Storm Freeboard(1 ft req'd)5 1.00 ft 810.00 2.00 8,435 14,247 810.50 2.50 9,115 18,634 Basin Configuration 811.00 3.00 9,809 23,363 Bottom Elevation 808.00 msl 811.50 3.50 10,517 28,444 Sediment Storage Elevation 810.50 msl 812.00 4.00 11,239 33,882 Riser Crest 810.50 msl 813.00 5.00 12,726 45,857 Emergency Spillway Crest 811.50 msl Top of Berm 813.00 msl Skimmer Outlet Basin Size Check Desired Skimmer Drawdown Time(td)6 72 hrs Basin Surface Area Provided at Spillway Crest 9,115 sf Desired Skimmer Drawdown Rate(Qd) 2,358 ft'/day Basin Storage Volume Provided Below Spillway Crest 18,634 cf Skimmer Size 6.0 in Head on Orifice(H)5 0.417 ft Calculated Orifice Diameter' 1.257 in Actual Orifice Diameter' 1.250 in Actual Skimmer Drawdown Time' 73 hrs Riser Structure Riser Inside Dimension(square) 4 ft Riser Flow as Weir13 37.20 cfs Barrel Diameter' 24 in Riser Flow as Orifice14 43.33 cfs Barrel Invert Elevation 807.80 msl Barrel Length 50.00 ft Barrel Flow as Orifice14 24.86 cfs Barrel Manning's N10 0.025 Barrel Flow as Pipe15 19.99 cfs Sharp Crested Weir Coefficient(C)11 3.1 Orifice Coefficient(C)12 0.6 Controlling Flow through Riser and Barrel Spillway 19.99 cfs Emergency Spillway Design Minimum Allowable Spillway Length16 20 ft Difference b/n 25 Yr Peak Flow and Riser/Barrel Flow -0.70 cfs Broad Crested Weir Coefficient(C)17 2.80 Ell Design Spillway Length13 20 ft Riser Concrete Anchor Design Length of Exposed Outlet Pipe 10 ft Buoyancy18 5860 Ibs Concrete Anchor Width 6.0 ft Weight of Concrete Anchor 7830 Ibs Concrete Anchor Length 6.0 ft Concrete Anchor Thickness 1.50 ft Safety Factor19 1.3 Notes 1.See attached drainage area map. 2.Entire area is denuded.Conservative rational coefficient for smooth bare packed soil is 0.60. Page 5 of 51 RISER SEDIMENT BASIN CALCULATIONS Lithium Hydroxide Conversion Plant HDR PROJECT NO.: 10302238 DATE: 08.27.2021 BY: AKL REVISED: 05.31.2022 RVW: VH 3.Time of concentration was assumed to be the minimum of 5 minutes. 4.Rainfall intensity at project location was acquired from the NOAA website,hftp://hdsc.nws.noaa.gov/hdsc/pfds/pfds_map_cont.html. 5.From Section 6.61-Sediment Basin of the NCDEQ Erosion and Sediment Control Planning and Design Manual. 6.Basin is required to be dewatered by the skimmer in 48 to 120 hours.The optimal dewatering time is 72 hours(see note 5). 7.Skimmer orifice equatic I D= V Qa/(2370*V H) (inches) (see note 5) 8.Actual skimmer orifice diameter is rounded to the nearest 1/4 inch. 9.Riser cross-sectional area is required to be more than 1.5 times the barrel cross-sectional area. 10.Use 0.025 for CMP and 0.013 for RCP. 11.3.1 for sharp-crested wiers. 12.0.6 for sharp-edged orifice. 13.Weir equation: Q= CLH's (see note 11) 14.Orifice equation: Q=CA(2gH)R5 (see note 12) 15.Pipe Flow equation: 2gh O5 *See Q=a [1+Km+KPL 16.Minimum allowable emergency spillway length is 20 feet(see note 5). 17.2.80 is the maximum allowable coefficient per Section 8.07-Sediment Basin Design of the NCDEQ Erosion and Sediment Control Planning and Design Manual. 18.Weight of water displaced by riser and exposed outlet pipe. 19.Minimum safety factor is 1.25,exceeding requirements of Section 8.07-Sediment Basin Design of the NCDEQ Erosion and Sediment Control Planning and Design Mar Page 6 of 51 RISER SEDIMENT BASIN CALCULATIONS Lithium Hydroxide Conversion Plant HDR PROJECT NO.: 10302238 DATE: 08.27.2021 BY: AKL REVISED: 05.31.2022 RVW: VH Riser Sediment Basin: SB-204 Drainage Area Characteristics Required Storage Volume Total drainage area(TDA)1 8.00 ac 10 Yr Peak Flow(Q10) 34.85 cfs Disturbed area(DA) 8.00 ac 25 Yr Peak Flow(Q25) 39.26 cfs Rational Coefficient(C)2 0.60 Req'd Min.Surface Area (435 sf per cfs of Q25)5 17,080 sf Time of Concentration(TC)3 5.0 min Req'd Min.Storage Volume (1800 cf per ac of TDA)5 14,400 cf 10 Yr Storm Rainfall Intensity(i)4 7.3 in/hr 25 Yr Storm Rainfall Intensity(i)4 8.2 in/hr Design Criteria Basin Size Bottom Elevation 813.00 msl Elev.(msl) Depth(ft) Area(sf) Cumulative Volume(cf) Depth of Storage Volume 2.50 ft 813.00 0.00 12,899 0 Depth of Flow over Riser(1 ft min)5 1.00 ft 814.00 1.00 14,609 13,745 Depth of Flow over Emergency Spillway 0.50 ft 814.25 1.25 15,045 17,452 25 Yr Storm Freeboard(1 ft req'd)5 1.00 ft 815.00 2.00 16,375 29,231 815.50 2.50 17,279 37,643 Basin Configuration 816.00 3.00 18,198 46,511 Bottom Elevation 813.00 msl 816.50 3.50 19,130 55,843 Sediment Storage Elevation 815.50 msl 817.00 4.00 20,007 65,626 Riser Crest 815.50 msl 818.00 5.00 22,013 86,628 Emergency Spillway Crest 816.50 msl Top of Berm 818.00 msl Skimmer Outlet Basin Size Check Desired Skimmer Drawdown Time(td)6 72 hrs Basin Surface Area Provided at Spillway Crest 17,279 sf Desired Skimmer Drawdown Rate(Qd) 4,800 ft3/day 113asin Storage Volume Provided Below Spillway Crest 37,643 cf Skimmer Size 6.0 in Head on Orifice(H)5 0.417 ft Calculated Orifice Diameter' 1.794 in Actual Orifice Diameter' 1.750 in Actual Skimmer Drawdown Time' 76 hrs Riser Structure Riser Inside Dimension(square) 4 ft Riser Flow as Weir13 37.20 cfs Barrel Diameter' DOUBLE 24 in Riser Flow as Orifice14 43.33 cfs Barrel Invert Elevation 812.50 msl Barrel Length 50.00 ft Barrel Flow as Orifice14 52.40 cfs Barrel Manning's N10 0.025 Barrel Flow as Pipe15 42.13 cfs Sharp Crested Weir Coefficient(C)11 3.1 Orifice Coefficient(C)12 0.6 Controlling Flow through Riser and Barrel Spillway 37.20 cfs Emergency Spillway Design Minimum Allowable Spillway Length16 20 ft Difference b/n 25 Yr Peak Flow and Riser/Barrel Flow 2.06 cfs Broad Crested Weir Coefficient(C)17 2.80 Ell Design Spillway Length" 20 ft Riser Concrete Anchor Design Length of Exposed Outlet Pipe 10 ft Buoyancy18 7821 Ibs Concrete Anchor Width 7.0 ft Weight of Concrete Anchor 10658 Ibs Concrete Anchor Length 7.0 ft Concrete Anchor Thickness 1.50 ft Safety Factor19 1.4 Notes 1.See attached drainage area map. 2.Entire area is denuded.Conservative rational coefficient for smooth bare packed soil is 0.60. Page 7 of 51 RISER SEDIMENT BASIN CALCULATIONS Lithium Hydroxide Conversion Plant HDR PROJECT NO.: 10302238 DATE: 08.27.2021 BY: AKL REVISED: 05.31.2022 RVW: VH 3.Time of concentration was assumed to be the minimum of 5 minutes. 4.Rainfall intensity at project location was acquired from the NOAA website,hftp://hdsc.nws.noaa.gov/hdsc/pfds/pfds_map_cont.html. 5.From Section 6.61-Sediment Basin of the NCDEQ Erosion and Sediment Control Planning and Design Manual. 6.Basin is required to be dewatered by the skimmer in 48 to 120 hours.The optimal dewatering time is 72 hours(see note 5). 7.Skimmer orifice equatic I D= V Qa/(2370*V H) (inches) (see note 5) 8.Actual skimmer orifice diameter is rounded to the nearest 1/4 inch. 9.Riser cross-sectional area is required to be more than 1.5 times the barrel cross-sectional area. 10.Use 0.025 for CMP and 0.013 for RCP. 11.3.1 for sharp-crested wiers. 12.0.6 for sharp-edged orifice. 13.Weir equation: Q= CLH's (see note 11) 14.Orifice equation: Q=CA(2gH)R5 (see note 12) 15.Pipe Flow equation: 2gh O5 *See Q=a [1+Km+KPL 16.Minimum allowable emergency spillway length is 20 feet(see note 5). 17.2.80 is the maximum allowable coefficient per Section 8.07-Sediment Basin Design of the NCDEQ Erosion and Sediment Control Planning and Design Manual. 18.Weight of water displaced by riser and exposed outlet pipe. 19.Minimum safety factor is 1.25,exceeding requirements of Section 8.07-Sediment Basin Design of the NCDEQ Erosion and Sediment Control Planning and Design Mar Page 8 of 51 RISER SEDIMENT BASIN CALCULATIONS Lithium Hydroxide Conversion Plant HDR PROJECT NO.: 10302238 DATE: 08.27.2021 BY: AKL REVISED: 05.31.2022 RVW: VH Riser Sediment Basin: SB-205 Drainage Area Characteristics Required Storage Volume Total drainage area(TDA)1 4.50 ac 10 Yr Peak Flow(Q10) 19.60 cfs Disturbed area(DA) 4.50 ac 25 Yr Peak Flow(Q25) 22.09 cfs Rational Coefficient(C)2 0.60 Req'd Min.Surface Area (435 sf per cfs of Q25)5 9,607 sf Time of Concentration(TC)3 5.0 min Req'd Min.Storage Volume (1800 cf per ac of TDA)5 8,100 cf 10 Yr Storm Rainfall Intensity i 4 7.3 in/hr 25 Yr Storm Rainfall Intensity(i)4 8.2 in/hr Design Criteria Basin Size Bottom Elevation 828.00 msl Elev.(msl) Depth(ft) Area(sf) Cumulative Volume(cf) Depth of Storage Volume 1.80 ft 828.00 0.00 8,809 0 Depth of Flow over Riser(1 ft min)5 1.00 ft 828.90 0.90 10,182 8,538 Depth of Flow over Emergency Spillway 0.20 ft 829.00 1.00 10,387 9,567 25 Yr Storm Freeboard(1 ft req'd)5 1.00 ft 829.80 1.80 11,661 18,381 830.00 2.00 12,048 20,752 Basin Configuration 830.80 2.80 13,380 30,919 Bottom Elevation 828.00 msl 831.00 3.00 13,778 33,634 Sediment Storage Elevation 829.80 msl 832.00 4.00 15,576 48,302 Riser Crest 829.80 msl Emergency Spillway Crest 830.80 msl Top of Berm 832.00 msl Skimmer Outlet Basin Size Check Desired Skimmer Drawdown Time(td)6 72 hrs Basin Surface Area Provided at Spillway Crest 11,661 sf Desired Skimmer Drawdown Rate(Qd) 2,700 ft'/day Basin Storage Volume Provided Below Spillway Crest 18,381 cf Skimmer Size 5.0 in Head on Orifice(H)5 0.333 ft Calculated Orifice Diameter' 1.423 in Actual Orifice Diameter' 1.500 in Actual Skimmer Drawdown Time' 65 hrs Riser Structure Riser Inside Dimension(square) 4 ft Riser Flow as Weir13 37.20 cfs Barrel Diameter' 24 in Riser Flow as Orifice14 43.33 cfs Barrel Invert Elevation 826.80 msl Barrel Length 50.00 ft Barrel Flow as Orifice14 26.20 cfs Barrel Manning's N10 0.025 Barrel Flow as Pipe15 21.07 cfs Sharp Crested Weir Coefficient(C)11 3.1 Orifice Coefficient(C)12 0.6 Controlling Flow through Riser and Barrel Spillway 21.07 cfs Emergency Spillway Design Minimum Allowable Spillway Length16 20 ft Difference b/n 25 Yr Peak Flow and Riser/Barrel Flow 1.02 cfs Broad Crested Weir Coefficient(C)17 2.80 Ell Design Spillway Length13 20 ft Riser Concrete Anchor Design Length of Exposed Outlet Pipe 10 ft Buoyancy18 4768 Ibs Concrete Anchor Width 5.5 ft Weight of Concrete Anchor 6579 Ibs Concrete Anchor Length 5.5 ft Concrete Anchor Thickness 1.50 ft Safety Factor19 1.4 Notes 1.See attached drainage area map. 2.Entire area is denuded.Conservative rational coefficient for smooth bare packed soil is 0.60. Page 9 of 51 RISER SEDIMENT BASIN CALCULATIONS Lithium Hydroxide Conversion Plant HDR PROJECT NO.: 10302238 DATE: 08.27.2021 BY: AKL REVISED: 05.31.2022 RVW: VH 3.Time of concentration was assumed to be the minimum of 5 minutes. 4.Rainfall intensity at project location was acquired from the NOAA website,hftp://hdsc.nws.noaa.gov/hdsc/pfds/pfds_map_cont.html. 5.From Section 6.61-Sediment Basin of the NCDEQ Erosion and Sediment Control Planning and Design Manual. 6.Basin is required to be dewatered by the skimmer in 48 to 120 hours.The optimal dewatering time is 72 hours(see note 5). 7.Skimmer orifice equatic I D= V Qa/(2370*V H) (inches) (see note 5) 8.Actual skimmer orifice diameter is rounded to the nearest 1/4 inch. 9.Riser cross-sectional area is required to be more than 1.5 times the barrel cross-sectional area. 10.Use 0.025 for CMP and 0.013 for RCP. 11.3.1 for sharp-crested wiers. 12.0.6 for sharp-edged orifice. 13.Weir equation: Q= CLH's (see note 11) 14.Orifice equation: Q=CA(2gH)R5 (see note 12) 15.Pipe Flow equation: 2gh O5 *See Q=a [1+Km+KPL 16.Minimum allowable emergency spillway length is 20 feet(see note 5). 17.2.80 is the maximum allowable coefficient per Section 8.07-Sediment Basin Design of the NCDEQ Erosion and Sediment Control Planning and Design Manual. 18.Weight of water displaced by riser and exposed outlet pipe. 19.Minimum safety factor is 1.25,exceeding requirements of Section 8.07-Sediment Basin Design of the NCDEQ Erosion and Sediment Control Planning and Design Mar Page 10 of 51 RISER SEDIMENT BASIN CALCULATIONS Lithium Hydroxide Conversion Plant HDR PROJECT NO.: 10302238 DATE: 08.27.2021 BY: AKL REVISED: 05.31.2022 RVW: VH Riser Sediment Basin: SB-206 Drainage Area Characteristics Required Storage Volume Total drainage area(TDA)1 5.50 ac 10 Yr Peak Flow(Q10) 23.96 cfs Disturbed area(DA) 5.50 ac 25 Yr Peak Flow(Q25) 26.99 cfs Rational Coefficient(C)2 0.60 Req'd Min.Surface Area (435 sf per cfs of Q25)5 11,742 sf Time of Concentration(TC)3 5.0 min Req'd Min.Storage Volume (1800 cf per ac of TDA)5 9,900 cf 10 Yr Storm Rainfall Intensity i 4 7.3 in/hr 25 Yr Storm Rainfall Intensity(i)4 8.2 in/hr Design Criteria Basin Size Bottom Elevation 833.00 msl Elev.(msl) Depth(ft) Area(sf) Cumulative Volume(cf) Depth of Storage Volume 1.80 ft 833.00 0.00 10,804 0 Depth of Flow over Riser(1 ft min)5 1.00 ft 833.90 0.90 12,251 10,368 Depth of Flow over Emergency Spillway 0.20 ft 834.00 1.00 12,538 11,607 25 Yr Storm Freeboard(1 ft req'd)5 1.00 ft 834.80 1.80 13,893 22,175 835.00 2.00 14,357 25,000 Basin Configuration 835.80 2.80 15,785 37,052 Bottom Elevation 833.00 msl 836.00 3.00 16,253 40,256 Sediment Storage Elevation 834.80 msl 837.00 4.00 18,226 57,486 Riser Crest 834.80 msl Emergency Spillway Crest 835.80 msl Top of Berm 837.00 msl Skimmer Outlet Basin Size Check Desired Skimmer Drawdown Time(td)6 72 hrs Basin Surface Area Provided at Spillway Crest 13,893 sf Desired Skimmer Drawdown Rate(Qd) 3,300 ft3/day Basin Storage Volume Provided Below Spillway Crest 22,175 cf Skimmer Size 6.0 in Head on Orifice(H)5 0.417 ft Calculated Orifice Diameter' 1.487 in Actual Orifice Diameter' 1.500 in Actual Skimmer Drawdown Time' 71 hrs Riser Structure Riser Inside Dimension(square) 6 ft Riser Flow as Weir13 62.00 cfs Barrel Diameter' 36 in Riser Flow as Orifice14 120.37 cfs Barrel Invert Elevation 831.00 msl Barrel Length 50.00 ft Barrel Flow as Orifice14 61.83 cfs Barrel Manning's N10 0.025 Barrel Flow as Pipe15 56.41 cfs Sharp Crested Weir Coefficient(C)11 3.1 Orifice Coefficient(C)12 0.6 Controlling Flow through Riser and Barrel Spillway 56.41 cfs Emergency Spillway Design Minimum Allowable Spillway Length16 20 ft Difference b/n 25 Yr Peak Flow and Riser/Barrel Flow -29.41 cfs Broad Crested Weir Coefficient(C)17 2.80 Ell Design Spillway Length13 20 ft Riser Concrete Anchor Design Length of Exposed Outlet Pipe 10 ft Buoyancy18 9914 Ibs Concrete Anchor Width 7.5 ft Weight of Concrete Anchor 16313 Ibs Concrete Anchor Length 7.5 ft Concrete Anchor Thickness 2.00 ft Safety Factor19 1.6 Notes 1.See attached drainage area map. 2.Entire area is denuded.Conservative rational coefficient for smooth bare packed soil is 0.60. Page 11 of 51 RISER SEDIMENT BASIN CALCULATIONS Lithium Hydroxide Conversion Plant HDR PROJECT NO.: 10302238 DATE: 08.27.2021 BY: AKL REVISED: 05.31.2022 RVW: VH 3.Time of concentration was assumed to be the minimum of 5 minutes. 4.Rainfall intensity at project location was acquired from the NOAA website,hftp://hdsc.nws.noaa.gov/hdsc/pfds/pfds_map_cont.html. 5.From Section 6.61-Sediment Basin of the NCDEQ Erosion and Sediment Control Planning and Design Manual. 6.Basin is required to be dewatered by the skimmer in 48 to 120 hours.The optimal dewatering time is 72 hours(see note 5). 7.Skimmer orifice equatic I D= V Qa/(2370*V H) (inches) (see note 5) 8.Actual skimmer orifice diameter is rounded to the nearest 1/4 inch. 9.Riser cross-sectional area is required to be more than 1.5 times the barrel cross-sectional area. 10.Use 0.025 for CMP and 0.013 for RCP. 11.3.1 for sharp-crested wiers. 12.0.6 for sharp-edged orifice. 13.Weir equation: Q= CLH's (see note 11) 14.Orifice equation: Q=CA(2gH)R5 (see note 12) 15.Pipe Flow equation: 2gh O5 *See Q=a [1+Km+KPL 16.Minimum allowable emergency spillway length is 20 feet(see note 5). 17.2.80 is the maximum allowable coefficient per Section 8.07-Sediment Basin Design of the NCDEQ Erosion and Sediment Control Planning and Design Manual. 18.Weight of water displaced by riser and exposed outlet pipe. 19.Minimum safety factor is 1.25,exceeding requirements of Section 8.07-Sediment Basin Design of the NCDEQ Erosion and Sediment Control Planning and Design Mar Page 12 of 51 RISER SEDIMENT BASIN CALCULATIONS Lithium Hydroxide Conversion Plant HDR PROJECT NO.: 10302238 DATE: 08.27.2021 BY: AKL REVISED: 05.31.2022 RVW: VH Riser Sediment Basin: SB-207 Drainage Area Characteristics Required Storage Volume Total drainage area(TDA)1 5.79 ac 10 Yr Peak Flow(Q10) 25.22 cfs Disturbed area(DA) 5.79 ac 25 Yr Peak Flow(Q25) 28.42 cfs Rational Coefficient(C)2 0.60 Req'd Min.Surface Area (435 sf per cfs of Q25)5 12,362 sf Time of Concentration(TC)3 5.0 min Req'd Min.Storage Volume (1800 cf per ac of TDA)5 10,422 cf 10 Yr Storm Rainfall Intensity(i)4 7.3 in/hr 25 Yr Storm Rainfall Intensity(i)4 8.2 in/hr Design Criteria Basin Size Bottom Elevation 843.00 msl Elev.(msl) Depth(ft) Area(sf) Cumulative Volume(cf) Depth of Storage Volume 2.50 ft 843.00 0.00 10,116 0 Depth of Flow over Riser(1 ft min)5 1.00 ft 844.00 1.00 11,727 10,912 Depth of Flow over Emergency Spillway 0.50 ft 844.25 1.25 12,139 13,895 25 Yr Storm Freeboard(1 ft req'd)5 1.00 ft 845.00 2.00 13,395 23,466 845.50 2.50 14,250 30,376 Basin Configuration 846.00 3.00 15,119 37,717 Bottom Elevation 843.00 msl 846.50 3.50 16,003 45,497 Sediment Storage Elevation 845.50 msl 847.00 4.00 16,900 53,722 Riser Crest 845.50 msl 848.00 5.00 18,737 71,532 Emergency Spillway Crest 846.50 msl Top of Berm 848.00 msl Skimmer Outlet Basin Size Check Desired Skimmer Drawdown Time(td)6 72 hrs Basin Surface Area Provided at Spillway Crest 14,250 sf Desired Skimmer Drawdown Rate(Qd) 3,474 ft3/day Basin Storage Volume Provided Below Spillway Crest 30,376 cf Skimmer Size 8.0 in Head on Orifice(H)5 0.500 ft Calculated Orifice Diameter' 1.458 in Actual Orifice Diameter' 1.500 in Actual Skimmer Drawdown Time' 68 hrs Riser Structure Riser Inside Dimension(square) 4 ft Riser Flow as Weir13 37.20 cfs Barrel Diameter' 24 in Riser Flow as Orifice14 43.33 cfs Barrel Invert Elevation 841.20 msl Barrel Length 50.00 ft Barrel Flow as Orifice14 31.37 cfs Barrel Manning's N10 0.025 Barrel Flow as Pipe15 25.22 cfs Sharp Crested Weir Coefficient(C)11 3.1 Orifice Coefficient(C)12 0.6 Controlling Flow through Riser and Barrel Spillway 25.22 cfs Emergency Spillway Design Minimum Allowable Spillway Length16 20 ft Difference b/n 25 Yr Peak Flow and Riser/Barrel Flow 3.20 cfs Broad Crested Weir Coefficient(C)17 2.80 Ell Design Spillway Length" 20 ft Riser Concrete Anchor Design Length of Exposed Outlet Pipe 10 ft Buoyancy18 5860 Ibs Concrete Anchor Width 6.0 ft Weight of Concrete Anchor 7830 Ibs Concrete Anchor Length 6.0 ft Concrete Anchor Thickness 1.50 ft Safety Factor19 1.3 Notes 1.See attached drainage area map. 2.Entire area is denuded.Conservative rational coefficient for smooth bare packed soil is 0.60. Page 13 of 51 RISER SEDIMENT BASIN CALCULATIONS Lithium Hydroxide Conversion Plant HDR PROJECT NO.: 10302238 DATE: 08.27.2021 BY: AKL REVISED: 05.31.2022 RVW: VH 3.Time of concentration was assumed to be the minimum of 5 minutes. 4.Rainfall intensity at project location was acquired from the NOAA website,hftp://hdsc.nws.noaa.gov/hdsc/pfds/pfds_map_cont.html. 5.From Section 6.61-Sediment Basin of the NCDEQ Erosion and Sediment Control Planning and Design Manual. 6.Basin is required to be dewatered by the skimmer in 48 to 120 hours.The optimal dewatering time is 72 hours(see note 5). 7.Skimmer orifice equatic I D= V Qa/(2370*V H) (inches) (see note 5) 8.Actual skimmer orifice diameter is rounded to the nearest 1/4 inch. 9.Riser cross-sectional area is required to be more than 1.5 times the barrel cross-sectional area. 10.Use 0.025 for CMP and 0.013 for RCP. 11.3.1 for sharp-crested wiers. 12.0.6 for sharp-edged orifice. 13.Weir equation: Q= CLH's (see note 11) 14.Orifice equation: Q=CA(2gH)R5 (see note 12) 15.Pipe Flow equation: 2gh O5 *See Q=a [1+Km+KPL 16.Minimum allowable emergency spillway length is 20 feet(see note 5). 17.2.80 is the maximum allowable coefficient per Section 8.07-Sediment Basin Design of the NCDEQ Erosion and Sediment Control Planning and Design Manual. 18.Weight of water displaced by riser and exposed outlet pipe. 19.Minimum safety factor is 1.25,exceeding requirements of Section 8.07-Sediment Basin Design of the NCDEQ Erosion and Sediment Control Planning and Design Mar Page 14 of 51 RISER SEDIMENT BASIN CALCULATIONS Lithium Hydroxide Conversion Plant HDR PROJECT NO.: 10302238 DATE: 08.27.2021 BY: AKL REVISED: 05.31.2022 RVW: VH Riser Sediment Basin: Drainage Area Characteristics Required Storage Volume Total drainage area(TDA)1 5.65 ac 10 Yr Peak Flow(Q10) 24.61 cfs Disturbed area(DA) 5.50 ac 25 Yr Peak Flow(Q25) 27.73 cfs Rational Coefficient(C)2 0.60 Req'd Min.Surface Area (435 sf per cfs of Q25)5 12,063 sf Time of Concentration(TC)3 5.0 min Req'd Min.Storage Volume (1800 cf per ac of TDA)5 10,170 cf 10 Yr Storm Rainfall Intensity(i)4 7.3 in/hr 25 Yr Storm Rainfall Intensity(i)4 8.2 in/hr Design Criteria Basin Size Bottom Elevation 874.00 msl Elev.(msl) Depth(ft) Area(sf) Cumulative Volume(cf) Depth of Storage Volume 2.50 ft 874.00 0.00 9,033 0 Depth of Flow over Riser(1 ft min)5 1.00 ft 875.00 1.00 10,632 9,822 Depth of Flow over Emergency Spillway 0.50 ft 875.25 1.25 11,034 12,530 25 Yr Storm Freeboard(1 ft req'd)5 1.00 ft 876.00 2.00 12,665 21,410 876.50 2.50 13,155 27,864 Basin Configuration 877.00 3.00 14,061 34,667 Bottom Elevation 874.00 msl 877.50 3.50 14,964 41,922 Sediment Storage Elevation 876.50 msl 878.00 4.00 15,868 49,629 Riser Crest 876.50 msl 879.00 5.00 17,718 66,414 Emergency Spillway Crest 877.50 msl Top of Berm 879.00 msl Skimmer Outlet Basin Size Check Desired Skimmer Drawdown Time(td)6 72 hrs Basin Surface Area Provided at Spillway Crest 13,155 sf Desired Skimmer Drawdown Rate(Qd) 3,390 ft3/day Basin Storage Volume Provided Below Spillway Crest 27,864 cf Skimmer Size 8.0 in Head on Orifice(H)5 0.500 ft Calculated Orifice Diameter' 1.441 in Actual Orifice Diameter' 1.500 in Actual Skimmer Drawdown Time' 66 hrs Riser Structure Riser Inside Dimension(square) 6 ft Riser Flow as Weir13 62.00 cfs Barrel Diameter' DOUBLE 24 in Riser Flow as Orifice14 120.37 cfs Barrel Invert Elevation 873.50 msl Barrel Length 50.00 ft Barrel Flow as Orifice14 52.40 cfs Barrel Manning's N10 0.025 Barrel Flow as Pipe15 42.13 cfs Sharp Crested Weir Coefficient(C)11 3.1 Orifice Coefficient(C)12 0.6 Controlling Flow through Riser and Barrel Spillway 42.13 cfs Emergency Spillway Design Minimum Allowable Spillway Length16 20 ft Difference b/n 25 Yr Peak Flow and Riser/Barrel Flow -14.40 cfs Broad Crested Weir Coefficient(C)17 2.80 Ell Design Spillway Length" 20 ft Riser Concrete Anchor Design Length of Exposed Outlet Pipe 10 ft Buoyancy18 11565 Ibs Concrete Anchor Width 7.5 ft Weight of Concrete Anchor 16313 Ibs Concrete Anchor Length 7.5 ft Concrete Anchor Thickness 2.00 ft Safety Factor19 1.4 Notes 1.See attached drainage area map. 2.Entire area is denuded.Conservative rational coefficient for smooth bare packed soil is 0.60. Page 15 of 51 RISER SEDIMENT BASIN CALCULATIONS Lithium Hydroxide Conversion Plant HDR PROJECT NO.: 10302238 DATE: 08.27.2021 BY: AKL REVISED: 05.31.2022 RVW: VH 3.Time of concentration was assumed to be the minimum of 5 minutes. 4.Rainfall intensity at project location was acquired from the NOAA website,hftp://hdsc.nws.noaa.gov/hdsc/pfds/pfds_map_cont.html. 5.From Section 6.61-Sediment Basin of the NCDEQ Erosion and Sediment Control Planning and Design Manual. 6.Basin is required to be dewatered by the skimmer in 48 to 120 hours.The optimal dewatering time is 72 hours(see note 5). 7.Skimmer orifice equatic I D= V Qa/(2370*V H) (inches) (see note 5) 8.Actual skimmer orifice diameter is rounded to the nearest 1/4 inch. 9.Riser cross-sectional area is required to be more than 1.5 times the barrel cross-sectional area. 10.Use 0.025 for CMP and 0.013 for RCP. 11.3.1 for sharp-crested wiers. 12.0.6 for sharp-edged orifice. 13.Weir equation: Q= CLH's (see note 11) 14.Orifice equation: Q=CA(2gH)R5 (see note 12) 15.Pipe Flow equation: 2gh O5 *See Q=a [1+Km+KPL 16.Minimum allowable emergency spillway length is 20 feet(see note 5). 17.2.80 is the maximum allowable coefficient per Section 8.07-Sediment Basin Design of the NCDEQ Erosion and Sediment Control Planning and Design Manual. 18.Weight of water displaced by riser and exposed outlet pipe. 19.Minimum safety factor is 1.25,exceeding requirements of Section 8.07-Sediment Basin Design of the NCDEQ Erosion and Sediment Control Planning and Design Mar Page 16 of 51 RISER SEDIMENT BASIN CALCULATIONS Lithium Hydroxide Conversion Plant HDR PROJECT NO.: 10302238 DATE: 08.27.2021 BY: AKL REVISED: 05.31.2022 RVW: VH Riser Sediment Basin: SB-209-Phase 1 Drainage Area Characteristics Required Storage Volume Total drainage area(TDA)1 6.40 ac 10 Yr Peak Flow(Q10) 27.88 cfs Disturbed area(DA) 6.40 ac 25 Yr Peak Flow(Q25) 31.41 cfs Rational Coefficient(C)2 0.60 Req'd Min.Surface Area (435 sf per cfs of Q25)5 13,664 sf Time of Concentration(TC)3 5.0 min Req'd Min.Storage Volume (1800 cf per ac of TDA)5 11,520 cf 10 Yr Storm Rainfall Intensity(i)4 7.3 in/hr 25 Yr Storm Rainfall Intensity(i)4 8.2 in/hr Design Criteria Basin Size Bottom Elevation 824.00 msl Elev.(msl) Depth(ft) Area(sf) Cumulative Volume(cf) Depth of Storage Volume 1.50 ft 824.00 0.00 11,576 0 Depth of Flow over Riser(1 ft min)5 1.00 ft 824.75 0.75 12,743 9,116 Depth of Flow over Emergency Spillway 0.50 ft 825.00 1.00 13,138 12,351 25 Yr Storm Freeboard(1 ft req'd)5 1.00 ft 825.50 1.50 13,941 19,120 826.00 2.00 14,757 26,293 Basin Configuration 826.50 2.50 15,401 33,832 Bottom Elevation 824.00 msl 827.00 3.00 16,432 41,789 Sediment Storage Elevation 825.50 msl 828.00 4.00 18,164 59,080 Riser Crest 825.50 msl Emergency Spillway Crest 826.50 msl Top of Berm 828.00 msl Skimmer Outlet Basin Size Check Desired Skimmer Drawdown Time(td)6 72 hrs Basin Surface Area Provided at Spillway Crest 13,941 sf Desired Skimmer Drawdown Rate(Qd) 3,840 ft3/day Basin Storage Volume Provided Below Spillway Crest 19,120 cf Skimmer Size 8.0 in Head on Orifice(H)5 0.500 ft Calculated Orifice Diameter' 1.533 in Actual Orifice Diameter' 1.500 in Actual Skimmer Drawdown Time' 75 hrs Riser Structure Riser Inside Dimension(square) 6 ft Riser Flow as Weir13 62.00 cfs Barrel Diameter' 30 in Riser Flow as Orifice14 120.37 cfs Barrel Invert Elevation 822.00 msl Barrel Length 50.00 ft Barrel Flow as Orifice14 42.61 cfs Barrel Manning's N10 0.025 Barrel Flow as Pipe15 36.89 cfs Sharp Crested Weir Coefficient(C)11 3.1 Orifice Coefficient(C)12 0.6 Controlling Flow through Riser and Barrel Spillway 36.89 cfs Emergency Spillway Design Minimum Allowable Spillway Length16 20 ft Difference b/n 25 Yr Peak Flow and Riser/Barrel Flow -5.48 cfs Broad Crested Weir Coefficient(C)17 2.80 Ell Design Spillway Length" 20 ft Riser Concrete Anchor Design Length of Exposed Outlet Pipe 10 ft Buoyancy18 7649 Ibs Concrete Anchor Width 7.0 ft Weight of Concrete Anchor 10658 Ibs Concrete Anchor Length 7.0 ft Concrete Anchor Thickness 1.50 ft Safety Factor19 1.4 Notes 1.See attached drainage area map. 2.Entire area is denuded.Conservative rational coefficient for smooth bare packed soil is 0.60. Page 17 of 51 RISER SEDIMENT BASIN CALCULATIONS Lithium Hydroxide Conversion Plant HDR PROJECT NO.: 10302238 DATE: 08.27.2021 BY: AKL REVISED: 05.31.2022 RVW: VH 3.Time of concentration was assumed to be the minimum of 5 minutes. 4.Rainfall intensity at project location was acquired from the NOAA website,hftp://hdsc.nws.noaa.gov/hdsc/pfds/pfds_map_cont.html. 5.From Section 6.61-Sediment Basin of the NCDEQ Erosion and Sediment Control Planning and Design Manual. 6.Basin is required to be dewatered by the skimmer in 48 to 120 hours.The optimal dewatering time is 72 hours(see note 5). 7.Skimmer orifice equatic I D= V Qa/(2370*V H) (inches) (see note 5) 8.Actual skimmer orifice diameter is rounded to the nearest 1/4 inch. 9.Riser cross-sectional area is required to be more than 1.5 times the barrel cross-sectional area. 10.Use 0.025 for CMP and 0.013 for RCP. 11.3.1 for sharp-crested wiers. 12.0.6 for sharp-edged orifice. 13.Weir equation: Q= CLH's (see note 11) 14.Orifice equation: Q=CA(2gH)R5 (see note 12) 15.Pipe Flow equation: 2gh O5 *See Q=a [1+Km+KPL 16.Minimum allowable emergency spillway length is 20 feet(see note 5). 17.2.80 is the maximum allowable coefficient per Section 8.07-Sediment Basin Design of the NCDEQ Erosion and Sediment Control Planning and Design Manual. 18.Weight of water displaced by riser and exposed outlet pipe. 19.Minimum safety factor is 1.25,exceeding requirements of Section 8.07-Sediment Basin Design of the NCDEQ Erosion and Sediment Control Planning and Design Mar Page 18 of 51 RISER SEDIMENT BASIN CALCULATIONS Lithium Hydroxide Conversion Plant HDR PROJECT NO.: 10302238 DATE: 08.27.2021 BY: AKL REVISED: 05.31.2022 RVW: VH Riser Sediment Basin: SB-210-Phase 1 Drainage Area Characteristics Required Storage Volume Total drainage area(TDA)1 10.65 ac 10 Yr Peak Flow(Q10) 46.39 cfs Disturbed area(DA) 6.00 ac 25 Yr Peak Flow(Q25) 52.27 cfs Rational Coefficient(C)2 0.60 Req'd Min.Surface Area (435 sf per cfs of Q25)5 22,738 sf Time of Concentration(TC)3 5.0 min Req'd Min.Storage Volume (1800 cf per ac of TDA)5 19,170 cf 10 Yr Storm Rainfall Intensity(i)4 7.3 in/hr 25 Yr Storm Rainfall Intensity(i)4 8.2 in/hr Design Criteria Basin Size Bottom Elevation 880.00 msl Elev.(msl) Depth(ft) Area(sf) Cumulative Volume(cf) Depth of Storage Volume 2.50 ft 880.00 0.00 20,173 0 Depth of Flow over Riser(1 ft min)5 1.00 ft 881.00 1.00 22,098 21,128 Depth of Flow over Emergency Spillway 0.50 ft 881.25 1.25 22,588 26,714 25 Yr Storm Freeboard(1 ft req'd)5 1.00 ft 882.00 2.00 24,079 44,211 882.50 2.50 25,091 56,503 Basin Configuration 883.00 3.00 26,116 69,304 Bottom Elevation 880.00 msl 883.50 3.50 27,157 82,621 Sediment Storage Elevation 882.50 msl 884.00 4.00 28,211 96,462 Riser Crest 882.50 msl 885.00 5.00 30,326 125,724 Emergency Spillway Crest 883.50 msl Top of Berm 885.00 msl Skimmer Outlet Basin Size Check Desired Skimmer Drawdown Time(td)6 72 hrs Basin Surface Area Provided at Spillway Crest 25,091 sf Desired Skimmer Drawdown Rate(Qd) 6,390 ft3/day 113asin Storage Volume Provided Below Spillway Crest 56,503 cf Skimmer Size 8.0 in Head on Orifice(H)5 0.500 ft Calculated Orifice Diameter' 1.978 in Actual Orifice Diameter' 2.000 in Actual Skimmer Drawdown Time' 70 hrs Riser Structure Riser Inside Dimension(square) 6 ft Riser Flow as Weir13 62.00 cfs Barrel Diameter' DOUBLE 24 in Riser Flow as Orifice14 120.37 cfs Barrel Invert Elevation 879.50 msl Barrel Length 30.00 ft Barrel Flow as Orifice14 52.40 cfs Barrel Manning's N10 0.025 Barrel Flow as Pipe15 47.52 cfs Sharp Crested Weir Coefficient(C)11 3.1 Orifice Coefficient(C)12 0.6 Controlling Flow through Riser and Barrel Spillway 47.52 cfs Emergency Spillway Design Minimum Allowable Spillway Length16 20 ft Difference b/n 25 Yr Peak Flow and Riser/Barrel Flow 4.75 cfs Broad Crested Weir Coefficient(C)17 2.80 Ell Design Spillway Length" 20 ft Riser Concrete Anchor Design Length of Exposed Outlet Pipe 10 ft Buoyancy18 11565 Ibs Concrete Anchor Width 7.5 ft Weight of Concrete Anchor 16313 Ibs Concrete Anchor Length 7.5 ft Concrete Anchor Thickness 2.00 ft Safety Factor19 1.4 Notes 1.See attached drainage area map. 2.Entire area is denuded.Conservative rational coefficient for smooth bare packed soil is 0.60. Page 19 of 51 RISER SEDIMENT BASIN CALCULATIONS Lithium Hydroxide Conversion Plant HDR PROJECT NO.: 10302238 DATE: 08.27.2021 BY: AKL REVISED: 05.31.2022 RVW: VH 3.Time of concentration was assumed to be the minimum of 5 minutes. 4.Rainfall intensity at project location was acquired from the NOAA website,hftp://hdsc.nws.noaa.gov/hdsc/pfds/pfds_map_cont.html. 5.From Section 6.61-Sediment Basin of the NCDEQ Erosion and Sediment Control Planning and Design Manual. 6.Basin is required to be dewatered by the skimmer in 48 to 120 hours.The optimal dewatering time is 72 hours(see note 5). 7.Skimmer orifice equatic I D= V Qa/(2370*V H) (inches) (see note 5) 8.Actual skimmer orifice diameter is rounded to the nearest 1/4 inch. 9.Riser cross-sectional area is required to be more than 1.5 times the barrel cross-sectional area. 10.Use 0.025 for CMP and 0.013 for RCP. 11.3.1 for sharp-crested wiers. 12.0.6 for sharp-edged orifice. 13.Weir equation: Q= CLH's (see note 11) 14.Orifice equation: Q=CA(2gH)R5 (see note 12) 15.Pipe Flow equation: 2gh O5 *See Q=a [1+Km+KPL 16.Minimum allowable emergency spillway length is 20 feet(see note 5). 17.2.80 is the maximum allowable coefficient per Section 8.07-Sediment Basin Design of the NCDEQ Erosion and Sediment Control Planning and Design Manual. 18.Weight of water displaced by riser and exposed outlet pipe. 19.Minimum safety factor is 1.25,exceeding requirements of Section 8.07-Sediment Basin Design of the NCDEQ Erosion and Sediment Control Planning and Design Mar Page 20 of 51 PLC I Lithium Hydroxide Conversion Plant—Stormwater Calculations ��� Appendix H—Sediment Trap and Skimmer Basin Calculations Appendix H — Sediment Trap and Skimmer Basin Calculations PLC I Lithium Hydroxide Conversion Plant—Stormwater Calculations Appendix H—Sediment Trap and Skimmer Basin Calculations This page intentionally left blank. SEDIMENT TRAP CALCULATIONS Lithium Hydroxide Conversion Plant HDR PROJECT NO.: 10302238 DATE: 08.27.2021 BY: AKL REVISED: 05.31.2022 RVW: VH Sediment Trap: ST-220 Drainage Area Characteristics Required Storage Volume Total drainage area(TDA)' 0.55 ac 10 Yr Peak Flow(Q10) 2.40 cfs Disturbed area(DA) 0.55 ac 25 Yr Peak Flow(Q25) 2.70 cfs Rational Coefficient(C)2 0.60 Req'd Min.Surface Area (435 sf per cfs of Q25)5 1,174 sf Time of Concentration(TC)3 5.0 min Req'd Min.Storage Volume (3600 cf per ac of TDA)5 1,980 cf 10 Yr Storm Rainfall Intensity(1)4 7.3 in/hr 25 Yr Storm Rainfall Intensity(i)° 8.2 in/hr Design Criteria ST-220 Bottom Elevation 889.00 msl Elev.(msl) Depth(ft) Area(sf) Cumulative Volume(cf) Depth of Storage Volume 2.00 ft 889.00 0.00 852 0 890.00 1.00 1,091 969 891.00 2.00 1,355 2,190 892.00 3.00 1,645 3,687 893.00 4.00 1,960 5,488 Basin Configuration Bottom Elevation 889.00 msl Sediment Storage Elevation/Spillway 891.00 msl Top of Berm 893.00 msl Spillway Length Drainage Area Length of Spillway Basin Size Check 1 4 Basin Surface Area Provided at Spillway Crest 1,355 sf 2 6 113asin Storage Volume Provided Below Spillway Crest 2,190 cf 3 8 4 10 5 12 Notes 1.See attached drainage area map. 2.Entire area is denuded.Conservative rational coefficient for smooth bare packed soil is 0.60. 3.Time of concentration was assumed to be the minimum of 5 minutes. 4.Rainfall intensity at project location was acquired from the NOAA website,http://hdsc.nws.noaa.gov/hdsc/pfds/pfds_map_cont.htmi. 5.From Section 6.60-Sediment Trap of the NCDEQ Erosion and Sediment Control Planning and Design Manual. 6.Basin is required to be dewatered by the skimmer in 48 to 120 hours.The optimal dewatering time is 72 hours(see note 5). 13.Weir equation: 0=CLH'S Page 24 of 51 SEDIMENT TRAP CALCULATIONS Lithium Hydroxide Conversion Plant HDR PROJECT NO.: 10302238 DATE: 08.27.2021 BY: AKL REVISED: 05.31.2022 RVW: VH Sediment Trap: ST-221 Drainage Area Characteristics Required Storage Volume Total drainage area(TDA)' 0.51 ac 10 Yr Peak Flow(Q10) 2.22 cfs Disturbed area(DA) 0.51 ac 25 Yr Peak Flow(Q25) 2.50 cfs Rational Coefficient(C)2 0.60 Req'd Min.Surface Area (435 sf per cfs of Q25)5 1,089 sf Time of Concentration(TC)3 5.0 min Req'd Min.Storage Volume (3600 cf per ac of TDA)5 1,836 cf 10 Yr Storm Rainfall Intensity(1)4 7.3 in/hr 25 Yr Storm Rainfall Intensity(i)° 8.2 in/hr Design Criteria ST-221 Bottom Elevation 884.00 msl Elev.(msl) Depth(ft) Area(sf) Cumulative Volume(cf) Depth of Storage Volume 2.00 ft 884.00 0.00 778 0 885.00 1.00 1,032 902 886.00 2.00 1,317 2,074 887.00 3.00 1,632 3,545 888.00 4.00 1,978 5,348 Basin Configuration Bottom Elevation 884.00 msl Sediment Storage Elevation/Spillway 886.00 msI- Top of Berm 888.00 msl Spillway Length Drainage Area Length of Spillway Basin Size Check 1 4 Basin Surface Area Provided at Spillway Crest 1,317 sf 2 6 Basin Storage Volume Provided Below Spillway Crest 2,074 cf 3 8 4 10 5 12 Notes 1.See attached drainage area map. 2.Entire area is denuded.Conservative rational coefficient for smooth bare packed soil is 0.60. 3.Time of concentration was assumed to be the minimum of 5 minutes. 4.Rainfall intensity at project location was acquired from the NOAA website,http://hdsc.nws.noaa.gov/hdsc/pfds/pfds_map_cont.html. 5.From Section 6.60-Sediment Trap of the NCDEQ Erosion and Sediment Control Planning and Design Manual. 6.Basin is required to be dewatered by the skimmer in 48 to 120 hours.The optimal dewatering time is 72 hours(see note 5). 13.Weir equation: 0=CLH'S Page 25 of 51 SEDIMENT TRAP CALCULATIONS Lithium Hydroxide Conversion Plant HDR PROJECT NO.: 10302238 DATE: 08.27.2021 BY: AKL REVISED: 05.31.2022 RVW: VH Sediment Trap: ST-222 Drainage Area Characteristics Required Storage Volume Total drainage area(TDA)' 0.70 ac 10 Yr Peak Flow(Q10) 3.05 cfs Disturbed area(DA) 0.70 ac 25 Yr Peak Flow(Q25) 3.44 cfs Rational Coefficient(C)2 0.60 Req'd Min.Surface Area (435 sf per cfs of Q25)5 1,494 sf Time of Concentration(TC)3 5.0 min Req'd Min.Storage Volume (3600 cf per ac of TDA)5 2,520 cf 10 Yr Storm Rainfall Intensity(1)4 7.3 in/hr 25 Yr Storm Rainfall Intensity(i)° 8.2 in/hr Design Criteria ST-222 Bottom Elevation 876.00 msl Elev.(msl) Depth(ft) Area(sf) Cumulative Volume(cf) Depth of Storage Volume 2.00 ft 876.00 0.00 1,081 0 877.00 1.00 1,348 1,212 878.00 2.00 1,640 2,704 879.00 3.00 1,957 4,500 880.00 4.00 2,300 6,626 Basin Configuration Bottom Elevation 876.00 msl Sediment Storage Elevation/Spillway 878.00 msl Top of Berm 880.00 msl Spillway Length Drainage Area Length of Spillway Basin Size Check 1 4 Basin Surface Area Provided at Spillway Crest 1,640 sf 2 6 113asin Storage Volume Provided Below Spillway Crest 2,704 cf 3 8 4 10 5 12 Notes 1.See attached drainage area map. 2.Entire area is denuded.Conservative rational coefficient for smooth bare packed soil is 0.60. 3.Time of concentration was assumed to be the minimum of 5 minutes. 4.Rainfall intensity at project location was acquired from the NOAA website,http://hdsc.nws.noaa.gov/hdsc/pfds/pfds_map_cont.htmi. 5.From Section 6.60-Sediment Trap of the NCDEQ Erosion and Sediment Control Planning and Design Manual. 6.Basin is required to be dewatered by the skimmer in 48 to 120 hours.The optimal dewatering time is 72 hours(see note 5). 13.Weir equation: 0=CLH'S Page 26 of 51 SEDIMENT TRAP CALCULATIONS Lithium Hydroxide Conversion Plant HDR PROJECT NO.: 10302238 DATE: 08.27.2021 BY: AKL REVISED: 05.31.2022 RVW: VH Sediment Trap: ST-223-Phase 2 Drainage Area Characteristics Required Storage Volume Total drainage area(TDA)' 0.80 ac 10 Yr Peak Flow(Q10) 3.48 cfs Disturbed area(DA) 0.80 ac 25 Yr Peak Flow(Q25) 3.93 cfs Rational Coefficient(C)2 0.60 Req'd Min.Surface Area (435 sf per cfs of Q25)5 1,708 sf Time of Concentration(TC)3 5.0 min Req'd Min.Storage Volume (3600 cf per ac of TDA)5 2,880 cf 10 Yr Storm Rainfall Intensity(1)4 7.3 in/hr 25 Yr Storm Rainfall Intensity(i)° 8.2 in/hr Design Criteria ST-223-Phase 2 Bottom Elevation 882.00 msl Elev.(msl) Depth(ft) Area(sf) Cumulative Volume(cf) Depth of Storage Volume 2.00 ft 882.00 0.00 1,219 0 883.00 1.00 1,501 1,358 884.00 2.00 1,808 3,010 885.00 3.00 2,141 4,982 886.00 4.00 2,498 7,299 Basin Configuration Bottom Elevation 882.00 msl Sediment Storage Elevation/Spillway 884.00 msl Top of Berm 886.00 msl Spillway Length Drainage Area Length of Spillway Basin Size Check 1 4 Basin Surface Area Provided at Spillway Crest 1,808 sf 2 6 Basin Storage Volume Provided Below Spillway Crest 3,010 cf 3 8 4 10 5 12 Notes 1.See attached drainage area map. 2.Entire area is denuded.Conservative rational coefficient for smooth bare packed soil is 0.60. 3.Time of concentration was assumed to be the minimum of 5 minutes. 4.Rainfall intensity at project location was acquired from the NOAA website,http://hdsc.nws.noaa.gov/hdsc/pfds/pfds_map_cont.htmi. 5.From Section 6.60-Sediment Trap of the NCDEQ Erosion and Sediment Control Planning and Design Manual. 6.Basin is required to be dewatered by the skimmer in 48 to 120 hours.The optimal dewatering time is 72 hours(see note 5). 13.Weir equation: 0=CLH'S Page 27 of 51 SEDIMENT TRAP CALCULATIONS Lithium Hydroxide Conversion Plant HDR PROJECT NO.: 10302238 DATE: 08.27.2021 BY: AKL REVISED: 05.31.2022 RVW: VH Sediment Trap: ST-224 Drainage Area Characteristics Required Storage Volume Total drainage area(TDA)' 0.60 ac 10 Yr Peak Flow(Q10) 2.61 cfs Disturbed area(DA) 0.60 ac 25 Yr Peak Flow(Q25) 2.94 cfs Rational Coefficient(C)2 0.60 Req'd Min.Surface Area (435 sf per cfs of Q25)5 1,281 sf Time of Concentration(TC)3 5.0 min Req'd Min.Storage Volume (3600 cf per ac of TDA)5 2,160 cf 10 Yr Storm Rainfall Intensity(1)4 7.3 in/hr 25 Yr Storm Rainfall Intensity(i)° 8.2 in/hr Design Criteria ST-224 Bottom Elevation 820.00 msl Elev.(msl) Depth(ft) Area(sf) Cumulative Volume(cf) Depth of Storage Volume 2.00 ft 820.00 0.00 1,081 0 820.00 0.00 1,348 0 821.00 1.00 1,640 1,492 822.00 2.00 1,957 3,288 823.00 3.00 2,300 5,414 Basin Configuration Bottom Elevation 820.00 msl Sediment Storage Elevation/Spillway 822.00 msl Top of Berm 824.00 msl Spillway Length Drainage Area Length of Spillway Basin Size Check 1 4 113asin Surface Area Provided at Spillway Crest 1,957 sf 2 6 113asin Storage Volume Provided Below Spillway Crest 3,288 cf 3 8 4 10 5 12 Notes 1.See attached drainage area map. 2.Entire area is denuded.Conservative rational coefficient for smooth bare packed soil is 0.60. 3.Time of concentration was assumed to be the minimum of 5 minutes. 4.Rainfall intensity at project location was acquired from the NOAA website,http://hdsc.nws.noaa.gov/hdsc/pfds/pfds_map_cont.htmi. 5.From Section 6.60-Sediment Trap of the NCDEQ Erosion and Sediment Control Planning and Design Manual. 6.Basin is required to be dewatered by the skimmer in 48 to 120 hours.The optimal dewatering time is 72 hours(see note 5). 13.Weir equation: 0=CLH'S Page 28 of 51 SEDIMENT TRAP CALCULATIONS Lithium Hydroxide Conversion Plant HDR PROJECT NO.: 10302238 DATE: 08.27.2021 BY: AKL REVISED: 05.31.2022 RVW: VH Sediment Trap: ST-225 Drainage Area Characteristics Required Storage Volume Total drainage area(TDA)' 0.80 ac 10 Yr Peak Flow(Q10) 3.48 cfs Disturbed area(DA) 0.80 ac 25 Yr Peak Flow(Q25) 3.93 cfs Rational Coefficient(C)2 0.60 Req'd Min.Surface Area (435 sf per cfs of Q25)5 1,708 sf Time of Concentration(TC)3 5.0 min Req'd Min.Storage Volume (3600 cf per ac of TDA)5 2,880 cf 10 Yr Storm Rainfall Intensity(1)4 7.3 in/hr 25 Yr Storm Rainfall Intensity(i)° 8.2 in/hr Design Criteria ST-225 Bottom Elevation 812.00 msl Elev.(msl) Depth(ft) Area(sf) Cumulative Volume(cf) Depth of Storage Volume 2.00 ft 812.00 0.00 1,219 0 813.00 1.00 1,501 1,358 814.00 2.00 1,808 3,010 815.00 3.00 2,141 4,982 816.00 4.00 2,498 7,299 Basin Configuration Bottom Elevation 812.00 msl Sediment Storage Elevation/Spillway 814.00 msl Top of Berm 816.00 msl Spillway Length Drainage Area Length of Spillway Basin Size Check 1 4 113asin Surface Area Provided at Spillway Crest 1,808 sf 2 6 113asin Storage Volume Provided Below Spillway Crest 3,010 cf 3 8 4 10 5 12 Notes 1.See attached drainage area map. 2.Entire area is denuded.Conservative rational coefficient for smooth bare packed soil is 0.60. 3.Time of concentration was assumed to be the minimum of 5 minutes. 4.Rainfall intensity at project location was acquired from the NOAA website,http://hdsc.nws.noaa.gov/hdsc/pfds/pfds_map_cont.htmi. 5.From Section 6.60-Sediment Trap of the NCDEQ Erosion and Sediment Control Planning and Design Manual. 6.Basin is required to be dewatered by the skimmer in 48 to 120 hours.The optimal dewatering time is 72 hours(see note 5). 13.Weir equation: 0=CLH'S Page 29 of 51 SEDIMENT TRAP CALCULATIONS Lithium Hydroxide Conversion Plant HDR PROJECT NO.: 10302238 DATE: 08.27.2021 BY: AKL REVISED: 05.31.2022 RVW: VH Sediment Trap: ST-226 Drainage Area Characteristics Required Storage Volume Total drainage area(TDA)' 0.50 ac 10 Yr Peak Flow(Q10) 2.18 cfs Disturbed area(DA) 0.50 ac 25 Yr Peak Flow(Q25) 2.45 cfs Rational Coefficient(C)2 0.60 Req'd Min.Surface Area (435 sf per cfs of Q25)5 1,067 sf Time of Concentration(TC)3 5.0 min Req'd Min.Storage Volume (3600 cf per ac of TDA)5 1,800 cf 10 Yr Storm Rainfall Intensity(1)4 7.3 in/hr 25 Yr Storm Rainfall Intensity(i)° 8.2 in/hr Design Criteria ST-226 Bottom Elevation 822.00 msl Elev.(msl) Depth(ft) Area(sf) Cumulative Volume(cf) Depth of Storage Volume 2.00 ft 822.00 0.00 1,081 0 823.00 1.00 1,348 1,212 824.00 2.00 1,640 2,704 825.00 3.00 1,957 4,500 826.00 4.00 2,300 6,626 Basin Configuration Bottom Elevation 822.00 msl Sediment Storage Elevation/Spillway 824.00 msl Top of Berm 826.00 msl Spillway Length Drainage Area Length of Spillway Basin Size Check 1 4 Basin Surface Area Provided at Spillway Crest 1,640 sf 2 6 113asin Storage Volume Provided Below Spillway Crest 2,704 cf 3 8 4 10 5 12 Notes 1.See attached drainage area map. 2.Entire area is denuded.Conservative rational coefficient for smooth bare packed soil is 0.60. 3.Time of concentration was assumed to be the minimum of 5 minutes. 4.Rainfall intensity at project location was acquired from the NOAA website,http://hdsc.nws.noaa.gov/hdsc/pfds/pfds_map_cont.htmi. 5.From Section 6.60-Sediment Trap of the NCDEQ Erosion and Sediment Control Planning and Design Manual. 6.Basin is required to be dewatered by the skimmer in 48 to 120 hours.The optimal dewatering time is 72 hours(see note 5). 13.Weir equation: 0=CLH'S Page 30 of 51 SEDIMENT TRAP CALCULATIONS Lithium Hydroxide Conversion Plant HDR PROJECT NO.: 10302238 DATE: 08.27.2021 BY: AKL REVISED: 05.31.2022 RVW: VH Sediment Trap: ST-227 Drainage Area Characteristics Required Storage Volume Total drainage area(TDA)' 0.25 ac 10 Yr Peak Flow(Q10) 1.09 cfs Disturbed area(DA) 0.25 ac 25 Yr Peak Flow(Q25) 1.23 cfs Rational Coefficient(C)2 0.60 Req'd Min.Surface Area (435 sf per cfs of Q25)5 534 sf Time of Concentration(TC)3 5.0 min Req'd Min.Storage Volume (3600 cf per ac of TDA)5 900 cf 10 Yr Storm Rainfall Intensity(i)° 7.3 in/hr 25 Yr Storm Rainfall Intensity(i)° 8.2 in/hr Design Criteria ST-227 Bottom Elevation 820.00 msl Elev.(msl) Depth(ft) Area(sf) Cumulative Volume(cf) Depth of Storage Volume 2.00 ft 820.00 0.00 300 0 821.00 1.00 446 371 822.00 2.00 621 902 823.00 3.00 821 1,620 824.00 4.00 1,046 2,552 Basin Configuration Bottom Elevation 820.00 msl Sediment Storage Elevation/Spillway 822.00 msl Top of Berm 824.00 msl Spillway Length Drainage Area Length of Spillway Basin Size Check 1 4 Basin Surface Area Provided at Spillway Crest 621 sf 2 6 Basin Storage Volume Provided Below Spillway Crest 902 cf 3 8 4 10 5 12 Notes 1.See attached drainage area map. 2.Entire area is denuded.Conservative rational coefficient for smooth bare packed soil is 0.60. 3.Time of concentration was assumed to be the minimum of 5 minutes. 4.Rainfall intensity at project location was acquired from the NOAA website,http://hdsc.nws.noaa.gov/hdsc/pfds/pfds_map_cont.htmi. 5.From Section 6.60-Sediment Trap of the NCDEQ Erosion and Sediment Control Planning and Design Manual. 6.Basin is required to be dewatered by the skimmer in 48 to 120 hours.The optimal dewatering time is 72 hours(see note 5). 13.Weir equation: 0=CLH'S Page 31 of 51 SEDIMENT TRAP CALCULATIONS Lithium Hydroxide Conversion Plant HDR PROJECT NO.: 10302238 DATE: 08.27.2021 BY: AKL REVISED: 05.31.2022 RVW: VH Sediment Trap: ST228-Phase 1 Drainage Area Characteristics Required Storage Volume Total drainage area(TDA)' 0.75 ac 10 Yr Peak Flow(Q10) 3.27 cfs Disturbed area(DA) 0.75 ac 25 Yr Peak Flow(Q25) 3.68 cfs Rational Coefficient(C)2 0.60 Req'd Min.Surface Area (325 sf per cfs of Q25)5 1,196 sf Time of Concentration(TC)3 5.0 min Req'd Min.Storage Volume (1800 cf per ac of TDA)5 1,350 cf 10 Yr Storm Rainfall Intensity(1)4 7.3 in/hr 25 Yr Storm Rainfall Intensity(i)° 8.2 in/hr Design Criteria ST228-Phase 1 Bottom Elevation 892.00 msl Elev.(msl) Depth(ft) Area(sf) Cumulative Volume(cf) Depth of Storage Volume 2.00 ft 892.00 0.00 708 0 893.00 1.00 947 825 894.00 2.00 1,212 1,901 895.00 3.00 1,501 3,255 896.00 4.00 1,816 4,911 Basin Configuration Bottom Elevation 892.00 msl Sediment Storage Elevation/Spillway 894.00 msl Top of Berm 896.00 msl Spillway Length Drainage Area Length of Spillway Basin Size Check 1 4 Basin Surface Area Provided at Spillway Crest 1,212 sf -] 2 6 Basin Storage Volume Provided Below Spillway Crest 1,901 cf 3 8 4 10 5 12 Notes 1.See attached drainage area map. 2.Entire area is denuded.Conservative rational coefficient for smooth bare packed soil is 0.60. 3.Time of concentration was assumed to be the minimum of 5 minutes. 4.Rainfall intensity at project location was acquired from the NOAA website,http://hdsc.nws.noaa.gov/hdsc/pfds/pfds_map_cont.htmi. 5.From Section 6.60-Sediment Trap of the NCDEQ Erosion and Sediment Control Planning and Design Manual. 6.Basin is required to be dewatered by the skimmer in 48 to 120 hours.The optimal dewatering time is 72 hours(see note 5). 13.Weir equation: 0=CLH'S Page 32 of 51 SKIMMER BASIN CALCULATIONS Lithium Hydroxide Conversion Plant HDR PROJECT NO.: 10302238 DATE: 08.27.2021 BY: AKL REVISED: 05.31.2022 RVW: VH Skimmer Basin: Drainage Area Characteristics Required Storage Volume Total drainage area(TDA)' 1.55 ac 10 Yr Peak Flow(Q16) 6.75 cfs Disturbed area(DA) 0.65 ac 25 Yr Peak Flow(Q25) 7.61 cfs Rational Coefficient(C)2 0.60 Req'd Min.Surface Area (325 sf per cfs of Q25)5 2,472 sf Time of Concentration(TC)3 5.0 min Req'd Min.Storage Volume (1800 cf per ac of TDA)5 2,790 cf 10 Yr Storm Rainfall Intensity i° 7.3 in/hr 25 Yr Storm Rainfall Intensity(i)° 8.2 in/hr Design Criteria SK-240-Phase 2 Bottom Elevation 878.00 msl Elev.(msl) Depth(ft) Area(sf) Cumulative Volume(cf) Depth of Storage Volume 2.00 ft 878.00 0.00 1,853 0 879.00 1.00 2,203 2,025 Basin Configuration 880.00 2.00 2,579 4,414 Bottom Elevation 878.00 msl 881.00 3.00 2,979 7,191 Sediment Storage Elevation 880.00 msl 882.00 4.00 3,405 10,380 Emergency Spillway Crest 881.00 msl Top of Berm 882.50 msl Skimmer Outlet Desired Skimmer Drawdown Time(td)6 72 hrs Desired Skimmer Drawdown Rate(Qd) 930 ft3/day Skimmer Size 8.0 in Head on Orifice(H)5 0.500 ft Basin Size Check Basin Surface Area Provided at Spillway Crest 2,579 sf Calculated Orifice Diameter' 0.755 in Basin Storage Volume Provided Below Spillway Crest 4,414 cf Actual Orifice Diameter' 0.750 in Actual Skimmer Drawdown Time' 73 hrs Emergency Spillway Design ��A 1.5)) h= E3000EE] Q= 7.61 cfs C= L= 10.00 ft Notes 1.See attached drainage area map. 2.Entire area is denuded.Conservative rational coefficient for smooth bare packed soil is 0.60. 3.Time of concentration was assumed to be the minimum of 5 minutes. 4.Rainfall intensity at project location was acquired from the NOAA website,http://hdsc.nws.noaa.gov/hdsc/pfds/pfds_map_cont.html. 5.From Section 6.64-Skimmer Sediment Basin of the NCDEQ Erosion and Sediment Control Planning and Design Manual. 6.Basin is required to be dewatered by the skimmer in 48 to 120 hours.The optimal dewatering time is 72 hours(see note 5). 7.Weir equation: 0=CLH'S Page 1 of 13 SKIMMER BASIN CALCULATIONS Lithium Hydroxide Conversion Plant HDR PROJECT NO.: 10302238 DATE: 08.27.2021 BY: AKL REVISED: 05.31.2022 RVW: VH Skimmer Basin: SK-241 -Phase 1 Drainage Area Characteristics Required Storage Volume Total drainage area(TDA)' 2.58 ac 10 Yr Peak Flow(Q16) 11.24 cfs Disturbed area(DA) 2.58 ac 25 Yr Peak Flow(Q25) 12.66 cfs Rational Coefficient(C)2 0.60 Req'd Min.Surface Area (325 sf per cfs of Q25)5 4,115 sf Time of Concentration(TC)3 5.0 min Req'd Min.Storage Volume (1800 cf per ac of TDA)5 4,644 cf 10 Yr Storm Rainfall Intensity i° 7.3 in/hr 25 Yr Storm Rainfall Intensity(i)° 8.2 in/hr Design Criteria SK-241 -Phase 1 Bottom Elevation 874.00 msl Elev.(msl) Depth(ft) Area(sf) Cumulative Volume(cf) Depth of Storage Volume 2.00 ft 874.00 0.00 3,928 0 875.00 1.00 4,426 4,175 Basin Configuration 876.00 2.00 4,949 8,860 Bottom Elevation 874.00 msl 877.00 3.00 5,497 14,080 Sediment Storage Elevation 876.00 msl 878.00 4.00 6,071 19,862 Emergency Spillway Crest 877.00 msl Top of Berm 878.50 msl Skimmer Outlet Desired Skimmer Drawdown Time(td)6 72 hrs Desired Skimmer Drawdown Rate(Qd) 1,548 ft'/day Skimmer Size 8.0 in Head on Orifice(H)5 0.500 ft Basin Size Check Basin Surface Area Provided at Spillway Crest 4,949 sf Calculated Orifice Diameter' 0.974 in Basin Storage Volume Provided Below Spillway Crest 8,860 cf Actual Orifice Diameter' 1.000 in Actual Skimmer Drawdown Time' 68 hrs Emergency Spillway Design ��A 1.5)) h= E3000EE] Q= 12.66 cfs C= L= 10.00 ft Notes 1.See attached drainage area map. 2.Entire area is denuded.Conservative rational coefficient for smooth bare packed soil is 0.60. 3.Time of concentration was assumed to be the minimum of 5 minutes. 4.Rainfall intensity at project location was acquired from the NOAA website,http://hdsc.nws.noaa.gov/hdsc/pfds/pfds_map_cont.html. 5.From Section 6.64-Skimmer Sediment Basin of the NCDEQ Erosion and Sediment Control Planning and Design Manual. 6.Basin is required to be dewatered by the skimmer in 48 to 120 hours.The optimal dewatering time is 72 hours(see note 5). 7.Weir equation: 0=CLH'' Page 2 of 13 SKIMMER BASIN CALCULATIONS Lithium Hydroxide Conversion Plant HDR PROJECT NO.: 10302238 DATE: 08.27.2021 BY: AKL REVISED: 05.31.2022 RVW: VH Skimmer Basin: SK-241 -Phase 2 Drainage Area Characteristics Required Storage Volume Total drainage area(TDA)' 1.66 ac 10 Yr Peak Flow(Q16) 7.23 cfs Disturbed area(DA) 1.66 ac 25 Yr Peak Flow(Q25) 8.15 cfs Rational Coefficient(C)2 0.60 Req'd Min.Surface Area (325 sf per cfs of Q25)5 2,648 sf Time of Concentration(TC)3 5.0 min Req'd Min.Storage Volume (1800 cf per ac of TDA)5 2,988 cf 10 Yr Storm Rainfall Intensity i° 7.3 in/hr 25 Yr Storm Rainfall Intensity(i)° 8.2 in/hr Design Criteria SK-241 -Phase 2 Bottom Elevation 874.00 msl Elev.(msl) Depth(ft) Area(sf) Cumulative Volume(cf) Depth of Storage Volume 2.00 ft 874.00 0.00 2,483 0 875.00 1.00 2,382 2,432 Basin Configuration 876.00 2.00 2,792 5,017 Bottom Elevation 874.00 msl 877.00 3.00 3,228 8,024 Sediment Storage Elevation 876.00 msl 878.00 4.00 3,688 11,479 Emergency Spillway Crest 877.00 msl Top of Berm 878.50 msl Skimmer Outlet Desired Skimmer Drawdown Time(td)6 72 hrs Desired Skimmer Drawdown Rate(Qd) 996 ft3/day Skimmer Size 8.0 in Head on Orifice(H)5 0.500 ft Basin Size Check Basin Surface Area Provided at Spillway Crest 2,792 sf Calculated Orifice Diameter' 0.781 in Basin Storage Volume Provided Below Spillway Crest 5,017 cf Actual Orifice Diameter' 0.750 in Actual Skimmer Drawdown Time' 78 hrs Emergency Spillway Design ��A 1.5)) h= E3000EE] Q= 8.15 cfs C= L= 10.00 ft Notes 1.See attached drainage area map. 2.Entire area is denuded.Conservative rational coefficient for smooth bare packed soil is 0.60. 3.Time of concentration was assumed to be the minimum of 5 minutes. 4.Rainfall intensity at project location was acquired from the NOAA website,http://hdsc.nws.noaa.gov/hdsc/pfds/pfds_map_cont.html. 5.From Section 6.64-Skimmer Sediment Basin of the NCDEQ Erosion and Sediment Control Planning and Design Manual. 6.Basin is required to be dewatered by the skimmer in 48 to 120 hours.The optimal dewatering time is 72 hours(see note 5). 7.Weir equation: 0=CLH'S Page 3 of 13 SKIMMER BASIN CALCULATIONS Lithium Hydroxide Conversion Plant HDR PROJECT NO.: 10302238 DATE: 08.27.2021 BY: AKL REVISED: 05.31.2022 RVW: VH Skimmer Basin: SK-242-Phase 2 Drainage Area Characteristics Required Storage Volume Total drainage area(TDA)' 1.50 ac 10 Yr Peak Flow(Q16) 6.53 cfs Disturbed area(DA) 1.50 ac 25 Yr Peak Flow(Q25) 7.36 cfs Rational Coefficient(C)2 0.60 Req'd Min.Surface Area (325 sf per cfs of Q25)5 2,393 sf Time of Concentration(TC)3 5.0 min Req'd Min.Storage Volume (1800 cf per ac of TDA)5 2,700 cf 10 Yr Storm Rainfall Intensity i° 7.3 in/hr 25 Yr Storm Rainfall Intensity(i)° 8.2 in/hr Design Criteria SK-242-Phase 2 Bottom Elevation 834.00 msl Elev.(msl) Depth(ft) Area(sf) Cumulative Volume(cf) Depth of Storage Volume 2.00 ft 834.00 0.00 1,770 0 835.00 1.00 2,114 1,939 Basin Configuration 836.00 2.00 2,483 4,235 Bottom Elevation 834.00 msl 837.00 3.00 2,877 6,913 Sediment Storage Elevation 836.00 msl 838.00 4.00 3,296 9,997 Emergency Spillway Crest 837.00 msl Top of Berm 838.50 msl Skimmer Outlet Desired Skimmer Drawdown Time(td)6 72 hrs Desired Skimmer Drawdown Rate(Qd) 90o ft3/day Skimmer Size 8.0 in Head on Orifice(H)5 0.500 ft Basin Size Check Basin Surface Area Provided at Spillway Crest 2,483 sf Calculated Orifice Diameter' 0.742 in Basin Storage Volume Provided Below Spillway Crest 4,235 cf Actual Orifice Diameter' 0.750 in Actual Skimmer Drawdown Time' 71 hrs Emergency Spillway Design ^1.5 h= 1.00 Q= 7.36 cfs C= 3.00 L= 10.00 ft Notes 1.See attached drainage area map. 2.Entire area is denuded.Conservative rational coefficient for smooth bare packed soil is 0.60. 3.Time of concentration was assumed to be the minimum of 5 minutes. 4.Rainfall intensity at project location was acquired from the NOAA website,http://hdsc.nws.noaa.gov/hdsc/pfds/pfds_map_cont.htmi. 5.From Section 6.64-Skimmer Sediment Basin of the NCDEQ Erosion and Sediment Control Planning and Design Manual. 6.Basin is required to be dewatered by the skimmer in 48 to 120 hours.The optimal dewatering time is 72 hours(see note 5). 7.Weir equation: 0=CLH'' Page 4 of 13 SKIMMER BASIN CALCULATIONS Lithium Hydroxide Conversion Plant HDR PROJECT NO.: 10302238 DATE: 08.27.2021 BY: AKL REVISED: 05.31.2022 RVW: VH Skimmer Basin: SK-243-Phase 1 Drainage Area Characteristics Required Storage Volume Total drainage area(TDA)' 1.99 ac 10 Yr Peak Flow(Q16) 8.67 cfs Disturbed area(DA) 1.99 ac 25 Yr Peak Flow(Q25) 9.77 cfs Rational Coefficient(C)2 0.60 Req'd Min.Surface Area (325 sf per cfs of Q25)5 3,174 sf Time of Concentration(TC)3 5.0 min Req'd Min.Storage Volume (1800 cf per ac of TDA)5 3,582 cf 10 Yr Storm Rainfall Intensity i° 7.3 in/hr 25 Yr Storm Rainfall Intensity(i)° 8.2 in/hr Design Criteria SK-243-Phase 1 Bottom Elevation 874.00 msl Elev.(msl) Depth(ft) Area(sf) Cumulative Volume(cf) Depth of Storage Volume 2.00 ft 874.00 0.00 2,676 0 875.00 1.00 3,083 2,877 Basin Configuration 876.00 2.00 3,515 6,174 Bottom Elevation 874.00 msl 877.00 3.00 3,972 9,915 Sediment Storage Elevation 876.00 msl 878.00 4.00 4,454 14,126 Emergency Spillway Crest 877.00 msl Top of Berm 878.50 msl Skimmer Outlet Desired Skimmer Drawdown Time(td)6 72 hrs Desired Skimmer Drawdown Rate(Qd) 1,194 ft'/day Skimmer Size 8.0 in Head on Orifice(H)5 0.500 ft Basin Size Check Basin Surface Area Provided at Spillway Crest 3,515 sf Calculated Orifice Diameter' 0.855 in Basin Storage Volume Provided Below Spillway Crest 6,174 cf Actual Orifice Diameter' 0.750 in Actual Skimmer Drawdown Time' 94 hrs Emergency Spillway Design ��A 1.5)) h= E3000EE] Q= 9.77 cfs C= L= 10.00 ft Notes 1.See attached drainage area map. 2.Entire area is denuded.Conservative rational coefficient for smooth bare packed soil is 0.60. 3.Time of concentration was assumed to be the minimum of 5 minutes. 4.Rainfall intensity at project location was acquired from the NOAA website,http://hdsc.nws.noaa.gov/hdsc/pfds/pfds_map_cont.html. 5.From Section 6.64-Skimmer Sediment Basin of the NCDEQ Erosion and Sediment Control Planning and Design Manual. 6.Basin is required to be dewatered by the skimmer in 48 to 120 hours.The optimal dewatering time is 72 hours(see note 5). 7.Weir equation: 0=CLH'' Page 5 of 13 SKIMMER BASIN CALCULATIONS Lithium Hydroxide Conversion Plant HDR PROJECT NO.: 10302238 DATE: 08.27.2021 BY: AKL REVISED: 05.31.2022 RVW: VH Skimmer Basin: SK-243-Phase 2 Drainage Area Characteristics Required Storage Volume Total drainage area(TDA)' 1.50 ac 10 Yr Peak Flow(Q16) 6.53 cfs Disturbed area(DA) 1.50 ac 25 Yr Peak Flow(Q25) 7.36 cfs Rational Coefficient(C)2 0.60 Req'd Min.Surface Area (325 sf per cfs of Q25)5 2,393 sf Time of Concentration(TC)3 5.0 min Req'd Min.Storage Volume (1800 cf per ac of TDA)5 2,700 cf 10 Yr Storm Rainfall Intensity i° 7.3 in/hr 25 Yr Storm Rainfall Intensity(i)° 8.2 in/hr Design Criteria SK-243-Phase 2 Bottom Elevation 874.00 msl Elev.(msl) Depth(ft) Area(sf) Cumulative Volume(cf) Depth of Storage Volume 2.00 ft 874.00 0.00 2,483 0 875.00 1.00 2,877 2,678 Basin Configuration 876.00 2.00 3,296 5,762 Bottom Elevation 874.00 msl 877.00 3.00 3,740 9,277 Sediment Storage Elevation 876.00 msl 878.00 4.00 4,210 13,250 Emergency Spillway Crest 877.00 msl Top of Berm 878.50 msl Skimmer Outlet Desired Skimmer Drawdown Time(td)6 72 hrs Desired Skimmer Drawdown Rate(Qd) 90o ft3/day Skimmer Size 6.0 in Head on Orifice(H)5 0.417 ft Basin Size Check Basin Surface Area Provided at Spillway Crest 3,296 sf Calculated Orifice Diameter' 0.777 in Basin Storage Volume Provided Below Spillway Crest 5,762 cf Actual Orifice Diameter' 0.750 in Actual Skimmer Drawdown Time' 77 hrs Emergency Spillway Design ��A 1.5)) h= E3000EE] Q= 7.36 cfs C= L= 10.00 ft Notes 1.See attached drainage area map. 2.Entire area is denuded.Conservative rational coefficient for smooth bare packed soil is 0.60. 3.Time of concentration was assumed to be the minimum of 5 minutes. 4.Rainfall intensity at project location was acquired from the NOAA website,http://hdsc.nws.noaa.gov/hdsc/pfds/pfds_map_cont.html. 5.From Section 6.64-Skimmer Sediment Basin of the NCDEQ Erosion and Sediment Control Planning and Design Manual. 6.Basin is required to be dewatered by the skimmer in 48 to 120 hours.The optimal dewatering time is 72 hours(see note 5). 7.Weir equation: 0=CLH'' Page 6 of 13 SKIMMER BASIN CALCULATIONS Lithium Hydroxide Conversion Plant HDR PROJECT NO.: 10302238 DATE: 08.27.2021 BY: AKL REVISED: 05.31.2022 RVW: VH Skimmer Basin: SK-244 Drainage Area Characteristics Required Storage Volume Total drainage area(TDA)' 2.25 ac 10 Yr Peak Flow(Q16) 9.80 cfs Disturbed area(DA) 2.25 ac 25 Yr Peak Flow(Q25) 11.04 cfs Rational Coefficient(C)2 0.60 Req'd Min.Surface Area (325 sf per cfs of Q25)5 3,589 sf Time of Concentration(TC)3 5.0 min Req'd Min.Storage Volume (1800 cf per ac of TDA)5 4,050 cf 10 Yr Storm Rainfall Intensity i° 7.3 in/hr 25 Yr Storm Rainfall Intensity(i)° 8.2 in/hr Design Criteria SK-244 Bottom Elevation 841.00 msl Elev.(msl) Depth(ft) Area(sf) Cumulative Volume(cf) Depth of Storage Volume 2.00 ft 841.00 0.00 2,726 0 842.00 1.00 3,147 2,934 Basin Configuration 843.00 2.00 3,594 6,302 Bottom Elevation 841.00 msl 844.00 3.00 4,066 10,130 Sediment Storage Elevation/Spillway 843.00 msl 845.00 4.00 4,563 14,442 Emergency Spillway Crest 844.00 msl Top of Berm 845.50 msl Skimmer Outlet Desired Skimmer Drawdown Time(td)6 72 hrs Desired Skimmer Drawdown Rate(Qd) 1,350 ft'/day Skimmer Size 5.0 in Head on Orifice(H)5 0.333 ft Basin Size Check Basin Surface Area Provided at Spillway Crest 3,594 sf Calculated Orifice Diameter' 1.006 in Basin Storage Volume Provided Below Spillway Crest 6,302 cf Actual Orifice Diameter' 1.000 in Actual Skimmer Drawdown Time' 73 hrs Emergency Spillway Design ��A 1.5)) h= E3000EE] Q= 11.04 cfs C= L= 10.00 ft Notes 1.See attached drainage area map. 2.Entire area is denuded.Conservative rational coefficient for smooth bare packed soil is 0.60. 3.Time of concentration was assumed to be the minimum of 5 minutes. 4.Rainfall intensity at project location was acquired from the NOAA website,http://hdsc.nws.noaa.gov/hdsc/pfds/pfds_map_cont.html. 5.From Section 6.64-Skimmer Sediment Basin of the NCDEQ Erosion and Sediment Control Planning and Design Manual. 6.Basin is required to be dewatered by the skimmer in 48 to 120 hours.The optimal dewatering time is 72 hours(see note 5). 7.Weir equation: 0=CLH'' Page 7 of 13 SKIMMER BASIN CALCULATIONS Lithium Hydroxide Conversion Plant HDR PROJECT NO.: 10302238 DATE: 08.27.2021 BY: AKL REVISED: 05.31.2022 RVW: VH Skimmer Basin: SK-245-Phase 1 Drainage Area Characteristics Required Storage Volume Total drainage area(TDA)' 3.10 ac 10 Yr Peak Flow(Q16) 13.50 cfs Disturbed area(DA) 3.10 ac 25 Yr Peak Flow(Q25) 15.21 cfs Rational Coefficient(C)2 0.60 Req'd Min.Surface Area (325 sf per cfs of Q25)5 4,945 sf Time of Concentration(TC)3 5.0 min Req'd Min.Storage Volume (1800 cf per ac of TDA)5 5,580 cf 10 Yr Storm Rainfall Intensity i° 7.3 in/hr 25 Yr Storm Rainfall Intensity(i)° 8.2 in/hr Design Criteria SK-245-Phase 1 Bottom Elevation 840.00 msl Elev.(msl) Depth(ft) Area(sf) Cumulative Volume(cf) Depth of Storage Volume 2.00 ft 840.00 0.00 3,964 0 841.00 1.00 4,470 4,214 Basin Configuration 842.00 2.00 5,001 8,947 Bottom Elevation 840.00 msl 843.00 3.00 5,558 14,225 Sediment Storage Elevation 842.00 msl 844.00 4.00 6,139 20,071 Emergency Spillway Crest 843.00 msl Top of Berm 844.50 msl Skimmer Outlet Desired Skimmer Drawdown Time(td)6 72 hrs Desired Skimmer Drawdown Rate(Qd) 1,860 ft'/day Skimmer Size 8.0 in Head on Orifice(H)5 0.500 ft Basin Size Check Basin Surface Area Provided at Spillway Crest 5,001 sf Calculated Orifice Diameter' 1.067 in Basin Storage Volume Provided Below Spillway Crest 8,947 cf Actual Orifice Diameter' 1.000 in Actual Skimmer Drawdown Time' 82 hrs Emergency Spillway Design ��A 1.5)) h= E3000EE] Q= 15.21 cfs C= L= 10.00 ft Notes 1.See attached drainage area map. 2.Entire area is denuded.Conservative rational coefficient for smooth bare packed soil is 0.60. 3.Time of concentration was assumed to be the minimum of 5 minutes. 4.Rainfall intensity at project location was acquired from the NOAA website,http://hdsc.nws.noaa.gov/hdsc/pfds/pfds_map_cont.html. 5.From Section 6.64-Skimmer Sediment Basin of the NCDEQ Erosion and Sediment Control Planning and Design Manual. 6.Basin is required to be dewatered by the skimmer in 48 to 120 hours.The optimal dewatering time is 72 hours(see note 5). 7.Weir equation: 0=CLH'' Page 8 of 13 SKIMMER BASIN CALCULATIONS Lithium Hydroxide Conversion Plant HDR PROJECT NO.: 10302238 DATE: 08.27.2021 BY: AKL REVISED: 05.31.2022 RVW: VH Skimmer Basin: SK-245-Phase 2 Drainage Area Characteristics Required Storage Volume Total drainage area(TDA)' 1.15 ac 10 Yr Peak Flow(Q16) 5.01 cfs Disturbed area(DA) 1.15 ac 25 Yr Peak Flow(Q25) 5.64 cfs Rational Coefficient(C)2 0.60 Req'd Min.Surface Area (325 sf per cfs of Q25)5 1,834 sf Time of Concentration(TC)3 5.0 min Req'd Min.Storage Volume (1800 cf per ac of TDA)5 2,070 cf 10 Yr Storm Rainfall Intensity i° 7.3 in/hr 25 Yr Storm Rainfall Intensity(i)° 8.2 in/hr Design Criteria SK-245-Phase 2 Bottom Elevation 840.00 msl Elev.(msl) Depth(ft) Area(sf) Cumulative Volume(cf) Depth of Storage Volume 2.00 ft 840.00 0.00 1,263 0 841.00 1.00 1,577 1,417 Basin Configuration 842.00 2.00 1,946 3,175 Bottom Elevation 840.00 msl 843.00 3.00 2,321 5,306 Sediment Storage Elevation 842.00 msl 844.00 4.00 2,721 7,824 Emergency Spillway Crest 843.00 msl Top of Berm 844.50 msl Skimmer Outlet Desired Skimmer Drawdown Time(td)6 72 hrs Desired Skimmer Drawdown Rate(Qd) 690 ft3/day Skimmer Size 4.0 in Head on Orifice(H)5 0.333 ft Basin Size Check Basin Surface Area Provided at Spillway Crest 1,946 sf Calculated Orifice Diameter' 0.719 in Basin Storage Volume Provided Below Spillway Crest 3,175 cf Actual Orifice Diameter' 0.750 in Actual Skimmer Drawdown Time' 66 hrs Emergency Spillway Design ��A 1.5)) h= E3000EE] Q= 5.64 cfs C= L= 10.00 ft Notes 1.See attached drainage area map. 2.Entire area is denuded.Conservative rational coefficient for smooth bare packed soil is 0.60. 3.Time of concentration was assumed to be the minimum of 5 minutes. 4.Rainfall intensity at project location was acquired from the NOAA website,http://hdsc.nws.noaa.gov/hdsc/pfds/pfds_map_cont.html. 5.From Section 6.64-Skimmer Sediment Basin of the NCDEQ Erosion and Sediment Control Planning and Design Manual. 6.Basin is required to be dewatered by the skimmer in 48 to 120 hours.The optimal dewatering time is 72 hours(see note 5). 7.Weir equation: 0=CLH'' Page 9 of 13 SKIMMER BASIN CALCULATIONS Lithium Hydroxide Conversion Plant HDR PROJECT NO.: 10302238 DATE: 08.27.2021 BY: AKL REVISED: 05.31.2022 RVW: VH Skimmer Basin: Drainage Area Characteristics Required Storage Volume Total drainage area(TDA)' 2.80 ac 10 Yr Peak Flow(Q16) 12.20 cfs Disturbed area(DA) 2.10 ac 25 Yr Peak Flow(Q25) 13.74 cfs Rational Coefficient(C)2 0.60 Req'd Min.Surface Area (325 sf per cfs of Q25)5 4,466 sf Time of Concentration(TC)3 5.0 min Req'd Min.Storage Volume (1800 cf per ac of TDA)5 5,040 cf 10 Yr Storm Rainfall Intensity i° 7.3 in/hr 25 Yr Storm Rainfall Intensity(i)° 8.2 in/hr Design Criteria SK-246-Phase 1 Bottom Elevation 877.00 msl Elev.(msl) Depth(ft) Area(sf) Cumulative Volume(cf) Depth of Storage Volume 2.00 ft 877.00 0.00 3,539 0 878.00 1.00 4,013 3,774 Basin Configuration 879.00 2.00 4,512 8,034 Bottom Elevation 877.00 msl 880.00 3.00 5,036 12,805 Sediment Storage Elevation 879.00 msl 881.00 4.00 5,585 18,113 Emergency Spillway Crest 880.00 msl Top of Berm 881.50 msl Skimmer Outlet Desired Skimmer Drawdown Time(td)6 72 hrs Desired Skimmer Drawdown Rate(Qd) 1,680 ft'/day Skimmer Size 8.0 in Head on Orifice(H)5 0.500 ft Basin Size Check Basin Surface Area Provided at Spillway Crest 4,512 sf Calculated Orifice Diameter' 1.014 in Basin Storage Volume Provided Below Spillway Crest 8,034 cf Actual Orifice Diameter' 1.000 in Actual Skimmer Drawdown Time' 74 hrs Emergency Spillway Design ��A 1.5)) h= E3000EE] Q= 13.74 cfs C= L= 10.00 ft Notes 1.See attached drainage area map. 2.Entire area is denuded.Conservative rational coefficient for smooth bare packed soil is 0.60. 3.Time of concentration was assumed to be the minimum of 5 minutes. 4.Rainfall intensity at project location was acquired from the NOAA website,http://hdsc.nws.noaa.gov/hdsc/pfds/pfds_map_cont.html. 5.From Section 6.64-Skimmer Sediment Basin of the NCDEQ Erosion and Sediment Control Planning and Design Manual. 6.Basin is required to be dewatered by the skimmer in 48 to 120 hours.The optimal dewatering time is 72 hours(see note 5). 7.Weir equation: 0=CLH'' Page 10 of 13 SKIMMER BASIN CALCULATIONS Lithium Hydroxide Conversion Plant HDR PROJECT NO.: 10302238 DATE: 08.27.2021 BY: AKL REVISED: 05.31.2022 RVW: VH Skimmer Basin: SK-247-Phase 1 Drainage Area Characteristics Required Storage Volume Total drainage area(TDA)' 1.90 ac 10 Yr Peak Flow(Q16) 8.28 cfs Disturbed area(DA) 1.90 ac 25 Yr Peak Flow(Q25) 9.33 cfs Rational Coefficient(C)2 0.60 Req'd Min.Surface Area (325 sf per cfs of Q25)5 3,031 sf Time of Concentration(TC)3 5.0 min Req'd Min.Storage Volume (1800 cf per ac of TDA)5 3,420 cf 10 Yr Storm Rainfall Intensity i° 7.3 in/hr 25 Yr Storm Rainfall Intensity(i)° 8.2 in/hr Design Criteria SK-247-Phase 1 Bottom Elevation 888.00 msl Elev.(msl) Depth(ft) Area(sf) Cumulative Volume(cf) Depth of Storage Volume 2.00 ft 888.00 0.00 2,273 0 889.00 1.00 2,658 2,463 Basin Configuration 890.00 2.00 3,069 5,324 Bottom Elevation 888.00 msl 891.00 3.00 3,505 8,609 Sediment Storage Elevation 890.00 msl 892.00 4.00 3,966 12,342 Emergency Spillway Crest 891.00 msl Top of Berm 892.50 msl Skimmer Outlet Desired Skimmer Drawdown Time(td)6 72 hrs Desired Skimmer Drawdown Rate(Qd) 1,140 ft'/day Skimmer Size 8.0 in Head on Orifice(H)5 0.500 ft Basin Size Check Basin Surface Area Provided at Spillway Crest 3,069 sf Calculated Orifice Diameter' 0.835 in Basin Storage Volume Provided Below Spillway Crest 5,324 cf Actual Orifice Diameter' 0.750 in Actual Skimmer Drawdown Time' 89 hrs Emergency Spillway Design ��A 1.5)) h= E3000EE] Q= 9.33 cfs C= L= 10.00 ft Notes 1.See attached drainage area map. 2.Entire area is denuded.Conservative rational coefficient for smooth bare packed soil is 0.60. 3.Time of concentration was assumed to be the minimum of 5 minutes. 4.Rainfall intensity at project location was acquired from the NOAA website,http://hdsc.nws.noaa.gov/hdsc/pfds/pfds_map_cont.html. 5.From Section 6.64-Skimmer Sediment Basin of the NCDEQ Erosion and Sediment Control Planning and Design Manual. 6.Basin is required to be dewatered by the skimmer in 48 to 120 hours.The optimal dewatering time is 72 hours(see note 5). 7.Weir equation: 0=CLH's Page 11 of 13 SKIMMER BASIN CALCULATIONS Lithium Hydroxide Conversion Plant HDR PROJECT NO.: 10302238 DATE: 08.27.2021 BY: AKL REVISED: 05.31.2022 RVW: VH Skimmer Basin: Drainage Area Characteristics Required Storage Volume Total drainage area(TDA)' 2.95 ac 10 Yr Peak Flow(Q16) 12.85 cfs Disturbed area(DA) 2.95 ac 25 Yr Peak Flow(Q25) 14.48 cfs Rational Coefficient(C)2 0.60 Req'd Min.Surface Area (325 sf per cfs of Q25)5 4,706 sf Time of Concentration(TC)3 5.0 min Req'd Min.Storage Volume (1800 cf per ac of TDA)5 5,310 cf 10 Yr Storm Rainfall Intensity i° 7.3 in/hr 25 Yr Storm Rainfall Intensity(i)° 8.2 in/hr Design Criteria SK-248-Phase 1 Bottom Elevation 870.00 msl Elev.(msl) Depth(ft) Area(sf) Cumulative Volume(cf) Depth of Storage Volume 2.00 ft 870.00 0.00 3,720 0 871.00 1.00 4,214 3,964 Basin Configuration 872.00 2.00 4,732 8,435 Bottom Elevation 870.00 msl 873.00 3.00 8,276 14,857 Sediment Storage Elevation 872.00 msl 874.00 4.00 5,845 21,882 Emergency Spillway Crest 873.00 msl Top of Berm 874.50 msl Skimmer Outlet Desired Skimmer Drawdown Time(td)6 72 hrs Desired Skimmer Drawdown Rate(Qd) 1,770 ft'/day Skimmer Size 8.0 in Head on Orifice(H)5 0.500 ft Basin Size Check Basin Surface Area Provided at Spillway Crest 4,732 sf Calculated Orifice Diameter' 1.041 in Basin Storage Volume Provided Below Spillway Crest 8,435 cf Actual Orifice Diameter' 1.000 in Actual Skimmer Drawdown Time' 78 hrs Emergency Spillway Design ��A 1.5)) h= E3000EE] Q= 14.48 cfs C= L= 10.00 ft Notes 1.See attached drainage area map. 2.Entire area is denuded.Conservative rational coefficient for smooth bare packed soil is 0.60. 3.Time of concentration was assumed to be the minimum of 5 minutes. 4.Rainfall intensity at project location was acquired from the NOAA website,http://hdsc.nws.noaa.gov/hdsc/pfds/pfds_map_cont.html. 5.From Section 6.64-Skimmer Sediment Basin of the NCDEQ Erosion and Sediment Control Planning and Design Manual. 6.Basin is required to be dewatered by the skimmer in 48 to 120 hours.The optimal dewatering time is 72 hours(see note 5). 7.Weir equation: 0=CLH'' Page 12 of 13 SKIMMER BASIN CALCULATIONS Lithium Hydroxide Conversion Plant HDR PROJECT NO.: 10302238 DATE: 05.31.2022 BY: AKL REVISED: RVW: VH Skimmer Basin: SK-249-Phase 1 Drainage Area Characteristics Required Storage Volume Total drainage area(TDA)' 2.40 ac 10 Yr Peak Flow(Q16) 10.45 cfs Disturbed area(DA) 2.40 ac 25 Yr Peak Flow(Q25) 11.78 cfs Rational Coefficient(C)2 0.60 Req'd Min.Surface Area (325 sf per cfs of Q25)5 3,828 sf Time of Concentration(TC)3 5.0 min Req'd Min.Storage Volume (1800 cf per ac of TDA)5 4,320 cf 10 Yr Storm Rainfall Intensity i° 7.3 in/hr 25 Yr Storm Rainfall Intensity(i)° 8.2 in/hr Design Criteria SK-249-Phase 1 Bottom Elevation 812.00 msl Elev.(msl) Depth(ft) Area(sf) Cumulative Volume(cf) Depth of Storage Volume 2.00 ft 812.00 0.00 3,026 0 813.00 1.00 3,482 3,251 Basin Configuration 814.00 2.00 3,964 6,972 Bottom Elevation 812.00 msl 815.00 3.00 4,470 11,186 Sediment Storage Elevation 814.00 msl 816.00 4.00 5,001 15,919 Emergency Spillway Crest 815.00 msl Top of Berm 816.50 msl Skimmer Outlet Desired Skimmer Drawdown Time(td)6 72 hrs Desired Skimmer Drawdown Rate(Qd) 1,440 ft'/day Skimmer Size 8.0 in Head on Orifice(H)5 0.500 ft Basin Size Check Basin Surface Area Provided at Spillway Crest 3,964 sf Calculated Orifice Diameter' 0.939 in Basin Storage Volume Provided Below Spillway Crest 6,972 cf Actual Orifice Diameter' 1.000 in Actual Skimmer Drawdown Time' 63 hrs Emergency Spillway Design ��A 1.5)) h= E3000EE] Q= 11.78 cfs C= L= 10.00 ft Notes 1.See attached drainage area map. 2.Entire area is denuded.Conservative rational coefficient for smooth bare packed soil is 0.60. 3.Time of concentration was assumed to be the minimum of 5 minutes. 4.Rainfall intensity at project location was acquired from the NOAA website,http://hdsc.nws.noaa.gov/hdsc/pfds/pfds_map_cont.html. 5.From Section 6.64-Skimmer Sediment Basin of the NCDEQ Erosion and Sediment Control Planning and Design Manual. 6.Basin is required to be dewatered by the skimmer in 48 to 120 hours.The optimal dewatering time is 72 hours(see note 5). 7.Weir equation: 0=CLH'' Page 13 of 13 PLC I Lithium Hydroxide Conversion Plant—Stormwater Calculations ��� Appendix I—Stormwater Calculations Appendix I —Stormwater Calculations PLC I Lithium Hydroxide Conversion Plant—Stormwater Calculations Appendix I—Stormwater Calculations This page intentionally left blank. Ca 5A-N rz�A5A � F5AR A-N o- 5A-S 1A-S -� 1A-R D 1A- —D F 24"PIPE \ SB-5(North) SB-5(North) SB-5(North) SA-1(North) SA-1(North) SA-1(North) 24"PIPE 5BB ' 5B-R ,— 5B-S B-S 1 B-R —fl 1 BB 1O SB-5(South) SB-5(South) SB-5(South) SB-1(South) SB-1(South) SB-1 (South) 24"PIPE F4A-N � A4A '�— [4A R] A2A 2A-S —� [2A-R � 24"PIPE SB-4(North) SB-4(North) SB-4(North) SB-2(North) SB-2(North) SB-2(North) 24"PIPE(North) cs 46C-N � 46-P SB-2(South) SB-2(South) SB-2(South) 24"PIPE(South) 24"PIPE SB-4 outh) [413-R] SB-4(South) SB-4(South) SB-3 SB-3 8B_3 24"PIPE Subcat Reach On Link Routing Diagram for Piedmont Ditches and Storm Sewer Prepared by HDR, Inc, Printed 5/31/2022 HydroCAD®10.10-7b s/n 07102 ©2022 HydroCAD Software Solutions LLC Piedmont Ditches and Storm Sewer PLI-Gaston Co 25-yr Duration=6 min, Inten=7.72 in/hr Prepared by HDR, Inc Printed 5/31/2022 HydroCAD® 10.10-7b s/n 07102 ©2022 HydroCAD Software Solutions LLC Page 2 Time span=0.00-2.00 hrs, dt=0.01 hrs, 201 points Runoff by Rational method, Rise/Fall=1.0/1.0 xTc Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment1A-S:SA-1 (North) Runoff Area=2.926 ac 94.53% Impervious Runoff Depth=0.77" Tc=0.0 min C=0.91 Runoff=20.71 cfs 0.188 of Subcatchment1 B-S: SB-1 (South) Runoff Area=1.881 ac 96.28% Impervious Runoff Depth=0.78" Tc=0.0 min C=0.92 Runoff=13.46 cfs 0.122 of Subcatchment2A-S:SB-2(North) Runoff Area=1.230 ac 93.50% Impervious Runoff Depth=0.76" Tc=0.0 min C=0.90 Runoff=8.61 cfs 0.078 of Subcatchment2B-S: SB-2(South) Runoff Area=2.380 ac 93.70% Impervious Runoff Depth=0.77" Tc=0.0 min C=0.91 Runoff=16.85 cfs 0.153 of Subcatchment3-S: SIB-3 Runoff Area=1.632 ac 87.25% Impervious Runoff Depth=0.73" Tc=0.0 min C=0.86 Runoff=10.92 cfs 0.099 of Subcatchment4A-S:SB-4(North) Runoff Area=3.076 ac 92.98% Impervious Runoff Depth=0.76" Tc=0.0 min C=0.90 Runoff=21.54 cfs 0.196 of Subcatchment4B-S: SB-4(South) Runoff Area=2.907 ac 89.85% Impervious Runoff Depth=0.75" Tc=0.0 min C=0.88 Runoff=19.90 cfs 0.181 of Subcatchment5A-S:SB-5(North) Runoff Area=0.740 ac 93.24% Impervious Runoff Depth=0.76" Tc=0.0 min C=0.90 Runoff=5.18 cfs 0.047 of Subcatchment5B-S: SB-5(South) Runoff Area=2.180 ac 88.53% Impervious Runoff Depth=0.74" Tc=0.0 min C=0.87 Runoff=14.75 cfs 0.134 of Reach 1A-N:24" PIPE Avg. Flow Depth=1.41' Max Vet=8.75 fps Inflow=20.70 cfs 0.180 of 24.0" Round Pipe n=0.012 L=35.0' S=0.0100 '/' Capacity=24.51 cfs Outflow=20.69 cfs 0.180 of Reach 1A-R:SA-1 (North) Avg. Flow Depth=1.12' Max Vet=4.25 fps Inflow=20.71 cfs 0.188 of n=0.025 L=250.0' S=0.0100 '/' Capacity=84.64 cfs Outflow=20.70 cfs 0.180 of Reach 1 B-N: 24" PIPE Avg. Flow Depth=0.95' Max Vet=9.13 fps Inflow=13.46 cfs 0.117 of 24.0" Round Pipe n=0.012 L=35.0' S=0.0143 '/' Capacity=29.29 cfs Outflow=13.46 cfs 0.117 of Reach 1 B-R: SB-1 (South) Avg. Flow Depth=0.93' Max Vet=3.81 fps Inflow=13.46 cfs 0.122 of n=0.025 L=200.0' S=0.0100 '/' Capacity=84.64 cfs Outflow=13.46 cfs 0.117 of Reach 2A-N:24" PIPE(North) Avg. Flow Depth=0.78' Max Vet=6.96 fps Inflow=7.98 cfs 0.075 of 24.0" Round Pipe n=0.012 L=65.0' S=0.0100 '/' Capacity=24.51 cfs Outflow=7.85 cfs 0.075 of Reach 2A-R:SB-2(North) Avg. Flow Depth=0.87' Max Vet=2.58 fps Inflow=8.61 cfs 0.078 of n=0.025 L=400.0' S=0.0050 '/' Capacity=59.85 cfs Outflow=7.98 cfs 0.075 of Reach 2B-N: 24" PIPE(South) Avg. Flow Depth=1.18' Max Vet=8.31 fps Inflow=16.04 cfs 0.146 of 24.0" Round Pipe n=0.012 L=65.0' S=0.0100 '/' Capacity=24.51 cfs Outflow=15.89 cfs 0.146 of Piedmont Ditches and Storm Sewer PLI-Gaston Co 25-yr Duration=6 min, Inten=7.72 in/hr Prepared by HDR, Inc Printed 5/31/2022 HydroCAD® 10.10-7b s/n 07102 ©2022 HydroCAD Software Solutions LLC Page 3 Reach 213-R: SB-2(South) Avg. Flow Depth=1.17' Max Vet=3.08 fps Inflow=16.85 cfs 0.153 of n=0.025 L=400.0' S=0.0050 '/' Capacity=59.85 cfs Outflow=16.04 cfs 0.146 of Reach 3-N: 24" PIPE Avg. Flow Depth=0.93' Max Vet=7.57 fps Inflow=10.91 cfs 0.095 of 24.0" Round Pipe n=0.012 L=120.0' S=0.0100 '/' Capacity=24.51 cfs Outflow=10.91 cfs 0.095 of Reach 3-R: SIB-3 Avg. Flow Depth=0.72' Max Vet=4.83 fps Inflow=10.92 cfs 0.099 of n=0.012 L=278.4' S=0.0050 '/' Capacity=125.04 cfs Outflow=10.91 cfs 0.095 of Reach 4A-N:24" PIPE Avg. Flow Depth=1.45' Max Vet=8.80 fps Inflow=21.49 cfs 0.187 of 24.0" Round Pipe n=0.012 L=100.0' S=0.0100 '/' Capacity=24.51 cfs Outflow=21.47 cfs 0.187 of Reach 4A-R:SIB-4(North) Avg. Flow Depth=1.02' Max Vet=5.17 fps Inflow=21.54 cfs 0.196 of n=0.025 L=380.0' S=0.0165 '/' Capacity=108.72 cfs Outflow=21.49 cfs 0.187 of Reach 413-R: SIB-4(South) Avg. Flow Depth=1.09' Max Vet=4.19 fps Inflow=19.90 cfs 0.181 of n=0.025 L=420.0' S=0.0100 '/' Capacity=84.64 cfs Outflow=19.55 cfs 0.173 of Reach 4BC-N: 24" PIPE Avg. Flow Depth=1.34' Max Vet=8.64 fps Inflow=19.55 cfs 0.173 of 24.0" Round Pipe n=0.012 L=290.0' S=0.0100 '/' Capacity=24.51 cfs Outflow=19.31 cfs 0.173 of Reach 5A-N:24" PIPE Avg. Flow Depth=1.31' Max Vet=8.58 fps Inflow=18.71 cfs 0.173 of 24.0" Round Pipe n=0.012 L=60.0' S=0.0100 '/' Capacity=24.51 cfs Outflow=18.57 cfs 0.173 of Reach 5A-R:SIB-5(North) Avg. Flow Depth=0.52' Max Vet=3.87 fps Inflow=5.18 cfs 0.047 of n=0.025 L=200.0' S=0.0201 '/' Capacity=119.84 cfs Outflow=5.18 cfs 0.045 of Reach 5B-R: SIB-5(South) Avg. Flow Depth=0.99' Max Vet=3.69 fps Inflow=14.75 cfs 0.134 of n=0.025 L=455.0' S=0.0088 '/' Capacity=79.46 cfs Outflow=14.27 cfs 0.128 of Pond 1A-P:SA-1 (North) Peak Elev=839.15' Inflow=20.70 cfs 0.180 of Outflow=20.70 cfs 0.180 of Pond 1 B-P: SB-1 (South) Peak Elev=837.97' Inflow=13.46 cfs 0.117 of Outflow=13.46 cfs 0.117 of Pond 2A-P:SB-2(North) Peak Elev=837.49' Inflow=7.98 cfs 0.075 of Outflow=7.98 cfs 0.075 of Pond 2B-P: SB-2(South) Peak Elev=838.33' Inflow=16.04 cfs 0.146 of Outflow=16.04 cfs 0.146 of Pond 3-P: SIB-3 Peak Elev=837.67' Inflow=10.91 cfs 0.095 of Outflow=10.91 cfs 0.095 of Pond 4A-P:SB-4(North) Peak Elev=838.41' Inflow=21.49 cfs 0.187 of Outflow=21.49 cfs 0.187 of Pond 4B-P: SB-4(South) Peak Elev=837.33' Inflow=19.55 cfs 0.173 of Outflow=19.55 cfs 0.173 of Piedmont Ditches and Storm Sewer PLI-Gaston Co 25-yr Duration=6 min, Inten=7.72 in/hr Prepared by HDR, Inc Printed 5/31/2022 HydroCADO 10.10-7b s/n 07102 ©2022 HydroCAD Software Solutions LLC Page 4 Pond 5A-P:SIB-5(North) Peak Elev=839.39' Inflow=5.18 cfs 0.045 of Outflow=5.18 cfs 0.045 of Pond 513-P: SIB-5(South) Peak Elev=838.98' Inflow=14.27 cfs 0.128 of Outflow=14.27 cfs 0.128 of Total Runoff Area = 18.952 ac Runoff Volume = 1.199 of Average Runoff Depth = 0.76" 7.80% Pervious = 1.479 ac 92.20% Impervious = 17.473 ac Piedmont Ditches and Storm Sewer PLI-Gaston Co 25-yr Duration=6 min, Inten=7.72 in/hr Prepared by HDR, Inc Printed 5/31/2022 HydroCADO 10.10-7b s/n 07102 ©2022 HydroCAD Software Solutions LLC Page 5 Summary for Subcatchment 1A-S: SA-1 (North) Runoff = 20.71 cfs @ 0.00 hrs, Volume= 0.188 af, Depth= 0.77" Routed to Reach 1A-R : SA-1 (North) Runoff by Rational method, Rise/Fall=1.0/1.0 xTc, Time Span= 0.00-2.00 hrs, dt= 0.01 hrs PLI-Gaston Co 25-yr Duration=6 min, Inten=7.72 in/hr Area (ac) C Description 2.766 0.95 0.160 0.25 2.926 0.91 Weighted Average 0.160 5.47% Pervious Area 2.766 94.53% Impervious Area Subcatchment 1A-S: SA-1 (North) Hydrograph 23 — — — — — — — — — — — — — — — — — ■Runoff 20.71 cfs 20 - - - PLGGaston-Gd--25- - 18 - Duration=6 min, 17 — — — —16 Udan 7.72 Cnlhr 15 14 12 t -Bufto - Otuftfe-Q.18$S9 - 10 - - - - - - - -unofFDepth:* 77" 8 7 - — — — — — — — — -- 6 — — — — — — - =0.91 5 4 3 2 1 0 0 1 2 Time (hours) Piedmont Ditches and Storm Sewer PLI-Gaston Co 25-yr Duration=6 min, Inten=7.72 in/hr Prepared by HDR, Inc Printed 5/31/2022 HydroCADO 10.10-7b s/n 07102 ©2022 HydroCAD Software Solutions LLC Page 6 Summary for Subcatchment 1 B-S: SB-1 (South) Runoff = 13.46 cfs @ 0.00 hrs, Volume= 0.122 af, Depth= 0.78" Routed to Reach 1 B-R : SB-1 (South) Runoff by Rational method, Rise/Fall=1.0/1.0 xTc, Time Span= 0.00-2.00 hrs, dt= 0.01 hrs PLI-Gaston Co 25-yr Duration=6 min, Inten=7.72 in/hr Area (ac) C Description 1.811 0.95 0.070 0.25 1.881 0.92 Weighted Average 0.070 3.72% Pervious Area 1.811 96.28% Impervious Area Subcatchment 1 B-S: SBA (South) Hydrograph 15 ■Runoff 13.46 cfs 13 PL1_-Gasfon G0 23=yr 12 - - - - - - - - -Duration=Cmin, 11 - - - - - - - - Inten=7.72Fnft 10 Area=r881 ac 8 Runoff Volume=0.122 of LL ' - - - ! - - - -Runoff Depth=0_78 - - - - T Tc=O fl-m i n q C=0.92 3 2 1 0 0 1 2 Time (hours) Piedmont Ditches and Storm Sewer PLI-Gaston Co 25-yr Duration=6 min, Inten=7.72 in/hr Prepared by HDR, Inc Printed 5/31/2022 HydroCADO 10.10-7b s/n 07102 ©2022 HydroCAD Software Solutions LLC Page 7 Summary for Subcatchment 2A-S: SB-2 (North) Runoff = 8.61 cfs @ 0.00 hrs, Volume= 0.078 af, Depth= 0.76" Routed to Reach 2A-R : SB-2 (North) Runoff by Rational method, Rise/Fall=1.0/1.0 xTc, Time Span= 0.00-2.00 hrs, dt= 0.01 hrs PLI-Gaston Co 25-yr Duration=6 min, Inten=7.72 in/hr Area (ac) C Description 1.150 0.95 0.080 0.25 1.230 0.90 Weighted Average 0.080 6.50% Pervious Area 1.150 93.50% Impervious Area Subcatchment 2A-S: SB-2 (North) Hydrograph + ■Runoff 8.61 cfs �1 - 4- - PLI-Gaston Co 25-yr 8 - _Duration=6 min, Inten=7.72 in/hr - � - - - - - - - - - - - 6 Runoff Area=1 .230 ac 5 - - - - Runoff Volume=0.078 of o - - - - - - - - -Runoff Depth-0-76" LL 4 - - - - - - - -Tc=0.0min- 3 I I - C=0.90 2 1 � L 1 I I 0 0 1 2 Time (hours) Piedmont Ditches and Storm Sewer PLI-Gaston Co 25-yr Duration=6 min, Inten=7.72 in/hr Prepared by HDR, Inc Printed 5/31/2022 HydroCADO 10.10-7b s/n 07102 ©2022 HydroCAD Software Solutions LLC Page 8 Summary for Subcatchment 2B-S: SB-2 (South) Runoff = 16.85 cfs @ 0.00 hrs, Volume= 0.153 af, Depth= 0.77" Routed to Reach 2B-R : SB-2 (South) Runoff by Rational method, Rise/Fall=1.0/1.0 xTc, Time Span= 0.00-2.00 hrs, dt= 0.01 hrs PLI-Gaston Co 25-yr Duration=6 min, Inten=7.72 in/hr Area (ac) C Description 2.230 0.95 0.150 0.25 2.380 0.91 Weighted Average 0.150 6.30% Pervious Area 2.230 93.70% Impervious Area Subcatchment 2B-S: SB-2 (South) Hydrograph ■Runoff 16.85 cfs 1s - - - PLI--G fSton-CO 25yr - T — — — — — 15 T - - - - - -Dwafian=6r im, 14 - T — — — — — — rnten=7.72inthr 12 - - - - - - - -Runoff Area=2.380-ae 10 - - - - fi -Runoff-VoI_u_me=Q.153-af t - - - -Runoff Depth=G-.77u LL $ - 7 — — — — — — — — — — — — — + - - - - - - - - - Te=0-0-mjq 6 — — — — — — — — — — — — — — — -k — — — — — — — — — — — —/� 5 — — — — — — — — — — — — — — - — — — — — — — — — — — C=0.91 4 3 _ 2 1 0 0 1 2 Time (hours) Piedmont Ditches and Storm Sewer PLI-Gaston Co 25-yr Duration=6 min, Inten=7.72 in/hr Prepared by HDR, Inc Printed 5/31/2022 HydroCADO 10.10-7b s/n 07102 ©2022 HydroCAD Software Solutions LLC Page 9 Summary for Subcatchment 3-S: SB-3 Runoff = 10.92 cfs @ 0.00 hrs, Volume= 0.099 af, Depth= 0.73" Routed to Reach 3-R : SB-3 Runoff by Rational method, Rise/Fall=1.0/1.0 xTc, Time Span= 0.00-2.00 hrs, dt= 0.01 hrs PLI-Gaston Co 25-yr Duration=6 min, Inten=7.72 in/hr Area (ac) C Description 1.424 0.95 0.208 0.25 1.632 0.86 Weighted Average 0.208 12.75% Pervious Area 1.424 87.25% Impervious Area Subcatchment 3-S: SB-3 Hydrograph 12 ■Runoff 10.92 cfs PLI-Gaston Co 25-yr 10 - - - - Duration=6 min, - - - - ! - - - Inten=7.72in/hr - - - - - - - - 4- - - -Runoff Area=1:632 ac ' -Run-off- Volume=0.099-af ° 6 - - ! - - Runoff Depth=0.73—' LL 5 Tc=0.0 m i n 4 - - - - - - -C=9.-86 3- 2- 0 0 1 2 Time (hours) Piedmont Ditches and Storm Sewer PLI-Gaston Co 25-yr Duration=6 min, Inten=7.72 in/hr Prepared by HDR, Inc Printed 5/31/2022 HydroCADO 10.10-7b s/n 07102 ©2022 HydroCAD Software Solutions LLC Page 10 Summary for Subcatchment 4A-S: SB-4 (North) Runoff = 21.54 cfs @ 0.00 hrs, Volume= 0.196 af, Depth= 0.76" Routed to Reach 4A-R : SB-4 (North) Runoff by Rational method, Rise/Fall=1.0/1.0 xTc, Time Span= 0.00-2.00 hrs, dt= 0.01 hrs PLI-Gaston Co 25-yr Duration=6 min, Inten=7.72 in/hr Area (ac) C Description 2.860 0.95 0.216 0.25 3.076 0.90 Weighted Average 0.216 7.02% Pervious Area 2.860 92.98% Impervious Area Subcatchment 4A-S: SB-4 (North) Hydrograph 24 — — — — — - ■Runoff 21.54 cfs 21 4- — — — -PLI-Gaston-Go-25 y 20 - fi 19 - Duration=6 mjw, 17 - ! - - - - - - Irate-n=7.72i-nft 15 fi -ftnof# IA1res=1076-aE 13 3 12 211 -Runoff ^ 7y 9 T 1 c---O-O-nTin s — - — -- — — 5 4 3 2 1 0 0 1 2 Time (hours) Piedmont Ditches and Storm Sewer PLI-Gaston Co 25-yr Duration=6 min, Inten=7.72 in/hr Prepared by HDR, Inc Printed 5/31/2022 HydroCADO 10.10-7b s/n 07102 ©2022 HydroCAD Software Solutions LLC Page 11 Summary for Subcatchment 4B-S: SB-4 (South) Runoff = 19.90 cfs @ 0.00 hrs, Volume= 0.181 af, Depth= 0.75" Routed to Reach 4B-R : SB-4 (South) Runoff by Rational method, Rise/Fall=1.0/1.0 xTc, Time Span= 0.00-2.00 hrs, dt= 0.01 hrs PLI-Gaston Co 25-yr Duration=6 min, Inten=7.72 in/hr Area (ac) C Description 2.612 0.95 0.295 0.25 2.907 0.88 Weighted Average 0.295 10.15% Pervious Area 2.612 89.85% Impervious Area Subcatchment 4B-S: SB-4 (South) Hydrograph 22 ■Runoff 19.90 cfs 20 F # 25 18 1 =DuTafim=6 mhy, 16 tnten=7.72 mfhr 15 14 Runoff Area=2.907 ac 13 12 RunoffA/olume=0.181- of LL 10 off Depth=01-5-' 8 - - - - - - - - - - - - - - - Tc7--O.O-mjpp 6 - - - - - - - - - - - C n 00 5 4 3 — — — — 2 1 0 0 1 2 Time (hours) Piedmont Ditches and Storm Sewer PLI-Gaston Co 25-yr Duration=6 min, Inten=7.72 in/hr Prepared by HDR, Inc Printed 5/31/2022 HydroCADO 10.10-7b s/n 07102 ©2022 HydroCAD Software Solutions LLC Page 12 Summary for Subcatchment 5A-S: SB-5 (North) Runoff = 5.18 cfs @ 0.00 hrs, Volume= 0.047 af, Depth= 0.76" Routed to Reach 5A-R : SB-5 (North) Runoff by Rational method, Rise/Fall=1.0/1.0 xTc, Time Span= 0.00-2.00 hrs, dt= 0.01 hrs PLI-Gaston Co 25-yr Duration=6 min, Inten=7.72 in/hr Area (ac) C Description 0.690 0.95 0.050 0.25 0.740 0.90 Weighted Average 0.050 6.76% Pervious Area 0.690 93.24% Impervious Area Subcatchment 5A-S: SB-5 (North) Hydrograph ■Runoff 5.1 s ors 5 PC1=Gasfon�Co-23=yr Duration=6 min, 4 - - rnten=7.72-in/hr Runoff Area=0.740 ac w 1 3 I I Runoff Volume=0.047 of LL Runoff Depth=0.76" A - rc=O.Omin C=0.90 1 0 0 1 2 Time (hours) Piedmont Ditches and Storm Sewer PLI-Gaston Co 25-yr Duration=6 min, Inten=7.72 in/hr Prepared by HDR, Inc Printed 5/31/2022 HydroCADO 10.10-7b s/n 07102 ©2022 HydroCAD Software Solutions LLC Page 13 Summary for Subcatchment 5B-S: SB-5 (South) Runoff = 14.75 cfs @ 0.00 hrs, Volume= 0.134 af, Depth= 0.74" Routed to Reach 5B-R : SB-5 (South) Runoff by Rational method, Rise/Fall=1.0/1.0 xTc, Time Span= 0.00-2.00 hrs, dt= 0.01 hrs PLI-Gaston Co 25-yr Duration=6 min, Inten=7.72 in/hr Area (ac) C Description 1.930 0.95 0.250 0.25 2.180 0.87 Weighted Average 0.250 11.47% Pervious Area 1.930 88.53% Impervious Area Subcatchment 5B-S: SB-5 (South) Hydrograph 16 — — — — — — — — — — — — — — — — — — ■Runoff 14.75 cfs 14 - - - - - - - Ptl=Gaston o25yr 13 - — — — — — —Durafion=5min-, 12 L - - - - - - In#en=7.72 inft 10 runoff Area=2-.TBD-ad 9 - — — — — — — T —Runoff Volume=0.13" - - - - - - - - - - - -Runoff Dep#h=G-.74" LL 7 — — — — — — — — — — — — - - ! - - - - - - - - - Tc=99min 5 — — — — — — — — — — — — — — — — — — — — — — — — — -C=9.$7 4 I 3 2 1 0 0 1 2 Time (hours) Piedmont Ditches and Storm Sewer PLI-Gaston Co 25-yr Duration=6 min, Inten=7.72 in/hr Prepared by HDR, Inc Printed 5/31/2022 HydroCAD® 10.10-7b s/n 07102 ©2022 HydroCAD Software Solutions LLC Page 14 Summary for Reach 1A-N: 24" PIPE INLET PIPE TO SB - 201 [52] Hint: Inlet/Outlet conditions not evaluated (Basin has double inlet pipes) [79] Warning: Submerged Pond 1A-P Primary device # 1 INLET by 1.26' Inflow Area = 2.926 ac, 94.53% Impervious, Inflow Depth = 0.74" for 25-yr event Inflow = 20.70 cfs @ 0.11 hrs, Volume= 0.180 of Outflow = 20.69 cfs @ 0.11 hrs, Volume= 0.180 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 0.00-2.00 hrs, dt= 0.01 hrs Max. Velocity= 8.75 fps, Min. Travel Time= 0.1 min Avg. Velocity = 1.82 fps, Avg. Travel Time= 0.3 min Peak Storage= 83 cf @ 0.11 hrs Average Depth at Peak Storage= 1.41' , Surface Width= 1.82' Bank-Full Depth= 2.00' Flow Area= 3.1 sf, Capacity= 24.51 cfs 24.0" Round Pipe n= 0.012 Concrete pipe, finished Length= 35.0' Slope= 0.0100 '/' Inlet Invert= 833.35', Outlet Invert= 833.00' Piedmont Ditches and Storm Sewer PLI-Gaston Co 25-yr Duration=6 min, Inten=7.72 in/hr Prepared by HDR, Inc Printed 5/31/2022 HydroCADO 10.10-7b s/n 07102 ©2022 HydroCAD Software Solutions LLC Page 15 Reach 1A-N: 24" PIPE Hydrograph i 23 i — — — — ❑Inflow zo 70 of5 —1— — ■Outflow 2; 20.69ofs _ _ - IInflow Area=7-926 aC 19 - - - - - - - - -KYg._-�Fllo—w—T-Dep6�1.4V 17 — — — — — — — — 1 �YJCIJc�L���.� f-PS 15 - - - - - - - - - — — — — — — — — � Om y 14 - - - - 1 Rdund Pipe 13 � 12 —1- - - - — — — c 11 —1- - - - - — — — — — — nID:012 a 10 = ��Y 9 —1— — — — — — — — — — — 7 ' 5 —I- - - - -APwC III Y24.50LdS 4 — — — — — — — — — — — — — — — — 3 ' 2 1 0 0 1 2 Time (hours) Piedmont Ditches and Storm Sewer PLI-Gaston Co 25-yr Duration=6 min, Inten=7.72 in/hr Prepared by HDR, Inc Printed 5/31/2022 HydroCADO 10.10-7b s/n 07102 ©2022 HydroCAD Software Solutions LLC Page 16 Summary for Reach 1A-R: SA-1 (North) Inflow Area = 2.926 ac, 94.53% Impervious, Inflow Depth = 0.77" for 25-yr event Inflow = 20.71 cfs @ 0.00 hrs, Volume= 0.188 of Outflow = 20.70 cfs @ 0.11 hrs, Volume= 0.180 af, Atten= 0%, Lag= 6.6 min Routed to Pond 1A-P : SA-1 (North) Routing by Stor-Ind+Trans method, Time Span= 0.00-2.00 hrs, dt= 0.01 hrs Max. Velocity= 4.25 fps, Min. Travel Time= 1.0 min Avg. Velocity = 0.90 fps, Avg. Travel Time= 4.6 min Peak Storage= 1,219 cf @ 0.10 hrs Average Depth at Peak Storage= 1.12' , Surface Width= 7.72' Bank-Full Depth= 2.00' Flow Area= 14.0 sf, Capacity= 84.64 cfs 1.00' x 2.00' deep channel, n= 0.025 Earth, clean &winding Side Slope Z-value= 3.0 7' Top Width= 13.00' Length= 250.0' Slope= 0.0100 '/' Inlet Invert= 839.60', Outlet Invert= 837.10' Reach 1A-R: SA-1 (North) Hydrograph ■Inflow 23 20.71 cfs — — — — — — — — — —1 — — r— — — — — — — — — — — — — — ■outflow 21 zo.7o�ts — — — — — — — — — — — — — — —1 — — N flout�'"'!1 eC�2�926 ar, 20 - — — — — I — — — — — — — — — — — — — — — — 19- -Flow Depth=t.1-2' 18 — — — — — — — —g'— — — — — — — — — 17 - — — — — — — — — — — —Max V-e =4.25-fps 16 15 -n=0.02. 14 t InL 13 — — — — — — — — — — — — — =ZWO' 12 r 10 — —I — — 8 - - - - ��padty=84:64 cfs 7 6 - — - 5 4 3 2 1 0 0 1 2 Time (hours) Piedmont Ditches and Storm Sewer PLI-Gaston Co 25-yr Duration=6 min, Inten=7.72 in/hr Prepared by HDR, Inc Printed 5/31/2022 HydroCAD® 10.10-7b s/n 07102 ©2022 HydroCAD Software Solutions LLC Page 17 Summary for Reach 1B-N: 24" PIPE INLET PIPE TO SB - 201 [52] Hint: Inlet/Outlet conditions not evaluated (Basin has double inlet pipes) [88] Warning: Qout>Qin may require smaller dt or Finer Routing [79] Warning: Submerged Pond 1 B-P Primary device # 1 INLET by 1.10' Inflow Area = 1.881 ac, 96.28% Impervious, Inflow Depth = 0.75" for 25-yr event Inflow = 13.46 cfs @ 0.11 hrs, Volume= 0.117 of Outflow = 13.46 cfs @ 0.11 hrs, Volume= 0.117 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 0.00-2.00 hrs, dt= 0.01 hrs Max. Velocity= 9.13 fps, Min. Travel Time= 0.1 min Avg. Velocity = 2.16 fps, Avg. Travel Time= 0.3 min Peak Storage= 52 cf @ 0.11 hrs Average Depth at Peak Storage= 0.95' , Surface Width= 2.00' Bank-Full Depth= 2.00' Flow Area= 3.1 sf, Capacity= 29.29 cfs 24.0" Round Pipe n= 0.012 Length= 35.0' Slope= 0.0143 T Inlet Invert= 833.50', Outlet Invert= 833.00' Piedmont Ditches and Storm Sewer PLI-Gaston Co 25-yr Duration=6 min, Inten=7.72 in/hr Prepared by HDR, Inc Printed 5/31/2022 HydroCADO 10.10-7b s/n 07102 ©2022 HydroCAD Software Solutions LLC Page 18 Reach 1 B-N: 24" PIPE Hydrograph 15 ■Inflow / 13.46cfs ❑Outflow 14 13.46ofs - - - -/�Tn-flow Area=T.&81 aCc 13 -Avg.-1ovv-Depth=- 0.9f 12 - — 11 - - - - - - - - - - -MaxVeE=9.1-3-fps _ _ _lof +}4 w 9 - Round Pim 3 8 � — — - - - - - - — — — n=O.O12 o — LL 6 — — — — — — — — — — — — -L=35.V 5 S=0.0143 '/' 4 -�- - - - -CapacitX 29.29-cfs 3 2 — — — — — — — — — — — — 1 0 0 1 2 Time (hours) Piedmont Ditches and Storm Sewer PLI-Gaston Co 25-yr Duration=6 min, Inten=7.72 in/hr Prepared by HDR, Inc Printed 5/31/2022 HydroCADO 10.10-7b s/n 07102 ©2022 HydroCAD Software Solutions LLC Page 19 Summary for Reach 1 B-R: S113-1 (South) Inflow Area = 1.881 ac, 96.28% Impervious, Inflow Depth = 0.78" for 25-yr event Inflow = 13.46 cfs @ 0.00 hrs, Volume= 0.122 of Outflow = 13.46 cfs @ 0.11 hrs, Volume= 0.117 af, Atten= 0%, Lag= 6.6 min Routed to Pond 1 B-P : SB-1 (South) Routing by Stor-Ind+Trans method, Time Span= 0.00-2.00 hrs, dt= 0.01 hrs Max. Velocity= 3.81 fps, Min. Travel Time= 0.9 min Avg. Velocity = 0.91 fps, Avg. Travel Time= 3.7 min Peak Storage= 707 cf @ 0.10 hrs Average Depth at Peak Storage= 0.93' , Surface Width= 6.59' Bank-Full Depth= 2.00' Flow Area= 14.0 sf, Capacity= 84.64 cfs 1.00' x 2.00' deep channel, n= 0.025 Earth, clean &winding Side Slope Z-value= 3.0 7' Top Width= 13.00' Length= 200.0' Slope= 0.0100 '/' Inlet Invert= 839.10', Outlet Invert= 837.10' Reach 1 B-R: SBA (South) Hydrograph — — — — — — — — — —I — — — — — — — — — — — — — - - — — — — — — — — — — — — — — — —I — — — — — — — — — — — — — — — ■Inflow 15 13.46 cfs ■Outflow 14 " 13.46cfs inflow Area= ac 13 12 - - -I - Aug.-Row Depth=0.93' 11 - - - - - - - - - - - - - - - Max_Ve4-3-S1-fps 10 — — — J'L=0.025 9- 200� w t= L 8 — —I L�Iv LL ' I S=0.0100 T 6 5 - -Gapacity-84 64-cfg 4 3- 2- 0 0 1 2 Time (hours) Piedmont Ditches and Storm Sewer PLI-Gaston Co 25-yr Duration=6 min, Inten=7.72 in/hr Prepared by HDR, Inc Printed 5/31/2022 HydroCAD® 10.10-7b s/n 07102 ©2022 HydroCAD Software Solutions LLC Page 20 Summary for Reach 2A-N: 24" PIPE (North) INLET PIPE TO SB - 202 (Basin has double inlet pipes) [52] Hint: Inlet/Outlet conditions not evaluated [79] Warning: Submerged Pond 2A-P Primary device # 1 INLET by 0.78' Inflow Area = 1.230 ac, 93.50% Impervious, Inflow Depth = 0.73" for 25-yr event Inflow = 7.98 cfs @ 0.14 hrs, Volume= 0.075 of Outflow = 7.85 cfs @ 0.14 hrs, Volume= 0.075 af, Atten= 2%, Lag= 0.2 min Routing by Stor-Ind+Trans method, Time Span= 0.00-2.00 hrs, dt= 0.01 hrs Max. Velocity= 6.96 fps, Min. Travel Time= 0.2 min Avg. Velocity = 1.48 fps, Avg. Travel Time= 0.7 min Peak Storage= 74 cf @ 0.14 hrs Average Depth at Peak Storage= 0.78' , Surface Width= 1.95' Bank-Full Depth= 2.00' Flow Area= 3.1 sf, Capacity= 24.51 cfs 24.0" Round Pipe n= 0.012 Length= 65.0' Slope= 0.0100 '/' Inlet Invert= 825.65', Outlet Invert= 825.00' Piedmont Ditches and Storm Sewer PLI-Gaston Co 25-yr Duration=6 min, Inten=7.72 in/hr Prepared by HDR, Inc Printed 5/31/2022 HydroCADO 10.10-7b s/n 07102 ©2022 HydroCAD Software Solutions LLC Page 21 Reach 2A-N: 24" PIPE (North) Hydrograph ■Inflow zsa ofs ❑Outflow 8 785cfs Inflow Area=1.230 ac Avg. Flow Depth=0.78' ' - Max Vel=6-96-fps- 6 — - - - - - - - - - - - 24.0., I 5 R_o_und Pipe - - - - - - - - 3 n=0.012 0 4 LL - I - L=65:0' I 3 —I - - - S=0.0100 2 Capacity=24.51 cfs 1 0 0 1 2 Time (hours) Piedmont Ditches and Storm Sewer PLI-Gaston Co 25-yr Duration=6 min, Inten=7.72 in/hr Prepared by HDR, Inc Printed 5/31/2022 HydroCAD® 10.10-7b s/n 07102 ©2022 HydroCAD Software Solutions LLC Page 22 Summary for Reach 2A-R: SB-2 (North) Inflow Area = 1.230 ac, 93.50% Impervious, Inflow Depth = 0.76" for 25-yr event Inflow = 8.61 cfs @ 0.00 hrs, Volume= 0.078 of Outflow = 7.98 cfs @ 0.14 hrs, Volume= 0.075 af, Atten= 7%, Lag= 8.3 min Routed to Pond 2A-P : SB-2 (North) Routing by Stor-Ind+Trans method, Time Span= 0.00-2.00 hrs, dt= 0.01 hrs Max. Velocity= 2.58 fps, Min. Travel Time= 2.6 min Avg. Velocity = 0.57 fps, Avg. Travel Time= 11.6 min Peak Storage= 1,251 cf @ 0.10 hrs Average Depth at Peak Storage= 0.87' , Surface Width= 6.21' Bank-Full Depth= 2.00' Flow Area= 14.0 sf, Capacity= 59.85 cfs 1.00' x 2.00' deep channel, n= 0.025 Earth, clean &winding Side Slope Z-value= 3.0 '/' Top Width= 13.00' Length= 400.0' Slope= 0.0050 T Inlet Invert= 839.10', Outlet Invert= 837.10' Reach 2A-R: SB-2 (North) Hydrograph ❑Inflow 8.61 cfs ❑Outflow 9 Inflow Area=1 .230 ac 7.98 cfs 8 ' Avg. Flow Depth=0.87' Max Vet=2.58 fps 6 I n_0.025 5 L=400.0' LL 4 S=0.0050 T 3 Capacity=59.85 cfs 2 1 0 0 1 2 Time (hours) Piedmont Ditches and Storm Sewer PLI-Gaston Co 25-yr Duration=6 min, Inten=7.72 in/hr Prepared by HDR, Inc Printed 5/31/2022 HydroCAD® 10.10-7b s/n 07102 ©2022 HydroCAD Software Solutions LLC Page 23 Summary for Reach 2B-N: 24" PIPE (South) INLET PIPE TO SB - 202 (Basin has double inlet pipes) [52] Hint: Inlet/Outlet conditions not evaluated [79] Warning: Submerged Pond 2B-P Primary device # 1 INLET by 1.18' Inflow Area = 2.380 ac, 93.70% Impervious, Inflow Depth = 0.74" for 25-yr event Inflow = 16.04 cfs @ 0.13 hrs, Volume= 0.146 of Outflow = 15.89 cfs @ 0.13 hrs, Volume= 0.146 af, Atten= 1%, Lag= 0.2 min Routing by Stor-Ind+Trans method, Time Span= 0.00-2.00 hrs, dt= 0.01 hrs Max. Velocity= 8.31 fps, Min. Travel Time= 0.1 min Avg. Velocity = 1.62 fps, Avg. Travel Time= 0.7 min Peak Storage= 125 cf @ 0.13 hrs Average Depth at Peak Storage= 1.18' , Surface Width= 1.97' Bank-Full Depth= 2.00' Flow Area= 3.1 sf, Capacity= 24.51 cfs 24.0" Round Pipe n= 0.012 Length= 65.0' Slope= 0.0100 '/' Inlet Invert= 825.65', Outlet Invert= 825.00' Piedmont Ditches and Storm Sewer PLI-Gaston Co 25-yr Duration=6 min, Inten=7.72 in/hr Prepared by HDR, Inc Printed 5/31/2022 HydroCADO 10.10-7b s/n 07102 ©2022 HydroCAD Software Solutions LLC Page 24 Reach 2B-N: 24" PIPE (South) Hydrograph / ❑Inflow 16.04 cfs — /� ■Outflow 17 4 flow Area=2-38-00 -aE 16 15 , _ _ _ _ -'- - Avg. F_lo_w_D_eth= 13 - -�- - - - 14 - - - - - - - - -MaxA(e1=8.31 fps 12 —— — � nn w 11 - - - - - - - - - - - -Ro-undPipe N — — — — — — — — — — — - - — — — 3 9 - - - - - - - - - - - - - n--0-012 LL $ — -L=VV� 6 — — — — — — — 6 - - - - - - - - - -S-0 -Oa0-0-'/� 4 - - - - -C-apacit 24.5r cfs 3 2 1 0 0 1 2 Time (hours) Piedmont Ditches and Storm Sewer PLI-Gaston Co 25-yr Duration=6 min, Inten=7.72 in/hr Prepared by HDR, Inc Printed 5/31/2022 HydroCADO 10.10-7b s/n 07102 ©2022 HydroCAD Software Solutions LLC Page 25 Summary for Reach 2113-R: S113-2 (South) Inflow Area = 2.380 ac, 93.70% Impervious, Inflow Depth = 0.77" for 25-yr event Inflow = 16.85 cfs @ 0.00 hrs, Volume= 0.153 of Outflow = 16.04 cfs @ 0.13 hrs, Volume= 0.146 af, Atten= 5%, Lag= 7.7 min Routed to Pond 2B-P : SB-2 (South) Routing by Stor-Ind+Trans method, Time Span= 0.00-2.00 hrs, dt= 0.01 hrs Max. Velocity= 3.08 fps, Min. Travel Time= 2.2 min Avg. Velocity = 0.63 fps, Avg. Travel Time= 10.7 min Peak Storage= 2,125 cf @ 0.10 hrs Average Depth at Peak Storage= 1.17' , Surface Width= 8.05' Bank-Full Depth= 2.00' Flow Area= 14.0 sf, Capacity= 59.85 cfs 1.00' x 2.00' deep channel, n= 0.025 Earth, clean &winding Side Slope Z-value= 3.0 7' Top Width= 13.00' Length= 400.0' Slope= 0.0050 T Inlet Invert= 839.10', Outlet Invert= 837.10' Reach 2113-R: S113-2 (South) Hydrograph ■Inflow 18 16.85 cfs — — — — — - — — — 0 Outflow 17 ,6.04cf5 - - - - Inflow=Area=2.380 ac 16 15 - -I - Avg.-Flow Depth= 1 A71 14 ' - -� - - - - -Ma7xVe1=,3-.V8_fp& 13 i 12 - - - - - - - - - - - - - - - - - - - m7-0.025 11 10 -0-0.-Ot - -Gapacity—W..SrJ-cfs 6 4- 3- 2- 1 0 0 1 2 Time (hours) Piedmont Ditches and Storm Sewer PLI-Gaston Co 25-yr Duration=6 min, Inten=7.72 in/hr Prepared by HDR, Inc Printed 5/31/2022 HydroCAD® 10.10-7b s/n 07102 ©2022 HydroCAD Software Solutions LLC Page 26 Summary for Reach 3-N: 24" PIPE INLET PIPE TO SB - 203 [52] Hint: Inlet/Outlet conditions not evaluated [79] Warning: Submerged Pond 3-P Primary device # 1 INLET by 0.93' Inflow Area = 1.632 ac, 87.25% Impervious, Inflow Depth = 0.70" for 25-yr event Inflow = 10.91 cfs @ 0.11 hrs, Volume= 0.095 of Outflow = 10.91 cfs @ 0.11 hrs, Volume= 0.095 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 0.00-2.00 hrs, dt= 0.01 hrs Max. Velocity= 7.57 fps, Min. Travel Time= 0.3 min Avg. Velocity = 1.79 fps, Avg. Travel Time= 1.1 min Peak Storage= 173 cf @ 0.11 hrs Average Depth at Peak Storage= 0.93' , Surface Width= 2.00' Bank-Full Depth= 2.00' Flow Area= 3.1 sf, Capacity= 24.51 cfs 24.0" Round Pipe n= 0.012 Length= 120.0' Slope= 0.0100 '/' Inlet Invert= 809.20', Outlet Invert= 808.00' Piedmont Ditches and Storm Sewer PLI-Gaston Co 25-yr Duration=6 min, Inten=7.72 in/hr Prepared by HDR, Inc Printed 5/31/2022 HydroCADO 10.10-7b s/n 07102 ©2022 HydroCAD Software Solutions LLC Page 27 Reach 3-N: 24" PIPE Hydrograph ■Inflow 12 10.91 cfs ❑Outflow 11 10.91df Inflow Area=1.632 ac 10 Avg. Flow-Depth=0.93' 9 Max Yet=7.57 fps 8 24.0" w 7 Round Pipe 3 6 n=0.012 0 LL 5 - - - - - - - -+ —L-=120-.0 4 — — — — — — —�7��O-.OlW -' 3 - - -Capacity=24.57-cfs 2-' 1 0 0 1 2 Time (hours) Piedmont Ditches and Storm Sewer PLI-Gaston Co 25-yr Duration=6 min, Inten=7.72 in/hr Prepared by HDR, Inc Printed 5/31/2022 HydroCAD® 10.10-7b s/n 07102 ©2022 HydroCAD Software Solutions LLC Page 28 Summary for Reach 3-R: SB-3 Inflow Area = 1.632 ac, 87.25% Impervious, Inflow Depth = 0.73" for 25-yr event Inflow = 10.92 cfs @ 0.00 hrs, Volume= 0.099 of Outflow = 10.91 cfs @ 0.11 hrs, Volume= 0.095 af, Atten= 0%, Lag= 6.6 min Routed to Pond 3-P : SB-3 Routing by Stor-Ind+Trans method, Time Span= 0.00-2.00 hrs, dt= 0.01 hrs Max. Velocity= 4.83 fps, Min. Travel Time= 1.0 min Avg. Velocity = 1.26 fps, Avg. Travel Time= 3.7 min Peak Storage= 629 cf @ 0.10 hrs Average Depth at Peak Storage= 0.72' , Surface Width= 5.30' Bank-Full Depth= 2.00' Flow Area= 14.0 sf, Capacity= 125.04 cfs 1.00' x 2.00' deep channel, n= 0.012 Side Slope Z-value= 3.0 '/' Top Width= 13.00' Length= 278.4' Slope= 0.0050 '/' Inlet Invert= 838.50', Outlet Invert= 837.10' Reach 3-R: SB-3 Hydrograph ❑Inflow 12 10.92df ❑Outflow 11 10.91 cfs Inflow Area=1 .632 ac 10= Avg. Flow Depth=0.72' Max Vet=4.83 fps n=0.012 L=278.4' 3 6 LL 6 — — - — — — — S=0.0050T 4- Capacity=125.04 cfs 3- 2- 0 0 1 2 Time (hours) Piedmont Ditches and Storm Sewer PLI-Gaston Co 25-yr Duration=6 min, Inten=7.72 in/hr Prepared by HDR, Inc Printed 5/31/2022 HydroCAD® 10.10-7b s/n 07102 ©2022 HydroCAD Software Solutions LLC Page 29 Summary for Reach 4A-N: 24" PIPE INLET PIPE TO SB - 204 (Basin has double inlet pipes) [52] Hint: Inlet/Outlet conditions not evaluated [79] Warning: Submerged Pond 4A-P Primary device # 1 INLET by 1.45' Inflow Area = 3.076 ac, 92.98% Impervious, Inflow Depth = 0.73" for 25-yr event Inflow = 21.49 cfs @ 0.12 hrs, Volume= 0.187 of Outflow = 21.47 cfs @ 0.12 hrs, Volume= 0.187 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 0.00-2.00 hrs, dt= 0.01 hrs Max. Velocity= 8.80 fps, Min. Travel Time= 0.2 min Avg. Velocity = 1.72 fps, Avg. Travel Time= 1.0 min Peak Storage= 244 cf @ 0.12 hrs Average Depth at Peak Storage= 1.45' , Surface Width= 1.78' Bank-Full Depth= 2.00' Flow Area= 3.1 sf, Capacity= 24.51 cfs 24.0" Round Pipe n= 0.012 Length= 100.0' Slope= 0.0100 '/' Inlet Invert= 814.00', Outlet Invert= 813.00' Piedmont Ditches and Storm Sewer PLI-Gaston Co 25-yr Duration=6 min, Inten=7.72 in/hr Prepared by HDR, Inc Printed 5/31/2022 HydroCADO 10.10-7b s/n 07102 ©2022 HydroCAD Software Solutions LLC Page 30 Reach 4A-N: 24" PIPE Hydrograph 24 i — — — — - — — — — — — ❑Inflow 23 21.49 cfs ■Outflow 22 21.47 cfs - - _ - 4 fl low Area=1 V7-6 ae 20 - - -4vg.+FowDepth=1.4r 18 —I - - - - - -FaxVe1=8.80-fpe 17 16 24.0" 15 w14 —Round Pipe 313 12 — — — — — — — — — — — — — n=0�12 ' 0 11 g @ qv r 6 — — - - - - - - — — Ca acrt -25'rc#a 5 - p 4 - — — — — — — — — — — — — — — — — — — — 3 2 ' 1 0 0 1 2 Time (hours) Piedmont Ditches and Storm Sewer PLI-Gaston Co 25-yr Duration=6 min, Inten=7.72 in/hr Prepared by HDR, Inc Printed 5/31/2022 HydroCADO 10.10-7b s/n 07102 ©2022 HydroCAD Software Solutions LLC Page 31 Summary for Reach 4A-R: S113-4 (North) Inflow Area = 3.076 ac, 92.98% Impervious, Inflow Depth = 0.76" for 25-yr event Inflow = 21.54 cfs @ 0.00 hrs, Volume= 0.196 of Outflow = 21.49 cfs @ 0.12 hrs, Volume= 0.187 af, Atten= 0%, Lag= 7.2 min Routed to Pond 4A-P : SB-4 (North) Routing by Stor-Ind+Trans method, Time Span= 0.00-2.00 hrs, dt= 0.01 hrs Max. Velocity= 5.17 fps, Min. Travel Time= 1.2 min Avg. Velocity = 1.07 fps, Avg. Travel Time= 5.9 min Peak Storage= 1,580 cf @ 0.10 hrs Average Depth at Peak Storage= 1.02' , Surface Width= 7.13' Bank-Full Depth= 2.00' Flow Area= 14.0 sf, Capacity= 108.72 cfs 1.00' x 2.00' deep channel, n= 0.025 Earth, clean &winding Side Slope Z-value= 3.0 7' Top Width= 13.00' Length= 380.0' Slope= 0.0165 '/' Inlet Invert= 840.00', Outlet Invert= 833.73' Reach 4A-R: S113-4 (North) Hydrograph -I - - - - - - - - - - - - - - ■Inflow 24 23 21.54 ds - - - - - - - - - - - -3- - - - - ■outflow 22 21.49 cfs - - - 17�i 1 o- YY- Area= -0■ 6 ac 21 - - - - - - - - - -I - - - - - - - - - - - - - - - - 20 - - - - - - - - - - - - -- - Avg.-RowDepth='ha 19 - - 18 i - - - - - - - - -Max_Vel=�5_17Jps 17 16 I - - - - o.t215 -n� 14 N13 - L—V V V.V, 3 12 - I - - - - - - - - - - - - - - - 110 - - -1 - - - - - - - - - - - --s- - 6 5 4 3 2 1 0 0 1 2 Time (hours) Piedmont Ditches and Storm Sewer PLI-Gaston Co 25-yr Duration=6 min, Inten=7.72 in/hr Prepared by HDR, Inc Printed 5/31/2022 HydroCADO 10.10-7b s/n 07102 ©2022 HydroCAD Software Solutions LLC Page 32 Summary for Reach 4113-R: S113-4 (South) Inflow Area = 2.907 ac, 89.85% Impervious, Inflow Depth = 0.75" for 25-yr event Inflow = 19.90 cfs @ 0.00 hrs, Volume= 0.181 of Outflow = 19.55 cfs @ 0.12 hrs, Volume= 0.173 af, Atten= 2%, Lag= 7.1 min Routed to Pond 4B-P : SB-4 (South) Routing by Stor-Ind+Trans method, Time Span= 0.00-2.00 hrs, dt= 0.01 hrs Max. Velocity= 4.19 fps, Min. Travel Time= 1.7 min Avg. Velocity = 0.80 fps, Avg. Travel Time= 8.7 min Peak Storage= 1,970 cf @ 0.10 hrs Average Depth at Peak Storage= 1.09' , Surface Width= 7.57' Bank-Full Depth= 2.00' Flow Area= 14.0 sf, Capacity= 84.64 cfs 1.00' x 2.00' deep channel, n= 0.025 Earth, clean &winding Side Slope Z-value= 3.0 '/' Top Width= 13.00' Length= 420.0' Slope= 0.0100 '/' Inlet Invert= 837.93', Outlet Invert= 833.73' Reach 4113-R: S113-4 (South) Hydrograph — — —I — — — — — — — — — — — — - - ■Inflow 22 19.90 cfs — — — — — — — — — —I — — — — — — — — — — — — — — — — 0 Outflow 21 955cfs — —I — — rnicW Area-247 a, 20 18 - - - - - Av9.19ow Depth-f- 91 16 - - - -' - Max_V_W= 419fps — — — — — — — — — — — — — — — — —C- 14 — — — — — — — — — — — — — — —I — — — — — — -�=0.02.5 13 — — — — — — — — — — — — — — —I — — — — — — —w n 5 12- 3: 11- 19 i S=0.0100,/, 8 - - IC-apacity=84.64-cfs 6- 5- 4 - 3 - 2 1 0 0 1 2 Time (hours) Piedmont Ditches and Storm Sewer PLI-Gaston Co 25-yr Duration=6 min, Inten=7.72 in/hr Prepared by HDR, Inc Printed 5/31/2022 HydroCAD® 10.10-7b s/n 07102 ©2022 HydroCAD Software Solutions LLC Page 33 Summary for Reach 4BC-N: 24" PIPE INLET PIPE TO SB - 204 (Basin has double inlet pipes) [52] Hint: Inlet/Outlet conditions not evaluated [79] Warning: Submerged Pond 4B-P Primary device # 1 INLET by 1.34' Inflow Area = 2.907 ac, 89.85% Impervious, Inflow Depth = 0.71" for 25-yr event Inflow = 19.55 cfs @ 0.12 hrs, Volume= 0.173 of Outflow = 19.31 cfs @ 0.13 hrs, Volume= 0.173 af, Atten= 1%, Lag= 0.8 min Routing by Stor-Ind+Trans method, Time Span= 0.00-2.00 hrs, dt= 0.01 hrs Max. Velocity= 8.64 fps, Min. Travel Time= 0.6 min Avg. Velocity = 1.60 fps, Avg. Travel Time= 3.0 min Peak Storage= 649 cf @ 0.12 hrs Average Depth at Peak Storage= 1.34' , Surface Width= 1.88' Bank-Full Depth= 2.00' Flow Area= 3.1 sf, Capacity= 24.51 cfs 24.0" Round Pipe n= 0.012 Corrugated PP, smooth interior Length= 290.0' Slope= 0.0100 '/' Inlet Invert= 815.90', Outlet Invert= 813.00' Piedmont Ditches and Storm Sewer PLI-Gaston Co 25-yr Duration=6 min, Inten=7.72 in/hr Prepared by HDR, Inc Printed 5/31/2022 HydroCADO 10.10-7b s/n 07102 ©2022 HydroCAD Software Solutions LLC Page 34 Reach 4BC-N: 24" PIPE Hydrograph / — — — - - - — — — — — ❑Inflow 21 / 19.55 cfs — — — � Y-� -A e r- p �n 0 Outflow 20 19.31 0f - Inflow IL ea=2-907 ac 18 i Avg.:Io�Dep I:. AV 15 / - - - - - - - - - - - - - - - - — — — — — — — — — - Oa4 14 13 - - - - - - - - - - - - - — — — — — — — — —RoundPipe 12 — — — — — — — — — 3 11 — — — — — — — — — — — — — — — — — — — — — — —O-M 0 10 8 — — — 5 - - - apaci#y=24.501 c#s 4 — — — — — 3 2 1 0 0 1 2 Time (hours) Piedmont Ditches and Storm Sewer PLI-Gaston Co 25-yr Duration=6 min, Inten=7.72 in/hr Prepared by HDR, Inc Printed 5/31/2022 HydroCAD® 10.10-7b s/n 07102 ©2022 HydroCAD Software Solutions LLC Page 35 Summary for Reach 5A-N: 24" PIPE INLET PIPE TO SB - 205 [52] Hint: Inlet/Outlet conditions not evaluated [79] Warning: Submerged Pond 5A-P Primary device # 1 INLET by 1.30' [79] Warning: Submerged Pond 5B-P Primary device # 1 OUTLET by 1.30' Inflow Area = 2.920 ac, 89.73% Impervious, Inflow Depth = 0.71" for 25-yr event Inflow = 18.71 cfs @ 0.11 hrs, Volume= 0.173 of Outflow = 18.57 cfs @ 0.11 hrs, Volume= 0.173 af, Atten= 1%, Lag= 0.2 min Routing by Stor-Ind+Trans method, Time Span= 0.00-2.00 hrs, dt= 0.01 hrs Max. Velocity= 8.58 fps, Min. Travel Time= 0.1 min Avg. Velocity = 1.64 fps, Avg. Travel Time= 0.6 min Peak Storage= 130 cf @ 0.11 hrs Average Depth at Peak Storage= 1.31' , Surface Width= 1.90' Bank-Full Depth= 2.00' Flow Area= 3.1 sf, Capacity= 24.51 cfs 24.0" Round Pipe n= 0.012 Length= 60.0' Slope= 0.0100 '/' Inlet Invert= 828.60', Outlet Invert= 828.00' Piedmont Ditches and Storm Sewer PLI-Gaston Co 25-yr Duration=6 min, Inten=7.72 in/hr Prepared by HDR, Inc Printed 5/31/2022 HydroCADO 10.10-7b s/n 07102 ©2022 HydroCAD Software Solutions LLC Page 36 Reach 5A-N: 24" PIPE Hydrograph — — — — — ❑Inflow 20 18.71 cfs ■Outflow 19 18.57cfs Inflow Area=2.92D ac 18 17 - - Avg.ftow[?e�th='C.3'f' 16 - - - - - — — — — — MaxVel-8.58fps 14 — — — — — — — — — — — — — — 24.n y ;z - - - - - - - -Round Pipe 11 _ _ _ 010 - - - - - n=�.0'I 7 — @ O—.MGvr —I — — — — — — — — — — — — 5 — — — - —apacity=24.5t cfs 4 — — — — — — — — — — — — — — — 3 2 ' 1 ' 0 0 1 2 Time (hours) Piedmont Ditches and Storm Sewer PLI-Gaston Co 25-yr Duration=6 min, Inten=7.72 in/hr Prepared by HDR, Inc Printed 5/31/2022 HydroCADO 10.10-7b s/n 07102 ©2022 HydroCAD Software Solutions LLC Page 37 Summary for Reach 5A-R: S113-5 (North) Inflow Area = 0.740 ac, 93.24% Impervious, Inflow Depth = 0.76" for 25-yr event Inflow = 5.18 cfs @ 0.00 hrs, Volume= 0.047 of Outflow = 5.18 cfs @ 0.11 hrs, Volume= 0.045 af, Atten= 0%, Lag= 6.6 min Routed to Pond 5A-P : SB-5 (North) Routing by Stor-Ind+Trans method, Time Span= 0.00-2.00 hrs, dt= 0.01 hrs Max. Velocity= 3.87 fps, Min. Travel Time= 0.9 min Avg. Velocity = 1.20 fps, Avg. Travel Time= 2.8 min Peak Storage= 268 cf @ 0.10 hrs Average Depth at Peak Storage= 0.52' , Surface Width= 4.13' Bank-Full Depth= 2.00' Flow Area= 14.0 sf, Capacity= 119.84 cfs 1.00' x 2.00' deep channel, n= 0.025 Earth, clean &winding Side Slope Z-value= 3.0 7' Top Width= 13.00' Length= 200.0' Slope= 0.0201 T Inlet Invert= 839.44', Outlet Invert= 835.43' Reach 5A-R: S113-5 (North) Hydrograph ■Inflow 5.18 cfs ❑Outflow 5.18 cfs Fnflow Area-0.7 ac 5 Avg. Flow Depth=0.52' 4 Max Vet=3.87 fps n=0.025 3 L=200.0' U_ S=0.0201 2 Capacity=119.84 cfs 1 0 0 1 2 Time (hours) Piedmont Ditches and Storm Sewer PLI-Gaston Co 25-yr Duration=6 min, Inten=7.72 in/hr Prepared by HDR, Inc Printed 5/31/2022 HydroCADO 10.10-7b s/n 07102 ©2022 HydroCAD Software Solutions LLC Page 38 Summary for Reach 5113-R: S113-5 (South) Inflow Area = 2.180 ac, 88.53% Impervious, Inflow Depth = 0.74" for 25-yr event Inflow = 14.75 cfs @ 0.00 hrs, Volume= 0.134 of Outflow = 14.27 cfs @ 0.13 hrs, Volume= 0.128 af, Atten= 3%, Lag= 7.6 min Routed to Pond 5B-P : SB-5 (South) Routing by Stor-Ind+Trans method, Time Span= 0.00-2.00 hrs, dt= 0.01 hrs Max. Velocity= 3.69 fps, Min. Travel Time= 2.1 min Avg. Velocity = 0.76 fps, Avg. Travel Time= 10.0 min Peak Storage= 1,782 cf @ 0.10 hrs Average Depth at Peak Storage= 0.99' , Surface Width= 6.93' Bank-Full Depth= 2.00' Flow Area= 14.0 sf, Capacity= 79.46 cfs 1.00' x 2.00' deep channel, n= 0.025 Earth, clean &winding Side Slope Z-value= 3.0 7' Top Width= 13.00' Length= 455.0' Slope= 0.0088 T Inlet Invert= 839.44', Outlet Invert= 835.43' Reach 5113-R: S113-5 (South) Hydrograph I ■Inflow 16 14.7e crs — — — —I — — — — — — — — — — — — ■Outflow 15 " 14.27cfs Inflow Area-2.1 80 ac - - - - - - - - - - - - - - - - - - - - - - - - - - 14 — — — — —13 — — — —I — Avg.-Flaw Depth=O-.99 12 — — — —I Max-Ve1_3.0_fPS —I — — — — — — — — — — — — — 11 - - - - - - - - - - - - - - - - -n=0.025, 10 9 L= — — - — LL ; - - - S=O.OG 8'P 6 — — - —Ca aci "-cfs- 5 p — 9 4 3 2 1 0 0 1 2 Time (hours) Piedmont Ditches and Storm Sewer PLI-Gaston Co 25-yr Duration=6 min, Inten=7.72 in/hr Prepared by HDR, Inc Printed 5/31/2022 HydroCAD® 10.10-7b s/n 07102 ©2022 HydroCAD Software Solutions LLC Page 39 Summary for Pond 1A-P: SA-1 (North) [57] Hint: Peaked at 839.15' (Flood elevation advised) [62] Hint: Exceeded Reach 1A-R OUTLET depth by 1.08' @ 0.11 hrs Inflow Area = 2.926 ac, 94.53% Impervious, Inflow Depth = 0.74" for 25-yr event Inflow = 20.70 cfs @ 0.11 hrs, Volume= 0.180 of Outflow = 20.70 cfs @ 0.11 hrs, Volume= 0.180 af, Atten= 0%, Lag= 0.0 min Primary = 20.70 cfs @ 0.11 hrs, Volume= 0.180 of Routed to Reach 1A-N : 24" PIPE Routing by Stor-Ind method, Time Span= 0.00-2.00 hrs, dt= 0.01 hrs Peak Elev= 839.15'@ 0.11 hrs Device Routing Invert Outlet Devices #1 Primary 833.50' 24.0" Round Culvert L= 35.0' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 833.50'/833.00' S= 0.0143 '/' Cc= 0.900 n= 0.012, Flow Area= 3.14 sf #2 Device 1 837.10' 24.0" x 1.5" Horiz. Orifice/Grate X 12 rows C= 0.600 in 24.0" x 36.0" Grate (50% open area) Limited to weir flow at low heads Primary OutFlow Max=20.70 cfs @ 0.11 hrs HW=839.15' (Free Discharge) L1=Culvert (Passes 20.70 cfs of 32.63 cfs potential flow) L2=Orifice/Grate (Orifice Controls 20.70 cfs @ 6.90 fps) Pond 1A-P: SA-1 (North) Hydrograph - ❑ Inflow 23 / 20.70 cfs — — — — — — — — — — — — — — — — — — — — — — — — — — ❑Primary 2; I -Inflow Area=2.926 ac 20.70 cfs 20 — — — — — — — — — —I — — — — — — — — — — — — — — — — 19 — — — — —Peak Elev=8-39.-15' 18 17 16 - — — — — — —I — — — — — — — — — — — — — — — — 15 — — — — — —I — — — — — — — — — — — — — — — — 14 y 13 12 - 0 11 M 10 9 — — — — — — — — — — — — — —I — — — — — — — — — — — — — — — — 8 7 — — — 6 — — 5 — — — — 4 3 2 1 0 0 1 2 Time (hours) Piedmont Ditches and Storm Sewer PLI-Gaston Co 25-yr Duration=6 min, Inten=7.72 in/hr Prepared by HDR, Inc Printed 5/31/2022 HydroCAD® 10.10-7b s/n 07102 ©2022 HydroCAD Software Solutions LLC Page 40 Summary for Pond 1 B-P: SB-1 (South) [57] Hint: Peaked at 837.97' (Flood elevation advised) [62] Hint: Exceeded Reach 1 B-R OUTLET depth by 0.07' @ 0.11 hrs Inflow Area = 1.881 ac, 96.28% Impervious, Inflow Depth = 0.75" for 25-yr event Inflow = 13.46 cfs @ 0.11 hrs, Volume= 0.117 of Outflow = 13.46 cfs @ 0.11 hrs, Volume= 0.117 af, Atten= 0%, Lag= 0.0 min Primary = 13.46 cfs @ 0.11 hrs, Volume= 0.117 of Routed to Reach 1B-N : 24" PIPE Routing by Stor-Ind method, Time Span= 0.00-2.00 hrs, dt= 0.01 hrs Peak Elev= 837.97'@ 0.11 hrs Device Routing Invert Outlet Devices #1 Primary 833.35' 24.0" Round Culvert L= 35.0' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 833.35'/833.00' S= 0.0100 T Cc= 0.900 n= 0.012, Flow Area= 3.14 sf #2 Device 1 837.10' 24.0" x 1.5" Horiz. Orifice/Grate X 12 rows C= 0.600 in 24.0" x 36.0" Grate (50% open area) Primary OutFlow Max=13.46 cfs @ 0.11 hrs HW=837.97' (Free Discharge) L1=Culvert (Passes 13.46 cfs of 28.77 cfs potential flow) L2=Orifice/Grate (Orifice Controls 13.46 cfs @ 4.49 fps) Pond 1 B-P: SBA (South) Hydrograph 15 ❑ Inflow 13.46 cfs ❑Primary 14 13.46 cfs Inflow Area=1 .881 ac 13 12 Peak Elev=837.97' 11 10 9 N 8 0 7 LL 6 5 4 3 2 1 0 0 1 2 Time (hours) Piedmont Ditches and Storm Sewer PLI-Gaston Co 25-yr Duration=6 min, Inten=7.72 in/hr Prepared by HDR, Inc Printed 5/31/2022 HydroCAD® 10.10-7b s/n 07102 ©2022 HydroCAD Software Solutions LLC Page 41 Summary for Pond 2A-P: SB-2 (North) [57] Hint: Peaked at 837.49' (Flood elevation advised) [61] Hint: Exceeded Reach 2A-R outlet invert by 0.39' @ 0.14 hrs Inflow Area = 1.230 ac, 93.50% Impervious, Inflow Depth = 0.73" for 25-yr event Inflow = 7.98 cfs @ 0.14 hrs, Volume= 0.075 of Outflow = 7.98 cfs @ 0.14 hrs, Volume= 0.075 af, Atten= 0%, Lag= 0.0 min Primary = 7.98 cfs @ 0.14 hrs, Volume= 0.075 of Routed to Reach 2A-N : 24" PIPE (North) Routing by Stor-Ind method, Time Span= 0.00-2.00 hrs, dt= 0.01 hrs Peak Elev= 837.49'@ 0.14 hrs Device Routing Invert Outlet Devices #1 Primary 825.65' 24.0" Round Culvert L= 65.0' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 825.65'/825.00' S= 0.0100 T Cc= 0.900 n= 0.012, Flow Area= 3.14 sf #2 Device 1 837.10' 24.0" x 1.5" Horiz. Orifice/Grate X 12 rows C= 0.600 in 24.0" x 36.0" Grate (50% open area) Limited to weir flow at low heads Primary OutFlow Max=7.99 cfs @ 0.14 hrs HW=837.49' (Free Discharge) L1=Culvert (Passes 7.99 cfs of 49.81 cfs potential flow) L2=Orifice/Grate (Weir Controls 7.99 cfs @ 2.04 fps) Pond 2A-P: SB-2 (North) Hydrograph ❑ Inflow .98 cfs ❑Primary 8 7.98 cfs Inflow Area=1 .230 ac Peak Elev=837.49' 6 y 5 3 0 4 LL 3 2- 1- 0 0 1 2 Time (hours) Piedmont Ditches and Storm Sewer PLI-Gaston Co 25-yr Duration=6 min, Inten=7.72 in/hr Prepared by HDR, Inc Printed 5/31/2022 HydroCAD® 10.10-7b s/n 07102 ©2022 HydroCAD Software Solutions LLC Page 42 Summary for Pond 2B-P: SB-2 (South) [57] Hint: Peaked at 838.33' (Flood elevation advised) [62] Hint: Exceeded Reach 2B-R OUTLET depth by 0.41' @ 0.13 hrs Inflow Area = 2.380 ac, 93.70% Impervious, Inflow Depth = 0.74" for 25-yr event Inflow = 16.04 cfs @ 0.13 hrs, Volume= 0.146 of Outflow = 16.04 cfs @ 0.13 hrs, Volume= 0.146 af, Atten= 0%, Lag= 0.0 min Primary = 16.04 cfs @ 0.13 hrs, Volume= 0.146 of Routed to Reach 2B-N : 24" PIPE (South) Routing by Stor-Ind method, Time Span= 0.00-2.00 hrs, dt= 0.01 hrs Peak Elev= 838.33'@ 0.13 hrs Device Routing Invert Outlet Devices #1 Primary 825.65' 24.0" Round Culvert L= 65.0' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 825.65'/825.00' S= 0.0100 T Cc= 0.900 n= 0.012, Flow Area= 3.14 sf #2 Device 1 837.10' 24.0" x 1.5" Horiz. Orifice/Grate X 12 rows C= 0.600 in 24.0" x 36.0" Grate (50% open area) Limited to weir flow at low heads Primary OutFlow Max=15.97 cfs @ 0.13 hrs HW=838.32' (Free Discharge) L1=Culvert (Passes 15.97 cfs of 51.68 cfs potential flow) L2=Orifice/Grate (Orifice Controls 15.97 cfs @ 5.32 fps) Pond 2B-P: SB-2 (South) Hydrograph ❑ Inflow ❑Prima 17 4�f° cfs 16 - - - - - - - Inflow Area=2.380 ac Primary 14 Peak Elev=838.33' 13 12 — — — — — — — — — —I — — — 11. — — — — — — — — — — —I — — — F 10 3 9 0 LL 8 7 - - - - - - - - - - - - - - - - 6 5 4 3 2 1 0 0 1 2 Time (hours) Piedmont Ditches and Storm Sewer PLI-Gaston Co 25-yr Duration=6 min, Inten=7.72 in/hr Prepared by HDR, Inc Printed 5/31/2022 HydroCAD® 10.10-7b s/n 07102 ©2022 HydroCAD Software Solutions LLC Page 43 Summary for Pond 3-P: SB-3 [57] Hint: Peaked at 837.67' (Flood elevation advised) [62] Hint: Exceeded Reach 3-R OUTLET depth by 0.07' @ 0.12 hrs Inflow Area = 1.632 ac, 87.25% Impervious, Inflow Depth = 0.70" for 25-yr event Inflow = 10.91 cfs @ 0.11 hrs, Volume= 0.095 of Outflow = 10.91 cfs @ 0.11 hrs, Volume= 0.095 af, Atten= 0%, Lag= 0.0 min Primary = 10.91 cfs @ 0.11 hrs, Volume= 0.095 of Routed to Reach 3-N : 24" PIPE Routing by Stor-Ind method, Time Span= 0.00-2.00 hrs, dt= 0.01 hrs Peak Elev= 837.67'@ 0.11 hrs Device Routing Invert Outlet Devices #1 Primary 809.20' 24.0" Round Culvert L= 120.0' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 809.20'/808.00' S= 0.0100 T Cc= 0.900 n= 0.012, Flow Area= 3.14 sf #2 Device 1 837.10' 24.0" x 1.5" Horiz. Orifice/Grate X 12 rows C= 0.600 in 24.0" x 36.0" Grate (50% open area) Limited to weir flow at low heads Primary OutFlow Max=10.93 cfs @ 0.11 hrs HW=837.67' (Free Discharge) L1=Culvert (Passes 10.93 cfs of 79.28 cfs potential flow) L2=Orifice/Grate (Orifice Controls 10.93 cfs @ 3.64 fps) Pond 3-P: SB-3 Hydrograph ❑ Inflow 12 10.91 cfs ❑Primary 11 10.91 cfs Inflow Area=1 .632 ac 10 - - - - - - - Peak Elev=837.67' g N7 _ — — — — — — — — — - V 3 g I — — 0 ` 5 — — — — — — — — — — — — — —I — — — 4 — — — — — — — — — — — —I — — — 3- 2- 1 0 0 1 2 Time (hours) Piedmont Ditches and Storm Sewer PLI-Gaston Co 25-yr Duration=6 min, Inten=7.72 in/hr Prepared by HDR, Inc Printed 5/31/2022 HydroCADO 10.10-7b s/n 07102 ©2022 HydroCAD Software Solutions LLC Page 44 Summary for Pond 4A-P: SB-4 (North) [57] Hint: Peaked at 838.41' (Flood elevation advised) [62] Hint: Exceeded Reach 4A-R OUTLET depth by 3.98' @ 0.12 hrs Inflow Area = 3.076 ac, 92.98% Impervious, Inflow Depth = 0.73" for 25-yr event Inflow = 21.49 cfs @ 0.12 hrs, Volume= 0.187 of Outflow = 21.49 cfs @ 0.12 hrs, Volume= 0.187 af, Atten= 0%, Lag= 0.0 min Primary = 21.49 cfs @ 0.12 hrs, Volume= 0.187 of Routed to Reach 4A-N : 24" PIPE Routing by Stor-Ind method, Time Span= 0.00-2.00 hrs, dt= 0.01 hrs Peak Elev= 838.41' @ 0.12 hrs Device Routing Invert Outlet Devices #1 Primary 814.00' 24.0" Round Culvert L= 100.0' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 814.00'/ 813.00' S= 0.0100 '/' Cc= 0.900 n= 0.012, Flow Area= 3.14 sf #2 Device 1 836.20' 24.0" x 1.5" Horiz. Orifice/Grate X 12 rows C= 0.600 in 24.0" x 36.0" Grate (50% open area) Limited to weir flow at low heads Primary OutFlow Max=21.49 cfs @ 0.12 hrs HW=838.41' (Free Discharge) L1=Culvert (Passes 21.49 cfs of 73.20 cfs potential flow) L2=Orifice/Grate (Orifice Controls 21.49 cfs @ 7.16 fps) Pond 4A-P: SB-4 (North) Hydrograph 24 i — — — — — — —I — — — — — — — — — — — — — — ■Inflow 21.49 cfs ❑Primary 22 21.49cfs — — — — — — —In law Arrea=10-Mac 21 / — — — — — — — — — — — — — — — — — — — — — — 19 - _ -P(WcElev=MBAT 18 — — — — — — — — — — — — — — — 17 16 — — — — — — — — — — — — — — — 15 — — — — — — — — — — — — — — — — — — — N 14 — — — — — — — — — — — — — — u 13 — — — — — — — — — — — — — 3 12 — — — — — — — — — — — — — — — — a 11 u10 — — — — — — — — — — — — — —I — — — — — — — — — — - 9 — — — — — — — — — — — 8 — — — — — — — — — — — — — — — — — — — — — — — — 7 — — — — — — — — — — — 6 — — — — — — — — — — — — — — — — — — — — 5 — — - — — — — — — — — — — — — 4 — — — — — — — — — — — — 3 — — — — — — — 2 1 0 0 1 2 Time (hours) Piedmont Ditches and Storm Sewer PLI-Gaston Co 25-yr Duration=6 min, Inten=7.72 in/hr Prepared by HDR, Inc Printed 5/31/2022 HydroCAD® 10.10-7b s/n 07102 ©2022 HydroCAD Software Solutions LLC Page 45 Summary for Pond 4B-P: SB-4 (South) [57] Hint: Peaked at 837.33' (Flood elevation advised) [62] Hint: Exceeded Reach 4B-R OUTLET depth by 2.78' @ 0.13 hrs Inflow Area = 2.907 ac, 89.85% Impervious, Inflow Depth = 0.71" for 25-yr event Inflow = 19.55 cfs @ 0.12 hrs, Volume= 0.173 of Outflow = 19.55 cfs @ 0.12 hrs, Volume= 0.173 af, Atten= 0%, Lag= 0.0 min Primary = 19.55 cfs @ 0.12 hrs, Volume= 0.173 of Routed to Reach 4BC-N : 24" PIPE Routing by Stor-Ind method, Time Span= 0.00-2.00 hrs, dt= 0.01 hrs Peak Elev= 837.33'@ 0.12 hrs Device Routing Invert Outlet Devices #1 Primary 815.90' 24.0" Round Culvert L= 290.0' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 815.90'/813.00' S= 0.0100 T Cc= 0.900 n= 0.012, Flow Area= 3.14 sf #2 Device 1 835.50' 24.0" x 1.5" Horiz. Orifice/Grate X 12 rows C= 0.600 in 24.0" x 36.0" Grate (50% open area) Limited to weir flow at low heads Primary OutFlow Max=19.47 cfs @ 0.12 hrs HW=837.32' (Free Discharge) L1=Culvert (Passes 19.47 cfs of 55.65 cfs potential flow) L2=Orifice/Grate (Orifice Controls 19.47 cfs @ 6.49 fps) Pond 4B-P: SB-4 (South) Hydrograph ❑ Inflow 21 19.55 cfs — —I — ❑Primary 20 19.55 cfs — —I Inflow Area=2.907 ac 19 i 18 — — —Peak Elev=8-37.-33' 17 — 16 — — — — — — — — — — — — — — — — — — — — — — 15 — — — — — — — — — — — — — — — — — — — — — — 14 — — — — — —I — — — — — — — — — — — — — — — — 13 — — — — — — — — — — —I — — — — — — — — — — — — — — — — 12 — — — — — — — — — — — —I — — — — — — — — — — — — — — — — 3 11 0 10 LL 9 - 8 - 7 — — —I — — — — — — — — — — — — 6 - — — — — — — — — — — — — — 5 — — — — — — — — — — — — — — — — — — — — — 4 — — — — — — — — — — — — — — — — — — — — — 3 — — — — — — — — — — — — — — — — — — — 2 1 0 0 1 2 Time (hours) Piedmont Ditches and Storm Sewer PLI-Gaston Co 25-yr Duration=6 min, Inten=7.72 in/hr Prepared by HDR, Inc Printed 5/31/2022 HydroCAD® 10.10-7b s/n 07102 ©2022 HydroCAD Software Solutions LLC Page 46 Summary for Pond 5A-P: SB-5 (North) [57] Hint: Peaked at 839.39' (Flood elevation advised) [62] Hint: Exceeded Reach 5A-R OUTLET depth by 3.67' @ 1.99 hrs Inflow Area = 0.740 ac, 93.24% Impervious, Inflow Depth = 0.73" for 25-yr event Inflow = 5.18 cfs @ 0.11 hrs, Volume= 0.045 of Outflow = 5.18 cfs @ 0.11 hrs, Volume= 0.045 af, Atten= 0%, Lag= 0.0 min Primary = 5.18 cfs @ 0.11 hrs, Volume= 0.045 of Routed to Reach 5A-N : 24" PIPE Routing by Stor-Ind method, Time Span= 0.00-2.00 hrs, dt= 0.01 hrs Peak Elev= 839.39'@ 0.11 hrs Device Routing Invert Outlet Devices #1 Primary 828.60' 24.0" Round Culvert L= 60.0' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 828.60'/828.00' S= 0.0100 T Cc= 0.900 n= 0.012, Flow Area= 3.14 sf #2 Device 1 839.10' 24.0" x 1.5" Horiz. Orifice/Grate X 12 rows C= 0.600 in 24.0" x 36.0" Grate (50% open area) Limited to weir flow at low heads Primary OutFlow Max=5.13 cfs @ 0.11 hrs HW=839.39' (Free Discharge) L1=Culvert (Passes 5.13 cfs of 47.33 cfs potential flow) L2=Orifice/Grate (Weir Controls 5.13 cfs @ 1.76 fps) Pond 5A-P: SB-5 (North) Hydrograph ❑ Inflow 5.18 cfs ❑Primary 5.18 cfs Inflow Area=0.740 ac 5 Peak Elev=839.39' 4- 3- 0 LL 2 1 0 0 1 2 Time (hours) Piedmont Ditches and Storm Sewer PLI-Gaston Co 25-yr Duration=6 min, Inten=7.72 in/hr Prepared by HDR, Inc Printed 5/31/2022 HydroCAD® 10.10-7b s/n 07102 ©2022 HydroCAD Software Solutions LLC Page 47 Summary for Pond 5B-P: SB-5 (South) [57] Hint: Peaked at 838.98' (Flood elevation advised) [62] Hint: Exceeded Reach 5B-R OUTLET depth by 2.86' @ 0.13 hrs Inflow Area = 2.180 ac, 88.53% Impervious, Inflow Depth = 0.70" for 25-yr event Inflow = 14.27 cfs @ 0.13 hrs, Volume= 0.128 of Outflow = 14.27 cfs @ 0.13 hrs, Volume= 0.128 af, Atten= 0%, Lag= 0.0 min Primary = 14.27 cfs @ 0.13 hrs, Volume= 0.128 of Routed to Reach 5A-N : 24" PIPE Routing by Stor-Ind method, Time Span= 0.00-2.00 hrs, dt= 0.01 hrs Peak Elev= 838.98'@ 0.13 hrs Device Routing Invert Outlet Devices #1 Primary 830.40' 24.0" Round Culvert L= 180.0' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 830.40'/828.60' S= 0.0100 T Cc= 0.900 n= 0.012, Flow Area= 3.14 sf #2 Device 1 838.00' 24.0" x 1.5" Horiz. Orifice/Grate X 12 rows C= 0.600 in 24.0" x 36.0" Grate (50% open area) Limited to weir flow at low heads Primary OutFlow Max=14.11 cfs @ 0.13 hrs HW=838.95' (Free Discharge) L1=Culvert (Passes 14.11 cfs of 39.45 cfs potential flow) L2=Orifice/Grate (Orifice Controls 14.11 cfs @ 4.70 fps) Pond 5B-P: SB-5 (South) Hydrograph ❑ Inflow 1a.z7ors 1 ❑Primary 15 a.z��rs — — — — — — — — — — -1 —Inflow-Area=2-.180-ac- 14 13 Peak Elev=838.98' 12 11 10 y9 — — — — — — — — — — — — — — — — — — — — — — � I 3 8 0 LL 7 6 1 5 3 2 — — 1 0 0 1 2 Time (hours) 1 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk, Inc.v2018.3 Tuesday, 12/7/2021 Hyd. No. 1 DA1- Stream Crossing at Road Hydrograph type = SCS Runoff Peak discharge = 189.56 cfs Storm frequency = 10 yrs Time to peak = 730 min Time interval = 2 min Hyd. volume = 758,686 cuft Drainage area = 74.730 ac Curve number = 78 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 28.10 min Total precip. = 5.10 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA1- Stream Crossing at Road Q (cfs) Hyd. No. 1 -- 10 Year Q (cfs) 210.00 210.00 180.00 180.00 150.00 150.00 120.00 120.00 90.00 90.00 60.00 60.00 30.00 30.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 2 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk, Inc.v2018.3 Tuesday, 12/7/2021 Hyd. No. 2 DA2- Crossing at Road Hydrograph type = SCS Runoff Peak discharge = 9.112 cfs Storm frequency = 10 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 25,553 cuft Drainage area = 2.500 ac Curve number = 79 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 14.70 min Total precip. = 5.10 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA2- Crossing at Road Q (cfs) Hyd. No. 2 -- 10 Year Q (cfs) 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) 3 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk, Inc.v2018.3 Tuesday, 12/7/2021 Hyd. No. 3 DA3- Crossing at Road Hydrograph type = SCS Runoff Peak discharge = 22.57 cfs Storm frequency = 10 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 58,525 cuft Drainage area = 5.590 ac Curve number = 78 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 12.90 min Total precip. = 5.10 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA3- Crossing at Road Q (cfs) Hyd. No. 3-- 10 Year Q (cfs) 24.00 24.00 20.00 20.00 16.00 16.00 12.00 12.00 8.00 8.00 4.00 4.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 3 Time (min) 4 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk, Inc.v2018.3 Tuesday, 12/7/2021 Hyd. No. 4 DA4- Stream Crossing at Railroad Hydrograph type = SCS Runoff Peak discharge = 354.47 cfs Storm frequency = 10 yrs Time to peak = 730 min Time interval = 2 min Hyd. volume = 1,423,773 cuft Drainage area = 149.810 ac Curve number = 76 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 27.70 min Total precip. = 5.10 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA4- Stream Crossing at Railroad Q (cfs) Hyd. No. 4-- 10 Year Q (cfs) 400.00 400.00 350.00 350.00 300.00 300.00 250.00 250.00 200.00 200.00 150.00 150.00 100.00 100.00 50.00 50.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 4 Time (min) 5 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk, Inc.v2018.3 Tuesday, 12/7/2021 Hyd. No. 5 DA 5 - Railroad Crossing South Hydrograph type = SCS Runoff Peak discharge = 51.83 cfs Storm frequency = 10 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 145,344 cuft Drainage area = 14.220 ac Curve number = 79 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 16.10 min Total precip. = 5.10 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA 5 - Railroad Crossing South Q (cfs) Hyd. No. 5-- 10 Year Q (cfs) 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 5 Time (min) 6 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk, Inc.v2018.3 Tuesday, 12/7/2021 Hyd. No. 1 DA1- Stream Crossing at Road Hydrograph type = SCS Runoff Peak discharge = 296.09 cfs Storm frequency = 25 yrs Time to peak = 730 min Time interval = 2 min Hyd. volume = 1,184,395 cuft Drainage area = 74.730 ac Curve number = 78 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 28.10 min Total precip. = 6.88 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA1- Stream Crossing at Road Q (cfs) Hyd. No. 1 --25 Year Q (cfs) 320.00 320.00 280.00 280.00 240.00 240.00 200.00 200.00 160.00 160.00 120.00 120.00 80.00 80.00 40.00 40.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 7 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk, Inc.v2018.3 Tuesday, 12/7/2021 Hyd. No. 2 DA2- Crossing at Road Hydrograph type = SCS Runoff Peak discharge = 14.01 cfs Storm frequency = 25 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 39,593 cuft Drainage area = 2.500 ac Curve number = 79 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 14.70 min Total precip. = 6.88 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA2- Crossing at Road Q (cfs) Hyd. No. 2 --25 Year Q (cfs) 15.00 15.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 3.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) 8 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk, Inc.v2018.3 Tuesday, 12/7/2021 Hyd. No. 3 DA3- Crossing at Road Hydrograph type = SCS Runoff Peak discharge = 34.99 cfs Storm frequency = 25 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 91,364 cuft Drainage area = 5.590 ac Curve number = 78 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 12.90 min Total precip. = 6.88 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA3- Crossing at Road Q (cfs) Hyd. No. 3--25 Year Q (cfs) 35.00 35.00 30.00 30.00 25.00 25.00 20.00 20.00 15.00 15.00 10.00 10.00 5.00 5.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 3 Time (min) 9 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk, Inc.v2018.3 Tuesday, 12/7/2021 Hyd. No. 4 DA4- Stream Crossing at Railroad Hydrograph type = SCS Runoff Peak discharge = 564.89 cfs Storm frequency = 25 yrs Time to peak = 730 min Time interval = 2 min Hyd. volume = 2,257,193 cuft Drainage area = 149.810 ac Curve number = 76 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 27.70 min Total precip. = 6.88 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA4- Stream Crossing at Railroad Q (cfs) Hyd. No. 4--25 Year Q (cfs) 640.00 640.00 560.00 560.00 480.00 480.00 400.00 400.00 320.00 320.00 240.00 240.00 160.00 160.00 80.00 80.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 4 Time (min) 10 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk, Inc.v2018.3 Tuesday, 12/7/2021 Hyd. No. 5 DA 5 - Railroad Crossing South Hydrograph type = SCS Runoff Peak discharge = 79.66 cfs Storm frequency = 25 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 225,203 cuft Drainage area = 14.220 ac Curve number = 79 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 16.10 min Total precip. = 6.88 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA 5 - Railroad Crossing South Q (cfs) Hyd. No. 5--25 Year Q (cfs) 80.00 80.00 70.00 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 5 Time (min) 11 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk, Inc.v2018.3 Tuesday, 12/7/2021 Hyd. No. 1 DA1- Stream Crossing at Road Hydrograph type = SCS Runoff Peak discharge = 448.37 cfs Storm frequency = 100 yrs Time to peak = 730 min Time interval = 2 min Hyd. volume = 1,809,269 cuft Drainage area = 74.730 ac Curve number = 78 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 28.10 min Total precip. = 9.37 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA1- Stream Crossing at Road Q (cfs) Hyd. No. 1 -- 100 Year Q (cfs) 480.00 480.00 420.00 420.00 360.00 360.00 300.00 300.00 240.00 240.00 180.00 180.00 120.00 120.00 60.00 60.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 12 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk, Inc.v2018.3 Tuesday, 12/7/2021 Hyd. No. 2 DA2- Crossing at Road Hydrograph type = SCS Runoff Peak discharge = 20.94 cfs Storm frequency = 100 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 60,121 cuft Drainage area = 2.500 ac Curve number = 79 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 14.70 min Total precip. = 9.37 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA2- Crossing at Road Q (cfs) Hyd. No. 2-- 100 Year Q (cfs) 21.00 21.00 18.00 18.00 15.00 1 1 1 1 115.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 3.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) 13 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk, Inc.v2018.3 Tuesday, 12/7/2021 Hyd. No. 3 DA3- Crossing at Road Hydrograph type = SCS Runoff Peak discharge = 52.65 cfs Storm frequency = 100 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 139,567 cuft Drainage area = 5.590 ac Curve number = 78 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 12.90 min Total precip. = 9.37 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA3- Crossing at Road Q (cfs) Hyd. No. 3-- 100 Year Q (cfs) 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 3 Time (min) 14 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk, Inc.v2018.3 Tuesday, 12/7/2021 Hyd. No. 4 DA4- Stream Crossing at Railroad Hydrograph type = SCS Runoff Peak discharge = 868.54 cfs Storm frequency = 100 yrs Time to peak = 730 min Time interval = 2 min Hyd. volume = 3,490,608 cuft Drainage area = 149.810 ac Curve number = 76 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 27.70 min Total precip. = 9.37 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA4- Stream Crossing at Railroad Q (cfs) Hyd. No. 4-- 100 Year Q (cfs) 875.00 875.00 750.00 750.00 625.00 625.00 500.00 500.00 375.00 375.00 250.00 250.00 125.00 125.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 4 Time (min) 15 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk, Inc.v2018.3 Tuesday, 12/7/2021 Hyd. No. 5 DA 5 - Railroad Crossing South Hydrograph type = SCS Runoff Peak discharge = 119.11 cfs Storm frequency = 100 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 341,967 cuft Drainage area = 14.220 ac Curve number = 79 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 16.10 min Total precip. = 9.37 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA 5 - Railroad Crossing South Q (cfs) Hyd. No. 5-- 100 Year Q (cfs) 120.00 120.00 100.00 100.00 80.00 80.00 60.00 60.00 40.00 40.00 20.00 20.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 5 Time (min) PLC I Lithium Hydroxide Conversion Plant—Stormwater Calculations ��� Appendix J—Stream and Culvert Crossing Calculations Appendix J — Stream and Culvert Crossing Calculations PLC I Lithium Hydroxide Conversion Plant—Stormwater Calculations Appendix J—Stream and Culvert Crossing Calculations This page intentionally left blank. 1 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk, Inc.v2018.3 Wednesday,08/25/2021 Hyd. No. 1 DA1- Stream Crossing at Road Hydrograph type = SCS Runoff Peak discharge = 185.17 cfs Storm frequency = 10 yrs Time to peak = 12.17 hrs Time interval = 2 min Hyd. volume = 741,122 cuft Drainage area = 73.000 ac Curve number = 78 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 28.10 min Total precip. = 5.10 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA1- Stream Crossing at Road Q (cfs) Hyd. No. 1 -- 10 Year Q (cfs) 210.00 210.00 180.00 180.00 150.00 150.00 120.00 120.00 90.00 90.00 60.00 60.00 30.00 30.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 1 Time (hrs) 2 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk, Inc.v2018.3 Wednesday,08/25/2021 Hyd. No. 2 DA2- Crossing at Road Hydrograph type = SCS Runoff Peak discharge = 9.112 cfs Storm frequency = 10 yrs Time to peak = 12.03 hrs Time interval = 2 min Hyd. volume = 25,553 cuft Drainage area = 2.500 ac Curve number = 79 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 14.70 min Total precip. = 5.10 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA2- Crossing at Road Q (cfs) Hyd. No. 2 -- 10 Year Q (cfs) 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 2 Time (hrs) 3 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk, Inc.v2018.3 Wednesday,08/25/2021 Hyd. No. 3 DA3- Crossing at Road Hydrograph type = SCS Runoff Peak discharge = 22.57 cfs Storm frequency = 10 yrs Time to peak = 12.00 hrs Time interval = 2 min Hyd. volume = 58,525 cuft Drainage area = 5.590 ac Curve number = 78 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 12.90 min Total precip. = 5.10 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA3- Crossing at Road Q (cfs) Hyd. No. 3 -- 10 Year Q (cfs) 24.00 24.00 20.00 20.00 16.00 16.00 12.00 12.00 8.00 8.00 4.00 4.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 3 Time (hrs) 4 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk, Inc.v2018.3 Wednesday,08/25/2021 Hyd. No. 4 DA4- Stream Crossing at Railroad Hydrograph type = SCS Runoff Peak discharge = 275.22 cfs Storm frequency = 10 yrs Time to peak = 12.27 hrs Time interval = 2 min Hyd. volume = 1,254,347 cuft Drainage area = 133.500 ac Curve number = 76 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 36.30 min Total precip. = 5.10 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA4- Stream Crossing at Railroad Q (cfs) Hyd. No. 4 -- 10 Year Q (cfs) 280.00 280.00 240.00 240.00 200.00 200.00 160.00 160.00 120.00 120.00 80.00 80.00 40.00 40.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 4 Time (hrs) 5 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk, Inc.v2018.3 Wednesday,08/25/2021 Hyd. No. 1 DA1- Stream Crossing at Road Hydrograph type = SCS Runoff Peak discharge = 289.24 cfs Storm frequency = 25 yrs Time to peak = 12.17 hrs Time interval = 2 min Hyd. volume = 1,156,974 cuft Drainage area = 73.000 ac Curve number = 78 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 28.10 min Total precip. = 6.88 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA1- Stream Crossing at Road Q (cfs) Hyd. No. 1 -- 25 Year Q (cfs) 320.00 320.00 280.00 280.00 240.00 240.00 200.00 200.00 160.00 160.00 120.00 120.00 80.00 80.00 40.00 40.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 1 Time (hrs) 6 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk, Inc.v2018.3 Wednesday,08/25/2021 Hyd. No. 2 DA2- Crossing at Road Hydrograph type = SCS Runoff Peak discharge = 14.01 cfs Storm frequency = 25 yrs Time to peak = 12.03 hrs Time interval = 2 min Hyd. volume = 39,593 cuft Drainage area = 2.500 ac Curve number = 79 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 14.70 min Total precip. = 6.88 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA2- Crossing at Road Q (cfs) Hyd. No. 2 -- 25 Year Q (cfs) 15.00 15.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 3.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 2 Time (hrs) 7 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk, Inc.v2018.3 Wednesday,08/25/2021 Hyd. No. 3 DA3- Crossing at Road Hydrograph type = SCS Runoff Peak discharge = 34.99 cfs Storm frequency = 25 yrs Time to peak = 12.00 hrs Time interval = 2 min Hyd. volume = 91,364 cuft Drainage area = 5.590 ac Curve number = 78 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 12.90 min Total precip. = 6.88 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA3- Crossing at Road Q (cfs) Hyd. No. 3 -- 25 Year Q (cfs) 35.00 35.00 30.00 30.00 25.00 25.00 20.00 20.00 15.00 15.00 10.00 10.00 5.00 5.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 3 Time (hrs) 8 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk, Inc.v2018.3 Wednesday,08/25/2021 Hyd. No. 4 DA4- Stream Crossing at Railroad Hydrograph type = SCS Runoff Peak discharge = 439.11 cfs Storm frequency = 25 yrs Time to peak = 12.23 hrs Time interval = 2 min Hyd. volume = 1,988,590 cuft Drainage area = 133.500 ac Curve number = 76 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 36.30 min Total precip. = 6.88 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA4- Stream Crossing at Railroad Q (cfs) Hyd. No. 4 -- 25 Year Q (cfs) 480.00 480.00 420.00 420.00 360.00 360.00 300.00 300.00 240.00 240.00 180.00 180.00 120.00 120.00 60.00 60.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 4 Time (hrs) 9 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk, Inc.v2018.3 Wednesday,08/25/2021 Hyd. No. 1 DA1- Stream Crossing at Road Hydrograph type = SCS Runoff Peak discharge = 437.99 cfs Storm frequency = 100 yrs Time to peak = 12.17 hrs Time interval = 2 min Hyd. volume = 1,767,385 cuft Drainage area = 73.000 ac Curve number = 78 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 28.10 min Total precip. = 9.37 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA1- Stream Crossing at Road Q (cfs) Hyd. No. 1 -- 100 Year Q (cfs) 480.00 480.00 420.00 420.00 360.00 360.00 300.00 300.00 240.00 240.00 180.00 180.00 120.00 120.00 60.00 60.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 1 Time (hrs) 10 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk, Inc.v2018.3 Wednesday,08/25/2021 Hyd. No. 2 DA2- Crossing at Road Hydrograph type = SCS Runoff Peak discharge = 20.94 cfs Storm frequency = 100 yrs Time to peak = 12.03 hrs Time interval = 2 min Hyd. volume = 60,121 cuft Drainage area = 2.500 ac Curve number = 79 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 14.70 min Total precip. = 9.37 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA2- Crossing at Road Q (cfs) Hyd. No. 2 -- 100 Year Q (cfs) 21.00 21.00 18.00 18.00 15.00 15.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 3.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 2 Time (hrs) 11 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk, Inc.v2018.3 Wednesday,08/25/2021 Hyd. No. 3 DA3- Crossing at Road Hydrograph type = SCS Runoff Peak discharge = 52.65 cfs Storm frequency = 100 yrs Time to peak = 12.00 hrs Time interval = 2 min Hyd. volume = 139,567 cuft Drainage area = 5.590 ac Curve number = 78 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 12.90 min Total precip. = 9.37 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA3- Crossing at Road Q (cfs) Hyd. No. 3-- 100 Year Q (cfs) 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 3 Time (hrs) 12 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk, Inc.v2018.3 Wednesday,08/25/2021 Hyd. No. 4 DA4- Stream Crossing at Railroad Hydrograph type = SCS Runoff Peak discharge = 675.92 cfs Storm frequency = 100 yrs Time to peak = 12.23 hrs Time interval = 2 min Hyd. volume = 3,075,232 cuft Drainage area = 133.500 ac Curve number = 76 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 36.30 min Total precip. = 9.37 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA4- Stream Crossing at Railroad Q (cfs) Hyd. No. 4 -- 100 Year Q (cfs) 700.00 700.00 600.00 600.00 500.00 500.00 400.00 400.00 300.00 300.00 200.00 200.00 100.00 100.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 4 Time (hrs) HY-8 Culvert Analysis Report Crossing Discharge Data Discharge Selection Method: Specify Minimum, Design, and Maximum Flow Minimum Flow: 9.11 cfs Design Flow: 14.01 cfs Maximum Flow: 20.94 cfs Table 1 - Summary of Culvert Flows at Crossing: Crossing 1 - DA2 Headwater Elevation Culvert 1 Discharge Roadway Discharge (ft) Total Discharge(cfs) (cfs) (cfs) Iterations 889.96 9.11 9.11 0.00 1 890.09 10.29 10.29 0.00 1 890.22 11.48 11.48 0.00 1 890.35 12.66 12.66 0.00 1 890.50 14.01 14.01 0.00 1 890.62 15.03 15.03 0.00 1 890.76 16.21 16.21 0.00 1 890.92 17.39 17.39 0.00 1 891.08 18.57 18.57 0.00 1 891.26 19.76 19.76 0.00 1 891.45 20.94 20.94 0.00 1 893.02 28.80 28.80 0.00 Overtopping Rating Curve Plot for Crossing: Crossing 1 - DA2 Total atui i Curve Crossing: Crossing 1 - D 893_5 893.0 E 892_5 Cm 0 892.0 w 891_ c� 891.0 aD _ 8pp90_5 890.0 IF 10 15 20 25 30 Total Discharge (cfs) Table 2 - Culvert Summary Table: Culvert 1 Total Culvert Headwater Inlet Outlet Flow Normal Critical Outlet Tailwater Outlet Tailwater Discharge Discharge Elevation Control Control Type Depth(ft) Depth(ft) Depth(ft) Depth(ft) Velocity Velocity (cfs) (cfs) (ft) Depth(ft) Depth(ft) (ft/s) (ft/s) 9.11 9.11 889.96 1.565 0.0* 1-S2n 0.563 1.077 0.592 0.308 11.693 2.740 10.29 10.29 890.09 1.692 0.0* 1-S2n 0.599 1.149 0.639 0.324 11.908 2.829 11.48 1 11.48 890.22 1.818 1 0.0* 1-S2n 1 0.634 1.216 0.672 1 0.340 12.390 2.911 12.66 12.66 890.35 1.946 0.0* 1-S2n 0.668 1.279 0.717 0.355 12.511 2.986 14.01 14.01 890.50 2.097 0.0* 5-S2n 0.704 1.348 0.755 0.371 12.901 3.066 15.03 15.03 890.62 2.216 0.0* 5-S2n 0.731 1.397 0.790 0.382 13.025 3.122 16.21 16.21 890.76 2.362 0.0* 5-S2n 0.762 1.451 0.827 0.395 13.215 3.184 17.39 17.39 890.92 1 2.517 0.0* 5-S2n 0.791 1.503 0.859 0.407 13.483 3.243 18.57 18.57 891.08 2.683 0.0* 5-S2n 0.821 1.551 0.895 0.419 13.635 3.298 19.76 19.76 891.26 2.860 0.134 1 5-S2n 0.849 1.597 0.932 0.430 13.778 3.351 20.94 20.94 891.45 3.049 0.321 1 5-S2n 0.877 1.639 0.965 0.441 13.947 3.402 * Full Flow Headwater elevation is below inlet invert. Straight Culvert Inlet Elevation(invert):888.40 ft, Outlet Elevation(invert):885.39 ft Culvert Length:65.60 ft, Culvert Slope:0.0459 Culvert Performance Curve Plot: Culvert 1 Perfonnali U1-'e Divert: 02vert 1 0 0 Inlet Control Elev Outlet Control Elev 392 a, w 91 390 170 a) 10 15 20 25 30 Total Discharge (cfs) Water Surface Profile Plot for Culvert: Culvert 1 Crossili - Crossing I - DA2, Design Discharge - 14.0 efs Cuh-ert Culvert 1_ C&ert Discharge 14.0 cfs 894 892 891 4----- 890 co w 889 888 887 886 --- 88 -20 0 20 40 60 80 Station (ft) Site Data - Culvert 1 Site Data Option: Culvert Invert Data Inlet Station: 0.00 ft Inlet Elevation: 888.40 ft Outlet Station: 65.53 ft Outlet Elevation: 885.39 ft Number of Barrels: 1 Culvert Data Summary - Culvert 1 Barrel Shape: Circular Barrel Diameter: 2.00 ft Barrel Material: Concrete Embedment: 0.00 in Barrel Manning's n: 0.0120 Culvert Type: Straight Inlet Configuration: Square Edge with Headwall Inlet Depression: None Table 3 - Downstream Channel Rating Curve (Crossing: Crossing 1 - DA2) Flow(cfs) Water Surface Depth (ft) Velocity(ft/s) Shear(psf) Froude Number Elev(ft) 9.11 885.70 0.31 2.74 0.77 1.13 10.29 885.71 0.32 2.83 0.81 1.14 11.48 885.73 0.34 2.91 0.85 1.14 12.66 885.75 0.36 2.99 0.89 1.15 14.01 885.76 0.37 3.07 0.93 1.16 15.03 885.77 0.38 3.12 0.95 1.16 16.21 885.79 0.40 3.18 0.99 1.17 17.39 885.80 0.41 3.24 1.02 1.18 18.57 885.81 0.42 3.30 1.05 1.18 19.76 885.82 0.43 3.35 1.07 1.19 20.94 885.83 0.44 3.40 1.10 1.19 Tailwater Channel Data - Crossing 1 - DA2 Tailwater Channel Option: Irregular Channel Channel Slope: 0.0400 User Defined Channel Cross-Section: Coord No. Station (ft) Elevation (ft) Manning's n 1 0.00 888.26 0.0350 2 16.95 886.56 0.0350 3 35.27 885.43 0.0350 4 39.94 885.39 0.0350 5 70.19 886.41 0.0350 6 93.78 886.85 0.0000 Roadway Data for Crossing: Crossing 1 - DA2 Roadway Profile Shape: Irregular Roadway Shape (coordinates) Irregular Roadway Cross-Section: Coord No. Station (ft) Elevation (ft) 0 350.00 894.44 1 363.74 893.99 2 400.00 893.02 Roadway Surface: Paved Roadway Top Width: 26.00 ft STREAM CROSSING #3 STREAM CROSSING #3 Crossing Discharge Data Discharge Selection Method: Specify Minimum, Design, and Maximum Flow Minimum Flow: 22.57 cfs Design Flow: 34.99 cfs Maximum Flow: 52.65 cfs STREAM CROSSING #3 Table 4 - Summary of Culvert Flows at Crossing: Crossing 2 - DA3 Headwater Elevation Culvert 2 Discharge Roadway Discharge (ft) Total Discharge(cfs) (cfs) (cfs) Iterations 873.46 22.57 22.57 0.00 1 873.64 25.58 25.58 0.00 1 873.82 28.59 28.59 0.00 1 873.99 31.59 31.59 0.00 1 874.19 34.99 34.99 0.00 1 874.35 37.61 37.61 0.00 1 874.54 40.62 40.62 0.00 1 874.74 43.63 43.63 0.00 1 874.95 46.63 46.63 0.00 1 875.17 49.64 49.64 0.00 1 875.41 52.65 52.65 0.00 1 878.21 79.45 79.45 0.00 Overtopping STREAM CROSSING #3 Rating Curve Plot for Crossing: Crossing 2 - DA3 Total Ratilig Curve Crossing: Crossing 2 - D A3 879 878 0 877 u 876 87r, 874 20 40 60 60 70 80 90 Total Discharge (cfs) STREAM CROSSING #3 Table 5 - Culvert Summary Table: Culvert 2 Total Culvert Headwater Inlet Outlet ter Outlet Tailwater Flow Normal Critical Outlet Tailwa Discharge Discharge Elevation Control Control Type Depth al Depth( Depth(ft) Deth ter Velocity Velocity yp p (cfs) (cfs) (ft) Depth(ft) Depth(ft) p (ft/s) (ft/s) 22.57 22.57 873.46 2.173 0.0* 1-S2n 0.720 1.529 0.835 0.288 14.048 2.690 25.58 25.58 873.64 2.353 0.0* 1-S2n 0.768 1.632 0.901 0.305 14.308 2.786 28.59 28.59 873.82 2.529 0.0* 1-S2n 0.812 1.730 0.964 0.320 14.577 2.874 31.59 31.59 873.99 2.703 0.0* 1-S2n 0.855 1.823 1.022 0.335 14.870 2.955 34.99 34.99 874.19 2.903 0.0* 1-S2n 0.901 1.922 1.089 0.350 15.094 3.039 37.61 37.61 874.35 3.062 0.027 5-S2n 0.935 1.995 1.138 0.362 15.293 3.100 40.62 40.62 874.54 3.251 0.237 5-S2n 0.973 2.075 1.194 0.374 15.485 3.166 43.63 43.63 874.74 3.450 0.454 5-S2n 1.011 2.152 1.247 0.386 15.699 3.228 46.63 46.63 874.95 3.6 10.676 5-S2n 1.047 2.224 1.301 0.397 15.870 3.292 49.64 49.64 875.17 3.883 1.259 5-S2n 1.083 2.293 1.351 0.408 16.067 3.356 52.65 52.65 875.41 1 4.120 1.462 5-S2n 1.117 2.358 1.402 0.418 16.248 3.417 STREAM CROSSING #3 * Full Flow Headwater elevation is below inlet invert. Straight Culvert Inlet Elevation(invert):871.29 ft, Outlet Elevation(invert):868.54 ft Culvert Length:45.49 ft, Culvert Slope:0.0606 STREAM CROSSING #3 Culvert Performance Curve Plot: Culvert 2 Performance Curve Cuh-ert: Cuh-ert 2 0 0 Inlet Control Elev Outlet Control Elev 879 878 877 0 876 w 875 874 = 873 872 A-k- 71 20 30 40 60 60 70 80 90 Total Discharge (cfs) STREAM CROSSING #3 Water Surface Profile Plot for Culvert: Culvert 2 Crossili - Crossing 2 - D 3, Design Discharge - 35.0 efs Cuh-ert Culvert I Culvert Discharge 35-0 cfs 880 87 876 874 ———' .a, u 872 ---�C 63 - -10 0 10 20 30 40 60 60 Station (ft) Site Data - Culvert 2 Site Data Option: Culvert Invert Data Inlet Station: 0.00 ft Inlet Elevation: 871.29 ft Outlet Station: 45.41 ft Outlet Elevation: 868.54 ft Number of Barrels: 1 Culvert Data Summary - Culvert 2 Barrel Shape: Circular Barrel Diameter: 3.00 ft Barrel Material: Concrete Embedment: 0.00 in Barrel Manning's n: 0.0120 Culvert Type: Straight Inlet Configuration: Square Edge with Headwall Inlet Depression: None STREAM CROSSING #3 Table 6 - Downstream Channel Rating Curve (Crossing: Crossing 2 - DA3) Flow(cfs) Water Surface Depth (ft) Velocity(ft/s) Shear(psf) Froude Number Elev(ft) 22.57 868.83 0.29 2.69 0.72 1.12 25.58 868.84 0.30 2.79 0.76 1.13 28.59 868.86 0.32 2.87 0.80 1.14 31.59 868.87 0.33 2.95 0.84 1.15 34.99 868.89 0.35 3.04 0.87 1.16 37.61 868.90 0.36 3.10 0.90 1.16 40.62 868.91 0.37 3.17 0.93 1.17 43.63 868.93 0.39 3.23 0.96 1.17 46.63 868.94 0.40 3.29 0.99 1.18 49.64 868.95 0.41 3.36 1.02 1.19 52.65 868.96 0.42 3.42 1.04 1.19 Tailwater Channel Data - Crossing 2 - DA3 Tailwater Channel Option: Irregular Channel Channel Slope: 0.0400 User Defined Channel Cross-Section: Coord No. Station (ft) Elevation (ft) Manning's n 1 0.00 870.14 0.0350 2 26.21 868.93 0.0350 3 45.28 868.54 0.0350 4 58.05 868.57 0.0350 5 71.82 868.72 0.0350 6 93.78 869.09 0.0000 Roadway Data for Crossing: Crossing 2 - DA3 Roadway Profile Shape: Irregular Roadway Shape (coordinates) Irregular Roadway Cross-Section: Coord No. Station (ft) Elevation (ft) 0 950.00 879.78 1 990.06 878.53 2 1000.00 878.21 Roadway Surface: Paved Roadway Top Width: 26.00 ft STREAM CROSSING #4 STREAM CROSSING #4 Crossing Discharge Data Discharge Selection Method: Specify Minimum, Design, and Maximum Flow Minimum Flow: 185.17 cfs Design Flow: 289.24 cfs Maximum Flow: 437.99 cfs STREAM CROSSING #4 Table 7 - Summary of Culvert Flows at Crossing: Crossing 3 - DA1 Headwater Elevation Open Bottom Arch 3 Roadway Discharge (ft) Total Discharge(cfs) Discharge(cfs) (cfs) Iterations 832.03 185.17 185.17 0.00 1 832.46 210.45 210.45 0.00 1 832.88 235.73 235.73 0.00 1 833.29 261.02 261.02 0.00 1 833.76 289.24 289.24 0.00 1 834.14 311.58 311.58 0.00 1 834.58 336.86 336.86 0.00 1 835.01 362.14 362.14 0.00 1 835.48 387.43 387.43 0.00 1 836.06 412.71 412.71 0.00 1 836.65 437.99 437.99 0.00 1 839.48 540.51 540.51 0.00 Overtopping STREAM CROSSING #4 Rating Curve Plot for Crossing: Crossing 3 - DA1 Total Rathig Curve Crossing: Crossing 3 - DA1 840 839 838 0 837 G 836 a� 83 c6 = 834 833 8,32 2U- 250 300 350 400 450 500 560 600 Total Discharge (cfs) STREAM CROSSING #4 Table 8 - Culvert Summary Table: Open Bottom Arch 3 Total Culvert Headwater Inlet Outlet ter Outlet Tailwater Flow Normal Critical Outlet Tailwa Discharge Discharge Elevation Control Control Type Depth al Depth( Depth(ft) Deth ter Velocity Velocity yp p (cfs) (cfs) (ft) Depth(ft) Depth(ft) p (ft/s) (ft/s) 185.17 185.17 832.03 4.061 0.0' 1-S2n 1.919 2.193 1.919 2.334 9.834 8.874 210.45 210.45 832.46 4.488 0.133 1-S2n 2.105 2.386 2.105 2.497 10.232 9.191 235.73 235.73 832.88 4.906 0.695 1-S2n 2.290 2.572 2.290 2.650 10.586 9.479 261.02 261.02 833.29 5.324 1.295 5-S2n 2.475 2.750 2.475 2.795 10.908 9.744 289.24 289.24 833.76 5.792 2.011 5-S2n 2.681 2.936 2.681 2.947 11.232 10.017 311.58 311.58 834.14 6.174 2.630 5-S2n 2.849 3.080 2.849 3.062 11.453 10.218 336.86 336.86 834.58 6.606 3.383 5-S2n 3.045 3.238 3.045 3.187 11.679 10.432 362.14 362.14 835.01 7.038 4.179 5-S2n 3.247 3.393 3.247 3.307 11.882 10.634 387.43 387.43 835.48 7.508 5.008 5-S2n 3.458 3.535 3.458 3.422 12.057 10.825 412.71 412.71 836.06 8.093 8.076 7-M2c 3.691 3.670 3.670 3.533 12.240 11.007 437.99 437.99 836.65 8.678 1 8.405 7-M2c 3.947 1 3.802 3.802 3.640 1 12.638 11.180 STREAM CROSSING #4 * Full Flow Headwater elevation is below inlet invert. Straight Culvert Inlet Elevation(invert):827.97 ft, Outlet Elevation(invert):824.00 ft Culvert Length: 111.46 ft, Culvert Slope:0.0356 STREAM CROSSING #4 Culvert Performance Curve Plot: Open Bottom Arch 3 Perfolluali U1 e Ci- v-ert: Open Bottom Arch 3 0 0 Inlet Control Elev Outlet Control Elev 34C� � 33r a 1 w 34 1 33,2 .a, _ 81 323 2r�r, 2 5 C-) 300 350 400 450 500 560 600 Total Discharge (cfs) STREAM CROSSING #4 Water Surface Profile Plot for Culvert: Open Bottom Arch 3 Crossing - Crossing 3 - DAL Design Discharge - 289.2 cfs Cuh-ert - Open Bottom Arch 3, Cuh-ert Discharge -289.2 cfs 842 840 838 836 834 --- 0 8�2 LLJ ��iVi 828 ----4C 326 824 0 50 100 Station (ft) Site Data - Open Bottom Arch 3 Site Data Option: Culvert Invert Data Inlet Station: 0.00 ft Inlet Elevation: 827.97 ft Outlet Station: 111.39 ft Outlet Elevation: 824.00 ft Number of Barrels: 1 Culvert Data Summary - Open Bottom Arch 3 Barrel Shape: Arch, Open Bottom Barrel Span: 10.00 ft Barrel Rise: 5.25 ft Barrel Material: Corrugated Steel Embedment: 0.00 in Barrel Manning's n: 0.0350 (top and sides) Manning's n: 0.0350 (bottom) Culvert Type: Straight Inlet Configuration: Thin Edge Projecting Inlet Depression: None STREAM CROSSING #4 STREAM CROSSING #4 Table 9 - Downstream Channel Rating Curve (Crossing: Crossing 3 - DA1) Flow(cfs) Water Surface Depth (ft) Velocity(ft/s) Shear(psf) Froude Number Elev(ft) 185.17 826.33 2.33 8.87 3.64 1.20 210.45 826.50 2.50 9.19 3.90 1.20 235.73 826.65 2.65 9.48 4.13 1.21 261.02 826.79 2.79 9.74 4.36 1.22 289.24 826.95 2.95 10.02 4.60 1.22 311.58 827.06 3.06 10.22 4.78 1.23 336.86 827.19 3.19 10.43 4.97 1.23 362.14 827.31 3.31 10.63 5.16 1.24 387.43 827.42 3.42 10.82 5.34 1.24 412.71 827.53 3.53 11.01 5.51 1.25 437.99 827.64 3.64 11.18 5.68 1.25 Tailwater Channel Data - Crossing 3 - DA1 Tailwater Channel Option: Irregular Channel Channel Slope: 0.0250 User Defined Channel Cross-Section: Coord No. Station (ft) Elevation (ft) Manning's n 1 0.00 835.17 0.0350 2 25.14 830.00 0.0350 3 47.91 828.00 0.0350 4 54.56 824.00 0.0350 5 60.25 824.00 0.0350 6 64.95 828.18 0.0350 7 76.03 830.91 0.0350 8 99.59 834.74 0.0000 Roadway Data for Crossing: Crossing 3 - DA1 Roadway Profile Shape: Irregular Roadway Shape (coordinates) Irregular Roadway Cross-Section: Coord No. Station (ft) Elevation (ft) 0 2000.00 841.16 1 2050.00 840.07 2 2083.00 839.64 3 2150.00 839.48 4 2200.00 839.91 Roadway Surface: Paved Roadway Top Width: 26.00 ft Crossing Discharge Data Discharge Selection Method: Specify Minimum, Design, and Maximum Flow Minimum Flow: 275.22 cfs Design Flow: 439.11 cfs Maximum Flow: 675.925 cfs Table 10 - Summary of Culvert Flows at Crossing: Railroad Crossing 4 - DA4 Open Bottom Arch 4- Headwater Elevation Total Discharge(cfs) Railroad Discharge Roadway Discharge Iterations (ft) (cfs) (cfs) 821.29 275.22 275.22 0.00 1 821.90 315.29 315.29 0.00 1 822.52 355.36 355.36 0.00 1 823.14 395.43 395.43 0.00 1 824.02 439.11 439.11 0.00 1 824.79 475.57 475.57 0.00 1 825.72 515.64 515.64 0.00 1 826.82 555.71 555.71 0.00 1 827.92 595.78 595.78 0.00 1 829.17 635.85 635.85 0.00 1 830.45 675.92 675.92 0.00 1 838.23 838.68 838.68 1 0.00 Overtopping Rating Curve Plot for Crossing: Railroad Crossing 4 - DA4 Total Rathig Curve Crossing:RAroad Crossing 4 -D A4 838 836 834 0 832 a� w 83p 828 a 826 824 822 ,rr 4C-) 500 600 700 800 000 Total Discharge (cfs) Table 11 - Culvert Summary Table: Open Bottom Arch 4 - Railroad Total Culvert Headwater Inlet Outlet Flow Normal Critical Outlet Tailwater Outlet Tailwater Discharge Discharge Elevation Control Control Type Depth(ft) Depth(ft) Depth(ft) Depth(ft) Velocity Velocity (cfs) (cfs) (ft) Depth(ft) Depth(ft) (ft/s) (ft/s) 275.22 275.22 821.29 5.041 0.0* 5-JS1t 1.908 2.565 4.558 4.558 6.325 7.213 315.29 315.29 821.90 5.648 0.145 51iS1t 2.100 2.801 4.845 4.845 7.076 7.461 355.36 1 355.36 822.52 1 6.268 1.336 5JS1f 1 2.291 3.029 5.000 5.111 7.927 1 7.686 395.43 395.43 823.14 6.887 2.599 5-JS1f 2.480 3.247 5.000 5.358 8.821 7.893 439.11 439.11 824.02 7.772 4.103 51iS1f 2.689 3.460 5.000 5.612 9.795 8.101 475.57 475.57 824.79 8.536 5.393 5-JS1f 2.867 3.630 5.000 5.811 10.609 8.263 515.64 515.64 825.72 9.469 6.937 5-JS1f 3.067 3.810 5.000 6.020 11.503 8.430 555.71 555.71 826.82 10.568 8.524 5-JS1f 3.274 3.965 5.000 6.220 12.397 8.588 595.78 595.78 827.92 11.668 10.179 5-JS1f 3.497 4.105 5.000 6.410 13.290 8.738 635.85 635.85 829.17 12.922 11.912 4-FFf 3.737 4.238 5.000 6.593 14.184 8.880 675.92 675.92 830.45 14.201 13.711 4-FFf 4.018 4.357 5.000 6.769 15.078 9.015 * Full Flow Headwater elevation is below inlet invert. Straight Culvert Inlet Elevation(invert):816.25 ft, Outlet Elevation(invert):808.00 ft Culvert Length: 162.06 ft, Culvert Slope:0.0510 Culvert Performance Curve Plot: Open Bottom Arch 4 - Railroad Perfonlian U1 e C&-ert: Open Bottom Arch 4- Railroad 0 0 Inlet Control Elev Outlet Control Elev u �2r _ 8 2C� ,rr 4r,r� 500 600 700 800 900 Total Discharge (cfs) Water Surface Profile Plot for Culvert: Open Bottom Arch 4 - Railroad Crossing - Raitroad Crossing 4 - DA4. Design Discharge - 439.1 cfs Cuh-ert - Open Bottom Arch 4 -Railroad Cuh-ert Discharge -439.1 cfs 840 83 8 21 825- {TS W 820 81� --- 31 C� r� 0 50 100 150 200 Statfon(ft) Site Data - Open Bottom Arch 4 - Railroad Site Data Option: Culvert Invert Data Inlet Station: 0.00 ft Inlet Elevation: 816.25 ft Outlet Station: 161.85 ft Outlet Elevation: 808.00 ft Number of Barrels: 1 Culvert Data Summary - Open Bottom Arch 4 - Railroad Barrel Shape: Arch, Open Bottom Barrel Span: 12.00 ft Barrel Rise: 5.00 ft Barrel Material: Corrugated Aluminum Embedment: 0.00 in Barrel Manning's n: 0.0240 (top and sides) Manning's n: 0.0350 (bottom) Culvert Type: Straight Inlet Configuration: Thin Edge Projecting Inlet Depression: None Table 12 - Downstream Channel Rating Curve (Crossing: Railroad Crossing 4 - DA4) Flow(cfs) Water Surface Depth (ft) Velocity(ft/s) Shear(psf) Froude Number Elev(ft) 275.22 812.56 4.56 7.21 2.84 0.77 315.29 812.85 4.85 7.46 3.02 0.77 355.36 813.11 5.11 7.69 3.19 0.78 395.43 813.36 5.36 7.89 3.34 0.78 439.11 813.61 5.61 8.10 3.50 0.79 475.57 813.81 5.81 8.26 3.63 0.79 515.64 814.02 6.02 8.43 3.76 0.80 555.71 814.22 6.22 8.59 3.88 0.80 595.78 814.41 6.41 8.74 4.00 0.80 635.85 814.59 6.59 8.88 4.11 0.80 675.92 814.77 6.77 9.02 4.22 0.81 Tailwater Channel Data - Railroad Crossing 4 - DA4 Tailwater Channel Option: Irregular Channel Channel Slope: 0.0100 User Defined Channel Cross-Section: Coord No. Station (ft) Elevation (ft) Manning's n 1 0.00 816.00 0.0350 2 15.50 816.00 0.0350 3 26.56 808.00 0.0350 4 29.35 808.00 0.0350 5 42.14 820.00 0.0350 6 52.13 821.38 0.0350 Roadway Data for Crossing: Railroad Crossing 4 - DA4 Roadway Profile Shape: Irregular Roadway Shape (coordinates) Irregular Roadway Cross-Section: Coord No. Station (ft) Elevation (ft) 0 1975.00 840.76 1 2083.00 838.23 2 2175.00 838.46 3 2425.00 840.96 Roadway Surface: Paved Roadway Top Width: 45.00 ft PLC I Lithium Hydroxide Conversion Plant—Stormwater Calculations ��� Appendix K—Outlet Protection Calculations Appendix K — Outlet Protection Calculations PLC I Lithium Hydroxide Conversion Plant—Stormwater Calculations Appendix K—Outlet Protection Calculations This page intentionally left blank. OUTLET PROTECTION CALCULATIONS Lithium Hydroxide Conversion Plant DATE: wwllil.!/im■i.i.a/iw■.mll.aaiaiii.wl.aEwl.l:waalii .i.lwi.�lwaaiar:wa:..Eal.lriillii.a.aaaa/i..a.a..a Erriiril.\lr.iiiafiri...iwililNriilili.rfl!/lira r! awialmriEl:amiwana:a■/.ialEnlafa:aOmal.ONaOOaa1E! a....l Nl.\r/.lilia gas ..r//l.rN.riii...iww..i..w.r aaaaaaamrmlaOEmaaliana:lraaNNOOOO■ra:mm7mammOman ! waliilwr/1►'ailfaNiiiaiiiriOlm!!!llnEiaffr.riara!! .aa/iraarwi\iiwsa:l..aiEri:iauai://m:law.a:isam:a .i.�rlrf�rii\NilalaallwrrwlrwN:iiiai.aN.:aaaiaaa iaSOama'ana:a■Oisas■.s:wmaNwa am on am as am"mom man aw/.:asaa!liaalsNiiaE..l..filraaia//.■l/a/i.aEN/a .iEal�/lEm:::snrwas:mmas:maNwnla.i.aaaaisiNnamaa amim\mw�imail.\NNaaamaww!/1Omlmar!!:ilmlaimiamma mina V awaaw--/i1ll.i.i.i..i..O/pa....a...m..wOfso:O a�lwnlaniraai�aaslal.i:iaiiNNaaaaia.aa/ai/iwnfN OLIE:mcOm:wOwNww�asa■i:■aaENia:iila■OamawiaOwas" • aaaama\Nir::naaa\awiiiaasaNNwiaaaiiwpliEmnE:aa .walla►a 1Otfaa:Eialal.aOOa./ai�aElaaa.E...awlNaaiiaaiailaa.ataa.lf lifOnmf.\aaa■7mEmmewaa .Oman w/Ea7�amfilalallrmaaawmnaOam Nw.�t.aiaim/OOiwnanmwfnmaal::.Oman rl.f:Elllli/.Ei.Ns.r\mi/.EimwNEiwwwwiwai:a :wa.i :ir.tOlEl:L'a:NaaNN:!\naliiaaNlOwn1■aaami waammlm Ilia wawawwwns.:aaOsn:aw:ia WOMMOMMOMW Oi w1l'awanirwla��a11N E.i:r.�NaNaawOO1 Onn:a w:i/O:O ! t:aaO"Man laa.!■.-1WOOM awaa�lfralarii■am:anaiiinla ■a:wwaHill:.E.ls/a��:lmiw.l:4�aNaiaaaam//./a/.aaa =..iwalh■aMIMOafa.�.EalEEO�.000irmlaw:Oiatn:a ::0lawff►a:/\laaa■:Un:aaaNaf��iawsmaaimaia/wn .a'aarmwi\/l.a.aaam\a■.i......a�+.:a:naiolrn//w/EE: OOOimm.Oa mlamiilai►\lwllaa.iwONw:00m; wf..-.Wa-- a�Js♦<wiwiwi:silolNErillias aw.wwm.���• .:aiivai./sEil//lE.a./aan sN\EfN1llaOnammam Ei.r�Oiawilti:aaa O:OaOO:naa/aaa alai Ofi.saa\NOiaaain■EO►laiaNElrawlfiaa:iiriliaE :.wa!l..ml. ■/`.a►`iOi:aaalJirawilaaiwaa/1��NiaalaEsilwr.aEEaaa■ :=Ol�lOaaEfOJaaEawla.aa nownaz�laamimiaam:■Om■:aO: ./�..awi....i.i.`..mil..../lm...:mil................ ::NiMV Oww::C/rrr.r...rr.wrawC.a.r.a.!siii:aw ■i Nam arilrliaaaaf►':Oil:niaalNOii/lazsarrwammasi.m .aE.mt/Va.saa::.ipl/. mm�-wnwwmmOm=m as:firnmaismEmamr:::E►.ii■:aal man Oalaaaaaam�.laana■ ■:a1r a.swllsaiw ws::w:i.ai is w1.pla:irliaaww ilil w:O TO PREVENT SCOUR HOLE This page intentionally left blank. 555 Fayetteville Street, Suite 900 Raleigh, NC 27601-3034 919.232.6600 NC License F0116 hdrinc.com © 2022 HDR, Inc., all rights reserved This page intentionally left blank.