Loading...
HomeMy WebLinkAboutAppendix B.0_Response_DEMLR_commentsPiedmont Lithium Carolinas, Inc. I Response to Additional Information Request (dated January 14, 2022) Appendix B: Response to Mooresville Regional Office Comments PIEDAA'0NT LITHIUM Appendix B: Mooresville Comments Response to Regional Office This page intentionally left blank. Piedmont Lithium Carolinas, Inc. I I Response to DEMLR Additional Information Request Appendix B Response to DEMLR Mooresville Regional Office Comments Comments on Carolina Lithium Project by MRO Staff January 14, 2022 Gaston County 36-35 1. The scale 1" = 200 feet on the plans are very difficult to see existing and proposed overland flows. Overview sheets are needed to see the entire project; however, smaller scale plans areneeded to properly show overland flows. Provide sheets as necessary. Drawings have been reformatted and broken down into grids with overlapping sections to ensure continuity of drawings. Overall large scale drawings for sitewide views provided at 1" = 600' with detailed sections provided with scales ranging from 1" = 1 00'to 1" = 20' as needed to see the detail. A Legend Sheet is included for ease of identification of the drawings. 2. All streams and water bodies need to be clearly shown on the plans. Adequate undisturbed stream buffers must be provided. Provide a legend to denote stream buffer on plans. All land disturbance and proposed measures must be relocated out of the required stream buffers.All 401/404 impact areas and non -impact areas needs to be clearly indented on the plans. Streams and water bodies are shown on the plans. 30 foot top of stream bank buffers are included on drawings as represented by description in the legend. Jurisdictional waters approved to be disturbed under the 401/404 are shown per the Legend on the applicable design sheets. Non -impact areas are labeled on applicable design sheets as well. 3. Basins must be designed for the maximum drainage area throughout all phases of construction. Provide drainage area delineation maps for pre & post construction for sizing of basins. Emergency spillways need to be located on natural ground. The principle spillway systems need to be located away from emergency spillways. Basins throughout entire project need to have a specific ID number. Basins need to have skimmers for dewatering and plans need to show skimmers in basins & construction details. Cross-section details for basins need to show the minimum required crest width. Ensure skimmer basins have baffles. Basins should be located within the existing natural drainage channels and/or below proposed fill slopes. Basins should not be located on fill slopes. It is unclear why some basins have two barrel pipes being shown. It is recommended that one large sized pipe be provided for the barrel pipes instead of the double -barrel pipes. Drawings have been included for each map section with drawings referencing pre -construction (phase 1), during construction (phase 2), and reclamation of each section. Each basin has been provided its own unique ID number. Skimmers have been added to basins with their design details included on the basin detail sheets. Page 1 of 6 Piedmont Lithium Carolinas, Inc. I I Response to DEMLR Additional Information Request Appendix B Response to DEMLR Mooresville Regional Office Comments 4. It is recommended that the project follow the NCG01 design guidelines. The drainage area of proposed sediment traps has to be less than 1.0 acre. Skimmer basins are required for drainage areas of 1.0 acre or more. Drawings have been designed to follow the NCG01 design guidelines as referenced. 5. Provide design calculations for all proposed sediment traps and basins. Ensure stage storage data is provided. In addition, ensure the required surface area is provided at proper elevations. Design calculations can be found on OOG-005, OOG-006, 01 CP-A001, 01 CP-A002, 01 CP-B001, 01 CP-B002, 02CO-005-009, and sediment basin detail sheets. 6. Adequate diversion berms need to divert all overland flow into basins. Ensure diversion berms have positive drainage and enter upper reaches of basin. Provide adequately sized slope drains to convey run-off into basins. Adequate diversion berms to divert overland flow into basins or sediment traps are included on the design sheets. Slope drains or rip rap inlets are included to convey run-off into basins. 7. The intent and purpose of the proposed "Flumes" into basins are unclear. It appears some flumes and ditches have ninety -degree bends to divert water into basins. It is unclear how these can properly function during field conditions. Make sure flow from the flumes can behandled adequately by the proposed diversion ditches directing flow towards basins. Clarify intent as necessary. Flumes carrying stormwater drainage into the applicable sediment basin or outlet protection into the basin will be constructed to ensure a non -erodible path for the stormwater is provided for entrance to the erosion and sediment control structure. The flow paths have been designed to function during field conditions. Slope drains or rip rap inlets are included to convey run-off into basins. 8. The proposed Sediment Basin #9 (Sheet 17 of 34) does not appear that it will function as intended. Suggest expanding basin width as necessary to allow basin to properly function. This basin is now shown on Sheet OOCO-E006. Sediment Basin No. 9 has been revised to better store sediment volume throughout the structure per agency guidance. Page 2 of 6 Piedmont Lithium Carolinas, Inc. I I Response to DEMLR Additional Information Request Appendix B Response to DEMLR Mooresville Regional Office Comments 9. Adequate measures have not been provided below all proposed disturbed areas and/or throughout all phases of construction. Adequate perimeter measures must be provided. Diversion berms need to be provided along the outer perimeter of site to adequately sized skimmer basins. Phase 1 erosion control plans need to show existing conditions with adequate proposed measures below all disturbed areas. Phase 2 plans need to show proposed sb development improvements, including proposed topo contours, with adequate measures located below all disturbed areas. It may be necessary to provide more phasing on such a large site. All proposed utilities to buildings must be shown on the plans. All proposed storm drainage systems need to be shown and identified on the plans. Basins are designed for the maximum drainage area throughout all phases. Drainage area delineation maps for pre- and post -construction are included with this response. At this time, we do not have details for utility routes to buildings. Utility routings to the overall site are shown based on our current understanding of future connection locations from the utility provider. The erosion control plans account for disturbance caused by routing utilities to site buildings. Once finalized any necessary modifications will be communicated accordingly to the agency. All drainage systems are shown and identified on the plans. The provided legend can assist with finding the system and location within the package. 10.Adequate measures must be provided throughout all phases of the proposed permanent stream crossings (e.g. pre & post construction). In addition, all stream work must be conducted "In the Dry." Provide adequate construction sequence and details as necessary. Typically, adequately sized basins will be needed at all four comers of the crossing along with diversion ditches. All stream crossings need to be labeled on the plans to show Iocation.Ensure to provide a specific stream crossing ID number. It is unclear how proposed arch culvert for Stream Crossing #2 (Sheet 13 of 18) will be installed. Ensure wall foundation locations are shown on the plans. Will the arch culvert have a bend without relocating stream channel? Make sure the proposed stream impacts are covered in your 401/404permits. Jurisdictional waters approved to be disturbed under the 401/404 are now labeled on the applicable design sheets located on Sheet 02CO-001 and associated Insets. Stream buffers are shown on all applicable design sheets and properly noted on the legend. Also, non -impact areas are clearly labeled on the Site / Mine Map Additional information pertaining to the construction of Stream Crossing No. 1, Stream Crossing No. 2, and the Whitesides Road Crossing can be found on Sheets OOCO-G010, OOCO-G011, OOCO-K004, OOCO-K005, OOCO-L004, and OOCO-L005. For the Conversion Plant, there are no 401/404 stream impacts, as noted on plan sheets 01CP- B007, 01 CP-B008, 01 CP-B009, 01 CP-0009, 01 CP-0010, AND 01 CP-0011. Allowable buffer impacts are shown in accordance with the most recent Gaston County UDO. Page 3 of 6 Piedmont Lithium Carolinas, Inc. I I Response to DEMLR Additional Information Request Appendix B Response to DEMLR Mooresville Regional Office Comments 11. Provide sizes and pipe material for proposed culverts on the plans. Ensure all design calculations are provided for sizing culverts. Provide legend to identify pipes. Ensure all proposed storm drainage systems are clearly shown and identified on the plans. Detailed information can be found on Sheets OOG-005 and OOG-006. 12.Make sure the legend specified all symbols/lines shown on the plan. A legend for erosion and sedimentation control measures and their corresponding symbols or line -types has not been provided on the plan or not very clear. All symbols/lines are now shown on the Legend Sheet. 13.Please identify measures that have already been installed, and those measures that are proposed. No measures are currently installed for the site. One existing bridge on Hephzibah Church Road will be upgraded for heavy equipment usage. This existing bridge is labeled on the applicable sheets. Proposed measures are located within this package. 14. Please provide sequentially phased construction and provide very detailed sequencing such that the extent and duration of the land -disturbing activity is minimized. Proposed construction sequence is now included on the Sheets OOG-005 and OOG-006 15. Modification of the baffle configuration is necessary to achieve the desired volume betweenbaffles, to allow the longest water path for settling and to allow access for maintenance. Show the baffle placement on the plans indicative of field conditions. Baffle configuration has been designed to achieve desired volume between baffles, allow necessary maintenance, and allow for longest water path for entering flow. Baffles are shown on the map and on the Legend Sheet. 16.Please specify the skimmer size, orifice diameter, and barrel diameter on the plans. Different branded skimmers have different design and operational parameters. Please specify the skimmer manufacturer on the plans. Please also provide manufacturer -specific calculations,if not yet provided. Any alternate skimmer must have calculations submitted and approved prior to installation. Detailed information, including manufacturer specific calculations can be found on Sheets OOG-005, OOG-006, and sediment basin detail sheets. Page 4 of 6 Piedmont Lithium Carolinas, Inc. I I Response to DEMLR Additional Information Request Appendix B Response to DEMLR Mooresville Regional Office Comments 17. Permanent/Temporary slope drains should be provided where temporary diversions discharge into sediment basins or traps with a slope height greater than seven feet. Diversions should be installed to the slope drains to prevent sheet flow over sediment basin slopes greater than 7 feet. Slope drains or rip rap inlets are included to convey run-off into basins and traps and shown on detail sheets. 18. When operating a pump around system the water shall be flow in the work area must be pumped around the work area and discharged in a stable manner downstream of the workarea. Pump must be an adequate size to accomplish the pump around. A pump around system as shown on Sheet OOG-012 will be implemented for in -stream culvert construction. No pump around system is necessary for Stream Crossing No. 1, Stream Crossing No. 2, Stream Crossing No. 3, or Stream Crossing No. 4. 19.Silt fencing below fill slopes should be installed a minimum of 10 feet off the proposed toe of the slope. This will allow room for sediment storage and maintenance access, as well asminimize the potential for damage to the silt fence during fill slope construction. Silt fence will be installed a minimum of 10 feet off of the proposed toe of slope. 20.A construction entrance should be provided on the plans where construction traffic will access a paved surface. For the construction entrance, provide turning radius sufficient to accommodate large trucks. A minimum length of 100' must be provided for the construction entrance/exit. All construction entrances are shown on plans and legend. Each entrance is designed with a minimum of 100' length. 21. Significant plans revisions will be necessary before this plan can be recommended for permit issuance. Plans have been revised based on comments noted above. Page 5 of 6 Piedmont Lithium Carolinas, Inc. I I Response to DEMLR Additional Information Request Appendix B Response to DEMLR Mooresville Regional Office Comments All drainage calculations can be found as Attachments to this document. Attachment 1 — Concentrator Plant Drainage Calculations Attachment 2 — Conversion Plant Drainage Calculations Attachment 3 — Full Package of all detailed Drawings Page 6 of 6