Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Appendix G.5
Piedmont Lithium Carolinas,Inc. I Response to DEMLR Additional Information Request Appendix G Response to DEMLR Mooresville Regional Office Comments 5. 1 Road, Parking, Walls, Fencing, and Stream Crossing Construction Specifications Piedmont Lithium Carolinas,Inc.I Response to DEMLR Additional Information Request ��� Attachment 5.1 —Road,Parking,Walls, Fencing,and Stream Crossing Specifications Page No. Table of Contents Introduction ...................................................................................................................................2 Design Drawings, Plan View, Map, Construction Specifications and Cross Sections ..................2 Road Width, Gradient, and Surfacing Materials............................................................................2 Earthworkfor Roads.....................................................................................................................2 Culverts and Bridges for streams..................................................................................................3 Drainage Ditches, Drainage Structures & Erosion Control ...........................................................3 ParkingLots..................................................................................................................................3 SiteRetaining Walls......................................................................................................................3 Fencing/Gates/Guardrail...............................................................................................................4 Operation and Maintenance Procedures ......................................................................................4 Certification and Periodic Inspection Procedures .........................................................................4 Abandonment and/or Removal Plan.............................................................................................4 1 Piedmont Lithium Carolinas,Inc.I Response to DEMLR Additional Information Request ��� Attachment 5.1 —Road,Parking,Walls, Fencing,and Stream Crossing Specifications Introduction The Lithium Hydroxide Conversion Plant will include site plan elements such as an access road, parking lots, fencing and walls. The Lithium Hydroxide Conversion Plant general specifications are noted here. Design Drawings, Plan View, Map, Construction Specifications and Cross Sections See design drawings for a site plan of the Lithium Hydroxide Conversion Plant. • Clearing and Grubbing — Clearing and grubbing shall be done as described in this application. • Excavation — Site Excavation is described in Appendix G, Attachment 5.3. • Culverts — Major stream crossings shall be installed at the approximate locations shown on the design drawings. Size requirements are included in this section. Site storm drainage is described in Appendix G, Attachment 5.3. Road Width, Gradient, and Surfacing Materials Road widths shall be as shown in the design drawings for the access drive, site loop and maintenance drives around and along the rail. Subgrade, base courses and surfacing materials shall be as shown in the design drawings and shall be installed per the North Carolina Department of Transportation's Standard Specifications for Roads and Structures 2018 addition and any additions. Standard Specifications Library - All Documents (ncdot.gov). All roads should be constructed to provide positive drainage off the drivable surface to roadside ditches and/or drainage structures. Road gradients can be determined from the design drawings but will have a maximum slope of 5%. Road cross-slopes shall be 2% minimum and 3% maximum. Earthwork for Roads Roads for the Lithium Hydroxide Conversion Plant are internal drives and thus the earthwork/grading associated with them fall within the same earthwork for other site elements including the facility pad and associated parking. Earthwork specifications can be found in Appendix G, Attachment 5.3. 2 Piedmont Lithium Carolinas,Inc.I Response to DEMLR Additional Information Request ��� Attachment 5.1 —Road,Parking,Walls, Fencing,and Stream Crossing Specifications Arch Spans and Bridges for Streams Arch spans or bridges associated with the crossing of streams on the conversion plant site shall be installed beneath roadways at the approximate locations as shown on the drawings. Where applicable, arch spans and bridges may need to follow the North Carolina Department of Transportation's Standard Specifications for Roads and Structures 2018 addition (and any additions) or the manufacturer's recommendations and specifications if a proprietary system (e.g. structural plate bottomless arch culvert). Sizing of the crossings shall be found in the design drawings. Drainage Ditches, Drainage Structures & Erosion Control See Appendix G, Attachment 5.3 for drainage and erosion control specifications including maintenance. Parking Lots Parking lots are provided for in various locations as shown in the design drawings. Subgrade, base courses and surfacing materials shall be as shown in the design drawings and shall be installed per the North Carolina Department of Transportation's Standard Specifications for Roads and Structures 2018 addition and any additions. Standard Specifications Library - All Documents (ncdot.gov). All parking lots should be constructed to provide positive drainage off the drivable surface to ditches and/or drainage structures. Parking lot gradients can be determined from the design drawings but will have a maximum slope of 4% and a minimum slope of 2%. Depending on use, parking lots may be a mix of heavy duty and light duty pavement. Striping of parking lots shall be with thermoplastic paint. Accessible parking spaces shall not exceed a slope of 2% in any direction. Site Retaining Walls Site retaining walls shall be installed where indicated within the design drawings and in the manner to be described within detailed structural drawings (e.g. cast-in-place, segmental block, etc.). Additional specifications may be required from a manufacturer in the use of a segmental block wall or similar. 3 Piedmont Lithium Carolinas,Inc.I Response to DEMLR Additional Information Request ��� Attachment 5.1 —Road,Parking,Walls, Fencing,and Stream Crossing Specifications Fencing/Gates/Guardrail Various fencing will be used on the site including perimeter security fencing§, various gates (vehicular and pedestrian) and along the top of walls to provide safety barriers. Unless special provisions/specifications are provided by a manufacturer, fencing, gates and guardrails shall be installed per the North Carolina Department of Transportation's Standard Specifications for Roads and Structures 2018 addition and any additions. Operation and Maintenance Procedures Operation and maintenance procedures will consist of keeping a durable surface and keeping sediment and drainage control structures maintained and operational. A road, wall, fencing, gates, etc. damaged by a catastrophic event will be repaired as soon as practical after the damage has occurred. Culverts shall be kept free of accumulating debris and shall be inspected after heavy rainfall events. Certification and Periodic Inspection Procedures Access roads shall be inspected as part of the weekly site inspections required for the facility. Certification of road construction shall be included in the required quarterly and annual reports. Abandonment and/or Removal Plan Buildings and equipment will be deconstructed after they are no longer needed for production operations. Roads and rail will remain on the site for future industrial use. Regrading of slopes shall be performed as necessary to be compatible with the post-mining land use and revegetation requirements, and to compliment the natural drainage pattern of the surrounding terrain. 4 Piedmont Lithium Carolinas,Inc. I Response to DEMLR Additional Information Request Appendix G Response to DEMLR Mooresville Regional Office Comments 5.2 Rail Construction Specifications Piedmont Lithium Carolinas,Inc.I Response to DEMLR Additional Informaiton Request ��� Attachment 5.2—Rail Construction Specifications Page No. Table of Contents Introduction ...................................................................................................................................1 Design Drawings, Plan View, Map, Construction Specifications and Cross Sections ..................1 Culverts, Bridges, and Low-Water Crossings ...............................................................................1 Drainage Ditches and Structures..................................................................................................1 Operation and Maintenance Procedures ......................................................................................1 Certifications and Periodic Inspection Procedures .......................................................................2 ReclamationPlan..........................................................................................................................2 TrackDesign.................................................................................................................................2 Piedmont Lithium Carolinas,Inc.i Response to DEMLR Additional Informaiton Request ��� Attachment 5.2—Rail Construction Specifications Introduction Rail access is provided to the site with a connection to the existing CSX main track. The lead track crosses Hephzibah Church Road and extends through the site to the Lithium Hydroxide Conversion Plant. Ditches, sediment traps, culverts, and silt fence will control the runoff from the rail, storage yard, and associated access roads. Design Drawings, Plan View, Map, Construction Specifications and Cross Sections A plan view of the rail and access road is shown on the Overall Site Plan Map (Appendix G, Attachment 1), and profiles are included in Appendix G, Attachment 4. • Clearing and Grubbing — Clearing and grubbing shall be done as described in this application. • Excavation — If excavation is required to construct the rail and yard area, excavations shall not be steeper than 2H:1 V (Horizontal:Vertical) in soil or 0.25H:1 V in rock. Details regarding road construction are provided in this section. • Culverts — Culverts shall be installed at the approximate locations shown on the design drawings. Size requirements are included in this section. Culverts, Bridges, and Low-Water Crossings Ditch culverts shall be installed beneath the rail at the approximate locations as shown on the drawings. Drainage Ditches and Structures The appropriate road ditches and sediment traps will be installed at the approximate locations as shown on the drawings. Operation and Maintenance Procedures Operation and maintenance procedures will consist of keeping a durable surface and keeping sediment and drainage control structures maintained and operational. A rail structure damaged by a catastrophic event will be repaired as soon as practical after the damage has occurred. 1 Piedmont Lithium Carolinas,Inc.I Response to DEMLR Additional Informaiton Request ��� Attachment 5.2—Rail Construction Specifications Certifications and Periodic Inspection Procedures Rail lines and storage yards shall be inspected as part of the weekly site inspections required for the facility. Certification of rail construction shall be included in the required quarterly and annual reports. Reclamation Plan Rail and associated access roads will remain in place for future industrial site use. Track Design Rail access is provided to the site with a connection to the existing CSXT main track with a No. 10 right hand turnout. The lead track crosses Hephzibah Church Road at-grade and extends through the site to the processing plant. The storage yard connects to the lead track approximately 600 feet from the Hephzibah Church Road grade crossing. The maximum horizontal curve is 12 degrees and the maximum compensated track grade is 2.50%. The grade across the stream leading up to and through the plant site is 0.00%. The grade through the storage tracks is 0.00%. A 15-foot-wide access road is provided adjacent to the lead track and around the perimeter of the storage yard. The storage yard consists of seven tracks with capacity for 54 rail cars. The fill slopes off the lead track are a maximum of 2:1. The fill slopes off the storage tracks is 3:1 typical, 2:1 maximum. All track construction shall be in accordance with the CSX Standard Specifications for the Design and Construction of Private Sidetracks. 2 Piedmont Lithium Carolinas,Inc. I Response to DEMLR Additional Information Request Appendix G Response to DEMLR Mooresville Regional Office Comments 5.3 Drainage and Sediment Structure Specifications Piedmont Lithium Carolinas,Inc.i Response to DEMLR Additional Information Request ��� Attachment 5.3—Drainage and Sediment Structure Specifications Page No. Table of Contents SitePreparation ............................................................................................................................2 Demolition.....................................................................................................................................2 SiteGrading/Excavation ...............................................................................................................2 ErosionControl Measures ............................................................................................................2 Sediment Control Structural BMP Excavation ..............................................................................3 Stockpiles......................................................................................................................................3 DitchLining —Vegetated...............................................................................................................3 Ditch Lining — Erosion Control Blanket .........................................................................................3 DitchLining — Rock Riprap ...........................................................................................................4 Ditch Lining — Grouted Rock Riprap .............................................................................................4 WorkingEdge Ditches ..................................................................................................................4 DitchMaintenance ........................................................................................................................4 DitchOutlets .................................................................................................................................5 Culverts and Storm Drainage........................................................................................................5 Culvert/Storm Drainage Riprap Outlet Protection.........................................................................5 CleaningUp ..................................................................................................................................5 Restoration of Surface and/or Structures......................................................................................5 Maintenance — Erosion and Sediment Control .............................................................................5 Maintenance — Storm Drainage ....................................................................................................6 1 Piedmont Lithium Carolinas,Inc.I Response to DEMLR Additional Information Request ��� Attachment 5.3—Drainage and Sediment Structure Specifications Site Preparation All obstructions and vegetative material will be removed with the boundaries of the limits of disturbance as is necessary for the construction of rail corridor, entrance drives, facility site, parking, sediment control Best Management Practices (BMPs) and other project infrastructure. Demolition All demolition material shall be disposed of off-site in a legal manner, unless noted otherwise. Site Grading/Excavation Site Grading will conform to the lines, grades, and cross-sections shown on the applicable design drawings located in Appendix G, Attachment 4. Excavated slopes shall meet the percent grade established within the drawings and at no time shall be steeper than 2:1. Fill areas shall be compacted under the direction of a geotechnical engineer using material that is suitable for structural fill and placed in lifts of a thickness that specified density can readily be achieved. Compaction requirements shall be a minimum of: Under Paved Areas, Sidewalks and Piping: Minimum 95% per ASTM D698 for Cohesive Soils. Unpaved Areas: 90% per ASTM D698 for Cohesive Soils. Inside of structures under foundations, under equipment support pads, under slabs-on-grade and scarified existing subgrade under fill material: 98% per ASTM D698 and 100% in the top 12 inches for Cohesive Soils. Outside structures next to walls, piers, columns, and any other structure exterior member: 92% per ASTM D698 for Cohesive Soils. Erosion Control Measures The following additional erosion and sediment control measures, if required and shown within the design drawings shall be constructed and maintained per the North Carolina Erosion and Sediment Control Planning and Design Manual. Where applicable, install per the manufacturer's recommendations and specifications: • Tree protection fencing • Silt Fence (including J-Hooks) • Inlet Protection • Slope Drains 2 Piedmont Lithium Carolinas,Inc.I Response to DEMLR Additional Information Request ��� Attachment 5.3—Drainage and Sediment Structure Specifications • Rock Check Dams and/or Sediment Tubes • Slope Matting • Dust Control • Construction Entrance • Culvert Inlet Protection • Temporary Diversions • Temporary/Permanent Seeding • Concrete Washout • Sediment Basins • Sediment Traps Sediment Control Structural BMP Excavation The completed sediment basins and sediment traps will conform to the cross-sections and design information shown on the applicable design drawings located in Appendix G, Attachment 4. Structural Sediment Control BMPs shall be developed and constructed in accordance with the North Carolina Erosion and Sediment Control Planning and Design Manual: NC DEQ: Erosion and Sediment Control Planning and Design Manual. Prior to installation of the BMPs the site shall be cleared and grubbed of all organic and unsuitable material. Topsoil material shall be removed and stockpiled. All obstructions will be removed along the line as is necessary for the construction of the BMP features. Stockpiles Incorporate stockpiles near the area of work. Protect all stockpiles with erosion control measures, but at a minimum include silt fence on the downstream side. Stockpiles shall be stabilized or covered when not in use. Ditch Lining — Vegetated Vegetated lining, when required, will be placed upon completion of final grade of ditch line, the ditch shall be vegetated according to the vegetation plan. Channels requiring vegetated lining shall be covered with a layer of soil having a minimum thickness of 12 inches. Ditch Lining — Erosion Control Blanket Erosion Control Blanket Lining, when required for ditch stabilization, will be placed upon completion of final grade of ditch line and installed per the manufacturer's recommendations 3 Piedmont Lithium Carolinas,Inc.I Response to DEMLR Additional Information Request ��� Attachment 5.3—Drainage and Sediment Structure Specifications and specifications. Blanket design strength will be as noted in the design drawings. The ditch shall be vegetated according to the vegetation plan. Ditch Lining — Rock Riprap Rock riprap lining, when required, will be placed in an eighteen (18) inch minimum thick blanket on the bottom and sides of the channel. The rock will be non-toxic, non-acid producing, durable rock having a minimum slake durability of ninety-five (95) percent and a median diameter (d50) of twelve inches (12"). Twenty-five (25) percent by weight of the rock will be one and one-half (1-1/2) times the median diameter or slightly larger. The remaining seventy-five (75) percent will be well-graded material consisting of sufficient rock small enough to fill the voids between the larger rocks. Ditch Lining — Grouted Rock Riprap Grouted rock riprap lining, when required, will be placed in an eighteen (18) inch thick blanket on the bottom and sides of the channel. The rock will be non-toxic, non-acid producing, durable rock having a minimum slake durability of ninety-five (95) percent. The sizing of the rock shall range in nominal diameter from three (3) inches to eighteen (18) inches with a minimum median diameter (d50) of twelve (12) inches. Twenty-five (25) percent by weight of the rock will be one and one half(1 — 1/2) times median diameter or slightly larger. Ten (10) percent of the rock shall be no smaller than three (3) inches. The remaining sixty-five (65) percent of the rock will be graded between three (3) and eighteen (18) inches. The grout shall be a sand/cement mixture with enough water added to yield a workable consistency that will fully penetrate the rock riprap. The grout mixture shall develop a twenty-eight (28) day compressive strength of three thousand (3000) psi. The grout mixture shall be approved by the Engineer and/or Owner prior to placement. Working Edge Ditches Working edge ditches, when required, will be constructed in natural ground or compacted fill and maintained as necessary to control surface drainage. Ditch Maintenance The ditches will be kept free of sediment and other debris during the working life of the facility so that the flow of water will remain unimpeded. If needed, critical sections will be covered with rock. 4 Piedmont Lithium Carolinas,Inc.I Response to DEMLR Additional Information Request ��� Attachment 5.3—Drainage and Sediment Structure Specifications Ditch Outlets The ditches will outlet as shown on the plans. The outlet area will be riprapped if necessary and disturbed soil areas will be revegetated according to the vegetation plan. Culverts and Storm Drainage Site Culverts and storm drainage shall be constructed per the details and to the grade lines shown in the design drawings. All storm material and construction practices including but not limited to piping, structures, bedding, compaction, dewatering, etc. shall be per the North Carolina Department of Transportation's Standard Specifications for Roads and Structures 2018 addition and any additions. Standard Specifications Library -All Documents (ncdot.gov). Note: see Appendix G, Attachment 5.1 for arch spans and bridges associated with stream crossings. Culvert/Storm Drainage Riprap Outlet Protection The outlet area for site storm drainage will be riprapped per the dimensions and class of riprap found within the design drawings and placed on a layer of nonwoven geotextile fabric. Cleaning Up Surplus material, tools and temporary structures will be removed by the Contractor. All dirt, rubbish and excess earth from the excavation will be hauled to an approved disposal area provided by the Contractor and the construction site will be left clean to the satisfaction of the Engineer and/or Owner. Restoration of Surface and/or Structures The contractor will restore the surface and/or structures disturbed to a condition equal to that before the work began and to the satisfaction of the Engineer and/or Owner and will furnish all labor and material incidental thereto. All graded areas shall receive stabilization in the form of permanent lawn via seeding. Reference the seeding specifications within the design drawings. Maintenance — Erosion and Sediment Control Reference the North Carolina Erosion and Sediment Control Planning and Design Manual for detailed maintenance guidelines for each erosion and sediment control best management 5 Piedmont Lithium Carolinas,Inc. I Response to DEMLR Additional Information Request Attachment 5.3—Drainage and Sediment Structure Specifications practice (BMP) used within the project. In general, inspect all BMPs weekly and after each rainfall event. Remove accumulated sediment where applicable and dispose of off-site or in a protected stockpile onsite. Keep all stone clean where applicable for a specific measure. Concrete Washout must maintain adequate holding capacity plus a freeboard of 12 inches. Remove any trash/debris found within the BMPs. Immediately repair any damaged BMP. Replace BMPs that continue to fail with a more structural BMP if stabilization can't be met. Maintenance — Storm Drainage Remove any accumulated trash and debris. Flush system at end of construction. Remove any grout/concrete deposits in pipes and structures immediately so as not to impede the system hydraulics. 6 Piedmont Lithium Carolinas,Inc. I Response to DEMLR Additional Information Request Appendix G Response to DEMLR Mooresville Regional Office Comments 5.4 Conversion Plant Drainage Calculations �r Sto rmwate r PIEDMONT LITHIUM Calculations Lithium Hydroxide Conversion Plant Gaston County, North Carolina December 8, 2021 � ` ��`,..CAR0 1%. Q- . i Es oti••.2''s 7 SEAL 032062 Z- �'• �. Valerie K.Hayntl 1 :Zl •) �4411111111���,`` � PLC I Lithium Hydroxide Conversion Plant—Stormwater Calculations Contents Contents Contents .................................................................................................................................... 1 1.0 Project Description .......................................................................................................... 2 2.0 Site Information ............................................................................................................... 2 2.1 Project Location........................................................................................................... 2 2.2 Soils............................................................................................................................. 2 2.3 Topography.................................................................................................................. 2 2.4 Site Characteristics...................................................................................................... 2 3.0 Erosion Control Calculations ........................................................................................... 3 3.1 Sediment Basins.......................................................................................................... 3 3.2 Sediment Traps ........................................................................................................... 3 4.0 Stormwater Calculations.................................................................................................. 3 5.0 Culvert and Stream Crossing Calculations ...................................................................... 4 Appendices Appendix A— FEMA Firmette Map Appendix B — USGS Topo Map Appendix C — Drainage Area Maps Appendix D — Soil Map and Report Appendix E — Curve Number and Time of Concentration Appendix F — NOAA Rainfall Data Appendix G — Sediment Basin Calculations Appendix H — Sediment Trap Calculations Appendix I —Stormwater Calculations Appendix J — Stream and Culvert Crossing Calculations Appendix K— Outlet Protection Calculations 1 PLC I Lithium Hydroxide Conversion Plant—Stormwater Calculations ��� Project Description 1 .0 Project Description Piedmont Lithium Carolinas, Inc. is proposing an integrated facility in Gaston County, North Carolina that will include both Concentrate Operations (including Mine#1, Concentrate Plant, and Industrial Minerals Plant)as well as a Lithium Hydroxide Conversion Plant. HDR Engineering, Inc. (HDR) is providing site layout, grading, stormwater, and erosion control plans for the Lithium Hydroxide Conversion Plant. This will include an entrance road, rail access, rail storage, the plant and associated administrative, operations, and maintenance buildings. This report will address the site stormwater analysis and design. 2.0 Site Information 2.1 Project Location The Lithium Hydroxide Conversion Plant will be located east of Cherryville on a combined parcel of property just south of Hephzibah Church Road. The property is bound on the west by Anthony Grove Road, and on the east by Saint Marks Church Road. 2.2 Soils The onsite soils consist of both sandy and clay loams, (see soils map in Appendix D) with moderate to poor infiltration rates. The majority of the site soils have a hydrologic soil group rating `B', with a small percentage of'D' or 'B/D' ratings. 2.3 Topography Elevations range from 910 feet NAVD at the corner of Anthony Grove Road and Hephzibah Church Road to 795 feet NAVD where Beaverdam Creek crosses St. Marks Church Road. The existing topography is shown on the Drainage Area Maps in Appendix C of this report. 2.4 Site Characteristics This site is located within a Water Supply— IV (WS-IV) watershed protected area. The site will be developed under the low density option with less than 24% built upon area and 30-foot stream buffers, following the standard rules for erosion and sediment controls, as set forth by the North Carolina Department of Environmental Quality (NCDEQ). 2 PLC I Lithium Hydroxide Conversion Plant—Stormwater Calculations ��� Erosion Control Calculations 3.0 Erosion Control Calculations 3.1 Sediment Basins All sediment basins are designed per NCDEQ standards. They are designed for a 25-year design storm, using local rainfall data (see Appendix F). Basins have a minimum surface area ratio of 435 ft2/cfs or greater, with appropriate length-to-width ratios and inflow points located as far as possible from the principal spillway inlet. All basins exceed the minimum volume requirement of 1,800 ft3/acre. Basins are to be constructed with a primary spillway and skimmer, as well as an emergency spillway designed to maintain 1-foot of freeboard. Porous baffles are to be installed to reduce velocity and turbulence of the water flowing through the basin. 3.2 Sediment Traps For drainage areas less than 5 acres, sediment traps have been designed per NCDEQ standards with a 25-year design storm based on local rainfall data. Each trap has a minimum surface area ratio of 435 ft2/cfs or greater and meet the minimum volume requirement of 3,600 ft3/acre of disturbed area. All sediment traps are to be constructed per NCDEQ minimum design criteria with a modified spillway designed to detain flow and allow improved sediment trapping (see plan sheet 17 of 20 for details). 4.0 Stormwater Calculations Storm sewer piping will convey stormwater runoff from the roadside ditches surrounding conversion plant to the sediment basins. Using HydroCAD version 10.10-5a analysis software, the storm sewer was designed based on the 25-year storm, as developed from local rainfall data. The storm sewer sizes were designed for full development, using a minimum time of concentration of 6 minutes. All proposed storm sewer pipes were designed assuming a minimum slope of 1% and a roughness coefficient of n= 0.012. The roadside ditches surrounding the conversion plant were also designed based on the 25-year storm and local rainfall data. The ditches are designed at a minimum slope of 1% with a 1-foot flat bottom and 3:1 side slopes assuming a roughness coefficient of n= 0.025. (see Appendix 1). 3 PLC I Lithium Hydroxide Conversion Plant—Stormwater Calculations ��� Culvert and Stream Crossing Calculations 5.0 Culvert and Stream Crossing Calculations To provide access to the site, an entrance road must be constructed from Hephzibah Church Road to the plant and will include 3 different culvert crossings along the route. The 3 crossings are designed for the 25-year design storm and checked for the 100 year storm to prevent overtopping using local rainfall data (see Appendix F). The first culvert crossing will consist of a 24-inch culvert with a contributing drainage area of 2.50 acres. The second crossing was sized as 36-inch culvert for the 5.59 acres of contributing drainage area. The last culvert along the entrance road, with a 74.73-acre drainage area, was sized to be an open bottom metal arch span of 10 ft. with a rise of 5.25-ft. The open bottom arch will allow the delineated stream to be unimpacted in the area. (see Appendix J). A railroad system is also shown to the south of the main entrance road. It will provide service from the main CSX line, north of Hephzibah Church Road, to the plant site. The railroad will require 2 drainage crossings: a culvert crossing near Hephzibah Church Road and a crossing along the delineated stream. The culvert crossing will be a 48-inch culvert with a contributing drainage area of 14.22 acres. The stream crossing has a contributing drainage area of 149.8 acres. An open bottom arch span of 14-feet with a rise of 7.25-feet was sized to accommodate the crossing and to prevent the stream from being impacted. (see Appendix J). The hydrographs for each culvert were created using Hydraflow Extensions for Civil 3D 2018 (see Appendix J). The curve numbers and time of concentrations are showing in Appendix E for they hydrograph calculations. The culvert crossing design and analysis were performed using HY8 version 7.60 by FHA (see Appendix J). 4 PLC I Lithium Hydroxide Conversion Plant ��� Appendices AppendixA — FEMA Firmette Map National Flood Hazard Layer FIRMette FEMA Legend 81°19'48"W 35o24'3"N SEE FIS REPORT FOR DETAILED LEGEND AND INDEX MAP FOR FIRM PANEL LAYOUT f yl Without Base Flood Elevation(BFE) Zone A,V,A99 w Iww% t SPECIAL FLOOD With BFE or Depth Zone Ae,AO,AH,VE,AR _ lei r HAZARD AREAS Regulatory Floodway + ICI s 0.2%Annual Chance Flood Hazard,Areas - of 1%annual chance flood with average I�it # * depth less than one foot or with drainage f * ', ` f, I # r {i areas of less than one square mile zone x *!r FFuture Chance Flood l%Annual _ Chance Flood Hazard zone Area with Reduced Flood Risk due to - •t OTHER AREAS OF Levee.See Notes.zone x } # FLOOD HAZARD Area with Flood Risk due to Leveezone D NO SCREEN Area of Minimal Flood Hazard zonex ' Q Effective LOMRs # OTHER AREAS Area of Undetermined Flood Hazard zone GENERAL ---- Channel,Culvert,or Storm Sewer STRUCTURES IIIIIII Levee,Dike,or Floodwall Cross AREA OF IVIINI VIAL FLOOD I-IP I RD � Water Surface Elevation 1%Annual Chance i 17•5 Water Surface Elevation Z?O 8- - - Coastal Transect b _ ^^^^ 513— Base Flood Elevation Line(BFE) •- LTA " + tr L }+ Limit of Study Jurisdiction Boundary 370455 —--- Coastal Transect Baseline OTHER _ Profile Baseline FEATURES Hydrographic Feature w Digital Data Available N dIP + 4 No Digital Data Available +y } Awl' . _ . t MAP PANELS Unmapped iF F •di. q Q rt '; The pin displayed on the map is an approximate + point selected by the user and does not represent ■ an authoritative property location. This map complies with FEMA's standards for the use of w _ digital flood maps if it is not void as described below. The basemap shown complies with FEMA's basemap accuracy standards The flood hazard information is derived directly from the # authoritative NFHL web services provided by FEMA.This map was exported on 8/26/2021 at 5:09 PM and does not r A Y• reflect changes or amendments subsequent to this date and .. • I qp time.The NFHL and effective information may change or y Z on 2 E become superseded by new data over time. This map image is void if the one or more of the following map elements do not appear:basemap imagery,flood zone labels, legend,scale bar,map creation date,community identifiers, EKZZZM 81019'11"W 35023'34"N FIRM panel number,and FIRM effective date.Map images for Feet 1:6 000 unmapped and unmodernized areas cannot be used for 0 250 500 1,000 1,500 2,000 regulatory purposes. Basemap:USGS National Map:Orthoimagery.Data refreshed October,2020 PLC Lithium Hydroxide Conversion Plant ��� Appendices Appendix B — USGS Topo Map U ��� U.S. DEPARTMENT OF THE INTERIOR The National Map LINCOLNTON WEST QUADRANGLE U. S. GEOLOGICAL SURVEY I '� �O�O NORTH CAROLINA science for a changing world U 7.5-MINUTE SERIES 81°22'30" 20' 17'30" 81°15' 467000mE a68 '69 '70 '71 472 '73 474 475 '76 1 330 000 FEET IX PONDfR0 V ' HOU1QrCIS Cr o �" f i'ry� ? ARD 3928 392800OMN z900 MJ R y... U 4YFFG goo ZH'owwrds Cr ^ 9a FORD LN SO t. ? JOYLAND LN ` "•y 640 000 �p 900 �EpNNER LN 9 al 39 ET 3927 V 9000 C 2 MAUjEYDR= 27 900 � � � �7Qiic.Pr I3r JEB SEAGLE DR Kp lPOn4r� � n'y'� n r Q PAUL ELMORE RD .�`�+' p�pR �%' ��1�+i ' s i •_ REEPSVILL /?D " r' E DIXON ST °''k r � >s�:�.'• � '`gig' � �, 3926 ! 3 . = - 3926 Z xF goo �RD v 7 w a ;i F r,r, VISTA DR k 1:� ° I NE-1140 � o �z• - r A 0 z E a- 2 �y y D Rockdam Cr � � � o 1000 v 3925 -- h o tl' .CHILp5.4 ;�.•:.�..; 3925 m ERNES'T HOUSfR RD q J vPL �a h A � ,i'•6F�1;<. 5 ' R _ � O ERS��� 'L D 5� !4y lD � W � m N \ K�RL Z 'r! hg LL MOTZAVf o r"+` 39 --= o Q J = 24 27'30" o s� g o z + 27'30" �� '� i � .;( � �pSE�gROptt G _r - # ���O�LQ, _ .t��•"t o ,� Q v r 182 `� g"I MOOSE GANTT TRL CO � " o Polkadot - 0 3923 < 150 3923 „ 0 .. t Johnstown 1 : w. . , o m /�, � - T� ��i•_ ROSEH/(�o ROSELANDOR � T s 39 3922 c� ORK NURCN RD pc'.+ / � '• j �.k' RATE RD 22 900 y y �, LAIRWISE LN DAVE HE FNER RD `� �� OF'K RD '� �y _ H'oDlifield = •Y _ yy �y'�: h � ; � �y��� � 3•; FOF/oUSER CtJ $ {, -:rgr r . LabOra�tO''r3' 3921 a U 21 _ S•1'ONEGgTE- N o In di r n Cr L 1 Ro // OvQ CROUS RD K p RLVERVIEW RD o Via'. O 8D0 Z �Qo 150 O 3920 0 z y�, IndZQ/7 Cr o 800 TP 3920 r 25' �4�qt v+ £ �C N 1E�RD Q 25' L1ckFork Indrian Cr 8 GASTON CO o F � LI�NCOILN CO _ �SB\�� � 3919 0 3919 o $ fi GQ v - w i RO ERT RD °� SITE LOCATION •`._ T tW Grp 150 ,E F GASTON WE885 CHAPEL RD i- (^< Ao ERTS R , ra - 3918 18 � 39 17 $ T:. H CHURCH RD v y� m - S .A i 900 � G.,. .� CNller uilQe G?' :, :� � i" �{. • -�_ �{" 4 " �-._ ,u .f O�� �, � _ f S �i °p z mA,� BROI,o'`OO Urntir CIeU r LQkre •+ o ''i, _ 'F v � -, �y� Ss� Z w � _ `•i. i t\j � 'Ery�, i� �f WAGON T L z a- tiyM z d.er ti 'fs. . •"7F> ? �k $ ,,itrd '°.�' u4) 1 ESa L e�rt b i y 39 17 cX 1 5 ;ts�,. -e, LP�O �GBQ `o ;,.�,--,{ v ds� •�v 1 a,rt ��r � -� ._ F"�3�{Jl �9 � �P�y T€ -. '� '. �� �S! �F,P >; x r i/) y^�� ,7; is �rl 1� ��� TI�• _ .� t y#. ;,• � � "':�P� �F09 � k�J•�' � Y a'� �rf�,•-,e, -`�t s. '� ds$ , � :�;i�'�• � �4�1�j, Carol�i�na = At'' � 0 150 A SumbeQrm FQ m � RANBgR 3916 sr LQke Nwmber wo 900 ° 900 3916 z �\ � pR o a r- y-•r p0 ORD .t' G _ : - z S 279 Sunbeam Far CNpRLIE C po v °0 900 r o Cher •)111- a a. E T?p o. - ra 7 t RUDISILL RD �r�' ��` �� Cherr u Itle �\ h °TTORD / 1 '_ HASTINGS oQ 3915000mN J9� � Z City Reseru it 3 s Lytle Be-Querda Cr dy$ o � 90o i 600 000 FEET 35°22'30' q 4 1 300 000 FEET 4 4 4 4 4 4 4 4 4 0DOM 35°22'30" 81°22'30" 67 68 69 20' 70 71 72 73 17,30„ 74 75 76 77 E81°15' Produced by the United States Geological Survey * SCALE 1:24 000 ROAD CLASSIFICATION North American Datum of 1983(NAD83) World Geodetic System of 1984(WGS84). Projection and N. 1 0.5 0 KILOMETERS 1 2 NORTH Expressway o Local Connector 1 000-meter grid:Universal Transverse Mercator,Zone 17S 7' 14' ■CAROLINA Secondary Hwy Local Road 10 000-foot ticks:North Carolina Coordinate System of 1983 128 MILS 1000 500 0 METERS 1000 2000 01 11' 1 0.5 0 1 Ramp 4WD 3 MILS MILES .Interstate Route 0 US Route O State Route 1000 0 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000 QUADRANGLE LOCATION Imagery..................................................NAIP,June 2012 UTM GRID AND 2013 MAGNETIC NORTH FEETDECLINATION AT CENTER OF SHEET Roads..............................................©2006-2012 TomTom Banoak Reepsville Maiden Names..........................................................GNIS, 2013 U.S.National Grid CONTOUR INTERVAL 20 FEET Hydrography....................National Hydrography Dataset,2012 100,000-m Square ID NORTH AMERICAN VERTICAL DATUM OF 1988 Contours............................National Elevation Dataset, 2008 Boundaries....................Census, IBWC, IBC,USGS, 1972-2012 y Lineolnton Lineolnton My This map was produced to conform with the Cherrville West East National Geospatial Program US Topo Product Standard,2011. A metadata file associated with this product is draft version 0.6.11 LINCOLNTON WEST, NC Grid Zone Designation 17S Waco Bessemer Gastonia City North 2013 ADJOINING 7.5'QUADRANGLES PLC Lithium Hydroxide Conversion Plant ��� Appendices Appendix C — Drainage Area Maps "N ��—� ��'�\•`r�,�- l��l�����������ll� lJILi/ � � _ _ _ �� � 1>> 1� � � , 1 _ _ _ � \� 11 ��-,�� DA1.74.73 AC TOC:28.1 MIN �� \ �� CN.78 �/— ) I /�" r� IT �� \�_ � ��� �j� l 500 0 500 1000 -- //, / (C� ;,• \�\I �/ ( SCALE: 1" = 500' - DA2:2.50 AC \ ��\���( ) �:�,• �� 1 \\J ��// TO CN479MI\ 1 ` ` GENERAL LEGEND �� �� J -�� ✓ ��� MTOC:1 �IN cN:7s ---I-I�� ■ ■ ■ ■ ■ ■ ■ ■ ■ STREAM CROSSING DRAINAGE AREA X 1 1 TIME OF CONCENTRATION 1, SEDIMENT BASIN/TRAP DRAINAGE AREA wo •� \� l _ X d `-I -- '—x x—X-x -9.--.Q I C 102 —x— —x—x x _ law �, , G° x x x „ Stream o o � � �\� A�,��� Crossing No 3 � �p X o 0 0 a a o DA5:14.22 ACo TOC:18.1 MIN CN:79 4 �\ 0800 ° - o o DA4:149.8 AC �— r-/ 00 t (INCLUDES DA1-3,5) 1I TOC:27.7 MIN � ° CN:76 0 oa Stream � X Crossing No. 4 X / X X X / u!—�) \ I SHEET TITLE FILENAME OOC-02.DWG DRAINAGE ANALYSIS MAP, SCALE 1"=500' PIEDMONT PLAN VIEW SHEET OOC 02 LITHIUM HYDROXIDE CONVERSION PLANT PLC Lithium Hydroxide Conversion Plant ��� Appendices Appendix D — Soil Map and Report 3 Hydrologic Soil Group—Gaston County, North Carolina N M O W N W W 469700 470000 470300 470600 470900 471200 471500 471800 35'24'30"N 35'24'30"N 00 wr e R3 &npV o � o • es D D �( ° JJ `F l • D D o D -4 4 35'22'57"N 35'22'57'N 469700 470000 470300 470600 470900 471200 471500 471800 3 3 N i0 Map Scale:1:14,000 if printed on A portrait(8.5"x 11")sheet. o N Meters 0 200 400 800 1200 Feet 0 500 1000 2000 3000 Map projection:Web Mercator Comer coordinates:WGS84 Edge tics:L TM Zone 17N WGS84 UsDA Natural Resources Web Soil Survey 8/26/2021 Conservation Service National Cooperative Soil Survey Page 1 of 5 Hydrologic Soil Group—Gaston County, North Carolina MAP LEGEND MAP INFORMATION Area of Interest(AOI) p C The soil surveys that comprise your AOI were mapped at Area of Interest(A01) 0 C/D 1:24,000. Soils Please rely on the bar scale on each map sheet for map Soil Rating Polygons 0 D measurements. 0 A p Not rated or not available Source of Map: Natural Resources Conservation Service 0 A/D Water Features Web Soil Survey URL: Streams and Canals Coordinate System: Web Mercator(EPSG:3857) 0 B Transportation Maps from the Web Soil Survey are based on the Web Mercator 0 B/D projection,which preserves direction and shape but distorts Rails distance and area.A projection that preserves area,such as the 0 C #%-0 Interstate Highways Albers equal-area conic projection,should be used if more accurate calculations of distance or area are required. C/D US Routes 0 This product is generated from the USDA-NRCS certified data as p Major Roads of the version date(s)listed below. Not rated or not available Local Roads Soil Survey Area: Gaston County,North Carolina Soil Rating Lines Background Survey Area Data: Version 20,Jun 4,2020 " x A ® Aerial Photography Soil map units are labeled(as space allows)for map scales " r A/D 1:50,000 or larger. B Date(s)aerial images were photographed: Apr 23,2014—Nov B/D 28,2017 The orthophoto or other base map on which the soil lines were " x C compiled and digitized probably differs from the background " 0 C/D imagery displayed on these maps.As a result,some minor shifting of map unit boundaries may be evident. " r D " r Not rated or not available Soil Rating Points 0 A 0 A/D B B/D UU� Natural Resources Web Soil Survey 8/26/2021 � Conservation Service National Cooperative Soil Survey Page 2 of 5 Hydrologic Soil Group—Gaston County, North Carolina Hydrologic Soil Group Map unit symbol Map unit name Rating Acres in AOI Percent of AOI ApB Appling sandy loam, 1 to B 181.2 28.5% 6 percent slopes CeB2 Cecil sandy clay loam,2 B 87.3 13.7% to 8 percent slopes, moderately eroded CeD2 Cecil sandy clay loam,8 B 53.9 8.5% to 15 percent slopes, moderately eroded CfB Cecil-Urban land B 7.5 1.2% complex,2 to 8 percent slopes ChA Chewacla loam,0 to 2 B/D 50.6 7.9% percent slopes, frequently flooded HeB Helena sandy loam, 1 to D 14.5 2.3% 6 percent slopes LdB2 Lloyd sandy clay loam,2 B 53.0 8.3% to 8 percent slopes, moderately eroded MaB2 Madison sandy clay B 0.7 0.1% loam,2 to 8 percent slopes,moderately eroded MaD2 Madison sandy clay B 0.1 0.0% loam,8 to 15 percent slopes,moderately eroded PaD2 Pacolet sandy clay B 9.1 1.4% loam,8 to 15 percent slopes,moderately eroded PaE Pacolet sandy loam, 15 B 71.8 11.3% to 25 percent slopes W Water 2.2 0.3% WeD Wedowee sandy loam,6 B 98.3 15.4% to 15 percent slopes WoA Worsham loam,0 to 2 D 6.3 1.0% percent slopes Totals for Area of Interest 636.4 100.0% USDA Natural Resources Web Soil Survey 8/26/2021 Conservation Service National Cooperative Soil Survey Page 3 of 5 Hydrologic Soil Group—Gaston County, North Carolina Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long-duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential)when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential)when thoroughly wet. These consist chiefly of clays that have a high shrink-swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Rating Options Aggregation Method: Dominant Condition usDA Natural Resources Web Soil Survey 8/26/2021 Conservation Service National Cooperative Soil Survey Page 4 of 5 Hydrologic Soil Group—Gaston County, North Carolina Aggregation is the process by which a set of component attribute values is reduced to a single value that represents the map unit as a whole. A map unit is typically composed of one or more "components". A component is either some type of soil or some nonsoil entity, e.g., rock outcrop. For the attribute being aggregated, the first step of the aggregation process is to derive one attribute value for each of a map unit's components. From this set of component attributes, the next step of the aggregation process derives a single value that represents the map unit as a whole. Once a single value for each map unit is derived, a thematic map for soil map units can be rendered. Aggregation must be done because, on any soil map, map units are delineated but components are not. For each of a map unit's components, a corresponding percent composition is recorded. A percent composition of 60 indicates that the corresponding component typically makes up approximately 60% of the map unit. Percent composition is a critical factor in some, but not all, aggregation methods. The aggregation method "Dominant Condition"first groups like attribute values for the components in a map unit. For each group, percent composition is set to the sum of the percent composition of all components participating in that group. These groups now represent"conditions" rather than components. The attribute value associated with the group with the highest cumulative percent composition is returned. If more than one group shares the highest cumulative percent composition, the corresponding "tie-break" rule determines which value should be returned. The "tie-break" rule indicates whether the lower or higher group value should be returned in the case of a percent composition tie. The result returned by this aggregation method represents the dominant condition throughout the map unit only when no tie has occurred. Component Percent Cutoff. None Specified Components whose percent composition is below the cutoff value will not be considered. If no cutoff value is specified, all components in the database will be considered. The data for some contrasting soils of minor extent may not be in the database, and therefore are not considered. Tie-break Rule: Higher The tie-break rule indicates which value should be selected from a set of multiple candidate values, or which value should be selected in the event of a percent composition tie. usDA Natural Resources Web Soil Survey 8/26/2021 Conservation Service National Cooperative Soil Survey Page 5 of 5 PLC Lithium Hydroxide Conversion Plant Appendices Appendix E — Curve Number and Time of Concentration Table -12 Runoff Curve Numbers Curve numbers for -- -------------C'r�wtr lkcrip�it>rti -------------------------- -- —L�yllrulslgie sail gr�1P--- - AYcrakc Ir avcr typc and hydrologi a cued i 6011 iii5�rt4'i�Yu�,arCu A $ L' I 'FAY den-eli ed whalr-ur vas (w -gelalk,n e.xwhf phed) Opc;i spmx(Isuais,parks, *alf courses.cernalerks.cle,} 5v- Poor condition (grass cover< 3 ia)............................ bpi 79 86 89 F air vandifion I grates cow 50% to 7M.................... 49 69 79 R4 GoM caiiditlan(gra_s.,over>75%)-------------------........ 34 61 74 80 P;1 vd parking]at!;,roofs,drivrwxys.E4r. (excluding ri hl-of-wa )............................,,.,..,.. 98 48 99 48 SIrew and roads: Parrs& curbs and storm scwcrs(cxcluding right-cf-way)...,,,.,.,,,,,,,,,,,,,,,,,,,,,.--.................... 98 9?: 9H 98 Paved.ap4i &fi�hts(Iris luding rjpt-af vray} .... 83 8is 92 93 Gravet(including right,I'-way).......................... 76 8S 89 91 DO{indudirig righi-or-way] .............................. 72 82 R7 get Urban dratncts: Commcrcial and business„,,,,,,.,............................... , 85 89 92 94 95 lnduStrial................................,,,,,................................ 72 81 88 l 93 Resi&nval digricts key airtrige lc sixlw Ii� acm or lcs&(t#tivr! hcascSI.-. •-------...---............. 65 77 95 90 92 1.4 acrr.....-------------------------.............._. _ ........ 38 61 _ 83 87 111 acre,,............................,.-..........................__......... 30 57 81 86 I�2 acre,,,,...........................,,... ..............................,,.. 25 54 71, 80 SS Iacrc,,,,,,.—....................................,............................ 20 51 6S. 79 M ................,,,, 13 46 65 77 ST AgF#cu l rrrf bawds Pasture, grassland or range i con wwous for age for gazingl' Poor hydrologic condition....."I'll-,............................ 68 79 86 \4) Fair h}dmlogiccondil Pon............................................ 79 H4 GJn~W hydrV19.9i-C c(widilion .......................................... 39 fit 74 NO W Poor hydrolcP& can itran.,,....--•-------------........................................... 45 w, r 8.3 Fair hydra ogic co ilion„,-....-.--------------............................... 6 6I] 73 79 {pDod hydrolo4ic cwrdition ....-.-.....................,,.,.,,., M r 77 Nc u'ly graded (I Vious arm Ofily.r�o Vqa>ilIUd)-,,,,,,,,,,,,,,,,,--,,.... NO 91 94 1 Mwaie nanoff"L"iion,and la- IF,2S. 2 TIw at•rrio pemm mkpm arts shown wda wTd 404C%'el*p ilr{C+Mp):+ic CN'J.11DACr tsrllmpliafk�WC&I follMV$!impar+'kK*ArM "dlrms yconncsicd w ihe*minage 4pirm ampmi.o sarm have a of".and prrviuw armor air cimriderc4 equivalerrt co apen tipara in goad hydrolo it cmWliion, I :�Thow"arc Oviv*lepl NoIhaac a1,rm-% rc.Cwr iw(N'a may 1 e w"cd fog odor vmibanwlim orapo Ip�woca "lypc' 4 Pax:Fewil biker,mull hers,mid bnjAaw desrroyrd by hemN g,=ing 4r regvtar huming. Fsir: Woo&arc grazed Irill rLw burued ind skifix fin€I Boer c-avers Ihr>oil. l}m d: Wo ds arc pnAceled from graai.ag-and I1cL{[,ind brush Adegostety 4ovrr Ute sail, COMPOSITE CURVE NUMBER CALCULATIONS DA1-STREAM CROSSING AT ROAD SOIL GROUP COVER TYPE ACRES % CN %of DA B Pvmt/Sidewalk/Equipment pads 13.43 0.18 98 0.97 Woods 28.21 0.39 66 Grass 130.99 0.43 79 D lWoods 12.10 11.00 183 10.03 COMPOSITE (B) 77.5 COMPOSITE (D) 83.0 TOTAL COMPOSITE CN 78 DA2-CROSSING AT ROAD SOIL GROUP COVER TYPE ACRES % JCN %of DA B Pvmt/Sidewalk/Equipment pads 0.06 0.02 198 11.00 Grass 2.44 0.98 179 TOTAL COMPOSITE CN 79 DA3-CROSSING AT ROAD SOIL GROUP COVER TYPE ACRES % CN %of DA B Pvmt/Sidewalk/Equipment pads 0.13 0.02 98 1.00 Woods 0.68 0.12 66 Grass 14.77 0.85 79 TOTAL COMPOSITE CN 78 DA4-STREAM CROSSING AT RAILROAD SOIL GROUP COVER TYPE ACRES % CN %of DA B Pvmt/Sidewalk/Equipment pads 14.74 0.10 98 0.96 Woods 55.09 0.38 66 Grass 75.95 0.52 79 D Woods 3.87 0.96 83 0.04 Grass 0.16 10.04 189 COMPOSITE (B) 76.0 COMPOSITE (D) 83.2 TOTAL COMPOSITE CN 76 DA5-CROSSING AT RAIL SOUTH SOIL GROUP COVER TYPE ACRES % CN %of DA B Pvmt 1.06 0.07 98 1.00 Woods 1.30 0.09 66 Grass 111.86 0.83 79 TOTAL COMPOSITE CN I79 12/10/2021 Time of Concentration Worksheet F:)R SCS TR-55 Method PROJECT: PLI DATE: 12/10/21 SCENARIO: DA1-Stream Crossing at Road PREPARED BY: FLS Drainage Area Info IM Drainage Area Tc Summary Data DRAINAGE AREA ID: DA 1 Flow Type Length(ft) Elev.Diff. Tc TOTAL BASIN LENGTH: 1980.7 ft Sheet Flow 100.0 0.50 17.4 mins. TOTAL ELEVATION UP: 888.00 Shallow Concentrated Flow 1880.7 55.50 10.8 mins. TOTAL ELEVATION DOWN: 832.00 Channel Flow-Rectangular 0.0 0.00 0.0 mins. TOTAL ACRES: 74.73 Channel Flow-Triangular 0.0 0.00 0.0 mins. Channel Flow-Trapezoidal 0.0 0.00 1 0.0 mins. Channel Flow-Circular 0.0 0.00 0.0 mins. Basin Totals1980.7 56.0028.1 mins. This time of concentration calculation is based on survey data,aerial photography,and field investigation. 2. SHALLOW CONCENTRATED FLOW Segment#1 Segment#2 Segment#3 Surface Description Grass Segment#1 Segment#2 Segment#3 Manning's"n" 0.16 Surface Description Paved Unpaved 2-Year,24-Hr.Rain Fall(In) 3.43 Flow Length(ft) 468.3 ft 1412.4 ft Flow Length(ft) 100.0 ft Elevation Up(ft) 887.50 872.00 Elevation Up(ft) 888.00 Elevation Down(ft) 872.00 832.00 Elevation Down(ft) 887.50 Watercourse Slope(ft/ft) 0.033 0.028 Land Slope(ft/ft) 0.005 Average Velocity(ft/Sec) 3.7 2.7 Time Of Concentration(Mins) 17.35 Time Of Concentration(Mins) 2.11 8.67 Total Sheet Flow Tc(Minutes): 17.4 min. Total Shallow Concentrated Tc(Mins):j 10.8 min. cApw rking\east01\d2277368\ PLI TOC.Asm DA 1-Road 4 of]8 12/10/2021 Time of Concentration Worksheet F:)R SCS TR-55 Method PROJECT: PLI DATE: 12/10/21 SCENARIO: DA1-Stream Crossing at Road PREPARED BY: FLS 3. CHANNEL FLOW-RECTANGULAR CHANNEL Segment#1 Segment#2 Segment#3 Segment#4 Segment#5 Segment#6 Segment#7 Segment#8 Segment#9 Surface Description Bottom Width(ft) Depth(ft) Area(Sq.ft) Wetted Perimeter(ft) Hydraulic Radius(ft) Flow Length(ft) Elevation Up(ft) Elevation Down(ft) Channel Slope(ft/ft) Manning's"n" Average Velocity(ft/Sec) Time Of Concentration(Mins) Total Rectangular Channel Tc(Mins): 0.0 mins. 4. CHANNEL FLOW-TRIANGULAR CHANNEL Segment#1 Segment#2 Segment#3 Segment#4 Segment#5 Segment#6 Segment#7 Segment#8 Segment#9 Surface Description Top Width(ft) Depth(ft) Area(Sq.ft) Wetted Perimeter(ft) Hydraulic Radius(ft) Flow Length(ft) Elevation Up(ft) Elevation Down(ft) Channel Slope(ft/ft) Manning's"no Average Velocity(ft/Sec) Time Of Concentration(Mins) Total Triangular Channel Tc 0.0 min. cApw rking\east01\d2277368\ PLI TOCAsm DA 1-Road 5 of 18 12/10/2021 Time of Concentration Worksheet F:)R SCS TR-55 Method PROJECT: PLI DATE: 12/10/21 SCENARIO: DA1-Stream Crossing at Road PREPARED BY: FLS 5. CHANNEL FLOW-TRAPEZOIDAL CHANNEL Segment#1 Segment#2 Segment#3 Segment#4 Segment#5 Segment#6 Segment#7 Segment#8 Segment#9 Surface Description Bottom Width(ft) Depth(ft) Side Slopes(?H:1V)(ft) Area(Sq.ft) Wetted Perimeter(ft) Hydraulic Radius(ft) Flow Length(ft) Elevation Up(ft) Elevation Down(ft) Channel Slope(ft/ft) Manning's"no Average Velocity(ft/Sec) Time Of Concentration(Mins) Total Trapezoidal Channel Tc 0.0 min. 6. CHANNEL FLOW-CIRCULAR CHANNEL(Gravity Flow) Segment#1 Segment#2 Segment#3 Segment#4 Segment#5 Segment#6 Segment#7 Segment#8 Segment#9 Surface Description Pipe Diameter(In) Area(Sq.ft) Wetted Perimeter(ft) Hydraulic Radius(ft) Flow Length(ft) Elevation Up(ft) Elevation Down(ft) Channel Slope(ft/ft) Manning's"n" Average Velocity(ft/Sec) Time Of Concentration(Mins) Total Circular Channel Tc(Mins): 0.0 min. 7.Total Basin Time of Concentration (Mintues) Total Basin Tc(Mins): 28.1 min. cApw rking\east01\d2277368\ Pu TOCAsm DA 1-Road 6 of]8 12/10/2021 Time of Concentration Worksheet F:)R SCS TR-55 Method PROJECT: PLI DATE: 12/10/21 SCENARIO: DA2-Crossing at Road PREPARED BY: FLS Drainage Area Infor 1. M Drainage Area Tc Summary Data DRAINAGE AREA ID: DA 2 Flow Type Length(ft) Elev.Diff. Tc TOTAL BASIN LENGTH: 367.1 ft Sheet Flow 100.0 1.00 13.1 mins. TOTAL ELEVATION UP: 897.00 Shallow Concentrated Flow 267.1 8.00 1.6 mins. TOTAL ELEVATION DOWN: 888.00 Channel Flow-Rectangular 0.0 0.00 0.0 mins. TOTAL ACRES: 12.50 Channel Flow-Triangular 0.0 0.00 0.0 mins. Channel Flow-Trapezoidal 0.0 0.00 0.0 mins. Channel Flow-Circular 0.0 0.00 0.0 mins. Basin Totals367.1 9.0014.7 mins. This time of concentration calculation is based on survey data,aerial photography,and field investigation. 2. SHALLOW CONCENTRATED FLOW Segment#1 Segment#2 Segment#3 Surface Description Grass Segment#1 Segment#2 Segment#3 Manning's"n" 0.16 Surface Description Unpaved 2-Year,24-Hr.Rain Fall(In) 3.43 Flow Length(ft) 267.1 ft Flow Length(ft) 100.0 ft Elevation Up(ft) 896.00 Elevation Up(ft) 897.00 Elevation Down(ft) 888.00 Elevation Down(ft) 896.00 Watercourse Slope(ft/ft) 0.030 Land Slope(ft/ft) 0.010 Average Velocity(ft/Sec) 2.8 Time Of Concentration(Mins) 13.15 Time Of Concentration(Mins) 1.59 Total Sheet Flow Tc(Minutes): 13.1 min. Total Shallow Concentrated Tc(Mins):1 1.6 min. cApw rking\east01\d2277368\ PLI TOC.Asm DA 2-Road 7 of]8 12/10/2021 Time of Concentration Worksheet F:)R SCS TR-55 Method PROJECT: PLI DATE: 12/10/21 SCENARIO: DA2-Crossing at Road PREPARED BY: FLS 3. CHANNEL FLOW-RECTANGULAR CHANNEL Segment#1 Segment#2 Segment#3 Segment#4 Segment#5 Segment#6 Segment#7 Segment#8 Segment#9 Surface Description Bottom Width(ft) Depth(ft) Area(Sq.ft) Wetted Perimeter(ft) Hydraulic Radius(ft) Flow Length(ft) Elevation Up(ft) Elevation Down(ft) Channel Slope(ft/ft) Manning's"no Average Velocity(ft/Sec) Time Of Concentration(Mins) Total Rectangular Channel Tc(Mins): 0.0 mins. 4. CHANNEL FLOW-TRIANGULAR CHANNEL Segment#1 Segment#2 Segment#3 Segment#4 Segment#5 Segment#6 Segment#7 Segment#8 Segment#9 Surface Description Top Width(ft) Depth(ft) Area(Sq.ft) Wetted Perimeter(ft) Hydraulic Radius(ft) Flow Length(ft) Elevation Up(ft) Elevation Down(ft) Channel Slope(ft/ft) Manning's"no Average Velocity(ft/Sec) Time Of Concentration(Mins) Total Triangular Channel Tc 0.0 min. cApw orking\east01\d2277368\ PLI MCA— DA 2-Road 8 or 18 12/10/2021 Time of Concentration Worksheet F:)R SCS TR-55 Method PROJECT: PLI DATE: 12/10/21 SCENARIO: DA2-Crossing at Road PREPARED BY: FLS 5. CHANNEL FLOW-TRAPEZOIDAL CHANNEL Segment#1 Segment#2 Segment#3 Segment#4 Segment#5 Segment#6 Segment#7 Segment#8 Segment#9 Surface Description Bottom Width(ft) Depth(ft) Side Slopes(?H:1V)(ft) Area(Sq.ft) Wetted Perimeter(ft) Hydraulic Radius(ft) Flow Length(ft) Elevation Up(ft) Elevation Down(ft) Channel Slope(ft/ft) Manning's"no Average Velocity(ft/Sec) Time Of Concentration(Mins) Total Trapezoidal Channel Tc 0.0 min. 6. CHANNEL FLOW-CIRCULAR CHANNEL(Gravity Flow) Segment#1 Segment#2 Segment#3 Segment#4 Segment#5 Segment#6 Segment#7 Segment#8 Segment#9 Surface Description Pipe Diameter(In) Area(Sq.ft) Wetted Perimeter(ft) Hydraulic Radius(ft) Flow Length(ft) Elevation Up(ft) Elevation Down(ft) Channel Slope(ft/ft) Manning's"n" Average Velocity(ft/Sec) Time Of Concentration(Mins) Total Circular Channel Tc(Mins): 0.0 min. 7.Total Basin Time of Concentration (Mintues) Total Basin Tc(Mins): 14.7 min. cApw rking\east01\d2277368\ PLI TOCAsm DA 2-Road 9 of 18 12/10/2021 Time of Concentration Worksheet F:)R SCS TR-55 Method PROJECT: PLI DATE: 12/10/21 SCENARIO: DA3-Crossing at Road PREPARED BY: FLS Drainage Area Info Drainage Area Tc Summary Data DRAINAGE AREA ID: DA 3 Flow Type Length(ft) Elev.Diff. Tc TOTAL BASIN LENGTH: 680.7 ft Sheet Flow 100.0 2.00 10.0 mins. TOTAL ELEVATION UP: 897.00 Shallow Concentrated Flow 580.7 25.00 2.9 mins. TOTAL ELEVATION DOWN: 870.00 Channel Flow-Rectangular 0.0 0.00 0.0 mins. TOTAL ACRES: 15.59 Channel Flow-Triangular 0.0 0.00 0.0 mins. Channel Flow-Trapezoidal 0.0 0.00 0.0 mins. Channel Flow-Circular 0.0 0.00 0.0 mins. Basin Totals •:i 12.9 mins. This time of concentration calculation is based on survey data,aerial photography,and field investigation. 2. SHALLOW CONCENTRATED FLOW Segment#1 Segment#2 Segment#3 Surface Description Grass Segment#1 Segment#2 Segment#3 Manning's"n" 0.16 Surface Description Unpaved 2-Year,24-Hr.Rain Fall(In) 3.43 Flow Length(ft) 580.7 ft Flow Length(ft) 100.0 ft Elevation Up(ft) 895.00 Elevation Up(ft) 897.00 Elevation Down(ft) 870.00 Elevation Down(ft) 895.00 Watercourse Slope(ft/ft) 0.043 Land Slope(ft/ft) 0.020 Average Velocity(ft/Sec) 3.3 Time Of Concentration(Mins) 9.97 Time Of Concentration(Mins) 2.89 Total Sheet Flow Tc(Minutes): 10.0 min. Total Shallow Concentrated Tc(Mins):1 2.9 min. cApw rking\east01\d2277368\ PLI TOC.Asm DA 3-Road 10 of 18 12/10/2021 Time of Concentration Worksheet F:)R SCS TR-55 Method PROJECT: PLI DATE: 12/10/21 SCENARIO: DA3-Crossing at Road PREPARED BY: FLS 3. CHANNEL FLOW-RECTANGULAR CHANNEL Segment#1 Segment#2 Segment#3 Segment#4 Segment#5 Segment#6 Segment#7 Segment#8 Segment#9 Surface Description Bottom Width(ft) Depth(ft) Area(Sq.ft) Wetted Perimeter(ft) Hydraulic Radius(ft) Flow Length(ft) Elevation Up(ft) Elevation Down(ft) Channel Slope(ft/ft) Manning's"no Average Velocity(ft/Sec) Time Of Concentration(Mins) Total Rectangular Channel Tc(Mins): 0.0 mins. 4. CHANNEL FLOW-TRIANGULAR CHANNEL Segment#1 Segment#2 Segment#3 Segment#4 Segment#5 Segment#6 Segment#7 Segment#8 Segment#9 Surface Description Top Width(ft) Depth(ft) Area(Sq.ft) Wetted Perimeter(ft) Hydraulic Radius(ft) Flow Length(ft) Elevation Up(ft) Elevation Down(ft) Channel Slope(ft/ft) Manning's"no Average Velocity(ft/Sec) Time Of Concentration(Mins) Total Triangular Channel Tc 0.0 min. cApw orking\east01\d2277368\ PLI MCA— DA 3-Road I I or 18 12/10/2021 Time of Concentration Worksheet F:)R SCS TR-55 Method PROJECT: PLI DATE: 12/10/21 SCENARIO: DA3-Crossing at Road PREPARED BY: FLS 5. CHANNEL FLOW-TRAPEZOIDAL CHANNEL Segment#1 Segment#2 Segment#3 Segment#4 Segment#5 Segment#6 Segment#7 Segment#8 Segment#9 Surface Description Bottom Width(ft) Depth(ft) Side Slopes(?H:1V)(ft) Area(Sq.ft) Wetted Perimeter(ft) Hydraulic Radius(ft) Flow Length(ft) Elevation Up(ft) Elevation Down(ft) Channel Slope(ft/ft) Manning's"no Average Velocity(ft/Sec) Time Of Concentration(Mins) Total Trapezoidal Channel Tc 0.0 min. 6. CHANNEL FLOW-CIRCULAR CHANNEL(Gravity Flow Segment#1 Segment#2 Segment#3 Segment#4 Segment#5 Segment#6 Segment#7 Segment#8 Segment#9 Surface Description Pipe Diameter(In) Area(Sq.ft) Wetted Perimeter(ft) Hydraulic Radius(ft) Flow Length(ft) Elevation Up(ft) Elevation Down(ft) Channel Slope(ft/ft) Manning's"no Average Velocity(ft/Sec) Time Of Concentration(Mins) Total Circular Channel Tc(Mins): 0.0 min. PLBasin Time of Concentration(Mintues) Total Basin Tc(Mins): 12.9 min. cApw rking\east01\d2277368\ PLI TOCAsm DA 3-Road 12 of]8 12/10/2021 Time of Concentration Worksheet F:)R SCS TR-55 Method PROJECT: PLI DATE: 12/10/21 SCENARIO: DA4-Stream Crossing at Railroad PREPARED BY: FLS Drainage Area Info Drainage Area Tc Summary Data DRAINAGE AREA ID: DA 4 Flow Type Length(ft) Elev.Diff. Tc TOTAL BASIN LENGTH: 3117.8 ft Sheet Flow 100.0 0.50 17.4 mins. TOTAL ELEVATION UP: 888.00 Shallow Concentrated Flow 730.3 25.50 3.5 mins. TOTAL ELEVATION DOWN: 810.00 Channel Flow-Rectangular 0.0 0.00 0.0 mins. TOTAL ACRES: 149.81 Channel Flow-Triangular 2287.5 52.00 6.8 mins. Channel Flow-Trapezoidal 0.0 0.00 0.0 mins. Channel Flow-Circular 0.0 0.00 0.0 mins. Basin Totals3117.8 78.0027.7 mins. This time of concentration calculation is based on survey data,aerial photography,and field investigation. 2. SHALLOW CONCENTRATED FLOW Segment#1 Segment#2 Segment#3 Surface Description Grass Segment#1 Segment#2 Segment#3 Manning's"n" 0.16 Surface Description Paved Unpaved 2-Year,24-Hr.Rain Fall(In) 3.43 Flow Length(ft) 468.3 ft 262.0 ft Flow Length(ft) 100.0 ft Elevation Up(ft) 887.50 872.00 Elevation Up(ft) 888.00 Elevation Down(ft) 872.00 862.00 Elevation Down(ft) 887.50 Watercourse Slope(ft/ft) 0.033 0.038 Land Slope(ft/ft) 0.005 Average Velocity(ft/Sec) 3.7 3.2 Time Of Concentration(Mins) 17.35 Time Of Concentration(Mins) 2.11 1.39 Total Sheet Flow Tc(Minutes): 17.4 min. Total Shallow Concentrated Tc(Mins):1 3.5 min. cApw rking\east01\d2277368\ PLI TOCxlsm DA 4-Railroad 13 of]8 12/10/2021 Time of Concentration Worksheet F:)R SCS TR-55 Method PROJECT: PLI DATE: 12/10/21 SCENARIO: DA4-Stream Crossing at Railroad PREPARED BY: FLS 3. CHANNEL FLOW-RECTANGULAR CHANNEL Segment#1 Segment#2 Segment#3 Segment#4 Segment#5 Segment#6 Segment#7 Segment#8 Segment#9 Surface Description Bottom Width(ft) Depth(ft) Area(Sq.ft) Wetted Perimeter(ft) Hydraulic Radius(ft) Flow Length(ft) Elevation Up(ft) Elevation Down(ft) Channel Slope(ft/ft) Manning's"n" Average Velocity(ft/Sec) Time Of Concentration(Mins) Total Rectangular Channel Tc(Mins): 0.0 mins. 4. CHANNEL FLOW-TRIANGULAR CHANNEL Segment#1 Segment#2 Segment#3 Segment#4 Segment#5 Segment#6 Segment#7 Segment#8 Segment#9 Surface Description Stream-Clean Top Width(ft) 5.0 Depth(ft) 1.5 Area(Sq.ft) 3.8 Wetted Perimeter(ft) 5.8 Hydraulic Radius(ft) 0.6 Flow Length(ft) 2287.5 Elevation Up(ft) 862.00 Elevation Down(ft) 810.00 Channel Slope(ft/ft) 0.023 Manning's"no 0.030 Average Velocity(ft/Sec) 5.6 Time Of Concentration(Mins) 6.84 Total Triangular Channel Tc 6.8 min. cApw rking\east01\d2277368\ PLI TOCAsm DA 4-Railroad 14 of 18 12/10/2021 Time of Concentration Worksheet F:)R SCS TR-55 Method PROJECT: PLI DATE: 12/10/21 SCENARIO: DA4-Stream Crossing at Railroad PREPARED BY: FLS 5. CHANNEL FLOW-TRAPEZOIDAL CHANNEL Segment#1 Segment#2 Segment#3 Segment#4 Segment#5 Segment#6 Segment#7 Segment#8 Segment#9 Surface Description Bottom Width(ft) Depth(ft) Side Slopes(?H:1V)(ft) Area(Sq.ft) Wetted Perimeter(ft) Hydraulic Radius(ft) Flow Length(ft) Elevation Up(ft) Elevation Down(ft) Channel Slope(ft/ft) Manning's"no Average Velocity(ft/Sec) Time Of Concentration(Mins) Total Trapezoidal Channel Tc 0.0 min. 6. CHANNEL FLOW-CIRCULAR CHANNEL(Gravity Flow) Segment#1 Segment#2 Segment#3 Segment#4 Segment#5 Segment#6 Segment#7 Segment#8 Segment#9 Surface Description Pipe Diameter(In) Area(Sq.ft) Wetted Perimeter(ft) Hydraulic Radius(ft) Flow Length(ft) Elevation Up(ft) Elevation Down(ft) Channel Slope(ft/ft) Manning's"n" Average Velocity(ft/Sec) Time Of Concentration(Mins) Total Circular Channel Tc(Mins): 0.0 min. 7.Total Basin Time of Concentration (Mintues) Total Basin Tc(Mins): 27.7 min. cApw rking\east01\d2277368\ PLI TOCAsm DA 4-Railroad 15 of 18 12/10/2021 Time of Concentration Worksheet F:)R SCS TR-55 Method PROJECT: PLI DATE: 12/10/21 SCENARIO: DA5-Stream Crossing at Railroad PREPARED BY: BSS Drainage Area Info Drainage Area Tc Summary Data DRAINAGE AREA ID: DA 5 Flow Type Length(ft) Elev.Diff. Tc TOTAL BASIN LENGTH: 1025.0 ft Sheet Flow 100.0 1.50 11.2 mins. TOTAL ELEVATION UP: 915.00 Shallow Concentrated Flow 925.0 34.50 4.9 mins. TOTAL ELEVATION DOWN: 879.00 Channel Flow-Rectangular 0.0 0.00 0.0 mins. TOTAL ACRES: 14.22 Channel Flow-Triangular 0.0 0.00 0.0 mins. Channel Flow-Trapezoidal 0.0 0.00 0.0 mins. Channel Flow-Circular 0.0 0.00 0.0 mins. Basin Totals1025.0 36.0016.1 mins. This time of concentration calculation is based on survey data,aerial photography,and field investigation. 2. SHALLOW CONCENTRATED FLOW Segment#1 Segment#2 Segment#3 Surface Description Grass Segment#1 Segment#2 Segment#3 Manning's"n" 0.16 Surface Description Unpaved 2-Year,24-Hr.Rain Fall(In) 3.43 Flow Length(ft) 925.0 ft Flow Length(ft) 100.0 ft Elevation Up(ft) 913.50 Elevation Up(ft) 915.00 Elevation Down(ft) 879.00 Elevation Down(ft) 913.50 Watercourse Slope(ft/ft) 0.037 Land Slope(ft/ft) 0.015 Average Velocity(ft/Sec) 3.1 Time Of Concentration(Mins) 11.18 Time Of Concentration(Mins) 4.95 Total Sheet Flow Tc(Minutes): 11.2 min. Total Shallow Concentrated Tc(Mins):1 4.9 min. cApw rking\east01\d2277368\ PLI TOCxlsm DA 5-Railroad South 16 ofls 12/10/2021 Time of Concentration Worksheet K)R SCS TR-55 Method PROJECT: PLI DATE: 12/10/21 SCENARIO: DA5-Stream Crossing at Railroad PREPARED BY: BSS 3. CHANNEL FLOW-RECTANGULAR CHANNEL Segment#1 Segment#2 Segment#3 Segment#4 Segment#5 Segment#6 Segment#7 Segment#8 Segment#9 Surface Description Bottom Width(ft) Depth(ft) Area(Sq.ft) Wetted Perimeter(ft) Hydraulic Radius(ft) Flow Length(ft) Elevation Up(ft) Elevation Down(ft) Channel Slope(ft/ft) Manning's"n" Average Velocity(ft/Sec) Time Of Concentration(Mins) Total Rectangular Channel Tc(Mins): 0.0 rains. 4. CHANNEL FLOW-TRIANGULAR CHANNEL Segment#1 Segment#2 Segment#3 Segment#4 Segment#5 Segment#6 Segment#7 Segment#8 Segment#9 Surface Description Top Width(ft) Depth(ft) Area(Sq.ft) Wetted Perimeter(ft) Hydraulic Radius(ft) Flow Length(ft) Elevation Up(ft) Elevation Down(ft) Channel Slope(ft/ft) Manning's"no Average Velocity(ft/Sec) Time Of Concentration(Mins) Total Triangular Channel Tc 0.0 min. cApw rking\east01\d2277368\ PLI TOCAsm DA 5-Railroad South 17 of1s 12/10/2021 Time of Concentration Worksheet K)R SCS TR-55 Method PROJECT: PLI DATE: 12/10/21 SCENARIO: DA5-Stream Crossing at Railroad PREPARED BY: BSS 5. CHANNEL FLOW-TRAPEZOIDAL CHANNEL Segment#1 Segment#2 Segment#3 Segment#4 Segment#5 Segment#6 Segment#7 Segment#8 Segment#9 Surface Description Bottom Width(ft) Depth(ft) Side Slopes(?H:1V)(ft) Area(Sq.ft) Wetted Perimeter(ft) Hydraulic Radius(ft) Flow Length(ft) Elevation Up(ft) Elevation Down(ft) Channel Slope(ft/ft) Manning's"no Average Velocity(ft/Sec) Time Of Concentration(Mins) Total Trapezoidal Channel Tc 0.0 min. 6. CHANNEL FLOW-CIRCULAR CHANNEL(Gravity Flow) Segment#1 Segment#2 Segment#3 Segment#4 Segment#5 Segment#6 Segment#7 Segment#8 Segment#9 Surface Description Pipe Diameter(In) Area(Sq.ft) Wetted Perimeter(ft) Hydraulic Radius(ft) Flow Length(ft) Elevation Up(ft) Elevation Down(ft) Channel Slope(ft/ft) Manning's"n" Average Velocity(ft/Sec) Time Of Concentration(Mins) Total Circular Channel Tc(Mins): 0.0 min. 7.Total Basin Time of Concentration (Mintues) Total Basin Tc(Mins): 16.1 min. cApw rking\east01\d2277368\ PLI TOCAsm DA 5-Railroad South 18 ores PLC Lithium Hydroxide Conversion Plant ��� Appendices Appendix F — NOAA Rainfall Data Precipitation Frequency Data Server Page 1 of 4 NOAA Atlas 14,Volume 2,Version 3 Location name: Lincolnton,North Carolina,USA' ' Latitude:35.4667°,Longitude: -81.3333° Elevation:919.07 ft" 'source:ESRI Mapsk,,� *'source:USGS POINT PRECIPITATION FREQUENCY ESTIMATES G.M.Bonnin,D.Martin,B.Lin,T.Parzybok,M.Yekta,and D.Riley NOAA,National Weather Service,Silver Spring,Maryland PF tabular I PF graphical I Maps & aerials PF tabular PDS-based point precipitation frequency estimates with 90%confidence intervals(in inches/hour)' Average recurrence interval(years) 11 2 11 5 10 11 25 11 50 1 100 200 500 1000 5-min 4.67 5.52 6.49 7.24 8.15 8.81 9.46 10.1 10.9 11.5 (4.28-5.08) 1 (5.06 6.02) 1 (5.95-7.09) (6.60-7.88) (7.39-8.88) (7.94 9.61) 1 (8.48-10.3) (8.96-11.1) (9.54-12.0) (9.96-12.7) 10-min 8.00 8.60 9.04 (7.10-8.77) (7.55-9.47) (7.85-10.0) 15-min 3.10 3.70 4.39 4.88 5.48 5.92 6.34 6.72 7.22 7.56 (2.85-3.38) 1 (3.40-4.04) (4.02-4.79) (4.46-5.32) (4.98-5.98) (5.34-6.46) 1 (5.68-6.92) (5.98-7.37) (6.33-7.95) (6.56-8.38) 30-min 2.13 2.55 3.12 3.54 4.06 4.46 4.85 5.23 5.74 6.13 (1.95-2.32) 1 (2.35-2.79) 1 (2.85-3.40) 1 (3.23-3.85) 1 (3.68-4.43) 1 (4.02-4.86) 1 (4.35-5.30) (4.65-5.74) 1 (5.04-6.32) 1 (5.32-6.78) 60-min 1.33 1.60 2.00 2.30 2.70 3.02 3.34 3.67 4.12 4.47(1.22-1.45) (1.47-1.75) (1.83-2.18) (2.10-2.51) 1 (2.45-2.95) (2.72-3.30) (2.99-3.65) (3.26-4.02) 1 (3.61-4.54) (3.88-4.95) 2-hr 0.770 0.935 1.17 1.36 1.62 1.83 2.04 2.26 2.58 2.83 (0.706-0.843) (0.856-1.02) (1.07-1.29) 1 (1.24-1.49) 11 (1.47-1.77) (1.64-2.00) (1.82-2.24) 1 (2.00-2.49) 1 (2.25-2.85) 1 (2.44-3.15) 3-hr 0.549 0.664 0.837 0.975 1.17 1.33 1.50 1.68 1.94 2.15 (0.503-0.605) (0.608-0.732) (0.764-0.921) (0.886-1.07) 1 (1.06-1.29) 1 (1.19-1.46) 1 (1.33-1.65) 1 (1.48-1.86) 1 (1.67-2.15) 1 (1.83-2.40) 6-hr 0.339 0.408 0.512 0.595 0.714 0.812 0.916 1.03 1.19 1.32 (0.312-0.370)(0.376-0.447) (0.469-0.560) (0.544-0.650) (0.647-0.779) (0.731-0.887) (0.817-1.00) (0.907-1.13) 1 (1.03-1.31) 12-hr 0.205 0.248 0.310 0.361 0.431 0.490 0.551 0.616 0.708 0.784 (0.189-0.223)(0.228-0.270) (0.285-0.338) (0.330-0.393) (0.392-0.470) (0.442-0.533)(0.493-0.599) (0.545-0.671)(0.618-0.774) (0.675-0.860) 24-hr 0.124 0.150 0.189 0.220 0.262 0.296 0.331 0.367 0.416 0.456 (0.116-0.133)(0.140-0.161) (0.176-0.203) (0.205-0.236) (0.243-0.281) (0.274-0.317) (0.304-0.354) (0.336-0.393)(0.380-0.447) (0.414-0.490) 2-day 0.69-0 079 0.8 -0 096 0.104-0 120 0.120-0.9138 0.14170.3164 0.159-0.2184 0.1076-0 205 0.194-0 227 0.2118-0 257 0.2372--0 281 3-day 0.052 0.063 0.078 0.090 0.106 0.119 0.133 0.146 0.165 0.180 (0.049-0.056)(0.059-0.067) (0.073-0.084) (0.084-0.097) (0.099-0.114) (0.110-0.128)(0.122-0.142) (0.135-0.157)(0.151-0.178) (0.164-0.194) 4-day 0.041 0.050 0.061 0.071 0.083 0.093 0.104 0.114 0.128 0.140 (0.039-0.044)(0.046-0.053) (0.057-0.066) (0.066-0.076) (0.077-0.089) (0.086-0.100)(0.095-0.111) (0.105-0.122)(0.118-0.138) (0.127-0.150) 7-day 0.027 0.033 0.040 0.045 0.053 0.059 0.065 0.072 0.080 0.087 (0.026-0 029)(0.031-0.035) (0.037-0.042) (0.043-0.048) (0.050-0.057) (0.055-0.063)(0.061-0.070) (0.066-0.076)(0.074-0.086) (0.080-0.093) 0.041 10-day 0 021--0 023 0.02 -0 028 0.030-0 033 0.03 -0 038 0.038-0 043 0.04 -0 048 0.046-0 052 0050-0 057 0.05 -0 063 0060-0 068 20-day 0.015 0.017 0.020 0.023 0.026 0.029 0.031 0.034 0.037 0.040 (0.014-0.015)(0.016-0.018) (0.019-0.021) (0.022-0.024) (0.025-0.028) (0.027-0.030)(0.029-0.033) (0.032-0.036)(0.035-0.040) (0.037-0.043) 30-day 0.012 0.014 0.016 0.018 0.020 0.022 0.024 0.025 0.028 0.029 (0.011-0.013)(0.013-0.015) (0.016-0.017) (0.017-0.019) (0.019-0.021) (0.021-0.023)(0.022-0.025) (0.024-0.027)(0.026-0.029) (0.028-0.031) 45-day 0.010 0.012 0.013 0.015 0.016 0.017 0.019 0.020 0.021 0.022 (0.010-0.011)(0.011-0.012) (0.013-0.014) (0.014-0.015) (0.016-0.017) (0.017-0.018)(0.018-0.020) (0.019-0.021)(0.020-0.022) (0.021-0.024) 60-day 0.009 0.010 0.012 0.013 0.014 0.015 0.016 0.017 0.018 0.019 (0.009-0009)(0.010-0.011) (0.011-0.012) (0.012-0.013) (0.014-0.015) (0.015-0.016)(0.015-0.017) (0.016-0.018)(0.017-0.019) (0.018-0.020) Precipitation frequency(PF)estimates in this table are based on frequency analysis of partial duration series(PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90%confidence interval.The probability that precipitation frequency estimates (for a given duration and average recurrence interval)will be greater than the upper bound(or less than the lower bound)is 5%.Estimates at upper bounds are not checked against probable maximum precipitation(PMP)estimates and may be higher than currently valid PIMP values. Please refer to NOAA Atlas 14 document for more information. Back to to Too https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=3 5.4667&Ion=-81.3333&dat... 8/20/2021 Precipitation Frequency Data Server Page 2 of 4 PF graphical PD5-based intensity-duration-frequency (IDF)curves Latitude: 35.4667 Longitude: -81.3333' 100.000 Average recufrence inlerral r 10.000 ... (Years} c — 1 Z' 2 1.000 _. ..:......: a - - — 5 O — 25 +, 0.100 ----- ----•------- - - — 49 5 0 200 4 a _0.010 ...........'........... ... 500 1000 0-001 � s s s r m mm m m m ru FUm N A 6 N A - --4 7 -V -y -y -y-y u'] O v1 O O �"1 N N V A A OO OO OO Un OO ri rl rn lG Duration ri INrn -T�Q 100.000 r 10.000 - Duration 41 1.000 - ---- ----- --- - ---- — 5-min — 2-day a c — 1Dmin — 3-day 15min — 4-day 0.100 — 3"Or — 7Aay — 6Dmin — 10-aay EL Ld — 2-rr — 20-day a 0.010 .. . . -- . . . ........ .........:...... — 3a1r — 30 oay — 5a1r — 45-day 12-hr — 60-day 0-001 — 24<-hr 1 2 5 10 25 50 100 200 500 1000 Average recurrence interval [years] NOAAAtIas 14,Volume 2,Version 3 Created{GMT}: Fri Aug 20 14:36:00 2021 Back to Top https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=3 5.4667&lon=-81.3333&dat... 8/20/2021 Precipitation Frequency Data Server Page 3 of 4 Maps & aerials Small scale terrain �r I Lincoln Large scale terrain Kingsport' Bristol il Johnson City' 3 sti Winston-Salem M • • Dui Greensboro r„il Mitd,eii rtw� Ashelille _ILA RT H C A R O L I N A Charlotte ttev Greenville 100km SOUTH CAROLINA 60mi Large scale map Kinasoort Bri tol Johnson City nston� lem Gmensbon A rhie;Mlle I I North Carolina a ar4ttCl x le�jlle 4 �l f 100k \ Omi https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=3 5.4667&Ion=-81.3333&dat... 8/20/2021 Precipitation Frequency Data Server Page 4 of 4 Lar a scale aerial Johnson Ci Greensbbro Asheville North Cardin a Ch'ariotte reenviLle Back to Top US Department of Commerce National Oceanic and Atmospheric Administration National Weather Service National Water Center 1325 East West Highway Silver Spring,MD 20910 Questions?:HDSC.Questions(a.noaa.aov Disclaimer https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=3 5.4667&Ion=-81.3333&dat... 8/20/2021 PLC Lithium Hydroxide Conversion Plant ��� Appendices Appendix G — Sediment Basin Calculations RISER SEDIMENT BASIN CALCULATIONS Lithium Hydroxide Conversion Plant HDR PROJECT NO.: 10302238 DATE: 08.27.2021 BY: AKL REVISED: 12.03.2021 RVW: VH Riser Sediment Basin: SB-201 Drainage Area Characteristics Required Storage Volume Total drainage area(TDA)1 11.16 ac 10 Yr Peak Flow(Q10) 48.61 cfs Disturbed area(DA) 6.68 ac 25 Yr Peak Flow(Q25) 54.77 cfs Rational Coefficient(C)2 0.60 Req'd Min.Surface Area (435 sf per cfs of Q25)5 23,826 sf Time of Concentration(TC)3 5.0 min Req'd Min.Storage Volume (1800 cf per ac of TDA)5 20,088 cf 10 Yr Storm Rainfall Intensity(i)4 7.3 in/hr 25 Yr Storm Rainfall Intensity(i)4 8.2 in/hr Design Criteria Basin Size Bottom Elevation 832.00 msl Elev.(msl) Depth(ft) Area(sf) Cumulative Volume(cf) Depth of Storage Volume 2.50 ft 832.00 0.00 20,173 0 Depth of Flow over Riser(1 ft min)5 1.00 ft 833.00 1.00 22,098 21,128 Depth of Flow over Emergency Spillway 0.50 ft 834.00 2.00 24,079 44,210 25 Yr Storm Freeboard(1 ft req'd)5 1.00 ft 835.00 3.00 26,116 69,300 836.00 4.00 28,211 96,457 Basin Configuration 837.00 5.00 30,362 125,737 Bottom Elevation 832.00 msl Sediment Storage Elevation 834.50 msl Riser Crest 834.50 msl Emergency Spillway Crest 835.50 msl Top of Berm 837.00 msl Skimmer Outlet Basin Size Check Desired Skimmer Drawdown Time(td)6 72 hrs Basin Surface Area Provided at Spillway Crest 25,098 sf Desired Skimmer Drawdown Rate(Qd) 6,696 ft3/day Basin Storage Volume Provided Below Spillway Crest 56,503 cf Skimmer Size 5.0 in Head on Orifice(H)5 0.333 ft Calculated Orifice Diameter' 2.241 in Actual Orifice Diameter' 2.250 in Actual Skimmer Drawdown Time' 71 hrs Barrel Riser Diameter(15 in min)5 36 in Riser Flow as Weir13 29.22 cfs Barrel Diameter' 18 in Riser Flow as Orifice14 34.04 cfs Barrel Invert Elevation 831.50 msl Barrel Length 50.00 ft Barrel Flow as Orifice14 15.34 cfs Barrel Manning's N10 0.025 Barrel Flow as Pipe15 11.03 cfs Sharp Crested Weir Coefficient(C)11 3.1 Orifice Coefficient(C)12 0.6 Controlling Flow through Riser and Barrel Spillway 11.03 cfs Barrel Riser Diameter(15 in min)5 72 in Riser Flow as Weir13 58.43 cfs Barrel Diameter' DOUBLE 24 in Riser Flow as Orifice14 136.14 cfs Barrel Invert Elevation 831.50 msl Barrel Length 50.00 ft Barrel Flow as Orifice14 DOUBLE 52.40 cfs Barrel Manning's N10 0.025 Barrel Flow as Pipe15 DOUBLE 42.13 cfs Sharp Crested Weir Coefficient C 11 3.1 Orifice Coefficient(C)12 0.6 Controlling Flow through Riser and Barrel Spillway 42.13 cfs Total of controlling Barrel Flows 53.17 cfs Spillway Minimum Allowable Spillway Length16 20 ft Difference b/n 25 Yr Peak Flow and Riser/Barrel Flow 1.61 cfs Broad Crested Weir Coefficient(C)17 2.80 Ell Design Spillway Length13 20 ft Page 1 of 44 RISER SEDIMENT BASIN CALCULATIONS Lithium Hydroxide Conversion Plant HDR PROJECT NO.:1 10302238 DATE: 08.27.2021 BY: AKL REVISED: 12.03.2021 RVW: VH Concrete Length of Exposed Outlet Pipe 10 ft Buoyancy's 6371 Ibs Concrete Anchor Width 7.0 ft Weight of Concrete Anchor 7105 Ibs Concrete Anchor Length 7.0 ft Concrete Anchor Thickness 1.00 ft Safety Factor" 1.1 Notes 1.See attached drainage area map. 2.Entire area is denuded.Conservative rational coefficient for smooth bare packed soil is 0.60. 3.Time of concentration was assumed to be the minimum of 5 minutes. 4.Rainfall intensity at project location was acquired from the NOAA website,http://hdsc.nws.noaa.gov/hdsc/pfds/pfds_map_cont.html. 5.From Section 6.61-Sediment Basin of the NCDEQ Erosion and Sediment Control Planning and Design Manual. 6.Basin is required to be dewatered by the skimmer in 48 to 120 hours.The optimal dewatering time is 72 hours(see note 5). 7.Skimmer orifice equatic D=�%i(2310-VC H) (inches) (see note 5) 8.Actual skimmer orifice diameter is rounded to the nearest 1/4 inch. 9.Riser cross-sectional area is required to be more than 1.5 times the barrel cross-sectional area. 10.Use 0.025 for CMP and 0.013 for RCP. 11.3.1 for corrugated metal pipe risers per Section 8.07-Sediment Basin Design of the NCDEQ Erosion and Sediment Control Planning and Design Manual. 12.0.6 for corrugated metal nine ricers per Section 8.07-Sediment Basin Design of the NCDEQ Erosion and Sediment Control Planning and Design Manual. 13.Weir equation: Q= CLH'� (see note 11) 14.Orifice equation: Q=CA(2gH)Ps (see note 12) 15.Pipe Flow equation: 2gh �9-5 'See + Q=a [tKm+KPL 16.Minimum allowable emergency spillway length is 20 feet(see note 5). 17.2.80 is the maximum allowable coefficient per Section 8.07-Sediment Basin Design of the NCDEQ Erosion and Sediment Control Planning and Design Manual. 18.Weight of water displaced by riser and exposed outlet pipe. 19.Minimum safety factor is 1.1 per Section 8.07-Sediment Basin Design of the NCDEQ Erosion and Sediment Control Planning and Design Manual. Page 2 of 44 RISER SEDIMENT BASIN CALCULATIONS Lithium Hydroxide Conversion Plant HDR PROJECT NO.: 10302238 DATE: 08.27.2021 BY: AKL REVISED: 12.03.2021 RVW: VH Riser Sediment Basin: SB-202 Drainage Area Characteristics Required Storage Volume Total drainage area(TDA)1 5.65 ac 10 Yr Peak Flow(Q10) 24.61 cfs Disturbed area(DA) 5.79 ac 25 Yr Peak Flow(Q25) 27.73 cfs Rational Coefficient(C)2 0.60 Req'd Min.Surface Area (435 sf per cfs of Q25)5 12,063 sf Time of Concentration(TC)3 5.0 min Req'd Min.Storage Volume (1800 cf per ac of TDA)5 10,170 cf 10 Yr Storm Rainfall Intensity(i)4 7.3 in/hr 25 Yr Storm Rainfall Intensity(i)4 8.2 in/hr Design Criteria Basin Size Bottom Elevation 825.00 msl Elev.(msl) Depth(ft) Area(sf) Cumulative Volume(cf) Depth of Storage Volume 2.50 ft 825.00 0.00 9,393 0 Depth of Flow over Riser(1 ft min)5 1.00 ft 826.00 1.00 11,000 10,186 Depth of Flow over Emergency Spillway 0.50 ft 827.00 2.00 12,665 22,009 25 Yr Storm Freeboard(1 ft req'd)5 1.00 ft 828.00 3.00 14,386 35,525 829.00 4.00 16,162 50,790 Basin Configuration 830.00 5.00 17,996 67,861 Bottom Elevation 825.00 msl Sediment Storage Elevation 827.50 msl Riser Crest 827.50 msl Emergency Spillway Crest 828.50 msl Top of Berm 830.00 msl Skimmer Outlet Basin Size Check Desired Skimmer Drawdown Time(td)6 72 hrs Basin Surface Area Provided at Spillway Crest 13,526 sf Desired Skimmer Drawdown Rate(Qd) 3,390 ft3/day Basin Storage Volume Provided Below Spillway Crest 28,555 cf Skimmer Size 8.0 in Head on Orifice(H)5 0.500 ft Calculated Orifice Diameter' 1.441 in Actual Orifice Diameter' 1.500 in Actual Skimmer Drawdown Time' 66 hrs Barrel Riser Diameter(15 in min)5 72 in Riser Flow as Weir13 58.43 cfs Barrel Diameter' DOUBLE 24 in Riser Flow as Orifice14 136.14 cfs Barrel Invert Elevation 824.00 msl Barrel Length 50.00 ft Barrel Flow as Orifice14 56.60 cfs Barrel Manning's N10 0.025 Barrel Flow as Pipe15 45.51 cfs Sharp Crested Weir Coefficient(C)11 3.1 Orifice Coefficient(C)12 0.6 Controlling Flow through Riser and Barrel Spillway 45.51 cfs Spillway Minimum Allowable Spillway Length16 20 ft Difference b/n 25 Yr Peak Flow and Riser/Barrel Flow -17.78 cfs Broad Crested Weir Coefficient(C)17 2.80 Ell Design Spillway Length" 20 ft Concrete Length of Exposed Outlet Pipe 10 ft Buoyancy18 6371 Ibs Concrete Anchor Width 6.5 ft Weight of Concrete Anchor 9189 Ibs Concrete Anchor Length 6.5 ft Concrete Anchor Thickness 1.50 ft Safety Factor19 1.4 Notes 1.See attached drainage area map. 2.Entire area is denuded.Conservative rational coefficient for smooth bare packed soil is 0.60. Page 3 of 44 RISER SEDIMENT BASIN CALCULATIONS Lithium Hydroxide Conversion Plant HDR PROJECT NO.: 10302238 DATE: 08.27.2021 BY: AKL REVISED: 12.03.2021 RVW: VH 3.Time of concentration was assumed to be the minimum of 5 minutes. 4.Rainfall intensity at project location was acquired from the NOAA website,hftp://hdsc.nws.noaa.gov/hdsc/pfds/pfds_map_cont.html. 5.From Section 6.61-Sediment Basin of the NCDEQ Erosion and Sediment Control Planning and Design Manual. 6.Basin is required to be dewatered by the skimmer in 48 to 120 hours.The optimal dewatering time is 72 hours(see note 5). 7.Skimmer orifice equatic I D= V Qa/(2370*V H) (inches) (see note 5) 8.Actual skimmer orifice diameter is rounded to the nearest 1/4 inch. 9.Riser cross-sectional area is required to be more than 1.5 times the barrel cross-sectional area. 10.Use 0.025 for CMP and 0.013 for RCP. 11.3.1 for corrugated metal pipe risers per Section 8.07-Sediment Basin Design of the NCDEQ Erosion and Sediment Control Planning and Design Manual. 12.0.6 for corrugated mortal nine ricers per Section 8.07-Sediment Basin Design of the NCDEQ Erosion and Sediment Control Planning and Design Manual. 13.Weir equation: Q= CLH7 5 (see note 11) 14.Orifice equation: Q=CA(2gH)R5 (see note 12) 15.Pipe Flow equation: 2gh O5 *See Q=a [1+Km+KPL 16.Minimum allowable emergency spillway length is 20 feet(see note 5). 17.2.80 is the maximum allowable coefficient per Section 8.07-Sediment Basin Design of the NCDEQ Erosion and Sediment Control Planning and Design Manual. 18.Weight of water displaced by riser and exposed outlet pipe. 19.Minimum safety factor is 1.1 per Section 8.07-Sediment Basin Design of the NCDEQ Erosion and Sediment Control Planning and Design Manual. Page 4 of 44 RISER SEDIMENT BASIN CALCULATIONS Lithium Hydroxide Conversion Plant HDR PROJECT NO.: 10302238 DATE: 08.27.2021 BY: AKL REVISED: 12.03.2021 RVW: VH Riser Sediment Basin: SB-203 Drainage Area Characteristics Required Storage Volume Total drainage area(TDA)1 3.93 ac 10 Yr Peak Flow(Q10) 17.12 cfs Disturbed area(DA) 3.93 ac 25 Yr Peak Flow(Q25) 19.29 cfs Rational Coefficient(C)2 0.60 Req'd Min.Surface Area (435 sf per cfs of Q25)5 8,390 sf Time of Concentration(TC)3 5.0 min Req'd Min.Storage Volume (1800 cf per ac of TDA)5 7,074 cf 10 Yr Storm Rainfall Intensity i 4 7.3 in/hr 25 Yr Storm Rainfall Intensity(i)4 8.2 in/hr Design Criteria Basin Size Bottom Elevation 808.00 msl Elev.(msl) Depth(ft) Area(sf) Cumulative Volume(cf) Depth of Storage Volume 2.50 ft 808.00 0.00 5,874 0 Depth of Flow over Riser(1 ft min)5 1.00 ft 809.00 1.00 7,118 6,486 Depth of Flow over Emergency Spillway 0.50 ft 810.00 2.00 8,435 14,253 25 Yr Storm Freeboard(1 ft req'd)5 1.00 ft 811.00 3.00 9,809 23,367 812.00 4.00 11,239 33,882 Basin Configuration 813.00 5.00 12,726 45,857 Bottom Elevation 808.00 msl Sediment Storage Elevation 810.50 msl Riser Crest 810.50 msl Emergency Spillway Crest 811.50 msl Top of Berm 813.00 msl Skimmer Outlet Basin Size Check Desired Skimmer Drawdown Time(td)6 72 hrs Basin Surface Area Provided at Spillway Crest 9,122 sf Desired Skimmer Drawdown Rate(Qd) 2,358 ft'/day Basin Storage Volume Provided Below Spillway Crest 18,641 cf Skimmer Size 6.0 in Head on Orifice(H)5 0.417 ft Calculated Orifice Diameter' 1.257 in Actual Orifice Diameter' 1.250 in Actual Skimmer Drawdown Time' 73 hrs Barrel Riser Diameter(15 in min)5 48 in Riser Flow as Weir13 38.96 cfs Barrel Diameter' 24 in Riser Flow as Orifice14 60.51 cfs Barrel Invert Elevation 807.50 msl Barrel Length 50.00 ft Barrel Flow as Orifice14 26.20 cfs Barrel Manning's N10 0.025 Barrel Flow as Pipe15 21.07 cfs Sharp Crested Weir Coefficient(C)11 3.1 Orifice Coefficient(C)12 0.6 Controlling Flow through Riser and Barrel Spillway 21.07 cfs Spillway Minimum Allowable Spillway Length16 20 ft Difference b/n 25 Yr Peak Flow and Riser/Barrel Flow -1.78 cfs Broad Crested Weir Coefficient(C)17 2.80 Ell Design Spillway Length" 20 ft Concrete Length of Exposed Outlet Pipe 10 ft Buoyancy18 3921 Ibs Concrete Anchor Width 6.0 ft Weight of Concrete Anchor 5220 Ibs Concrete Anchor Length 6.0 ft Concrete Anchor Thickness 1.00 ft Safety Factor19 1.3 Notes 1.See attached drainage area map. 2.Entire area is denuded.Conservative rational coefficient for smooth bare packed soil is 0.60. Page 5 of 44 RISER SEDIMENT BASIN CALCULATIONS Lithium Hydroxide Conversion Plant HDR PROJECT NO.: 10302238 DATE: 08.27.2021 BY: AKL REVISED: 12.03.2021 RVW: VH 3.Time of concentration was assumed to be the minimum of 5 minutes. 4.Rainfall intensity at project location was acquired from the NOAA website,hftp://hdsc.nws.noaa.gov/hdsc/pfds/pfds_map_cont.html. 5.From Section 6.61-Sediment Basin of the NCDEQ Erosion and Sediment Control Planning and Design Manual. 6.Basin is required to be dewatered by the skimmer in 48 to 120 hours.The optimal dewatering time is 72 hours(see note 5). 7.Skimmer orifice equatic I D= V Qa/(2370*V H) (inches) (see note 5) 8.Actual skimmer orifice diameter is rounded to the nearest 1/4 inch. 9.Riser cross-sectional area is required to be more than 1.5 times the barrel cross-sectional area. 10.Use 0.025 for CMP and 0.013 for RCP. 11.3.1 for corrugated metal pipe risers per Section 8.07-Sediment Basin Design of the NCDEQ Erosion and Sediment Control Planning and Design Manual. 12.0.6 for corrugated mortal nine ricers per Section 8.07-Sediment Basin Design of the NCDEQ Erosion and Sediment Control Planning and Design Manual. 13.Weir equation: Q= CLH7 5 (see note 11) 14.Orifice equation: Q=CA(2gH)R5 (see note 12) 15.Pipe Flow equation: 2gh O5 *See Q=a [1+Km+KPL 16.Minimum allowable emergency spillway length is 20 feet(see note 5). 17.2.80 is the maximum allowable coefficient per Section 8.07-Sediment Basin Design of the NCDEQ Erosion and Sediment Control Planning and Design Manual. 18.Weight of water displaced by riser and exposed outlet pipe. 19.Minimum safety factor is 1.1 per Section 8.07-Sediment Basin Design of the NCDEQ Erosion and Sediment Control Planning and Design Manual. Page 6 of 44 RISER SEDIMENT BASIN CALCULATIONS Lithium Hydroxide Conversion Plant HDR PROJECT NO.: 10302238 DATE: 08.27.2021 BY: AKL REVISED: 12.03.2021 RVW: VH Riser Sediment Basin: SB-204 Drainage Area Characteristics Required Storage Volume Total drainage area(TDA)1 8.00 ac 10 Yr Peak Flow(Q10) 34.85 cfs Disturbed area(DA) 8.00 ac 25 Yr Peak Flow(Q25) 39.26 cfs Rational Coefficient(C)2 0.60 Req'd Min.Surface Area (435 sf per cfs of Q25)5 17,080 sf Time of Concentration(TC)3 5.0 min Req'd Min.Storage Volume (1800 cf per ac of TDA)5 14,400 cf 10 Yr Storm Rainfall Intensity(i)4 7.3 in/hr 25 Yr Storm Rainfall Intensity(i)4 8.2 in/hr Design Criteria Basin Size Bottom Elevation 813.00 msl Elev.(msl) Depth(ft) Area(sf) Cumulative Volume(cf) Depth of Storage Volume 2.50 ft 813.00 0.00 12,899 0 Depth of Flow over Riser(1 ft min)5 1.00 ft 814.00 1.00 14,609 13,745 Depth of Flow over Emergency Spillway 0.50 ft 815.00 2.00 16,375 29,229 25 Yr Storm Freeboard(1 ft req'd)5 1.00 ft 816.00 3.00 18,198 46,507 817.00 4.00 20,007 65,603 Basin Configuration 818.00 5.00 22,013 86,605 Bottom Elevation 813.00 msl Sediment Storage Elevation 815.50 msl Riser Crest 815.50 msl Emergency Spillway Crest 816.50 msl Top of Berm 818.00 msl Skimmer Outlet Basin Size Check Desired Skimmer Drawdown Time(td)6 72 hrs Basin Surface Area Provided at Spillway Crest 17,287 sf Desired Skimmer Drawdown Rate(Qd) 4,800 ft3/day 113asin Storage Volume Provided Below Spillway Crest 37,643 cf Skimmer Size 6.0 in Head on Orifice(H)5 0.417 ft Calculated Orifice Diameter' 1.794 in Actual Orifice Diameter' 1.750 in Actual Skimmer Drawdown Time' 76 hrs Barrel Riser Diameter(15 in min)5 72 in Riser Flow as Weir13 58.43 cfs Barrel Diameter' DOUBLE 24 in Riser Flow as Orifice14 136.14 cfs Barrel Invert Elevation 812.50 msl Barrel Length 50.00 ft Barrel Flow as Orifice14 52.40 cfs Barrel Manning's N10 0.025 Barrel Flow as Pipe15 42.13 cfs Sharp Crested Weir Coefficient(C)11 3.1 Orifice Coefficient(C)12 0.6 Controlling Flow through Riser and Barrel Spillway 42.13 cfs Spillway Minimum Allowable Spillway Length16 20 ft Difference b/n 25 Yr Peak Flow and Riser/Barrel Flow -2.87 cfs Broad Crested Weir Coefficient(C)17 2.80 Ell Design Spillway Length" 20 ft Concrete Length of Exposed Outlet Pipe 10 ft Buoyancy18 6371 Ibs Concrete Anchor Width 6.0 ft Weight of Concrete Anchor 7830 Ibs Concrete Anchor Length 6.0 ft Concrete Anchor Thickness 1.50 ft Safety Factor19 1.2 Notes 1.See attached drainage area map. 2.Entire area is denuded.Conservative rational coefficient for smooth bare packed soil is 0.60. Page 7 of 44 RISER SEDIMENT BASIN CALCULATIONS Lithium Hydroxide Conversion Plant HDR PROJECT NO.: 10302238 DATE: 08.27.2021 BY: AKL REVISED: 12.03.2021 RVW: VH 3.Time of concentration was assumed to be the minimum of 5 minutes. 4.Rainfall intensity at project location was acquired from the NOAA website,hftp://hdsc.nws.noaa.gov/hdsc/pfds/pfds_map_cont.html. 5.From Section 6.61-Sediment Basin of the NCDEQ Erosion and Sediment Control Planning and Design Manual. 6.Basin is required to be dewatered by the skimmer in 48 to 120 hours.The optimal dewatering time is 72 hours(see note 5). 7.Skimmer orifice equatic I D= V Qa/(2370*V H) (inches) (see note 5) 8.Actual skimmer orifice diameter is rounded to the nearest 1/4 inch. 9.Riser cross-sectional area is required to be more than 1.5 times the barrel cross-sectional area. 10.Use 0.025 for CMP and 0.013 for RCP. 11.3.1 for corrugated metal pipe risers per Section 8.07-Sediment Basin Design of the NCDEQ Erosion and Sediment Control Planning and Design Manual. 12.0.6 for corrugated mortal nine ricers per Section 8.07-Sediment Basin Design of the NCDEQ Erosion and Sediment Control Planning and Design Manual. 13.Weir equation: Q= CLH7 5 (see note 11) 14.Orifice equation: Q=CA(2gH)R5 (see note 12) 15.Pipe Flow equation: 2gh O5 *See Q=a [1+Km+KPL 16.Minimum allowable emergency spillway length is 20 feet(see note 5). 17.2.80 is the maximum allowable coefficient per Section 8.07-Sediment Basin Design of the NCDEQ Erosion and Sediment Control Planning and Design Manual. 18.Weight of water displaced by riser and exposed outlet pipe. 19.Minimum safety factor is 1.1 per Section 8.07-Sediment Basin Design of the NCDEQ Erosion and Sediment Control Planning and Design Manual. Page 8 of 44 RISER SEDIMENT BASIN CALCULATIONS Lithium Hydroxide Conversion Plant HDR PROJECT NO.: 10302238 DATE: 08.27.2021 BY: AKL REVISED: 12.03.2021 RVW: VH Riser Sediment Basin: SB-205 Drainage Area Characteristics Required Storage Volume Total drainage area(TDA)1 4.50 ac 10 Yr Peak Flow(Q10) 19.60 cfs Disturbed area(DA) 4.50 ac 25 Yr Peak Flow(Q25) 22.09 cfs Rational Coefficient(C)2 0.60 Req'd Min.Surface Area (435 sf per cfs of Q25)5 9,607 sf Time of Concentration(TC)3 5.0 min Req'd Min.Storage Volume (1800 cf per ac of TDA)5 8,100 cf 10 Yr Storm Rainfall Intensity i 4 7.3 in/hr 25 Yr Storm Rainfall Intensity(i)4 8.2 in/hr Design Criteria Basin Size Bottom Elevation 828.00 msl Elev.(msl) Depth(ft) Area(sf) Cumulative Volume(cf) Depth of Storage Volume 1.80 ft 828.00 0.00 8,809 0 Depth of Flow over Riser(1 ft min)5 1.00 ft 829.00 1.00 10,387 9,587 Depth of Flow over Emergency Spillway 0.20 ft 830.00 2.00 12,048 20,794 25 Yr Storm Freeboard(1 ft req'd)5 1.00 ft 831.00 3.00 13,778 33,698 832.00 4.00 15,576 48,366 Basin Configuration Bottom Elevation 828.00 msl Sediment Storage Elevation 829.80 msl Riser Crest 829.80 msl Emergency Spillway Crest 830.80 msl Top of Berm 832.00 msl Skimmer Outlet Basin Size Check Desired Skimmer Drawdown Time(td)6 72 hrs Basin Surface Area Provided at Spillway Crest 11,716 sf Desired Skimmer Drawdown Rate(Qd) 2,700 ft'/day Basin Storage Volume Provided Below Spillway Crest 18,423 cf Skimmer Size 5.0 in Head on Orifice(H)5 0.333 ft Calculated Orifice Diameter' 1.423 in Actual Orifice Diameter' 1.500 in Actual Skimmer Drawdown Time' 65 hrs Barrel Riser Diameter(15 in min)5 48 in Riser Flow as Weir13 38.96 cfs Barrel Diameter' 24 in Riser Flow as Orifice14 60.51 cfs Barrel Invert Elevation 826.80 msl Barrel Length 50.00 ft Barrel Flow as Orifice14 26.20 cfs Barrel Manning's N10 0.025 Barrel Flow as Pipe15 21.07 cfs Sharp Crested Weir Coefficient(C)11 3.1 Orifice Coefficient(C)12 0.6 Controlling Flow through Riser and Barrel Spillway 21.07 cfs Spillway Minimum Allowable Spillway Length16 20 ft Difference b/n 25 Yr Peak Flow and Riser/Barrel Flow 1.02 cfs Broad Crested Weir Coefficient(C)17 2.80 Ell Design Spillway Length13 20 ft Concrete Length of Exposed Outlet Pipe 10 ft Buoyancy18 3372 Ibs Concrete Anchor Width 6.0 ft Weight of Concrete Anchor 5220 Ibs Concrete Anchor Length 6.0 ft Concrete Anchor Thickness 1.00 ft Safety Factor19 1.5 Notes 1.See attached drainage area map. 2.Entire area is denuded.Conservative rational coefficient for smooth bare packed soil is 0.60. Page 9 of 44 RISER SEDIMENT BASIN CALCULATIONS Lithium Hydroxide Conversion Plant HDR PROJECT NO.: 10302238 DATE: 08.27.2021 BY: AKL REVISED: 12.03.2021 RVW: VH 3.Time of concentration was assumed to be the minimum of 5 minutes. 4.Rainfall intensity at project location was acquired from the NOAA website,hftp://hdsc.nws.noaa.gov/hdsc/pfds/pfds_map_cont.html. 5.From Section 6.61-Sediment Basin of the NCDEQ Erosion and Sediment Control Planning and Design Manual. 6.Basin is required to be dewatered by the skimmer in 48 to 120 hours.The optimal dewatering time is 72 hours(see note 5). 7.Skimmer orifice equatic I D= V Qa/(2370*V H) (inches) (see note 5) 8.Actual skimmer orifice diameter is rounded to the nearest 1/4 inch. 9.Riser cross-sectional area is required to be more than 1.5 times the barrel cross-sectional area. 10.Use 0.025 for CMP and 0.013 for RCP. 11.3.1 for corrugated metal pipe risers per Section 8.07-Sediment Basin Design of the NCDEQ Erosion and Sediment Control Planning and Design Manual. 12.0.6 for corrugated mortal nine ricers per Section 8.07-Sediment Basin Design of the NCDEQ Erosion and Sediment Control Planning and Design Manual. 13.Weir equation: Q= CLH7 5 (see note 11) 14.Orifice equation: Q=CA(2gH)R5 (see note 12) 15.Pipe Flow equation: 2gh O5 *See Q=a [1+Km+KPL 16.Minimum allowable emergency spillway length is 20 feet(see note 5). 17.2.80 is the maximum allowable coefficient per Section 8.07-Sediment Basin Design of the NCDEQ Erosion and Sediment Control Planning and Design Manual. 18.Weight of water displaced by riser and exposed outlet pipe. 19.Minimum safety factor is 1.1 per Section 8.07-Sediment Basin Design of the NCDEQ Erosion and Sediment Control Planning and Design Manual. Page 10 of 44 RISER SEDIMENT BASIN CALCULATIONS Lithium Hydroxide Conversion Plant HDR PROJECT NO.: 10302238 DATE: 08.27.2021 BY: AKL REVISED: 12.03.2021 RVW: VH Riser Sediment Basin: SB-206 Drainage Area Characteristics Required Storage Volume Total drainage area(TDA)1 5.50 ac 10 Yr Peak Flow(Q10) 23.96 cfs Disturbed area(DA) 5.50 ac 25 Yr Peak Flow(Q25) 26.99 cfs Rational Coefficient(C)2 0.60 Req'd Min.Surface Area (435 sf per cfs of Q25)5 11,742 sf Time of Concentration(TC)3 5.0 min Req'd Min.Storage Volume (1800 cf per ac of TDA)5 9,900 cf 10 Yr Storm Rainfall Intensity i 4 7.3 in/hr 25 Yr Storm Rainfall Intensity(i)4 8.2 in/hr Design Criteria Basin Size Bottom Elevation 833.00 msl Elev.(msl) Depth(ft) Area(sf) Cumulative Volume(cf) Depth of Storage Volume 1.80 ft 833.00 0.00 11,208 0 Depth of Flow over Riser(1 ft min)5 1.00 ft 834.00 1.00 12,924 12,056 Depth of Flow over Emergency Spillway 0.20 ft 835.00 2.00 14,717 25,867 25 Yr Storm Freeboard(1 ft req'd)5 1.00 ft 836.00 3.00 16,560 41,496 837.00 4.00 18,449 58,992 Basin Configuration Bottom Elevation 833.00 msl Sediment Storage Elevation 834.80 msl Riser Crest 834.80 msl Emergency Spillway Crest 835.80 msl Top of Berm 837.00 msl Skimmer Outlet Basin Size Check Desired Skimmer Drawdown Time(td)6 72 hrs Basin Surface Area Provided at Spillway Crest 14,358 sf Desired Skimmer Drawdown Rate(Qd) 3,300 ft3/day Basin Storage Volume Provided Below Spillway Crest 22,964 cf Skimmer Size 6.0 in Head on Orifice(H)5 0.417 ft Calculated Orifice Diameter' 1.487 in Actual Orifice Diameter' 1.500 in Actual Skimmer Drawdown Time' 71 hrs Barrel Riser Diameter(15 in min)5 60 in Riser Flow as Weir13 48.69 cfs Barrel Diameter' 36 in Riser Flow as Orifice14 94.54 cfs Barrel Invert Elevation 831.00 msl Barrel Length 50.00 ft Barrel Flow as Orifice14 61.83 cfs Barrel Manning's N10 0.025 Barrel Flow as Pipe15 56.41 cfs Sharp Crested Weir Coefficient(C)11 3.1 Orifice Coefficient(C)12 0.6 Controlling Flow through Riser and Barrel Spillway 48.69 cfs Spillway Minimum Allowable Spillway Length16 20 ft Difference b/n 25 Yr Peak Flow and Riser/Barrel Flow -21.70 cfs Broad Crested Weir Coefficient(C)17 2.80 Ell Design Spillway Length13 20 ft Concrete Length of Exposed Outlet Pipe 10 ft Buoyancy18 6616 Ibs Concrete Anchor Width 7.0 ft Weight of Concrete Anchor 10658 Ibs Concrete Anchor Length 7.0 ft Concrete Anchor Thickness 1.50 ft Safety Factor19 1.6 Notes 1.See attached drainage area map. 2.Entire area is denuded.Conservative rational coefficient for smooth bare packed soil is 0.60. Page 11 of 44 RISER SEDIMENT BASIN CALCULATIONS Lithium Hydroxide Conversion Plant HDR PROJECT NO.: 10302238 DATE: 08.27.2021 BY: AKL REVISED: 12.03.2021 RVW: VH 3.Time of concentration was assumed to be the minimum of 5 minutes. 4.Rainfall intensity at project location was acquired from the NOAA website,hftp://hdsc.nws.noaa.gov/hdsc/pfds/pfds_map_cont.html. 5.From Section 6.61-Sediment Basin of the NCDEQ Erosion and Sediment Control Planning and Design Manual. 6.Basin is required to be dewatered by the skimmer in 48 to 120 hours.The optimal dewatering time is 72 hours(see note 5). 7.Skimmer orifice equatic I D= V Qa/(2370*V H) (inches) (see note 5) 8.Actual skimmer orifice diameter is rounded to the nearest 1/4 inch. 9.Riser cross-sectional area is required to be more than 1.5 times the barrel cross-sectional area. 10.Use 0.025 for CMP and 0.013 for RCP. 11.3.1 for corrugated metal pipe risers per Section 8.07-Sediment Basin Design of the NCDEQ Erosion and Sediment Control Planning and Design Manual. 12.0.6 for corrugated mortal nine ricers per Section 8.07-Sediment Basin Design of the NCDEQ Erosion and Sediment Control Planning and Design Manual. 13.Weir equation: Q= CLH7 5 (see note 11) 14.Orifice equation: Q=CA(2gH)R5 (see note 12) 15.Pipe Flow equation: 2gh O5 *See Q=a [1+Km+KPL 16.Minimum allowable emergency spillway length is 20 feet(see note 5). 17.2.80 is the maximum allowable coefficient per Section 8.07-Sediment Basin Design of the NCDEQ Erosion and Sediment Control Planning and Design Manual. 18.Weight of water displaced by riser and exposed outlet pipe. 19.Minimum safety factor is 1.1 per Section 8.07-Sediment Basin Design of the NCDEQ Erosion and Sediment Control Planning and Design Manual. Page 12 of 44 RISER SEDIMENT BASIN CALCULATIONS Lithium Hydroxide Conversion Plant HDR PROJECT NO.: 10302238 DATE: 08.27.2021 BY: AKL REVISED: 12.03.2021 RVW: VH Riser Sediment Basin: SB-207 Drainage Area Characteristics Required Storage Volume Total drainage area(TDA)1 5.79 ac 10 Yr Peak Flow(Q10) 25.22 cfs Disturbed area(DA) 5.79 ac 25 Yr Peak Flow(Q25) 28.42 cfs Rational Coefficient(C)2 0.60 Req'd Min.Surface Area (435 sf per cfs of Q25)5 12,362 sf Time of Concentration(TC)3 5.0 min Req'd Min.Storage Volume (1800 cf per ac of TDA)5 10,422 cf 10 Yr Storm Rainfall Intensity(i)4 7.3 in/hr 25 Yr Storm Rainfall Intensity(i)4 8.2 in/hr Design Criteria Basin Size Bottom Elevation 843.00 msl Elev.(msl) Depth(ft) Area(sf) Cumulative Volume(cf) Depth of Storage Volume 2.50 ft 843.00 0.00 10,116 0 Depth of Flow over Riser(1 ft min)5 1.00 ft 844.00 1.00 11,727 10,912 Depth of Flow over Emergency Spillway 0.50 ft 845.00 2.00 13,395 23,463 25 Yr Storm Freeboard(1 ft req'd)5 1.00 ft 846.00 3.00 15,119 37,712 847.00 4.00 16,900 53,713 Basin Configuration 848.00 5.00 18,737 71,523 Bottom Elevation 843.00 msl Sediment Storage Elevation 845.50 msl Riser Crest 845.50 msl Emergency Spillway Crest 846.50 msl Top of Berm 848.00 msl Skimmer Outlet Basin Size Check Desired Skimmer Drawdown Time(td)6 72 hrs Basin Surface Area Provided at Spillway Crest 14,257 sf Desired Skimmer Drawdown Rate(Qd) 3,474 ft3/day Basin Storage Volume Provided Below Spillway Crest 30,375 cf Skimmer Size 8.0 in Head on Orifice(H)5 0.500 ft Calculated Orifice Diameter' 1.458 in Actual Orifice Diameter' 1.500 in Actual Skimmer Drawdown Time' 68 hrs Barrel Riser Diameter(15 in min)5 48 in Riser Flow as Weir13 38.96 cfs Barrel Diameter' 24 in Riser Flow as Orifice14 60.51 cfs Barrel Invert Elevation 841.00 msl Barrel Length 50.00 ft Barrel Flow as Orifice14 32.09 cfs Barrel Manning's N10 0.025 Barrel Flow as Pipe15 25.80 cfs Sharp Crested Weir Coefficient(C)11 3.1 Orifice Coefficient(C)12 0.6 Controlling Flow through Riser and Barrel Spillway 25.80 cfs Spillway Minimum Allowable Spillway Length16 20 ft Difference b/n 25 Yr Peak Flow and Riser/Barrel Flow 2.62 cfs Broad Crested Weir Coefficient(C)17 2.80 Ell Design Spillway Length" 20 ft Concrete Length of Exposed Outlet Pipe 10 ft Buoyancy18 3921 Ibs Concrete Anchor Width 5.0 ft Weight of Concrete Anchor 5438 Ibs Concrete Anchor Length 5.0 ft Concrete Anchor Thickness 1.50 ft Safety Factor19 1.4 Notes 1.See attached drainage area map. 2.Entire area is denuded.Conservative rational coefficient for smooth bare packed soil is 0.60. Page 13 of 44 RISER SEDIMENT BASIN CALCULATIONS Lithium Hydroxide Conversion Plant HDR PROJECT NO.: 10302238 DATE: 08.27.2021 BY: AKL REVISED: 12.03.2021 RVW: VH 3.Time of concentration was assumed to be the minimum of 5 minutes. 4.Rainfall intensity at project location was acquired from the NOAA website,hftp://hdsc.nws.noaa.gov/hdsc/pfds/pfds_map_cont.html. 5.From Section 6.61-Sediment Basin of the NCDEQ Erosion and Sediment Control Planning and Design Manual. 6.Basin is required to be dewatered by the skimmer in 48 to 120 hours.The optimal dewatering time is 72 hours(see note 5). 7.Skimmer orifice equatic I D= V Qa/(2370*V H) (inches) (see note 5) 8.Actual skimmer orifice diameter is rounded to the nearest 1/4 inch. 9.Riser cross-sectional area is required to be more than 1.5 times the barrel cross-sectional area. 10.Use 0.025 for CMP and 0.013 for RCP. 11.3.1 for corrugated metal pipe risers per Section 8.07-Sediment Basin Design of the NCDEQ Erosion and Sediment Control Planning and Design Manual. 12.0.6 for corrugated mortal nine ricers per Section 8.07-Sediment Basin Design of the NCDEQ Erosion and Sediment Control Planning and Design Manual. 13.Weir equation: Q= CLH7 5 (see note 11) 14.Orifice equation: Q=CA(2gH)R5 (see note 12) 15.Pipe Flow equation: 2gh O5 *See Q=a [1+Km+KPL 16.Minimum allowable emergency spillway length is 20 feet(see note 5). 17.2.80 is the maximum allowable coefficient per Section 8.07-Sediment Basin Design of the NCDEQ Erosion and Sediment Control Planning and Design Manual. 18.Weight of water displaced by riser and exposed outlet pipe. 19.Minimum safety factor is 1.1 per Section 8.07-Sediment Basin Design of the NCDEQ Erosion and Sediment Control Planning and Design Manual. Page 14 of 44 RISER SEDIMENT BASIN CALCULATIONS Lithium Hydroxide Conversion Plant HDR PROJECT NO.: 10302238 DATE: 08.27.2021 BY: AKL REVISED: 12.03.2021 RVW: VH Riser Sediment Basin: Drainage Area Characteristics Required Storage Volume Total drainage area(TDA)1 5.65 ac 10 Yr Peak Flow(Q10) 24.61 cfs Disturbed area(DA) 5.50 ac 25 Yr Peak Flow(Q25) 27.73 cfs Rational Coefficient(C)2 0.60 Req'd Min.Surface Area (435 sf per cfs of Q25)5 12,063 sf Time of Concentration(TC)3 5.0 min Req'd Min.Storage Volume (1800 cf per ac of TDA)5 10,170 cf 10 Yr Storm Rainfall Intensity(i)4 7.3 in/hr 25 Yr Storm Rainfall Intensity(i)4 8.2 in/hr Design Criteria Basin Size Bottom Elevation 874.00 msl Elev.(msl) Depth(ft) Area(sf) Cumulative Volume(cf) Depth of Storage Volume 2.50 ft 874.00 0.00 9,393 0 Depth of Flow over Riser(1 ft min)5 1.00 ft 875.00 1.00 11,000 10,186 Depth of Flow over Emergency Spillway 0.50 ft 876.00 2.00 12,665 22,009 25 Yr Storm Freeboard(1 ft req'd)5 1.00 ft 877.00 3.00 14,386 35,525 878.00 4.00 16,162 50,790 Basin Configuration 879.00 5.00 17,996 67,861 Bottom Elevation 874.00 msl Sediment Storage Elevation 876.50 msl Riser Crest 876.50 msl Emergency Spillway Crest 877.50 msl Top of Berm 879.00 msl Skimmer Outlet Basin Size Check Desired Skimmer Drawdown Time(td)6 72 hrs Basin Surface Area Provided at Spillway Crest 13,526 sf Desired Skimmer Drawdown Rate(Qd) 3,390 ft3/day Basin Storage Volume Provided Below Spillway Crest 28,555 cf Skimmer Size 8.0 in Head on Orifice(H)5 0.500 ft Calculated Orifice Diameter' 1.441 in Actual Orifice Diameter' 1.500 in Actual Skimmer Drawdown Time' 66 hrs Barrel Riser Diameter(15 in min)5 72 in Riser Flow as Weir13 58.43 cfs Barrel Diameter' DOUBLE 24 in Riser Flow as Orifice14 136.14 cfs Barrel Invert Elevation 874.00 msl Barrel Length 50.00 ft Barrel Flow as Orifice14 47.83 cfs Barrel Manning's N10 0.025 Barrel Flow as Pipe15 38.46 cfs Sharp Crested Weir Coefficient(C)11 3.1 Orifice Coefficient(C)12 0.6 Controlling Flow through Riser and Barrel Spillway 38.46 cfs Spillway Minimum Allowable Spillway Length16 20 ft Difference b/n 25 Yr Peak Flow and Riser/Barrel Flow -10.73 cfs Broad Crested Weir Coefficient(C)17 2.80 Ell Design Spillway Length" 20 ft Concrete Length of Exposed Outlet Pipe 10 ft Buoyancy18 6371 Ibs Concrete Anchor Width 7.5 ft Weight of Concrete Anchor 8156 Ibs Concrete Anchor Length 7.5 ft Concrete Anchor Thickness 1.00 ft Safety Factor19 1.3 Notes 1.See attached drainage area map. 2.Entire area is denuded.Conservative rational coefficient for smooth bare packed soil is 0.60. Page 15 of 44 RISER SEDIMENT BASIN CALCULATIONS Lithium Hydroxide Conversion Plant HDR PROJECT NO.: 10302238 DATE: 08.27.2021 BY: AKL REVISED: 12.03.2021 RVW: VH 3.Time of concentration was assumed to be the minimum of 5 minutes. 4.Rainfall intensity at project location was acquired from the NOAA website,hftp://hdsc.nws.noaa.gov/hdsc/pfds/pfds_map_cont.html. 5.From Section 6.61-Sediment Basin of the NCDEQ Erosion and Sediment Control Planning and Design Manual. 6.Basin is required to be dewatered by the skimmer in 48 to 120 hours.The optimal dewatering time is 72 hours(see note 5). 7.Skimmer orifice equatic I D= V Qa/(2370*V H) (inches) (see note 5) 8.Actual skimmer orifice diameter is rounded to the nearest 1/4 inch. 9.Riser cross-sectional area is required to be more than 1.5 times the barrel cross-sectional area. 10.Use 0.025 for CMP and 0.013 for RCP. 11.3.1 for corrugated metal pipe risers per Section 8.07-Sediment Basin Design of the NCDEQ Erosion and Sediment Control Planning and Design Manual. 12.0.6 for corrugated mortal nine ricers per Section 8.07-Sediment Basin Design of the NCDEQ Erosion and Sediment Control Planning and Design Manual. 13.Weir equation: Q= CLH7 5 (see note 11) 14.Orifice equation: Q=CA(2gH)R5 (see note 12) 15.Pipe Flow equation: 2gh O5 *See Q=a [1+Km+KPL 16.Minimum allowable emergency spillway length is 20 feet(see note 5). 17.2.80 is the maximum allowable coefficient per Section 8.07-Sediment Basin Design of the NCDEQ Erosion and Sediment Control Planning and Design Manual. 18.Weight of water displaced by riser and exposed outlet pipe. 19.Minimum safety factor is 1.1 per Section 8.07-Sediment Basin Design of the NCDEQ Erosion and Sediment Control Planning and Design Manual. Page 16 of 44 RISER SEDIMENT BASIN CALCULATIONS Lithium Hydroxide Conversion Plant HDR PROJECT NO.: 10302238 DATE: 08.27.2021 BY: AKL REVISED: 12.03.2021 RVW: VH Riser Sediment Basin: SB-209-Phase 1 Drainage Area Characteristics Required Storage Volume Total drainage area(TDA)1 6.40 ac 10 Yr Peak Flow(Q10) 27.88 cfs Disturbed area(DA) 6.40 ac 25 Yr Peak Flow(Q25) 31.41 cfs Rational Coefficient(C)2 0.60 Req'd Min.Surface Area (435 sf per cfs of Q25)5 13,664 sf Time of Concentration(TC)3 5.0 min Req'd Min.Storage Volume (1800 cf per ac of TDA)5 11,520 cf 10 Yr Storm Rainfall Intensity(i)4 7.3 in/hr 25 Yr Storm Rainfall Intensity(i)4 8.2 in/hr Design Criteria Basin Size Bottom Elevation 824.00 msl Elev.(msl) Depth(ft) Area(sf) Cumulative Volume(cf) Depth of Storage Volume 1.50 ft 824.00 0.00 11,576 0 Depth of Flow over Riser(1 ft min)5 1.00 ft 825.00 1.00 13,138 12,349 Depth of Flow over Emergency Spillway 0.50 ft 826.00 2.00 14,757 26,288 25 Yr Storm Freeboard(1 ft req'd)5 1.00 ft 827.00 3.00 16,432 41,875 828.00 4.00 18,164 59,166 Basin Configuration Bottom Elevation 824.00 msl Sediment Storage Elevation 825.50 msl Riser Crest 825.50 msl Emergency Spillway Crest 826.50 msl Top of Berm 828.00 msl Skimmer Outlet Basin Size Check Desired Skimmer Drawdown Time(td)6 72 hrs Basin Surface Area Provided at Spillway Crest 13,948 sf Desired Skimmer Drawdown Rate(Qd) 3,840 ft3/day Basin Storage Volume Provided Below Spillway Crest 19,119 cf Skimmer Size 8.0 in Head on Orifice(H)5 0.500 ft Calculated Orifice Diameter' 1.533 in Actual Orifice Diameter' 1.500 in Actual Skimmer Drawdown Time' 75 hrs Barrel Riser Diameter(15 in min)5 60 in Riser Flow as Weir13 48.69 cfs Barrel Diameter' 30 in Riser Flow as Orifice14 94.54 cfs Barrel Invert Elevation 822.00 msl Barrel Length 50.00 ft Barrel Flow as Orifice14 42.61 cfs Barrel Manning's N10 0.025 Barrel Flow as Pipe15 36.89 cfs Sharp Crested Weir Coefficient(C)11 3.1 Orifice Coefficient(C)12 0.6 Controlling Flow through Riser and Barrel Spillway 36.89 cfs Spillway Minimum Allowable Spillway Length16 20 ft Difference b/n 25 Yr Peak Flow and Riser/Barrel Flow -5.48 cfs Broad Crested Weir Coefficient(C)17 2.80 Ell Design Spillway Length" 20 ft Concrete Length of Exposed Outlet Pipe 10 ft Buoyancy18 4901 Ibs Concrete Anchor Width 7.5 ft Weight of Concrete Anchor 8156 Ibs Concrete Anchor Length 7.5 ft Concrete Anchor Thickness 1.00 ft Safety Factor19 1.7 Notes 1.See attached drainage area map. 2.Entire area is denuded.Conservative rational coefficient for smooth bare packed soil is 0.60. Page 17 of 44 RISER SEDIMENT BASIN CALCULATIONS Lithium Hydroxide Conversion Plant HDR PROJECT NO.: 10302238 DATE: 08.27.2021 BY: AKL REVISED: 12.03.2021 RVW: VH 3.Time of concentration was assumed to be the minimum of 5 minutes. 4.Rainfall intensity at project location was acquired from the NOAA website,hftp://hdsc.nws.noaa.gov/hdsc/pfds/pfds_map_cont.html. 5.From Section 6.61-Sediment Basin of the NCDEQ Erosion and Sediment Control Planning and Design Manual. 6.Basin is required to be dewatered by the skimmer in 48 to 120 hours.The optimal dewatering time is 72 hours(see note 5). 7.Skimmer orifice equatic I D= V Qa/(2370*V H) (inches) (see note 5) 8.Actual skimmer orifice diameter is rounded to the nearest 1/4 inch. 9.Riser cross-sectional area is required to be more than 1.5 times the barrel cross-sectional area. 10.Use 0.025 for CMP and 0.013 for RCP. 11.3.1 for corrugated metal pipe risers per Section 8.07-Sediment Basin Design of the NCDEQ Erosion and Sediment Control Planning and Design Manual. 12.0.6 for corrugated mortal nine ricers per Section 8.07-Sediment Basin Design of the NCDEQ Erosion and Sediment Control Planning and Design Manual. 13.Weir equation: Q= CLH7 5 (see note 11) 14.Orifice equation: Q=CA(2gH)R5 (see note 12) 15.Pipe Flow equation: 2gh O5 *See Q=a [1+Km+KPL 16.Minimum allowable emergency spillway length is 20 feet(see note 5). 17.2.80 is the maximum allowable coefficient per Section 8.07-Sediment Basin Design of the NCDEQ Erosion and Sediment Control Planning and Design Manual. 18.Weight of water displaced by riser and exposed outlet pipe. 19.Minimum safety factor is 1.1 per Section 8.07-Sediment Basin Design of the NCDEQ Erosion and Sediment Control Planning and Design Manual. Page 18 of 44 RISER SEDIMENT BASIN CALCULATIONS Lithium Hydroxide Conversion Plant HDR PROJECT NO.: 10302238 DATE: 08.27.2021 BY: AKL REVISED: 12.03.2021 RVW: VH Riser Sediment Basin: SB-210-Phase 1 Drainage Area Characteristics Required Storage Volume Total drainage area(TDA)1 10.65 ac 10 Yr Peak Flow(Q10) 46.39 cfs Disturbed area(DA) 6.00 ac 25 Yr Peak Flow(Q25) 52.27 cfs Rational Coefficient(C)2 0.60 Req'd Min.Surface Area (435 sf per cfs of Q25)5 22,738 sf Time of Concentration(TC)3 5.0 min Req'd Min.Storage Volume (1800 cf per ac of TDA)5 19,170 cf 10 Yr Storm Rainfall Intensity(i)4 7.3 in/hr 25 Yr Storm Rainfall Intensity(i)4 8.2 in/hr Design Criteria Basin Size Bottom Elevation 880.00 msl Elev.(msl) Depth(ft) Area(sf) Cumulative Volume(cf) Depth of Storage Volume 2.50 ft 880.00 0.00 20,173 0 Depth of Flow over Riser(1 ft min)5 1.00 ft 881.00 1.00 22,098 21,128 Depth of Flow over Emergency Spillway 0.50 ft 882.00 2.00 24,079 44,210 25 Yr Storm Freeboard(1 ft req'd)5 1.00 ft 883.00 3.00 26,116 69,300 884.00 4.00 28,211 96,457 Basin Configuration 885.00 5.00 30,326 125,719 Bottom Elevation 880.00 msl Sediment Storage Elevation 882.50 msl Riser Crest 882.50 msl Emergency Spillway Crest 883.50 msl Top of Berm 885.00 msl Skimmer Outlet Basin Size Check Desired Skimmer Drawdown Time(td)6 72 hrs Basin Surface Area Provided at Spillway Crest 25,098 sf Desired Skimmer Drawdown Rate(Qd) 6,390 ft3/day 113asin Storage Volume Provided Below Spillway Crest 56,503 cf Skimmer Size 8.0 in Head on Orifice(H)5 0.500 ft Calculated Orifice Diameter' 1.978 in Actual Orifice Diameter' 2.000 in Actual Skimmer Drawdown Time' 70 hrs Barrel Riser Diameter(15 in min)5 72 in Riser Flow as Weir13 58.43 cfs Barrel Diameter' DOUBLE 24 in Riser Flow as Orifice14 136.14 cfs Barrel Invert Elevation 879.50 msl Barrel Length 30.00 ft Barrel Flow as Orifice14 52.40 cfs Barrel Manning's N10 0.025 Barrel Flow as Pipe15 47.52 cfs Sharp Crested Weir Coefficient(C)11 3.1 Orifice Coefficient(C)12 0.6 Controlling Flow through Riser and Barrel Spillway 47.52 cfs Spillway Minimum Allowable Spillway Length16 20 ft Difference b/n 25 Yr Peak Flow and Riser/Barrel Flow 4.75 cfs Broad Crested Weir Coefficient(C)17 2.80 Ell Design Spillway Length13 20 ft Concrete Length of Exposed Outlet Pipe 10 ft Buoyancy18 6371 Ibs Concrete Anchor Width 7.0 ft Weight of Concrete Anchor 10658 Ibs Concrete Anchor Length 7.0 ft Concrete Anchor Thickness 1.50 ft Safety Factor19 1.7 Notes 1.See attached drainage area map. 2.Entire area is denuded.Conservative rational coefficient for smooth bare packed soil is 0.60. Page 19 of 44 RISER SEDIMENT BASIN CALCULATIONS Lithium Hydroxide Conversion Plant HDR PROJECT NO.: 10302238 DATE: 08.27.2021 BY: AKL REVISED: 12.03.2021 RVW: VH 3.Time of concentration was assumed to be the minimum of 5 minutes. 4.Rainfall intensity at project location was acquired from the NOAA website,hftp://hdsc.nws.noaa.gov/hdsc/pfds/pfds_map_cont.html. 5.From Section 6.61-Sediment Basin of the NCDEQ Erosion and Sediment Control Planning and Design Manual. 6.Basin is required to be dewatered by the skimmer in 48 to 120 hours.The optimal dewatering time is 72 hours(see note 5). 7.Skimmer orifice equatic I D= V Qa/(2370*V H) (inches) (see note 5) 8.Actual skimmer orifice diameter is rounded to the nearest 1/4 inch. 9.Riser cross-sectional area is required to be more than 1.5 times the barrel cross-sectional area. 10.Use 0.025 for CMP and 0.013 for RCP. 11.3.1 for corrugated metal pipe risers per Section 8.07-Sediment Basin Design of the NCDEQ Erosion and Sediment Control Planning and Design Manual. 12.0.6 for corrugated mortal nine ricers per Section 8.07-Sediment Basin Design of the NCDEQ Erosion and Sediment Control Planning and Design Manual. 13.Weir equation: Q= CLH7 5 (see note 11) 14.Orifice equation: Q=CA(2gH)R5 (see note 12) 15.Pipe Flow equation: 2gh O5 *See Q=a [1+Km+KPL 16.Minimum allowable emergency spillway length is 20 feet(see note 5). 17.2.80 is the maximum allowable coefficient per Section 8.07-Sediment Basin Design of the NCDEQ Erosion and Sediment Control Planning and Design Manual. 18.Weight of water displaced by riser and exposed outlet pipe. 19.Minimum safety factor is 1.1 per Section 8.07-Sediment Basin Design of the NCDEQ Erosion and Sediment Control Planning and Design Manual. Page 20 of 44 PLC Lithium Hydroxide Conversion Plant ��� Appendices Appendix H — Sediment Trap Calculations SEDIMENT TRAP CALCULATIONS Lithium Hydroxide Conversion Plant HDR PROJECT NO.: 10302238 DATE: 08.27.2021 BY: AKL REVISED: 12.03.2021 RVW: VH Sediment Trap: ST-222 Drainage Area Characteristics Required Storage Volume Total drainage area(TDA)' 0.50 ac 10 Yr Peak Flow(Q10) 2.18 cfs Disturbed area(DA) 0.50 ac 25 Yr Peak Flow(Q25) 2.45 cfs Rational Coefficient(C)2 0.60 Req'd Min.Surface Area (435 sf per cfs of Q25)5 1,067 sf Time of Concentration(TC)3 5.0 min Req'd Min.Storage Volume (3600 cf per ac of TDA)5 1,800 cf 10 Yr Storm Rainfall Intensity(1)4 7.3 in/hr 25 Yr Storm Rainfall Intensity(i)° 8.2 in/hr Design Criteria Basin Size Bottom Elevation 891.00 msl Elev.(msl) Depth(ft) Area(sf) Cumulative Volume(cf) Depth of Storage Volume 2.00 ft 891.00 0.00 852 0 892.00 1.00 1,091 969 893.00 2.00 1,355 2,190 894.00 3.00 1,645 3,687 895.00 4.00 1,960 5,488 Basin Configuration Bottom Elevation 891.00 msl Sediment Storage Elevation 893.00 msl Emergency Spillway Crest 894.00 msl Top of Berm 895.50 msl Spillway Length Basin Size Check Drainage Area Length of Spillway Basin Surface Area Provided at Spillway Crest 1,355 sf 1 4 Basin Storage Volume Provided Below Spillway Crest 2,190 cf 2 6 3 8 4 10 5 12 Notes 1.See attached drainage area map. 2.Entire area is denuded.Conservative rational coefficient for smooth bare packed soil is 0.60. 3.Time of concentration was assumed to be the minimum of 5 minutes. 4.Rainfall intensity at project location was acquired from the NOAA website,http://hdsc.nws.noaa.gov/hdsc/pfds/pfds_map_cont.html. 5.From Section 6.60-Sediment Trap of the NCDEQ Erosion and Sediment Control Planning and Design Manual. 6.Basin is required to be dewatered by the skimmer in 48 to 120 hours.The optimal dewatering time is 72 hours(see note 5). 13.Weir equation: 0= CLH'5 Page 21 of 44 SEDIMENT TRAP CALCULATIONS Lithium Hydroxide Conversion Plant HDR PROJECT NO.: 10302238 DATE: 08.27.2021 BY: AKL REVISED: 12.03.2021 RVW: VH Sediment Trap: ST-223 Drainage Area Characteristics Required Storage Volume Total drainage area(TDA)' 0.40 ac 10 Yr Peak Flow(Q10) 1.74 cfs Disturbed area(DA) 0.40 ac 25 Yr Peak Flow(Q25) 1.96 cfs Rational Coefficient(C)2 0.60 Req'd Min.Surface Area (435 sf per cfs of Q25)5 854 sf Time of Concentration(TC)3 5.0 min Req'd Min.Storage Volume (3600 cf per ac of TDA)5 1,440 cf 10 Yr Storm Rainfall Intensity(1)4 7.3 in/hr 25 Yr Storm Rainfall Intensity(i)° 8.2 in/hr Design Criteria Basin Size Bottom Elevation 883.00 msl Elev.(msl) Depth(ft) Area(sf) Cumulative Volume(cf) Depth of Storage Volume 2.00 ft 883.00 0.00 642 0 884.00 1.00 853 745 885.00 2.00 1,088 1,713 886.00 3.00 1,349 2,929 887.00 4.00 1,635 4,419 Basin Configuration Bottom Elevation 883.00 msl Sediment Storage Elevation 885.00 msl Emergency Spillway Crest 886.00 msl Top of Berm 887.50 msl Spillway Length Basin Size Check Drainage Area Length of Spillway Basin Surface Area Provided at Spillway Crest 1,088 sf 1 4 Basin Storage Volume Provided Below Spillway Crest 1,713 cf 2 6 3 8 4 10 5 12 Notes 1.See attached drainage area map. 2.Entire area is denuded.Conservative rational coefficient for smooth bare packed soil is 0.60. 3.Time of concentration was assumed to be the minimum of 5 minutes. 4.Rainfall intensity at project location was acquired from the NOAA website,http://hdsc.nws.noaa.gov/hdsc/pfds/pfds_map_cont.html. 5.From Section 6.60-Sediment Trap of the NCDEQ Erosion and Sediment Control Planning and Design Manual. 6.Basin is required to be dewatered by the skimmer in 48 to 120 hours.The optimal dewatering time is 72 hours(see note 5). 13.Weir equation: 0= CLH'5 Page 22 of 44 SEDIMENT TRAP CALCULATIONS Lithium Hydroxide Conversion Plant HDR PROJECT NO.: 10302238 DATE: 08.27.2021 BY: AKL REVISED: 12.03.2021 RVW: VH Sediment Trap: ST-224-Phase 2 Drainage Area Characteristics Required Storage Volume Total drainage area(TDA)' 1.55 ac 10 Yr Peak Flow(Q10) 6.75 cfs Disturbed area(DA) 0.65 ac 25 Yr Peak Flow(Q25) 7.61 cfs Rational Coefficient(C)2 0.60 Req'd Min.Surface Area (435 sf per cfs of Q25)5 3,309 sf Time of Concentration(TC)3 5.0 min Req'd Min.Storage Volume (3600 cf per ac of TDA)5 5,580 cf 10 Yr Storm Rainfall Intensity(1)4 7.3 in/hr 25 Yr Storm Rainfall Intensity(i)° 8.2 in/hr Design Criteria Basin Size Bottom Elevation 878.00 msl Elev.(msl) Depth(ft) Area(sf) Cumulative Volume(cf) Depth of Storage Volume 2.00 ft 878.00 0.00 2,203 0 879.00 1.00 2,800 2,496 880.00 2.00 3,405 5,593 881.00 3.00 4,090 9,335 882.00 4.00 4,832 13,791 Basin Configuration Bottom Elevation 878.00 msl Sediment Storage Elevation 880.00 msl Emergency Spillway Crest 881.00 msl Top of Berm 882.50 msl Spillway Length Basin Size Check Drainage Area Length of Spillway Basin Surface Area Provided at Spillway Crest 3,405 sf 1 4 Basin Storage Volume Provided Below Spillway Crest 5,593 cf 2 6 3 8 4 10 5 12 Notes 1.See attached drainage area map. 2.Entire area is denuded.Conservative rational coefficient for smooth bare packed soil is 0.60. 3.Time of concentration was assumed to be the minimum of 5 minutes. 4.Rainfall intensity at project location was acquired from the NOAA website,http://hdsc.nws.noaa.gov/hdsc/pfds/pfds_map_cont.html. 5.From Section 6.60-Sediment Trap of the NCDEQ Erosion and Sediment Control Planning and Design Manual. 6.Basin is required to be dewatered by the skimmer in 48 to 120 hours.The optimal dewatering time is 72 hours(see note 5). 13.Weir equation: 0= CLH'5 Page 23 of 44 SEDIMENT TRAP CALCULATIONS Lithium Hydroxide Conversion Plant HDR PROJECT NO.: 10302238 DATE: 08.27.2021 BY: AKL REVISED: 12.03.2021 RVW: VH Sediment Trap: ST-225-Phase 1 Drainage Area Characteristics Required Storage Volume Total drainage area(TDA)' 2.58 ac 10 Yr Peak Flow(Q10) 11.24 cfs Disturbed area(DA) 2.58 ac 25 Yr Peak Flow(Q25) 12.66 cfs Rational Coefficient(C)2 0.60 Req'd Min.Surface Area (435 sf per cfs of Q25)5 5,508 sf Time of Concentration(TC)3 5.0 min Req'd Min.Storage Volume (3600 cf per ac of TDA)5 9,288 cf 10 Yr Storm Rainfall Intensity(1)4 7.3 in/hr 25 Yr Storm Rainfall Intensity(i)° 8.2 in/hr Design Criteria Basin Size Bottom Elevation 874.00 msl Elev.(msl) Depth(ft) Area(sf) Cumulative Volume(cf) Depth of Storage Volume 2.00 ft 874.00 0.00 4,724 0 875.00 1.00 5,322 5,020 876.00 2.00 6,071 10,712 877.00 3.00 6,611 17,052 878.00 4.00 7,302 24,005 Basin Configuration Bottom Elevation 874.00 msl Sediment Storage Elevation 876.00 msl Emergency Spillway Crest 877.00 msl Top of Berm 878.50 msl Spillway Length Basin Size Check Drainage Area Length of Spillway Basin Surface Area Provided at Spillway Crest 6,071 sf 1 4 Basin Storage Volume Provided Below Spillway Crest 10,712 cf 2 6 3 8 4 10 5 12 Notes 1.See attached drainage area map. 2.Entire area is denuded.Conservative rational coefficient for smooth bare packed soil is 0.60. 3.Time of concentration was assumed to be the minimum of 5 minutes. 4.Rainfall intensity at project location was acquired from the NOAA website,http://hdsc.nws.noaa.gov/hdsc/pfds/pfds_map_cont.html. 5.From Section 6.60-Sediment Trap of the NCDEQ Erosion and Sediment Control Planning and Design Manual. 6.Basin is required to be dewatered by the skimmer in 48 to 120 hours.The optimal dewatering time is 72 hours(see note 5). 13.Weir equation: 0= CLH'5 Page 24 of 44 SEDIMENT TRAP CALCULATIONS Lithium Hydroxide Conversion Plant HDR PROJECT NO.: 10302238 DATE: 08.27.2021 BY: AKL REVISED: 12.03.2021 RVW: VH Sediment Trap: ST-225-Phase 2 Drainage Area Characteristics Required Storage Volume Total drainage area(TDA)' 1.66 ac 10 Yr Peak Flow(Q10) 7.23 cfs Disturbed area(DA) 1.66 ac 25 Yr Peak Flow(Q25) 8.15 cfs Rational Coefficient(C)2 0.60 Req'd Min.Surface Area (435 sf per cfs of Q25)5 3,544 sf Time of Concentration(TC)3 5.0 min Req'd Min.Storage Volume (3600 cf per ac of TDA)5 5,976 cf 10 Yr Storm Rainfall Intensity(1)4 7.3 in/hr 25 Yr Storm Rainfall Intensity(i)° 8.2 in/hr Design Criteria Basin Size Bottom Elevation 878.00 msl Elev.(msl) Depth(ft) Area(sf) Cumulative Volume(cf) Depth of Storage Volume 2.00 ft 878.00 0.00 2,483 0 879.00 1.00 3,083 2,778 880.00 2.00 3,740 6,184 881.00 3.00 4,454 10,276 882.00 4.00 5,224 15,110 Basin Configuration Bottom Elevation 878.00 msl Sediment Storage Elevation 880.00 msl Emergency Spillway Crest 881.00 msl Top of Berm 882.50 msl Spillway Length Basin Size Check Drainage Area Length of Spillway Basin Surface Area Provided at Spillway Crest 3,740 sf 1 4 Basin Storage Volume Provided Below Spillway Crest 6,184 cf 2 6 3 8 4 10 5 12 Notes 1.See attached drainage area map. 2.Entire area is denuded.Conservative rational coefficient for smooth bare packed soil is 0.60. 3.Time of concentration was assumed to be the minimum of 5 minutes. 4.Rainfall intensity at project location was acquired from the NOAA website,http://hdsc.nws.noaa.gov/hdsc/pfds/pfds_map_cont.html. 5.From Section 6.60-Sediment Trap of the NCDEQ Erosion and Sediment Control Planning and Design Manual. 6.Basin is required to be dewatered by the skimmer in 48 to 120 hours.The optimal dewatering time is 72 hours(see note 5). 13.Weir equation: 0= CLH'5 Page 25 of 44 SEDIMENT TRAP CALCULATIONS Lithium Hydroxide Conversion Plant HDR PROJECT NO.: 10302238 DATE: 08.27.2021 BY: AKL REVISED: 12.03.2021 RVW: VH Sediment Trap: ST-226-Phase 2 Drainage Area Characteristics Required Storage Volume Total drainage area(TDA)' 1.50 ac 10 Yr Peak Flow(Q10) 6.53 cfs Disturbed area(DA) 1.50 ac 25 Yr Peak Flow(Q25) 7.36 cfs Rational Coefficient(C)2 0.60 Req'd Min.Surface Area (435 sf per cfs of Q25)5 3,202 sf Time of Concentration(TC)3 5.0 min Req'd Min.Storage Volume (3600 cf per ac of TDA)5 5,400 cf 10 Yr Storm Rainfall Intensity(1)4 7.3 in/hr 25 Yr Storm Rainfall Intensity(i)° 8.2 in/hr Design Criteria Basin Size Bottom Elevation 836.00 msl Elev.(msl) Depth(ft) Area(sf) Cumulative Volume(cf) Depth of Storage Volume 2.00 ft 836.00 0.00 2,483 0 837.00 1.00 2,877 2,678 838.00 2.00 3,296 5,762 839.00 3.00 3,740 9,277 840.00 4.00 4,210 13,250 Basin Configuration Bottom Elevation 836.00 msl Sediment Storage Elevation 838.00 msl Emergency Spillway Crest 839.00 msl Top of Berm 840.50 msl Spillway Length Basin Size Check Drainage Area Length of Spillway Basin Surface Area Provided at Spillway Crest 3,296 sf 1 4 Basin Storage Volume Provided Below Spillway Crest 5,762 cf 2 6 3 8 4 10 5 12 Notes 1.See attached drainage area map. 2.Entire area is denuded.Conservative rational coefficient for smooth bare packed soil is 0.60. 3.Time of concentration was assumed to be the minimum of 5 minutes. 4.Rainfall intensity at project location was acquired from the NOAA website,http://hdsc.nws.noaa.gov/hdsc/pfds/pfds_map_cont.html. 5.From Section 6.60-Sediment Trap of the NCDEQ Erosion and Sediment Control Planning and Design Manual. 6.Basin is required to be dewatered by the skimmer in 48 to 120 hours.The optimal dewatering time is 72 hours(see note 5). 13.Weir equation: 0= CLH'5 Page 26 of 44 SEDIMENT TRAP CALCULATIONS Lithium Hydroxide Conversion Plant HDR PROJECT NO.: 10302238 DATE: 08.27.2021 BY: AKL REVISED: 12.03.2021 RVW: VH Sediment Trap: ST-227 Drainage Area Characteristics Required Storage Volume Total drainage area(TDA)' 0.70 ac 10 Yr Peak Flow(Q10) 3.05 cfs Disturbed area(DA) 0.70 ac 25 Yr Peak Flow(Q25) 3.44 cfs Rational Coefficient(C)2 0.60 Req'd Min.Surface Area (435 sf per cfs of Q25)5 1,494 sf Time of Concentration(TC)3 5.0 min Req'd Min.Storage Volume (3600 cf per ac of TDA)5 2,520 cf 10 Yr Storm Rainfall Intensity(1)4 7.3 in/hr 25 Yr Storm Rainfall Intensity(i)° 8.2 in/hr Design Criteria Basin Size Bottom Elevation 876.00 msl Elev.(msl) Depth(ft) Area(sf) Cumulative Volume(cf) Depth of Storage Volume 2.00 ft 876.00 0.00 1,081 0 877.00 1.00 1,348 1,212 878.00 2.00 1,640 2,704 879.00 3.00 1,957 4,500 880.00 4.00 2,300 6,626 Basin Configuration Bottom Elevation 876.00 msl Sediment Storage Elevation 878.00 msl Emergency Spillway Crest 879.00 msl Top of Berm 880.50 msl Spillway Length Basin Size Check Drainage Area Length of Spillway Basin Surface Area Provided at Spillway Crest 1,640 sf 1 4 Basin Storage Volume Provided Below Spillway Crest 2,704 cf 2 6 3 8 4 10 5 12 Notes 1.See attached drainage area map. 2.Entire area is denuded.Conservative rational coefficient for smooth bare packed soil is 0.60. 3.Time of concentration was assumed to be the minimum of 5 minutes. 4.Rainfall intensity at project location was acquired from the NOAA website,http://hdsc.nws.noaa.gov/hdsc/pfds/pfds_map_cont.html. 5.From Section 6.60-Sediment Trap of the NCDEQ Erosion and Sediment Control Planning and Design Manual. 6.Basin is required to be dewatered by the skimmer in 48 to 120 hours.The optimal dewatering time is 72 hours(see note 5). 13.Weir equation: 0= CLH'5 Page 27 of 44 SEDIMENT TRAP CALCULATIONS Lithium Hydroxide Conversion Plant HDR PROJECT NO.: 10302238 DATE: 08.27.2021 BY: AKL REVISED: 12.03.2021 RVW: VH Sediment Trap: ST-228 Drainage Area Characteristics Required Storage Volume Total drainage area(TDA)' 0.80 ac 10 Yr Peak Flow(Q10) 3.48 cfs Disturbed area(DA) 0.80 ac 25 Yr Peak Flow(Q25) 3.93 cfs Rational Coefficient(C)2 0.60 Req'd Min.Surface Area (435 sf per cfs of Q25)5 1,708 sf Time of Concentration(TC)3 5.0 min Req'd Min.Storage Volume (3600 cf per ac of TDA)5 2,880 cf 10 Yr Storm Rainfall Intensity(1)4 7.3 in/hr 25 Yr Storm Rainfall Intensity(i)° 8.2 in/hr Design Criteria Basin Size Bottom Elevation 882.00 msl Elev.(msl) Depth(ft) Area(sf) Cumulative Volume(cf) Depth of Storage Volume 2.00 ft 882.00 0.00 1,219 0 883.00 1.00 1,501 1,358 884.00 2.00 1,808 3,010 885.00 3.00 2,141 4,982 886.00 4.00 2,498 7,299 Basin Configuration Bottom Elevation 882.00 msl Sediment Storage Elevation 884.00 msl Emergency Spillway Crest 885.00 msl Top of Berm 886.50 msl Spillway Length Basin Size Check Drainage Area Length of Spillway Basin Surface Area Provided at Spillway Crest 1,808 sf 1 4 Basin Storage Volume Provided Below Spillway Crest 3,010 cf 2 6 3 8 4 10 5 12 Notes 1.See attached drainage area map. 2.Entire area is denuded.Conservative rational coefficient for smooth bare packed soil is 0.60. 3.Time of concentration was assumed to be the minimum of 5 minutes. 4.Rainfall intensity at project location was acquired from the NOAA website,http://hdsc.nws.noaa.gov/hdsc/pfds/pfds_map_cont.html. 5.From Section 6.60-Sediment Trap of the NCDEQ Erosion and Sediment Control Planning and Design Manual. 6.Basin is required to be dewatered by the skimmer in 48 to 120 hours.The optimal dewatering time is 72 hours(see note 5). 13.Weir equation: 0= CLH'5 Page 28 of 44 SEDIMENT TRAP CALCULATIONS Lithium Hydroxide Conversion Plant HDR PROJECT NO.: 10302238 DATE: 08.27.2021 BY: AKL REVISED: 12.03.2021 RVW: VH Sediment Trap: ST-229-Phase 1 Drainage Area Characteristics Required Storage Volume Total drainage area(TDA)' 1.99 ac 10 Yr Peak Flow(Q10) 8.67 cfs Disturbed area(DA) 1.99 ac 25 Yr Peak Flow(Q25) 9.77 cfs Rational Coefficient(C)2 0.60 Req'd Min.Surface Area (435 sf per cfs of Q25)5 4,249 sf Time of Concentration(TC)3 5.0 min Req'd Min.Storage Volume (3600 cf per ac of TDA)5 7,164 cf 10 Yr Storm Rainfall Intensity(1)4 7.3 in/hr 25 Yr Storm Rainfall Intensity(i)° 8.2 in/hr Design Criteria Basin Size Bottom Elevation 874.00 msl Elev.(msl) Depth(ft) Area(sf) Cumulative Volume(cf) Depth of Storage Volume 2.00 ft 874.00 0.00 3,083 0 875.00 1.00 3,740 3,406 876.00 2.00 4,454 7,498 877.00 3.00 5,224 12,332 878.00 4.00 6,051 17,964 Basin Configuration Bottom Elevation 874.00 msl Sediment Storage Elevation 876.00 msl Emergency Spillway Crest 877.00 msl Top of Berm 878.50 msl Spillway Length Basin Size Check Drainage Area Length of Spillway Basin Surface Area Provided at Spillway Crest 4,454 sf 1 4 Basin Storage Volume Provided Below Spillway Crest 7,498 cf 2 6 3 8 4 10 5 12 Notes 1.See attached drainage area map. 2.Entire area is denuded.Conservative rational coefficient for smooth bare packed soil is 0.60. 3.Time of concentration was assumed to be the minimum of 5 minutes. 4.Rainfall intensity at project location was acquired from the NOAA website,http://hdsc.nws.noaa.gov/hdsc/pfds/pfds_map_cont.html. 5.From Section 6.60-Sediment Trap of the NCDEQ Erosion and Sediment Control Planning and Design Manual. 6.Basin is required to be dewatered by the skimmer in 48 to 120 hours.The optimal dewatering time is 72 hours(see note 5). 13.Weir equation: 0= CLH'5 Page 29 of 44 SEDIMENT TRAP CALCULATIONS Lithium Hydroxide Conversion Plant HDR PROJECT NO.: 10302238 DATE: 08.27.2021 BY: AKL REVISED: 12.03.2021 RVW: VH Sediment Trap: ST-229-Phase 2 Drainage Area Characteristics Required Storage Volume Total drainage area(TDA)' 1.50 ac 10 Yr Peak Flow(Q10) 6.53 cfs Disturbed area(DA) 1.50 ac 25 Yr Peak Flow(Q25) 7.36 cfs Rational Coefficient(C)2 0.60 Req'd Min.Surface Area (435 sf per cfs of Q25)5 3,202 sf Time of Concentration(TC)3 5.0 min Req'd Min.Storage Volume (3600 cf per ac of TDA)5 5,400 cf 10 Yr Storm Rainfall Intensity(1)4 7.3 in/hr 25 Yr Storm Rainfall Intensity(i)° 8.2 in/hr Design Criteria Basin Size Bottom Elevation 874.00 msl Elev.(msl) Depth(ft) Area(sf) Cumulative Volume(cf) Depth of Storage Volume 2.00 ft 874.00 0.00 2,483 0 875.00 1.00 2,877 2,678 876.00 2.00 3,296 5,762 877.00 3.00 3,740 9,277 878.00 4.00 4,210 13,250 Basin Configuration Bottom Elevation 874.00 msl Sediment Storage Elevation 876.00 msl Emergency Spillway Crest 877.00 msl Top of Berm 878.50 msl Spillway Length Basin Size Check Drainage Area Length of Spillway Basin Surface Area Provided at Spillway Crest 3,296 sf 1 4 Basin Storage Volume Provided Below Spillway Crest 5,762 cf 2 6 3 8 4 10 5 12 Notes 1.See attached drainage area map. 2.Entire area is denuded.Conservative rational coefficient for smooth bare packed soil is 0.60. 3.Time of concentration was assumed to be the minimum of 5 minutes. 4.Rainfall intensity at project location was acquired from the NOAA website,http://hdsc.nws.noaa.gov/hdsc/pfds/pfds_map_cont.html. 5.From Section 6.60-Sediment Trap of the NCDEQ Erosion and Sediment Control Planning and Design Manual. 6.Basin is required to be dewatered by the skimmer in 48 to 120 hours.The optimal dewatering time is 72 hours(see note 5). 13.Weir equation: 0= CLH'5 Page 30 of 44 SEDIMENT TRAP CALCULATIONS Lithium Hydroxide Conversion Plant HDR PROJECT NO.: 10302238 DATE: 08.27.2021 BY: AKL REVISED: 12.03.2021 RVW: VH Sediment Trap: ST-230 Drainage Area Characteristics Required Storage Volume Total drainage area(TDA)' 2.25 ac 10 Yr Peak Flow(Q10) 9.80 cfs Disturbed area(DA) 2.25 ac 25 Yr Peak Flow(Q25) 11.04 cfs Rational Coefficient(C)2 0.60 Req'd Min.Surface Area (435 sf per cfs of Q25)5 4,804 sf Time of Concentration(TC)3 5.0 min Req'd Min.Storage Volume (3600 cf per ac of TDA)5 8,100 cf 10 Yr Storm Rainfall Intensity(1)4 7.3 in/hr 25 Yr Storm Rainfall Intensity(i)° 8.2 in/hr Design Criteria Basin Size Bottom Elevation 841.00 msl Elev.(msl) Depth(ft) Area(sf) Cumulative Volume(cf) Depth of Storage Volume 2.00 ft 841.00 0.00 3,827 0 842.00 1.00 4,312 4,067 843.00 2.00 4,821 8,631 844.00 3.00 5,356 13,717 845.00 4.00 5,916 19,351 Basin Configuration Bottom Elevation 841.00 msl Sediment Storage Elevation 843.00 msl Emergency Spillway Crest 844.00 msl Top of Berm 845.50 msl Spillway Length Basin Size Check Drainage Area Length of Spillway Basin Surface Area Provided at Spillway Crest 4,821 sf 1 4 Basin Storage Volume Provided Below Spillway Crest 8,631 cf 2 6 3 8 4 10 5 12 Notes 1.See attached drainage area map. 2.Entire area is denuded.Conservative rational coefficient for smooth bare packed soil is 0.60. 3.Time of concentration was assumed to be the minimum of 5 minutes. 4.Rainfall intensity at project location was acquired from the NOAA website,http://hdsc.nws.noaa.gov/hdsc/pfds/pfds_map_cont.html. 5.From Section 6.60-Sediment Trap of the NCDEQ Erosion and Sediment Control Planning and Design Manual. 6.Basin is required to be dewatered by the skimmer in 48 to 120 hours.The optimal dewatering time is 72 hours(see note 5). 13.Weir equation: 0= CLH'5 Page 31 of 44 SEDIMENT TRAP CALCULATIONS Lithium Hydroxide Conversion Plant HDR PROJECT NO.: 10302238 DATE: 08.27.2021 BY: AKL REVISED: 12.03.2021 RVW: VH Sediment Trap: ST-231 Drainage Area Characteristics Required Storage Volume Total drainage area(TDA)' 0.60 ac 10 Yr Peak Flow(Q10) 2.61 cfs Disturbed area(DA) 0.60 ac 25 Yr Peak Flow(Q25) 2.94 cfs Rational Coefficient(C)2 0.60 Req'd Min.Surface Area (435 sf per cfs of Q25)5 1,281 sf Time of Concentration(TC)3 5.0 min Req'd Min.Storage Volume (3600 cf per ac of TDA)5 2,160 cf 10 Yr Storm Rainfall Intensity(1)4 7.3 in/hr 25 Yr Storm Rainfall Intensity(i)° 8.2 in/hr Design Criteria Basin Size Bottom Elevation 819.00 msl Elev.(msl) Depth(ft) Area(sf) Cumulative Volume(cf) Depth of Storage Volume 2.00 ft 819.00 0.00 1,081 0 820.00 1.00 1,348 1,212 821.00 2.00 1,640 2,704 822.00 3.00 1,957 4,500 823.00 4.00 2,300 6,626 Basin Configuration Bottom Elevation 819.00 msl Sediment Storage Elevation 821.00 msl Emergency Spillway Crest 822.00 msl Top of Berm 823.50 msl Spillway Length Basin Size Check Drainage Area Length of Spillway Basin Surface Area Provided at Spillway Crest 1,640 sf 1 4 Basin Storage Volume Provided Below Spillway Crest 2,704 cf 2 6 3 8 4 10 5 12 Notes 1.See attached drainage area map. 2.Entire area is denuded.Conservative rational coefficient for smooth bare packed soil is 0.60. 3.Time of concentration was assumed to be the minimum of 5 minutes. 4.Rainfall intensity at project location was acquired from the NOAA website,http://hdsc.nws.noaa.gov/hdsc/pfds/pfds_map_cont.html. 5.From Section 6.60-Sediment Trap of the NCDEQ Erosion and Sediment Control Planning and Design Manual. 6.Basin is required to be dewatered by the skimmer in 48 to 120 hours.The optimal dewatering time is 72 hours(see note 5). 13.Weir equation: 0= CLH'5 Page 32 of 44 SEDIMENT TRAP CALCULATIONS Lithium Hydroxide Conversion Plant HDR PROJECT NO.: 10302238 DATE: 08.27.2021 BY: AKL REVISED: 12.03.2021 RVW: VH Sediment Trap: ST-232 Drainage Area Characteristics Required Storage Volume Total drainage area(TDA)' 0.80 ac 10 Yr Peak Flow(Q10) 3.48 cfs Disturbed area(DA) 0.80 ac 25 Yr Peak Flow(Q25) 3.93 cfs Rational Coefficient(C)2 0.60 Req'd Min.Surface Area (435 sf per cfs of Q25)5 1,708 sf Time of Concentration(TC)3 5.0 min Req'd Min.Storage Volume (3600 cf per ac of TDA)5 2,880 cf 10 Yr Storm Rainfall Intensity(1)4 7.3 in/hr 25 Yr Storm Rainfall Intensity(i)° 8.2 in/hr Design Criteria Basin Size Bottom Elevation 812.00 msl Elev.(msl) Depth(ft) Area(sf) Cumulative Volume(cf) Depth of Storage Volume 2.00 ft 812.00 0.00 1,219 0 813.00 1.00 1,501 1,358 814.00 2.00 1,808 3,010 815.00 3.00 2,141 4,982 816.00 4.00 2,498 7,299 Basin Configuration Bottom Elevation 812.00 msl Sediment Storage Elevation 814.00 msl Emergency Spillway Crest 815.00 msl Top of Berm 816.50 msl Spillway Length Basin Size Check Drainage Area Length of Spillway Basin Surface Area Provided at Spillway Crest 1,808 sf 1 4 Basin Storage Volume Provided Below Spillway Crest 3,010 cf 2 6 3 8 4 10 5 12 Notes 1.See attached drainage area map. 2.Entire area is denuded.Conservative rational coefficient for smooth bare packed soil is 0.60. 3.Time of concentration was assumed to be the minimum of 5 minutes. 4.Rainfall intensity at project location was acquired from the NOAA website,http://hdsc.nws.noaa.gov/hdsc/pfds/pfds_map_cont.html. 5.From Section 6.60-Sediment Trap of the NCDEQ Erosion and Sediment Control Planning and Design Manual. 6.Basin is required to be dewatered by the skimmer in 48 to 120 hours.The optimal dewatering time is 72 hours(see note 5). 13.Weir equation: 0= CLH'5 Page 33 of 44 SEDIMENT TRAP CALCULATIONS Lithium Hydroxide Conversion Plant HDR PROJECT NO.: 10302238 DATE: 08.27.2021 BY: AKL REVISED: 12.03.2021 RVW: VH Sediment Trap: ST233-Phase 1 Drainage Area Characteristics Required Storage Volume Total drainage area(TDA)' 3.10 ac 10 Yr Peak Flow(Q10) 13.50 cfs Disturbed area(DA) 3.10 ac 25 Yr Peak Flow(Q25) 15.21 cfs Rational Coefficient(C)2 0.60 Req'd Min.Surface Area (435 sf per cfs of Q25)5 6,618 sf Time of Concentration(TC)3 5.0 min Req'd Min.Storage Volume (3600 cf per ac of TDA)5 11,160 cf 10 Yr Storm Rainfall Intensity(i)° 7.3 in/hr 25 Yr Storm Rainfall Intensity(i)° 8.2 in/hr Design Criteria Basin Size Bottom Elevation 840.00 msl Elev.(msl) Depth(ft) Area(sf) Cumulative Volume(cf) Depth of Storage Volume 2.00 ft 840.00 0.00 5,600 0 841.00 1.00 6,300 5,947 842.00 2.00 7,059 12,622 843.00 3.00 7,800 20,049 844.00 4.00 8,660 28,275 Basin Configuration Bottom Elevation 840.00 msl Sediment Storage Elevation 842.00 msl Emergency Spillway Crest 843.00 msl Top of Berm 844.50 msl Spillway Length Basin Size Check Drainage Area Length of Spillway Basin Surface Area Provided at Spillway Crest 7,059 sf 1 4 Basin Storage Volume Provided Below Spillway Crest 12,622 cf 2 6 3 8 4 10 5 12 Notes 1.See attached drainage area map. 2.Entire area is denuded.Conservative rational coefficient for smooth bare packed soil is 0.60. 3.Time of concentration was assumed to be the minimum of 5 minutes. 4.Rainfall intensity at project location was acquired from the NOAA website,http://hdsc.nws.noaa.gov/hdsc/pfds/pfds_map_cont.html. 5.From Section 6.60-Sediment Trap of the NCDEQ Erosion and Sediment Control Planning and Design Manual. 6.Basin is required to be dewatered by the skimmer in 48 to 120 hours.The optimal dewatering time is 72 hours(see note 5). 13.Weir equation: 0= CLH'5 Page 34 of 44 SEDIMENT TRAP CALCULATIONS Lithium Hydroxide Conversion Plant HDR PROJECT NO.: 10302238 DATE: 08.27.2021 BY: AKL REVISED: 12.03.2021 RVW: VH Sediment Trap: ST-233-Phase 2 Drainage Area Characteristics Required Storage Volume Total drainage area(TDA)' 1.15 ac 10 Yr Peak Flow(Q10) 5.01 cfs Disturbed area(DA) 1.15 ac 25 Yr Peak Flow(Q25) 5.64 cfs Rational Coefficient(C)2 0.60 Req'd Min.Surface Area (435 sf per cfs of Q25)5 2,455 sf Time of Concentration(TC)3 5.0 min Req'd Min.Storage Volume (3600 cf per ac of TDA)5 4,140 cf 10 Yr Storm Rainfall Intensity i° 7.3 in/hr 25 Yr Storm Rainfall Intensity(i)° 8.2 in/hr Design Criteria Basin Size Bottom Elevation 840.00 msl Elev.(msl) Depth(ft) Area(sf) Cumulative Volume(cf) Depth of Storage Volume 2.00 ft 840.00 0.00 1,943 0 841.00 1.00 2,294 2,116 842.00 2.00 2,670 4,596 843.00 3.00 3,071 7,464 844.00 4.00 3,497 10,746 Basin Configuration Bottom Elevation 840.00 msl Sediment Storage Elevation 842.00 msl Emergency Spillway Crest 843.00 msl Top of Berm 844.50 msl Spillway Length Basin Size Check Drainage Area Length of Spillway Basin Surface Area Provided at Spillway Crest 2,670 sf 1 4 Basin Storage Volume Provided Below Spillway Crest 4,596 cf 2 6 3 8 4 10 5 12 Notes 1.See attached drainage area map. 2.Entire area is denuded.Conservative rational coefficient for smooth bare packed soil is 0.60. 3.Time of concentration was assumed to be the minimum of 5 minutes. 4.Rainfall intensity at project location was acquired from the NOAA website,http://hdsc.nws.noaa.gov/hdsc/pfds/pfds_map_cont.html. 5.From Section 6.60-Sediment Trap of the NCDEQ Erosion and Sediment Control Planning and Design Manual. 6.Basin is required to be dewatered by the skimmer in 48 to 120 hours.The optimal dewatering time is 72 hours(see note 5). 13.Weir equation: 0= CLH'5 Page 35 of 44 SEDIMENT TRAP CALCULATIONS Lithium Hydroxide Conversion Plant HDR PROJECT NO.: 10302238 DATE: 08.27.2021 BY: AKL REVISED: 12.03.2021 RVW: VH Sediment Trap: ST-234 Drainage Area Characteristics Required Storage Volume Total drainage area(TDA)' 0.50 ac 10 Yr Peak Flow(Q10) 2.18 cfs Disturbed area(DA) 0.50 ac 25 Yr Peak Flow(Q25) 2.45 cfs Rational Coefficient(C)2 0.60 Req'd Min.Surface Area (435 sf per cfs of Q25)5 1,067 sf Time of Concentration(TC)3 5.0 min Req'd Min.Storage Volume (3600 cf per ac of TDA)5 1,800 cf 10 Yr Storm Rainfall Intensity(1)4 7.3 in/hr 25 Yr Storm Rainfall Intensity(i)° 8.2 in/hr Design Criteria Basin Size Bottom Elevation 820.00 msl Elev.(msl) Depth(ft) Area(sf) Cumulative Volume(cf) Depth of Storage Volume 2.00 ft 820.00 0.00 1,081 0 821.00 1.00 1,348 1,212 822.00 2.00 1,640 2,704 823.00 3.00 1,957 4,500 824.00 4.00 2,300 6,626 Basin Configuration Bottom Elevation 820.00 msl Sediment Storage Elevation 822.00 msl Emergency Spillway Crest 823.00 msl Top of Berm 824.50 msl Spillway Length Basin Size Check Drainage Area Length of Spillway Basin Surface Area Provided at Spillway Crest 1,640 sf 1 4 Basin Storage Volume Provided Below Spillway Crest 2,704 cf 2 6 3 8 4 10 5 12 Notes 1.See attached drainage area map. 2.Entire area is denuded.Conservative rational coefficient for smooth bare packed soil is 0.60. 3.Time of concentration was assumed to be the minimum of 5 minutes. 4.Rainfall intensity at project location was acquired from the NOAA website,http://hdsc.nws.noaa.gov/hdsc/pfds/pfds_map_cont.html. 5.From Section 6.60-Sediment Trap of the NCDEQ Erosion and Sediment Control Planning and Design Manual. 6.Basin is required to be dewatered by the skimmer in 48 to 120 hours.The optimal dewatering time is 72 hours(see note 5). 13.Weir equation: 0= CLH'5 Page 36 of 44 SEDIMENT TRAP CALCULATIONS Lithium Hydroxide Conversion Plant HDR PROJECT NO.: 10302238 DATE: 08.27.2021 BY: AKL REVISED: 12.03.2021 RVW: VH Sediment Trap: ST-235 Drainage Area Characteristics Required Storage Volume Total drainage area(TDA)' 0.25 ac 10 Yr Peak Flow(Q10) 1.09 cfs Disturbed area(DA) 0.25 ac 25 Yr Peak Flow(Q25) 1.23 cfs Rational Coefficient(C)2 0.60 Req'd Min.Surface Area (435 sf per cfs of Q25)5 534 sf Time of Concentration(TC)3 5.0 min Req'd Min.Storage Volume (3600 cf per ac of TDA)5 900 cf 10 Yr Storm Rainfall Intensity(i)° 7.3 in/hr 25 Yr Storm Rainfall Intensity(i)° 8.2 in/hr Design Criteria Basin Size Bottom Elevation 820.00 msl Elev.(msl) Depth(ft) Area(sf) Cumulative Volume(cf) Depth of Storage Volume 2.00 ft 820.00 0.00 300 0 821.00 1.00 446 371 822.00 2.00 621 902 823.00 3.00 821 1,620 824.00 4.00 1,046 2,552 Basin Configuration Bottom Elevation 820.00 msl Sediment Storage Elevation 822.00 msl Emergency Spillway Crest 823.00 msl Top of Berm 824.50 msl Spillway Length Basin Size Check Drainage Area Length of Spillway Basin Surface Area Provided at Spillway Crest 621 sf 1 4 Basin Storage Volume Provided Below Spillway Crest 902 cf 2 6 3 8 4 10 5 12 Notes 1.See attached drainage area map. 2.Entire area is denuded.Conservative rational coefficient for smooth bare packed soil is 0.60. 3.Time of concentration was assumed to be the minimum of 5 minutes. 4.Rainfall intensity at project location was acquired from the NOAA website,http://hdsc.nws.noaa.gov/hdsc/pfds/pfds_map_cont.html. 5.From Section 6.60-Sediment Trap of the NCDEQ Erosion and Sediment Control Planning and Design Manual. 6.Basin is required to be dewatered by the skimmer in 48 to 120 hours.The optimal dewatering time is 72 hours(see note 5). 13.Weir equation: 0= CLH'5 Page 37 of 44 SEDIMENT TRAP CALCULATIONS Lithium Hydroxide Conversion Plant HDR PROJECT NO.: 10302238 DATE: 08.27.2021 BY: AKL REVISED: 12.03.2021 RVW: VH Sediment Trap: ST236-Phase 1 Drainage Area Characteristics Required Storage Volume Total drainage area(TDA)' 2.80 ac 10 Yr Peak Flow(Q10) 12.20 cfs Disturbed area(DA) 2.10 ac 25 Yr Peak Flow(Q25) 13.74 cfs Rational Coefficient(C)2 0.60 Req'd Min.Surface Area (435 sf per cfs of Q25)5 5,978 sf Time of Concentration(TC)3 5.0 min Req'd Min.Storage Volume (3600 cf per ac of TDA)5 10,080 cf 10 Yr Storm Rainfall Intensity(i)° 7.3 in/hr 25 Yr Storm Rainfall Intensity(i)° 8.2 in/hr Design Criteria Basin Size Bottom Elevation 877.00 msl Elev.(msl) Depth(ft) Area(sf) Cumulative Volume(cf) Depth of Storage Volume 2.00 ft 877.00 0.00 4,724 0 878.00 1.00 5,322 5,020 879.00 2.00 6,071 10,712 880.00 3.00 6,611 17,052 881.00 4.00 7,302 24,005 Basin Configuration Bottom Elevation 877.00 msl Sediment Storage Elevation 879.00 msl Emergency Spillway Crest 880.00 msl Top of Berm 881.50 msl Spillway Length Basin Size Check Drainage Area Length of Spillway Basin Surface Area Provided at Spillway Crest 6,071 sf 1 4 Basin Storage Volume Provided Below Spillway Crest 10,712 cf 2 6 3 8 4 10 5 12 Notes 1.See attached drainage area map. 2.Entire area is denuded.Conservative rational coefficient for smooth bare packed soil is 0.60. 3.Time of concentration was assumed to be the minimum of 5 minutes. 4.Rainfall intensity at project location was acquired from the NOAA website,http://hdsc.nws.noaa.gov/hdsc/pfds/pfds_map_cont.html. 5.From Section 6.60-Sediment Trap of the NCDEQ Erosion and Sediment Control Planning and Design Manual. 6.Basin is required to be dewatered by the skimmer in 48 to 120 hours.The optimal dewatering time is 72 hours(see note 5). 13.Weir equation: 0= CLH'5 Page 38 of 44 SEDIMENT TRAP CALCULATIONS Lithium Hydroxide Conversion Plant HDR PROJECT NO.: 10302238 DATE: 08.27.2021 BY: AKL REVISED: 12.03.2021 RVW: VH Sediment Trap: ST237-Phase 1 Drainage Area Characteristics Required Storage Volume Total drainage area(TDA)' 1.60 ac 10 Yr Peak Flow(Q10) 6.97 cfs Disturbed area(DA) 1.50 ac 25 Yr Peak Flow(Q25) 7.85 cfs Rational Coefficient(C)2 0.60 Req'd Min.Surface Area (435 sf per cfs of Q25)5 3,416 sf Time of Concentration(TC)3 5.0 min Req'd Min.Storage Volume (3600 cf per ac of TDA)5 5,760 cf 10 Yr Storm Rainfall Intensity(1)4 7.3 in/hr 25 Yr Storm Rainfall Intensity(i)° 8.2 in/hr Design Criteria Basin Size Bottom Elevation 888.00 msl Elev.(msl) Depth(ft) Area(sf) Cumulative Volume(cf) Depth of Storage Volume 2.00 ft 888.00 0.00 3,069 0 889.00 1.00 3,505 3,285 890.00 2.00 3,966 7,018 891.00 3.00 4,453 11,225 892.00 4.00 4,964 15,931 Basin Configuration Bottom Elevation 888.00 msl Sediment Storage Elevation 890.00 msl Emergency Spillway Crest 891.00 msl Top of Berm 892.50 msl Spillway Length Basin Size Check Drainage Area Length of Spillway Basin Surface Area Provided at Spillway Crest 3,966 sf 1 4 Basin Storage Volume Provided Below Spillway Crest 7,018 cf 2 6 3 8 4 10 5 12 Notes 1.See attached drainage area map. 2.Entire area is denuded.Conservative rational coefficient for smooth bare packed soil is 0.60. 3.Time of concentration was assumed to be the minimum of 5 minutes. 4.Rainfall intensity at project location was acquired from the NOAA website,http://hdsc.nws.noaa.gov/hdsc/pfds/pfds_map_cont.html. 5.From Section 6.60-Sediment Trap of the NCDEQ Erosion and Sediment Control Planning and Design Manual. 6.Basin is required to be dewatered by the skimmer in 48 to 120 hours.The optimal dewatering time is 72 hours(see note 5). 13.Weir equation: 0= CLH'5 Page 39 of 44 SEDIMENT TRAP CALCULATIONS Lithium Hydroxide Conversion Plant HDR PROJECT NO.: 10302238 DATE: 08.27.2021 BY: AKL REVISED: 12.03.2021 RVW: VH Sediment Trap: ST238-Phase 1 Drainage Area Characteristics Required Storage Volume Total drainage area(TDA)' 0.50 ac 10 Yr Peak Flow(Q10) 2.18 cfs Disturbed area(DA) 0.50 ac 25 Yr Peak Flow(Q25) 2.45 cfs Rational Coefficient(C)2 0.60 Req'd Min.Surface Area (435 sf per cfs of Q25)5 1,067 sf Time of Concentration(TC)3 5.0 min Req'd Min.Storage Volume (3600 cf per ac of TDA)5 1,800 cf 10 Yr Storm Rainfall Intensity(1)4 7.3 in/hr 25 Yr Storm Rainfall Intensity(i)° 8.2 in/hr Design Criteria Basin Size Bottom Elevation 892.00 msl Elev.(msl) Depth(ft) Area(sf) Cumulative Volume(cf) Depth of Storage Volume 2.00 ft 892.00 0.00 722 0 893.00 1.00 859 790 894.00 2.00 1,224 1,826 895.00 3.00 1,517 3,194 896.00 4.00 1,839 4,869 Basin Configuration Bottom Elevation 892.00 msl Sediment Storage Elevation 894.00 msl Emergency Spillway Crest 895.00 msl Top of Berm 896.50 msl Spillway Length Basin Size Check Drainage Area Length of Spillway Basin Surface Area Provided at Spillway Crest 1,224 sf 1 4 Basin Storage Volume Provided Below Spillway Crest 1,826 cf 2 6 3 8 4 10 5 12 Notes 1.See attached drainage area map. 2.Entire area is denuded.Conservative rational coefficient for smooth bare packed soil is 0.60. 3.Time of concentration was assumed to be the minimum of 5 minutes. 4.Rainfall intensity at project location was acquired from the NOAA website,http://hdsc.nws.noaa.gov/hdsc/pfds/pfds_map_cont.html. 5.From Section 6.60-Sediment Trap of the NCDEQ Erosion and Sediment Control Planning and Design Manual. 6.Basin is required to be dewatered by the skimmer in 48 to 120 hours.The optimal dewatering time is 72 hours(see note 5). 13.Weir equation: 0= CLH'5 Page 40 of 44 SEDIMENT TRAP CALCULATIONS Lithium Hydroxide Conversion Plant HDR PROJECT NO.: 10302238 DATE: 08.27.2021 BY: AKL REVISED: 12.03.2021 RVW: VH Sediment Trap: ST239-Phase 1 Drainage Area Characteristics Required Storage Volume Total drainage area(TDA)' 3.20 ac 10 Yr Peak Flow(Q10) 13.94 cfs Disturbed area(DA) 2.05 ac 25 Yr Peak Flow(Q25) 15.71 cfs Rational Coefficient(C)2 0.60 Req'd Min.Surface Area (435 sf per cfs of Q25)5 6,832 sf Time of Concentration(TC)3 5.0 min Req'd Min.Storage Volume (3600 cf per ac of TDA)5 11,520 cf 10 Yr Storm Rainfall Intensity(i)° 7.3 in/hr 25 Yr Storm Rainfall Intensity(i)° 8.2 in/hr Design Criteria Basin Size Bottom Elevation 856.00 msl Elev.(msl) Depth(ft) Area(sf) Cumulative Volume(cf) Depth of Storage Volume 2.00 ft 856.00 0.00 5,603 0 857.00 1.00 6,313 5,954 858.00 2.00 7,059 12,637 859.00 3.00 7,842 20,084 860.00 4.00 8,662 28,333 Basin Configuration Bottom Elevation 856.00 msl Sediment Storage Elevation 858.00 msl Emergency Spillway Crest 859.00 msl Top of Berm 860.50 msl Spillway Length Basin Size Check Drainage Area Length of Spillway Basin Surface Area Provided at Spillway Crest 7,059 sf 1 4 Basin Storage Volume Provided Below Spillway Crest 12,637 cf 2 6 3 8 4 10 5 12 Notes 1.See attached drainage area map. 2.Entire area is denuded.Conservative rational coefficient for smooth bare packed soil is 0.60. 3.Time of concentration was assumed to be the minimum of 5 minutes. 4.Rainfall intensity at project location was acquired from the NOAA website,http://hdsc.nws.noaa.gov/hdsc/pfds/pfds_map_cont.html. 5.From Section 6.60-Sediment Trap of the NCDEQ Erosion and Sediment Control Planning and Design Manual. 6.Basin is required to be dewatered by the skimmer in 48 to 120 hours.The optimal dewatering time is 72 hours(see note 5). 13.Weir equation: 0= CLH'5 Page 41 of 44 SEDIMENT TRAP CALCULATIONS Lithium Hydroxide Conversion Plant HDR PROJECT NO.: 10302238 DATE: 08.27.2021 BY: AKL REVISED: 12.03.2021 RVW: VH Sediment Trap: ST240-Phase 1 Drainage Area Characteristics Required Storage Volume Total drainage area(TDA)' 2.95 ac 10 Yr Peak Flow(Q10) 12.85 cfs Disturbed area(DA) 2.95 ac 25 Yr Peak Flow(Q25) 14.48 cfs Rational Coefficient(C)2 0.60 Req'd Min.Surface Area (435 sf per cfs of Q25)5 6,298 sf Time of Concentration(TC)3 5.0 min Req'd Min.Storage Volume (3600 cf per ac of TDA)5 10,620 cf 10 Yr Storm Rainfall Intensity(i)° 7.3 in/hr 25 Yr Storm Rainfall Intensity(i)° 8.2 in/hr Design Criteria Basin Size Bottom Elevation 870.00 msl Elev.(msl) Depth(ft) Area(sf) Cumulative Volume(cf) Depth of Storage Volume 2.00 ft 870.00 0.00 5,600 0 871.00 1.00 6,300 5,947 872.00 2.00 7,059 12,622 873.00 3.00 7,800 20,049 874.00 4.00 8,660 28,275 Basin Configuration Bottom Elevation 870.00 msl Sediment Storage Elevation 872.00 msl Emergency Spillway Crest 873.00 msl Top of Berm 874.50 msl Spillway Length Basin Size Check Drainage Area Length of Spillway Basin Surface Area Provided at Spillway Crest 7,059 sf 1 4 Basin Storage Volume Provided Below Spillway Crest 12,622 cf 2 6 3 8 4 10 5 12 Notes 1.See attached drainage area map. 2.Entire area is denuded.Conservative rational coefficient for smooth bare packed soil is 0.60. 3.Time of concentration was assumed to be the minimum of 5 minutes. 4.Rainfall intensity at project location was acquired from the NOAA website,http://hdsc.nws.noaa.gov/hdsc/pfds/pfds_map_cont.html. 5.From Section 6.60-Sediment Trap of the NCDEQ Erosion and Sediment Control Planning and Design Manual. 6.Basin is required to be dewatered by the skimmer in 48 to 120 hours.The optimal dewatering time is 72 hours(see note 5). 13.Weir equation: 0= CLH'5 Page 42 of 44 PLC Lithium Hydroxide Conversion Plant ��� Appendices Appendix I —Stormwater Calculations CB v SB-5(North) SA-1 North (North) (North) 24"PIPE 5-N 5P 5R (North) SA-1 North SA-1 North 24"PIPE SB-5(North) SB-5(North) c6 1 B-S 1 B-R 1 B-P 1 B-N 4A-S SB-1(South) SB-1(South) SB-1(South) 24"PIPE SB-4torth) 4A-N 4A-R 2-S 2-R 2-P 2-N 24"PIPE SB-4(North) SB-4(North) SB-2 SB-2 SB-2 24"PIPE 4B-N 4B-R 24"PIPE SB-4(South) SB-4 outh) 3-N SB-3 SB-3 8B-3 18"PIPE 4B-S SB-4(South) Subcat Reach On Link Routing Diagram for Piedmont Ditches and Storm Sewer Prepared by HDR, Inc, Printed 8/27/2021 HydroCAD®10.10-5a s/n 05756 ©2020 HydroCAD Software Solutions LLC PLI Storm Sewer& Dltch Calculations - 25 Yr Storm Piedmont Ditches and Storm SeGaston County, NC 25-Year Duration=6 min, Inten=7.63 in/hr Prepared by HDR, Inc Printed 8/27/2021 HydroCADO 10.10-5a s/n 05756 ©2020 HydroCAD Software Solutions LLC Page 2 Time span=0.00-2.00 hrs, dt=0.01 hrs, 201 points Runoff by Rational method, Rise/Fall=1.0/1.0 xTc Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment1A-S:SA-1 (North) Runoff Area=2.926 ac 94.53% Impervious Runoff Depth=0.76" Tc=0.0 min C=0.91 Runoff=20.49 cfs 0.186 of Subcatchment1 B-S: SB-1 (South) Runoff Area=1.881 ac 96.28% Impervious Runoff Depth=0.77" Tc=0.0 min C=0.92 Runoff=13.31 cfs 0.121 of Subcatchment2-S: SIB-2 Runoff Area=3.607 ac 93.76% Impervious Runoff Depth=0.76" Tc=0.0 min C=0.91 Runoff=25.25 cfs 0.230 of Subcatchment3-S: SIB-3 Runoff Area=1.632 ac 87.25% Impervious Runoff Depth=0.72" Tc=0.0 min C=0.86 Runoff=10.80 cfs 0.098 of Subcatchment4A-S:SB-4(North) Runoff Area=3.076 ac 92.98% Impervious Runoff Depth=0.76" Tc=0.0 min C=0.90 Runoff=21.30 cfs 0.194 of Subcatchment4B-S: SB-4(South) Runoff Area=2.907 ac 89.85% Impervious Runoff Depth=0.74" Tc=0.0 min C=0.88 Runoff=19.68 cfs 0.179 of Subcatchment5S: SB-5(North) Runoff Area=2.907 ac 89.85% Impervious Runoff Depth=0.74" Tc=0.0 min C=0.88 Runoff=19.68 cfs 0.179 of Reach 1A-N:24" PIPE Avg. Flow Depth=1.37' Max Vet=8.69 fps Inflow=20.37 cfs 0.178 of 24.0" Round Pipe n=0.012 L=269.0' S=0.0100 '/' Capacity=24.51 cfs Outflow=19.85 cfs 0.178 of Reach 1A-R:SA-1 (North) Avg. Flow Depth=1.11' Max Vet=4.21 fps Inflow=20.49 cfs 0.186 of n=0.025 L=466.6' S=0.0100 '/' Capacity=84.58 cfs Outflow=20.37 cfs 0.178 of Reach 1 B-N: 24" PIPE Avg. Flow Depth=1.05' Max Vet=7.96 fps Inflow=13.31 cfs 0.116 of 24.0" Round Pipe n=0.012 L=269.0' S=0.0100 '/' Capacity=24.51 cfs Outflow=13.29 cfs 0.116 of Reach 1 B-R: SIB-1 (South) Avg. Flow Depth=0.93' Max Vet=3.79 fps Inflow=13.31 cfs 0.121 of n=0.025 L=204.5' S=0.0100 '/' Capacity=84.53 cfs Outflow=13.31 cfs 0.116 of Reach 2-N: 24" PIPE Avg. Flow Depth=1.61' Max Vet=8.89 fps Inflow=25.20 cfs 0.219 of 24.0" Round Pipe n=0.012 L=627.0' S=0.0100 '/' Capacity=24.51 cfs Outflow=24.01 cfs 0.219 of Reach 2-R: SIB-2 Avg. Flow Depth=1.21' Max Vet=4.45 fps Inflow=25.25 cfs 0.230 of n=0.025 L=407.0' S=0.0100 '/' Capacity=84.64 cfs Outflow=25.20 cfs 0.219 of Reach 3-N: 18" PIPE Avg. Flow Depth=1.15' Max Vet=7.31 fps Inflow=10.80 cfs 0.094 of 18.0" Round Pipe n=0.012 L=627.0' S=0.0100 '/' Capacity=11.38 cfs Outflow=10.53 cfs 0.094 of Reach 3-R: SIB-3 Avg. Flow Depth=0.61' Max Vet=6.22 fps Inflow=10.80 cfs 0.098 of n=0.012 L=278.4' S=0.0100 '/' Capacity=176.20 cfs Outflow=10.80 cfs 0.094 of Reach 4A-N:24" PIPE Avg. Flow Depth=1.35' Max Vet=8.66 fps Inflow=20.06 cfs 0.185 of 24.0" Round Pipe n=0.012 L=269.0' S=0.0100 '/' Capacity=24.51 cfs Outflow=19.48 cfs 0.185 of PLI Storm Sewer& Dltch Calculations - 25 Yr Storm Piedmont Ditches and Storm SeGaston County, NC 25-Year Duration=6 min, Inten=7.63 in/hr Prepared by HDR, Inc Printed 8/27/2021 HydroCADO 10.10-5a s/n 05756 ©2020 HydroCAD Software Solutions LLC Page 3 Reach 4A-R:SB-4(North) Avg. Flow Depth=1.11' Max Vet=4.21 fps Inflow=21.30 cfs 0.194 of n=0.025 L=627.0' S=0.0100 '/' Capacity=84.64 cfs Outflow=20.06 cfs 0.185 of Reach 4B-N: 24" PIPE Avg. Flow Depth=1.33' Max Vet=8.63 fps Inflow=19.33 cfs 0.171 of 24.0" Round Pipe n=0.012 L=269.0' S=0.0100 '/' Capacity=24.51 cfs Outflow=19.10 cfs 0.171 of Reach 4B-R: SIB-4(South) Avg. Flow Depth=1.09' Max Vet=4.18 fps Inflow=19.68 cfs 0.179 of n=0.025 L=420.0' S=0.0100 '/' Capacity=84.64 cfs Outflow=19.33 cfs 0.171 of Reach 5-N: 24" PIPE Avg. Flow Depth=1.34' Max Vet=8.64 fps Inflow=19.50 cfs 0.171 of 24.0" Round Pipe n=0.012 L=196.0' S=0.0100 '/' Capacity=24.51 cfs Outflow=19.18 cfs 0.171 of Reach 5R: SB-5(North) Avg. Flow Depth=1.09' Max Vet=4.19 fps Inflow=19.68 cfs 0.179 of n=0.025 L=400.0' S=0.0100 '/' Capacity=84.74 cfs Outflow=19.50 cfs 0.171 of Pond 1A-P:SA-1 (North) Peak Elev=832.99' Inflow=20.37 cfs 0.178 of 24.0" Round Culvert n=0.012 L=269.0' S=0.0100 '/' Outflow=20.37 cfs 0.178 of Pond 1 B-P: SB-1 (South) Peak Elev=831.95' Inflow=13.31 cfs 0.116 of 24.0" Round Culvert n=0.012 L=269.0' S=0.0100 '/' Outflow=13.31 cfs 0.116 of Pond 2-P: SIB-2 Peak Elev=833.51' Inflow=25.20 cfs 0.219 of 24.0" Round Culvert n=0.012 L=269.0' S=0.0100 '/' Outflow=25.20 cfs 0.219 of Pond 3-P: SIB-3 Peak Elev=833.39' Inflow=10.80 cfs 0.094 of 18.0" Round Culvert n=0.012 L=269.0' S=0.0100 '/' Outflow=10.80 cfs 0.094 of Pond 4A-P:SB-4(North) Peak Elev=832.49' Inflow=20.06 cfs 0.185 of 24.0" Round Culvert n=0.012 L=269.0' S=0.0100 '/' Outflow=20.06 cfs 0.185 of Pond 4B-P: SB-4(South) Peak Elev=832.36' Inflow=19.33 cfs 0.171 of 24.0" Round Culvert n=0.012 L=269.0' S=0.0100 '/' Outflow=19.33 cfs 0.171 of Pond 5P: SB-5(North) Peak Elev=838.10' Inflow=19.50 cfs 0.171 of 24.0" Round Culvert n=0.012 L=196.0' S=0.0100 '/' Outflow=19.50 cfs 0.171 of Total Runoff Area = 18.936 ac Runoff Volume = 1.187 of Average Runoff Depth = 0.75" 7.76% Pervious = 1.469 ac 92.24% Impervious = 17.467 ac PLI Storm Sewer& Dltch Calculations - 25 Yr Storm Piedmont Ditches and Storm SeGaston County, NC 25-Year Duration=6 min, Inten=7.63 in/hr Prepared by HDR, Inc Printed 8/27/2021 HydroCADO 10.10-5a s/n 05756 ©2020 HydroCAD Software Solutions LLC Page 4 Summary for Subcatchment 1A-S: SA-1 (North) Runoff = 20.49 cfs @ 0.00 hrs, Volume= 0.186 af, Depth= 0.76" Runoff by Rational method, Rise/Fall=1.0/1.0 xTc, Time Span= 0.00-2.00 hrs, dt= 0.01 hrs Gaston County, NC 25-Year Duration=6 min, Inten=7.63 in/hr Area (ac) C Description 2.766 0.95 0.160 0.25 2.926 0.91 Weighted Average 0.160 5.47% Pervious Area 2.766 94.53% Impervious Area Subcatchment 1A-S: SA-1 (North) Hydrograph 22 - - - ■Runoff 20.49 cfs 20 - - - - -Gaston ACounty 18 - - - - - - -NG 23- Gar 17 - - - - - - - - - - - 16 - - - - - - - - - - -Duration=6Kmin-, 15 - 1 - 14 - -L - 1 I Lle n 7.6 a iMft 12 - fi :R-UX1off ACea*zm-aC 0 11 _R11r1D fY� =0. 6 FL: - 8 JhnoffDepth#G--7 " 7 - - - - - - - - TED.:Omin_ 5 .-9 3 - - - - 2 1 0 0 1 2 Time (hours) PLI Storm Sewer& Dltch Calculations - 25 Yr Storm Piedmont Ditches and Storm SeGaston County, NC 25-Year Duration=6 min, Inten=7.63 in/hr Prepared by HDR, Inc Printed 8/27/2021 HydroCADO 10.10-5a s/n 05756 ©2020 HydroCAD Software Solutions LLC Page 5 Summary for Subcatchment 1 B-S: SB-1 (South) Runoff = 13.31 cfs @ 0.00 hrs, Volume= 0.121 af, Depth= 0.77" Runoff by Rational method, Rise/Fall=1.0/1.0 xTc, Time Span= 0.00-2.00 hrs, dt= 0.01 hrs Gaston County, NC 25-Year Duration=6 min, Inten=7.63 in/hr Area (ac) C Description 1.811 0.95 0.070 0.25 1.881 0.92 Weighted Average 0.070 3.72% Pervious Area 1.811 96.28% Impervious Area Subcatchment 1 B-S: SBA (South) Hydrograph — — — — — — — — ■Runoff 13.31 cfs 13 - - - - - Gaston County 12 — — — — - NC25-Yeas 11 Duration=6 min-, 10 I 9 — — — — — — — — — — — lnten=7.63in/hr 8 T Runoff Area=1.881 ac Runoff Volume=0.12-1-af LL 6 - - - - - - - - - - Runoff Depth=0.77" 5 4 Tc=0.0 m i n 3 — - — — — C-0.92 2 1 0 0 1 2 Time (hours) PLI Storm Sewer& Dltch Calculations - 25 Yr Storm Piedmont Ditches and Storm SeGaston County, NC 25-Year Duration=6 min, Inten=7.63 in/hr Prepared by HDR, Inc Printed 8/27/2021 HydroCADO 10.10-5a s/n 05756 ©2020 HydroCAD Software Solutions LLC Page 6 Summary for Subcatchment 2-S: SB-2 Runoff = 25.25 cfs @ 0.00 hrs, Volume= 0.230 af, Depth= 0.76" Runoff by Rational method, Rise/Fall=1.0/1.0 xTc, Time Span= 0.00-2.00 hrs, dt= 0.01 hrs Gaston County, NC 25-Year Duration=6 min, Inten=7.63 in/hr Area (ac) C Description 3.382 0.95 0.225 0.25 3.607 0.91 Weighted Average 0.225 6.24% Pervious Area 3.382 93.76% Impervious Area Subcatchment 2-S: SB-2 Hydrograph 28 ■Runoff 25.25 cfs 24 -Gaswt7o/te L n+moo u my 22 IYv �Year 20 Duration=6 min, 18 3 16 - - -ftnoff Area=3.607-ae 14 LL 12 ff Ran-oVorurve=0.230 a# 101 Runoff: Depth=0.76" T - - - - - - - - -Tc=O.Omin - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 6 4 2 0 0 1 2 Time (hours) PLI Storm Sewer& Dltch Calculations - 25 Yr Storm Piedmont Ditches and Storm SeGaston County, NC 25-Year Duration=6 min, Inten=7.63 in/hr Prepared by HDR, Inc Printed 8/27/2021 HydroCADO 10.10-5a s/n 05756 ©2020 HydroCAD Software Solutions LLC Page 7 Summary for Subcatchment 3-S: SB-3 Runoff = 10.80 cfs @ 0.00 hrs, Volume= 0.098 af, Depth= 0.72" Runoff by Rational method, Rise/Fall=1.0/1.0 xTc, Time Span= 0.00-2.00 hrs, dt= 0.01 hrs Gaston County, NC 25-Year Duration=6 min, Inten=7.63 in/hr Area (ac) C Description 1.424 0.95 0.208 0.25 1.632 0.86 Weighted Average 0.208 12.75% Pervious Area 1.424 87.25% Impervious Area Subcatchment 3-S: SB-3 Hydrograph 12 ❑Runoff 10.80 cfs Gaston County 10 NC 25-Year Duration=6 min, Inten=7.63 in/hr Runoff Area=1 .632 ac ° 6 Runoff Volume=0.098 of LL 5 4 Runoff Depth=0.72" Tc=0.0 m i n 3 2 C=0.86 1 0 0 1 2 Time (hours) PLI Storm Sewer& Dltch Calculations - 25 Yr Storm Piedmont Ditches and Storm SeGaston County, NC 25-Year Duration=6 min, Inten=7.63 in/hr Prepared by HDR, Inc Printed 8/27/2021 HydroCADO 10.10-5a s/n 05756 ©2020 HydroCAD Software Solutions LLC Page 8 Summary for Subcatchment 4A-S: SB-4 (North) Runoff = 21.30 cfs @ 0.00 hrs, Volume= 0.194 af, Depth= 0.76" Runoff by Rational method, Rise/Fall=1.0/1.0 xTc, Time Span= 0.00-2.00 hrs, dt= 0.01 hrs Gaston County, NC 25-Year Duration=6 min, Inten=7.63 in/hr Area (ac) C Description 2.860 0.95 0.216 0.25 3.076 0.90 Weighted Average 0.216 7.02% Pervious Area 2.860 92.98% Impervious Area Subcatchment 4A-S: SB-4 (North) Hydrograph 23 - - - - - - - - - - - - - - - - ■Runoff 21.30 cfs ,� �+ 21 Gaston aston -Ounty 20 19 - - - - - - - - -NC25--Yeaip 18 - 17 - - - - - - -Duir'afian-6 mim 16 - - - - + - - - - - - -- - - - - - - - - - 15 - - - - - T - - - - - - fiMen--7.6arnf 14 13 - - - - - 1 - - -Runoff Area=10-7f-ac 12 - - - - - - L - - - - - - - -.„-�-,�- p- - - - - o UL 11 T Ru-n-off�1{.1111C=V.194� 9 - - - - - - - - - —- - - FD- - - -7_ - 7 — - - - - - L - - - - - - - - - c---O 5 - fi �0�0 4 3 2 1 0 0 1 2 Time (hours) PLI Storm Sewer& Dltch Calculations - 25 Yr Storm Piedmont Ditches and Storm SeGaston County, NC 25-Year Duration=6 min, Inten=7.63 in/hr Prepared by HDR, Inc Printed 8/27/2021 HydroCADO 10.10-5a s/n 05756 ©2020 HydroCAD Software Solutions LLC Page 9 Summary for Subcatchment 4B-S: SB-4 (South) Runoff = 19.68 cfs @ 0.00 hrs, Volume= 0.179 af, Depth= 0.74" Runoff by Rational method, Rise/Fall=1.0/1.0 xTc, Time Span= 0.00-2.00 hrs, dt= 0.01 hrs Gaston County, NC 25-Year Duration=6 min, Inten=7.63 in/hr Area (ac) C Description 2.612 0.95 0.295 0.25 2.907 0.88 Weighted Average 0.295 10.15% Pervious Area 2.612 89.85% Impervious Area Subcatchment 4B-S: SB-4 (South) Hydrograph 22 - - - - - - - - - - - - ■Runoff 19.68 cfs 19 - 7G ston SOU-11ty ;$ - 1G25vear 15 16 - Duratlan-6 m� T 14 T tfiten--7.6a in/111 v 12 - 3 11 p -Runoff l'�1.r„e,�aw=1n.7V -ac 2 10 - - 1 -Run-o fA1,oktFne=Q.4/�af 9 - - - - - - - 8 - + - - - -RunofDeptb=Q74" 6 - - - - - - - - - - - -Tc=D!Omin 4 - - - - - - - - 0.88 3 - - 2 1 0 0 1 2 Time (hours) PLI Storm Sewer& Dltch Calculations - 25 Yr Storm Piedmont Ditches and Storm SeGaston County, NC 25-Year Duration=6 min, Inten=7.63 in/hr Prepared by HDR, Inc Printed 8/27/2021 HydroCADO 10.10-5a s/n 05756 ©2020 HydroCAD Software Solutions LLC Page 10 Summary for Subcatchment 5S: SB-5 (North) Runoff = 19.68 cfs @ 0.00 hrs, Volume= 0.179 af, Depth= 0.74" Runoff by Rational method, Rise/Fall=1.0/1.0 xTc, Time Span= 0.00-2.00 hrs, dt= 0.01 hrs Gaston County, NC 25-Year Duration=6 min, Inten=7.63 in/hr Area (ac) C Description 2.612 0.95 0.295 0.25 2.907 0.88 Weighted Average 0.295 10.15% Pervious Area 2.612 89.85% Impervious Area Subcatchment 5S: SB-5 (North) Hydrograph 22 - - - - - - - - - - - - ■Runoff 19.68 cfs 19 - 7Gasfon :COunty ;$ - 1G25vear 15 16 - Duratlan=6 m� T 14 T finten--7.6a in/111 v 12 - 3 11 -Runoff !Area=19 I -ac 2 10 - - L -Run-offA1,oktFne=0.479-af 9 - - - - - - - 8 - + - - - -Runoff Deptb=Q74" 6 - - - - - - - - - - - -Tc=D!Omin 4 - - - - - - - - 0.88 3 - - 2 1 0 0 1 2 Time (hours) PLI Storm Sewer& Dltch Calculations - 25 Yr Storm Piedmont Ditches and Storm SeGaston County, NC 25-Year Duration=6 min, Inten=7.63 in/hr Prepared by HDR, Inc Printed 8/27/2021 HydroCADO 10.10-5a s/n 05756 ©2020 HydroCAD Software Solutions LLC Page 11 Summary for Reach 1A-N: 24" PIPE Inflow Area = 2.926 ac, 94.53% Impervious, Inflow Depth = 0.73" for 25-Year event Inflow = 20.37 cfs @ 0.13 hrs, Volume= 0.178 of Outflow = 19.85 cfs @ 0.14 hrs, Volume= 0.178 af, Atten= 3%, Lag= 0.6 min Routing by Stor-Ind+Trans method, Time Span= 0.00-2.00 hrs, dt= 0.01 hrs Max. Velocity= 8.69 fps, Min. Travel Time= 0.5 min Avg. Velocity = 1.65 fps, Avg. Travel Time= 2.7 min Peak Storage= 617 cf @ 0.13 hrs INLET PIPE TO SB - 201 Average Depth at Peak Storage= 1.37' , Surface Width= 1.86' (Basin has double inlet pipes) Bank-Full Depth= 2.00' Flow Area= 3.1 sf, Capacity= 24.51 cfs 24.0" Round Pipe n= 0.012 Length= 269.0' Slope= 0.0100 '/' Inlet Invert= 830.18', Outlet Invert= 827.49' 0 Reach 1A-N: 24" PIPE Hydrograph i - - - - - - - - - - - - - - - ■Inflow 22 / , 20.37 cfs — — — — — — — — — — — — — — — outflow 21 'Us W-C 4nf low Area-�9-26 aE 20 //�� 19 - - - - - - - - -Avg.-How-Depth--UT 18 - - - - - - - - - - - - -�- - ` - - Q cA16 15 - -24-0n w 13 - - Round Pipe _o LL 19 - - - - - - - - - - - - - -�nn26�9Q/r 5 - Z�PWftY-24.5'C cfS_ 4 ' 3 2 1 0 0 1 2 Time (hours) PLI Storm Sewer& Dltch Calculations - 25 Yr Storm Piedmont Ditches and Storm SeGaston County, NC 25-Year Duration=6 min, Inten=7.63 in/hr Prepared by HDR, Inc Printed 8/27/2021 HydroCADO 10.10-5a s/n 05756 ©2020 HydroCAD Software Solutions LLC Page 12 Summary for Reach 1A-R: SA-1 (North) Inflow Area = 2.926 ac, 94.53% Impervious, Inflow Depth = 0.76" for 25-Year event Inflow = 20.49 cfs @ 0.00 hrs, Volume= 0.186 of Outflow = 20.37 cfs @ 0.13 hrs, Volume= 0.178 af, Atten= 1%, Lag= 7.5 min Routing by Stor-Ind+Trans method, Time Span= 0.00-2.00 hrs, dt= 0.01 hrs Max. Velocity= 4.21 fps, Min. Travel Time= 1.8 min Avg. Velocity = 0.82 fps, Avg. Travel Time= 9.4 min Peak Storage= 2,254 cf @ 0.10 hrs Average Depth at Peak Storage= 1.11' , Surface Width= 7.68' Bank-Full Depth= 2.00' Flow Area= 14.0 sf, Capacity= 84.58 cfs 1.00' x 2.00' deep channel, n= 0.025 Earth, clean &winding Side Slope Z-value= 3.0 7' Top Width= 13.00' Length= 466.6' Slope= 0.0100 '/' Inlet Invert= 838.84', Outlet Invert= 834.18' Reach 1A-R: SA-1 (North) Hydrograph ■Inflow 22 20.49 cfs — — — — _ - — — — — — — — — — — — — — — — outflow 21 20.37df — — — — — — — - —� — — W10 w Tea--2.J26 ac 20 — — — — —� — — — — — — — — — — — — — L. — — 19 — — — — 18 i — — — — — — — — — — — —� — — ���— — — — — — — — — — — 17 - - - - - - - - - - - - - - - - -Max_'M 4.21-fp 16 — — — — — —I — — — — — — 15 - - - - - - - - - - - - - - - - n=0.D25 14 13 12 — —� — — — — — — — — — — L��ks7�7�r 11 FL 10 - - - S=0.0100-T' 8 - -Gapadty=84:58 -ds 6 - — — — 5 4 - — — 3 - 2 1 0 0 1 2 Time (hours) PLI Storm Sewer& Dltch Calculations - 25 Yr Storm Piedmont Ditches and Storm SeGaston County, NC 25-Year Duration=6 min, Inten=7.63 in/hr Prepared by HDR, Inc Printed 8/27/2021 HydroCADO 10.10-5a s/n 05756 ©2020 HydroCAD Software Solutions LLC Page 13 Summary for Reach 1 B-N: 24" PIPE Inflow Area = 1.881 ac, 96.28% Impervious, Inflow Depth = 0.74" for 25-Year event Inflow = 13.31 cfs @ 0.11 hrs, Volume= 0.116 of Outflow = 13.29 cfs @ 0.11 hrs, Volume= 0.116 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 0.00-2.00 hrs, dt= 0.01 hrs Max. Velocity= 7.96 fps, Min. Travel Time= 0.6 min Avg. Velocity = 1.75 fps, Avg. Travel Time= 2.6 min INLET PIPE TO SB - 201 Peak Storage= 450 cf @ 0.11 hrs (Basin has double inlet pipes) Average Depth at Peak Storage= 1.05' , Surface Width= 2.00' Bank-Full Depth= 2.00' Flow Area= 3.1 sf, Capacity= 24.51 cfs 24.0" Round Pipe n= 0.012 Length= 269.0' Slope= 0.0100 '/' Inlet Invert= 830.18', Outlet Invert= 827.49' 0 Reach 1 B-N: 24" PIPE Hydrograph ■Inflow 13.31 cfs ■outflow 14 13.29cN Inflow Area=1.881 ac 13 _ -Av(J•_FfowDe th=1_.05' 12 — —� — a p 11- - - - - - -UaxVel=7.96-fps 10 - - - - - - - - - - - - 2 .-0''- N 9- _ _ _ _ _ _ _Round Pipe 3 8 � "1— - - - - - - - - - - - n= 2 a LL 6 - — - - - - - - - - - - -L=2690F 5 S=0.0100 T 4 - - -� - - - - apa�i#X=_24.5't cfs 3 2 1 0 0 1 2 Time (hours) PLI Storm Sewer& Dltch Calculations - 25 Yr Storm Piedmont Ditches and Storm SeGaston County, NC 25-Year Duration=6 min, Inten=7.63 in/hr Prepared by HDR, Inc Printed 8/27/2021 HydroCADO 10.10-5a s/n 05756 ©2020 HydroCAD Software Solutions LLC Page 14 Summary for Reach 1 B-R: S113-1 (South) Inflow Area = 1.881 ac, 96.28% Impervious, Inflow Depth = 0.77" for 25-Year event Inflow = 13.31 cfs @ 0.00 hrs, Volume= 0.121 of Outflow = 13.31 cfs @ 0.11 hrs, Volume= 0.116 af, Atten= 0%, Lag= 6.6 min Routing by Stor-Ind+Trans method, Time Span= 0.00-2.00 hrs, dt= 0.01 hrs Max. Velocity= 3.79 fps, Min. Travel Time= 0.9 min Avg. Velocity = 0.90 fps, Avg. Travel Time= 3.8 min Peak Storage= 717 cf @ 0.10 hrs Average Depth at Peak Storage= 0.93' , Surface Width= 6.56' Bank-Full Depth= 2.00' Flow Area= 14.0 sf, Capacity= 84.53 cfs 1.00' x 2.00' deep channel, n= 0.025 Earth, clean &winding Side Slope Z-value= 3.0 7' Top Width= 13.00' Length= 204.5' Slope= 0.0100 '/' Inlet Invert= 836.22', Outlet Invert= 834.18' Reach 1 B-R: SBA (South) Hydrograph ■Inflow 13.31 cfs 0 Outflow 14 1331cfs Inflow Area=1 .881 ac 13 12 - - - Avg.-low Depth=0.93' 11 — — — —Max_Ve]=_3-79_fps 10 I - - - - - - - - - - - - - - - x�0.025- _ 9 N U $ L L —_2N.-5' 'LL - - - - - S=0.0t0_0_'/_ 6 5 - - - - - - IC-apacity=84.53-cf - - - - - - - - - - - - - - - - 3 2- 1- 0 0 1 2 Time (hours) PLI Storm Sewer& Dltch Calculations - 25 Yr Storm Piedmont Ditches and Storm SeGaston County, NC 25-Year Duration=6 min, Inten=7.63 in/hr Prepared by HDR, Inc Printed 8/27/2021 HydroCADO 10.10-5a s/n 05756 ©2020 HydroCAD Software Solutions LLC Page 15 Summary for Reach 2-N: 24" PIPE Inflow Area = 3.607 ac, 93.76% Impervious, Inflow Depth = 0.73" for 25-Year event Inflow = 25.20 cfs @ 0.12 hrs, Volume= 0.219 of Outflow = 24.01 cfs @ 0.14 hrs, Volume= 0.219 af, Atten= 5%, Lag= 1.7 min Routing by Stor-Ind+Trans method, Time Span= 0.00-2.00 hrs, dt= 0.01 hrs Max. Velocity= 8.89 fps, Min. Travel Time= 1.2 min Avg. Velocity = 1.73 fps, Avg. Travel Time= 6.0 min INLET PIPE TO Peak Storage= 1,695 cf @ 0.12 hrs SIB - 202 Average Depth at Peak Storage= 1.61' , Surface Width= 1.59' Bank-Full Depth= 2.00' Flow Area= 3.1 sf, Capacity= 24.51 cfs 24.0" Round Pipe n= 0.012 Length= 627.0' Slope= 0.0100 '/' Inlet Invert= 829.74', Outlet Invert= 823.47' 0 Reach 2-N: 24" PIPE Hydrograph ❑I l nfow 28 25.20 cfs ❑Outflow 26 Inflow Area=3.607 ac 24.01 cfs 24 Avg. Flow Depth=1.61' 22 - - - - - - _ _ Max Vet=8.89 fps 20- 18 24.0" y 16 Round Pipe 3 14 n=0.012 0 12 L=627.0' 10 S=0.0100 T 8 6 Capacity=24.51 cfs 4 2 0 0 1 2 Time (hours) PLI Storm Sewer& Dltch Calculations - 25 Yr Storm Piedmont Ditches and Storm SeGaston County, NC 25-Year Duration=6 min, Inten=7.63 in/hr Prepared by HDR, Inc Printed 8/27/2021 HydroCADO 10.10-5a s/n 05756 ©2020 HydroCAD Software Solutions LLC Page 16 Summary for Reach 2-R: S113-2 Inflow Area = 3.607 ac, 93.76% Impervious, Inflow Depth = 0.76" for 25-Year event Inflow = 25.25 cfs @ 0.00 hrs, Volume= 0.230 of Outflow = 25.20 cfs @ 0.12 hrs, Volume= 0.219 af, Atten= 0%, Lag= 6.9 min Routing by Stor-Ind+Trans method, Time Span= 0.00-2.00 hrs, dt= 0.01 hrs Max. Velocity= 4.45 fps, Min. Travel Time= 1.5 min Avg. Velocity = 0.82 fps, Avg. Travel Time= 8.3 min Peak Storage= 2,289 cf @ 0.10 hrs Average Depth at Peak Storage= 1.21' , Surface Width= 8.28' Bank-Full Depth= 2.00' Flow Area= 14.0 sf, Capacity= 84.64 cfs 1.00' x 2.00' deep channel, n= 0.025 Earth, clean &winding Side Slope Z-value= 3.0 7' Top Width= 13.00' Length= 407.0' Slope= 0.0100 '/' Inlet Invert= 837.81', Outlet Invert= 833.74' Reach 2-R: S113-2 Hydrograph — — _ _ _ _ _ _ ■Inflow 28 25.25 cfs I❑Outflow 26 25.20df In#law-Area=3.607 ac 24 - _ _ _ _ _; _ Avg. Flow Depth=1.21' 22 — — — — 20 — — — — — — lulaXVel=4.-5fps 18 — — — — — — — — — — — — — — n=0.025 -, - - - - - -I — — — — — — — — — — — — — — — — 16 L=407.0' 3 14 1 VV L—°° 12 — — —I — — — — — — — — C=0.0 'P 10 - - - - - -capacity=$4.64-c#s 8- 6- 4- 2 0 0 1 2 Time (hours) PLI Storm Sewer& Dltch Calculations - 25 Yr Storm Piedmont Ditches and Storm SeGaston County, NC 25-Year Duration=6 min, Inten=7.63 in/hr Prepared by HDR, Inc Printed 8/27/2021 HydroCADO 10.10-5a s/n 05756 ©2020 HydroCAD Software Solutions LLC Page 17 Summary for Reach 3-N: 18" PIPE Inflow Area = 1.632 ac, 87.25% Impervious, Inflow Depth = 0.69" for 25-Year event Inflow = 10.80 cfs @ 0.11 hrs, Volume= 0.094 of Outflow = 10.53 cfs @ 0.13 hrs, Volume= 0.094 af, Atten= 2%, Lag= 1.2 min Routing by Stor-Ind+Trans method, Time Span= 0.00-2.00 hrs, dt= 0.01 hrs Max. Velocity= 7.31 fps, Min. Travel Time= 1.4 min Avg. Velocity = 1.38 fps, Avg. Travel Time= 7.6 min Peak Storage= 909 cf @ 0.11 hrs INLET PIPE TO Average Depth at Peak Storage= 1.15' , Surface Width= 1.27' SIB - 203 Bank-Full Depth= 1.50' Flow Area= 1.8 sf, Capacity= 11.38 cfs 18.0" Round Pipe n= 0.012 Length= 627.0' Slope= 0.0100 '/' Inlet Invert= 831.03', Outlet Invert= 824.76' 0 Reach 3-N: 18" PIPE Hydrograph 12 ❑I l nfow 10.80cf5 ❑Outflow 11 10.530, Inflow Area=1.632 ac 10 Avg. Flow Depth=1.15' 9 Max Vet=7.31 fps 18.0" y Round Pipe 3 6 n=0.012 LL 5 L=627.0' 4 S=0.0100 T 3 Capacity=11.38 cfs 2 1 0 0 1 2 Time (hours) PLI Storm Sewer& Dltch Calculations - 25 Yr Storm Piedmont Ditches and Storm SeGaston County, NC 25-Year Duration=6 min, Inten=7.63 in/hr Prepared by HDR, Inc Printed 8/27/2021 HydroCADO 10.10-5a s/n 05756 ©2020 HydroCAD Software Solutions LLC Page 18 Summary for Reach 3-R: S113-3 Inflow Area = 1.632 ac, 87.25% Impervious, Inflow Depth = 0.72" for 25-Year event Inflow = 10.80 cfs @ 0.00 hrs, Volume= 0.098 of Outflow = 10.80 cfs @ 0.11 hrs, Volume= 0.094 af, Atten= 0%, Lag= 6.6 min Routing by Stor-Ind+Trans method, Time Span= 0.00-2.00 hrs, dt= 0.01 hrs Max. Velocity= 6.22 fps, Min. Travel Time= 0.7 min Avg. Velocity = 1.88 fps, Avg. Travel Time= 2.5 min Peak Storage= 483 cf @ 0.10 hrs Average Depth at Peak Storage= 0.61' , Surface Width= 4.67' Bank-Full Depth= 2.00' Flow Area= 14.0 sf, Capacity= 176.20 cfs 1.00' x 2.00' deep channel, n= 0.012 Side Slope Z-value= 3.0 7' Top Width= 13.00' Length= 278.4' Slope= 0.0100 '/' Inlet Invert= 837.81', Outlet Invert= 835.03' Reach 3-R: S113-3 Hydrograph ■Inflow 12 10.80 ifs — — — — — — — — — — — — — — — ■Outflow 11 ' 10.80 cfs — — — — — - lnflowArea=a -682 ac 10 Avg. Flow Depth=0.61' Max Vet=6.22 fps - - - n=0.D12 L=278.4' 5 - S=0.0100 T 4 CapaciW-17-6-.20-efs- 3 2 1 0 0 1 2 Time (hours) PLI Storm Sewer& Dltch Calculations - 25 Yr Storm Piedmont Ditches and Storm SeGaston County, NC 25-Year Duration=6 min, Inten=7.63 in/hr Prepared by HDR, Inc Printed 8/27/2021 HydroCADO 10.10-5a s/n 05756 ©2020 HydroCAD Software Solutions LLC Page 19 Summary for Reach 4A-N: 24" PIPE Inflow Area = 3.076 ac, 92.98% Impervious, Inflow Depth = 0.72" for 25-Year event Inflow = 20.06 cfs @ 0.14 hrs, Volume= 0.185 of Outflow = 19.48 cfs @ 0.15 hrs, Volume= 0.185 af, Atten= 3%, Lag= 0.7 min Routing by Stor-Ind+Trans method, Time Span= 0.00-2.00 hrs, dt= 0.01 hrs Max. Velocity= 8.66 fps, Min. Travel Time= 0.5 min Avg. Velocity = 1.83 fps, Avg. Travel Time= 2.5 min Peak Storage= 607 cf @ 0.14 hrs Average Depth at Peak Storage= 1.35' , Surface Width= 1.87' INLET PIPE TO SB - 204 Bank-Full Depth= 2.00' Flow Area= 3.1 sf, Capacity= 24.51 cfs (Basin has double inlet pipes) 24.0" Round Pipe n= 0.012 Length= 269.0' Slope= 0.0100 '/' Inlet Invert= 829.73', Outlet Invert= 827.04' C) Reach 4A-N: 24" PIPE Hydrograph — — — — — — — — — — — — — — — — — — — — — — — — — — — — - i — — — — — — — — — — — — — —I — — — — — — — — — — — — — — ■Inflow 22 i 20.06 cfs — — — — — — — — — — — — — — — — — — — — — — — — — — — ■Outflow 21 i - - - - - - - - - - - - - - - - - inflow Area=1(f76 -ao 20 / 19.48 cfs — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — - - - - - - - - - - - - - - - - -A-v -Row-� th=4.3r 19 i pp-�� 18 — — — — — — — — — — — — — — — — — — — — — — —- — — — — 17 — — — — — — — — — — — — — - - - - - -MaxAtel=8.66Af_ps 15 — — — — — — —� — — — — — — — — — — 14 y13 — — — — — — - - - - - - Round Pipe u 12 — —� — — — — — 3 11 n=0-0a 10 i LL 9 - - - - - - - - - - - -L=269.0' 8 - _ _ - - - - -S_0_01GO-� 5 - - - rapacity-_24.3'F ds 4 3 2- 0- 0 1 2 Time (hours) PLI Storm Sewer& Dltch Calculations - 25 Yr Storm Piedmont Ditches and Storm SeGaston County, NC 25-Year Duration=6 min, Inten=7.63 in/hr Prepared by HDR, Inc Printed 8/27/2021 HydroCADO 10.10-5a s/n 05756 ©2020 HydroCAD Software Solutions LLC Page 20 Summary for Reach 4A-R: S113-4 (North) Inflow Area = 3.076 ac, 92.98% Impervious, Inflow Depth = 0.76" for 25-Year event Inflow = 21.30 cfs @ 0.00 hrs, Volume= 0.194 of Outflow = 20.06 cfs @ 0.14 hrs, Volume= 0.185 af, Atten= 6%, Lag= 8.2 min Routing by Stor-Ind+Trans method, Time Span= 0.00-2.00 hrs, dt= 0.01 hrs Max. Velocity= 4.21 fps, Min. Travel Time= 2.5 min Avg. Velocity = 0.90 fps, Avg. Travel Time= 11.6 min Peak Storage= 3,000 cf @ 0.10 hrs Average Depth at Peak Storage= 1.11' , Surface Width= 7.64' Bank-Full Depth= 2.00' Flow Area= 14.0 sf, Capacity= 84.64 cfs 1.00' x 2.00' deep channel, n= 0.025 Earth, clean &winding Side Slope Z-value= 3.0 7' Top Width= 13.00' Length= 627.0' Slope= 0.0100 '/' Inlet Invert= 840.00', Outlet Invert= 833.73' Reach 4A-R: S113-4 (North) Hydrograph —I — — — — — — — — — — — — — — — — ■Inflow 23 21.30 cfs _ — — — — — — — — — — — — — — — — — — — outflow 22 - - - - - - - - - - -I - - Inflow-Area=3-07Gae 21 20.06 cfs 20 - - Avg. Flaw Delith='r 11' 19 — — — — — — — — — 1$ - - - — — — — — —Mem—W=i&zijp 15 ' — - — — — — — — -n=0.02 14 13 — — — — — — — — L=V27.-0, 12 — — — — — — — — — — — — — — — — — A —/�— — — LL 110 — — — — — — — — — — £-Q.00LOWT s - j-alaa_c-lty_-U, C. s 6 5 4 3 2 1 0 0 1 2 Time (hours) PLI Storm Sewer& Dltch Calculations - 25 Yr Storm Piedmont Ditches and Storm SeGaston County, NC 25-Year Duration=6 min, Inten=7.63 in/hr Prepared by HDR, Inc Printed 8/27/2021 HydroCADO 10.10-5a s/n 05756 ©2020 HydroCAD Software Solutions LLC Page 21 Summary for Reach 4B-N: 24" PIPE Inflow Area = 2.907 ac, 89.85% Impervious, Inflow Depth = 0.71" for 25-Year event Inflow = 19.33 cfs @ 0.12 hrs, Volume= 0.171 of Outflow = 19.10 cfs @ 0.13 hrs, Volume= 0.171 af, Atten= 1%, Lag= 0.7 min Routing by Stor-Ind+Trans method, Time Span= 0.00-2.00 hrs, dt= 0.01 hrs Max. Velocity= 8.63 fps, Min. Travel Time= 0.5 min Avg. Velocity = 1.60 fps, Avg. Travel Time= 2.8 min Peak Storage= 597 cf @ 0.12 hrs INLET PIPE TO SB - 204 Average Depth at Peak Storage= 1.33' , Surface Width= 1.89' (Basin has double inlet pipes) Bank-Full Depth= 2.00' Flow Area= 3.1 sf, Capacity= 24.51 cfs 24.0" Round Pipe n= 0.012 Length= 269.0' Slope= 0.0100 '/' Inlet Invert= 829.73', Outlet Invert= 827.04' 0 Reach 4B-N: 24" PIPE Hydrograph — — — — — — — — — — — — — — — —I — — — — — — — — — — — — — — — — ■Inflow 21 19.33 cs — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — 0 outflow 20 19.10cs - - - - - - - - - - - - - — - - - 4nftoY TT ea=2-.9n7 -ac— — — — — — —I — — — — — — — — — — — — 18 Avg.-RowDept�=1.33' 17 — — — — — — — — — — — — — — — — — — — — 16 ' — — — — — — — — — — — — — — — — — — — —MaxyQl_=8.63fps 15 — — — — — — — — — — — — — — — — — 24.10W 14 — — — — — — —I — — — — — — — — — — — — — — — 13 — — — — — — — — — — — - - - - - - - - -RoundPipa 12 — — — — — — — — — — — —I — — — — — — — — — — — — — 311 — — — — — — — — — — — — — — — — — — — — — n--"12 0 10 LL 9 - - - - - - - - L-=269G- 8 7 - - - - - - - - - - - -S=0,01WI/' 6 5 - _apaci y=24.5'1_cfa 4 3 2 1 0 0 1 2 Time (hours) PLI Storm Sewer& Dltch Calculations - 25 Yr Storm Piedmont Ditches and Storm SeGaston County, NC 25-Year Duration=6 min, Inten=7.63 in/hr Prepared by HDR, Inc Printed 8/27/2021 HydroCADO 10.10-5a s/n 05756 ©2020 HydroCAD Software Solutions LLC Page 22 Summary for Reach 4113-R: S113-4 (South) Inflow Area = 2.907 ac, 89.85% Impervious, Inflow Depth = 0.74" for 25-Year event Inflow = 19.68 cfs @ 0.00 hrs, Volume= 0.179 of Outflow = 19.33 cfs @ 0.12 hrs, Volume= 0.171 af, Atten= 2%, Lag= 7.1 min Routing by Stor-Ind+Trans method, Time Span= 0.00-2.00 hrs, dt= 0.01 hrs Max. Velocity= 4.18 fps, Min. Travel Time= 1.7 min Avg. Velocity = 0.80 fps, Avg. Travel Time= 8.8 min Peak Storage= 1,953 cf @ 0.10 hrs Average Depth at Peak Storage= 1.09' , Surface Width= 7.54' Bank-Full Depth= 2.00' Flow Area= 14.0 sf, Capacity= 84.64 cfs 1.00' x 2.00' deep channel, n= 0.025 Earth, clean &winding Side Slope Z-value= 3.0 7' Top Width= 13.00' Length= 420.0' Slope= 0.0100 '/' Inlet Invert= 837.93', Outlet Invert= 833.73' Reach 4113-R: S113-4 (South) Hydrograph - - -1 - - - - - - - - - - - - - - - - ■Inflow 21 19.68 cfs - - - - - - - - - - -I - - --jam-� -`-A,-�-rp- - - -7y1- - -^_ Outflow 20 19.33 cfs - - - - - - - - - - -I - - N FfID Y-Y-/-41 ea=2M7 ac 19 i - - - - - - - - - - -1 - - - - - - - - - - 18 , - - - - - -1 - Avg.-Flaw Depth=I- 17 - - - - - - - - - - - - - 16 - - - - -I - - - - -IWC�X VVCt�18-fpS 15 14 - - - -1 - - - - - - - - - - -n=e.025 13 - - -1 - - - - - - - - - - - - - - - - tn u 12 L=42 n�, a 10 S=e.e 1 V V 'r LL 7 j Capacity=&4.6`4_ds 7 6 I - 5 I 4- 3- 2 1 0 0 1 2 Time (hours) PLI Storm Sewer& Dltch Calculations - 25 Yr Storm Piedmont Ditches and Storm SeGaston County, NC 25-Year Duration=6 min, Inten=7.63 in/hr Prepared by HDR, Inc Printed 8/27/2021 HydroCADO 10.10-5a s/n 05756 ©2020 HydroCAD Software Solutions LLC Page 23 Summary for Reach 5-N: 24" PIPE Inflow Area = 2.907 ac, 89.85% Impervious, Inflow Depth = 0.71" for 25-Year event Inflow = 19.50 cfs @ 0.12 hrs, Volume= 0.171 of Outflow = 19.18 cfs @ 0.12 hrs, Volume= 0.171 af, Atten= 2%, Lag= 0.5 min Routing by Stor-Ind+Trans method, Time Span= 0.00-2.00 hrs, dt= 0.01 hrs Max. Velocity= 8.64 fps, Min. Travel Time= 0.4 min Avg. Velocity = 1.57 fps, Avg. Travel Time= 2.1 min Peak Storage= 438 cf @ 0.12 hrs INLET PIPE TO Average Depth at Peak Storage= 1.34' , Surface Width= 1.88' SB - 205 Bank-Full Depth= 2.00' Flow Area= 3.1 sf, Capacity= 24.51 cfs 24.0" Round Pipe n= 0.012 Length= 196.0' Slope= 0.0100 T Inlet Invert= 835.44', Outlet Invert= 833.48' 0 Reach 5-N: 24" PIPE Hydrograph / — — — — — — — — - - — — — — — — — — — — — — — — ■Inflow 21 / 19.50 cfs - - - - `-., e p - �n - ■�UtfIOW 20 19.18 cfs - -� - - - ini{lo Y� Area=2.907 -ac 19 / — — — 18 / -� - - -vg._F1owD0ffi_1.34! 16 i - — — — — — IWAX- VQl=3.60p6- _I _ _ _ _ _ -� — — — — — — — 14 — — — — — .�µ 13 -� - - - - - Round Pipe 12 ;o - - - - - - - - - - - - n=0�12 .2 9 - - - L=19641 8 S=0-0a WIP 5 - - - _apaci y=24.5'1_cfs 4- 3- 2- 1 0 0 1 2 Time (hours) PLI Storm Sewer& Dltch Calculations - 25 Yr Storm Piedmont Ditches and Storm SeGaston County, NC 25-Year Duration=6 min, Inten=7.63 in/hr Prepared by HDR, Inc Printed 8/27/2021 HydroCADO 10.10-5a s/n 05756 ©2020 HydroCAD Software Solutions LLC Page 24 Summary for Reach 5R: S113-5 (North) Inflow Area = 2.907 ac, 89.85% Impervious, Inflow Depth = 0.74" for 25-Year event Inflow = 19.68 cfs @ 0.00 hrs, Volume= 0.179 of Outflow = 19.50 cfs @ 0.12 hrs, Volume= 0.171 af, Atten= 1%, Lag= 7.0 min Routing by Stor-Ind+Trans method, Time Span= 0.00-2.00 hrs, dt= 0.01 hrs Max. Velocity= 4.19 fps, Min. Travel Time= 1.6 min Avg. Velocity = 0.79 fps, Avg. Travel Time= 8.4 min Peak Storage= 1,862 cf @ 0.10 hrs Average Depth at Peak Storage= 1.09' , Surface Width= 7.54' Bank-Full Depth= 2.00' Flow Area= 14.0 sf, Capacity= 84.74 cfs 1.00' x 2.00' deep channel, n= 0.025 Earth, clean &winding Side Slope Z-value= 3.0 7' Top Width= 13.00' Length= 400.0' Slope= 0.0100 '/' Inlet Invert= 839.44', Outlet Invert= 835.43' Reach 5R: S113-5 (North) Hydrograph - - -I - - - - - - - - - - - - - - - - ■Inflow 21 19.68 cfs — — — — — — — --j -2T —`—A,—�—rp— — 7—/1—TM— — —^— Outflow 20 19.50 cfs - — — — — — — H H I 0 Y-Y-/1-�Ga-2 rV�7 a V- 19 - 18 - - - - -I - Avg.-Flaw Depth=I- 17 i - - - - - - - - - - - - 16 - - - -I - - - - -Max V�Ct��9-fps 15 14 - - -I - - - - - - - - - - -n=e.025 13 - - - - - - - - - - - - - - - - - - - tn u 12 - -I - - L_4N.-O, 3 11 2 19 �7=e.OM 'P� Capacity=&4.74_ds 6 5- 4- 3- 2- 1 0 0 1 Rol Time (hours) PLI Storm Sewer& Dltch Calculations - 25 Yr Storm Piedmont Ditches and Storm SeGaston County, NC 25-Year Duration=6 min, Inten=7.63 in/hr Prepared by HDR, Inc Printed 8/27/2021 HydroCADO 10.10-5a s/n 05756 ©2020 HydroCAD Software Solutions LLC Page 25 Summary for Pond 1A-P: SA-1 (North) Inflow Area = 2.926 ac, 94.53% Impervious, Inflow Depth = 0.73" for 25-Year event Inflow = 20.37 cfs @ 0.13 hrs, Volume= 0.178 of Outflow = 20.37 cfs @ 0.13 hrs, Volume= 0.178 af, Atten= 0%, Lag= 0.0 min Primary = 20.37 cfs @ 0.13 hrs, Volume= 0.178 of Routing by Stor-Ind method, Time Span= 0.00-2.00 hrs, dt= 0.01 hrs Peak Elev= 832.99'@ 0.13 hrs Device Routing Invert Outlet Devices #1 Primary 830.18' 24.0" Round Culvert L= 269.0' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 830.18'/827.49' S= 0.0100 T Cc= 0.900 n= 0.012, Flow Area= 3.14 sf Primary OutFlow Max=19.95 cfs @ 0.13 hrs HW=832.92' (Free Discharge) L1=Culvert (Inlet Controls 19.95 cfs @ 6.35 fps) Pond 1A-P: SA-1 (North) Hydrograph — — — — — — — — — — — — — — — —I — — — — — — — — — — — ❑ Inflow 22 20.37 its — — — — — — — — — — —I — — — — — — — ❑Primary 21 20.37 cfs — — — — — — — —I —Inflow Area=2.926 ac 20 18 - - - - - _ Peak Elev=832.99' 17 i 16 24.0" 15 14 Round Culvert w 13 3 11 n=0.012 0 LL 19 L=269.0' 8 S=0.0100 T 6 5 4 3 2 1 0 0 1 2 Time (hours) PLI Storm Sewer& Dltch Calculations - 25 Yr Storm Piedmont Ditches and Storm SeGaston County, NC 25-Year Duration=6 min, Inten=7.63 in/hr Prepared by HDR, Inc Printed 8/27/2021 HydroCADO 10.10-5a s/n 05756 ©2020 HydroCAD Software Solutions LLC Page 26 Summary for Pond 1 B-P: SB-1 (South) Inflow Area = 1.881 ac, 96.28% Impervious, Inflow Depth = 0.74" for 25-Year event Inflow = 13.31 cfs @ 0.11 hrs, Volume= 0.116 of Outflow = 13.31 cfs @ 0.11 hrs, Volume= 0.116 af, Atten= 0%, Lag= 0.0 min Primary = 13.31 cfs @ 0.11 hrs, Volume= 0.116 of Routing by Stor-Ind method, Time Span= 0.00-2.00 hrs, dt= 0.01 hrs Peak Elev= 831.95' @ 0.11 hrs Device Routing Invert Outlet Devices #1 Primary 830.18' 24.0" Round Culvert L= 269.0' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 830.18'/ 827.49' S= 0.0100 '/' Cc= 0.900 n= 0.012, Flow Area= 3.14 sf Primary OutFlow Max=13.31 cfs @ 0.11 hrs HW=831.95' (Free Discharge) L1=Culvert (Inlet Controls 13.31 cfs @ 4.53 fps) Pond 1 B-P: SBA (South) Hydrograph —I ❑ Inflow 13.31 cfs ❑Primary 14 13.31cfs _Inflow_Area= L.6&1_ac_ 13 12 — — — — — — — — — — —PeakElev=831 .-W 11 — — — — — — — — — — — — — — — — — — — — —24.0" 10 - - Round Culvert N 8 _ n=0-012- 0 7 — —, — LL 6 L=269.0' 5 &-O—Q1D0 '/'_ 4- 3- 2 1 0 0 1 2 Time (hours) PLI Storm Sewer& Dltch Calculations - 25 Yr Storm Piedmont Ditches and Storm SeGaston County, NC 25-Year Duration=6 min, Inten=7.63 in/hr Prepared by HDR, Inc Printed 8/27/2021 HydroCADO 10.10-5a s/n 05756 ©2020 HydroCAD Software Solutions LLC Page 27 Summary for Pond 2-P: SB-2 Inflow Area = 3.607 ac, 93.76% Impervious, Inflow Depth = 0.73" for 25-Year event Inflow = 25.20 cfs @ 0.12 hrs, Volume= 0.219 of Outflow = 25.20 cfs @ 0.12 hrs, Volume= 0.219 af, Atten= 0%, Lag= 0.0 min Primary = 25.20 cfs @ 0.12 hrs, Volume= 0.219 of Routing by Stor-Ind method, Time Span= 0.00-2.00 hrs, dt= 0.01 hrs Peak Elev= 833.51' @ 0.12 hrs Device Routing Invert Outlet Devices #1 Primary 829.74' 24.0" Round Culvert L= 269.0' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 829.74'/ 827.05' S= 0.0100 '/' Cc= 0.900 n= 0.012, Flow Area= 3.14 sf Primary OutFlow Max=24.90 cfs @ 0.12 hrs HW=833.45' (Free Discharge) L1=Culvert (Inlet Controls 24.90 cfs @ 7.93 fps) Pond 2-P: SB-2 Hydrograph _ _ 28 ❑ Inflow � z5.zocrs — — — — — — — — — — — — — — — — — — — — ❑Primary 26 25.20 cfs - -I -Inflow area=3:60Tac z2 _ _ _ -P-eak Elev=833.5a' 20 - - - - - - - - - - - - - 24.OWL - - - - - - - - - - - - - - Round Culvert w 16- 3 14- — — — — — — — — — — — — — — — 1�— .0'�� 0 LL 12- — — — — — — — — — — — — — — — — — — — - - - - -L-269.-Or - - - - - - - - -II - - - -S---0-0-1001/1 - 6- 4- 2- 0 0 1 2 Time (hours) PLI Storm Sewer& Dltch Calculations - 25 Yr Storm Piedmont Ditches and Storm SeGaston County, NC 25-Year Duration=6 min, Inten=7.63 in/hr Prepared by HDR, Inc Printed 8/27/2021 HydroCADO 10.10-5a s/n 05756 ©2020 HydroCAD Software Solutions LLC Page 28 Summary for Pond 3-P: SB-3 Inflow Area = 1.632 ac, 87.25% Impervious, Inflow Depth = 0.69" for 25-Year event Inflow = 10.80 cfs @ 0.11 hrs, Volume= 0.094 of Outflow = 10.80 cfs @ 0.11 hrs, Volume= 0.094 af, Atten= 0%, Lag= 0.0 min Primary = 10.80 cfs @ 0.11 hrs, Volume= 0.094 of Routing by Stor-Ind method, Time Span= 0.00-2.00 hrs, dt= 0.01 hrs Peak Elev= 833.39'@ 0.11 hrs Device Routing Invert Outlet Devices #1 Primary 831.03' 18.0" Round Culvert L= 269.0' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 831.03'/828.34' S= 0.0100 T Cc= 0.900 n= 0.012, Flow Area= 1.77 sf Primary OutFlow Max=10.80 cfs @ 0.11 hrs HW=833.39' (Free Discharge) L1=Culvert (Inlet Controls 10.80 cfs @ 6.11 fps) Pond 3-P: SB-3 Hydrograph I ❑ Inflow 12 10.80 cfs ❑Primary 11 10.80 cfs Inflow Area=1 .632 ac 10 Peak Elev=833.39' 9 18.0" 8 7 Round Culvert N - — - w 3 6 n=0.012 LL 5 L=269.0' 4 S=0.0100 T 3 2 1 0 0 1 2 Time (hours) PLI Storm Sewer& Dltch Calculations - 25 Yr Storm Piedmont Ditches and Storm SeGaston County, NC 25-Year Duration=6 min, Inten=7.63 in/hr Prepared by HDR, Inc Printed 8/27/2021 HydroCADO 10.10-5a s/n 05756 ©2020 HydroCAD Software Solutions LLC Page 29 Summary for Pond 4A-P: SB-4 (North) Inflow Area = 3.076 ac, 92.98% Impervious, Inflow Depth = 0.72" for 25-Year event Inflow = 20.06 cfs @ 0.14 hrs, Volume= 0.185 of Outflow = 20.06 cfs @ 0.14 hrs, Volume= 0.185 af, Atten= 0%, Lag= 0.0 min Primary = 20.06 cfs @ 0.14 hrs, Volume= 0.185 of Routing by Stor-Ind method, Time Span= 0.00-2.00 hrs, dt= 0.01 hrs Peak Elev= 832.49'@ 0.14 hrs Device Routing Invert Outlet Devices #1 Primary 829.73' 24.0" Round Culvert L= 269.0' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 829.73'/827.04' S= 0.0100 T Cc= 0.900 n= 0.012, Flow Area= 3.14 sf Primary OutFlow Max=19.78 cfs @ 0.14 hrs HW=832.44' (Free Discharge) L1=Culvert (Inlet Controls 19.78 cfs @ 6.30 fps) Pond 4A-P: SB-4 (North) Hydrograph - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - ❑ Inflow 22 120.06 cfs I - - - - - - - - - - - - - - - - - - - - - - - - - ❑Primary 20 2006ofs Inflow Area=3.076 ac 18 Peak Elev=832.49' 17 - - - - - - - - - - - - - - 24.0" 16 - - - - - - - - - - 15 - - - - - - - - - - 14 , - - - - - - - - - - - - ' - Round Culvert y 13 i - - - - - - - - - - - - - -I - 122/ g 11 ' i a 10 - - - - - - - - - - 9 - - - - - - - - - - L=269.0 8 - - - - - - - - - - - - - - - S=0.0100T 6 - - - 5 - - - 4 3 2 1 0 0 1 2 Time (hours) PLI Storm Sewer& Dltch Calculations - 25 Yr Storm Piedmont Ditches and Storm SeGaston County, NC 25-Year Duration=6 min, Inten=7.63 in/hr Prepared by HDR, Inc Printed 8/27/2021 HydroCADO 10.10-5a s/n 05756 ©2020 HydroCAD Software Solutions LLC Page 30 Summary for Pond 4B-P: SB-4 (South) Inflow Area = 2.907 ac, 89.85% Impervious, Inflow Depth = 0.71" for 25-Year event Inflow = 19.33 cfs @ 0.12 hrs, Volume= 0.171 of Outflow = 19.33 cfs @ 0.12 hrs, Volume= 0.171 af, Atten= 0%, Lag= 0.0 min Primary = 19.33 cfs @ 0.12 hrs, Volume= 0.171 of Routing by Stor-Ind method, Time Span= 0.00-2.00 hrs, dt= 0.01 hrs Peak Elev= 832.36' @ 0.12 hrs Device Routing Invert Outlet Devices #1 Primary 829.73' 24.0" Round Culvert L= 269.0' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 829.73'/ 827.04' S= 0.0100 '/' Cc= 0.900 n= 0.012, Flow Area= 3.14 sf Primary OutFlow Max=19.25 cfs @ 0.12 hrs HW=832.35' (Free Discharge) L1=Culvert (Inlet Controls 19.25 cfs @ 6.13 fps) Pond 4B-P: SB-4 (South) Hydrograph — — — — — —I — — - — — — — — — — — — — ❑ Inflow 21 i 19.33 cfs — — — — — — — — — — — — — — — — — ❑ Primary 20 19.33 cfs - - -Inflow Arrea=Z 9a7 ac- 19 i — — — — — - — — — — — — — — — — — — — — — — — — 18 - - - - - - - - - -PeakElev=8-32.-3-6'16 — — — — — — — — - — — — — — — — — — — — — — —2,0"- 13 — — 31; - - - - - - - - - - - - - - q a.0�2 o 10 9 - - - - - - - -L-=269.0'- 5 4- 3- 2- 1 0 0 1 2 Time (hours) PLI Storm Sewer& Dltch Calculations - 25 Yr Storm Piedmont Ditches and Storm SeGaston County, NC 25-Year Duration=6 min, Inten=7.63 in/hr Prepared by HDR, Inc Printed 8/27/2021 HydroCADO 10.10-5a s/n 05756 ©2020 HydroCAD Software Solutions LLC Page 31 Summary for Pond 5P: SB-5 (North) Inflow Area = 2.907 ac, 89.85% Impervious, Inflow Depth = 0.71" for 25-Year event Inflow = 19.50 cfs @ 0.12 hrs, Volume= 0.171 of Outflow = 19.50 cfs @ 0.12 hrs, Volume= 0.171 af, Atten= 0%, Lag= 0.0 min Primary = 19.50 cfs @ 0.12 hrs, Volume= 0.171 of Routing by Stor-Ind method, Time Span= 0.00-2.00 hrs, dt= 0.01 hrs Peak Elev= 838.10'@ 0.12 hrs Device Routing Invert Outlet Devices #1 Primary 835.44' 24.0" Round Culvert L= 196.0' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 835.44'/833.48' S= 0.0100 T Cc= 0.900 n= 0.012, Flow Area= 3.14 sf Primary OutFlow Max=19.33 cfs @ 0.12 hrs HW=838.07' (Free Discharge) L1=Culvert (Inlet Controls 19.33 cfs @ 6.15 fps) Pond 5P: SB-5 (North) Hydrograph ❑ Inflow 21 19s0.N ❑Primary 20 19.50ds Inflow Area=2.907 ac 19 i ,8 Peak Elev=838.10' 16 15 — — — — — - 24.0" 13 - - - Round Culvert Iq 11 - - - - - n=0.012 0 10 LL 9 — — — — — — — L=196.0' 8 S=0.0100 T 5 4 3 2 1 0 0 1 2 Time (hours) 1 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk, Inc.v2018.3 Tuesday, 12/7/2021 Hyd. No. 1 DA1- Stream Crossing at Road Hydrograph type = SCS Runoff Peak discharge = 189.56 cfs Storm frequency = 10 yrs Time to peak = 730 min Time interval = 2 min Hyd. volume = 758,686 cuft Drainage area = 74.730 ac Curve number = 78 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 28.10 min Total precip. = 5.10 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA1- Stream Crossing at Road Q (cfs) Hyd. No. 1 -- 10 Year Q (cfs) 210.00 210.00 180.00 180.00 150.00 150.00 120.00 120.00 90.00 90.00 60.00 60.00 30.00 30.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 2 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk, Inc.v2018.3 Tuesday, 12/7/2021 Hyd. No. 2 DA2- Crossing at Road Hydrograph type = SCS Runoff Peak discharge = 9.112 cfs Storm frequency = 10 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 25,553 cuft Drainage area = 2.500 ac Curve number = 79 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 14.70 min Total precip. = 5.10 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA2- Crossing at Road Q (cfs) Hyd. No. 2 -- 10 Year Q (cfs) 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) 3 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk, Inc.v2018.3 Tuesday, 12/7/2021 Hyd. No. 3 DA3- Crossing at Road Hydrograph type = SCS Runoff Peak discharge = 22.57 cfs Storm frequency = 10 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 58,525 cuft Drainage area = 5.590 ac Curve number = 78 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 12.90 min Total precip. = 5.10 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA3- Crossing at Road Q (cfs) Hyd. No. 3-- 10 Year Q (cfs) 24.00 24.00 20.00 20.00 16.00 16.00 12.00 12.00 8.00 8.00 4.00 4.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 3 Time (min) 4 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk, Inc.v2018.3 Tuesday, 12/7/2021 Hyd. No. 4 DA4- Stream Crossing at Railroad Hydrograph type = SCS Runoff Peak discharge = 354.47 cfs Storm frequency = 10 yrs Time to peak = 730 min Time interval = 2 min Hyd. volume = 1,423,773 cuft Drainage area = 149.810 ac Curve number = 76 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 27.70 min Total precip. = 5.10 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA4- Stream Crossing at Railroad Q (cfs) Hyd. No. 4-- 10 Year Q (cfs) 400.00 400.00 350.00 350.00 300.00 300.00 250.00 250.00 200.00 200.00 150.00 150.00 100.00 100.00 50.00 50.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 4 Time (min) 5 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk, Inc.v2018.3 Tuesday, 12/7/2021 Hyd. No. 5 DA 5 - Railroad Crossing South Hydrograph type = SCS Runoff Peak discharge = 51.83 cfs Storm frequency = 10 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 145,344 cuft Drainage area = 14.220 ac Curve number = 79 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 16.10 min Total precip. = 5.10 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA 5 - Railroad Crossing South Q (cfs) Hyd. No. 5-- 10 Year Q (cfs) 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 5 Time (min) 6 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk, Inc.v2018.3 Tuesday, 12/7/2021 Hyd. No. 1 DA1- Stream Crossing at Road Hydrograph type = SCS Runoff Peak discharge = 296.09 cfs Storm frequency = 25 yrs Time to peak = 730 min Time interval = 2 min Hyd. volume = 1,184,395 cuft Drainage area = 74.730 ac Curve number = 78 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 28.10 min Total precip. = 6.88 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA1- Stream Crossing at Road Q (cfs) Hyd. No. 1 --25 Year Q (cfs) 320.00 320.00 280.00 280.00 240.00 240.00 200.00 200.00 160.00 160.00 120.00 120.00 80.00 80.00 40.00 40.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 7 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk, Inc.v2018.3 Tuesday, 12/7/2021 Hyd. No. 2 DA2- Crossing at Road Hydrograph type = SCS Runoff Peak discharge = 14.01 cfs Storm frequency = 25 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 39,593 cuft Drainage area = 2.500 ac Curve number = 79 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 14.70 min Total precip. = 6.88 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA2- Crossing at Road Q (cfs) Hyd. No. 2 --25 Year Q (cfs) 15.00 15.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 3.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) 8 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk, Inc.v2018.3 Tuesday, 12/7/2021 Hyd. No. 3 DA3- Crossing at Road Hydrograph type = SCS Runoff Peak discharge = 34.99 cfs Storm frequency = 25 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 91,364 cuft Drainage area = 5.590 ac Curve number = 78 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 12.90 min Total precip. = 6.88 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA3- Crossing at Road Q (cfs) Hyd. No. 3--25 Year Q (cfs) 35.00 35.00 30.00 30.00 25.00 25.00 20.00 20.00 15.00 15.00 10.00 10.00 5.00 5.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 3 Time (min) 9 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk, Inc.v2018.3 Tuesday, 12/7/2021 Hyd. No. 4 DA4- Stream Crossing at Railroad Hydrograph type = SCS Runoff Peak discharge = 564.89 cfs Storm frequency = 25 yrs Time to peak = 730 min Time interval = 2 min Hyd. volume = 2,257,193 cuft Drainage area = 149.810 ac Curve number = 76 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 27.70 min Total precip. = 6.88 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA4- Stream Crossing at Railroad Q (cfs) Hyd. No. 4--25 Year Q (cfs) 640.00 640.00 560.00 560.00 480.00 480.00 400.00 400.00 320.00 320.00 240.00 240.00 160.00 160.00 80.00 80.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 4 Time (min) 10 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk, Inc.v2018.3 Tuesday, 12/7/2021 Hyd. No. 5 DA 5 - Railroad Crossing South Hydrograph type = SCS Runoff Peak discharge = 79.66 cfs Storm frequency = 25 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 225,203 cuft Drainage area = 14.220 ac Curve number = 79 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 16.10 min Total precip. = 6.88 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA 5 - Railroad Crossing South Q (cfs) Hyd. No. 5--25 Year Q (cfs) 80.00 80.00 70.00 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 5 Time (min) 11 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk, Inc.v2018.3 Tuesday, 12/7/2021 Hyd. No. 1 DA1- Stream Crossing at Road Hydrograph type = SCS Runoff Peak discharge = 448.37 cfs Storm frequency = 100 yrs Time to peak = 730 min Time interval = 2 min Hyd. volume = 1,809,269 cuft Drainage area = 74.730 ac Curve number = 78 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 28.10 min Total precip. = 9.37 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA1- Stream Crossing at Road Q (cfs) Hyd. No. 1 -- 100 Year Q (cfs) 480.00 480.00 420.00 420.00 360.00 360.00 300.00 300.00 240.00 240.00 180.00 180.00 120.00 120.00 60.00 60.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 12 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk, Inc.v2018.3 Tuesday, 12/7/2021 Hyd. No. 2 DA2- Crossing at Road Hydrograph type = SCS Runoff Peak discharge = 20.94 cfs Storm frequency = 100 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 60,121 cuft Drainage area = 2.500 ac Curve number = 79 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 14.70 min Total precip. = 9.37 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA2- Crossing at Road Q (cfs) Hyd. No. 2-- 100 Year Q (cfs) 21.00 21.00 18.00 18.00 15.00 1 1 1 1 115.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 3.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) 13 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk, Inc.v2018.3 Tuesday, 12/7/2021 Hyd. No. 3 DA3- Crossing at Road Hydrograph type = SCS Runoff Peak discharge = 52.65 cfs Storm frequency = 100 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 139,567 cuft Drainage area = 5.590 ac Curve number = 78 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 12.90 min Total precip. = 9.37 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA3- Crossing at Road Q (cfs) Hyd. No. 3-- 100 Year Q (cfs) 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 3 Time (min) 14 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk, Inc.v2018.3 Tuesday, 12/7/2021 Hyd. No. 4 DA4- Stream Crossing at Railroad Hydrograph type = SCS Runoff Peak discharge = 868.54 cfs Storm frequency = 100 yrs Time to peak = 730 min Time interval = 2 min Hyd. volume = 3,490,608 cuft Drainage area = 149.810 ac Curve number = 76 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 27.70 min Total precip. = 9.37 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA4- Stream Crossing at Railroad Q (cfs) Hyd. No. 4-- 100 Year Q (cfs) 875.00 875.00 750.00 750.00 625.00 625.00 500.00 500.00 375.00 375.00 250.00 250.00 125.00 125.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 4 Time (min) 15 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2018 by Autodesk, Inc.v2018.3 Tuesday, 12/7/2021 Hyd. No. 5 DA 5 - Railroad Crossing South Hydrograph type = SCS Runoff Peak discharge = 119.11 cfs Storm frequency = 100 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 341,967 cuft Drainage area = 14.220 ac Curve number = 79 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 16.10 min Total precip. = 9.37 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA 5 - Railroad Crossing South Q (cfs) Hyd. No. 5-- 100 Year Q (cfs) 120.00 120.00 100.00 100.00 80.00 80.00 60.00 60.00 40.00 40.00 20.00 20.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 5 Time (min) PLC Lithium Hydroxide Conversion Plant ��� Appendices Appendix J — Stream and Culvert Crossing Calculations HY-8 Culvert Analysis Report Culvert #C101 Crossing Discharge Data Discharge Selection Method: Specify Minimum, Design, and Maximum Flow Minimum Flow: 9.11 cfs Design Flow: 14.01 cfs Maximum Flow: 20.94 cfs Table 1 - Summary of Culvert Flows at Crossing: Crossing 1 - DA2 Headwater Elevation Culvert 1 Discharge Roadway Discharge (ft) Total Discharge(cfs) (cfs) (cfs) Iterations 889.96 9.11 9.11 0.00 1 890.09 10.29 10.29 0.00 1 890.22 11.48 11.48 0.00 1 890.35 12.66 12.66 0.00 1 890.50 14.01 14.01 0.00 1 890.62 15.03 15.03 0.00 1 890.76 16.21 16.21 0.00 1 890.92 17.39 17.39 0.00 1 891.08 18.57 18.57 0.00 1 891.26 19.76 19.76 0.00 1 891.45 20.94 20.94 0.00 1 893.02 28.80 28.80 0.00 Overtopping Rating Curve Plot for Crossing: Crossing 1 - DA2 Total Rating Curve Crossing:Crossing 1-DA2 893.5 893.D 8925 a } 892.D a� w aj 891.5 m -Om 891.D a) T 890.5 890.D 10 15 20 25 30 Total Discharge(cfs) Table 2 - Culvert Summary Table: Culvert 1 Total Culvert Headwat Inlet Outlet Normal Critical Outlet Tailwate Outlet Tailwate Discharg Discharg er Control Control Flow Depth Depth Depth r Depth Velocity r e(cfs) a(cfs) Elevatio Depth Depth Type (ft) (ft) (ft) (ft) (fus) Velocity n ft ft ft fus 9.11 9.11 889.96 1.565 0.0* 1-S2n 0.563 1.077 0.592 0.308 11.693 2.740 10.29 10.29 890.09 1.692 0.0* 1-S2n 0.599 1.149 0.639 0.324 11.908 2.829 11.48 11.48 890.22 1.818 0.0* 1-S2n 0.634 1.216 0.672 0.340 12.390 2.911 12.66 12.66 890.35 1.946 0.0* 1-S2n 0.668 1.279 0.717 0.355 12.511 2.986 14.01 14.01 890.50 2.097 0.0* 5-S2n 0.704 1.348 0.755 0.371 12.901 3.066 15.03 15.03 890.62 2.216 0.0* 5-S2n 0.731 1.397 0.790 0.382 13.025 3.122 16.21 16.21 890.76 2.362 0.0* 5-S2n 0.762 1.451 0.827 0.395 13.215 3.184 17.39 17.39 890.92 2.517 0.0* 5-S2n 0.791 1.503 0.859 0.407 13.483 3.243 18.57 18.57 891.08 2.683 0.0* 5-S2n 0.821 1.551 0.895 0.419 13.635 3.298 19.76 1 19.76 1 891.26 1 2.860 1 0.134 1 5-S2n 1 0.849 1 1.597 1 0.932 1 0.430 1 13.778 3.351 20.94 1 20.94 1 891.45 1 3.049 1 0.321 1 5-S2n 1 0.877 1 1.639 1 0.965 1 0.441 1 13.947 3.402 * Full Flow Headwater elevation is below inlet invert. Straight Culvert Inlet Elevation(invert):888.40 ft, Outlet Elevation(invert):885.39 ft Culvert Length:65.60 ft, Culvert Slope:0.0459 Culvert Performance Curve Plot: Culvert 1 Performance Curve culven:cUIVffI r 0 0 Inlet Control Elev bullet Control Elev 893 892 0 a a) w 891 2 m -� 890 m a) _ 889 Y 10 15 20 25 30 Total Discharge Scfs) Water Surface Profile Plot for Culvert: Culvert 1 Culvert #C101 Crossuig- Crossuig 1 -DA2,Desigxi Discharge - 14.0 cfs Cuh-ert-Cuh ert 1-Cuh-en Discharge-14-6 cfs 894 893 892 U 891 c � 0 890 m _ w 889 888 887 886 885 -20 0 20 40 60 80 statiar{ft) S Inlet 5tatlon: U.UU tt Inlet Elevation: 888.40 ft Outlet Station: 65.53 ft Outlet Elevation: 885.39 ft Number of Barrels: 1 Culvert Data Summary - Culvert 1 Barrel Shape: Circular Barrel Diameter: 2.00 ft Barrel Material: Concrete Embedment: 0.00 in Barrel Manning's n: 0.0120 Culvert Type: Straight Inlet Configuration: Square Edge with Headwall Inlet Depression: None Table 3 - Downstream Channel Rating Curve (Crossing: Crossing 1 - DA2) Flow(cfs) Water Surface Depth (ft) Velocity(ft/s) Shear(psf) Froude Number Elev (ft) 9.11 885.70 0.31 2.74 0.77 1.13 10.29 885.71 0.32 2.83 0.81 1.14 11.48 885.73 0.34 2.91 0.85 1.14 12.66 885.75 0.36 2.99 0.89 1.15 14.01 885.76 0.37 3.07 0.93 1.16 15.03 885.77 0.38 3.12 0.95 1.16 16.21 885.79 0.40 3.18 0.99 1.17 17.39 885.80 0.41 3.24 1.02 1.18 18.57 885.81 0.42 3.30 1.05 1.18 19.76 885.82 0.43 3.35 1.07 1.19 20.94 885.83 0.44 3.40 1.10 1.19 Tailwater Channel Data - Crossing 1 - DA2 Tailwater Channel Option: Irregular Channel Channel Slope: 0.0400 User Defined Channel Cross-Section: Coord No. Station (ft) Elevation (ft) Manning's n 1 0.00 888.26 0.0350 2 16.95 886.56 0.0350 3 35.27 885.43 0.0350 4 39.94 885.39 0.0350 5 70.19 886.41 0.0350 6 93.78 886.85 0.0000 Roadway Data for Crossing: Crossing 1 - DA2 Roadway Profile Shape: Irregular Roadway Shape (coordinates) Irregular Roadway Cross-Section: Coord No. Station (ft) Elevation (ft) 0 350.00 894.44 1 363.74 893.99 2 400.00 893.02 Roadway Surface: Paved Roadway Top Width: 26.00 ft Culvert #C102 Crossing Discharge Data Discharge Selection Method: Specify Minimum, Design, and Maximum Flow Minimum Flow: 22.57 cfs Design Flow: 34.99 cfs Maximum Flow: 52.65 cfs Table 4 - Summary of Culvert Flows at Crossing: Crossing 2 - DA3 Headwater Elevation Culvert 2 Discharge Roadway Discharge (ft) Total Discharge(cfs) (cfs) (cfs) Iterations 873.46 22.57 22.57 0.00 1 873.64 25.58 25.58 0.00 1 873.82 28.59 28.59 0.00 1 873.99 31.59 31.59 0.00 1 874.19 34.99 34.99 0.00 1 874.35 37.61 37.61 0.00 1 874.54 40.62 40.62 0.00 1 874.74 43.63 43.63 0.00 1 874.95 46.63 46.63 0.00 1 875.17 49.64 49.64 0.00 1 875.41 52.65 52.65 0.00 1 878.21 79.45 79.45 0.00 Overtopping Rating Curve Plot for Crossing: Crossing 2 - DA3 Total Rating Curve Crossing:Crossing 2-DA3 879 878 a 877 6 } a) w 876 a� m 875 aD T 87d 20 30 40 b0 60 70 80 90 Total Discharge(cfs) Table 5 - Culvert Summary Table: Culvert 2 Total Culvert Headwat Inlet Outlet Normal Critical Outlet Tailwate Outlet Tailwate Discharg Discharg er Control Control Flow Depth Depth Depth r Depth Velocity r e(cfs) a(cfs) Elevatio Depth Depth Type (ft) (ft) (ft) (ft) (fus) Velocity n ft ft ft fus 22.57 22.57 873.46 2.173 0.0* 1-S2n 0.720 1.529 0.835 0.288 14.048 2.690 25.58 25.58 873.64 2.353 0.0* 1-S2n 0.768 1.632 0.901 0.305 14.308 2.786 28.59 28.59 873.82 2.529 0.0* 1-S2n 0.812 1.730 0.964 0.320 14.577 2.874 31.59 31.59 873.99 2.703 0.0* 1-S2n 0.855 1.823 1.022 0.335 14.870 2.955 34.99 34.99 874.19 2.903 0.0* 1-S2n 0.901 1.922 1.089 0.350 15.094 3.039 37.61 37.61 874.35 3.062 0.027 5-S2n 0.935 1.995 1.138 0.362 15.293 3.100 40.62 40.62 874.54 3.251 0.237 5-S2n 0.973 2.075 1.194 0.374 15.485 3.166 43.63 43.63 874.74 3.450 0.454 5-S2n 1.011 2.152 1.247 0.386 15.699 3.228 46.63 46.63 874.95 3.660 0.676 5-S2n 1.047 2.224 1.301 0.397 15.870 3.292 49.64 1 49.64 1 875.17 1 3.883 1 1.259 1 5-S2n 1 1.083 1 2.293 1 1.351 1 0.408 1 16.067 3.356 52.65 1 52.65 1 875.41 1 4.120 1 1.462 1 5-S2n 1 1.117 1 2.358 1 1.402 1 0.418 1 16.248 3.417 * Full Flow Headwater elevation is below inlet invert. Straight Culvert Inlet Elevation(invert):871.29 ft, Outlet Elevation(invert):868.54 ft Culvert Length:45.49 ft, Culvert Slope:0.0606 Culvert Performance Curve Plot: Culvert 2 Performance Curve Culver:aulvfft z 0 0 Inlet Control Elev bullet Control Elev 879 878 0 877 a m 876 } w 875 --� 874 CU — 41 873 Ar-- 872 r s - r r 871 20 30 40 b0 60 70 80 90 Total Discharge(cfs) Culvert #C102 Water Surface Profile Plot for Culvert: Culvert 2 Crossuig- Crossuig 2 -DA3,Desigxi Discharge - 35.0 cfs Cuh•ert-Cuhert 2,Cuh•en Discharge-35.0 cfs 880 878 —876 C 0 874 --- a}i w - 872 870 868 -10 0 10 20 30 40 50 60 Station(ft) S Inlet 5tatlon: U.UU tt Inlet Elevation: 871.29 ft Outlet Station: 45.41 ft Outlet Elevation: 868.54 ft Number of Barrels: 1 Culvert Data Summary - Culvert 2 Barrel Shape: Circular Barrel Diameter: 3.00 ft Barrel Material: Concrete Embedment: 0.00 in Barrel Manning's n: 0.0120 Culvert Type: Straight Inlet Configuration: Square Edge with Headwall Inlet Depression: None Table 6 - Downstream Channel Rating Curve (Crossing: Crossing 2 - DA3) Flow(cfs) Water Surface Depth (ft) Velocity(ft/s) Shear(psf) Froude Number Elev (ft) 22.57 868.83 0.29 2.69 0.72 1.12 25.58 868.84 0.30 2.79 0.76 1.13 28.59 868.86 0.32 2.87 0.80 1.14 31.59 868.87 0.33 2.95 0.84 1.15 34.99 868.89 0.35 3.04 0.87 1.16 37.61 868.90 0.36 3.10 0.90 1.16 40.62 868.91 0.37 3.17 0.93 1.17 43.63 868.93 0.39 3.23 0.96 1.17 46.63 868.94 0.40 3.29 0.99 1.18 49.64 868.95 0.41 3.36 1.02 1.19 52.65 868.96 0.42 3.42 1.04 1.19 Tailwater Channel Data - Crossing 2 - DA3 Tailwater Channel Option: Irregular Channel Channel Slope: 0.0400 User Defined Channel Cross-Section: Coord No. Station (ft) Elevation (ft) Manning's n 1 0.00 870.14 0.0350 2 26.21 868.93 0.0350 3 45.28 868.54 0.0350 4 58.05 868.57 0.0350 5 71.82 868.72 0.0350 6 93.78 869.09 0.0000 Roadway Data for Crossing: Crossing 2 - DA3 Roadway Profile Shape: Irregular Roadway Shape (coordinates) Irregular Roadway Cross-Section: Coord No. Station (ft) Elevation (ft) 0 950.00 879.78 1 990.06 878.53 2 1000.00 878.21 Roadway Surface: Paved Roadway Top Width: 26.00 ft Stream Crossing No. 3 Crossing Discharge Data Discharge Selection Method: Specify Minimum, Design, and Maximum Flow Minimum Flow: 189.56 cfs Design Flow: 296.09 cfs Maximum Flow: 448.37 cfs Table 7 - Summary of Culvert Flows at Crossing: Crossing 3 - DA1 Headwater Elevation Open Bottom Arch 3 Roadway Discharge (ft) Total Discharge(cfs) Discharge(cfs) (cfs) Iterations 832.11 189.56 189.56 0.00 1 832.54 215.44 215.44 0.00 1 832.97 241.32 241.32 0.00 1 833.40 267.20 267.20 0.00 1 833.88 296.09 296.09 0.00 1 834.27 318.97 318.97 0.00 1 834.71 344.85 344.85 0.00 1 835.15 370.73 370.73 0.00 1 835.69 396.61 396.61 0.00 1 836.29 422.49 422.49 0.00 1 836.89 448.37 448.37 0.00 1 839.48 540.51 540.51 0.00 Overtopping Rating Curve Plot for Crossing: Crossing 3 - DA1 Total Rating Curve Crossing:Crossing 3-DAt 84fl 839 838 0 a 837 } a) w 83g a� 835 ca m = 834 833 832 200 300 400 500 500 Tatal Discharge�cfs) Table 8 - Culvert Summary Table: Open Bottom Arch 3 Total Culvert Headwat Inlet Outlet Normal Critical Outlet Tailwate Outlet Tailwate Discharg Discharg er Control Control Flow Depth Depth Depth r Depth Velocity r e(cfs) a(cfs) Elevatio Depth Depth Type (ft) (ft) (ft) (ft) (fus) Velocity n ft ft ft fus 189.56 189.56 832.11 4.141 0.0* 1-S2n 1.951 2.227 1.951 2.363 9.907 8.932 215.44 215.44 832.54 4.570 0.241 1-S2n 2.142 2.423 2.142 2.528 10.304 9.250 241.32 241.32 832.97 4.998 0.825 1-S2n 2.331 2.613 2.336 2.683 10.638 9.540 267.20 267.20 833.40 5.426 1.448 5-S2n 2.520 2.791 2.520 2.829 10.982 9.806 296.09 296.09 833.88 5.909 2.192 5-S2n 2.732 2.981 2.732 2.983 11.303 10.079 318.97 318.97 834.27 6.300 2.846 5-S2n 2.906 3.126 2.906 3.100 11.522 10.282 344.85 344.85 834.71 6.742 3.630 5-S2n 3.108 3.287 3.108 3.226 11.745 10.497 370.73 370.73 835.15 7.184 4.457 5-S2n 3.317 3.443 3.317 3.347 11.946 10.700 396.61 396.61 835.69 7.720 5.318 5-S2n 3.540 3.584 3.540 3.463 12.109 10.892 422.49 422.49 836.29 8.319 8.203 7-M2 3.787 3.722 3.722 3.575 12.394 11.074 c 448.37 448.37 836.89 8.918 8.541 7-M2 4.062 3.855 3.855 3.683 12.801 11.248 c * Full Flow Headwater elevation is below inlet invert. Straight Culvert Inlet Elevation(invert):827.97 ft, Outlet Elevation(invert):824.00 ft Culvert Length:111.46 ft, Culvert Slope:0.0356 Culvert Performance Curve Plot: Open Bottom Arch 3 Performance Curve Culvert:Open Bottom Arch 3 0 0 Inlet Control Elev bullet Control Elev 840 838 v 836 m m w 834 CU J' 01 l 832 m = 830 X x 828 260 300 400 500 500 Tatal Discharge�cfs) Stream Crossing No. 3 Water Surface Profile Plot for Culvert: Open Bottom Arch 3 Crossing- Crossing 3 -DAL Desigxi Discharge- 296.1 cfs C&ert Open Bottom Arch 3,Cuhert Discharge-296.1 cfs 842 840 838 836 834 --- 0 } 832 m w 830 828 �- 826 824 0 50 100 Station(ft) S Inlet 5tatlon: U.UU tt Inlet Elevation: 827.97 ft Outlet Station: 111.39 ft Outlet Elevation: 824.00 ft Number of Barrels: 1 Culvert Data Summary - Open Bottom Arch 3 Barrel Shape: Arch, Open Bottom Barrel Span: 10.00 ft Barrel Rise: 5.25 ft Barrel Material: Corrugated Steel Embedment: 0.00 in Barrel Manning's n: 0.0350 (top and sides) Manning's n: 0.0350 (bottom) Culvert Type: Straight Inlet Configuration: Thin Edge Projecting Inlet Depression: None Table 9 - Downstream Channel Rating Curve (Crossing: Crossing 3 - DA1) Flow(cfs) Water Surface Depth (ft) Velocity(ft/s) Shear(psf) Froude Number Elev(ft) 189.56 826.36 2.36 8.93 3.69 1.20 215.44 826.53 2.53 9.25 3.94 1.21 241.32 826.68 2.68 9.54 4.19 1.21 267.20 826.83 2.83 9.81 4.41 1.22 296.09 826.98 2.98 10.08 4.65 1.23 318.97 827.10 3.10 10.28 4.84 1.23 344.85 827.23 3.23 10.50 5.03 1.24 370.73 827.35 3.35 10.70 5.22 1.24 396.61 827.46 3.46 10.89 5.40 1.25 422.49 827.57 3.57 11.07 5.58 1.25 448.37 827.68 3.68 11.25 5.75 1.25 Tailwater Channel Data - Crossing 3 - DA1 Tailwater Channel Option: Irregular Channel Channel Slope: 0.0250 User Defined Channel Cross-Section: Coord No. Station (ft) Elevation (ft) Manning's n 1 0.00 835.17 0.0350 2 25.14 830.00 0.0350 3 47.91 828.00 0.0350 4 54.56 824.00 0.0350 5 60.25 824.00 0.0350 6 64.95 828.18 0.0350 7 76.03 830.91 0.0350 8 99.59 834.74 0.0000 Roadway Data for Crossing: Crossing 3 - DA1 Roadway Profile Shape: Irregular Roadway Shape (coordinates) Irregular Roadway Cross-Section: Coord No. Station (ft) Elevation (ft) 0 2000.00 841.16 1 2050.00 840.07 2 2083.00 839.64 3 2150.00 839.48 4 2200.00 839.91 Roadway Surface: Paved Roadway Top Width: 26.00 ft Stream Crossing No. 4 Crossing Discharge Data Discharge Selection Method: Specify Minimum, Design, and Maximum Flow Minimum Flow: 354.47 cfs Design Flow: 564.89 cfs Maximum Flow: 868.54 cfs Table 10 - Summary of Culvert Flows at Crossing: Railroad Crossing 4 - DA4 Headwater Elevation Open Bottom Arch 4- Roadway Discharge (ft) Total Discharge(cfs) Railroad Discharge (cfs) Iterations cfs 821.09 354.47 354.47 0.00 1 821.66 405.88 405.88 0.00 1 822.20 457.28 457.28 0.00 1 822.72 508.69 508.69 0.00 1 823.29 564.89 564.89 0.00 1 823.76 611.51 611.51 0.00 1 824.28 662.91 662.91 0.00 1 824.82 714.32 714.32 0.00 1 825.35 765.73 765.73 0.00 1 825.89 817.13 817.13 0.00 1 826.45 868.54 868.54 0.00 1 838.23 1517.23 1517.23 0.00 Overtopping Rating Curve Plot for Crossing: Railroad Crossing 4 - DA4 Total Rating Curve Crossing:Railroad Crossing 4-DA4 838 83S v 834 0 a m 832 } a) w 830 a� 828 ai 826 824 822 400 500 800 1000 1200 1400 1600 Total Discharge Scfs) Table 11 - Culvert Summary Table: Open Bottom Arch 4 - Railroad Total Culvert Headwat Inlet Outlet Normal Critical Outlet Tailwate Outlet Tailwate Discharg Discharg er Control Control Flow Depth Depth Depth r Depth Velocity r e(cfs) a(cfs) Elevatio Depth Depth Type (ft) (ft) (ft) (ft) (fus) Velocity n ft (ft) (ft fus 354.47 354.47 821.09 4.836 0.0* 1 tS1 1.916 2.708 5.105 5.105 5.426 7.682 405.88 405.88 821.66 5.407 0.0* 1 tS1 2.094 2.960 5.420 5.420 5.934 7.944 457.28 457.28 822.20 5.951 0.0* 1-S2n 2.266 3.202 2.273 5.712 14.591 8.183 508.69 508.69 822.72 6.469 0.004 1-S2n 2.432 3.437 2.432 5.985 15.204 8.402 564.89 564.89 823.29 7.036 0.799 1-S2n 2.610 3.685 2.610 6.264 15.774 8.623 611.51 611.51 823.76 7.506 1.497 5-S2n 2.755 3.876 2.755 6.483 16.215 8.794 662.91 662.91 824.28 8.030 2.281 5-S2n 2.914 4.083 2.914 6.713 16.672 8.972 714.32 714.32 824.82 8.566 3.095 5-S2n 3.070 4.284 3.070 6.932 17.101 9.139 765.73 765.73 825.35 9.102 3.941 5-S2n 3.226 4.481 3.232 7.141 17.473 9.298 817.13 817.13 825.89 9.638 4.808 5-S2n 3.380 4.673 3.404 7.342 17.772 9.449 868.54 868.54 826.45 10.196 5.719 5-S2n 3.534 4.849 3.534 7.536 18.251 9.592 * Full Flow Headwater elevation is below inlet invert. Straight Culvert Inlet Elevation(invert):816.25 ft, Outlet Elevation(invert):808.00 ft Culvert Length:162.06 ft, Culvert Slope:0.0510 Culvert Performance Curve Plot: Open Bottom Arch 4 - Railroad Performance Curve Culvert:Open Bottom Arch 4-Railroad 0 0 840 Inlet Control Elev bullet Control Elev _ 835 v 0 o � } 830 .' a) w m 825 � CU rr r = 820 r r 400 500 800 1000 1200 1400 1600 Total Discharge Scfs) Stream Crossing No. 4 Water Surface Profile Plot for Culvert: Open Bottom Arch 4 - Railroad Crossing-Railroad Crossing 4-DAa.Dcstgn Discharge-564.9 cfs Culvert-Open Bottom Arch 4-Railroad-Cuh•ert Discharge-564.4 cf 840 835 830 c 0 825 a}i w 820 815 --- 810 -50 0 50 100 150 200 Station(ft) S Inlet 5tatlon: U.UU tt Inlet Elevation: 816.25 ft Outlet Station: 161.85 ft Outlet Elevation: 808.00 ft Number of Barrels: 1 Culvert Data Summary - Open Bottom Arch 4 - Railroad Barrel Shape: Arch, Open Bottom Barrel Span: 14.00 ft Barrel Rise: 7.25 ft Barrel Material: Corrugated Aluminum Embedment: 0.00 in Barrel Manning's n: 0.0240 (top and sides) Manning's n: 0.0350 (bottom) Culvert Type: Straight Inlet Configuration: Thin Edge Projecting Inlet Depression: None Table 12 - Downstream Channel Rating Curve (Crossing: Railroad Crossing 4 - DA4) Flow(cfs) Water Surface Depth (ft) Velocity(ft/s) Shear(psf) Froude Number Elev (ft) 354.47 813.10 5.10 7.68 3.19 0.78 405.88 813.42 5.42 7.94 3.38 0.78 457.28 813.71 5.71 8.18 3.56 0.79 508.69 813.98 5.98 8.40 3.73 0.79 564.89 814.26 6.26 8.62 3.91 0.80 611.51 814.48 6.48 8.79 4.05 0.80 662.91 814.71 6.71 8.97 4.19 0.81 714.32 814.93 6.93 9.14 4.33 0.81 765.73 815.14 7.14 9.30 4.46 0.81 817.13 815.34 7.34 9.45 4.58 0.82 868.54 815.54 7.54 9.59 4.70 0.82 Tailwater Channel Data - Railroad Crossing 4 - DA4 Tailwater Channel Option: Irregular Channel Channel Slope: 0.0100 User Defined Channel Cross-Section: Coord No. Station (ft) Elevation (ft) Manning's n 1 0.00 816.00 0.0350 2 15.50 816.00 0.0350 3 26.56 808.00 0.0350 4 29.35 808.00 0.0350 5 42.14 820.00 0.0350 6 52.13 821.38 0.0350 Roadway Data for Crossing: Railroad Crossing 4 - DA4 Roadway Profile Shape: Irregular Roadway Shape (coordinates) Irregular Roadway Cross-Section: Coord No. Station (ft) Elevation (ft) 0 1975.00 840.76 1 2083.00 838.23 2 2175.00 838.46 3 2425.00 840.96 Roadway Surface: Paved Roadway Top Width: 45.00 ft Culvert #C103 Crossing Discharge Data Discharge Selection Method: Specify Minimum, Design, and Maximum Flow Minimum Flow: 51.83 cfs Design Flow: 79.66 cfs Maximum Flow: 119.11 cfs Table 13 - Summary of Culvert Flows at Crossing: Crossing 5 - DA 5 Headwater Elevation Culvert 5 Discharge Roadway Discharge (ft) Total Discharge(cfs) (cfs) (cfs) Iterations 883.13 51.83 51.83 0.00 1 883.38 58.56 58.56 0.00 1 883.64 65.29 65.29 0.00 1 883.89 72.01 72.01 0.00 1 884.20 79.66 79.66 0.00 1 884.44 85.47 85.47 0.00 1 884.73 92.20 92.20 0.00 1 885.05 98.93 98.93 0.00 1 885.38 105.65 105.65 0.00 1 885.74 112.38 112.38 0.00 1 886.12 119.11 119.11 0.00 1 894.00 202.93 202.93 0.00 Overtopping Rating Curve Plot for Crossing: Crossing 5 - DA 5 Total Rating Curve Crossing:Crossing 5-DA 5 893 892 891 0 890 CU a}i 889 w 888 a� 887 ID, 886 885 004 883 60 80 100 120 140 160 180 200 220 Total Discharge(cfs) Table 14 - Culvert Summary Table: Culvert 5 Total Culvert Headwat Inlet Outlet Normal Critical Outlet Tailwate Outlet Tailwate Discharg Discharg er Control Control Flow Depth Depth Depth r Depth Velocity r e(cfs) a(cfs) Elevatio Depth Depth Type (ft) (ft) (ft) (ft) (fus) Velocity n ft ft ft fus 51.83 51.83 883.13 3.178 0.0* 1-S2n 1.215 2.162 1.324 0.513 14.275 4.408 58.56 58.56 883.38 3.433 0.002 1-S2n 1.295 2.304 1.422 0.535 14.623 4.594 65.29 65.29 883.64 3.687 0.296 1-S2n 1.371 2.439 1.517 0.556 14.942 4.766 72.01 72.01 883.89 3.944 0.601 1-S2n 1.445 2.566 1.607 0.577 15.251 4.924 79.66 79.66 884.20 4.248 0.961 5-S2n 1.525 2.703 1.707 0.599 15.577 5.092 85.47 85.47 884.44 4.489 1.243 5-S2n 1.584 2.802 1.783 0.615 15.783 5.212 92.20 92.20 884.73 4.784 1.582 5-S2n 1.652 2.911 1.865 0.633 16.047 5.343 98.93 98.93 885.05 5.098 2.425 5-S2n 1.717 3.014 1.949 0.650 16.273 5.467 105.65 105.65 885.38 5.433 2.737 5-S2n 1.782 3.111 2.030 0.667 16.503 5.584 112.381 112.38 1 885.74 1 5.791 1 3.064 1 5-S2n 1 1.846 1 3.202 1 2.108 1 0.683 1 16.736 1 5.697 119.111 119.11 1 886.12 1 6.173 1 3.405 1 5-S2n 1 1.908 1 3.287 1 2.185 1 0.699 1 16.959 1 5.804 * Full Flow Headwater elevation is below inlet invert. Straight Culvert Inlet Elevation(invert):879.95 ft, Outlet Elevation(invert):876.99 ft Culvert Length:108.04 ft, Culvert Slope:0.0274 Culvert Performance Curve Plot: Culvert 5 Performance Curve cUtven:aUIVfft s 0 0 894 Inlet Control Elev bullet Control Elev 892 890 a } a) 888 w a5 886 � rrr = 882 X 000 rrr 60 80 100 120 140 160 180 200 220 Tatal Discharge(cfs) Culvert #C103 Water Surface Profile Plot for Culvert: Culvert 5 Crossing- Crossing 5 -DA 5,Design Discharge- 79.7 cfs Culvert-Culvert 5,Culvert Discharge-79.7 cfs 892 890 888 v 886 884 --- } w 882 880 878 876 ___ 874 -20 0 20 40 60 80 100 120 140 station(ft) S Inlet Station: U.UU tt Inlet Elevation: 879.95 ft Outlet Station: 108.00 ft Outlet Elevation: 876.99 ft Number of Barrels: 1 Culvert Data Summary - Culvert 5 Barrel Shape: Circular Barrel Diameter: 4.00 ft Barrel Material: Concrete Embedment: 0.00 in Barrel Manning's n: 0.0120 Culvert Type: Straight Inlet Configuration: Square Edge with Headwall Inlet Depression: None Table 15 - Downstream Channel Rating Curve (Crossing: Crossing 5 - DA 5) Flow(cfs) Water Surface Depth (ft) Velocity(ft/s) Shear(psf) Froude Number Elev (ft) 51.83 875.41 0.51 4.41 1.98 1.50 58.56 875.44 0.54 4.59 2.07 1.51 65.29 875.46 0.56 4.77 2.15 1.53 72.01 875.48 0.58 4.92 2.23 1.54 79.66 875.50 0.60 5.09 2.32 1.55 85.47 875.51 0.61 5.21 2.38 1.56 92.20 875.53 0.63 5.34 2.45 1.57 98.93 875.55 0.65 5.47 2.51 1.58 105.65 875.57 0.67 5.58 2.58 1.59 112.38 875.58 0.68 5.70 2.64 1.60 119.11 875.60 0.70 5.80 2.70 1.60 Tailwater Channel Data - Crossing 5 - DA 5 Tailwater Channel Option: Irregular Channel Channel Slope: 0.0620 User Defined Channel Cross-Section: Coord No. Station (ft) Elevation (ft) Manning's n 1 0.00 876.00 0.0350 2 15.40 875.30 0.0350 3 32.40 874.90 0.0350 4 56.40 875.40 0.0350 5 69.30 876.30 0.0350 6 80.00 877.00 0.0350 Roadway Data for Crossing: Crossing 5 - DA 5 Roadway Profile Shape: Irregular Roadway Shape (coordinates) Irregular Roadway Cross-Section: Coord No. Station (ft) Elevation (ft) 0 0.00 893.00 1 96.00 894.00 2 197.00 895.00 Roadway Surface: Paved Roadway Top Width: 50.00 ft PLC I Lithium Hydroxide Conversion Plant ��� Appendices Appendix K — Outlet Protection Calculations PROTECTIONOUTLET HydroxideLithium . D- --• NO.: 1 1 DATE: 0: i sE1/ila/wsis/aiuismwmasaiE/rE/s//aimsi/w/amaa.al/ awEis►li/a.a../samoEawrsfwllalRtlfrrs//m.samaw/1t irirww•�uari/river/iaaaEarasrarRwaarrrrwa..lralaa/ EE1.aam1/smE\masaim\sn\wlsanaia.lnslm■!l.mas.Ewwam lw Man iw� swia/smoiwsa■sa0/Es.sa!sa!/lss!oaal.lnllsllwEroliaarsis/ss.lrwllsasswiiliisl.ira/rtaEussssaw!wslslarwlsaiaasaiaw wash.mno MammauamaaaalfaElrRma.smanamaimmis.Ew■ a/ESE/airlaEEmianE\ssaElsrEmmREEa/l.s..maawwlslwa � sa/alaaais►+iISEERail.aassEE.mmsl.mEml.Ewm.r.E\Ew■ sswa//i.Emal/Ilse...EiwiarwraRsra.m.a\alE!/wmawrs wily/Eit_E/rwiiaa/assl.m.\.1EmREaai/aa/REaEm/a/s/ un.11s/ /Eaw.tm■E!/Eal.aElsalaslasummisnRollaauiiw sai.!gi/wawa\a/imwEEllaaalaW/i/ar..ia/aataa\lraw ./wll�gwlwai�aEEt.l.iaa.warattawraawwa///aR ail=7/a7aiwir-�w/aaiiiiwlllaWiral.l.\/w.liaww/at !\.mvuRsw�aE..EE\!alnnmm..anmamo.lam.\aR\!lmsrmE u•.a■.\wt/wa.w E\wtEt.s\w1rsRREEwmuumm�olmiaiam// sl/aa/\aiEs■ElEw�.�wlt..mii■lmwRm wawE■s!i/s s a.sE1 w/ ma/awl\Eat...atR\aaaElallERMlwi/iwir/til..ElrEE wall.w►ilea/^7wEwwaaEEwE.EIiiE/EawEaw/i//ir/Ella// :am////.�E.w E..l!Eil►.l.i f f!al�.mO t o i!m moil.r s w i r as E ==& a Ea.a mmwasssaw�i!/aE\lariaElSiR /as/li.wE./i!a! Ena llR/�lawlaa.R.E.\l.ifElliiwEaaEawwa/l1.rE.1lE/ /lE/s..omlmamaa.Raaa\m.f■ralW.u.wi.E!/amasses.s ria•S.aima►.mIgmm ..wilafiElEiplw/i�E =masa.a.s visa aawRl.:Mlasa/Elam..-�wa.EaWiaEEiaE//1mammon sls Etam\llL��aal.!!!!.E!►`aa/./a.Eawaa.i.Oar/a\Ell mE m.w.Rwa mMak-sRas.f swww"RaRRwaslaaar r rmr aaaa raEw=MEaooiswas.7EliEaasmEcawalslwsmalaamE.a.rma ■aaw.Mai/msmsaaE�Easa.EEi.,-aawsw/aaaaaaas/ariaw ElwaaRfaraaaaiwaiW�-ala..m.rr,zamrarrra/wwr.rrrrr E aRla►RRuat►gaalwti�mERRRwomsRlRRRE E��..l.l.•EiwtliEawgsaaf■ra�woasEEw�E/Eam..aE/Ew lliarrrr�wiaawsia�aaltEaaraa�-�.rrrra._-+/lrwEarra E.!a.lnEa wwumwERw�ra.■..lwEwEEa.�-�.ai�-+Eu/// i n..aEE�J!�EERlEE/al.lisaa/aRm.a\mlaEla...r..��� laaw/ldialwlr/rralrw-rw.ra.ar........meEarmonsoon lla la.Raw►!/RlaE1!!lr�la.w\W i./rElwa.....1laEa wave►.u■EmEus•REsa.....ww►alEaRaass.\aa\allEi.Es.s ....amaal.EEJ■/Esl..l.a..6 a nauseousness a.owt mamas Etna►•sioamlaw.�t..EEaas■amaE.........so.m....an w.�.aa�smmammaa.�awrEwl..E.e.E.a_-aaaaE\aasimmma.maiE 1l...amammsmwmmma ■.salE.\.an.Eaa■E�-r.■m.smlmm/mm■ao.�aaElmamwsn..oao ■w.Emu.wumumaiEla► ,aim■\lE.Raamam.�lrm\a.aallaaE .mama:/1•ESE/EEm..wwlw.ml.l.misR.lmsaE►wEma summons ■..mmam/.�.aaat/iilEm.EraEaaEaammlaasmam/�asummons saEa.msoa\a!w!lmiE!■l�1■.ualawwm.smlaasls!\�\l.oa. TO PREVENT SCOUR HOLE rs.m.mmoElmmfsmlm.l..l.suEmwRai.mmamw/sE.lt1E...w I I I M1, I 'I 6 x(pipe diameter) • - Filling (pipe diameter) © • -Filling I (pipe diameter) •' I � © I I I I �©�®� I' I © I I I I � �• ©��® PLC I Lithium Hydroxide Conversion Plant ��� Appendices FN 440 South Church Street555 Fayetteville Street, Suite 900 Charlotte, NC 27601-3034 919.232.6600 hdrinc.com © 2016 HDR, Inc., all rights reserved