Loading...
HomeMy WebLinkAboutLQS CommentsLAND QUALITY SECTION REGIONAL OFFICE MINING PERMIT APPLICATION REVIEW CHECKLIST APPLICATION/PERMIT NO.: 11-03 ACTION: New Modification Transfer Release APPLICANT NAME: Vulcan Construction Materials El 0 1:1 El MINE NAME: Enka Quarry COUNTY: Buncombe 1 . Yes No Explain A. Is the site currently under NOV? B. Is an NPDES permit needed? El F-1 C. Is an NPDES permitting existing? D. Is an O & M Plan needed? F El Field Issues A. Are potential wetlands and watercourses properly Yes No indicated on the Mine Map? B. Are the proposed buffer zones adequate? C. Do all occupied dwellings within 300 feet of the mine excavation appear to be indicated? D. Do all water supply wells within 500 feet of the mine excavation appear to be indicated? E. Is visual screening needed? F. Are the proposed erosion and sedimentation control measures properly located to prevent offsite sedimentation? G. Is the proposed revegetation/reclamation plan acceptable? * Date Inspected: Erosion and Sedimentation Control Plan Review It is the responsibility of the Regional Office staff to verify the adequacy of the E&SC measures. Please provide any concerns or comments: • was the application routed to and when? Date Division of Air Quality: Division of Water Resources (Surface Water Protection Section): Other: Inspector/Reviewer's Name: Rev: Sept 2020 r0