HomeMy WebLinkAboutDWR CommentsReturn PDF of this form to DEMLR CO by email. cc DEMLR RO, DWR SPU. Send a copy to the permittee.
DIVISION OF WATER RESOURCES
MINING PERMIT APPLICATION REVIEW FORM
DEMLR PERMIT:
SECTIONTHIS TO BE OUT
11-03 Project Action New
BY DEIVILR
Modification Transfer Release
Applicant Name:
Vulcan Construction Materials
X
Applicant's Email:
johnsto@vmcmail.com
County:
Buncombe
Project Name:
Enka Quarry
YES
NO
Date Commencing
Have land disturbing activities started??
X
L
09/12/1972
Latitude:
35.5442
Longitude:
-82.6757
Please return comments to (at DEMLR CO):
Adam Parr
adam.parr@ncdenr.gov
Comments due by: = 03/10/2022
SECTION BELOW• BE FILLED OUT BY DWR
YES NO
Is this mine an active permit in BIMS?
El
F-1
Is the RO concerned that the operation, as proposed, would violate standards of water quality?
Comments:
Does this mine (or previous owner) have DWR back fees to pay?
(If Yes, amount):
Watershed/Stream Name & Classification:
DWR Compliance Status of Mine:
401 Wetland Cert. required?
I
I ❑
401 Wetland Cert. existing?
I
Ll
I ❑
(If Yes, Permit #):
Does DWR RO have enough information to determine if a 401 certification is required?
Central Coastal Plain Capacity Use Area (CCPCUA). Required?
Central Coastal Plain Capacity Use Area (CCPCUA). Existing?
I
I
❑
(If Yes, Permit #):
Does DWR RO have enough information to determine if a CCPCUA is required?
Is an O & M Plan needed?
❑
Are wetlands disturbed at this site?
I
❑
Does DWR RO suspect or know of nearby wetlands to the site?
Is a wetland delineation required prior to DWR issuing the permit?
JD
Consultant
Onsite
Offsite
Stream Determination Needed?
Stream Determination Completed?
Does DWR RO need a statement that no wetlands/streams are disturbed for this project
from applicant?
Rev November 2021 r0
Return PDF of this form to DEMLR CO by email. cc DEMLR RO, DWR SPU. Send a copy to the permittee.
Buffer Determination Needed?
Buffer Determination Completed?
Recycle system permit existing?
(If Yes, Permit #):
New Recycle System permit required?
Enough information to determine?
Non -discharge permit existing?
(If Yes, Permit #):
Will wastewaters discharge to HQW waters with a 7Q10=0?
7Q10 Flow:
Unknown Permittee must determine
Does DWR require DEMLR to hold the permit (e.g. so DWR can review it further or
because DWR requires more information)?
❑
I ❑
Has Violation
O&M Requirements
❑
HQW/7Q10 Concerns
IT
-
Pay back fees or renew DWR permit
❑
Other
Please describe
the reason to
hold the permit:
RO contact:
Hold Until:
Mine must wait to dewater until an O&M plan is approved?
(-
CentralOffice Date Regional Office I Date
DWR RO Surface Water
RO Aquifer Protection Section
Rev November 2021 r0