Loading...
HomeMy WebLinkAboutCombined Routing Sheets 2021v2DEPARTMENT OF ENVIRONMENTAL QUALITY MINING PERMIT APPLICATION REVIEW FORM DEMLR PERMIT: THIS SECTION 11-03 1 TO BE OUT Project Action New BY DEIVILR Modification Transfer Release Applicant Name: Vulcan Construction Materials ✓ Mine Name: Enka Quarry County: Buncombe Applicant's Email: johnsto@vmcmail.com YES NO Date Commencing Have land disturbing activities started?? ✓ Ll 1 09/12/1972 Latitude: 35.5442 Longitude: -82.6757 7.5 Quad: Enka Permit Reviewer (Central Office): Adam Parr adam.parr@ncdenr.gov Initials ARP Regional Office I Asheville Regional Office Supervisor/Contact Shawna Riddle Comments due by: 03/10/2022 Rev. June 2021 r0 Return PDF of this form to DEMLR CO by email. cc DEMLR RO, DWR SPU. Send a copy to the permittee. DIVISION OF WATER RESOURCES MINING PERMIT APPLICATION REVIEW FORM DEMLR PERMIT: SECTIONTHIS TO BE OUT 11-03 Project Action New BY DEIVILR Modification Transfer Release Applicant Name: Vulcan Construction Materials X Applicant's Email: johnsto@vmcmail.com County: Buncombe Project Name: Enka Quarry YES NO Date Commencing Have land disturbing activities started?? X L 09/12/1972 Latitude: 35.5442 Longitude: -82.6757 Please return comments to (at DEMLR CO): Adam Parr adam.parr@ncdenr.gov Comments due by: = 03/10/2022 SECTION BELOW• BE FILLED OUT BY DWR YES NO Is this mine an active permit in BIMS? El F-1 Is the RO concerned that the operation, as proposed, would violate standards of water quality? Comments: Does this mine (or previous owner) have DWR back fees to pay? (If Yes, amount): Watershed/Stream Name & Classification: DWR Compliance Status of Mine: 401 Wetland Cert. required? I I ❑ 401 Wetland Cert. existing? I Ll I ❑ (If Yes, Permit #): Does DWR RO have enough information to determine if a 401 certification is required? Central Coastal Plain Capacity Use Area (CCPCUA). Required? Central Coastal Plain Capacity Use Area (CCPCUA). Existing? I I ❑ (If Yes, Permit #): Does DWR RO have enough information to determine if a CCPCUA is required? Is an O & M Plan needed? ❑ Are wetlands disturbed at this site? I ❑ Does DWR RO suspect or know of nearby wetlands to the site? Is a wetland delineation required prior to DWR issuing the permit? JD Consultant Onsite Offsite Stream Determination Needed? Stream Determination Completed? Does DWR RO need a statement that no wetlands/streams are disturbed for this project from applicant? Rev November 2021 r0 Return PDF of this form to DEMLR CO by email. cc DEMLR RO, DWR SPU. Send a copy to the permittee. Buffer Determination Needed? Buffer Determination Completed? Recycle system permit existing? (If Yes, Permit #): New Recycle System permit required? Enough information to determine? Non -discharge permit existing? (If Yes, Permit #): Will wastewaters discharge to HQW waters with a 7Q10=0? 7Q10 Flow: Unknown Permittee must determine Does DWR require DEMLR to hold the permit (e.g. so DWR can review it further or because DWR requires more information)? ❑ I ❑ Has Violation O&M Requirements ❑ HQW/7Q10 Concerns IT - Pay back fees or renew DWR permit ❑ Other Please describe the reason to hold the permit: RO contact: Hold Until: Mine must wait to dewater until an O&M plan is approved? (- CentralOffice Date Regional Office I Date DWR RO Surface Water RO Aquifer Protection Section Rev November 2021 r0 DIVISION OF AIR QUALITY MINING PERMIT APPLICATION REVIEW CHECKLIST Application / Project No.: 11-03 Project Name: Enka Quarry County: Buncombe Please return comments back to: Adam Parr Shawna Riddle Comments due by: 03/10/2022 Will the operation, as proposed, violate standards of air quality? Comments: Yes No Permit # if Existing Air Permit Required ❑ ❑ Air Permit Existing ❑ ❑ Other Comments: Reviewed By: Date: Print Name: Central Office Reviewer: ARP Rev. Sept 2020 r0 LAND QUALITY SECTION REGIONAL OFFICE MINING PERMIT APPLICATION REVIEW CHECKLIST APPLICATION/PERMIT NO.: 11-03 ACTION: New Modification Transfer Release APPLICANT NAME: Vulcan Construction Materials ❑ ❑X ❑ ❑ MINE NAME: Enka Quarry COUNTY: Buncombe 1 . Yes No Explain A. Is the site currently under NOV? B. Is an NPDES permit needed? El ❑ C. Is an NPDES permitting existing? ❑ ❑ D. Is an O & M Plan needed? ❑ ❑ Field Issues A. Are potential wetlands and watercourses properly Yes No indicated on the Mine Map? B. Are the proposed buffer zones adequate? C. Do all occupied dwellings within 300 feet of the mine excavation appear to be indicated? D. Do all water supply wells within 500 feet of the mine excavation appear to be indicated? E. Is visual screening needed? F. Are the proposed erosion and sedimentation control measures properly located to prevent offsite sedimentation? G. Is the proposed revegetation/reclamation plan acceptable? * Date Inspected: Erosion and Sedimentation Control Plan Review It is the responsibility of the Regional Office staff to verify the adequacy of the E&SC measures. Please provide any concerns or comments: • was the application routed to and when? Date Division of Air Quality: Division of Water Resources (Surface Water Protection Section): Other: Inspector/Reviewer's Name: Rev: Sept 2020 r0 NC GEOLOGICAL SURVEY MINING PERMIT APPLICATION REVIEW CHECKLIST Mining is . complete Application/Permit No: 11-03 Action: New Modification Transfer Applicant Name: Vulcan Construction Materials ❑ ❑X ❑ Mine Name: Enka Quarry FCounty: Buncombe Latitude: 35.5442 7.5 Quad: Enka Longitude: -82.6757 Attached page 1-3 of the mine application. Suspense Date for Comments: 03/10/2022 NCGS to complete this Section Geological Significance: YES NO[] Commodity: Mineral Resources: 1985 Geological Map Unit: Other Geological Map Units: Lithology: Geochemistry Hazardous Minerals: Subsidence: Slope Stability: Seismic Hazard: Hydrogeology: Flood Plain Deposits: Comments: Reviewer: Date: Rev: 2020 r0