HomeMy WebLinkAboutCombined Routing Sheets 2021v2DEPARTMENT OF ENVIRONMENTAL QUALITY
MINING PERMIT APPLICATION REVIEW FORM
DEMLR PERMIT:
THIS SECTION
11-03 1
TO BE OUT
Project Action New
BY DEIVILR
Modification
Transfer Release
Applicant Name:
Vulcan Construction Materials
✓
Mine Name:
Enka Quarry
County:
Buncombe
Applicant's Email:
johnsto@vmcmail.com
YES
NO
Date Commencing
Have land disturbing activities started??
✓
Ll
1
09/12/1972
Latitude:
35.5442
Longitude:
-82.6757
7.5 Quad:
Enka
Permit Reviewer (Central Office):
Adam Parr
adam.parr@ncdenr.gov
Initials
ARP
Regional Office
I Asheville
Regional Office Supervisor/Contact
Shawna Riddle
Comments due by:
03/10/2022
Rev. June 2021 r0
Return PDF of this form to DEMLR CO by email. cc DEMLR RO, DWR SPU. Send a copy to the permittee.
DIVISION OF WATER RESOURCES
MINING PERMIT APPLICATION REVIEW FORM
DEMLR PERMIT:
SECTIONTHIS TO BE OUT
11-03 Project Action New
BY DEIVILR
Modification Transfer Release
Applicant Name:
Vulcan Construction Materials
X
Applicant's Email:
johnsto@vmcmail.com
County:
Buncombe
Project Name:
Enka Quarry
YES
NO
Date Commencing
Have land disturbing activities started??
X
L
09/12/1972
Latitude:
35.5442
Longitude:
-82.6757
Please return comments to (at DEMLR CO):
Adam Parr
adam.parr@ncdenr.gov
Comments due by: = 03/10/2022
SECTION BELOW• BE FILLED OUT BY DWR
YES NO
Is this mine an active permit in BIMS?
El
F-1
Is the RO concerned that the operation, as proposed, would violate standards of water quality?
Comments:
Does this mine (or previous owner) have DWR back fees to pay?
(If Yes, amount):
Watershed/Stream Name & Classification:
DWR Compliance Status of Mine:
401 Wetland Cert. required?
I
I ❑
401 Wetland Cert. existing?
I
Ll
I ❑
(If Yes, Permit #):
Does DWR RO have enough information to determine if a 401 certification is required?
Central Coastal Plain Capacity Use Area (CCPCUA). Required?
Central Coastal Plain Capacity Use Area (CCPCUA). Existing?
I
I
❑
(If Yes, Permit #):
Does DWR RO have enough information to determine if a CCPCUA is required?
Is an O & M Plan needed?
❑
Are wetlands disturbed at this site?
I
❑
Does DWR RO suspect or know of nearby wetlands to the site?
Is a wetland delineation required prior to DWR issuing the permit?
JD
Consultant
Onsite
Offsite
Stream Determination Needed?
Stream Determination Completed?
Does DWR RO need a statement that no wetlands/streams are disturbed for this project
from applicant?
Rev November 2021 r0
Return PDF of this form to DEMLR CO by email. cc DEMLR RO, DWR SPU. Send a copy to the permittee.
Buffer Determination Needed?
Buffer Determination Completed?
Recycle system permit existing?
(If Yes, Permit #):
New Recycle System permit required?
Enough information to determine?
Non -discharge permit existing?
(If Yes, Permit #):
Will wastewaters discharge to HQW waters with a 7Q10=0?
7Q10 Flow:
Unknown Permittee must determine
Does DWR require DEMLR to hold the permit (e.g. so DWR can review it further or
because DWR requires more information)?
❑
I ❑
Has Violation
O&M Requirements
❑
HQW/7Q10 Concerns
IT
-
Pay back fees or renew DWR permit
❑
Other
Please describe
the reason to
hold the permit:
RO contact:
Hold Until:
Mine must wait to dewater until an O&M plan is approved?
(-
CentralOffice Date Regional Office I Date
DWR RO Surface Water
RO Aquifer Protection Section
Rev November 2021 r0
DIVISION OF AIR QUALITY
MINING PERMIT APPLICATION REVIEW CHECKLIST
Application / Project No.:
11-03
Project Name:
Enka Quarry
County:
Buncombe
Please return comments back to:
Adam Parr Shawna Riddle
Comments due by:
03/10/2022
Will the operation, as proposed, violate standards of air quality?
Comments:
Yes
No
Permit # if Existing
Air Permit Required
❑
❑
Air Permit Existing
❑
❑
Other Comments:
Reviewed By: Date:
Print Name:
Central Office Reviewer: ARP
Rev. Sept 2020 r0
LAND QUALITY SECTION REGIONAL OFFICE
MINING PERMIT APPLICATION REVIEW CHECKLIST
APPLICATION/PERMIT NO.:
11-03
ACTION:
New
Modification
Transfer
Release
APPLICANT NAME:
Vulcan Construction Materials
❑
❑X
❑
❑
MINE NAME:
Enka Quarry
COUNTY:
Buncombe
1 .
Yes
No
Explain
A.
Is the site currently under NOV?
B.
Is an NPDES permit needed? El
❑
C.
Is an NPDES permitting existing? ❑
❑
D. Is an O & M Plan needed? ❑ ❑
Field Issues
A. Are potential wetlands and watercourses properly
Yes No
indicated on the Mine Map?
B.
Are the proposed buffer zones adequate?
C.
Do all occupied dwellings within 300 feet of the mine excavation appear to be indicated?
D.
Do all water supply wells within 500 feet of the mine excavation appear to be indicated?
E.
Is visual screening needed?
F.
Are the proposed erosion and sedimentation control measures properly located to prevent
offsite sedimentation?
G.
Is the proposed revegetation/reclamation plan acceptable?
* Date Inspected:
Erosion and Sedimentation Control Plan Review
It is the responsibility of the Regional Office staff to verify the adequacy of the E&SC measures. Please provide
any concerns or comments:
• was the application routed to and when? Date
Division of Air Quality:
Division of Water Resources (Surface Water Protection Section):
Other:
Inspector/Reviewer's Name:
Rev: Sept 2020 r0
NC GEOLOGICAL SURVEY
MINING PERMIT APPLICATION REVIEW CHECKLIST
Mining is . complete
Application/Permit No: 11-03 Action:
New Modification Transfer
Applicant Name:
Vulcan Construction Materials
❑ ❑X ❑
Mine Name:
Enka Quarry
FCounty:
Buncombe
Latitude:
35.5442
7.5 Quad:
Enka
Longitude:
-82.6757
Attached page 1-3 of the mine application.
Suspense Date for Comments: 03/10/2022
NCGS to complete this Section
Geological Significance: YES NO[]
Commodity:
Mineral Resources:
1985 Geological Map Unit:
Other Geological Map Units:
Lithology:
Geochemistry Hazardous Minerals:
Subsidence:
Slope Stability:
Seismic Hazard:
Hydrogeology:
Flood Plain Deposits:
Comments:
Reviewer:
Date:
Rev: 2020 r0