Loading...
HomeMy WebLinkAbout20220228_DWR_CommentsDocuSign Envelope ID: E12D5984-EAE1-4750`885A,336FBBE12F81 _`MLR CO by email. cc DEMLR RO, DWR SPU. Send a copy to the permittee. DIVISION OF WATER RESOURCES MINING PERMIT APPLICATION REVIEW FORM DEMLR PERMIT: THIS SECTION TO BE OUT 11-03 Project Action New BY DEIVILR Modification Transfer Release Applicant Name: Vulcan Construction Materials X E Ll Applicant's Email: johnsto@vmcmail.com County: Buncombe Project Name: Enka Quarry YES NO Date Commencing Have land disturbing activities started?? XL 09/12/1972 Latitude: 35.5442 Longitude: -82.6757 Please return comments to (at DEMLR CO): Adam Parr adam.parr@ncdenr.gov Comments due by: 03/10/2022 SECTION• TO BE FILLED OUT BY DWR YES NO Is this mine an active permit in BIMS? X Is the RO concerned that the operation, as proposed, would violate standards of water quality? X Comments: Leachate and stormwater runoff of stockpiled recycled concrete aggregate can negatively impact water quality due to increased alkalinity, deposition of suspended solids and other chemicals.The permit application does not provide sufficient information on the pre-screening of material that will be accepted (i.e., 'clean concrete'), BMPs necessary, etc. in order to make a determination. DWR will defer to DEMLR stormwater permitting authority regarding this question. Does this mine (or previous owner) have DWR back fees to pay? X (If Yes, amount): Watershed/Stream Name & Classification: DWR Compliance Status of Mine: No known DWR jurisdictional compliance issues (this determination does not include SW program) 401 Wetland Cert. required? Ll I 0 401 Wetland Cert. existing? x (If Yes, Permit #): #1999-0516 Does DWR RO have enough information to determine if a 401 certification is required? X Central Coastal Plain Capacity Use Area (CCPCUA). Required? Ll x Central Coastal Plain Capacity Use Area (CCPCUA). Existing? Ll X (If Yes, Permit #): Does DWR RO have enough information to determine if a CCPCUA is required? X Is an 0 & M Plan needed? Ll X Are wetlands disturbed at this site? X Does DWR RO suspect or know of nearby wetlands to the site? X Is a wetland delineation required prior to DWR issuing the permit? X JD Consultant Onsite Offsite Stream Determination Needed? X Stream Determination Completed? Does DWR RO need a statement that no wetlands/streams are disturbed for this project from applicant? Rev November 2021 r0 DocuSign Envelope ID: E12D5984-EAE1-4750`885A 1 -1-,BE12F81 -`MLR CO by email. cc DEMLR RO, DWR SPU. Send a copy to the permittee. Buffer Determination Needed? X Buffer Determination Completed? Recycle system permit existing? LI X (If Yes, Permit #): New Recycle System permit required? Enough information to determine? X Non -discharge permit existing? LI I X (If Yes, Permit #): Will wastewaters discharge to HQW waters with a 7Q10=0? LI I i< 7Q10 Flow: Unknown Permittee must determine Does DWR require DEMLR to hold the permit (e.g. so DWR can review it further or because DWR requires more information)? ❑ I 0 Has Violation O&M Requirements HQW/7Q10 Concerns IT - Pay back fees or renew DWR permit LI Other Please describe the reason to hold the permit: RO contact: Landon Davidson Hold Until: Mine must wait to dewater until an O&M plan is approved? ❑ X Reviewed . -i__� _ Central Office Date I R `G1,al Off�i%_ I Date DWR RO Surface Water RO Aquifer Protection Section Rev November 2021 r0