DIVISION OF WATER RESOURCES
MINING PERMIT APPLICATION REVIEW FORM
DEMLR PERMIT:
THIS SECTION TO BE OUT
11-03 Project Action New
BY DEIVILR
Modification Transfer Release
Applicant Name:
Vulcan Construction Materials
X
E
Ll
Applicant's Email:
johnsto@vmcmail.com
County:
Buncombe
Project Name:
Enka Quarry
YES
NO
Date Commencing
Have land disturbing activities started??
XL
09/12/1972
Latitude:
35.5442
Longitude:
-82.6757
Please return comments to (at DEMLR CO):
Adam Parr
adam.parr@ncdenr.gov
Comments due by: 03/10/2022
SECTION• TO BE FILLED OUT BY DWR
YES NO
Is this mine an active permit in BIMS?
X
Is the RO concerned that the operation, as proposed, would violate standards of water quality?
X
Comments:
Leachate and stormwater runoff of stockpiled recycled concrete aggregate can negatively impact water quality due to
increased alkalinity, deposition of suspended solids and other chemicals.The permit application does not provide
sufficient information on the pre-screening of material that will be accepted (i.e., 'clean concrete'), BMPs necessary, etc.
in order to make a determination. DWR will defer to DEMLR stormwater permitting authority regarding this question.
Does this mine (or previous owner) have DWR back fees to pay?
X
(If Yes, amount):
Watershed/Stream Name & Classification:
DWR Compliance Status of Mine:
No known DWR jurisdictional compliance issues (this determination does not include SW program)
401 Wetland Cert. required?
Ll
I 0
401 Wetland Cert. existing?
x
(If Yes, Permit #):
#1999-0516
Does DWR RO have enough information to determine if a 401 certification is required?
X
Central Coastal Plain Capacity Use Area (CCPCUA). Required?
Ll
x
Central Coastal Plain Capacity Use Area (CCPCUA). Existing?
Ll
X
(If Yes, Permit #):
Does DWR RO have enough information to determine if a CCPCUA is required?
X
Is an 0 & M Plan needed?
Ll
X
Are wetlands disturbed at this site?
X
Does DWR RO suspect or know of nearby wetlands to the site?
X
Is a wetland delineation required prior to DWR issuing the permit?
X
JD
Consultant
Onsite
Offsite
Stream Determination Needed?
X
Stream Determination Completed?
Does DWR RO need a statement that no wetlands/streams are disturbed for this project
from applicant?
Rev November 2021 r0
DocuSign Envelope ID: E12D5984-EAE1-4750`885A 1 -1-,BE12F81 -`MLR CO by email. cc DEMLR RO, DWR SPU. Send a copy to the permittee.
Buffer Determination Needed?
X
Buffer Determination Completed?
Recycle system permit existing?
LI
X
(If Yes, Permit #):
New Recycle System permit required?
Enough information to determine?
X
Non -discharge permit existing?
LI
I
X
(If Yes, Permit #):
Will wastewaters discharge to HQW waters with a 7Q10=0?
LI
I
i<
7Q10 Flow:
Unknown Permittee must determine
Does DWR require DEMLR to hold the permit (e.g. so DWR can review it further or
because DWR requires more information)?
❑
I 0
Has Violation
O&M Requirements
HQW/7Q10 Concerns
IT
-
Pay back fees or renew DWR permit
LI
Other
Please describe
the reason to
hold the permit:
RO contact:
Landon Davidson
Hold Until:
Mine must wait to dewater until an O&M plan is approved?
❑ X
Reviewed .
-i__� _
Central Office Date I R `G1,al Off�i%_ I Date
DWR RO Surface Water
RO Aquifer Protection Section