HomeMy WebLinkAbout20220818_Transfer_98-34ROY COOPER
Governor
ELIZABETH S. BISER
Secretary
BRIAN WRENN
Director
Certified Mail
Return Receipt Requested
7016 2140 0000 0565 2786
Kelly Proctor
PLT Construction Company Inc
5676 Thompson Chapel Church Rd.
Wilson, NC
Re: Flat Rock Pit
Mining Permit No. 98-34
Wilson County
Neuse River Basin
Dear Kelly Proctor:
NORTH CAROLINA
Environmental Quality
August 18, 2022
Your request to have Mining Permit No. 98-34 transferred in its entirety from your company to FSC 11, LLC dba
Fred Smith Company has been approved. As we have received FSC II, LLC dba Fred Smith Company's required
surety in an amount sufficient to cover the present operation, your company is hereby released from further
responsibility for this site with respect to The Mining Act of 1971. Therefore, I am returning your $139,600.00
surety bond (No. 08733454) to you for your disposal.
Thank you for your cooperation in this matter.
Smcer ,
David Miller, PE
State Mining Engineer
DM/ap
Enclosures: Surety Bond #08733454
cc: Mr. Bill Denton, PE, w/o enclosures
Mr. Beau Thomas-DOL, Mine and Quarry Bureau, w/o enclosures
North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
512 North Salisbury Street 11612 Mail Service Center I Raleigh. North Carolina 27699-1612
919.707.9200
oFw
ROY COOPER
Governor
ELIZABETH S. BISER
Secretary
BRIAN WRENN
Director
Mr. Sean R. Madden
Fred Smith Company
701 Corporate Center Drive, Suite 101
Raleigh, NC 27607
RE: Flat Rock Pit
Mining Permit No. 98-34
Wilson County
Neuse River Basin
Dear Mr. Madden:
NORTH CAROLINA
Environmental Quality
August 18, 2022
Your request to have the above referenced mining permit, issued to PLT Construction Company, Inc., has been
approved and is transferred in its entirety to you. As we have received the required surety in an amount sufficient
to cover the present operation, I am enclosing the transferred mining permit. The permit number and mine name
shall remain the same as before the transfer.
Please review the permit carefully and notify this office of any objections or questions you may have concerning
the terms of the permit. It is your responsibility to fully understand and comply with the conditions of your mining
permit. I would like to draw your particular attention to the following conditions where minor additions or changes
were made: II1.4.13, 111.9, IV.
As a reminder, your permitted acreage at this site is 37.43 acres and the amount of land you are approved to disturb
is 30.58 acres.
Again, if you should have any questions on this matter please contact Adam Part, PE, Assistant State Mining
Engineer, at (919) 707-9220.
Sincerel ,
David Miller, PE
State Mining Engineer
DM/ap
Enclosures
cc: Mr. Bill Denton, PE
Mr. Beau Thomas-DOL, Mine and Quarry Bureau, w/o enclosures
North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
512 North Salisbury Street 11612 Mall Service Center I Raleigh, North Carolina 27699-1612
919.707.9200
w unw
DEPARTMENT OF ENVIRONMENTAL QUALITY
DIVISION OF ENERGY, MINERAL, AND LAND
RESOURCES
LAND QUALITY SECTION
PERMIT
For the operation of a mining activity
In accordance with the provisions of N.C.G.S. §74-46 through 68, "The
Mining Act of 1971," Mining Permit Rule 15A NCAC 05B, and other
applicable laws, rules, and regulations
Permission is hereby granted to:
FSC II, LLC dba Fred Smith Company
Flat Rock Pit
Wilson County - Permit No. 98-34
for the operation of a
Sand Mine
Which shall provide that the usefulness, productivity and scenic values of
all lands and waters affected by this mining operation will receive the
greatest practical degree of protection and restoration.
Page 2
In accordance with the application for this mining permit, which is hereby approved by the Department of
Environmental Quality, hereinafter referred to as the Department, and in conformity with the approved Reclamation
Plan attached to and incorporated as part of this permit, provisions must be made for the protection of the
surrounding environment and for reclamation of the land and water affected by the permitted mining operation.
This permit is expressly conditioned upon compliance with all the requirements of the approved Reclamation Plan.
However, completed performance of the approved Reclamation Plan is a separable obligation, secured by the bond
or other security on file with the Department, and may survive the revocation or suspension of this permit.
This permit is not transferable by the permittee with the following exception: If another operator succeeds to the
interest of the permittee in the permitted mining operation, by virtue of a sale, lease, assignment or otherwise, the
Department may release the permittee from the duties imposed upon him by the conditions of his permit and by the
Mining Act with reference to the permitted operation, and transfer the permit to the successor operator, provided
that both operators have complied with the requirements of the Mining Act and that the successor operator agrees
to assume the duties of the permittee with reference to reclamation of the affected land and posts a suitable bond or
other security.
In the event that the Department determines that the permittee or permittee's successor is not complying with the
Reclamation Plan or other terms and conditions of this permit or is failing to achieve the purposes and requirements
of the Mining Act, the Department may give the operator written notice of its intent to modify, revoke or suspend
the permit, or its intent to modify the Reclamation Plan as incorporated in the permit. The operator shall have right
to a hearing at a designated time and place on any proposed modification, revocation, or suspension by the
Department. Alternatively, and in addition to the above, the Department may institute other enforcement procedures
authorized by law.
I. Definitions. N.C.G.S. §74-49.
Wherever used or referred to in this permit, unless the context clearly indicates otherwise, terms shall have
the same meaning as supplied by the Mining Act, N.C.G.S. §74-49.
II. Issuance and Modifications. N.C.G.S.
October 19, 2012: This permit has been modified to update the mine map to show existing erosion and
sedimentation control measures (Basin B) as well as to allow the stockpiling of uncontaminated quarry
screenings as indicated on the mine map last revised August 28, 2012. As a result of updates to the map,
the affected acreage has decreased slightly to 30.58 acres.
Janugy 28, 2014: This permit has been modified to allow the on -site disposal of beneficial fill material
(imported earthen material and/or concrete materials) within the permit boundary as indicated on the mine
maps received by the Land Quality Section on December 16, 2013.
December 1, 2017: This permit has been issued for the life of site or the duration of the lease term.
August 18, 2022: This permit has been transferred in its entirety to FSC II, LLC dba Fred Smith Company.
Mining activity shall occur as indicated on the original permit and the mine maps received August 10, 2022.
The permitted area and affected area at this site changed with new mapping. The permitted area at this site
is 37.43 acres and the area approved to disturb is 30.58 acres.
This permit is valid for the life of the site or life of lease, if applicable, as defined by Session Law 2017-
209 and has no expiration date. However, all provisions of N.C.G.S. §74-51 and N.C.G.S. §74-52 still
apply for new, transferred, and modified mining permits.
Page 3
III. Operating Conditions. N.C.G.S. V4-51.
This Permit shall be subject to the provisions of the Mining Act, N.C.G.S. §74-46, et. seq., and to the
following conditions and limitations:
1. Wastewater and Quarry Dewatering.
A. Any wastewater processing or mine dewatering shall be in accordance with the permitting
requirements and rules promulgated by the N.C. Environmental Management Commission.
B. Any stormwater runoff from the affected areas at the site shall be in accordance with any
applicable permit requirements and regulations promulgated by the Environmental
Protection Agency and enforced by the N.C. Environmental Management Commission. It
shall be the permittee's responsibility to contact the Stormwater Program to secure any
necessary stormwater permits or other approval documents.
2. Air Quality and Dust Control.
A. Any mining process producing air contamination emissions shall be subject to the
permitting requirements and rules promulgated by the N.C. Environmental Management
Commission and enforced by the Division of Air Quality.
B. During mining operations, water trucks or other means that may be necessary shall be
utilized to prevent dust from leaving the permitted area.
3. Buffer Zones.
A. Sufficient buffer (minimum 50 foot undisturbed) shall be maintained between any affected
land and any adjoining waterway or wetland to prevent sedimentation of that waterway or
wetland from erosion of the affected land and to preserve the integrity of the natural
watercourse or wetland.
B. Any mining activity affecting waters of the State, waters of the U. S., or wetlands shall be
in accordance with the requirements and regulations promulgated and enforced by the N.
C. Environmental Management Commission.
4. Erosion and Sediment Control.
A. Adequate mechanical barriers including but not limited to diversions, earthen dikes,
sediment check dams, sediment retarding structures, rip rap pits, or ditches shall be
provided in the initial stages of any land disturbance and maintained to prevent sediment
from discharging onto adjacent surface areas or into any lake, wetland, or natural
watercourse in proximity to the affected land.
B. Mining activities, including the installation and maintenance of the approved erosion and
sediment control measures, shall be conducted as indicated on the mine maps received by
the Land Quality Section on December 16, 2013, and the supplemental information
received October 9, 2013, December 16, 2013, July 2, 2021, August 2, 2021, May 17, 2022,
and August 10, 2022.
C. Sediment ponds shall be retained until the upland areas are completely graded and
stabilized.
D. A berm shall be constructed and maintained at the top of the working slope to direct runoff
into appropriately designed slope drains that direct flow to the basins and convey runoff
down the slopes without accelerated erosion.
Page 4
5. Permanently Marked Boundaries.
All affected area boundaries (30.58 acres) shall be permanently marked at the site on 100-foot
intervals unless the line of sight allows for larger spacing intervals.
6. Graded Slopes and Fills.
The angle for graded slopes and fills shall be no greater than the angle, which can be retained by
vegetative cover or other adequate erosion control measure, structure, or device. In any event,
exposed slopes or any excavated channels, the erosion of which may cause off -site damage because
of sedimentation, shall be planted, or otherwise provided with ground cover, devices, or structures
sufficient to restrain such erosion.
7. Surface Drainage.
The affected land shall be graded so as to prevent collection of pools of water that are, or likely to
become, noxious or foul. Necessary structures such as drainage ditches or conduits shall be
constructed or installed when required to prevent such conditions.
8. Visual Screening.
Existing vegetation or vegetated earthen berms shall be maintained between the mine and public
thoroughfares whenever practical to screen the operation from the public.
9. Buffer Between Mining Permit Boundaries and/or Right-of-ways.
Sufficient buffer, as indicated on the mine map received August 10, 2022, shall be maintained
between any excavation and any mining permit boundary to protect adjacent property.
10. Refuse Disposal.
A. No on -site disposal of refuse or other solid waste that is generated outside of the mining
permit area shall be allowed within the boundaries of the mining permit area unless
authorization to conduct said disposal has first been obtained from both the Division of
Waste Management and the Division of Energy, Mineral and Land Resources, Department
of Environmental Quality. The method of disposal shall be consistent with the approved
reclamation plan.
B. Mining refuse as defined by N.C.G.S. §74-49 (14) of The Mining Act of 1971 generated
on -site and directly associated with the mining activity may be disposed of in a designated
refuse area. All other waste products must be disposed of in a disposal facility approved
by the Division of Waste Management. No petroleum products, acids, solvents or their
storage containers or any other material that may be considered hazardous shall be disposed
of within the permitted area.
C. For the purposes of this permit, the Division of Energy, Mineral and Land Resources
considers the following materials to be "mining refuse" (in addition to those specifically
listed under N.C.G.S. §74-49 (14) of the N.C. Mining Act of 1971):
i. on -site generated land clearing debris.
ii. conveyor belts.
iii. wire cables.
iv. v-belts.
Page 5
V. steel reinforced air hoses.
vi. drill steel.
D. If mining refuse is to be permanently disposed within the mining permit boundary, the
following information must be provided to and approved by the Division of Energy,
Mineral and Land Resources prior to commencement of such disposal:
i. the approximate boundaries and size of the refuse disposal area.
ii. a list of refuse items to be disposed.
iii. verification that a minimum of 4 feet of cover will be provided over the refuse.
iv. verification that the refuse will be disposed at least 4 feet above the seasonally
high-water table; and,
V. verification that a permanent vegetative groundcover will be established.
E. Uncontaminated quarry screenings shall be stockpiled onsite as indicated on the mine maps
received by the Land Quality Section on December 16, 2013.
F. Only fill material qualifying as Beneficial Fill, as defined in Rule .0562 of Title 15A
Subchapter 13B of the North Carolina Administrative Code and as interpreted by the
policies of the Division of Waste Management, shall be used to fill the excavation as part
of the approved reclamation plan.
IV. Annual Reclamation Report and Annual Operating Fee. N.C.G.S. §74-55.
An Annual Reclamation Report and Annual Operating Fee of $400.00 shall be submitted to the Department
by September 1 of each year until reclamation is completed and approved for release by the Department.
V. Prior Approval Required for Plan Modification. N.C.G.S. §74-52.
The operator shall notify the Department in writing of the desire to delete, modify or otherwise change any
part of the mining, reclamation, or erosion/sediment control plan contained in the approved application for
a mining permit or any approved revision to it. Approval to implement such changes must be obtained
from the Department prior to on -site implementation of the revisions.
VI. Bonding. N.C.G.S. §74-54.
The security, which was posted pursuant to N.C.G.S. §74-54 in the form of a $139,600.00 surety bond (of
which $126,900.00 is required for this site), is sufficient to cover the operation as indicated in the approved
application. This security must remain in force for this permit to be valid. The total affected land shall not
exceed the bonded acreage.
VII. Archaeological Resources. N.C.G.S §70-3.
A. Authorized representatives of the Division of Archives and History shall be granted access
to the site to determine the presence of significant archaeological resources.
B. Pursuant to N.C.G.S. §70-3, "The Unmarked Human Burial and Human Skeletal Remains
Protection Act," should the operator or any person in his employ encounter human skeletal
remains, immediate notification shall be provided to the county medical examiner and the
chief archaeologist, North Carolina Division of Archives and History.
Page 6
VIII. Approved Reclamation Plan. N.C.G.S. §74-53.
The Mining Permit incorporates this Reclamation Plan, the performance of which is a condition on the
continuing validity of that Mining Permit. Additionally, the Reclamation Plan is a separable obligation of
the permittee, which continues beyond the terms of the Mining Permit.
To comply with N.C.G.S. §74-53 the approved plan will provide:
1. Minimum Standards.
A. The final slopes in all excavations in soil, sand, gravel, and other unconsolidated materials
shall be at such an angle as to minimize the possibility of slides and be consistent with the
future use of the land.
B. Provisions for safety to persons and to adjoining property must be provided in all
excavations in rock.
C. All overburden and spoil shall be left in a configuration which is in accordance with
accepted conservation practices, and which is suitable for the proposed subsequent use of
the land.
D. No small pools of water shall be allowed to collect or remain on the mined area that are, or
are likely to become noxious, odious, or foul.
E. The revegetation plan shall conform to accepted and recommended agronomic and
reforestation practices as established by the North Carolina Agricultural Experiment
Station and the North Carolina Forest Service.
F. Permittee shall conduct reclamation activities pursuant to the Reclamation Plan herein
incorporated. These activities shall be conducted according to the time schedule included
in the plan, which shall to the extent feasible provide reclamation simultaneous with mining
operations and in any event, provide reclamation at the earliest practicable time after
completion or termination of mining on any segment of the permit area and shall be
completed within two years after completion or termination of mining.
2. Reclamation Conditions.
A. Provided further, and subject to the Reclamation schedule, the planned reclamation shall
be to regrade and satisfactorily revegetate any disturbed areas.
B. The specifications for surface gradient restoration to a surface suitable for the planned
future use are as follows:
i. All final perimeter side slopes shall be graded to a 3 horizontal to 1 vertical or
flatter slope.
ii. Any settling ponds or sediment basins shall be backfilled and stabilized.
iii. Any areas used for waste piles, screening, stockpiling, or other processing shall be
leveled and smoothed.
iv. Compacted surfaces shall be disced, subsoiled, or otherwise prepared before
revegetation.
V. No contaminants shall be permanently disposed of at the mine site. On -site
disposal of waste shall be in accordance with Operating Condition Nos. III.l0.A
through III.10.D.
vi. The affected land shall be graded to prevent the collection of noxious or foul water.
Page 7
3.
Revegetation Plan.
After site preparation, all disturbed land areas shall be revegetated as per the following:
Permanent Seeding Specifications
Dates Species
February 15- April 1 Kobe Lespedeza
Bahiagrass
Redtop
Winter rye (grain)
April 1- July 31
August 1- October 25
October 25- February 15
Common Bermuda
Lespedeza (unscarified)
German millet
Rye (grain- temporary)
Rate, Lbs. / Acre
10
50
1
15
50
30
40
120
Soil Amendments
Lime 2000 lbs./acre or follow recommendations from a soil test.
Fertilizer 1000 lbs./acre 8-8-8 or 10-10-10 or follow recommendations from a soil test.
Mulch All seeded areas shall be mulched using small grain straw at a rate of 2000
lbs./acre and anchored appropriately.
Whenever possible, disturbed areas should be vegetated with native warm season grasses such as
switch grass, Indian grass, bluestem, and gamma grass.
In addition, the permittee shall consult with a professional wildlife biologist with the N.C. Wildlife
Resources Commission to enhance post -project wildlife habitat at the site.
4. Reclamation Plan.
Reclamation shall be conducted simultaneously with mining to the extent feasible. In any event,
reclamation shall be initiated as soon as feasible after completion or termination of mining of any
mine segment under permit. Final reclamation, including revegetation, shall be completed within
two years of completion or termination of mining.
Page 8
X. Issuance and Modification Summer. N.C.G.S. V4-51 and V4-52.
This permit, issued November 24, 2003, modified October 19, 2012, renewed and modified January 28,
2014, and modified December 1, 2017, is hereby transferred in its entirety this 18th day of August 2022
pursuant to N.C.G.S. §74-51.
By. l'o�
Brian Wrenn, Director
Division of Energy, Mineral, and Land Resources
By Authority of the Secretary
Of the Department of Environmental Quality