Loading...
HomeMy WebLinkAbout20220517_ADI_ReceivedMay 13, 2022 VIA UPS AND E-MAIL Sean R. Madden Company Attorney 701 Corporate Center Drive, Suite 101 Raleigh, NC 27607 Tel: (919) 576-5127 Sean.Madden@fredsmithcompany.net Adam Parr— Assistant State Mining Engineer RECEIVE[) Division of Energy, Mineral and Land Resources Department of Environmental Quality MAY 17 1011 1612 Mail Service Center LAND QUALITY Raleigh, NC 27699 MINING PROGRAM Re: Flat Rock Pit —Mining Permit No. 98-34—Permit Transfer Dear Mr. Parr: As you are likely aware, FSC II, LLC dba Fred Smith Company ("FSC") submitted transfer requests for the permits of the above -referenced Mine. hi response to the request, FSC received correspondence from you requesting additional or revised information for the Mine such that the request for transfer could be reviewed. FSC secured an extension through May 13, 2022 to respond to the letter requesting additional information. Pursuant to the letter, you requested additional or revised information regarding the following: 1. Provide a current mine map that reflects current site conditions. The mine map must include the items listed in section B.2 of the mining permit application. 2. Maintain Erosion and Sediment Control (E&SC) measures as noted in the mine inspection report. 3. Clearly mark the mine permit boundaries as specified in Condition 5 of the mining permit. All affected area boundaries (30.58 acres) shall be permanently marked at the site on 100-foot intervals unless the line of sight allows for larger spacing intervals. 4. Provide an estimate life of the mine on pg. 3 or pg. 14 of the mine permit application. This value is used to determine the inflation factor on the bond reclamation worksheet. FSC retained WithersRavenel to create updated maps reflecting the current site conditions. The maps were submitted by WithersRavenel to your attention both via email and hard copy. Subsequent to generating the maps, the boundaries have been permanently marked to reflect the ; Page 2 boundaries which appear in the updated maps. The E&SC measures have been addressed and remedied based on the mine inspection report. Finally, the estimated life of the mine is twenty (20) years. FSC is respectfully represents that it has addressed each of the items listed in your letter and requests that the permit transfer be approved. Should you have any questions or require and additional information, please do not hesitate to contact me. Regards, Sea4I1 R. M Sean R. Madden Company Attorney