HomeMy WebLinkAbout20220906_ESC_CalcsDocuSign Envelope ID: 1774F976-B2F9-4A65-8234-233B27BAEC48
%0 WithersRavenel
lipOur People. Your Success.
Erosion & Sedimentation
Control Calculations
Hanson Rocky Mount II Quarry
RECEIVED
SEP 0 6 ton
LAND QUALITY
MINING PROGRAM
September 1, 2022
Prepared by: David Glenn, El
Checked by: Daryl Riggins, PE
NEAR
027404
apy�• T..�`GG
DocuSign Envelope ID: 1774F976-82F9-4A65-8234-233B27BAEC48
Skimmer Sediment Basin Design Calculations
Per NC Erosion & Sediment Control Planning & Design Manual
Project: Hanson RM Concrete Plant
Project #: 09211082
By: Daryl Riggins, PE
Date: 9/1/2022
Revisions:
10 WithersRavenel
Our Peopte. Your Success.
TEMPORARY BASIN DESIGN SUMMARY
115 MacKenan Drive I Cary, NC 27511
t: 919.469.3340 1 f: 919.467.6008
www.withersravenel.com I License No. F-1479
DRAINAGE
DISTURBED
C
PEAK
WEIR
VOLUME
VOLUME
SURFACE
SURFACE
BASIN
TYPE
DEPTH
LENGTH
WIDTH
AREA
AREA
AREA
AREA
VALUE
FLOW
LENGTH
REQUIRED
PROVIDED
REQUIRED
PROVIDED
(AC)
(AC)
(CFS)
(FT)
(
(FT)
(CF)
(CF)
((SF)
(SF)
TST 1
SED. TRAP
2.20
2.20
0.60
9.48
1 4.0
SEE EC PLANS
10
7,920
8,356
4,123
4,185
NOTES: V OF FREEBOARD PROVIDED
SURFACE AREA REQUIREMENT FOR SKIMMER SEDIMENT BASIN: 435 sf/cfs
SURFACE AREA REQUIREMENT FOR A SEDIMENT TRAP: 435 sf/cfs
VOLUME REQUIREMENT FOR TEMPORARY SEDIMENT TRAP: 3600 cf/ac
RAINFALL INTENSITY: 7.18 in/hr
DocuSign Envelope ID: 1774F976-B2F9-4A65-8234-233B27BAEC48
Skimmer Sediment Basin Design Calculations
Per NC Erosion & Sediment Control Planning & Design Manual
1%WithersRavenet
Our People, Your Success
Project: Hanson RM Concrete Plant
Project #: 09211082
115 MacKenan Drive I Gary, NC 27511
By: Daryl Riggins, PE
C 919.469,33401 f: 919.467.6008
Date: 9/1/2022
www.wRhersravenel corn I License No. F-1479
Revisions:
Asheville I Cary I Charlotte I Greensboro I Pittsboro I Raleigh I Southern Pines I Wilmington
Ralnfall Runoff Intensity 10- ear 7.18 (in/hr)
Drainage Area = 2.2 AC
Disturbed Area = 2.2 AC
Total = I 2.20 I 1.32
Use Composite C= 0.60
Q= CIA
Q30 - 9A8 CFS
Surface Area Required = 4,122.76 SF
435 sf/cfs
Volume Required = 7,920.00 CF
3600 cf/ac
BASIN ELEVATION -AREA CALCULATION
(elev & areas taken from CAD file)
Contour
Elevation
Contour Area
Average
Volume
Cumulative
Volume
(SF)
(CF)
(CF)
69.5
2,500.00
0.00
0.00
72
4,185.00
8,356.25
8,356.25
72
0.00
0.00
8,356.25
72
0.00
0.00
8,356.25
72
0.00
0.00
8,356.25
Surface Area Provided = 4,185.00 SF
Volume Provided = 8,356.25 CF
Baffle Zone Area - 1,046.25 SF
DEPTH OF BASIN = 4.00 FT
BASIN MINIMUM ELEVATIONS
BOTTOM =
69.50
TOP SED STORAGE =
71.87
SPILLWAY =
72.37
TOPEMBANKMENT=
73.87
SPILLWAY DIMENSIONS
WEIR LENGTH = 10.00
DEPTH OF FLOW = 0.50
SPILLWAY CAPACITY = 10.92(
DocuSign Envelope ID: 1774F976-B2F9-4A65.8234-233B27BAEC48
Velocity Dissiaator Design Calculations
Per NC Erosion & Sediment Control Planning & Design Manual
Project: Hanson RM Concrete Plant '
1%
WithersRavenel
Our People. Your Success.
Project #: 09211082 115 MacKenan Drive I Cary, NC 27511
By: Daryl Riggins, PE t: 919.469.3340 1f: 919A67.6008
Date: 9/1/2022 www.withersravenel.com I License No. F-1479
Revisions: Asheville I Cary I Charlotte I Greensboro I Pittsboro I Raleigh I Southern Pines I Wilmington
VELOCITY DISSIPATOR DESIGN SUMMARY
PIPE
a
LENGTH
WIDTH
WIDTH
STONE
MIN.
OUTLET
Q25
SLOPE
VELOCITY
ZONE
TYPE
Do
La
1
2
CLASS
DEPTH
(IN)
(CFS)
I (%)
I (FPS)
(Figure 8.06c)
(Figure 806d)
(FT)
(FT)
(F0
(IN)
DW PIPE
1 18
10.6
1 0.50
1 12.96
3
OVERLAND
6
4.5
7.5
1
1 24
NOTES
1. All dissipators shall have filter fabric underliners; NCDOT Standard Specification Section 1056, or approved
equivalent
2.Outlet and downstream widths shall be installed as shown in chart unless discharging into a channel, where
the riprap shall be placed from top of bank to top of bank.
3. Design based on Section 8.06, Design of Riprap Outlet Protection, from the NC Erosion & Sediment Control
Planning & Design Manual.
4. Q25 calculated by the Rational Method with a runoff coefficient (C) of 0.60 and a drainage area of
lapproximately 2.2 acres.
DocuSign Envelope ID: 1774F976•B2F94A65-8234-233B27BAEC48
Velocity Dissinator Desien Calculations
Per NC Erosion & Sediment Control Planning & Design Manual
Project: Hanson RM Concrete Plant
Project #: 09211082
By: Daryl Riggins, PE
Date: 9/1/2022
Revisions:,
USE VELOCITY AND PIPE
DIAMETER TO SELECT ZONE
Figure 8.06e
1% WithersRavenel
Our People. Your Success.
115 MacKenan Drive I Cary, NC 27511
t: 919.469.33401 f: 919.467.6008
Www.withersravenel.com I License No. F-1479
Asheville I Cary I Charlotte I Greensboro I Pittsbwo 1 Raleieh I Southern Pines I Wilmington
ID15 20 25'
DIAMETER (Ft.)
RIPRAP SPECIFICATIONS
ZONE
APRON MATERIAL
STONE DIAMETER (in)
APRON LENGTH
(x Do)'
MIN. DEPTH
i1n)
CLASS
CHANNEL
I OVERLAND
CHANNEL
OVERLAND
1
Stone Filling (Fine)
3'
4
3
9
12
A
2
Stone Filling (Light)
6-
6
3
12
18
B
3
Stone Filling (Medium)
13'
8
4
18
24
1
4
Stone Filling (Heavy)
23'
8
4
30
36
1
5
Stone Filling (Heavy)
23'
10
5
30
36
2
6
Stone Filling (Heavy)
23'
10
6
30
36
2
7
Special Study Required (Energy Dissipatom, Stilling
Basins, or Larger Size Stone
STUDY
STUDY
STUDY
STUDY
STUDY
'MULTIPLY BY ORIFICE DIAMETER
z
N
APRON MATERIAL
LENGTH OF APRON
TO PROTECT
CULVERT
Lt
TO PREVENT SCOUR
HOLE USE L2 ALWAYS
�
I
STONE FILLING (FINE) CL A
3 X D,
4 x D
2
STONE FILLING (LIGHT) CL. B
3 X D,
6 x D.
3
STONE FILLING (MEDIUM) CL 1
4 X Do
8 x D
4
STONE FILLING (HEAVY) CL. 1
4 X Do
0 x D
5
STONE FILLING (HEAVY) CL.2
5XD,
IOx D,
6
STONE FILLING (HEAVY) CL. 2
6 X D.
10 x D.
7 SPECIAL STUDY REQUIRED (ENERGY DISSIPATORS. STILLING
BASIN OR LARGER SIZE STONE).
Figure 8.06d
AIM. i 1m," Pllw di+ lmin t
"gum twoo
W1 3
a W�
Outlet "IG Do • La
pipe 1
diameter (Do)
LA —
i w r < 0.5%
LI - Overland
WI= 311
o T
Outlet W Do + 0.41.a
pipe i
diameter (I La
5Do
L2 - Channel
DocuSign Envelope ID: 1774F976-B2F94A65-8234-233B27BAEC48 precipitation Frequency Data Server
NOAA Atlas 14, Volume 2, Version 3
Location name: Rocky Mount, North Carolina, ,�11
USA` rwen III A
Latitude: 35.9782°, Longitude:-77.7395°
Elevation: 74.64 fC° a
'source: ESRI Maps.
"source: USGS
POINT PRECIPITATION FREQUENCY ESTIMATES
G.M. Bonin, D. Martin, B. Lin, T Parzybak M.Yelds. and D. May
NOAA, National Weather Service, SINer Spring, Maryland
PF tabulaI PF graphical I Maps & aerials
PF tabular
PDS-based point precipitation frequency estimates with 90% confidence Intervals (in Inches/hour),
Average
recurrence Interval (years)
Duration
1
�����[
2
5
10
25
50 1
50
100
200
500
1000
Strtin
4.86
4AD5.39
SW
5.06-6.13
6.23
5.658.85
7.18
6.50-7.90
8.05
27-0.88
8.87
97-9.76
9.5B
8.56-10.5
10.3
9.11.11.3
11.0
9.71-12.1
11.8
10.3-13.1
10-min
3.51A830
4.0,54.90
4.525.48
5.20-8.32
5.80-7.06
6.3& .76
6.805.38
22-8.94)
.67-8.61
(8.11-310.3
15inin
2.933.58
3.40+1.10
9.82�062
4.39-5.33
4.90-5.98
5.364.56
6,73-7.04
6.07�52
6.4,".08
(6. 85.60
30-min
2.01--2.46)
2.34.2.84
2.7132E
3:8-3.88
3,63-4.42
4.D4-4.94
4.395.40
4.725.88
5.2-6AI
5A9596
1.36
1.62
1.91
2.28
2.88
3.04
3.36
3.73
4.17
4.60
60•min
125-1.53
1.47-1.78
1.742.17
2.07-2.51
2.41-2.94
2.733.34
3.023.72
3.314.11
3.684.80
4.015.08
2-hr
(0.726-0898
0.857-1.04
1.02-t1.25
1.4-31852
1.47-1..81)
1.702.10
1.912637
(2.142.67)
1(2.433.07
2.713.46
1F-066
3•hr
0.5070-0.83
0.604-0944
0.725-0.895
0.883-1'OB
1.08-18.31
723-19.63
7.40.r7�.75
1.58-10.89
1.81-2.31
2.042.85
0.340
OA00
0.481
0.07
0.711
0.836
0.960
1.10
128
1A7
6-hr
0.305-0.381
0.382-0.444
0.434-0.633
0.529-0.650
0.637-0.785
0.7"-0.921
0.848-1.08
0.958-120
1.11-1.41
1.25-1.62
12-hr
0.179-0.220
0.2�2-0.257
0255-0.10
0.013-0.381
0.379-0.482
0.44&0.546
0.510-0.631
0.579-0.725
0.673-0854
0.6&0.990
4alr
0.109-01
0.132-02164
0.170-0.199
0.203-0238
0252-02B8
0.293-0.351
0.3394AI2
0.389-0.481
0464-0597
0. 27-0.688
0.082
0.105
0.125
0.155
0.181
0.211
0.244
0294
0.338
2-d7ay0.068
2 day
0.063-0.074
0.076-0.089
0.097-0.114
0.115-0.136
0.142-0.169
0.164-0.198
0.189-0.231
0.215-0.268
02-9".326
0.287-0.378
004
0.058
0.074
0.088
0.108
0.126
0.145
0.167
0200
0.28
3�ay
.8
0.045-0.052
0.054-0.063
0.069-0.080
0.081-0.095
0.098-0.11
0.114-0.137
0.130-0.158
0.148-0.183
0.174-0.221
0.1954.254
OW0.059
0.069
0.085
0.098
0.112
0.129
0.152
0.173
F4.7day0.038
4�ay
0.036-0.042)
0.043-0.050)
(0.054-0.063)1(0.064-0.075)
(0.078-0.091)1(0.089-0.106)
0.101-0.122
0.114-0.140
0.133-0.188
0.149-0.192
026
0031
0039
0.0
0055
0063
00
0.081
0.106009
7deya
.
.
.
.
.
0.024-0.028)
0.0290033)!(0.0-0
0.042-0.049
0.051-0.059
(0.058-0.068)
0.065-0.078
0.073-0.088
(0.084-0.104)
1(0.003-0.117
..
10-dey
0.01M.022
0.023-0026)!
0.029-0033
0.D33-0.038
0099-0.046
0.044-0.052
0.050-0.058
0055-0 O88
0063-0.0
0.070-0.087
0.017
0.020
0.023
0.027
0.031
0.034
0.038
0.044
0.048
20j0.014
0.013-0.015
0.016.0.018
0.019-0.022
(0.022-0.025)
0.025-0.02B
0.028-0.033
0.032-0.09
0.035-0.041)
(0.039-0.04
0.043-0.052
0.071
O 014
0.018
0.019
0.022
0.024
0.026
0.029
0.032
0.035
30
0.011-0.012
0.013-0.014
0.015-0.01
0.017.0.020
0.020-0.023
(0.022-0.025)
0.024-0.028
0.027-0.031
0.030-0.035
(0.032-0.038
0010
015
017
018-0.020
45dey
0.D09-0O10
0.0011-0.012
00113-0014
0.0014-0018
0.0016-0018
O.
0020-0.023
0021-U.025)
(0024-0028)
1(0.025-0.030
0.009
0.010
0.012
0.013
0.015
0.017
0.018
0.019
0.021
0.023
60day
0.008-0.009
0.010-0.011
0.011-0.013
0.013-0.014
0.014-0.Of6)
0.016-0.017
0.017-0.019
0.01&0.021
0.020-0.023
0.021_0024
Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PD.S).
mbers In parenthesis are PF estimates al lower and upper bounds of the 90% confidence Interval. The probability that precipitation frequency estimates (far aan
[NI
duration end average recurrence interval) will be greater than the upper bound (or less then the lower bound) la 5%. Estimates at upper bounds are notecked
against probable m Amum precipitation (PMP) estimates and may be higher than currently valid PMP values.
ease refer to NDAA Atlas 14 document for more Information.
Back to Top
PF graphical
httpsJlhdsc.nws.noaa.govfhdsdpfdalpfds_printpage.html7lat=35.976281on=77.7395&data=Intensity&units=english&series=pds 114
DocuSig4Envelope ID: 1774F976-B2F94A65-8234-233B276AEO48 precipitation Frequency Date Server
PDS-based intensity -duration -frequency (IDF) curves
Latitude: 35.97620, Longitude:-77.7395°
300.000
10.000...:.._.:....
:.. :. .:... ... ..:...
..
L
C
.......
...........
a
y
c
y
0.100 .......i.....i
_ i....i..i.....i_._....:.: .
a�
S
a
\�
0.030....:
...:.....:.....:.....:...:....
.. ..
0.001
C
C
G C
G r- T TT
Lh
T T
T T
TT
E
E
rLS V y v v v
p v
vp
v vp
.Av
N
VE ppE
rn
ppE
10 ~ N N !%f
n N
G
N
O rD
.4
Duration
1+1
100.r`^^
19
NOAA Atlas 14, Volume 2. Version 3
Average recurrence interval (years)
Created (GMT): Fri Jun 10 15:42:16 2022
Back to Top
Maps & aerials
Small scale terrain
Average recur
interval
(years)
— 1
2
—5
— +o
— 25
60
100
— 200
Soo
— 1000
Duration
— - 5-min
— 2-day
— 10-n n
— 3-day
15-min
— 4-day
— 30 In
— 7-day
— 60-rnin
— 10-dey
— 2-hr
— 204ay
— 3-hr
— 30-day
— 6-ht
— 45-day
— 12-hr
— 60-0ay
— 24-hr
https:ghdsc.nws.noaa.govlhdsctp(dslpfds_tdntpage.html7lat--35.9762&Ion=-77.7395&data=intensity&units=english&seriw=pds 214
DocuSign Envelope ID: 1774F976-B2F9-4A65-8234-233B27BAEC48
e!'
�L
.
Roanoke
Precipitation Frequency Data Server
e
3km
2 _
2mi
Large scale terrain
4 @9
C
0 ~
• Durham lodry Mourt'.
ibor0
Raleigh",:,
O L I N A •Greenville _. + Or
J
PJIr
1OW"
�� Jacksonville
Large scale map
Norfolk
virginit
c Beach
cunt
reenville
100km
somi fiJacksmville
,
Large scale aerial
httpsJlhdsc.nws.noaa.govl dselpfdslpfds,_pdntpage.html71at=35.97628Ion=77.7395&data=intercity&units=engiish&sedes=pds 3l4
DocuSign Envelope ID: 1774F976-82F9-4A65-8234-233B27BAEC48 precipita0on Frequency Data Server
Back to Top
US Department of Commerce
National Oceanic and Atmosohedc Administration
National Weather Service
National Water Center
1325 Fast West Highway
Silver Spring, MD 20910
Questions]: HaaQ.Qugktonl@noa-y-.gov
Disclaimer
httpsJlhdsc.nws.noaa.govlhdsetpfdslpfdsydntpage.html71at=35.976281on=77.73958data=lntenslty&units=english&series=pds 414