Loading...
HomeMy WebLinkAbout20220902_ESC_Calculations_77-01APPENDIX B - CALCULATIONS PHASE I DITCH CALCULATIONS Civil & Environmental Consultants, Inc. Project Name: Rockingham Quarry CEC Project No.: 304-408 Description: 25-Year Stormwater Ditch Calculations 2.5' Deep V-Ditch By: CTH Date: 9/1/2022 Checked By: ERR Date: 9/1/2022 Total Flow (cfs) 50.33 Channel Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Perimeter Ditch #1 Triangular Side Slopes (z:1) = 3.00, 3.00 Total Depth (ft) = 2.50 Invert Elev (ft) = 270.00 Slope (%) = 2.00 N-Value = 0.060 Calculations Compute by: Known Q Known Q (cfs) = 50.33 Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ft/s) Wetted Perim (ft) Crit Depth, Yc (ft) Top Width (ft) EGL (ft) Thursday, Sep 1 2022 = 2.17 = 50.33 = 14.13 = 3.56 = 13.72 = 1.78 = 13.02 = 2.37 Elev (ft) Section Depth (ft) 273.00 272.50 3.00 2.50 v — 272.00 2.00 271.50 1.50 271.00 1.00 270.50 0.50 270.00 269 50 0.00 _n Fn 2 4 6 8 10 12 14 16 18 20 vVV Reach (ft) ECMDS 7.0 Page 1 of 1 NORTH AMERICAN GREEN' CHANNEL ANALYSIS > > >Perimeter Ditch #1 Name Perimeter Ditch #1 Discharge 50.33 Channel Slope 0.02 Channel Bottom Width 0 Left Side Slope 3 Right Side Slope 3 Low Flow Liner Retardence Class C 6-12 in Vegetation Type Mix (Sod and Bunch) Vegetation Density Fair 50-64% Soil Type Clay Loam (CL) SC150 North American Green 5401 St. Wendel-Cynthiana Rd. Poseyville, Indiana 47633 Tel. 800.772.2040 >Fax 812.867.0247 www.nagreen.com ECMDS v7.0 Normal Permissible Calculated Safety Staple Phase Reach Discharge Velocity Mannings N I I Remarks I Depth Shear Stress Shear Stress Factor Pattern SC150 Straight 50.33 cfs 5.39 rt/s 1.76 ft 0.035 2 Ibs/ft2 2.2 Ibs/ft2 0.91 UNSTABLE D Unvegetated Underlying Straight 50.33 cfs 5.39 ft/s 1.76 ft 0.035 2.18 Ibs/ft2 1.04 Ibs/ft2 2.09 STABLE D Substrate Unreinforced Vegetation Normal Permissible Calculated Safety Staple Phase Reach Discharge Velocity Mannings N I I Remarks I Depth Shear Stress Shear Stress Factor pattern Unreinforced Straight 50.33 cfs 4.48 ft/s 1.94 ft 0.044 4 Ibs/ft2 2.42 Ibs/ft2 1.66 STABLE Vegetation Underlying Straight 50.33 cfs 4.48 ft/s 1.94 ft 0.044 3.08 Ibs/ft2 1.15 Ibs/ft2 2.68 STABLE Substrate https:Hecmds.com/project/153102/channel-analysis/228492/show 9/1/2022 EXISTING PERMITTED SEDIMENT CHANNEL CALCULATIONS (*PERFORMED BY PHILIP BAILEY, APRIL 25, 2019) Rockingham Quarry • Mining Permit No. 77-01 Vulcan Construction Materials, LLC Mining Permit Modification — April 25, 2019 Pit No.2 Sediment Channel The Pit No.2 Sediment Channel is designed to control runoff from the maximum 5 8 a c r e d r a i n a g e a r e a. The Sediment Channel will be constructed with a single outfall at Sta 23+25; please refer to the included site plan for dimensional data and location. The Sediment Channel will be installed according to the requirements of the included construction specifications and maintenance plans SEDIMENT CHANNELS, ROCK WEIR OUTLETS, and OUTLET PROTECTION. Sediment Storage Volume The maximum disturbed drainage area for this sediment channel is 19 acres during initial construction. Once the sediment channel and berms are complete, then the quarry pit excavation to top of rock will commence. Once this excavation commences, any sediment laden water from the excavation will be trapped in the quarry excavation, requiring a pump to remove the water. The pump line will discharge in the sediment channel at Sta 12+16. This sediment channel is designed to provide a sediment storage volume of at least 3,600 cubic feet per acre of disturbed drainage area. The proposed Sediment Channel provides 74,696 cubic feet of storage volume; 19 acres of disturbance requires (19 ac x 3,600 cubic ft / ac = 68,400 cubic feet), which provides 10% more than the required storage. Please refer to the included sediment storage volume calculations. Watershed Modeling The Rational Method was utilized to predict surface runoff. The included design calculations describe input data used in the method to determine and peak discharge. Design Storm Events The rock check dams and outfall spillways of the Sediment Channel are designed to safely pass the peak flow of runoff from a 100 year — 24 hour storm with a minimum of 1 foot of freeboard. The peak outflow occurs at Sta 23+25 outfall and the 100 year — 24 hour storm is 130.7 cfs. All the rock check dams and outfall spillways are designed to pass 78.4 cfs. Please refer to the design computations. Pit No.2 Sediment Channel Rock Weir Outlet at Sta 23+25 Design Computations Drainiage Basin Characteristics Total Drainage Area - 58 Acres Runoff Coefficient, C - 0.35 Travel Length - 2397 feet Time of Concentration (Tc) - 20.0 min Intensity, i2 - 3.67 in/hr Intensity, i25 - 5.50 in/hr Intensity, i,00 - 6.44 in/hr Peak Runoff Discharge, Q2 - 74.5 cfs Peak Runoff Discharge, Q25 - 111.7 cfs Peak Runoff Discharge, Q,00 - 130.7 cfs Spillway Design Invert Elevation - 201.9 ft Bottom Width - 50 ft Total Depth - 2 ft Freeboard - 1.00 ft Side Slopes - 5 :1 Capacity with 1' Freeboard - 168.4 cfs 100 Year Storm Flow Depth - 0.8 ft Average 100 Year Velocity - 0.5 fps Sediment Channel Sta 11 +75 to Sta 23+25 Design Computations - Sediment Storage and Stormwater Flow Sub Basin Sediment Storage Characteristics NCDEQ Requirements - 3,600 CU FT PER ACRE Total Drainage Area - 29.00 Acres Disturbed Drainage Area - 16.00 Acres Required Sediment Storage - 63,579.0 cu-ft Required Sediment Storage - 1.460 ac-ft Runoff Coefficient, C - 0.4 Travel Length - 2397 feet Time of Concentration (Tc) - 20.0 min Intensity, iz - 3.67 in/hr Intensity, i25 - 5.50 in/hr Intensity, i,00 - 6.44 in/hr Peak Runoff Discharge, Qz - 44.7 cfs Peak Runoff Discharge, Q25 - 67.0 cfs Peak Runoff Discharge, Q,00 - 78.4 cfs Sediment Channel Cell Channel Slope % Ponded Ponded Length Minimum Pond Depth D, (ft) Check Dam Height D2 (ft) Bottom Channel Width (ft) Channel Side Slope (z:1) 100 Yr Flow Depth Over Check Dam (ft) Volume (cu-ft) Total Volume (cu-ft) Total Volume (ac-ft) Sta 12+00 to Sta 14+50 2.00 250 0 5 5 2 1.0 7,329.2 7,329.2 0.168 Sta 15+00 to Sta 22+50 0.00 750 5 5 5 1 2 1 1.0 1 56,250.01 63,579.2 1.460 Sediment Channel Sta 23+25 to Sta 29+20 Design Computations - Sediment Storage and Stormwater Flow Sub Basin Sediment Storage Characteristics NCDEQ Requirements - 3,600 CU FT PER ACRE Total Drainage Area - 8.00 Acres Disturbed Drainage Area - 3.00 Acres Required Sediment Storage - 10,800.0 cu-ft Required Sediment Storage - 0.248 ac-ft Runoff Coefficient, C - 0.4 Travel Length - 636 feet Time of Concentration (Tc) - 10.0 min Intensity, iz - 4.54 in/hr Intensity, i25 - 6.38 in/hr Intensity, i,00 - 7.15 in/hr Peak Runoff Discharge, Qz - 15.3 cfs Peak Runoff Discharge, Q25 - 21.4 cfs Peak Runoff Discharge, Q,00 - 24.0 cfs Sediment Channel Cell Channel Slope % Ponded Ponded Length Minimum Pond Depth D, (ft) Check Dam Height D2 (ft) Bottom Channel Width (ft) Channel Side Slope (z:1) 100 Yr Flow Depth Over Check Dam (ft) Volume (cu-ft) Total Volume (cu-ft) Total Volume (cu-ft) Sta 24+00 to Sta 24+50 0.00 50 5 5 5 2 0.4 3,750.0 3,750.0 0.086 Sta 24+50 to Sta 25+75 4.00 125 0 5 5 2 0.4 3,683.4 7,433.4 0.171 Sta 26+25 to Sta 27+50 4.00 125 0 5 5 2 0.4 3,683.4 11,116.8 0.255