Loading...
HomeMy WebLinkAbout20220822_ADI_ReceivedCAROLINA GEOLOGICAL SERVICES, INC August 15, 2022 Mr. Adam Parr NCDEQ,DEMLR 1612 Mail Service Center Raleigh, NC 27699-1612 Subject: Modification Simpson Hocutt Mine, Permit # 16-82, ADI response Dear Mr. Parr; RECEIVED AUG 2 2 2022 LAND QUALITY MINING PROGRAM On behalf of Noah Simpson, Thomas Simpson Constriction Company, Inc, I am writing in response to your Augustl0, 2022 letter requesting additional information on the above - referenced mining permit modification application. I will respond to each item in the order of your letter for clarity. 1. A riprap lined channel will be installed between the outlet of the sediment basin and the 50 foot undisturbed wetland buffer to prevent erosion of the slope. The location of the channel and a detail has been added to the mine map. 2. A 25 foot "undisturbed" buffer will be maintained between the mining limit and the permit boundary. The exceptions to this are the placement of the riprap lined channel (see item 1) and the perimeter berm along the southern side of the mine (see item 3) 3. The "undisturbed" buffer already contains vegetation that screens the operation on the west side. Natural vegetation, distance, and topography screens the operation on the north and east side. The south side of the mine is naturally screened by distance and vegetation, however a perimeter berm will be established along the south end of the mine for further screening. 4. A detail of the perimeter berm has been added to the mine map. We trust that this information will allow you to complete your review of this modification request. Please let me know if you need any additional information. ' ;Lc,e,rJamIzzell Carolina Geological Services, Inc. enclosures PO Box 429, GARNER, NC 27529