Loading...
HomeMy WebLinkAboutextension time request-Brickhaven2-permit no 19-08CIS ENGINEERING & ENVIRONMENTAL SCIENCE COMPANY 3008 ANDERSON DRIVE, SUITE 102 RALEIGH, NC 27609 (919)781-7798 May 195 2021 NIr. Brian Wrenn. Director NCDEMLR 512 N. Salisbury Street Raleigh, NC 27699 Re: Permit Modification Response Time Extension Request Brickhaven Mine II, Tract B Mining Permit No. 19-08 Chatham County, NC General Shale Brick, Inc. Dear Mr. Wrenn: This is a request to extend om• response to the letter dated December 11, 2020, by Mr. Adam Parr, that requested additional information for the submitted mine modification. The requested additional information includes the jurisdictional determination with the US Army Corps of Engineers concerning the delineation of streams and wetlands at the mine. Ms. Robin Perez, Licensed Soil Scientist, has conducted the delineation, but we have not had the Army Corps of Engineers visit the site. It is unlikely that this issue will be resolved by mid -June and request, on behalf of General Shale Brick, to extend our response submittal to October 15, 2021. Thank you for your consideration of this request. Sincerely, T /� T. Patrick Sbillington, P. E. President