HomeMy WebLinkAbout19-08 Modification 2020 - Applicatione's
ENGINEERING & ENVIRONMENTAL SCIENCE COMPANY
3008 ANDERSON DRIVE, SUITE 102
RALEIGH, NC 27609
(919)781-7798
LETTER OF TRANSMITTAL
Date: October 26, 2020
To: NCDEQ-DEMLR
1612 Mail Service Center
Raleigh, NC 27699-1612
From: T. Patrick Shillington, P.E.
Engineering and Environmental Science Company (E2S)
3008 Anderson Dr., Suite 102
Raleigh, NC 27609
Subject: Brickhaven Mine #2 Tract B
Mining Permit Modification (Mining Permit# 19-08)
Chatham County
Submitted are the mine maps, specifications, and evaluation for the above referenced
project.
The following are submitted:
1. Check for Mining Permit Modification fee.
2. Six (6) copies of the Mining Permit Application
2. Six (6) copies of the mine maps.
3. Six (6) copies of the revised Erosion Control Evaluation and Calculations.
4. Six (6) copies of the stream determination performed by Maycock
Environmental.
RCCEIVED
LAND QUALITY
MINING PROGRAM
APPLICATION FOR A MINING PERMIT
NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY
APPLICATION FOR A MINING PERMIT
(PLEASE PRINT OR TYPE)
1. Name of Mine Brickhaven Mine #2 Tract B County Chatham
River Basin Cape Fear
Latitude (decimal degrees to four places)
35.5993
Longitude (decimal degrees to four places)-79.021
2. Name of Applicant* General Shale Brick, Inc.
3. Permanent address for receipt of official mail**
Telephone (919)774-6533 ext. 221 Alternate No. none
4. Mine Office Address none
Telephone ( )
5. Mine Manager Warren Paschal
6. E-mail Address:
&CCCjVCD
('CT 2 61II2g
LAND
I certify that all details contained in this Permit Application are true and correct to the best of our
knowledge. We fully understand that any willful misrepresentation of facts will be cause for permit
revocation.
* * * Signature 0px'4_4f
Print Name Warren Paschal
Title Environmental Compliance Manager
Date /V 1 LQ(Zbzno
This will be the name that the mining permit will be issued to and the name that must be indicated on the
reclamation bond (security) that corresponds to this site.
* * The Division of Energy, Mineral, and Land Resources must be notified of any changes in the permanent address
or telephone number.
*** Signature of company officer required.
G. S. 74-51 provides that the Department shall grant or deny an application for a permit within 60 days of receipt of a
complete application or, if a public hearing is held, within 30 days following the hearing and the filing of any
supplemental information required by the Department. All questions must be addressed and all required maps
provided before this application can be considered complete. Attach additional sheets as needed.
-1-
APPLICATION FOR A MINING PERMIT
NOTE: All of the following questions must be thoroughly answered regarding your mining operation for
the intended life of the mine. All responses must be clearly conveyed on a corresponding, detailed mine map.
A. GENERAL CHARACTERISTICS OF THE MINE
1. Answer all of the following that apply:
❑ If this is an application for a NEW permit, indicate the total acreage at the site to be covered by the
permit (this is the acreage that the "new permit" fee will be based upon):
Of this acreage, how much is owned and how much is leased? Acres owned:
Acres leased: Property owner if leased:
If this is an application for a MODIFICATION to a mining permit, indicate the mining permit
number and the total (overall) acreage covered by the existing permit.
Mining Permit No.: 19-08 Total permitted acreage: 348
Does the modification involve acreage within the previously approved permitted boundary?
Yes M No ❑. If yes, indicate the acreage to be covered by this modification (this is the acreage
that the "major modification" fee will be based upon): 50
Does the modification involve acreage outside the previously approved permitted boundary?
Yes ❑ No M. If yes, indicate the additional acreage to be covered by this
modification: . (NOTE: you must complete all of Section F. of this application form
entitled Notification of Adjoining Landowners).
Of this acreage to be added to the permit, will any portion of this acreage be affected (i.e.: disturbed,
ground cover removed) by the mining operation? Yes ❑ No ❑ (If no, a "minor modification"
fee of $100.00 is required, despite the "undisturbed" acreage to be added). If yes, indicate the
acreage to be affected within the acreage to be added to the permit (the total acreage to be added to
the permit is the acreage that the "major modification" fee will be based upon):
❑ If this is an application for TRANSFER of a mining permit, indicate the mining permit number and
the total (overall) acreage covered by the existing permit.
Mining Permit No.: Total permitted acreage:
SEE THE FEE SCHEDULE AT THE END OF THIS FORM FOR THE PROPER FEE AMOUNT TO BE
PAID FOR THE REQUESTED PERMIT ACTION(S) AND CORRESPONDING ACREAGE NOTED
ABOVE
2. Name of all materials mined:
3. Mining method:
Hydraulic Dredge Front-end Loader & Truck Shovel & Truck
Dragline & Truck Self -loading Scraper
Other (explain):
4. a. Expected maximum depth of mine (feet) 60'
Depth is relative to what benchmark? (e.g., natural ground level, mean sea level, road elevation, etc.)
natural ground level
b. Expected average depth of mine (feet) 40'
Has any area(s) at this site been mined in the past? Yes No ❑
If yes, when and by whom was this activity conducted? General Shale Brick, Inc. since 1985
APPLICATION FOR A MINING PERMIT
6. Number of years for which the permit is requested (Life of the Mining Operation or Life of Lease from
Public Entity): Life of the Mining Operation
B. MAPS
1. Clearly mark and label the location of your mining operation on six (6) conies of a 7.5-minute quadrangle
and a county highway map. These maps, in addition to six (6) conies of all mine maps and reclamation
maps, must be submitted with each permit application.
7.5-minute quadrangles may be obtained from the N.C. Geological Survey:
Mailing Address: Physical Address:
1612 Mail Service Center OR 512 North Salisbury Street, 5'h Floor
Raleigh, North Carolina 27699-1612 Raleigh, North Carolina 27604
(919)733-2423
httD://Dortal.nedenr.oriz/web/lr/aeoloaical home
County highway maps may be obtained from the N.C. Department of Transportation:
North Carolina Department of Transportation - Geographic Information Systems (GIS)
Mailing Address:
NCDOT GIS Unit
1587 Mail Service Center
Raleigh, North Carolina 27699-1587
Physical Address:
NCDOT GIS Unit
3401 Carl Sandburg Court
Raleigh, North Carolina 27610
(919) 212-6000
http://www.ncdot.org/it/gis/
2. Mine maps must be accurate and appropriately scaled drawings, aerial photographs or enlarged
topographic maps of the entire mine site. All aspects of the mine site must be clearly labeled on the
maps along with their corresponding (approximate) acreage. Thus, all mine and reclamation maps
must denote those activities that are intended to be conducted during the life of the mining permit.
All maps must be of a scale sufficient (see minimum requirements listed below) to clearly illustrate the
following, at a minimum:
a. Property lines of the tract or tracts of land on which the proposed mining activity is to be located
including easements and rights -of -way.
b. Existing or proposed permit boundaries.
c. Initial and ultimate limits of clearing and grading.
d. Outline and width of all buffer zones (both undisturbed and unexcavated).
e. Outline and acreage of all pits/excavations.
f. Outline and acreage of all stockpile areas.
g. Outline and acreage of all temporary and/or permanent overburden disposal areas.
h. Location and acreage of all processing plants (processing plants may be described as to location and
distance from mine if sufficiently far removed).
i. Locations and names of all streams, rivers and lakes.
j. Outline and acreage of all settling and/or processing wastewater ponds.
k. Location and acreage of all planned and existing access roads and on -site haul roads.
1. Location of planned and existing on -site buildings.
m. Location and dimensions of all proposed sediment and erosion control measures.
n. Location of 100-year floodplain limits and wetland boundaries.
o. Names of owners of record, both public and private, of all tracts of land that are adjoining the mining
permit boundary; if an adjoining tract is owned or leased by the applicant or is owned by the lessor of
the mine tract, names of owners of record of tracts adjoining these tracts, that are within 1,000 feet of
the mining permit boundary, must be provided on the mine map.
APPLICATION FOR A MINING PERMIT
p. Names of owners of record, both public and private, of all tracts of land that are adjoining the mining
permit boundary which lie directly across and are contiguous to any highway, creek, stream, river, or
other watercourse, railroad track, or utility or other public right-of-way. If an adjoining tract is owned
or leased by the applicant or is owned by the lessor of the mine tract, names of owners of record of
tracts adjoining these tracts, that are within 1,000 feet of the mining permit boundary, must be
provided on the mine map(s). NOTE: "Highway" means a road that has four lanes of travel or less
and is not designated as an Interstate Highway.
q. Map legend:
1. Name of applicant
2. Name of mine
3. North arrow
4. County
5. Scale
6. Symbols used and corresponding names
7. Date prepared and revised
8. Name and title of person preparing map
Map scales should meet the following guidelines:
PERMITTED ACREAGE
MAP SCALE
0-49 Acres
1 inch = 50 feet
50-199 Acres
1 inch = 100 feet
200+ Acres
1 inch = 200 feet
(NOTE: Smaller scaled maps may be acceptable if they clearly illustrate the above items)
APPLICATION FOR A MINING PERMIT
A table/chart must be provided on the mine map that clearly lists the approximate acreage of tailings/sediment
ponds, stockpiles, wastepiles, processing area/haul roads, mine excavation and any other major aspect of the
mining operation that is proposed to be affected/disturbed during the life of the mining permit. A table/chart
similar to the following will be acceptable:
CATEGORY
AFFECTED ACREAGE
Tailings/Sediment Ponds
14
Stockpiles
5
Wastepiles
0
Processing Area/Haul Roads
10
Mine Excavation
115
Other (Explain)
0
Total Disturbed Acreage
144
NOTE:
IN ADDITION TO THE ABOVE, THE MAPS MUST ALSO INCLUDE ANY SITE -SPECIFIC
INFORMATION THAT IS PROVIDED IN THE ANSWERS TO THE FOLLOWING QUESTIONS IN
THIS APPLICATION FORM (PLEASE NOTE THE ITALICIZED QUESTIONS/STATEMENTS
THROUGHOUT THE FORM). THIS APPLICATION WILL NOT BE CONSIDERED COMPLETE
WITHOUT ALL RELEVANT ITEMS BEING ADEQUATELY ADDRESSED ON THE MINE MAPS.
-5-
APPLICATION FOR A MINING PERMIT
C. PROTECTION OF NATURAL RESOURCES
1. Describe in detail the sequence of events for the development and operation of the mine and reference the
sequence to the mine map(s). Attach additional sheets as needed.
Mining will continue as permitted in the existing active mine area (east of existing Basin K). Erosion control
for the proposed new mining area will consist of four (4) new sediment basins (Basins L, M, N. and O).
Earthen berms will be constructed to divert stormwater runoff to these basins. No mining will occur north of
the Progress Energy Easement that runs through the property.
2. Describe specific erosion control measures to be installed prior to land disturbing activities and during
mining to prevent offsite sedimentation (include specific plans for sediment and erosion control for mine
excavation(s), waste piles, access/mine roads and process areas), and give a detailed sequence of
installation and schedule for maintenance of the measures. Locate and label all sediment and erosion
control measures on the mine map(s) and provide typical cross-sections/construction details of each
measure. Engineering designs and calculations are required to justify the adequacy of any proposed
measures.
Proposed erosion control measures consist of diversion berms and sediment basins with riser pipes and
skimmers. Areas upslope of the basins will be mined and the runoff from these areas will be conveyed to the
basins by gravity. Silt fence will be placed beneath the diversion berms and below the sediment basins.
3. a. Will the operation involve washing the material mined, recycling process water, or other waste water
handling? Yes ❑ No E. If yes, briefly describe all such processes including any chemicals to be used.
b. Will the operation involve discharging fresh or waste water from the mine or plant as a point discharge to
the waters of the State? Yes M No ❑. Ifyes, briefly describe the nature ofthe discharge and locate
all proposed discharge points (along with their method of stabilization) on your mine map(s).
Discharge of stormwater runoff from erosion control structures.
APPLICATION FOR A MINING PERMIT
Will any part of the proposed mine excavation(s) extend below the water table? Yes ❑ No [K.
If yes, do you intend to dewater the excavation(s)? Yes ❑ No ❑.
If yes, what impact, if any, will mine dewatering have on neighboring wells? Estimated withdrawal rate
in gallons per day: . Locate all existing wells on the mine map(s) that lie within
500 feet of the proposed excavation area. Provide data to support any conclusions or statements made,
including any monitoring well data, well construction data and current water withdrawal rates. Indicate
whether the proposed mine locale is served by a public water system or private wells.
d. If you answered yes to any of the above questions, provide evidence that you have applied for or
obtained the appropriate water quality permit(s) (i.e., non -discharge, NPDES, Stormwater, etc.) from the
Stormwater Program. In addition, the applicant is required to register water use with the Division of
Water Resources, Ground Water Management Branch, if the operation withdraws more than 10,000
gallons per day and needs a capacity use permit from the Division of Water Resources, Ground Water
Management Branch, if the operation lies in a capacity use area and withdraws more than 100,000
gallons per day.
The facility is covered by General Permit NCG020881
4. a. Will the operation involve crushing or any other air contaminant emissions? Yes ❑ No EK.
If yes, indicate evidence that you have applied for or obtained an air quality permit issued by the
Division of Air Quality or local governing body.
b. How will dust from stockpiles, haul roads, etc., be controlled?
Haul roads are stabilized with broken brick or crushed rock. Stockpiles and haul roads will be wetted to
control dust as needed.
APPLICATION FOR A MINING PERMIT
5. a. A buffer will be required between any mining activity and any mining permit boundary or right-of-
way. It may be an unexcavated buffer (no excavation, but roadways, berms and erosion &
sedimentation control measures may be installed within it), an undisturbed buffer (no disturbance
within the buffer whatsoever), or a combination of the two, depending upon the site conditions. Note
that all buffers must be located within the mining permit boundaries.
How wide a buffer will be maintained between any mining activity and any mining permit boundary
or right-of-way at this site? A minimum buffer of 25 feet is recommended, although a wider buffer
may be needed depending on site conditions. Show all buffer locations and widths on the mine
map(s).
Buffer widths are noted on the mine maps. At least a 50 ft. undisturbed or unexcavated buffer will be
provided along the permitted boundary adjacent to other properties and along the NCDOT right-of-way.
b. A minimum 50 foot wide undisturbed buffer will be required between any land disturbing activities
within the mining permit boundaries and any natural watercourses and wetlands unless smaller
undisturbed buffers can be justified. Depending on site conditions, a buffer wider than 50 feet may
be needed.
How wide an undisturbed buffer will be maintained between any land disturbing activities within the
mining permit boundaries and any natural watercourses and wetlands at this site? Show all buffer
locations and widths on the mine map(s).
A minimum 50 ft undisturbed buffer will be maintained between land disturbing activities and any natural
watercourse or wetlands.
6. a. Describe methods to prevent landslide or slope instability adjacent to adjoining permit boundaries
during mining. Minimum 2 horizontal to 1 vertical slopes or flatter for clayey material and
minimum 3 horizontal to 1 vertical slopes or flatter for sandy material are generally required, unless
technical justification can be provided to allow steeper slopes.
All cut slopes will be maintained at 2:1 (H:V) slope or flatter.
APPLICATION FOR A MINING PERMIT
b. Provide a cross-section on the mine map(s) for all fill slopes (berms, wastepiles, overburden
disposal areas, etc.), clearly indicating the intended side slope gradient, installation of any benches
and/or slope drains (with supporting design information) if needed, and the method of final
stabilization.
c. In excavation(s) of unconsolidated (non -rock) materials, specify the angle of all cut slopes including
specifications for benching and sloping. Cross -sections for all cut slopes must be provided on the
mine map(s).
All cut slopes will be maintained at 2:1 (H:V) slope or flatter.
100
d. In hardrock excavations, specify proposed bench widths and heights in feet. Provide cross -sections
of the mine excavation clearly noting the angles of the cut slopes, widths of all safety benches and
mine benches, and the expected maximum depth of the excavation.
7. Describe other methods to be taken during mining to prevent physical hazard to any neighboring dwelling
house, public road, public, commercial or industrial building from any mine excavation. Locate all such
structures on the mine map if they are within 300 feet of any proposed excavation.
The closest residential dwelling is about 180 ft. from the mine excavation. The mine will be sloped at 2:1
(H:V) at the perimeter of the mine.
8. Describe what kind of barricade will be used to prevent inadvertent public access along any high wall area
and when it will be implemented. Vegetated earthen berms, appropriate fencing and adequate boulder
barriers may be acceptable high wall barricades. A construction detail/cross-section and location of each
type of barricade to be used must be indicated on the mine map(s).
No highwalls will be constructed. Perimeter excavation slopes are maintained at 2:1 (H:V) or flatter.
APPLICATION FOR A MINING PERMIT
9. Are acid producing minerals or soils present? Yes ❑ No JK.
If yes, how will acid water pollution from the excavation, stockpiles and waste areas be controlled?
10. a. Describe specific plans (including a schedule of implementation) for screening the operation from
public view such as maintaining or planting trees, bushes or other vegetation, building berms or other
measures. Show the location of all visual screening on the mine map(s) and provide cross -sections
through all proposed berms or proposed spacing, sizes and species for tree plantings.
The site is situated away from roads and buildings and is already screened from public view by existing
wooded areas. Therefore, no visual screening is proposed.
MZ//:1
b. Could the operation have a significantly adverse effect on the purposes of a publicly owned park,
forest or recreation area? If so, how will such effects (i.e., noise, visibility, etc.) be mitigated?
11. Will explosives be used? Yes ❑ No F�.
If yes, specify the types of explosive(s) and describe what precaution(s) will be used to prevent physical
hazard to persons or neighboring property from flying rocks or excessive air blasts or ground vibrations.
Depending on the mine's location to nearby structures, more detailed technical information may be
required on the blasting program (such as a third -party blasting study). Locate the nearest offsite occupied
structures) to the proposed excavation(s) on the mine map and indicate its approximate distance to the
proposed excavation.
12. Will fuel tanks, solvents, or other chemical reagents be stored on -site? Yes 2 No ❑.
Ifyes, describe these materials, how they will be stored and method of containment in case of spill. Indicate
the location(s) of all storage facilities on the mine map(s).
No solvents or chemicals are stored on -site. Above ground tanks are periodically provided for equipment
refueling. Soil berms are provided around the tank when on -site.
-10-
APPLICATION FOR A MINING PERMIT
D. RECLAMATION PLAN
1. Describe your intended plan for the final reclamation and subsequent use of all affected lands and indicate
the sequence and general methods to be used in reclaiming this land. This must include the method of
reclamation of settling ponds and/or sediment control basins and the method of restoration or establishment
of any permanent drainage channels to a condition minimizing erosion, siltation and other pollution. This
information must be illustrated on a reclamation map and must correspond directly with the information
provided on the mine map(s). In addition, design information, including typical cross -sections, of any
permanent channels to be constructed as part of the reclamation plan and the location(s) of all permanent
channels must be indicated on the reclamation map.
The erosion control outlet structure will be removed and sloped for positive drainage. The downslope check
dam in the ditch will be removed by spreading the brick and stone in the ditch to form a broad swale. The
roads leading to the mine and crossing the ditch will remain in -place. The roadway ditches are grassed and
stable. The 51x5' riser structure and outlet pipe will remain in -place at existing Basin K.
2. Is an excavated or impounded body of water to be left as a part of the reclamation? Yes JR No ❑.
If yes, illustrate the location of the body(s) of water on the reclamation map and provide a scaled
cross-section(s) through the proposed body(s) of water. The minimum water depth must be at least 4 feet,
measured from the normal low water table elevation, unless information is provided to indicate that a more
shallow water body will be productive and beneficial at this site.
Will the body(s) of water be stocked with fish? Yes M No ❑
If yes, specify species.
Bass and other assorted fish, as recommended by NC Wildlife.
3. Describe provisions for safety to persons and to adjoining property in all completed excavations in rock
including what kind of permanent barricade will be left. Acceptable permanent barricades are appropriate
fencing, large boulders placed end -to -end, etc. Construction details and locations of all permanent
barricades must be shown on the reclamation map.
N/A
APPLICATION FOR A MINING PERMIT
4. Indicate the method(s) of reclamation of overburden, refuse, spoil banks or other such on -site mine waste
areas, including specifications for benching and sloping. Final cross -sections and locations for such
areas must be provided on the reclamation map.
No waste areas are anticipated at this time.
5. a. Describe reclamation of processing facilities, stockpile areas, and on -site roadways.
All stockpiles will be depleted and the disturbed area graded and vegetated. Roadways leading to the site and
crossing the ditch will remain in place. The small sheds will be removed. The two irrigation systems'
underground piping will remain in -place. The pipe ends will be capped. The sprinkler heads and stands will
be removed.
b. Will any on -site roadways be left as part of the reclamation? Yes M No ❑.
If yes, identify such roadways on the reclamation map and provide details on permanent road and ditch
line stabilization.
The haul road from SR-1924 to the current stockpile areas will remain in -place.
6. Describe the method of control of contaminants and disposal of scrap metal, junk machinery, cables, or
other such waste products of mining. (Note definition of refuse in The Mining Act of 1971.)
No off -site generated waste shall be disposed of on the mine site without Arior written approval
from the NC Department of Environmental Quality, Division of Energy, Mineral, and Land
Resources and either the Division of Waste Management (DWM) or local governing body. If a
disposal permit has been issued by DWM for the site, a copy of said permit must be attached to
this application. All temporary and permanent refuse disposal areas must be clearly delineated on the
mine maps) and reclamation map, along with a list of items to be disposed in said areas.
No waste products are anticipated at this site. However, should it become apparent that it is necessary to
dispose of waste, the disposed material will meet the guidelines in the Solid Waste Section's Policy on
Recycling and Reuse (Memorandum 16) and the letter dated September 14, 1992, by Mark Fry.
-12-
APPLICATION FOR A MINING PERMIT
7. Describe your plan for revegetation or other surface treatment of the affected areas. This plan must
include recommendations for year-round seeding, including the time of seeding and the amount and type
of seed, fertilizer, lime and mulch per acre. The recommendations must include general seeding
instructions for both permanent and temporary revegetation. Revegetation utilizing only tree plantings is
not acceptable. Recommendations can be sought from:
a. Authorized representatives of the local Soil and Water Conservation District;
b. Authorized representatives of the NC Forest Service, Department of Agriculture and Consumer
Services;
c. Authorized county representatives of the North Carolina Cooperative Extension Service, specialists
and research faculty with the Colleges of Agriculture and Life Sciences and Forest Resources at
North Carolina State University;
d. North Carolina licensed landscape architects;
e. Private consulting foresters referred by the NC Forest Service, Department of Agriculture and
Consumer Services;
f. N.C. Erosion and Sedimentation Control Planning and Design Manual;
g. N.C. Surface Mining Manual: A Guide for Permitting, Operation and Reclamation;
h. Others as may be approved by the Department.
LIME - RATE OF APPLICATION (tons/acre):
FERTILIZER - ANALYSIS AND RATE OF APPLICATION (pounds/acre):
SEED - TYPE(S) AND RATE(S) OF APPLICATION INCLUDING YEAR-ROUND SEEDING
SCHEDULE (pounds/acre): [NOTE: Include Legumes]
Seed Types: Seeding Dates: Seeding Rates:
C4 Do go il►i 02OT M Q
MULCH - TYPE AND RATE OF APPLICATION (pounds/acre) AND METHOD OF ANCHORING:
OTHER VEGETATIVE COVERS - TYPE (S) AND RATE (S) OF APPLICATION INCLUDING
SEEDING SCHEDULE (pounds/acre, trees/acre, spacing of trees/shrubs, etc):
Revegetation and/or reforestation plan a,pproved by: /
Signature .� w�' Date
Print Name T. Patrick S in ton P.E.
Title President .^
Agency Engineering & Environmental Science Com an
-13-
APPLICATION FOR A MINING PERMIT
E. DETERMINATION OF AFFECTED ACREAGE AND BOND
The following bond calculation worksheet is to be used to establish an appropriate bond (based upon a range
of $500 to $5, 000 per affected acre) for each permitted mine site based upon the acreage approved by the
Department to be affected during the life of the miningpermit. Please insert the approximate acreage, for each
aspect ofthe mining operation, that you intend to affect duringthe ofthis mining permit (in addition, please
insert the appropriate reclamation costlacre for each category from the .Schedule of Reclamation C'.ostc
provided with this application form) OR you can defer to the Department to calculate vour bond for you based
ur
AFFECTED
CATEGORY
ACREAGE
Tailings/Sediment Ponds:
14
Ac.
Stockpiles:
5
Ac.
Wastepiles:
0
Ac.
Processing Area/Haul Roads:
10
Ac.
Mine Excavation:
115
Ac.
Other:
0
Ac.
TOTAL AFFECTED AC.:
144 Ac.
(TOTAL PERMITTED AC.:
348 Ac.)
RECLAMATION
RECLAMATION
COST/ACRE*
COST
X
$
2500 /Ac.
_ $ 35,000
X
$
2500 /Ac.
_ $ 12,500
X
$
/Ac.
_ $ 0
X
$
5000 /Ac.
_ $ 50,000
X
$
2000 /Ac.
_ $ 208,000
X
$
/Ac.
_ $
Temporar& Permanent Sedimentation & Erosion Control Measures:
Divide the TOTAL AFFECTED AC. above into the following two categories: a) affected acres that drain into
proposed/existing excavation and/or b) affected acres that will be graded for positive drainage where measures will
be needed to prevent offsite sedimentation and sedimentation to onsite watercourses and wetlands.
a) Internal Drainage 94 Ac.
b) Positive Drainage 50 Ac. X $1,500.00 = $ $75,000
SUBTOTAL COST: $ 380,500
Inflation Factor:
0.02 X SUBTOTAL COST: $ 380,500 X Permit Life Provided by Applicant (Life of the Mining Operation
or Life of Lease from Public Entity (in Years)): 40
INFLATION COST: $ 304,400
Total Reclamation Bond Cost: $ 684,900
(round down to the nearest $100.00)
(NOTE: The reclamation bond cannot exceed $1 million per GS 74-54)
-14-
APPLICATION FOR A MINING PERMIT
G. LAND ENTRY AGREEMENT
We hereby grant to the Department or its appointed representatives the right of entry and travel upon our lands
or operation during regular business hours for the purpose of making necessary field inspections or investigations as
may be reasonably required in the administration of the Mining Act of 1971 pursuant to G.S. 74-56.
We further grant to the Department or its appointed representatives the right to make whatever entries on the
land as may be reasonably necessary and to take whatever actions as may be reasonably necessary in order to carry
out reclamation which the operator has failed to complete in the event a bond forfeiture is ordered pursuant to G.S.
74-59.
LANDOWNER:
Signature: �GV�t,I� 00"..'a
Print Name: Warren Paschal, Environmental
Compliance Manager
(Title, if applicable)
Company: General Shale Brick Inc
(If applicable)
Address: 300 Brick Plant Rd.
Moncure, NC 27559
Telephone: 9�19) 774-6533 ext. 221
Date Signed: IV1II--w
APPLICANT:
Signature:* u1e� PAa-yuX
Print Name: Warren Paschal
Title: Environmental Compliance Manager
Company: General Shale Brick, Inc.
Mine Name: Brickhaven Mine #2 Tract B
Telephone: (919) 774-6533 ext. 221
Date Signed: ty 1 I / ZD
*Signature must be the same as the individual who signed Page 1 of this application.
One oriLyinal and
and reclamation maps, and the appropriate processing fee (see next page for fee schedule) in the forma check
or money order payable to the North Carolina Department of Environmental Quality must be sent to the
Raleigh Central Office at the address listed on the front cover of this application form.
Inquiries regarding the status of the review of this application should be directed to the Mining Program staff at
(919) 707-9220.
APPLICATION FOR A MINING PERMIT
MINING FEE SCHEDULE
A nonrefundable permit application processing fee when filing for a new mining permit, permit modification or transferred permit is
required as follows:
0-25 acres
26+acres
New Permit Applications
$3,750.00
$55000.00
Permit Modifications
$750.00
$15000.00
Permit Transfers
$100.00
$100.00
Annual Operating Fee
$400.00
$400.00
Acres for new permits means the total acreage at the site. Acres for modification of permits means that area of land affected by the modification within the permitted mine
area, or any additional land that is to be disturbed and added to an existing permitted area, or both.
- 19-
APPLICATION FOR A MINING PERMIT
SCHEDULE OF RECLAMATION COSTS
(Based upon range of $500 - $5,000 per affected acre)
COMMODITY CODES: SG = Sand and/or Gravel, GS = Gemstone, Borrow = Borrow/fill dirt, CS = Crushed Stone,
DS = Dimension Stone, FS = Feldspar, MI = Mica, LI = Lithium, PF = Pyrophyllite, OL = Olivine,
KY = Kyanite/Sillimanite/Andalusite, PH = Phosphate, CL = Clay/Shale, PE = Peat, AU = Gold, TI = Titanium, and OT
= Other
Type
T/S Ponds
S.piles
W.piles
P.arealH.R.
Mine Excay.
SG, GS,
$500/ac.(L)
$1800/ac.
$2000/ac.
$1800/ac.
$500/ac.(L)
Borrow
1500(FI)
$2000(PD)
CS, DS,
500(L)
1800
2000
2000
500(L)
FS, MI,
1500(FI)
2500(PD)
LI, PF, OL, KY
PH
1000(L)
2500
5000
5000
2000(L)
2500(FI)
5000(PD)
CL
1000(L)
2500
5000
5000
2000(L)
2500(FI)
3700(PD)
PE, AU,
1000(L)
2500
3000
3500
2000(L)
TI, OT
2500(FI)
5000(PD)
(L) = reclamation to a lake and revegetating sideslopes
(FI) = reclamation by filling in and revegetating
(PD) = reclamation by grading for positive drainage & revegetating
AS PER NCAC 15A 5B.0003, IF YOU DISAGREE WITH THE BOND AMOUNT DETERMINED BY THE
BOND CALCULATION WORKSHEET, YOU MAY SUBMIT AN ESTIMATE OF RECLAMATION COSTS
FROM A THIRD PARTY CONTRACTOR. SAID ESTIMATE MUST BE PROVIDED WITHIN 30 DAYS TO
THE FOLLOWING ADDRESS: Mining Program,1612 Mail Service Center, Raleigh, North Carolina 27699-1612
ALL ESTIMATES MUST INCLUDE THE FOLLOWING, AS A MINIMUM:
• FINAL GRADING COSTS PER ACRE
• LIME AND FERTILIZER COSTS PER ACRE
• YEAR-ROUND SEEDING MIXTURE COSTS PER ACRE (FROM APPROVED REVEGETATION
PLAN IN APPLICATION/PERMIT DOCUMENT)
• MULCH AND ANCHORING COSTS PER ACRE
• ANY OTHER RECLAMATION COSTS NECESSARY TO COMPLY WITH THE APPROVED
RECLAMATION PLAN FOR THE SITE IN QUESTION
YOU WILL BE NOTIFIED AS SOON AS POSSIBLE OF THE DIRECTOR'S FINAL BOND DETERMINATION.
-22-