Loading...
HomeMy WebLinkAboutBrickhave Mine#2, Tract B, 19-08Retum PDP of this fort to DEMLR CO by email cc DEMLR RO, DWR SPU Send a copy to the perrittee. DIVISION OF WATER RESOURCES MINING PERMIT APPLICATION REVIEW FORM SECTIONTHIS r OUT DEMLR DEMLR PERMIT: 19-08 Project Action I Newl Modification Transfer Release Applicant Name: General Shale Brick Inc. F1 X Applicant's Email: warren.paschal@generalshale.com County: Chatham Project Name: Brickhaven Mine #2 Tract B YES NO Date Commencing Have land disturbing activities started?? X 05128/1985 Latitude: 135.5993 1 Longitude: -79,0219 Please return comments to (at DEMLR CO): Adam Parr adam.parrAncdenr.gov p Comments due by: 11 330/2020 Is this mine an active permit in RIMS? Is the RO concerned that the operation, as proposed, would violate standards of water quality? Comments: Does this mine (or previous owner) have DWR back fees to pay? (if Yes, amount): YES NO Watershed/Stream Name & Classification: DWR Compliance Status of Mine: 401 Wetland Cert. required? 401 Wetland Cert. existinga? 1-1 I ICI (if Yes, Permit #J: Does DWR RO have enough information to determine if a 401 certification is required? Is an O & M Plan needed? I„f Are wetlands disturbed at this site? Does DWR,RO suspect or know of nearby wetlands to the site? Is a wetland delineation required prior to DWR issuing the permit? �,,, o 1D Consultant —1CA Onsite �► f.�o..r }w offsite Stream Determination Needed? Stream Determination Completed? D; coK o Lark Does DWR RO need a statement that no wetlands/str ams are disturbed for this project ❑ from applicant? Buffer Determination Needed? Buffer Determination Completed? AV ev.4 v,,:k abth P z_' tack Recycle system permit existing? (if Yes, Permit#): New Recycle System permit required? Enough information to determine? I F-1 Return POP of this foram to DEMLR CO by email cc DEMLR RO, DWR SPU.. Send a copy to the permiltee Non -discharge permit existing? (if Yes, Permit #): Will wastewaters discharge to HQW waters with a 7Q10=0? 7Q10 Flow: Unknown Permittee must determine Does DWR require DEMLR to hold the permit (e.g. so DWR can review it further or because DWR KA requires more information)? Has Violation O&M Requirements HQW/7Q10 Concerns Pay bock fees or renew DWR permit �0 ^ JAC ro ck c-. 119dow- Other Please describe the reason to old the permit: RO contact: 14 U %, V,5O"N Hold Until: Mine must wait to dewater until an O&M plan is approved? Reviewed Central Office Date Regional Office Date DWR RO Surface Water a 1� _z� _� RO Aquifer Protection Section Paw Qans—s nr )n,)n rn