Loading...
HomeMy WebLinkAbout20211221_DWRReturn PDF of this form to DEMLR CO by email. cc DEMLR RO, DWR SPU. Send a copy to the permittee. DIVISION OF WATER RESOURCES MINING PERMIT APPLICATION REVIEW FORM DEMLR PERMIT: THIS SECTION TO BE 16-83 Project Action New OUT BY DEIVILR Modification Transfer Release Applicant Name: Ralph Thomas Jr. X Applicant's Email: ralphthomasjr@hotmail.com County: Carteret Project Name: Thomas Borrow Pit YES NO Date Commencing Have land disturbing activities started?? —1 07/27/2021 Latitude: 34.77530 Longitude: -76.63060 Please return comments to (at DEMLR CO): Jenna Spencer jenna,spencer@ncdenr,gov Comments due by: 12/08/2021 SECTION• TO BE FILLED OUT BY DWR YES NO Is this mine an active permit in BIMS? NCG020993 Is the RO concerned that the operation, as proposed, would violate standards of water quality? W Comments: See additional comments on second page. Does this mine (or previous owner) have DWR back fees to pay? L�/ (If Yes, amount): Watershed/Stream Name & Classification: Thomas Creek Stream Index 21-35-1-5 From Source to North River Class SA;HQW DWR Compliance Status of Mine: 401 Wetland Cert. required? ✓ 401 Wetland Cert. existing? ❑✓ (If Yes, Permit #): 2017-1234 Does DWR RO have enough information to determine if a 401 certification is required? ❑✓ I El Is an O & M Plan needed? ✓I El Are wetlands disturbed at this site? ❑ ❑✓ Does DWR RO suspect or know of nearby wetlands to the site? I ❑✓I ❑ Is a wetland delineation required prior to DWR issuing the permit? I✓ Already completed expires 03/17/2022 SAW-2017-01139 JD Consultant Onsite ❑ Offsite ❑ ❑ Stream Determination Needed? ❑ 1 ❑✓ Stream Determination Completed? ❑ ❑✓ Does DWR RO need a statement that no wetlands/streams are disturbed for this project from applicant? ❑✓ ❑ Buffer Determination Needed? ❑ ✓ Buffer Determination Completed? ❑ ❑✓ Recycle system permit existing? ❑ ❑✓ (If Yes, Permit #): New Recycle System permit required? F-1 ✓ Enough information to determine? Rev. December 2020-2020rl Return PDF of this form to DEMLR CO by email. cc DEMLR RO, DWR SPU. Send a copy to the permittee. Non -discharge permit existing? LI I 1,(I (If Yes, Permit #): Will wastewaters discharge to HQW waters with a 7Q10=0? 7Q10 Flow: Unknown Permittee must determine Proposed discharge area is SA;HQW Does DWR require DEMLR to hold the permit (e.g. so DWR can review it further or because DWR requires more information)? ❑✓ ❑ Has Violation O&M Requirements ./ HQW/7Q10 Concerns ./ LI Pay back fees or renew DWR permit Other Please describe the reason to hold the permit: DWR is concerned about the proposed dewatering discharging to class SA;HQW waters. RO contact: Hold Until: Mine must wait to dewater until an O&M plan is approved? ✓ Reviewed Central Office Date Regional Office Date DWR RO Surface Water Megan Faulkner & Holley Snider 12/21/2021 RO Aquifer Protection Section Additional Comments: DWR has concerns regarding the proposal to discharge mine water to wetlands and surface waters adjacent to North River. North River is classified as SA;HQW and is a designated primary nursery area by NCDMF. The application lacks the information required to determine if the project will not violate tidal salt water quality standards for SA;HQWs in 15A NCACO2B.0221, water quality standards for HQWs in 15A NCACO2B.0224, and the anti -degradation policy found is 15A NCACO2B.0201. Coordination with the appropriate agencies is needed to ensure that water quality standards for the receiving waters can be maintained. Rev. December 2020-2020r1