Subject: Partial Release, Mar Mac Sand and Gravel Pit, Permit # 96-43
Dear Mr. Parr,
RECEIVED
IUL 1 g 202�
LAND QUALITY
MINING PROGRAM
We are hereby requesting release of 1 acre from the Permitted Acreage of Mar Mac Sand and
Gravel Mine, Mining Permit # 96-43. The Mine Map has been updated and highlighted to show
the released area. This area was has never been disturbed by mining, and was previously
intended as buffer. The land will be used by a different commercial business unrelated to the
sand mine. Please let me know if you need any additional information.
Sincerely,
Revised 2/2012
PARTIAL RELEASE OF MINE SITE CHECKLIST
In order for the permittee to be released from further reclamation responsibility for a portion of
the permitted mine site with respect to The Mining Act of 1971, the following is required:
A letter must be submitted to the Land Quality Section by the permittee stating that
reclamation has been completed on a portion of the mine site, that he has no further
intentions to re -affect this portion of the site in the future, and that he wishes to be
released from further reclamation responsibility with respect to the mining permit, the
reclamation bond, and The Mining Act of 1971 on this portion of the site. Two copies of
an updated mine map of the site must be submitted clearly indicating the size and location
of the portion of the mine site to be released.
A. The subject site will be inspected by representatives of the Department in
accordance with G.S. 74-56 to determine whether the operator has complied with
the reclamation plan, the requirements of The Mining Act of 1971, and the terms
and conditions of the mining permit. If the reclamation has been properly
completed on the portion of the site in question, a memo will be sent from or
through the Regional Engineer to the Mining Specialist noting the date the site was
RECUVinsp'ected and recommending that the reclaimed portion of the site be released.
The memo should also indicate the reclamation method employed for the particular
JUL _ 3 Wba. A copy of the inspection report and letter requesting partial release should
be attached to the memo.
LAND QUALI Y
MINING PRO&'-1`"i
B. If the reclamation has not been sufficiently completed on the portion of the site, the
Inspector will give written notice to the permittee to advise him of any deficiencies
noted during the site inspection. The operator will commence action to rectify
these deficiencies and will diligently proceed until they have been corrected. The
Regional Office staff may extend performance periods referred to in G.S. 74-53
(Reclamation Plan) for delays clearly beyond the permittee's control, but only in
cases where the Department finds that the permittee is making every reasonable
effort to comply. Upon completion of the necessary reclamation, the permittee will
contact the Land Quality Section Regional Office staff to determine whether or not
the portion of the site is releasable. If releasable, a memo will be sent from or
through the Regional Engineer as described in 2.A. above.
3. Upon receipt of the above, the Director (or his designee) will notify the permittee in writing
that the permittee is released from further obligations with respect to The Mining Act of
1971 for the portion of the site that has been sufficiently reclaimed. At that time, the
Director (or his designee) will release the appropriate portion of any performance
(reclamation) bond or other security that the permittee has posted under G.S. 74-54.
For more information, contact the Land Quality Section Regional Office serving your area or the
Central Office at (919) 707-9220.