Loading...
HomeMy WebLinkAbout20220204_DWRFrom: Tankard, Robert To: Parr, Adam; Dumpor, Samir; Edwards, James Cc: Pullinaer, Robert C; Edgerton, Thom Subject: RE: 48-19 - Rich Farms Mine - NEW - Hyde Cc Date: Friday, February 4, 2022 3:46:51 PM Attachments: 48-19 RICH FARMS MINE.odf Adam, DWR has no concerns. Thanks! Robert From: Parr, Adam <adam.parr@ncdenr.gov> Sent: Friday, January 28, 2022 4:29 PM To: Dumpor, Samir <samir.dumpor@ncdenr.gov>; Tankard, Robert <robert.tankard@ncdenr.gov>; Dunn, Maria T. <maria.dunn@ncwildlife.org>; Harrison, James A <James.Harrison@ncdenr.gov>; Galamb, Eric <Eric.Galamb@ncagr.gov>; Farrell, Christine E <christine.farrell@ncparks.gov>; DCR - Environmental _Review <Environmental.Review@ncdcr.gov>; Taylor, Kenneth <kenneth.b.taylor@ncdenr.gov>; pete_benjamin@fws.gov; Bauer, Michael <michael.bauer@ncdenr.gov>; Chianese, Gabrielle <gabrielle.chianese@ncdenr.gov> Subject: 48-19 - Rich Farms Mine - NEW - Hyde Co All, Please see the attached files for the NEW application for the Rich Farm Mine (application # 48-19). Hard Copies will be sent as usual. Please have comments back by February 24 2022. Thanks, Adam Parr, PE Assistant State Mining Engineer Division of Energy, Mineral and Land Resources North Carolina Department of Environmental Quality Office: (919) 707-9207 Cell: (919) 441-7157 FAX: (919) 715-8801 Email: adam.parrCcDncdenr.gov Physical Address: 512 N Salisbury Street Mailing Address: 1612 Mail Service Center Raleigh, North Carolina 27699-1612 Mining Program Website: https://deq.nc.gov/mining-program E a.pamn.ns al Enr4�+alrl uuaalry Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties Return PDF of this form to DEMLR CO by email. cc DEMLR RO, DWR SPU. Send a copy to the permittee. DIVISION OF WATER RESOURCES MINING PERMIT APPLICATION REVIEW FORM DEMLR PERMIT: SECTIONTHIS TO BE OUT 48-19 Project Action New BY DEIVILR Modification Transfer Release Applicant Name: B.E. singleton & sons X Applicant's Email: bobby@besingleton.com County: Hyde Project Name: Rich Farms Mine YES NO Date Commencing Have land disturbing activities started?? X L 01/24/2012 Latitude: 35.558291 Longitude: -76.43097 Please return comments to (at DEMLR CO): Adam Parr adam.parr@ncdenr.gov Comments due by: = 02/24/2022 SECTION BELOW TO BE FILLED OUT BY DWR YES NO Is this mine an active permit in BIMS? El 1xi Is the RO concerned that the operation, as proposed, would violate standards of water quality? F IX Comments: Does this mine (or previous owner) have DWR back fees to pay? X (If Yes, amount): Watershed/Stream Name & Classification: DWR Compliance Status of Mine: 401 Wetland Cert. required? I I Q 401 Wetland Cert. existing? I I 0 (If Yes, Permit #): Does DWR RO have enough information to determine if a 401 certification is required? ❑X Central Coastal Plain Capacity Use Area (CCPCUA). Required? ILlI X Central Coastal Plain Capacity Use Area (CCPCUA). Existing? (If Yes, Permit #): Does DWR RO have enough information to determine if a CCPCUA is required? X Is an O & M Plan needed? Ll X Are wetlands disturbed at this site? X Does DWR RO suspect or know of nearby wetlands to the site? X Is a wetland delineation required prior to DWR issuing the permit? X JD X Consultant F X I Onsite F X I Offsite11 X Stream Determination Needed? Ll I X Stream Determination Completed? LlI 0 Does DWR RO need a statement that no wetlands/streams are disturbed for this project from applicant? z Rev November 2021 r0 Return PDF of this form to DEMLR CO by email. cc DEMLR RO, DWR SPU. Send a copy to the permittee. Buffer Determination Needed? X Buffer Determination Completed? X Recycle system permit existing? LI X (If Yes, Permit #): New Recycle System permit required? X Enough information to determine? X Non -discharge permit existing? LI I X (If Yes, Permit #): Will wastewaters discharge to HQW waters with a 7Q10=0? LI I i< 7Q10 Flow: Unknown Permittee must determine Does DWR require DEMLR to hold the permit (e.g. so DWR can review it further or because DWR requires more information)? ❑ 0 Has ViolationLI X O&M Requirements a HQW/7Q10 Concerns X Pay back fees or renew DWR permit Other LI I X Please describe the reason to hold the permit: RO contact: Robert Tankard Hold Until: Mine must wait to dewater until an O&M plan is approved? ❑ I F (- CentralOffice Date Regional Office I Date DWR RO Surface Water Robert Tankard 02/04/2022 RO Aquifer Protection Section Rev November 2021 r0