HomeMy WebLinkAbout20211215_DWRReturn PDF of this form to DEMLR CO by email. cc DEMLR RO, DWR SPU. Send a copy to the permittee.
DIVISION OF WATER RESOURCES
MINING PERMIT APPLICATION REVIEW FORM
DEMLR PERMIT:
SECTIONTHIS TO BE OUT
83-05 Project Action New
BY DEIVILR
Modification Transfer Release
Applicant Name:
R.L. Bradsher Farms, LLC
X
Applicant's Email:
County:
Scotland
Project Name:
Scotland Pit
YES
NO
Date Commencing
Have land disturbing activities started??
X
LJ
06/23/1999
Latitude:
34.919
Longitude:
-79.5329
Please return comments to (at DEMLR CO):
Adam Parr
adam.parr@ncdenr.gov
Comments due by: 01/10/2022
SECTION• TO BE FILLED OUT BY DWR
YES NO
Is this mine an active permit in BIMS?
El
X
Is the RO concerned that the operation, as proposed, would violate standards of water quality?
X
Comments:
NWI map indicates the presence of wetlands on the western side of the property. NWI maps
are only an indicator of the possible presence of wetlands. An actual wetland determination
should be conducted to verify the presence and extent of wetlands so that they can be
avoided.
Does this mine (or previous owner) have DWR back fees to pay?
(If Yes, amount):
Watershed/Stream Name & Classification:
Jordan Creek B;Sw
DWR Compliance Status of Mine:
401 Wetland Cert. required?
401 Wetland Cert. existing?
I
(If Yes, Permit #):
Does DWR RO have enough information to determine if a 401 certification is required?
El
I
X
Central Coastal Plain Capacity Use Area (CCPCUA). Required?
Central Coastal Plain Capacity Use Area (CCPCUA). Existing?
(If Yes, Permit #):
Does DWR RO have enough information to determine if a CCPCUA is required?
Is an O & M Plan needed?
I
El
Are wetlands disturbed at this site?
I
El
Does DWR RO suspect or know of nearby wetlands to the site?
X
Is a wetland delineation required prior to DWR issuing the permit?
X
JD
Consultant
X
Onsite
X
Offsite
Stream Determination Needed?
Stream Determination Completed?
Does DWR RO need a statement that no wetlands/streams are disturbed for this project
from applicant?
Rev November 2021 r0
Return PDF of this form to DEMLR CO by email. cc DEMLR RO, DWR SPU. Send a copy to the permittee.
Buffer Determination Needed?
Buffer Determination Completed?
Recycle system permit existing?
(If Yes, Permit #):
New Recycle System permit required?
Enough information to determine?
Non -discharge permit existing?
(If Yes, Permit #):
Will wastewaters discharge to HQW waters with a 7Q10=0?
7Q10 Flow:
Unknown Permittee must determine
Does DWR require DEMLR to hold the permit (e.g. so DWR can review it further or
because DWR requires more information)?
❑
❑
Has Violation
O&M Requirements
❑
HQW/7Q10 Concerns
Pay back fees or renew DWR permit
❑
Other
X
EI
Please describe
the reason to
hold the permit:
NWI map shows wetland on the property. Presence and extent of wetland needs to be
verified by an onsite wetland determination by a qualified wetland consultant.
RO contact:
Chad Turlington
Hold Until:
Mine must wait to dewater until an O&M plan is approved?
I El I ❑
(-
CentralOffice Date Regional Office I Date
DWR RO Surface Water
Chad Turlington
12/15/2021
RO Aquifer Protection Section
Rev November 2021 r0